Control system and control method

By storing and managing function process information and device function correspondence in the control system, and dynamically adjusting function allocation, the function implementation interruption and delay problems caused by failures during cooperation of multiple devices are solved, and the system's adaptability and reliability are improved.

CN113994282BActive Publication Date: 2024-11-26KK TOSHIBA +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202080041551.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Priority Date
2019-06-06
Filing Date
2020-06-02
Publication Date
2024-11-26
Estimated Expiration
2040-06-02

AI Technical Summary

Technical Problem

When multiple devices cooperate, it is difficult to quickly change the cooperative relationship after a failure occurs, resulting in interruption or delay in function implementation.

Method used

By storing function process information and device function correspondence information in the control system, dynamic management and updates are realized, allowing automatic or manual adjustment of function allocation when a fault occurs, ensuring the flexibility and efficiency of the system.

Benefits of technology

It realizes rapid function changes in the event of device failure, avoids interruption and delay in function implementation, and improves the adaptability and reliability of the system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113994282B_ABST
    Figure CN113994282B_ABST
Patent Text Reader

Abstract

The control system of the embodiment includes a plurality of devices and a control unit. The control unit stores first information and second information, wherein the first information indicates the collaboration of a plurality of functions for realizing a process, and the second information indicates the correspondence between the plurality of devices and the plurality of functions, and the control unit controls the plurality of devices based on the first information and the second information to realize the process.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] Embodiments of the present invention relate to a control system and a control method for controlling cooperation of a plurality of devices. Background Art

[0002] In recent years, with the development of the network, a control system has been developed as follows: multiple devices that respectively implement multiple functions constituting one process cooperate to perform one process. Once the order of implementing multiple functions is determined, the multiple devices assigned to the multiple functions need to cooperate to work in a prescribed order corresponding to the order of implementing the functions. The control system controls the cooperation of multiple devices.

[0003] When a device fails, the coordination of multiple devices must be changed. In conventional control systems, the correspondence between functions and devices is often fixed one-to-one in advance. Therefore, when a device fails, the coordination cannot be easily changed.

[0004] Prior art literature

[0005] Patent Literature

[0006] Patent Document 1: Japanese Patent Application No. 2013-519167 Summary of the invention

[0007] Technical problem to be solved by the invention

[0008] An object of the present invention is to easily change the coordination of a plurality of devices in a control system that controls the coordination of a plurality of devices.

[0009] Means for solving technical problems

[0010] The control system of the embodiment includes a plurality of devices and a control unit. The control unit stores first information and second information, wherein the first information indicates the collaboration of a plurality of functions for realizing a process, and the second information indicates the correspondence between the plurality of devices and the plurality of functions, and the plurality of devices are controlled based on the first information and the second information to realize the process. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] Figure 1 This is a diagram showing an overview of an example of process management in the control system according to the first embodiment.

[0012] Figure 2 This is a diagram showing an example of functional flow information used in an example of process management.

[0013] Figure 3 This is a diagram showing an example of link information used in an example of process management.

[0014] Figure 4This is a diagram showing an example of a change in process management.

[0015] Figure 5 This is a diagram showing an example of functional flow information used when changing process management.

[0016] Figure 6 This is a diagram showing an example of functional flow information used when changing process management.

[0017] Figure 7 This is a diagram showing an example of functional flow information used when changing process management.

[0018] Figure 8 This is a diagram showing an example of link information used when changing process management.

[0019] Fig. 9 This is a diagram showing another example of the change in process management.

[0020] Fig.10 This is a diagram showing an example of functional flow information used in another example of the change of process management.

[0021] Fig.11 This is a diagram showing an example of functional flow information used in another example of the change of process management.

[0022] Fig.12 This is a diagram showing an example of the hierarchical structure of the process management according to the first embodiment.

[0023] Fig.13 This is a diagram showing an example of the functional flow of process management in a manufacturing system.

[0024] Fig.14 This is a diagram showing an example of the functional flow of a manufacturing system.

[0025] Fig.15 This is a block diagram showing an example of a process management system for managing a manufacturing process.

[0026] Fig.16 Yes means Fig.15 A diagram showing an example of a functional flow in a process management system shown.

[0027] Fig.17 Yes means Fig.16 A conceptual diagram of the changes in the functional flow shown.

[0028] Fig.18 This is a diagram showing an example of a function map used for detour route creation.

[0029] Fig.19 This is a diagram showing an example of an operation of creating a detour using a function map.

[0030] Fig. 20 It is a diagram showing an example of the operation rate management information used for the detour road production plant.

[0031] Fig.21 It is a diagram showing a display example of the area diagram based on the operation rate management information.

[0032] Fig. 22 It is a diagram showing another example of the process management including the detour road production.

[0033] Fig.23 It is a diagram showing yet another example of the process management including the detour road production.

[0034] Fig.24 It is a diagram showing another example of the function diagram used for the detour road production.

[0035] Fig.25 It is a diagram showing an example of the link information used for the detour road production.

[0036] Fig.26 It is a diagram showing an example of the movement of components during the detour road production.

[0037] Fig. 27 It is a diagram showing an example of the IP header which is the first example of the connection data (Japanese: inheritance data) transmitted between devices.

[0038] Fig.28 It is a diagram showing an example of the function flow header within the payload of the first example of the connection data.

[0039] Fig.29 It is a diagram showing another example of the function flow header within the payload of the first example of the connection data.

[0040] Fig.30 It is a diagram showing an example of the function flow header within the payload of the second example of the connection data.

[0041] Fig.31 It is a diagram showing an example of the function flow body within the payload of the second example of the connection data.

[0042] Fig.32 It is a diagram schematically showing the structure of the management shell.

[0043] Fig.33 It is a diagram showing an example of the management shells collaborating with each other via the network.

[0044] Fig.34 It is a diagram showing the concept of the segmentation of the connection data.

[0045] Fig.35This is a diagram showing an example of divided transmission of connection data.

[0046] Fig.36 This is a diagram showing an example of a carriage for conveying a component processed by a first device to a second device.

[0047] Fig.37 This is a diagram showing another example of the functional flow.

[0048] Fig.38 This is a flowchart showing an example of functional flow creation.

[0049] Fig.39 This is a flowchart showing an example of functional flow creation.

[0050] Fig.40 This is a flowchart showing an example of link information update.

[0051] Fig.41 This is a flowchart showing an example of updating the area map.

[0052] Fig.42 This is a flowchart showing an example of data transfer when processing by the first device is completed.

[0053] Fig.43 This is a flowchart showing another example of link information update.

[0054] Fig.44 This is a flowchart showing an example of detour route creation.

[0055] Fig.45 This is a flowchart showing an example of detour route creation.

[0056] Fig.46 This is a diagram showing an overview of an example of a building management system as an example of a control system according to the second embodiment.

[0057] Fig.47 This is a flowchart showing an example of building management by the building management system.

[0058] Fig.48 It is a diagram for explaining the concept of the manufacturing skill base system according to the third embodiment.

[0059] Fig.49 This is a block diagram showing an example of an asset management system as an example of a control system according to the third embodiment.

[0060] Fig.50 This is a diagram showing an overview of an example of an asset management system.

[0061] Fig.51 This is a diagram showing an example of a bypass evaluation unit of an asset management system. DETAILED DESCRIPTION

[0062] Hereinafter, the embodiments will be described with reference to the accompanying drawings. The following descriptions illustrate devices and methods for embodying the technical ideas of the embodiments, and the technical ideas of the embodiments are not limited to the structures, shapes, configurations, materials, etc. of the constituent elements described below. Deformations that can be easily thought of by a person skilled in the art are naturally also included in the disclosed scope. In order to make the description clearer, in the accompanying drawings, the size, thickness, plane size or shape of each element are sometimes changed relative to the actual implementation and schematically shown. In a plurality of drawings, elements with different dimensional relationships or ratios are sometimes included. In a plurality of drawings, there are also cases where the same reference numerals are marked for corresponding elements and repeated descriptions are omitted. Although there are cases where multiple names are given to some elements, the examples of these names are only for illustration, and other names are not denied for these elements. In addition, for elements that are not given multiple names, other names are not denied. In addition, in the following description, "connection" not only means direct connection, but also means indirect connection via other elements.

[0063] [First embodiment]

[0064] [Overview of process management]

[0065] The control system of the embodiment can be applied to various systems. As an example, an example of a control system applied to process management is described. Process management refers to managing the manufacturing process of a manufacturing system that manufactures products, such as materials and components. Various functions are required to manufacture products. The mechanism that realizes the function is called a device. Process management manages the order in which multiple functions are realized and the combination of which device realizes which function.

[0066] As a simple example of a manufacturing process, consider cutting a material into a specified shape to make a component, opening a hole of a specified size at a specified position of the component, and inserting other components into the hole as a product. Examples of functions are cutting materials, opening holes in components, and assembling multiple components. An example of a device that implements the cutting function is a milling machine, an example of a device that implements the hole opening function is a drill, and an example of a device that implements the assembly function is a robot arm. The operator operates the processing device to perform the specified processing operation and manufacture the product. Sometimes the operator does not operate the operation panel of the processing device, but uses a computer-controlled processing device. For example, processing devices such as milling machines, drills, and robot arms are sometimes replaced by NC (Numerical Control) processing devices. NC processing devices work through control programs, and if the control program is changed, different functions can be achieved. For example, an NC drill that opens a hole with a depth of 10 cm at a point 10 cm away from the right end of the component and 10 cm away from the upper end of the component realizes the function of "opening a hole with a diameter of 5 mm and a depth of 10 cm at a point 10 cm away from the right end of the component and 10 cm away from the upper end of the component". If the control program of the NC drill is changed, the NC drill can realize the function of "opening a hole with a diameter of 1 cm and a depth of 5 cm at a point 5 cm away from the right end of the component and 20 cm away from the upper end of the component." Therefore, examples of devices are not limited to hardware such as processing devices, but also include software such as such control programs. Moreover, hardware is not limited to dedicated hardware, but also includes general-purpose processing devices such as personal computers. In this case, the program installed in the general-purpose processing device becomes an example of a device. A system composed of a general-purpose processing device can change the program of the general-purpose processing device according to changes in the use environment and the purpose of use, thereby changing the function to be realized, which can improve the diversity, autonomy, and rapid adaptability of the system.

[0067] Multiple devices for realizing multiple functions required to produce a product can be centrally arranged in the same factory of an enterprise or dispersedly arranged in different factories of an enterprise. Moreover, multiple devices can also be dispersedly arranged in multiple places across multiple enterprises. Multiple devices are connected to each other via a network. A server is also connected to the network. Multiple devices can be directly connected to each other without going through a server, or they can be connected to each other via a server.

[0068] The control system notifies each device of the function to be implemented, and each device implements the function. When a device that implements a function implements the function, the component obtained by implementing the function is transmitted to the next device that implements the function to be implemented, and information indicating the implementation result of the function is sent to the next device via the network.

[0069] An example of process management using a control system according to the embodiment is summarized as follows: Figure 1As shown. Process management manages the flow of functions of each product as a functional flow. The functional flow indicates when and in what order multiple functions are implemented, that is, the collaboration between multiple functions. Information indicating the functional flow is called functional flow information (first information). Figure 1 Indicates the functional flow for products A, B, and C. Process management manages multiple devices that implement each of multiple functions, and manages the combination of which device implements which function as link information (second information). Link information indicates which function corresponds to which device (also called link), that is, which function is assigned to which device. Figure 1 Indicates the links for drill bits a, b, and c. Based on the functional flow information and the link information, the device that realizes each function is identified, and the device operates according to the functional flow information, thereby manufacturing the product.

[0070] Functional flow information can also be prepared before the manufacturing manager starts manufacturing and input into the system. Alternatively, a picture of a product can be imported into a personal computer, etc., and a program that automatically prepares functional flow information based on the picture can be used to automatically prepare the functional flow information and input into the system. When the functional flow information is automatically prepared, it can also be set to require the approval of the manufacturing manager.

[0071] like Figure 1 As shown, the functional flow for product A shows that the functions are implemented in the order of cutting, drilling, assembly, ... The functional flow for product B shows that the functions are implemented in the order of cutting, assembly, drilling, cutting, ... The functional flow for product C shows that the functions are implemented in the order of drilling, assembly, cutting, ... In addition, the functional flow also represents the total number of products manufactured.

[0072] The link information of drill a indicates that drill a realizes the hole-making function of product B. The link information of drill b indicates that drill b realizes the hole-making function of product C and the hole-making function of product A. The link information of drill c indicates that there is no function realized by drill c. For processing devices other than drills, such as milling machines and robotic arms, the same link information as that of drills is also managed.

[0073] Before each drill a, b, c realizes the function assigned to the device, a control program corresponding to the realized function is installed in each drill a, b, c. After each drill a, b, c realizes the function, the control program corresponding to the realized function is uninstalled from each drill a, b, c.

[0074] Figure 2An example of functional flow information used in process management is shown. Functional flow information is set according to each product manufactured. For product A (e.g., 1000 pieces), the functional flow information is composed of the start cutting date and time, the end cutting date and time, the start drilling date and time, the drilling end date and time, the start assembly date and time, and the assembly end date and time. These dates and times are future dates and times and are set according to the manufacturing plan. Similarly, for product B (e.g., 2000 pieces), the functional flow information is composed of the start cutting date and time, the end cutting date and time, the start assembly date and time, the drilling end date and time, the start drilling date and time, and the cutting end date and time. For product C (e.g., 10000 pieces), the functional flow information is composed of the start drilling date and time, the drilling end date and time, the start assembly date and time, the assembly end date and time, the start cutting date and time, and the cutting end date and time. In this way, the order of cutting, drilling, and assembly can also be different depending on the product. Figure 2 It is functional process information that represents the overall manufacturing process of multiple products, but it can also be set corresponding to each product. Figure 2 The sub-function flow information is the same as the function flow information shown. That is, the sub-function flow information for a product only has the number of products. In addition, in the description of the function flow information, link information and each figure, "○" is an arbitrary natural number corresponding to the date and time.

[0075] Figure 3 An example of link information used in process management is shown. Link information indicates a list of functions assigned to each device in the system. The assignment of functions to devices is also called link. The 0 symbol indicates that the function has been assigned to the device and the link between the function and the device has been set, and the × symbol indicates that the function has not been assigned to the device and the link between the function and the device has not been set, that is, it has been released.

[0076] The link information related to the drill indicates that the drilling function of product B is assigned to drill a, the drilling function of product A and the drilling function of product C are assigned to drill b, and no function is assigned to drill c. The link information related to the milling machine indicates that no function is assigned to milling machine a, the cutting function of product A and the cutting function of product B are assigned to milling machine b, and the cutting function of product C is assigned to milling machine c. The link information related to the robot arm indicates that no function is assigned to robot arms a and c, and the assembly function of product A, the assembly function of product B, and the assembly function of product C are assigned to robot arm b.

[0077] Since the functional flow is composed of a collection of functions of each product, the function column of the link information may also be represented by which function of which functional flow, rather than the function related to the manufacture of the product.

[0078] [Changes in process management]

[0079] In the above-mentioned manufacturing process, it is assumed that a certain device, such as a drill, fails due to the damage of the blade, etc. In this case, the cooperation between the predetermined functions stops, resulting in the suspension of the implementation of the functional process. There is a situation where the manufacturing system has multiple devices configured in multiple places such as multiple factories of the same enterprise or different enterprises. In the previous process management, the operating conditions of the devices constituting the manufacturing system were not managed, so it was impossible to find a substitute device to continue the hole-opening function implemented by the failed device. Therefore, when the blade of the drill is replaced, the implementation of the hole-opening function implemented by the drill is stopped. If there is an unused substitute device in the same factory, even if the hole-opening function is continued from the failed device to the substitute device, the implementation of the hole-opening function will also stop if the substitute device is planned to be used. If the number of functions (number of processes) increases, the response to the failure becomes complicated, and sometimes the best replacement part cannot be found even if it takes a long time.

[0080] Furthermore, in conventional NC processing devices, in order to install a control program for operating the processing device, a portable storage medium such as a USB memory storing the control program needs to be electrically connected to the processing device. Therefore, even if the best alternative device is found, it takes time to install a control program such as "opening a hole with a depth of 10 cm at a point 10 cm from the right end of a component and 10 cm from the upper end of the component" to the alternative device, and there will still be a period in which the hole opening function is stopped.

[0081] In the process management of the embodiment, since the functional flow information and link information are managed, the operating conditions of multiple devices in the system and the functions implemented by the multiple devices can be identified, and the cooperation between the functions can be easily changed when the device fails. In the process management of the embodiment, the server installs the control program to the device via the network and uninstalls the control program from the device.

[0082] In the process management system of the embodiment, the change of process management corresponding to the failure of the device is, for example, Figure 4 Assume that the implementation is Figure 1The functional flow shown is the same as the functional flow shown, and the drilling function of drill b for product C (hereinafter referred to as drilling function #1 for product C) is broken during the implementation. In this case, since drilling function #1 for product C is assigned to drill b, when drill b is detected to have a fault, the assignment of drilling function #1 for product C to drill b is released and the link information is updated. In addition, a new drilling function #2 for product C is added to the functional flow, and the functional flow is updated. The drilling function #2 for product C is assigned to a substitute drill other than drill b. The drilling function #2 for product C assigned to the substitute drill is called a substitute function or a detour function. The part of the functional flow related to the switch from an unrealizable function to an alternative function, the implementation of the alternative function, and the switch from the alternative function to the next function after it becomes unrealizable is called a detour. The drill selected based on the attributes described later, such as drill c, is set as the link target device for drilling function #2 for product C. When the link destination of the alternative function is determined, the allocation of the alternative function and the link destination device is set, and the link information is updated.

[0083] In the functional flow, since the hole-drilling function for product A (hereinafter referred to as hole-drilling function #1 for product A) is also assigned to drill bit b, when a failure of drill bit b is detected, a new hole-drilling function #2 for product A is added to the functional flow, and the functional flow is updated. The hole-drilling function #2 for product A is also assigned to drill bits other than drill bit b. A drill bit selected based on the attributes described later, such as drill bit c, is set as the link target device for the hole-drilling function #2 for product A. When the link target of the function is determined, the allocation of the hole-drilling function #1 for product A to drill bit b is released, the allocation of the hole-drilling function #2 for product A to drill bit c is set, and the link information is updated.

[0084] Figure 5 An example of functional flow information for product A updated in the process management system when a failure occurs is shown. The functional flow information is updated when drill b fails. The functional flow information for product A consists of the start date and time of cutting, the end date and time of cutting, the start date and time of hole #1, the start date and time of hole #2, the end date and time of hole #1, the end date and time of hole #2, the start date and time of assembly, and the end date and time of assembly. Drill b fails and hole #2 is started. In the functional flow, although hole #1 and hole #2 coexist, as mentioned above, since the allocation of hole opening function #1 to drill b is released when the failure of drill b is detected, hole opening function #1 cannot be realized after the failure of drill b is detected.

[0085] Even if drill bit B fails, the functional flow information for product B does not change, so Figure 6The update function flow information for product B shown is the same as Figure 2 The functional process information shown for product B is the same, and consists of the start date and time of cutting, the end date and time of cutting, the start date and time of assembly, the end date and time of assembly, the start date and time of drilling, the end date and time of drilling, the start date and time of cutting, and the end date and time of cutting.

[0086] Figure 7 An example of functional flow information for product C updated by the process management system when a fault occurs is shown. The functional flow information for product C is composed of the start date and time of hole #1, the start date and time of hole #2, the end date and time of hole #1, the end date and time of hole #2, the start date and time of assembly, the end date and time of assembly, the start date and time of cutting, and the end date and time of cutting. The start date and time of hole #1 is roughly the same as the start date and time of hole #2. The end date and time of hole #1 is also roughly the same as the end date and time of hole #2. In the functional flow, although hole #1 and hole #2 coexist, as mentioned above, the allocation of hole function #1 to drill bit b is released when the fault of drill bit b is detected, so after the fault of drill bit b is detected, hole function #1 cannot be realized.

[0087] Figure 8 An example of link information related to the updated drill when the functional flow information is updated is shown. Figure 3 Add the following to the link information shown: Figure 4 Thus, the newly added hole opening function #2 for product C and the hole opening function #2 for product A are provided. Figure 8 The updated link information shows that the drilling function #1 for product A and the drilling function #1 for product C are no longer assigned to drill a, and the drilling function #2 for product A and the drilling function #2 for product C are assigned to drill c.

[0088] Since the process management system retains the released hole-drilling function #1 for product A in the updated function flow, the control program is not uninstalled when the control program is already installed on the drill bit b that is scheduled to implement the hole-drilling function #1 for product A. As a result, when the repair of the failed drill bit b is completed, the process management system can stop the hole-drilling function #2 for product C implemented by the drill bit c, and restart the hole-drilling function #1 for product C by the drill bit b that has completed the repair.

[0089] In addition, when the process management system adds a replacement function to the functional flow, such as Figure 4 As shown, the original function assigned to the failed device does not necessarily have to remain in the functional flow, and it can also be Fig. 9The initial function is removed from the function flow as shown.

[0090] Fig.10 An example of updated functional flow information for product A is shown in which a new hole-drilling function #2 for product A is added to the functional flow and the hole-drilling function #1 for product A assigned to the device having a fault is deleted from the functional flow. The functional flow information for product A includes a cutting start date and time, a cutting end date and time, a hole-drilling #2 start date and time, a hole-drilling #2 end date and time, an assembly start date and time, and an assembly end date and time.

[0091] Functional process information for product B and Figure 6 The update function flow shown is the same, so the illustration is omitted.

[0092] Fig.11 An example of updated functional flow information for product C is shown in which a new drilling function #2 for product C is added to the functional flow and the drilling function #1 for product C assigned to the device in which the failure occurred is deleted from the functional flow. The functional flow information for product C is composed of drilling #1 start date and time, drilling #1 end date and time, drilling #2 start date and time, drilling #2 end date and time, assembly start date and time, assembly end date and time, cutting start date and time, and cutting end date and time. The drilling #1 end date and time is substantially the same as the drilling #2 start date and time.

[0093] Link information when functional flow information is updated Figure 8 The link information shown is the same, so illustration is omitted.

[0094] In addition, if Figure 4 As shown, when a replacement function is added to the functional flow, if the original function assigned to the malfunctioning device remains in the functional flow, there is the following advantage: when the device assigned to the original function before the replacement becomes normally operating, the original function can be simply implemented, that is, the processing of the detour is completed, and the original functional flow can be returned.

[0095] Furthermore, the above-mentioned process management modification examples include Figure 4 An example of a change in the functional flow that retains the original function as shown, and Fig. 9An example of changing the function flow in which the initial function is deleted is shown in FIG. However, since process management is controlled by a combination of the function flow and the link information, process management can be changed by changing the link information without changing the function flow and changing the correspondence between the function and the device. For example, if there is a device that is not expected to work properly, if the link information is changed in such a way that the function is released from the device and the function is assigned to another device that is expected to work properly, the process management is changed even if the same function flow is executed.

[0096] [Specific example of process management]

[0097] Hereinafter, a specific example of the process management according to the embodiment will be described.

[0098] like Fig.12 As shown, process management consists of a function layer, a device layer, and an intermediate layer between the two layers. The function layer manages the function flow. The intermediate layer manages the link information and communication protocol. The device layer manages the area diagram.

[0099] Fig.12 The functional flow shown indicates that function b is implemented after function a, function c is implemented after function b, and function d is implemented after function c. The device layer has devices A to E as mechanisms for implementing the functions a to e that constitute the functional flow. The device can also be a device that can implement multiple functions. For example, in the case of an NC-controlled device, if the control program is changed, the function implemented by the device is also changed, so that the device can implement multiple functions.

[0100] If a device, such as device C, cannot work, function c corresponding to device C cannot be implemented. Or, although device C is working, if the work is delayed, it takes a long time to implement function c. When the process manager recognizes such a state, he sometimes looks for a substitute function for function c (here, function e) and rewrites the functional flow in such a way that function e is implemented after function b and function d is implemented after function e.

[0101] In such Figure 4 When the functional flow is changed as shown, since the functional flow includes both the original function c and its replacement function e, in addition to the flow from function b to function c and the flow from function c to function d, the functional flow also includes a detour from function b to function e and a detour from function e to function d.

[0102] In such Fig. 9 When the functional flow is changed as shown, the functional flow includes a detour from function b to function e to replace the flow from function b to function c, and the functional flow includes a detour from function e to function d to replace the flow from function c to function d.

[0103] The following instructions are as follows Figure 4 As shown in FIG. 1 , a case where a new function is added while the original function remains in the event of a device failure is considered as an object, but in the case of Fig. 9 The same applies to the case where the original function is deleted and only the new function is added as shown.

[0104] The device layer corresponding to the real space is controlled by the link information as the intermediate layer and the function layer corresponding to the virtual space via the communication protocol. The communication protocol is independent of the country, region, industry, etc. and is commonly used in any country, region, industry, etc.

[0105] The area map managed by the device layer defines a display method for indicating the operating status of each device. The device layer includes an information disclosure / sharing unit. The information disclosure / sharing unit discloses and / or shares the area map and the functional flow on the network.

[0106] The functional flow is displayed as a functional diagram (first image). The functional diagram can be in various forms, but for example, it can be composed of icons representing each function and arrows representing the paths of the cooperating functions. The functional diagram can also display information related to the functional implementation, such as the progress of the implementation of each function and the mixed status of the collaboration between functions. Link information such as Figure 3 , Figure 8 As shown in FIG. 1 , the information is managed in a table format, and therefore is displayed as a link table (second image) as it is.

[0107] If a device fails, information about the failure is sent to the server (control unit) via the network. When the function layer receives information about the failure from the server via the network, an "×" symbol may be displayed on the icon or arrow of the corresponding function on the function map.

[0108] The function layer has a link evaluation unit. The link evaluation unit calculates the attribute value of the link between the function and each device, and includes it in the function diagram to display the attribute value. The process manager can find a replacement function or rewrite the function flow based on the attribute value. An example of the attribute value is the average processing time of the function, the pass rate, etc.

[0109] Reference Fig.13 , Fig.14 An example of a functional flow of a manufacturing system is described. For the sake of convenience, in the above description, the function of transporting processed products between functions is omitted from the functional flow, but the transport function is also included in the functional flow. Fig.13 Concept showing the linking of functions and devices. Fig.14 The concept of the device layer is shown.

[0110] The functional process consists of cutting, conveying, drilling, conveying, and assembly. Fig.13, Fig.14 As shown, the link information is set in such a way that the cutting function 112a for product #1 is assigned to the milling machine 102b, the conveying function 112b for the cut component A is assigned to the trolley 108a, the drilling function 112c is assigned to the drill 104a, the conveying function 112d for the drilled component B is assigned to the trolley 108c, the assembly function 112e is assigned to the robot 106a, and the conveying function 112f for the assembled component C is assigned to the trolley 108e. Similarly, the link information is set in such a way that the cutting function for product #2 is assigned to the milling machine 102d, the conveying function for the cut component is assigned to the trolley 108b, the drilling function is assigned to the drill 104b, the conveying function for the drilled component is assigned to the trolley 108d, and the assembly function is assigned to the robot 106b. Thus, each function of each product is realized by each device, thereby manufacturing the product.

[0111] Fig.15 This is a block diagram showing an example of a process management system for managing a manufacturing process. A plurality of devices 20-1 to 20-m1 (sometimes also referred to as devices 20) as function implementation mechanisms, terminals 30-1 to 30-m2 (sometimes also referred to as terminals 30) used by process managers, servers 40-1 to 40-m3 (sometimes also referred to as servers 40), and a second server 50 are connected to a network 10. m1, m2, and m3 are arbitrary positive integers. The network 10 includes an intranet, the Internet, and the like. The processes managed by the process management system envision the processes for each product. The manufacturing process is not limited to being implemented in the same factory, but can also be implemented across multiple factories. Moreover, it is not limited to being implemented in the same enterprise, but can also be implemented across factories of multiple enterprises.

[0112] The device 20 includes a processing device related to manufacturing, a trolley for transporting parts from a first device to a second device, and the like. Each device 20 includes a drive unit 24, a controller 22, a sensor 26, and a display unit 28. The drive unit 24 includes a milling machine, a drill, a robot arm related to processing, and a main body of a trolley related to transportation. The controller 22 includes a processor installed with a control program for driving the drive unit 24. The sensor 26 detects the status of each position of the device 20 and sends the detection result to the server 40. The display unit 28 displays information sent from the server 40 or other devices 20. Although a plurality of servers 40 are provided for each product, it is also possible not to provide a plurality of servers, but to have one server take on the process management of a plurality of products.

[0113] Each terminal 30 is composed of a portable electronic device such as a smartphone, a notebook / tablet personal computer, etc. The terminal 30 may have an input device such as a mouse, a keyboard, and a display device, or may have a touch panel display / input device. The process manager can manage the manufacturing process by creating and updating the functional flow and creating and updating the link using the terminal 30.

[0114] The server 40 is a server of the manufacturing company of the product, which stores functional flow information 42 and link information 44, and discloses the functional flow information and link information related to the product to the device 20 related to the manufacturing of the product and the terminal 30 of the process manager, so as to share the functional flow information and link information.

[0115] The second server 50 is a server of a company other than the product manufacturing company, such as a transportation company. When multiple devices related to the manufacturing of a product are dispersed in remote areas, and the processed parts of a certain device are transported to the remote device by a truck of a transportation company, the second server 50 is used for cooperative control of functions in addition to the server 40.

[0116] Fig.16 Show Fig.15 An example of a functional flow in a process management system shown in FIG. The functional layer management is composed of a function 122a for confirming the quantity / characteristics of delivered materials, a function 122b for processing / molding parts, a function 122c for measuring / inputting dimensions / performance of parts, a function 122d for sorting qualified parts after processing, a function 122e for assembling parts, a function 122f for measuring product characteristics / inputting data, a function 122g for sorting products that can be shipped, a function 122h for analyzing data and judging the quality of products, a function 122i for calculating the quality rate and the order quantity, a function 122j for ordering processed materials, and a function 122k for analyzing data and judging the quality of products.

[0117] Examples of the component processing / molding function 122b include cutting and drilling. The component size / performance measurement / input function 122c measures the size / performance of the component after processing / molding, and sends the measurement results to the data analysis / quality judgment function 122h. The data analysis / quality judgment function 122h judges the quality of the component after processing / molding, and sends the quality judgment result to the qualified product sorting function 122d. The qualified product sorting function 122d sorts qualified products from the processed / molded components based on the quality judgment result.

[0118] The data analysis / quality determination function 122h sends quality and quality component quantity data to the pass rate / order quantity calculation function 122i.

[0119] Examples of the component assembly function 122e include the case where a plurality of components are assembled to complete a product. The product characteristic measurement / data input function 122f measures the characteristics of the finished product and sends the measurement results to the data analysis / quality judgment function 122k. The data analysis / quality judgment function 122k judges the quality of the finished product and sends the quality judgment results to the product sorting function 122g that can be shipped. The product sorting function 122g can be shipped from the finished products based on the quality judgment results.

[0120] The data analysis / quality judgment function 122k sends the quality product quantity data to the pass rate / order quantity calculation function 122i. The pass rate / order quantity calculation function 122i calculates the pass rate and order quantity based on the quality component quantity data and the quality product quantity data, and sends the calculation result to the processing material ordering function 122j. The processing material ordering function 122j determines the order quantity based on the pass rate and the order quantity, and sends the order quantity to the quantity / characteristic confirmation function 122a of the delivered material.

[0121] Each function of the functional flow is linked to each device at the device layer, and the state of the link setting is managed by link information. In an example of link setting, the processing material ordering function 122j is assigned to the device 124a, the pass rate / order quantity calculation function 122i is assigned to the device 124b, and the data analysis / quality judgment functions 122h and 122k are assigned to the device 124c. In this way, in this functional flow, the data analysis / quality judgment functions 122h and 122k are assigned to one device 124c, so the implementation of the data analysis / quality judgment functions 122h and 122k may be delayed depending on the processing capacity of the device 124c.

[0122] If the sensor 26 of the device 124c detects a delay in the processing of the device 124c, the detection result is sent to the server 40 of the manufacturer of the product. Alternatively, an operator located near the device 124c may visually confirm the processing delay of the device 124c and notify the server 40 of the delay using a communicator (not shown) of the device 124c.

[0123] When the server 40 is notified of the processing delay of the device 124c, the processing delay of the device 124c is notified to the terminal 30 of the process manager of the product. The terminal 30 notifies the process manager of the processing delay of the functions 122h and 122k by sound, light, etc. When the process manager recognizes the delay in the implementation of the functions 122h and 122k by the device 124c, he or she can recognize the need to correct the functional flow.

[0124] Reference Fig.17 right Fig.16The concept of the change of the functional flow shown is explained. If the process manager recognizes the delay in the implementation of functions 122h and 122k, the functional flow information is changed in the following manner: a second data analysis / quality judgment function 122h-2 is created, and the measurement result of the component size / performance measurement / input function 122c is also sent to the second data analysis / quality judgment function 122h-2. Furthermore, the process manager changes the functional flow information in the following manner: the quality component quantity data obtained in the second data analysis / quality judgment function 122h-2 is sent to the qualified rate / order quantity calculation function 122i, and the quality data obtained in the second data analysis / quality judgment function 122h-2 is sent to the qualified product sorting function 122d. The original data analysis / quality judgment function 122h can remain in the functional flow information or be deleted.

[0125] The process manager changes the link information in the following manner: the data analysis / qualification function 122h is released from the device 124c and the second data analysis / qualification function 122h-2 is assigned to a certain device, for example, the device 124d to which no function is assigned.

[0126] Thus, device 124d realizes the second data analysis / quality judgment function 122h-2, and device 124c realizes the data analysis / quality judgment function 122k. Devices 124c and 124d can respectively realize their functions quickly, and the delay in realizing the data analysis / quality judgment function is eliminated.

[0127] Functional flow information processes are changed by managers modifying the functional diagram. Fig.18 , Fig.19 The functional diagram shown illustrates an example of actual processing of changing the functional flow information of a manufacturing system. During the execution of a functional flow to manufacture a product, if an abnormal operation or a stop of operation of the device 20 is detected by a sensor, the detection result is sent to the server 40. If the server 40 receives a notification of a delay or stop in the execution of a function, an alarm is notified to the terminal 30 of the process manager of the functional flow. The terminal 30 that receives the notification informs the process manager of the necessity of changing the functional flow through sound, light, etc., and displays a menu. If the process manager recognizes the changeability of the functional flow and selects the change of the functional flow from the menu, the terminal receives the functional flow information from the server 40 and displays it. Fig.18 Functional diagram 132 as shown.

[0128] The function diagram 132 displays the function flow information so that the user can visually confirm it as an image, including an icon representing a shape cutting function 112a, an icon representing a hole opening function 112c, an icon representing an assembly function 112e, and arrows 114a and 114b representing the collaboration of functions. For the convenience of explanation, the function of transporting parts between functions is omitted here. In the link information not shown, the shape cutting function 112a is assigned to the milling machine 102b, the hole opening function 112c is assigned to the drill 104a, and the assembly function 112e is assigned to the robot 106a. In addition, in order to indicate that the hole opening function performed by the drill 104a cannot be implemented or a delay occurs in the implementation, the function diagram 132 also displays an overlapping × symbol on the icon representing the hole opening function 112c.

[0129] Fig.18 For example, a case where the blade of the drill 104a is damaged, an operator located near the drill 104a notices that the blade of the drill 104a is damaged, and the operator stops the operation of the drill 104a. Or, Fig.18 In another example, the sensor 26 of the drill 104a detects the damage of the blade, and the operation of the drill 104a is automatically stopped. The stop of the operation of the drill 104a is notified to the server 40, and the server sends a signal to the terminal 30. Fig.18 Such display function diagram 132 data.

[0130] If the process manager drags and drops Fig.18 The icon of the opening function 112c that cannot be normally implemented on the function diagram is used to change the display position, as shown in FIG. Fig.19 As shown in FIG. 1 , an icon of the second hole-punching function 112c-2 is created on the function diagram as a copy of the icon of the hole-punching function 112c. Furthermore, the arrow indicating the flow from the icon of the shape cutting function 112a to the icon of the first hole-punching function 112c is deleted, and an arrow 114a-2 indicating the flow from the icon of the shape cutting function 112a to the icon of the second hole-punching function 112c-2 is displayed instead. Similarly, the arrow indicating the flow from the icon of the first hole-punching function 112c to the icon of the assembly function 112e is deleted, and an arrow 114b-2 indicating the flow from the icon of the second hole-punching function 112c-2 to the icon of the assembly function 112e is displayed instead. Accordingly, the function flow information is also changed.

[0131] If the change of the functional flow is completed, the server 40 stops displaying the functional diagram 132 of the terminal 30 and displays the functional diagram 132 on the terminal 30 instead. Figure 3 , Figure 8Alternatively, the server 40 may display the function diagram 132 and the link table in two screens. When the process manager performs an operation on the link table to release the link from the first drilling function 112c to the drill 104a (changing the zero symbol to the × symbol) and performs an operation on the link table to set the link from the second drilling function 112c-2 to another drill, such as the drill 104c (changing the × symbol to the zero symbol), the link information is updated.

[0132] Thus, after the shape cutting function is achieved, the second hole-making function is normally achieved instead of the first hole-making function that cannot be normally achieved, and after the hole-making function is achieved, the assembly function is achieved, thereby preventing the manufacturing process from being delayed.

[0133] In addition, the original first opening function can either remain in the functional flow or be deleted.

[0134] When the newly added second drilling function is assigned to other drills, if the process manager knows the working conditions of each drill, he can select an appropriate drill. As an example of the working conditions, the server 40 manages Fig. 20 The operation rate management information indicates the operation rates of all devices 20 managed by the process management system. When the process manager assigns a new function to a device, the terminal 30 displays the operation rate management information based on the operation rate management information. Fig.21 The area graph is shown in the figure. The area graph shows the operation rate of the equipment in the form of a bar graph by company or factory. The area graph can be displayed at the same time as the function graph, or it can be displayed by switching the screen.

[0135] For example, the area graph shows that the operation rates of drill 2 in factory a1 of company A and drill 2 in factory b1 of company B are high, while drill 1 in factory a1 of company A, drill 1 and drill 2 in factory a2 of company A, and drill 1 in factory b1 of company B are not in operation. By observing the area graph, the process manager can allocate the newly added function to the device with a low operation rate, can use each device efficiently, and can manufacture products efficiently.

[0136] Other examples of the operating status include the CPU usage rate of the controller of the device, the average processing time for realizing a function, the pass rate, and the like.

[0137] Reference Fig. 22 Another example of changing the functional flow is shown. Fig. 22An example of a function diagram 232 displayed on the terminal 30 is shown. The function diagram 232 is composed of an icon 222b for a component processing / molding function, an icon 222c for a component dimension / performance measurement / input function, an icon 222d for a qualified product sorting function, an icon 222e for a component assembly function, an icon 222f for a product characteristic measurement / data input function, an icon 222h for a data analysis / quality judgment function, an icon 222i for a qualified rate / order quantity calculation function, and an icon 222k for a data analysis / quality judgment function. Among these icons, an × symbol is superimposed on the icon 222c for a component dimension / performance measurement / input function that has been detected as not being able to be implemented normally. Fig.18 , Fig.19 In the example of the functional flow change shown in FIG. 1 , although an alternative function is set for the function that cannot be normally implemented and is superimposed with an × symbol, in Fig. 22 In the example of changes in the functional flow shown, functions that cannot be normally implemented are individually deleted.

[0138] If the process manager performs the operation of deleting the icon 222c on the function diagram 232, the arrows indicating the flow from the icon 222b of the component processing / molding function to the icon 222c of the component size / performance measurement / input function, and the arrows indicating the flow from the icon 222c of the component size / performance measurement / input function to the icon 222d of the qualified product sorting function are deleted, and the arrows indicating the flow (detour) from the icon 222b of the component processing / molding function to the icon 222d of the qualified product sorting function are displayed instead. Accordingly, the function flow information is also changed.

[0139] When the process manager performs an operation to release the link between the icon 222c of the component dimension / performance measurement / input function and the device on the link table, the link information is updated.

[0140] Reference Fig.23 Another example of changing the functional flow is shown. Fig.23An example of a function diagram 332 displayed on the terminal 30 is shown. The function diagram 332 is composed of an icon 222a-1 of a function for confirming the quantity / characteristics of delivered materials, an icon 222b-1 of a function for processing / molding components, an icon 222c-1 of a function for measuring / inputting component dimensions / performance, an icon 222d-1 of a function for sorting qualified products, an icon 222e of a function for assembling components, an icon 222h of a function for analyzing data / judging quality, an icon 222i of a function for calculating the qualified rate / order quantity, and an icon 222j of a function for ordering processed materials. Among these icons, a plurality of icons (the icon 222a-1 of a function for confirming the quantity / characteristics of delivered materials, the icon 222b-1 of a function for processing / molding components, the icon 222c-1 of a function for measuring / inputting component dimensions / performance, and the icon 222d-1 of a function for sorting qualified products) that are detected as not being normally implemented are superimposed with an × symbol. When a partial flow 222-1 composed of a plurality of functions in the above-mentioned function flow cannot be normally implemented, an alternative function can be set together. If the process manager selects multiple icons 222a-1, 222b-1, 222c-1, and 222d-1 overlapped with an × symbol on the function diagram, and drags and drops the icon group 222-1, an icon group 222-2 is created on the function diagram as a copy of the icon group 222-1. The icon group 222-2 is composed of an icon 222a-2 for the delivered material quantity / characteristic confirmation function #2, an icon 222b-2 for the component processing / molding function #2, an icon 222c-2 for the component size / performance measurement / input function #2, and an icon 222d-2 for the qualified product sorting function #2.

[0141] Moreover, the arrow indicating the flow from icon 222j of the processing material ordering function to icon 222a-1 of the delivered material quantity / characteristics confirmation function is deleted, and an arrow indicating the flow to icon 222a-2 of the delivered material quantity / characteristics confirmation function #2 is displayed instead. Similarly, the arrow indicating the flow from the icon 222c-1 of the component size / performance measurement / input function to the icon 222h of the data analysis / quality judgment function is deleted, and the arrow indicating the flow from the icon 222c-2 of the component size / performance measurement / input function #2 to the icon 222h of the data analysis / quality judgment function is displayed instead, the arrow indicating the flow from the icon 222h of the data analysis / quality judgment function to the icon 222d-1 of the qualified product sorting function is deleted, and the arrow indicating the flow from the icon 222h of the data analysis / quality judgment function to the icon 222d-2 of the qualified product sorting function #2 is displayed instead, and the arrow indicating the flow from the icon 222d-1 of the qualified product sorting function to the icon 222e of the component assembly function is deleted, and the arrow indicating the flow from the icon 222d-2 of the qualified product sorting function #2 to the icon 222e of the component assembly function is displayed instead. Accordingly, the functional flow information is also changed.

[0142] Fig.24 FIG. 130 is a modified example of the display method of the functional diagram 132. In the above-mentioned functional diagram, the arrows indicating the flow of functions only show the chronological relationship of the order in which the functions are implemented. Fig.24 In the function diagram, the thickness of the arrows representing the function flow indicates the delay / confusion of the processing between the functions. Between the functions before and after the flow with thinner arrows, it indicates that the processing is blocked. By observing this function diagram, the process manager can consider setting alternative functions for the functions connected by thinner arrows.

[0143] Furthermore, the icon representing the function not only displays the label of the function, but also can display the working status of the device implementing the function in the form of a bar graph. The working status of the device can be the CPU usage rate, the operation rate of the device, the average processing time, the pass rate, etc. Furthermore, in order to distinguish the icons of the functions that have been implemented and the icons of the functions that have not been implemented, for example, they can also be displayed as icons with thick frames.

[0144] This allows process managers to change the functional flow in advance before the function becomes unavailable, so that there are no manufacturing hiccups.

[0145] Reference Fig.25 An example of link information is described. Link information indicates which function is linked to each device and which function is linked to which function. When a function flow is created and function #i is assigned to device #j, data indicating the creation date and time is entered into the function flow creation date and time column related to function #i of device #j. If the function flow creation date and time related to function #i of device #j is blank, it means that function #i is not assigned to device #j. If the function flow is changed and the link of function #i to device #j is released, data indicating the release date and time is entered into the link release date and time column related to function #i of device #j. If the link release date and time related to function #i of device #j is blank, it means that function #i is assigned to device #j. That is, data is entered into one of the function flow creation date and time related to function #i of device #j and the link release date and time, and the other is blank.

[0146] Each time a function is added to the functional flow, a function column is added to the link information.

[0147] The link information also manages the device identification information, region identification information, performance, additional performance, and attributes of each device. The device identification information of interest may also be an IP address. Here, the region identification information indicates the name of the organization to which the device belongs. The performance of interest may be the capacity of the built-in memory, etc., for CPU power. The additional performance of interest may also be the idle capacity of the additional memory.

[0148] Fig.26 An example of changing the functional flow in a manufacturing system that includes manufacturers from different companies is shown. Assume that a function (such as a hole-drilling function) cannot be realized due to a failure of a certain device, and the process manager attempts to change the functional flow, but the device that can realize the function does not exist in the company, so the process manager outsources the function to another company. Fig.26 The first factory 142 is a factory that contains a faulty device linked to a function that cannot be realized. The process manager outsources the drilling function to the second server 114 and sends the server 40 ( Fig.15 ) entrusts the function flow information and link information to be sent to the second server 114. The second server 114 is a server of a goods processing / manufacturing contract agency including logistics.

[0149] The manager of the second server 114 searches for a supplier who can realize the hole-drilling function, removes the link of the unrealizable function to the faulty device in the first factory 142, sets the link of the unrealizable function to the supplier's device 150, and updates the link information. The manager of the second server 114 entrusts the supplier's server 146 to outsource the hole-drilling function, and sends the updated function flow information to the server 146. In addition, the second server 144 entrusts the delivery company 154 to deliver the parts in the first factory 142 to the supplier, and to deliver the processed parts from the supplier to the second factory 158. The second factory is a factory that realizes the next function of the function (hole-drilling function) realized by the first factory. Sometimes the second factory is the first factory.

[0150] The supplier's server 146 sends the function flow information to the parser 148. The parser 148 is a parser for the specification sheet / image, and the supplier's device 150 determines whether the function flow can be executed based on the function flow information. If it is determined that it cannot be executed, the parser 148 sends an error to the second server 144 via the server 146. If it is determined that it can be executed, the parser 148 sends the function flow information to the device 150.

[0151] Thus, the components in the first factory 142 are transported to the device 150 of another enterprise, and the device 150 performs the drilling function instead of the device in the first factory 142. The components after the drilling function is completed are transported to the second factory 158 to perform the next function of the drilling function.

[0152] Connection data for cooperation of functions is transmitted between devices 20 or between the server 40 and the device 20. Fig. 27 , Fig.28 An example of the connection data is described below. If the function of the first device is realized, the processed component as the realization result is transported to the second device. Along with the transportation of the item, the connection data indicating the realization process of the function flow is also sent from the first device to the second device via the network 10, and is also sent to the server 40. The second device starts to realize the function based on the connection data.

[0153] like Fig. 27 (a) (or Fig.28 (a) Fig.29 As shown in (a) of FIG. 1 , the connection data is transmitted as a data packet consisting of a physical layer header, a MAC layer header, an IP header, a TCP header (or a UDP header), and a payload. Fig. 27 As shown in (b), the IP header consists of information related to the IP data packet, the sender's IP address, and the receiver's IP address. Fig.28 (b) (or Fig.29 As shown in (b)), the payload consists of a function flow header and data related to the product obtained after the function is implemented.

[0154] like Fig.28 As shown in (c), the functional flow header is composed of the functional flow ID, product quantity, sub-functional flow ID, functional ID, functional flow production date and time, server URL, functional flow management information, and delivery date management information. An example of a functional flow is "cut materials and produce part A by 0:00 on ...

[0155] The above functional flow is composed of 1000 sub-functional flows. Function ID indicates functions such as cutting, drilling, and assembly. Server URL is the URL of the server related to the product, indicating the reporting address and consultation method of the progress of the product. Functional flow management information is management information indicating the sequence of functional flows, and in this example includes the progress status of the function (processing completion mark, etc.), delivery date information, etc. Here, the delivery date management information indicates the actual delivery date. This information is described by Linux (registered trademark) and JavaScript (registered trademark).

[0156] The data related to the product obtained after the function is realized includes: Fig.16Dimensions / performance of components, product characteristics, data for judging advantages and disadvantages, data on the number of components with advantages and disadvantages, data on the number of products with advantages and disadvantages, and pass rate data, etc., as shown.

[0157] Fig.29 is another example of the head of the function flow. As Fig.29 shown in (c) of Fig.28 the head of the function flow can include, in addition to the information shown in (c) of

[0158] Refer to Fig.30 and Fig.31 to illustrate another example of the data structure of the connection data. Fig.30 in (a) of Fig.31 and (a) of Fig. 27 in (a) of Fig.28 in (a) of Fig.29 is the same as (a) of Fig.30 And Fig.31 The example of shows connection data that applies the concept of the management shell (Japanese: 管理シェル) defined by Industry 4.0 for digitalization of manufacturing. Industry 4.0 enables the networking of business processes beyond enterprise barriers. All "things" required to connect to the world of Industry 4.0 are called assets. All levels of the production system are connected via a network, and communication occurs between "things" at all levels. The interface that connects an asset to the network is called a management shell. In the management shell, all important information and data related to its asset are collected / saved. The management shell can be retrieved via an address on the Internet, and its asset is uniquely identified. The management shell enables controlled access to all information of the asset.

[0159] Fig.32 shows the structured and modeled form of the management shell. As the structure of the management shell 401, it is first composed of a function flow head 402 and a function flow body 404. In the head 402, as information that can identify the management shell 401 and the asset 412, a management shell identifier (ID) 406 and an asset identifier (ID) 408 are assigned. As the management shell ID 406 and the asset ID 408, the corresponding URLs can be used. The body 404 that constitutes the management shell is composed of a plurality of sub-models 410A, 410B,.... The asset 412 that is attached with the management shell 401 and connected to the world of Industry 4.0 is called an Industry 4.0 component 444.

[0160] Through these sub-models 410A, 410B, ..., it is possible to describe (obtain information) various aspects such as security, safety, energy, and manufacturing capabilities of the asset 412. The sub-models 410A, 410B, ... are composed of a set of attributes classified by hierarchy, and all data related to the asset 412, such as the data (specifications, performance) and functions of the asset 412, can become attributes.

[0161] The attributes are divided into "basic attributes", "required attributes", "optional attributes" and "free attributes". "Basic attributes" are required attributes after standardization and are applicable to all management shells. "Required attributes" are required attributes after standardization and are applicable to sub-models. "Optional attributes" are standardized attributes, but their application to sub-models is optional. "Free attributes" are limited usage attributes that can be set by manufacturers independently.

[0162] The representative example of an asset is machinery, but as mentioned above, it is not limited to physical "things" such as the entire factory, workstations, and internal parts of the machinery. It also includes non-material "things" such as documents (production plans, purchase orders, etc.). All kinds of "things" at all levels can be assets. The management shell is a standardized communication interface that enables all assets to communicate with each other. For example, Fig.33 In this way, the management shells included in the plurality of components 444A, 444B, 444C, ... can cooperate by exchanging information with each other through the WebAPI and the service API via the network 446. The network 446 side is a structure that is open to the information possessed by the management shell, and the management shell is a structure that is closed to the information possessed by itself. Since it is possible to cooperate through the WebAPI and the service API, it is also possible to function as a server to circulate information through the management shell on the network 446.

[0163] Fig.30 and Fig.31 The communication interface of the management shell having such features is schematically shown. Fig.30 As shown in (b), Fig.30 The payload of (a) is composed of a functional flow header and a functional flow body. The functional flow header and the functional flow body constitute the management shell of Industry 4.0. Fig.30 As shown in (c), the function flow header is composed of an asset ID and a management shell ID. The function flow ID is described in the asset ID. As described above, these IDs can be used in correspondence with the URL.

[0164] like Fig.31As shown in (c), the functional process body is composed of domain attributes, functional attributes, and communication protocol information / sent data of different fields / topics. The functional process body is composed of multiple sub-models. These sub-models can be used to describe various aspects of assets. Information related to a certain aspect is summarized into a sub-model. For a certain aspect, there is a sub-model. Thus, for example, a drill with suitable performance / characteristics can be found on the Industry 4.0 network through the sub-model "drill".

[0165] Each sub-model deals with a clearly defined domain (subject). Each sub-model consists of multiple attributes classified in a hierarchy. The content of the attribute can be any information related to the asset, such as the asset's data (equipment structure, specifications, performance, etc.) or functions.

[0166] Asset information can be provided through the attribute. Examples of attributes include product characteristics, process characteristics, links to external data sources and files (reference targets), links to other management shells, other sub-models, attributes (reference targets), asset capabilities, performance, descriptions of call-up methods, and sets of attributes. Attributes are described using XML language. Relationships such as electrical systems / piping / configurations obtained through images, CAD, and photos also meet the above conditions. During operation and maintenance, status data, operation data, and maintenance history can also be listed as attributes, for example. The data of these assets can also be circulated on the network for flexible use.

[0167] In other words, there is a sub-model for each aspect that is desired to be acquired (or controlled). Through these sub-models, for example, only drill information of a specific machine tool can be acquired or controlled.

[0168] A submodel handles any clearly defined field or subject. A plurality of such submodels are included in the management shell. Moreover, among the submodels, there are common submodels that are applicable to most assets in Industry 4.0, and these are set as "basic submodels". On the other hand, among trading companies in the value chain, submodels newly created for specific purposes are positioned as "free submodels". These submodels are created in a form that corresponds to all aspects of the assets, but it is not realistic for all to be developed by the company alone, so the various international standards and specifications established by the alliance that already exist are reflected in the management shell.

[0169] Here, if a device fails during the implementation of a function based on a certain device, and a detour is created for the corresponding function, then Fig.34As shown, the connection data sent from the device corresponding to one function is also divided. For example, if the data analysis / quality judgment function 122h cannot be implemented and the data analysis / quality judgment function 122h-2 is set as a substitute function, the connection data sent from the device corresponding to the data analysis / quality judgment function 122h is divided into: the connection data sent from the device before the failure corresponding to the data analysis / quality judgment function 122h, and the connection data sent from other devices corresponding to the data analysis / quality judgment function 122h-2.

[0170] Fig.35 An example of transmission of connection data between devices. Although data can also be sent when processing of a component / product is completed, in the embodiment, the functional flow is set so that the data transmission between devices is aggregated into data packets and sent intermittently. For example, after the cutting of the first to 500th components A for product A (function A1) is completed, the connection data for the first to 500th components A are sent. Similarly, after the cutting of the 501st to 1000th components A for product A (function A2) is completed, the connection data for the 501st to 1000th components A are sent.

[0171] Since the function flow is set so as to intermittently send connection data as described above, the function flow can be changed (such as detour route creation) during the period when the connection data is not sent, and failures can be dealt with.

[0172] Fig.36 An example of the display content of the display unit 164 of the trolley 162 is shown. The trolley 162 is an example of the conveying device 20 that moves the processed parts from the manufacturing device to other manufacturing devices in the factory. The manufacturing device sends a signal to the manufacturing device that realizes the next function. Figure 27 to Figure 31 The display unit 164 of the trolley 162 displays the function flow ID, sub-function flow ID, function ID, next process, consultation method, and delivery date, etc. The operator of the device 20 observes the displayed content of the next process and can reliably deliver the processed parts to the device 20 of the next process.

[0173] Fig.37Another example of a functional flow is shown. In this functional flow, even if the function is the same, if the linked devices are different, different function IDs are set. For example, in the case of opening holes of a specified diameter and a specified depth at specified positions for 1000 components, it is assumed that the first to 500th components are opened by drill D1, and the 501st to 1000th components are opened by drill D2. In the functional flow, the hole-opening functions of the first to 500th are set as function a1-1, and the hole-opening functions of the 501st to 1000th are set as function a1-2. The link information is defined in such a way that the hole-opening function a1-1 is linked to the drill D1, and the hole-opening function a1-2 is linked to the drill D2. If it is set like this, when the drill D1 or D2 fails, the function linked to the failed device can be determined on the functional diagram.

[0174] [Work examples of various processes required for process management]

[0175] Fig.38 , Fig.39 This is a flowchart showing an example of functional flow creation.

[0176] In step S102, the process manager operates the terminal 30 to request the server 40 to display a menu. In step S104, the terminal 30 displays the menu sent from the server 40. The menu contains icons of various processes that can be executed in the terminal 30, such as a function flow creation icon. In step S106, the process manager selects the function flow creation icon in the menu. The selection result is sent to the server 40, and in step S108, the terminal 30 displays the function template sent from the server 40 based on the selection result. The function template is a list of functions. In step S110, the process manager selects a function in the function template. In step S112, the terminal 30 sends information about the selected function to the server 40. In step S114, the terminal 30 displays the recommended candidate of "device (control program has been installed) 20 that implements the selected function" sent from the server 40.

[0177] In step S116, the process manager decides whether to agree with the recommended candidate and inputs the decision result to the terminal 30. If the recommended candidate is agreed, in step S117, the server 40 assigns the selected function to the device 20 of the recommended candidate and updates the link information. If the recommended candidate is not agreed, in step S118, the terminal 30 displays the area map sent from the server 40. The display example of the area map may also be Fig.21In step S120, the process manager selects "device 20 that implements the selected function" in the area map. In step S122, the terminal 30 sends information about the device 20 selected in the area map to the server 40. In step S124, the server 40 assigns the selected function to the selected device 20, updates the link information, and installs the control program to the selected device 20.

[0178] In step S126 executed after step S117 or S124, the process manager newly configures the icon of the selected function on the function diagram. When other icons have been configured, the process manager connects the newly configured icon to the existing icon. The connection status of the icons is stored in the server 40 as function flow information. In step S128, the process manager inputs information indicating whether the function flow is completed to the terminal 30. If information indicating that the function flow is not completed is input, the processing of step S106 is repeated. If information indicating that the function flow is completed is input, then in step S130, the terminal 30 entrusts the server 40 to send a message to all devices 20 included in the function flow. Figure 2 The functional flow information as shown is sent from the server 40 to the device 20.

[0179] Fig.40 1 is a sequence diagram showing an example of the installation of the control program in step S124. The terminal 30 requests the server 40 to send the link information and the area map (S42). The server 40 sends the link information and the area map to the terminal 30 (S44). The terminal 30 sends a communication connection request to the device 20 (S46). The communication connection is established between the terminal 30 and the device 20 (S48).

[0180] The terminal 30 sends a control program acquisition instruction to the device 20 (S50). The device 20 sends a control program acquisition request to the server 40 (S52). The server 40 sends the control program to the device 20 (S54). The device 20 installs the control program (S56). The device 20 sends a control program installation completion notification to the server 40 (S58). The server S40 updates the link information (S60) and sends a link information update notification to the terminal 30 (S62).

[0181] Fig.41 This is a flowchart showing an example of updating of an area map. Fig.41 The processing of is started when a new function is added to the function map and a device assigned to the new function is selected. Fig.39 The process starts when a device is selected in step S120 of the server 40. In step S142, the server 40 determines whether the selected device corresponds to automatic installation of the program.

[0182] If it is determined to be compatible, in step S144, server 40 sends a request to install the control program to the selected device 20. In step S146, the selected device obtains the installation file from server 40 and executes it to install the control program and notifies server 40 of the completion of the installation.

[0183] If it is determined that the control program is not compatible, the server 40 sends an email requesting the installation of the control program to the selected device or the terminal of the operator thereof in step S148. In step S150, the operator of the selected device 20 installs the control program.

[0184] In step S152 following step S146 or S150 , the server adds the selected device to the area map and updates the area map.

[0185] Fig.42 This is a flowchart showing an example of data transmission and component delivery when the processing of the device 20 is completed. In step S162, the device 20 determines whether the processing of one function in one functional flow is completed. In the case where the functional flow is "cutting materials and making component A, drilling holes in component A and making component B, assembling component B and component C and making 1000 products", if the cutting, drilling or assembly of 1000 products is completed, the determination result in step S162 is yes.

[0186] If the processing of a function is completed, in step S164, the device 20 accesses the server 40 and refers to the function flow information to confirm which device implements the next function in the function flow. In step S166, the device 20 accesses the server 40 and refers to the link information to obtain the identification number (IP address) of the next device. In step S168, the device 20 establishes communication with the next device. In step S170, the device 20 determines whether the power of the next device is turned on. In the case where it is determined that the power of the next device is turned on, in step S172, the device 20 accesses the server 40 and refers to the link information to determine whether the next function is linked to the next device.

[0187] If it is determined in step S170 that the power of the next device is not turned on, and if it is determined in step S172 that the next function is not linked and set in the next device, the device 20 notifies the server 40 of the determination result. If the server 40 receives the notification of the determination result, in step S174, the server 40 instructs the terminal 30 to create a detour. The terminal 30 conveys the instruction from the server to the process manager. As a result, the process manager can create a detour when necessary.

[0188] If it is determined in step S172 that the link setting has been completed, and if a sufficient time has passed since the detour was indicated in step S714, the device 20 transmits the connection data including the functional flow management information to the next device in step S176. The operator of the device 20 delivers the processed parts to the next device 20. In step S178, the device 20 determines whether the data transmission is successful. If it is determined that the data transmission fails, the process returns to step S174, and the detour is indicated to the terminal 30 through the server 40.

[0189] Fig.43 This is an example of a flowchart when the processing of a functional flow is completed.

[0190] In step S202, the device 20 notifies the terminal 30 of the completion of processing of a functional flow. In step S204, the terminal 30 accesses the server 40 and refers to the link information to detect the device 20 linked to the function included in the functional flow whose processing has been completed (processing completed functional flow), and confirms the link status of the above device 20 and other functions not included in the processing completed functional flow.

[0191] In step S206, the terminal 30 determines whether the device 20 linked to the function included in the processing completed functional flow is linked to other functions not included in the processing completed functional flow. If it is determined that the device 20 linked to the function included in the processing completed functional flow is not linked to other functions not included in the processing completed functional flow, then in step S208, the terminal 30 inputs the current date and time to the link release date and time of the device 20 linked to the function included in the processing completed functional flow, and updates the link information. The terminal 30 displays a link table based on the link information.

[0192] The process manager who has observed the link table decides whether to delete the function column in step S210 if there is a function column not linked to any device in the link table, and inputs the decision result to the terminal 30. If the process manager decides to delete the function column not linked to any device, in step S212, the terminal 30 deletes the function column not linked to any device and updates the link information.

[0193] Fig.44 , Fig.45 This is a flowchart showing an example of detour route forming processing.

[0194] In step S232, the process manager operates the terminal 30 to request the server 40 to display a menu. In step S234, the terminal 30 displays the menu sent from the server 40. The menu includes icons for various processes that can be executed at the terminal 30, such as making a detour. In step S236, the process manager selects the making detour icon in the menu. The selection result is sent to the server 40, and in step S238, the terminal 30 displays the function diagram sent from the server 40 according to the selection result. In step S240, as shown in FIG. Fig.18 , Fig.19 As shown in FIG. 24 , the process manager sets the alternative function on the function map. In step S242, the terminal 30 sends information about the set alternative function to the server 40. In step S244, the terminal 30 displays the recommended candidate of "device 20 (control program installed) that realizes the set alternative function" sent from the server 40.

[0195] In step S246, the process manager decides whether to agree with the recommended candidate and inputs the decision result to the terminal 30. If the recommended candidate is agreed, in step S247, the server 40 assigns the selected function to the device 20 of the recommended candidate and updates the link information. If the recommended candidate is not agreed, in step S248, the terminal 30 updates the link information, for example, Fig.21 The area map sent from the server 40 is displayed as shown. In step S250, the process manager selects "the device 20 that realizes the set alternative function" in the area map. In step S252, the terminal 30 sends the information of the selected device 20 to the server 40. In step S254, the server 40 assigns the set function to the selected device 20, updates the link information, and installs the control program to the selected device 20.

[0196] In step S256 executed after step S247 or S254, the terminal 30 requests the server 40 to send the function flow information including the replacement function to all the devices 20 included in the original function flow, so that the data is sent from the server 40 to the devices 20. In step S258, all the devices 20 that have received the data send a reception completion signal to the terminal 30. In step S260, the terminal 30 determines whether the reception completion signal has been received from all the devices 20. If it is determined that the reception completion signal has not been received from at least one device 20, step S256 is repeated.

[0197] According to the first embodiment, since the process management is performed using the functional flow information and the link information, a plurality of devices can be used efficiently and the process management can be easily changed.

[0198] In the implementation mode, unified processing is achieved in which multiple different functions are processed in cooperation with each other. In the unified processing, multiple different devices share multiple different functions. When the processing of a function undertaken by a device is completed, the connection data representing the processing result is sent to the device undertaking the next function via the network. As a mechanism for implementing the function, a device composed of specific hardware can be used, or a program installed in a general-purpose device such as a personal computer can be used. In the implementation mode, the relationship between the function and the device can be freely changed. Therefore, it is easy to realize the rapid adaptation of the system and the autonomous action of each component in the system.

[0199] [Second embodiment]

[0200] The first embodiment describes an example of a control system applied to a manufacturing system. As a second embodiment of the control system, management of social infrastructure will be described. Here, a building management system will be described. Fig.46 An example of a functional flow in a building management system is shown. The functional layer management includes a functional flow consisting of an illumination detection function 182a in a specified area of ​​a building, a lighting control function 182b in a specified area of ​​a building, a temperature control function 182c in a specified area of ​​a building, a temperature detection function 182d in a specified area of ​​a building, and a centralized control function 182e.

[0201] In the first embodiment, the plurality of functions are connected in series in the order in which they are implemented, but in the second embodiment, the plurality of functions are connected to one centralized control function, and the plurality of functions are not connected to each other. The illumination data detected in the illumination detection function 182a is sent to the centralized control function 182e. The illumination control data from the centralized control function 182e is sent to the lighting control function 182b. The temperature data detected in the temperature detection function 182d is sent to the centralized control function 182e. The temperature control data from the centralized control function 182e is sent to the temperature control function 182c.

[0202] Each function of the functional flow is linked to each device at the device layer, and the status of the link setting is managed by link information. In an example of link setting, the illumination detection function 182a is assigned to the illumination sensor 184a, the lighting control function 182b is assigned to the fluorescent lamp and power supply unit 184b, the temperature control function 182c is assigned to the air conditioner 184c, and the temperature detection function 182d is assigned to the temperature sensor 184d. Fig.15 The centralized control function 182e is assigned to a dedicated device in the plurality of devices 20.

[0203] Assume that the fluorescent lamp and the power supply unit 184b are aged. If the fluorescent lamp and the power supply unit 184b are detected to be aged, the detection result is sent to the process manager's terminal 30. As a result, when the terminal 30 displays the function diagram, the lighting control function 182b linked to the fluorescent lamp and the power supply unit 184b can be displayed on the function diagram in a manner distinguishable from other functions. The process manager creates a lighting control function 182b-2 on the function diagram as a substitute function for the lighting control function 182b, and changes the function flow (function flow information) in such a way that the illumination control data from the centralized control function 182e is not sent to the lighting control function 182b but instead the illumination control data from the centralized control function 182e is sent to the lighting control function 182b-2. When the terminal 30 displays the link table, the process manager updates the link information in such a way that the lighting control function 182b-2 is linked to the LED lighting and drive circuit 184b-2 on the link table.

[0204] Fig.47 This is a flowchart showing an example of the operation of a building management system. The sensor 26 of each device 20 always determines whether each device 20 is aged or faulty. When aging or fault is found, in step S282, the device 20 (in this case, the fluorescent lamp and the power supply unit 184b) notifies the server 40 that an aged component / faulty component has been found. In step S284, the server 40 investigates the performance of a replacement component for the aged component / faulty component. As examples of replacement components, there are fluorescent lamps or LEDs. In step S286, the server 40 determines whether the performance of the replacement component is the same as that of the existing component. In a case where it is determined that the performance of the replacement component is the same as that of the existing component (in the case where the replacement component is a fluorescent lamp), in step S306, the replacement component is set up (the existing component is replaced with the replacement component).

[0205] When it is determined that the performance of the replacement component is different from that of the existing component (when the replacement component is an LED), in step S288, the server 40 decides to temporarily retain the existing function (lighting control function 182b) in the function diagram. Thereafter, in step S290, the replacement component (LED lighting and drive circuit 184b-2) is set up. In step S292, the server 40 installs the control program in the LED lighting and drive circuit 184b-2. Thereafter, in step S294, the operation of the LED lighting and drive circuit 184b-2 is confirmed. If normal operation cannot be confirmed, if there are other replacement components, an investigation is conducted on the other replacement components (step S284). If there are no other replacement components, the process ends.

[0206] When normal operation is confirmed, in step S296, the aged component / faulty component is removed. In step S298, the control program is uninstalled from the removed aged component / faulty component. In step S300, the server 40 causes the process manager to update the functional flow. The process manager drags and drops the icon of the lighting control function 182b on the functional diagram and creates the icon of the second lighting control function (detour) 182b-2, thereby updating the functional flow information. The updated functional flow information is published on the network. There is also a case where the published functional flow information is further updated by other process managers. In step S302, the server 40 causes the process manager to update the link information. The process manager removes the link from the lighting control function 182b to the fluorescent lamp and power supply unit 184b on the link table, and sets the link from the second lighting control function 182b-2 to the LED lighting and drive circuit 184b-2, thereby updating the link information. The updated link table is published on the network. There is also a case where the published link information is further updated by other process managers. In step S304, the server 40 requests the server 40 to update the area map. The updated area map is also published on the network. There is also a case where the published area map is further updated by other process managers.

[0207] According to the second embodiment, the concept of process management is applied to facility management, a plurality of equipments are controlled using a functional flow and a link table, and process management can be easily changed.

[0208] [Third Embodiment]

[0209] A manufacturing skill base system as a third embodiment of the control system will be described. Fig.48 This is a diagram for explaining the concept of the manufacturing skill base system of this embodiment. Hereinafter, the manufacturing skill base system is referred to as a "digital craftsman platform".

[0210] The digital "craftsman" platform is a system realized by integrating IoT (Internet of Things) technology and AI (Artificial Intelligence) technology. The digital "craftsman" platform can be roughly divided into a stage of making a digital "craftsman" 530 and a stage of using a digital "craftsman" 530 described later.

[0211] First, an overview of the stages of creating a digital “craftsman” 530 is described below.

[0212] The digital "craftsman" platform constructs a digital twin (Digital Twin) 502, which reproduces the operations performed by operators (including craftsmen 510 with excellent skills (operators called "craftsmen" in reality)) in physical space 501 such as actual production line J in cyberspace. Production line J is a manufacturing system composed of multiple devices 20 described in the first embodiment. In the first and second embodiments, the operator does not need to operate the device when realizing the function, but in the third embodiment, there is a case where the operator operates the device. This operation requires skills, and the third embodiment involves a system that utilizes the skills of the craftsman 510. The digital "craftsman" platform uses data w2 related to the operations performed by the craftsman 510 in the data w1 obtained to construct the digital twin 502, and constructs a "craftsman" digital twin 503 that reproduces the operations performed by the craftsman 510 in the physical space 501 in cyberspace. Here, the skills of the craftsman 510 generally include non-visual skills called "know-how".

[0213] The skills of the craftsman 510 can be derived through the analysis of daily reports, fault reports (based on natural language), sounds, and vibrations. In addition, the skills can be digitized by sensing the conditions grasped by the craftsman 510 using the five senses. In addition, the movements of the craftsman 510 can also be grasped by voice recognition / image recognition. In addition, the movements of the craftsman 510 can also be grasped by using a wristband or the like and the actions of the craftsman 510 can be analyzed to explore the skills of the craftsman 510 based on experience. That is, by using IoT and AI, the skills of the craftsman 510 can be quantified / explicitly knowledgeable.

[0214] Next, the stage of using the digital "craftsman" 530 is explained. By digitizing the skills of skilled people (proficient people) such as craftsmen 510, their skills can be inherited, talent training can be achieved, and automation and autonomy can be performed as needed. That is, the experience and implicit knowledge of craftsmen 510 are digitized and passed on to future generations. When the skills of craftsmen 510 that have been digitized / explicitly knowledgeed as described above are transmitted as information to operators other than craftsmen, the operators who have been taught the skill information can determine the same appropriate actions as the craftsmen, and can accurately and quickly perform appropriate actions.

[0215] Here, the practice of using IoT or the like to send information about the physical space 501 to the cyberspace in almost real time and reproduce the environment of the physical space 501 in the cyberspace is called "digital twin". Moreover, the method of constructing the digital twins 502 and 503 formed in the cyberspace is not limited to a specific method, and various known methods can be used. In addition, IoT technology can be applied to the acquisition of data for constructing the digital twins 502 and 503.

[0216] Specifically, the data used to construct digital twins 502 and 503 are, for example, information related to phenomena recognized by the operator through the five senses such as seeing, hearing or touching, information related to the operator's line of sight or the movement of a specific part, information related to the state of the device handled by the operator, or information related to the operator's deliverables (not limited to products, including plans, etc.). Regarding the operator's line of sight or the movement of a specific part, for example, a sensor can be installed on the operator to detect it, or it can be detected based on the image of the operator captured by a camera. That is, one of the data used to construct digital twins 502 and 503 can also be an image captured of the operator. In addition, when the movement of the operator's line of sight is detected from the image, the camera used to capture the image can also be mounted on the glasses worn by the operator. As described above, the method for obtaining data for constructing digital twins 502 and 503 is not limited to a specific method, and various known methods can be used. In addition, with the advancement of IoT technology, this method can also be gradually changed.

[0217] In addition, the data obtained in order to construct the digital twins 502 and 503 include data belonging to the operator's input and data belonging to the operator's output. For example, consider the case where the operator recognizes certain phenomena through the five senses such as seeing, hearing or touching and takes certain actions. At this time, information related to certain phenomena recognized by the operator through the five senses such as seeing, hearing or touching is obtained as data belonging to the operator's input. In parallel, information related to certain actions taken by the operator is obtained as data belonging to the operator's output. The data belonging to the input or output of the operator obtained in the above manner is attached with identification information that can identify the production base, the individual, etc. This identification information can be used in the processing of extracting data related to the work performed by the craftsman 510 from the data of the digital twin 502 (used to construct the "craftsman" digital twin 503).

[0218] In order to make the explanation easier to understand, Fig.48 FIG. 5 shows a situation where a craftsman 510 exists in one production base (production line J), ​​but the craftsman 510 can change locations and be dispersed in multiple production bases. In addition, it is also possible to consider that multiple craftsmen 510 ( Fig.48 This does not mean that there is only one craftsman 510 on production line J. The multiple craftsmen 510 are, for example, people with excellent skills in various fields and processes such as "operation", "quality", "production planning", and "inventory". Of course, these excellent skills may come from individual operators, but sometimes one operator may have multiple excellent skills.

[0219] The multiple craftsmen 520 (520-1, 520-2, 520-3, ..., 520-N) on the "craftsman" digital twin 503 are a collection of data related to the work performed by these multiple craftsmen 510. The digital "craftsman" platform models the skills of these multiple craftsmen 510 separately, for example, by deep learning using the data of the multiple craftsmen 520 on the "craftsman" digital twin 503 as learning data. The digital "craftsman" 530 is a module for circulating the skills of multiple craftsmen 510 using a neural network ("craftsman" model) created by the modeling. Creating a digital "craftsman" 530 is essentially modeling the skills of multiple craftsmen 510. In other words, it is to create a "'craftsman' model".

[0220] For example, consider the case where a "craftsman" model, i.e., a digital craftsman 530, is manufactured by modeling the skills of the craftsman 510 who will work on production line J. At this time, it is possible to infer certain actions (outputs) that the craftsman 510 would take based on information (input) related to certain phenomena recognized by the operator through the five senses such as seeing, hearing, or touching in production line K without the craftsman 510, and reflect the inference results on production line K. That is, the skill information w3 representing the skills of the craftsman 510 can be circulated on the network through the control unit (not shown) of the digital "craftsman" platform. Fig.33 As shown, since the management shell can cooperate via the WebAPI and the service API, information can be circulated on the network via the management shell as a service.

[0221] In this embodiment, in addition to the functional process information, each skill information w3 of the craftsman 510 (the collection of data related to the work performed by multiple craftsmen 510, i.e., the craftsman 520) is also managed as an asset using a management shell. That is, through the management shell, the functional process information and the skill information w3 can be connected to the network through a standardized communication interface, and the assets can also communicate with each other. As a result, no matter in which production line other than production line J, for example, in production line K, efficient manufacturing using the skill information w3 of the craftsman can be achieved according to the functional process. The skill information w3 is displayed on the display unit 28 of the device 20 or the display unit of the terminal 30.

[0222] The information collected when creating the digital craftsman 530, such as "operation", "quality", "production plan", "inventory" and other various "things of value to the organization" at all levels can become assets. At this time, it can also be managed in association with "things" such as equipment and machines.

[0223] like Fig.32As shown, the functional process body 404 of the management shell 401 is composed of multiple sub-models 410A, 410B, ..., and various aspects of the asset 412 can be described through these sub-models 410A, 410B, .... Each sub-model 410A, 410B, ... handles a clearly defined field (subject), and these sub-models are composed of multiple attributes classified in a hierarchy. Therefore, all information related to the asset 412, such as the data of the asset 412 (various digital data collected from the craftsman 510 that constitute the digital craftsman 530) can become attributes. The information of the asset 412 can be provided through its attributes. By having a management shell 401 with multiple sub-models 410A, 410B, ..., the digital craftsman 530 can also be circulated on the network for utilization / application.

[0224] In addition, the production line K may be regarded as the future production line J after the craftsman 510 retires. In addition, the modeling of the skills of the craftsman 510 may also be realized by applying AI technology.

[0225] According to the third embodiment, it is possible to circulate the skills of a craftsman in time and space, for example, by passing on the skills of a craftsman to the next generation or by transferring the skills of a craftsman overseas.

[0226] [Fourth Embodiment]

[0227] An asset operation system as a fourth embodiment of the control system will be described. Fig.49 This is a block diagram showing an example of an asset management system.

[0228] A plurality of devices 60-1 to 60-m1 (sometimes also referred to as devices 60) and servers 70-1 to 70-m3 are connected to a network 10. An asset operator who conducts financial transactions operates the device 60 to cooperate with the server 70, receives data for asset operation from the server 70, and conducts transactions for asset operation. The device 60 is composed of a notebook / tablet personal computer, a smart phone, etc. Each device 60 includes a controller 22, a display unit 28, and an input unit 29. The input unit 29 includes a mouse, a keyboard, etc. The display unit 28 may also have a touch panel display / input device. The server 70 is provided in each financial institution and stores function flow information 42 and link information 44.

[0229] Fig.50An example of an overview of an asset management system is shown. Asset management consists of a function layer, a method layer, and an intermediate layer. The function layer manages the function flow, and the method layer manages real assets. An example of the functions possessed by the function layer can include a bank account deposit function, an online treasury bond purchase function, an online stock trading function, a virtual currency transaction function, and an online remittance procedure function. The bank account deposit function is a real-world financial transaction, and the other online treasury bond purchase function, online stock trading function, virtual currency transaction function, and online remittance procedure function are financial transactions in the virtual world on the Internet. An asset operator who conducts financial transactions in the real world switches to conducting financial transactions in the virtual world, which can be regarded as a functional bypass. In addition, unlike the first and second embodiments, the time sequence for implementing the functions is not defined in the functional flow, and the timing of the implementation of all functions is appropriately switched by the asset manager.

[0230] In manufacturing systems, the mechanism that implements functions is called a device, but in financial systems, the mechanism that implements functions is called a method. The method layer has the methods required to implement each function of the function layer, such as national currency, virtual currency, government bonds, stocks, foreign currencies, etc. Therefore, the method layer plays a role corresponding to the above-mentioned device layer and is suitable for the concept of the device layer.

[0231] The middle layer is the same as the first and second embodiments, and has a communication protocol and link information, and also has a bypass evaluation unit. The link information defines: the deposit function in the bank account is linked to the domestic currency, the online purchase of treasury bonds is linked to the treasury bond certificate, the online stock trading function is linked to the stock, the virtual currency trading function is linked to the virtual currency, and the online exchange procedure function is linked to the foreign currency. When the asset manager properly implements the function of the function layer, the method in the method layer linked to the function is executed to conduct financial transactions.

[0232] Each function is provided with an attribute related to the value of the function. Examples of attributes include the deposit interest rate for the bank account deposit function, the treasury bond interest rate for the online treasury bond purchase function, the stock price for the online stock trading function, the virtual currency exchange rate for the virtual currency trading function, and the exchange rate for the online exchange procedure function.

[0233] The bypass evaluation unit calculates the commodity value of the financial transaction obtained by realizing each function. Fig.51An example of a bypass evaluation unit is shown. The conversion unit stores deposit interest rates, treasury bond interest rates, stock prices, virtual currency exchange rates, and exchange rates. If the asset manager deposits money into a bank account, the value of the deposit is calculated based on the deposit interest rate. If the asset manager purchases treasury bonds online, the value of the treasury bonds is calculated based on the treasury bond interest rate. If the asset manager purchases stocks online, the value of the stocks is calculated based on the stock price. If the asset manager trades virtual currency, the value of the virtual currency transaction is calculated based on the virtual currency exchange rate. If the asset manager conducts exchange transactions online, the value of the transaction is calculated based on the exchange rate. When calculating the value of each transaction, the conversion unit converts the value into the same currency value.

[0234] According to the fourth embodiment, the asset manager can accurately determine which transaction will most increase assets.

[0235] In addition, the present invention is not limited to the original state of each of the above-mentioned embodiments. In the implementation stage, the constituent elements can be deformed and concretized within the scope of the main purpose. In addition, various inventions can be formed by appropriate combinations of multiple constituent elements disclosed in the above-mentioned embodiments. For example, several constituent elements can also be deleted from all the constituent elements shown in the embodiments. Moreover, the constituent elements of different embodiments can also be appropriately combined.

[0236] Description of Reference Numerals

[0237] 10…network, 20…device, 22…controller, 24…driving unit, 26…sensor, 28…display unit, 30…terminal, 40…server, 42…functional process information, 44…link information.

Claims

1. A control system comprising: A plurality of devices, each capable of realizing at least one function; a control unit storing first information and second information, wherein the first information indicates an implementation order of two or more functions required to implement a process, and the second information indicates to which of the plurality of devices the two or more functions are assigned, and causing the plurality of devices to operate in sequence based on the first information and the second information to implement the process; A terminal having a display unit and an input unit, wherein the terminal is connected to the control unit; as well as A sensor for detecting the operating status of the plurality of devices, When the sensor detects that one of the plurality of devices is not operating normally, the sensor sends the detection result to the control unit. When receiving the detection result, the control unit notifies the terminal of an alarm. The terminal displays on the display unit two or more icons representing the two or more functions configured in the implementation order and a first path image representing the implementation order, and displays a symbol indicating that the function is not implemented normally on a first icon of the two or more icons, wherein the first icon represents a function assigned to the one device that is not operating normally. The terminal changes the display position of the first icon according to the operation of the input unit, and further displays a second icon indicating an alternative function to the one function and a second path image indicating an implementation order of the alternative functions on the display unit.

2. The control system according to claim 1, The plurality of devices include a first device that implements a first function and a second device that implements a second function, The first device includes a sending unit, and when implementing the first function, the sending unit sends connection data to the second device or the control unit. The connection data has: identification information identifying the first information; Function information indicating the first function; and Result information indicating a result of processing based on the first function.

3. The control system according to claim 2, The connection data also includes: information on the implementation period of the first function implemented by the first device; and Progress status information of the first function implemented by the first device.

4. A control system according to claim 2 or 3, The sending unit sends the connection data using a management shell.

5. The control system according to any one of claims 1 to 3, The plurality of devices are dispersed in a plurality of factories of the same enterprise or in a plurality of factories of a plurality of enterprises.

6. A control method, comprising: causing a plurality of devices to operate sequentially to implement a process based on first information and second information, wherein the first information indicates the order in which two or more functions required to implement the process are implemented, and the second information indicates to which of the plurality of devices the two or more functions are assigned, In the control method, detecting the operating states of the plurality of devices, When it is detected that one of the plurality of devices is not operating normally, two or more icons representing the two or more functions configured in the implementation order and a first path image representing the implementation order are displayed, A symbol indicating that a function is not normally implemented is displayed on a first icon among the two or more icons, the first icon indicating a function assigned to the one device, The display position of the first icon is changed according to the operation of the input unit, and a second icon indicating an alternative function to the one function and a second path image indicating the order of implementing the alternative functions are further displayed.

7. The control method according to claim 6, The plurality of devices include a first device that implements a first function and a second device that implements a second function, When the first device implements the first function, the first device sends connection data to the second device. The connection data has: identification information identifying the first information; Function information indicating the first function; and Result information indicating a result of processing based on the first function.