A method, system and computer storage medium for integrating urban three-dimensional models

By acquiring 3D architectural and geological models, and simulating engineering geological boreholes and geological layers through topology processing, the problem of geological interspersion and suspended buildings in the integration of urban 3D models and geological models is solved, achieving seamless integration of above and below ground. , providing effective support for urban planning.

CN114022625BInactive Publication Date: 2024-10-29北京市地质矿产勘查院信息中心 +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202111299557.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-11-04
Publication Date
2024-10-29
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

There are limitations in the integration between urban 3D models and urban geological models, especially due to geological intersections and suspended buildings, resulting in low model accuracy and the inability of resources to effectively support urban construction.

Method used

By acquiring three-dimensional architectural models and geological models, simulated engineering geological boreholes and geological layers are constructed, and topology processing is performed to adjust the geological layers, so that the architectural model and the geological model can be integrated with each other to solve the problems of geological interspersion and suspended buildings.

Benefits of technology

It achieves seamless integration of three-dimensional models, provides above-ground and underground integrated support, and improves the supporting role of urban planning and construction. It is especially suitable for the planning of megacities in plain areas.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114022625B_ABST
    Figure CN114022625B_ABST
Patent Text Reader

Abstract

The present invention relates to a method, system and computer storage medium for integrating urban three-dimensional models, wherein the method comprises: obtaining a three-dimensional building model; obtaining a three-dimensional geological model, wherein the three-dimensional geological model comprises several simulated geological layers; constructing at least one simulated engineering geological borehole and a simulated borehole geological layer corresponding to the simulated engineering geological borehole position; and performing topological processing on the three-dimensional geological model based on the simulated engineering geological borehole and the simulated borehole geological layer to adjust the simulated geological layer so that the three-dimensional building model and the three-dimensional geological model are integrated with each other. The above method can solve the problems of geological interlacing and building suspension generated during the integration process by integrating different types of spatial models in the three-dimensional space.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of model construction, and in particular to a method, system and computer storage medium for integrating three-dimensional urban models. Background Art

[0002] The concept of urban 3D model has evolved from a narrow sandbox model to a digital 3D model of the surface, and has now expanded to cover all elements of the city, including both above-ground buildings and various activities, as well as underground space facilities, underground pipelines and geological bodies. The 3D model's intuitive simulation of the real environment of buildings at multiple levels above and below ground has enabled more and more industries to solve practical problems more efficiently based on the 3D model.

[0003] The urban 3D model is a 3D geometric expression of buildings, infrastructure, topography, and landscape on the ground of the city. Its essence is a real-life 3D model built on the 3D model of the urban terrain. To build a 3D real-life model of the city, oblique photogrammetry technology has become the mainstream, and a single 3D model technology has been formed to support diversified management such as query statistics. Although data collection methods and 3D modeling technology are changing with each passing day, there are still limitations in current urban modeling, which are mainly reflected in the limitations of complete data acquisition and the limitations of fully automatic modeling solutions. The urban geological model mainly refers to the expression of the 3D structure of the geological body. Due to the incompleteness of our acquisition of geological body information, it is necessary to use multi-source data and multi-method collaborative modeling when modeling. In addition to the case of rich borehole information and simple geological conditions, boreholes can be directly used for automatic modeling. In most cases, it is necessary to make full use of geophysical and geochemical exploration data, drilling data, etc. for semi-automatic manual modeling. At the same time, there are some difficulties in urban geological modeling that need to be solved, including local updates of the model, the characterization of complex geological bodies, and the low model accuracy caused by the limitation of underground information acquisition.

[0004] The integration of urban three-dimensional models and urban geological models has always been a research hotspot in the modeling field. However, the integration process needs to deal with spatial topological problems such as intersections, interlacing, overlaps, and gaps, and the workload of manual participation in judgment and processing is relatively large.

[0005] The demand for the construction of three-dimensional models is driving the continuous updating and improvement of model integration technology, but there are still many problems that need to be solved. Among them, the current urban planning and construction is generally based on urban geological conditions, and is carried out on the basis of urban master planning and detailed planning. Usually, the evaluation of geological conditions and the approval of planning and design schemes are completed by the geological department and the planning department respectively on different platforms using different spatial data. The difficulty of their work continues to increase with the development of urban construction. Although the urban three-dimensional model established by the current planning department and the urban geological model established by the geological department play an important planning and construction function in their respective fields, the two parties cannot be integrated, so that they cannot form a resource synergy, and they cannot provide support for urban construction in the form of "three-dimensional one map". Summary of the invention

[0006] Based on this, it is necessary to provide a city three-dimensional model integration method, system and computer storage medium to address the problem that the above-mentioned building model cannot be effectively combined with the geological conditions of the corresponding terrain.

[0007] A method for integrating urban three-dimensional models, comprising:

[0008] Obtaining a three-dimensional building model;

[0009] Acquire a three-dimensional geological model, wherein the three-dimensional geological model includes a plurality of simulated geological layers;

[0010] Constructing at least one simulated engineering geological borehole and a simulated borehole geological layer corresponding to the simulated engineering geological borehole position;

[0011] Based on the simulated engineering geological boreholes and the simulated borehole geological layers, the three-dimensional geological model is topologically processed to adjust the simulated geological layers so that the three-dimensional building model is integrated with the three-dimensional geological model.

[0012] The above-mentioned urban three-dimensional model integration method of the present invention can solve the problems of geological interlacing and building suspension generated during the integration process by integrating different types of spatial models in the three-dimensional space, adjusting the simulated geological layers in the three-dimensional geological model, and adjusting the positional relationship between the three-dimensional geological model and the above-mentioned building model.

[0013] In one preferred embodiment, the method comprises:

[0014] Performing monomer processing on the three-dimensional building model to form a monomer building model, wherein the monomer building model includes at least one building model;

[0015] The three-dimensional geological model is processed into monomers to form a monomer geological model. The monomer geological model area may correspond to a plurality of monomer building models with the same spatial position. The monomer geological model includes at least one simulated engineering geological borehole.

[0016] In one preferred embodiment, the three-dimensional geological model is topologically processed based on the simulated engineering geological borehole and the simulated borehole geological layer to adjust the simulated geological layer so that the three-dimensional building model is integrated with the three-dimensional geological model, including:

[0017] Screening the simulated geological boreholes to obtain reference boreholes, wherein the reference boreholes can penetrate all simulated geological layers included in the geological model;

[0018] Based on the reference borehole, the simulated geological layer corresponding to the three-dimensional geological model is adjusted to pre-integrate the three-dimensional building model with the three-dimensional geological model.

[0019] In one preferred embodiment, the simulated geological layer corresponding to the three-dimensional geological model is adjusted based on the reference borehole to pre-integrate the three-dimensional building model with the three-dimensional geological model, and the adjustment method includes:

[0020] The vertical movement direction of the simulated geological layer is adjusted.

[0021] In one preferred embodiment, the adjusting the vertical movement direction of the simulated geological layer includes:

[0022] Determining the position information of the reference borehole;

[0023] Based on the location of the reference borehole, construct a vector line segment vertical to the stratum;

[0024] According to the vector line segment, the position relationship of the remaining simulated geological layers of the three-dimensional geological model is adjusted so that the position of the remaining simulated geological layers matches the simulated geological layers at the location of the reference borehole.

[0025] In one preferred embodiment, after the step of pre-integrating the three-dimensional building model with the three-dimensional geological model, the method further comprises:

[0026] Based on at least one of the simulated engineering geological boreholes contained in each monomer geological model, the simulated geological layer corresponding to the monomer geological model is adjusted to perform secondary integration of the monomer geological model and the corresponding three-dimensional building model.

[0027] In one preferred embodiment, based on at least one simulated engineering geological borehole contained in each monomer geological model, the simulated geological layer corresponding to the monomer geological model is adjusted to perform secondary integration of the monomer geological model and the corresponding three-dimensional building model, and the adjustment method includes:

[0028] The vertical movement direction, curvature and rotation angle of the simulated geological layer are adjusted.

[0029] In one preferred embodiment, adjusting the rotation angle of the simulated geological layer includes:

[0030] The corresponding simulated geological layer of the single geological model is rotated and adjusted by taking the location of the simulated engineering geological borehole as the origin and the vector of the simulated engineering geological borehole as the vertical constraint axis.

[0031] In one of the preferred embodiments, in the step of rotating and adjusting the corresponding simulated geological layer of the single geological model with the location of the simulated engineering geological borehole as the origin and the vector of the simulated engineering geological borehole as the vertical constraint axis, the simulated geological layer is rotated from the surface layer to the bottom, and the rotation angle and curvature of the corresponding simulated geological layer are rotated and adjusted.

[0032] In one preferred embodiment, the method further comprises:

[0033] Based on the three-dimensional building model, construct a foundation model of the corresponding building model;

[0034] The foundation model is integrated with the three-dimensional building model and the three-dimensional geological model.

[0035] In one preferred embodiment, the edge portion of each monomer geological model has a monomer watershed capable of presenting the simulated geological layer at the corresponding position, and the simulated geological layer of the corresponding adjacent monomer geological model is matched with the monomer geological model through the monomer watershed.

[0036] In one preferred embodiment, the step of constructing at least one simulated engineering geological borehole and a simulated borehole geological layer corresponding to the location of the simulated engineering geological borehole comprises:

[0037] Drilling at least one engineering geological borehole in the target real scene area to obtain the borehole geological layer contained in the corresponding position of the engineering geological borehole;

[0038] Based on the engineering geological boreholes and the corresponding borehole geological layers, simulated geological boreholes and simulated borehole geological layers are constructed at corresponding positions of the three-dimensional geological model.

[0039] The urban three-dimensional model integration method in the above-mentioned embodiment of the present invention is mainly suitable for areas where multiple sets of urban three-dimensional models and urban geological models have been established. It can process three-dimensional model data of different sources, types and formats, has low additional requirements for the original model, and has accurate spatial topological position after integration. The method can be based on existing three-dimensional building models, three-dimensional geological models, etc. combined with engineering geological drilling, urban planning data, architectural design drawings, orthophotos and other multi-source data, solves spatial topological errors such as geological body interlacing and building suspension during the integration process, realizes seamless integration of ground-underground integrated three-dimensional models, provides ground-underground integrated support for urban planning and construction, and can be used to guide the planning and construction of cities, especially megacities in plain areas.

[0040] A city three-dimensional model integration system, comprising:

[0041] An information acquisition module is used to obtain a three-dimensional building model and a three-dimensional geological model, wherein the three-dimensional geological model includes several simulated geological layers;

[0042] A borehole construction module, used to construct at least one simulated engineering geological borehole and a simulated borehole geological layer corresponding to the simulated engineering geological borehole position;

[0043] The processor is electrically connected to the information acquisition module and the drilling module, and is used to perform topological processing on the three-dimensional geological model based on the simulated engineering geological drilling and the simulated drilling geological layer to adjust the simulated geological layer so that the three-dimensional building model and the three-dimensional geological model are integrated with each other.

[0044] The urban three-dimensional model construction system in the above-mentioned embodiment of the present invention is mainly suitable for areas where multiple sets of urban three-dimensional models and urban geological models have been established. It can process three-dimensional model data of different sources, types and formats, has low additional requirements for the original model, and has accurate spatial topological position after integration. The method can be based on existing three-dimensional building models, three-dimensional geological models, etc. combined with engineering geological drilling, urban planning data, architectural design drawings, orthophotos and other multi-source data, solves spatial topological errors such as geological body interlacing and building suspension during the integration process, realizes seamless integration of ground-underground integrated three-dimensional models, provides ground-underground integrated support for urban planning and construction, and can be used to guide the planning and construction of cities, especially megacities in plain areas.

[0045] A computer storage medium includes a stored program, wherein when the program is running, the device where the storage medium is located is controlled to execute the above method.

[0046] The computer storage medium in the above-mentioned embodiment of the present invention utilizes the urban three-dimensional model integration method, which is mainly suitable for areas where multiple sets of urban three-dimensional models and urban geological models have been established. It can process three-dimensional model data of different sources, types and formats, has low additional requirements for the original model, and has accurate spatial topological position after integration. The method can be based on existing three-dimensional building models, three-dimensional geological models, etc., combined with engineering geological drilling, urban planning data, architectural design drawings, orthophotos and other multi-source data, solves spatial topological errors such as geological body interlacing and building suspension during the integration process, realizes seamless integration of ground-underground integrated three-dimensional models, provides ground-underground integrated support for urban planning and construction, and can be used to guide the planning and construction of cities, especially megacities in plain areas. BRIEF DESCRIPTION OF THE DRAWINGS

[0047] Figure 1 A flowchart of a city three-dimensional model integration method disclosed in a preferred embodiment of the present invention;

[0048] Figure 2 It is a flowchart of the subdivided steps of step S30 of a city three-dimensional model integration method disclosed in a preferred embodiment of the present invention;

[0049] Figure 3 It is a flowchart of the subdivided steps of step S40 of a city three-dimensional model integration method disclosed in a preferred embodiment of the present invention;

[0050] Figure 4 A schematic diagram of modules of a system for constructing a three-dimensional urban model disclosed in a preferred embodiment of the present invention;

[0051] Figure 5 A first comparison schematic diagram of a simulated geological layer of a three-dimensional geological model before and after adjustment in a method for integrating a three-dimensional urban model disclosed in a preferred embodiment of the present invention;

[0052] Figure 6 A second comparison schematic diagram of a simulated geological layer of a three-dimensional geological model before and after adjustment in a method for integrating a three-dimensional urban model disclosed in a preferred embodiment of the present invention;

[0053] Figure 7 A third comparison schematic diagram of a simulated geological layer of a three-dimensional geological model before and after adjustment in a method for integrating a three-dimensional urban model disclosed in a preferred embodiment of the present invention;

[0054] Figure 8 A schematic diagram of a pinch-out body showing a situation where an upper layer of a drill hole of a simulated geological layer of a three-dimensional geological model disclosed in a preferred embodiment of the present invention is missing;

[0055] Fig. 9A schematic diagram of a pinch-out body showing a situation where an intermediate aquifer segment of a simulated geological layer of a three-dimensional geological model disclosed in a preferred embodiment of the present invention is missing;

[0056] Fig.10 A schematic diagram of a pinch-out body showing a situation where an intermediate aquifer segment of a simulated geological layer of a three-dimensional geological model disclosed in a preferred embodiment of the present invention is missing;

[0057] Fig.11 A schematic diagram of a pinch-out body showing a missing middle aquifer section of a borehole of a simulated geological layer of a three-dimensional geological model disclosed in a preferred embodiment of the present invention;

[0058] Fig.12 A schematic diagram of a pinch-out body showing the missing middle aquifer section of a borehole in a simulated geological layer of a three-dimensional geological model disclosed in a preferred embodiment of the present invention. DETAILED DESCRIPTION

[0059] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.

[0060] It should be noted that when an element is referred to as being "disposed on" another element, it may be directly on the other element or there may be a central element. When an element is considered to be "connected to" another element, it may be directly connected to the other element or there may be a central element at the same time. The terms "vertical", "horizontal", "left", "right" and similar expressions used herein are for illustrative purposes only and do not represent the only implementation method.

[0061] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art of the present invention. The terms used herein in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The term "and / or" used herein includes any and all combinations of one or more related listed items.

[0062] like Figure 1 As shown, the first preferred embodiment of the present invention discloses a method for integrating a three-dimensional urban model. The method in this embodiment aims to form a three-dimensional urban model including a three-dimensional urban model, a foundation model and a geological model. Specifically, the three-dimensional urban model integration method includes:

[0063] S10: Obtaining a three-dimensional building model;

[0064] A three-dimensional building model is obtained, and the three-dimensional building model is monomerized to form at least two monomer building models.

[0065] Specifically, the above-mentioned three-dimensional building model is subjected to individual processing. In this embodiment, the above-mentioned individual processing of the three-dimensional building model is to discretize the urban three-dimensional model established by oblique photogrammetry according to its geological space entity type, and accurately place it in the spatial position corresponding to the three-dimensional geological model, and supplement the attributes and geographic coding of each independent land object entity.

[0066] In more detail, the monomer building model obtained by the monomer processing of the three-dimensional building model includes at least one building model. In this embodiment, the principle of the monomer processing of the three-dimensional building model is generally to separate the building model with a volume greater than 10m 3 The geospatial buildings are divided and stored separately, and independent geometric models are established according to the external contours of the corresponding building models, and independent geographical attributes and geographic codes are assigned, such as buildings, public toilets, power distribution stations, teaching buildings, etc. After the above-mentioned buildings with independent geographical attributes are processed individually, the above-mentioned geometric models with independent building attributes are processed individually as units to form independent individual building models. In this embodiment, the individualization is performed on a building model as a unit to form an individual building model. In other embodiments of the present invention, two or more adjacent building models can also be processed individually as units to form individual building models, and the present invention does not limit this.

[0067] S20: Acquire a three-dimensional geological model, wherein the three-dimensional geological model includes several initial simulated geological layers.

[0068] In this step, a three-dimensional geological model of the target area corresponding to the three-dimensional building model is obtained. In this embodiment, the three-dimensional geological model is generally obtained from another model file independent of the three-dimensional building model, and the three-dimensional geological model includes several initial simulated geological layers corresponding to the geology of the target area. The initial simulated geological layers can be adjusted in subsequent steps to be combined with the above-mentioned single building model.

[0069] S30: constructing at least one simulated engineering geological borehole and a simulated borehole geological layer corresponding to the position of the simulated engineering geological borehole;

[0070] Specifically, Figure 2 As shown, the above step S30 specifically includes:

[0071] S31: Drilling at least one engineering geological borehole in the target real scene area to obtain a borehole geological layer contained in a corresponding position of the engineering geological borehole;

[0072] This step mainly uses engineering geological drilling to obtain at least one position in the target real scene area, and obtains the actual geological layer contained in the corresponding position, and adjusts the simulated geological structure of the remaining positions according to the geological layer obtained at the corresponding position, thereby achieving the purpose of adjusting the initial simulated geological layer.

[0073] The above method in this embodiment can also perform monomer processing on the three-dimensional geological model to form a monomer geological model, and the monomer geological model includes at least one simulated engineering geological borehole.

[0074] The above-mentioned monomerization processing of the three-dimensional geological model obtains a monomer geological model. Specifically, the geological model can be monomerized according to the independent social functions of the monomerized building areas and building facilities that have been divided in the three-dimensional building model. In this embodiment, the area divided by the monomerization processing of the above-mentioned three-dimensional geological model is generally monomerized based on independent functional areas, such as areas with a single social function such as building complexes (communities), parks, and high-speed rail stations. The area will include a collection of multiple geological space entities, such as three towers, two power distribution stations, a school, a complete set of monomerized regional strata, and a closed community wall. After the monomerization processing, a multi-layer tile structure with characteristic data will be formed, and all of them will be converted into TIN models for storage in the monomerized areas.

[0075] In the target area in the physical scene, the geological layer at the corresponding position is obtained through engineering geological drilling. The position obtained by the above-mentioned engineering geological drilling should try to satisfy the monomer division result of the three-dimensional geological model. In other words, each of the above-mentioned monomer geological models can include multiple simulated geological drilling holes. In this implementation, it is required that each monomer area has a corresponding engineering geological drilling hole as its vertical reference, and its hole elevation should be re-measured in the field; if there is no suitable drilling hole in this monomer area, a drilling hole within 20m from this area can be selected, and the engineering geological drilling hole can be translated to the side of the main building in the monomer area.

[0076] S32: Based on the engineering geological boreholes and the corresponding borehole geological layers, construct simulated geological boreholes and simulated borehole geological layers at corresponding positions of the three-dimensional geological model.

[0077] In this subdivision step, the borehole geological layer at the location is simulated into the three-dimensional geological model. The location obtained by the engineering geological borehole is simulated at the corresponding location of the three-dimensional geological model, and the geological layer at the corresponding location of the engineering geological borehole is also simulated into the above three-dimensional geological model to obtain a simulated geological borehole and a simulated borehole geological layer corresponding to the simulated geological borehole.

[0078] S40: Based on the simulated engineering geological drilling and the simulated drilling geological layer, topological processing is performed on the three-dimensional geological model to adjust the simulated geological layer so that the three-dimensional building model and the three-dimensional geological model are integrated with each other.

[0079] Specifically, this step mainly includes the following subdivision steps: Figure 3 As shown:

[0080] S41: Screening the simulated geological boreholes to obtain reference boreholes, wherein the reference boreholes can penetrate all simulated geological layers included in the geological model.

[0081] In the above-mentioned S41 step, the selected benchmark boreholes should penetrate all strata and be used to control the high-quality drilling of the entire stratum. In this embodiment, the above-mentioned benchmark boreholes should evenly cover the entire study area horizontally. The number of benchmark boreholes to be selected can be determined according to the complexity of the terrain to be simulated. The greater the complexity of the terrain, the more benchmark boreholes can be selected. In this embodiment, no less than 10 benchmark boreholes are selected per square kilometer corresponding to the real scene area. The above-mentioned benchmark boreholes play a skeleton role in the subsequent integration process of the three-dimensional geological model, and will also serve as a benchmark reference for the construction of the geological layer of the subsequent geological model.

[0082] The reference borehole has an accurately measured hole elevation. The significance of accurately measuring the hole elevation is that ground subsidence and engineering construction often cause the surface elevation to fail. Using the remeasured hole elevation can improve the fitting accuracy of DEM, borehole and geological layer.

[0083] S42: Based on the reference borehole, adjusting the simulated geological layer corresponding to the three-dimensional geological model to pre-integrate the three-dimensional building model with the three-dimensional geological model.

[0084] In the above step S42, the reference borehole is topologically processed, and the simulated geological layer corresponding to the three-dimensional geological model is adjusted based on the reference borehole. The adjustment method includes: adjusting the vertical movement direction of the simulated geological layer.

[0085] Combination Figure 5 As shown, Figure 5 The before and after comparison diagram of the simulated geological layer movement adjustment is shown. Specifically, the vertical movement direction of the simulated geological layer is adjusted. Specifically, the above step S42 includes the following subdivision steps:

[0086] Determining the position information of the reference borehole;

[0087] Based on the location of the reference borehole, construct a vector line segment vertical to the stratum;

[0088] According to the vector line segment, the position relationship of the remaining simulated geological layers of the three-dimensional geological model is adjusted so that the position of the remaining simulated geological layers matches the simulated geological layers at the location of the reference borehole.

[0089] In this embodiment, in the above step S42, the above-mentioned reference borehole is used to process the spatial topological relationship at a macro level, and an irregular triangulated network of the reference borehole is established. When the reference borehole is used to process the spatial topology at a macro level, each simulated geological layer in the three-dimensional geological model will participate in the adjustment of the spatial layout and topological relationship as a whole. The influence area of ​​each reference borehole is the area composed of directly connected vertices in the irregular triangulated network, and the adjustment of the strata outside this area is not affected by the above-mentioned reference borehole.

[0090] In this embodiment, the re-measured borehole elevation is used to adjust and move the corresponding stratum vertically; and the projection point of the reference borehole on the DEM is used as the origin, and a vector line segment of the reference borehole is established perpendicular to the stratum direction. The borehole vector is used to fine-tune the spatial distribution state of each geological layer in the remaining part of the three-dimensional geological model within a certain area, so that the stratum is basically consistent with the lithology of the geological layer in the borehole in the vertical direction and the corresponding layer segment in the vector direction and position, so as to achieve the purpose of matching the position of the simulated geological layer of the remaining part with the simulated geological layer at the location of the reference borehole.

[0091] The method for establishing the above-mentioned benchmark borehole vector segment is to first place the benchmark borehole in an accurate spatial position, and use its hole mouth elevation measured in the field to accurately fit it with the DEM; then establish a borehole vector segment in the direction perpendicular to the formation, and its length is the depth of the benchmark borehole; then use the lithology layer segment in the borehole vector and the buried depth value of each layer segment to divide the vector segment, thereby forming a borehole vector segment composed of different lithology layers, which represents the rock sample information of each stratum actually extracted during the drilling construction process, and can be used as a vertical to calibrate the stratum distribution state.

[0092] The method further includes: after the above step S42, the method further includes:

[0093] S43: Based on at least one of the simulated engineering geological boreholes included in each monomer geological model, the simulated geological layer corresponding to the monomer geological model is adjusted to perform secondary integration of the monomer geological model and the corresponding three-dimensional building model.

[0094] After the above step S42, the geological layers of the three-dimensional geological model are adjusted so that the three-dimensional building model is pre-integrated with the above three-dimensional geological model. Then, through the above step S43, the simulated geological layers corresponding to the engineering geological boreholes contained in each monomer geological model are used to further adjust the geological layers of each monomer geological model of the three-dimensional geological model, so that the monomer geological model and the corresponding monomer building model are further topologically processed, thereby achieving the purpose of integrating the monomer geological model with the corresponding monomer building model.

[0095] In this step S43, the adjustment method for adjusting the single geological model includes the moving direction, curvature and rotation angle of the simulated geological layer. Among them, the adjustment method of the moving direction is similar to the adjustment method disclosed in the above step S42, and the present invention will not be repeated here. The following is a detailed discussion on the curvature and rotation angle of the simulated geological layer:

[0096] Combination Figure 6 As shown, Figure 6 The before and after comparison diagram of the simulated geological layer rotation adjustment is shown. The above adjustment of the rotation and curvature of the simulated geological layer specifically includes:

[0097] The adjusting of the rotation angle of the simulated geological layer includes: taking the location of the simulated engineering geological borehole as the origin and the vector of the simulated engineering geological borehole as the vertical constraint axis, and rotating and adjusting the corresponding simulated geological layer of the single geological model.

[0098] In the step of rotating and adjusting the corresponding simulated geological layer of the single geological model with the location of the simulated engineering geological borehole as the origin and the vector of the simulated engineering geological borehole as the vertical constraint axis, the rotation angle of the simulated geological layer corresponding to the rotation adjustment gradually decreases from the surface layer to the bottom.

[0099] Specifically, the projection point of the reference borehole on the DEM is taken as the origin, the location of the reference borehole is taken as the rotation axis, the vector of the reference borehole is taken as the vertical constraint axis, and the surface high-precision DEM is taken as the horizontal reference. The geological layers that have an intersecting topological relationship with the surface high-precision DEM are rotated to make them fit and be consistent with the spatial distribution state and distribution direction of the DEM as much as possible. At the same time, the vertical rotation angle from the 0th layer to the nth layer that has an intersecting relationship with the DEM surface is required to gradually decrease, and no rotation and angle adjustment are performed on the n+1th layer (the first layer that has no intersecting relationship with the DEM). The effect of the above-mentioned gradual decrease in the rotation angle from the 0th layer to the nth layer that has an intersecting relationship with the DEM surface is that the closer the simulated geological layer is to the surface, the greater the effect of geomorphic reshaping, the closer its morphology is to the DEM, the closer it is to the deep stratum, the less it is affected by geomorphic reshaping, and the closer its morphology is to the adjacent stratum, until the stratum that has no intersection with the DEM maintains its natural distribution state.

[0100] like Figure 7 As shown, Figure 7 This is a comparison diagram of spatial operations on the levels where the strata and the DEM surface have an intersecting topological relationship. In this implementation, spatial operations are performed on the levels where the strata and the DEM surface have an intersecting topological relationship, wherein the lithology of the 0th layer is filled in the area between the DEM surface and the 0th layer, and the three-dimensional geological model of the remaining area is directly cut off and no longer retained.

[0101] In this embodiment, the edge portion of each monomer geological model has a monomer watershed that can present the simulated geological layer at the corresponding position, and the simulated geological layers of the corresponding adjacent monomer geological models are connected to other monomer geological models through the monomer watershed.

[0102] The monomer watershed is the boundary between each geological monomer area and other areas. It is manifested as a geological profile belt with a certain morphology. Its profile morphology is jointly affected by the stratigraphic distribution state of the monomerized area and the separated monomerized area. The number of monomer watersheds is the same as the number of adjacent monomerized areas. Multiple monomer watersheds together constitute the regional watershed of the monomerized area. The adjustment of the spatial topological relationship inside the monomer watershed depends on the drilling vector in this area. Outside the monomer watershed, the scale of the drilling in this area fails. Each geological monomer area is connected to the strata of other areas through the monomer watershed.

[0103] After the adjustment of the simulated geological layers of the above-mentioned monomer geological model is completed, all monomer watersheds in the area of ​​the monomer geological model are traversed, and the top boundary of the 0th layer is adjusted to coincide with the DEM surface at the monomer watershed. The angle adjustment of the 0th layer caused by its pulling gradually decreases from the monomer watershed to the origin of the borehole; the spatial distribution form and direction of the strata at each monomer watershed are adjusted so that each geological layer can be connected with the corresponding layer of the adjacent monomerized area at the monomer watershed, and the adjustment angle gradually decreases from the monomer watershed to the borehole. The significance of adjusting the geological layer at the monomer watershed is to ensure the continuity of the monomer model with other monomerized models at the watershed. If there is a situation where the upper layer of the geological body is missing on both sides of the monomer watershed and cannot correspond, the corresponding geological body needs to be pinched out.

[0104] The following is a discussion of the special situations that occur during the topological processing of simulated geological layers in the above three-dimensional geological model:

[0105] If there is a missing upper layer in the 3D geological model, after the geological layer rotation adjustment is completed, the geological layer generation function "z i =(z dem *(mi)+z m+1*i) / m” to generate the missing geological layers, where z dem is the elevation value of DEM, z m+1 is the first layer of the original stratum, i is the current layer number, and m is the total number of missing strata.

[0106] The role of the above geological layer generating function is: the closer to the surface, the greater the effect of geomorphic reshaping, and the closer its shape is to DEM, and DEM is directly used in the 0th layer of the corresponding borehole; on the contrary, the closer to the deep stratum, the less it is affected by geomorphic reshaping, and the closer it is to the stratigraphic distribution state of the m+1th layer.

[0107] If there is a missing aquiclude in the middle of the three-dimensional geological model, it is generally not processed in this implementation mode, and the original stratigraphic sequence and spatial distribution state of the stratum are maintained.

[0108] If there is a missing aquiclude in the borehole, it is generally not processed in this embodiment to maintain the original stratigraphic sequence and spatial distribution of the stratum.

[0109] If there is a missing surface layer in the three-dimensional geological model, the origin should be moved down to the vertex in the borehole corresponding to the upper boundary of the 0th layer of the three-dimensional geological model, and the origin should be counted as point m.

[0110] If there is a missing surface layer of the engineering geological borehole, the origin should be moved up to the virtual intersection of the upper boundary of the 0th layer of the 3D geological model and the vertical extension line of the borehole.

[0111] If there is a missing intermediate layer in the three-dimensional geological model, the thickness of the corresponding stratum of the missing layer should be checked. If the corresponding stratum thickness is less than 0.5m, it can be generalized with the upper or lower layer in the borehole; if the lithology of the missing layer is similar to that of the upper or lower layer, it also needs to be generalized with the upper or lower layer in the borehole.

[0112] If there is a missing layer section in the middle of the borehole, the thickness of the corresponding stratum should be checked. If the corresponding stratum thickness is less than 0.5m, it can be generalized with the upper or lower layer in the three-dimensional geological model; if the lithology of the missing layer section is relatively close to that of the upper or lower layer, it can also be generalized with the upper or lower layer section in the three-dimensional geological model.

[0113] If there is a mismatch between the stratum and the borehole vector, the accuracy of the borehole should be tested first using other nearby boreholes or geophysical data; if the test is passed, the interlayer with a thickness of less than 0.5m in the borehole will be merged with the strata above and below it. If the lithology of the corresponding layer after merging is close to that of the upper or lower layer, it will be merged again until there is no stratum less than 0.5m in the borehole vector and the lithology of adjacent strata is different. Then the borehole vector and the stratum will be compared again. If there is still no match, the minimum generalized thickness will be adjusted to 0.8m and generalized again. If there is still no match after generalization, the correctness of the model needs to be verified.

[0114] like Figure 8 As shown in the figure, if there is a missing upper layer of the geological layer corresponding to the engineering geological borehole, after the simulated geological layer rotation adjustment is completed, the missing strata in the upper layer of the engineering geological borehole are assumed to be the 0th to mth layers. The intersection of the borehole and the DEM should be taken as the starting point, and the midpoint between the DEM and the bottom interface of the m+1th layer should be taken as the end point to establish a geological layer from the borehole to the watershed. The lithology of the lower stratum is the first-layer lithology of the borehole vector, and the upper part is the original stratum lithology of the three-dimensional geological model. Although this treatment reduces the accuracy of the geological layer at the single watershed, it reduces the number of missing strata as much as possible and ensures the continuity of the geological layer at the watershed.

[0115] like Fig. 9 and Fig.10 As shown in the figure, if there is a missing aquifer segment in the simulated geological layer, after the rotation and adjustment of the geological layer is completed, the upper or (and) lower boundary of the missing layer segment corresponding to the borehole vector should be used as the reference plane, and the local geological interface should be constructed in the 3D geological model, and its distribution state should be consistent with the adjacent geological layer as much as possible; then the layer should be vertically pulled at the watershed of the monomer area to merge it with the upper or lower layer, so as to form a geological pinch-out surface with the borehole as the center and the watershed as the end. The above pinch-out refers to the phenomenon that an object with a certain volume gradually shrinks until it disappears. The pinch-out of the stratum refers to the phenomenon that the thickness of the sedimentary layer gradually becomes thinner until there is no sedimentation towards the edge of the sedimentary basin, and the pinch-out surface expresses the smooth surface of the stratum pinch-out phenomenon.

[0116] like Fig.11 and Fig.12 As shown in the figure, if there is a missing aquifer segment in the corresponding simulated geological layer in the borehole, after the rotation and adjustment of the geological layer is completed, the middle point of the upper and lower boundaries of the missing layer segment in the borehole vector should be used as the convergence point, and the corresponding layer in the three-dimensional geological model should be pulled from the borehole vector to the convergence point, thereby forming a geological pinch-out surface with the convergence point as the end point and the watershed as the center.

[0117] In this embodiment, the method may further include step S50: constructing a foundation model and integrating it with the three-dimensional building model and the three-dimensional geological model, specifically including:

[0118] Based on the three-dimensional building model, construct a foundation model of the corresponding building model;

[0119] The foundation model is integrated with the three-dimensional building model and the three-dimensional geological model.

[0120] In this step, a building foundation model corresponding to the building model can be formed based on the corresponding building model included in the above-mentioned corresponding single building model. Specifically, according to the physical building of the building model, with reference to the building type and building height, planning documents, orthophotos, construction drawings and other documents can be used, or a foundation simulation calculation method can be used to identify and calculate the foundations of buildings and infrastructure, and the foundations can be cut and filled at corresponding positions in the model to form a building foundation model corresponding to the building model.

[0121] In this step, simulated geological drilling is used to process the spatial topological relationship of the monomer area model. After the correct topological relationship is formed, the ground base is cut, excavated, filled and other spatial operations are performed in the three-dimensional building model and geological model, and the foundation is placed in the accurate position of the ground and underground integrated model based on the three-dimensional terrain model. According to the type of geoscientific space entity, a collection of ground and underground models is formed in the geological area.

[0122] The above method may further include:

[0123] S60: Converting the three-dimensional building model, the building foundation model and the three-dimensional geological model into a standard format suitable for mutual combination.

[0124] The standardization of three-dimensional building models is to convert the spatial data format of the building model, check the spatial topological relationship, verify the accuracy of the three-dimensional terrain model, convert the coordinate system, and convert the volume-surface format; the spatial data format of the three-dimensional building model is generally SHP, OBJ, OSG, etc., and its spatial coordinate system is generally CGCS2000, Beijing 1954, Xi'an 80, etc., which needs to be converted into a unified SHP format and use the CGCS2000 coordinate system according to the integration requirements; the spatial topological errors of the model are generally inaccurate intersection, separation, and overlap between geological space entities, which need to be handled with reference to the planning and construction drawings.

[0125] The standardization of three-dimensional geological models involves the conversion of spatial data formats, checking of spatial topological relationships, conversion of spatial coordinate systems, restoration of vertical scales, and conversion of volume-surface formats.

[0126] The spatial data format of the three-dimensional geological model is generally SHP, OBJ, OSG, etc., and its spatial coordinate system is generally CGCS2000, Beijing 1954, Xi'an 80, etc. It needs to be converted into a unified SHP format and use the CGCS2000 coordinate system according to the integration requirements; the model space topology error is generally the inaccurate intersection, separation, coincidence and other relationships between geological levels, which need to be processed with reference to the modeling boreholes; after the model is standardized, the Grid / Tin hybrid data model will be used to express the geological level, which can be stored in ArcGIS Multi-Patch vector format, so that it can be integrated with the B-Rep-based three-dimensional building model; for the expression of topological relationships, the extended dimensional 9-intersection model (DE-9IM) will be used as the theoretical framework, and the 3DFDS data structure model will be used as the carrier of the topological data model to describe the topological relationship between the above-ground and underground model bodies. The topological relationship is mainly expressed as intersection, separation, coincidence, equality, covering, covered, contained, and contained.

[0127] In this implementation, the single building model is stored as a "boundary expression modeling (B-Rep)" data structure based on the building monomer to meet the building geometry structure of the LoD3 specification. The basic unit of the single building model construction is a triangular patch, which is specifically stored in ArcGIS's Multi-Patch vector format.

[0128] In this embodiment, the above-mentioned simulated geological boreholes can be standardized. The standardized simulated geological boreholes are made into engineering geological boreholes with unified rock classification and naming rules and unified rock and soil stratification marks, and are stored in a standardized format; among the screened boreholes, the benchmark boreholes with macro-control significance for the strata are again selected and stored in a standardized format; finally, the hole elevations of all boreholes are measured in the field. The standardized format conversion step in this section can be performed while obtaining the corresponding model, or before any model pre-integration step, and the present invention does not limit this.

[0129] S70: After the three-dimensional building model and the three-dimensional geological model are combined with each other, the three-dimensional city model is verified.

[0130] In this embodiment, the borehole verification method is used to check and process the inaccurate topological relationships such as intersection, separation, and overlap between model assemblies in each geological area.

[0131] The above steps include topological relationship inspection and verification of the single area (single building model and corresponding single geological model) and the global area (target model). The continuity of the strata, the accuracy of the building foundation, and the closure of the pinch-out body are checked within the single area; the continuity of the strata, the closure of the pinch-out geological body, the rationality of the underground space, the rationality of the foundation, and the continuity of the strata at the single watershed are checked in the whole area.

[0132] The urban three-dimensional model integration method in the above-mentioned embodiment of the present invention is mainly suitable for areas where multiple sets of urban three-dimensional models and urban geological models have been established. It can process three-dimensional model data of different sources, types and formats, has low additional requirements for the original model, and has accurate spatial topology after integration. The method can be based on existing three-dimensional building models, three-dimensional geological models, etc. combined with engineering geological drilling, urban planning data, architectural design drawings, orthophotos and other multi-source data, solves spatial topological errors such as geological body interlacing and building suspension during the integration process, realizes seamless integration of ground-underground integrated three-dimensional models, provides ground-underground integrated support for urban planning and construction, and can be used to guide the planning and construction of cities, especially megacities in plain areas.

[0133] like Figure 4 As shown, the second preferred embodiment of the present invention discloses a three-dimensional space simulation construction system 100 . The three-dimensional space model integration system 100 includes an information acquisition module 110 , a drilling construction module 120 and a processor 130 .

[0134] The information acquisition module 110 is used to obtain a three-dimensional building model and a three-dimensional geological model, wherein the three-dimensional geological model includes several simulated geological layers.

[0135] The information acquisition module 110 acquires the three-dimensional building model and performs monomer processing on the three-dimensional building model to form at least two monomer building models.

[0136] Specifically, the above-mentioned information acquisition module 110 also includes a singularization processing unit 111, which performs singularization processing on the above-mentioned three-dimensional building model. In this embodiment, the singularization processing unit 111 discretizes the three-dimensional urban model established by oblique photogrammetry according to its geological space entity type, and accurately places it in the spatial position corresponding to the three-dimensional geological model, and supplements the attributes and geographic coding of each independent land object entity.

[0137] In more detail, the monomer building model obtained by the monomer processing unit 111 after the three-dimensional building model is monomerized includes at least one building model. In this embodiment, the principle of the monomer processing of the three-dimensional building model is generally to monomerize the building model with a volume greater than 10m 3The geospatial buildings are divided and stored separately, and independent geometric models are established according to the external contours of the corresponding building models, and independent geographical attributes and geographic codes are assigned, such as buildings, public toilets, power distribution stations, teaching buildings, etc. After the above-mentioned buildings with independent geographical attributes are processed individually, the models with independent building attributes are processed individually as units to form independent individual building models. In this embodiment, a single building model is processed individually as a unit to form a single building model. In other embodiments of the present invention, two or more adjacent building models can also be processed individually as units to form individual building models, and the present invention does not limit this.

[0138] The information acquisition module 110 may also acquire a three-dimensional geological model, wherein the three-dimensional geological model includes several initial simulated geological layers.

[0139] The information acquisition module 110 obtains a three-dimensional geological model of the target area corresponding to the three-dimensional building model. In this embodiment, the three-dimensional geological model is generally obtained from another model file independent of the three-dimensional building model, and the three-dimensional geological model includes several initial simulated geological layers corresponding to the geology of the target area. The initial simulated geological layers can be adjusted later to be combined with the single building model.

[0140] The borehole construction module 120 is used to construct at least one simulated engineering geological borehole and a simulated borehole geological layer corresponding to the simulated engineering geological borehole position.

[0141] Specifically, at least one engineering geological borehole is drilled in the target real scene area to obtain the borehole geological layer contained in the corresponding position of the engineering geological borehole; at least one position in the target real scene area is obtained by using the engineering geological borehole, and the actual geological layer contained in the corresponding position is obtained, and the simulated geological structure of the remaining positions is adjusted according to the geological layer obtained at the corresponding position. Thus, the purpose of adjusting the initial simulated geological layer can be achieved.

[0142] The above-mentioned monomer processing unit 111 performs monomer processing on the three-dimensional geological model to form a monomer geological model, and the monomer geological model includes at least one simulated engineering geological borehole. The above-mentioned monomer processing unit 111 performs monomer processing on the three-dimensional geological model to obtain a monomer geological model, and specifically, the geological model can be processed in monomers according to the independent social functions of the monomerized building areas and building facilities that have been divided in the three-dimensional building model. In this embodiment, the area divided by the monomer processing of the above-mentioned three-dimensional geological model is generally processed in monomers based on independent functional areas, such as areas with a single social function such as building complexes (communities), parks, and high-speed rail stations, and the area will include a collection of multiple geospatial entities, such as three towers, two power distribution stations, a school, a complete set of monomerized regional strata, and a closed community wall. After the monomer processing, a multi-layer tile structure with characteristic data will be formed, and all of the monomerized areas will be converted into TIN models for storage.

[0143] In the target area in the physical scene, the geological layer at the corresponding position is obtained through engineering geological drilling. The position obtained by the above-mentioned engineering geological drilling should try to satisfy the monomer division result of the three-dimensional geological model. In other words, each of the above-mentioned monomer geological models can include multiple simulated geological drilling holes. In this implementation, it is required that each monomer area has a corresponding engineering geological drilling hole as its vertical reference, and its hole elevation should be re-measured in the field; if there is no suitable drilling hole in this monomer area, a drilling hole within 20m from this area can be selected, and the engineering geological drilling hole can be translated to the side of the main building in the monomer area.

[0144] The borehole construction module 120 constructs a simulated geological borehole and a simulated borehole geological layer at a corresponding position of the three-dimensional geological model based on the engineering geological borehole and the corresponding borehole geological layer. The borehole construction module 120 simulates the geological layer at the position into the three-dimensional geological model. The position obtained by the engineering geological borehole is simulated at the corresponding position of the three-dimensional geological model, and the geological layer at the corresponding position of the engineering geological borehole is also simulated into the above three-dimensional geological model to obtain a simulated geological borehole and a simulated borehole geological layer corresponding to the simulated geological borehole.

[0145] The processor 130 is electrically connected to the information acquisition module and the drilling module, and is used to perform topological processing on the three-dimensional geological model based on the simulated engineering geological drilling and the simulated drilling geological layer to adjust the simulated geological layer so that the three-dimensional building model and the three-dimensional geological model are integrated with each other.

[0146] Specifically, the processor 130 includes a pre-integration unit 131 and a secondary integration unit 132 .

[0147] The pre-integration unit 131 is used to screen the simulated geological boreholes to obtain reference boreholes, and the reference boreholes can penetrate all simulated geological layers included in the geological model.

[0148] The reference boreholes selected by the processor 130 should penetrate all strata and be used to control high-quality drilling of the entire stratum. In this embodiment, the reference boreholes should evenly cover the entire study area horizontally. The number of reference boreholes selected can be determined according to the complexity of the terrain to be simulated. The greater the complexity of the terrain, the more reference boreholes can be selected. In this embodiment, no less than 10 reference boreholes are selected per square kilometer corresponding to the real scene area. The reference boreholes play a skeleton role in the subsequent integration process of the three-dimensional geological model, and will also serve as a reference reference for the construction of the geological layer of the subsequent geological model.

[0149] The reference borehole has an accurately measured hole elevation. The significance of accurately measuring the hole elevation is that ground subsidence and engineering construction often cause the surface elevation to fail. Using the remeasured hole elevation can improve the fitting accuracy of DEM, borehole and geological layer.

[0150] Next, the pre-integration unit 131 adjusts the simulated geological layer corresponding to the three-dimensional geological model based on the reference borehole to pre-integrate the three-dimensional building model with the three-dimensional geological model.

[0151] The topological processing is performed on the reference borehole, and the simulated geological layer corresponding to the three-dimensional geological model is adjusted based on the reference borehole. The adjustment method includes: adjusting the moving direction of the simulated geological layer. The moving direction may be a vertical moving direction, etc.

[0152] Combination Figure 5 As shown, Figure 5 The before and after comparison diagram of the simulated geological layer movement adjustment is shown in FIG. 1 . Specifically, the pre-integration unit 131 includes:

[0153] Determining the position information of the reference borehole;

[0154] Based on the location of the reference borehole, construct a vector line segment vertical to the stratum;

[0155] According to the vector line segment, the position relationship of the remaining simulated geological layers of the three-dimensional geological model is adjusted so that the position of the remaining simulated geological layers matches the simulated geological layers at the location of the reference borehole.

[0156] In this embodiment, the above-mentioned benchmark boreholes are used to process the spatial topological relationship at a macro level, and an irregular triangulated network of the benchmark boreholes is established. When the benchmark boreholes are used to process the spatial topology at a macro level, each simulated geological layer in the three-dimensional geological model will participate in the adjustment of the spatial layout and topological relationship as a whole. The influence area of ​​each benchmark borehole is the area composed of directly connected vertices in the irregular triangulated network, and the adjustment of the strata outside this area is not affected by the above-mentioned benchmark boreholes.

[0157] In this embodiment, the re-measured borehole elevation is used to adjust and move the corresponding stratum vertically; and the projection point of the reference borehole on the DEM is used as the origin, and a vector line segment of the reference borehole is established perpendicular to the stratum direction. The borehole vector is used to fine-tune the spatial distribution state of each geological layer in the remaining part of the three-dimensional geological model within a certain area, so that the stratum is basically consistent with the lithology of the geological layer in the borehole in the vertical direction and the corresponding layer segment in the vector direction and position, so as to achieve the purpose of matching the position of the simulated geological layer of the remaining part with the simulated geological layer at the location of the reference borehole.

[0158] The method for establishing the above-mentioned benchmark borehole vector segment is to first place the benchmark borehole in an accurate spatial position, and use its hole mouth elevation measured in the field to accurately fit it with the DEM; then establish a borehole vector segment in the direction perpendicular to the formation, and its length is the depth of the benchmark borehole; then use the lithology layer segment in the borehole vector and the buried depth value of each layer segment to divide the vector segment, thereby forming a borehole vector segment composed of different lithology layers, which represents the rock sample information of each stratum actually extracted during the drilling construction process, and can be used as a vertical to calibrate the stratum distribution state.

[0159] The secondary integration unit 132 adjusts the simulated geological layer corresponding to each monomer geological model based on at least one simulated engineering geological borehole included in each monomer geological model, so as to perform secondary integration of the monomer geological model and the corresponding three-dimensional building model.

[0160] After adjusting the geological layers of the three-dimensional geological model so that the three-dimensional building model is pre-integrated with the above three-dimensional geological model, the secondary integration unit 132 uses the simulated geological layers corresponding to the engineering geological boreholes contained in each monomer geological model to further adjust the geological layers of each monomer geological model of the three-dimensional geological model, so that the monomer geological model and the corresponding monomer building model are further topologically processed, thereby achieving the purpose of the monomer geological model and the corresponding monomer building model. The adjustment method of the topological processing is similar to the adjustment method disclosed above, and the present invention will not be repeated here. The following is a detailed discussion of the curvature and rotation angle of the simulated geological layer:

[0161] In addition, combined Figure 6As shown, Figure 6 The before and after comparison diagram of the simulated geological layer rotation adjustment is shown. The above adjustment of the rotation and curvature of the simulated geological layer specifically includes:

[0162] The adjusting of the rotation angle of the simulated geological layer includes: taking the location of the simulated engineering geological borehole as the origin and the vector of the simulated engineering geological borehole as the vertical constraint axis, and rotating and adjusting the corresponding simulated geological layer of the single geological model.

[0163] In the step of rotating and adjusting the corresponding simulated geological layer of the single geological model with the location of the simulated engineering geological borehole as the origin and the vector of the simulated engineering geological borehole as the vertical constraint axis, the rotation angle of the simulated geological layer corresponding to the rotation adjustment gradually decreases from the surface layer to the bottom.

[0164] Specifically, the projection point of the reference borehole on the DEM is taken as the origin, the location of the reference borehole is taken as the rotation axis, the vector of the reference borehole is taken as the vertical constraint axis, and the surface high-precision DEM is taken as the horizontal reference. The geological layers that have an intersecting topological relationship with the surface high-precision DEM are rotated to make them fit and be consistent with the spatial distribution state and distribution direction of the DEM as much as possible. At the same time, the vertical rotation angle from the 0th layer to the nth layer that has an intersecting relationship with the DEM surface is required to gradually decrease, and no rotation and angle adjustment are performed on the n+1th layer (the first layer that has no intersecting relationship with the DEM). The effect of the above-mentioned gradual decrease in the rotation angle from the 0th layer to the nth layer that has an intersecting relationship with the DEM surface is that the closer the simulated geological layer is to the surface, the greater the effect of geomorphic reshaping, the closer its morphology is to the DEM, the closer it is to the deep stratum, the less it is affected by geomorphic reshaping, and the closer its morphology is to the adjacent stratum, until the stratum that has no intersection with the DEM maintains its natural distribution state.

[0165] like Figure 7 As shown, Figure 7 This is a comparison diagram of spatial operations on the levels where the strata and the DEM surface have an intersecting topological relationship. In this implementation, spatial operations are performed on the levels where the strata and the DEM surface have an intersecting topological relationship, wherein the lithology of the 0th layer is filled in the area between the DEM surface and the 0th layer, and the three-dimensional geological model of the remaining area is directly cut off and no longer retained.

[0166] The edge portion of each monomer geological model has a monomer watershed that can present the simulated geological layer at the corresponding position, and the simulated geological layer of the corresponding adjacent monomer geological model is matched with the monomer geological model through the monomer watershed.

[0167] In this embodiment, the edge portion of each monomer geological model has a monomer watershed that can present the simulated geological layer at the corresponding position, and the simulated geological layers of the corresponding adjacent monomer geological models are connected to other geological models through the monomer watershed.

[0168] The monomer watershed is the boundary between each geological monomer area and other areas. It is manifested as a geological profile belt with a certain shape. Its profile shape is jointly affected by the stratigraphic distribution state of the monomerized area and the adjacent monomerized areas. The number of monomer watersheds is the same as the number of adjacent monomerized areas. Multiple monomer watersheds together constitute the regional watershed of the monomerized area. The adjustment of the spatial topological relationship inside the monomer watershed depends on the drilling vector in this area. Outside the monomer watershed, the scale of the drilling in this area fails. Each geological monomer area is connected to the strata of other areas through the monomer watershed.

[0169] After the adjustment of the simulated geological layers of the above-mentioned monomer geological model is completed, all monomer watersheds in the area of ​​the monomer geological model are traversed, and the top boundary of the 0th layer is adjusted to coincide with the DEM surface at the monomer watershed, and the angle adjustment of the 0th layer caused by its pulling gradually decreases from the monomer watershed to the origin of the borehole; the spatial distribution form and direction of the strata at each monomer watershed are adjusted so that each geological layer can be connected with the corresponding layer of the adjacent monomerized area at the monomer watershed, and the adjustment angle gradually decreases from the monomer watershed to the borehole. The significance of adjusting the geological layer at the monomer watershed is to ensure the continuity of the monomer model with other monomerized models at the watershed. If there is a situation on both sides of the monomer watershed that cannot be matched due to the missing upper layer of the three-dimensional geological model, the corresponding geological body needs to be pinched out.

[0170] The following is a discussion of the special situations that occur during the topological processing of simulated geological layers in the above three-dimensional geological model:

[0171] If there is a missing upper layer in the 3D geological model, after the geological layer rotation adjustment is completed, the geological layer generation function "z i =(z dem *(mi)+z m+1 *i) / m” to generate the missing geological layers, where z dem is the elevation value of DEM, z m+1 is the first layer of the original stratum, i is the current layer number, and m is the total number of missing strata.

[0172] The role of the above geological layer generating function is: the closer to the surface, the greater the effect of geomorphic reshaping, and the closer its shape is to DEM, and DEM is directly used in the 0th layer of the corresponding borehole; on the contrary, the closer to the deep stratum, the less it is affected by geomorphic reshaping, and the closer it is to the stratigraphic distribution state of the m+1th layer.

[0173] If there is a missing aquiclude in the middle of the three-dimensional geological model, it is generally not processed to maintain the original stratigraphic sequence and spatial distribution of the stratum.

[0174] If there is a missing aquiclude section in the middle of the borehole, it is generally not processed to maintain the original stratigraphic sequence and spatial distribution of the stratum.

[0175] If the upper layer of the three-dimensional geological model is missing, the origin should be moved down to the vertex in the borehole corresponding to the upper boundary of the 0th layer of the three-dimensional geological model, and the origin should be counted as point m.

[0176] If there is a missing layer above the borehole, the origin should be moved upward to the virtual intersection of the upper boundary of layer 0 of the 3D geological model and the vertical extension line of the borehole.

[0177] If there is a missing intermediate layer in the three-dimensional geological model, the thickness of the corresponding stratum of the missing layer should be checked. If the corresponding stratum thickness is less than 0.5m, it can be generalized with the upper or lower layer in the borehole; if the lithology of the missing layer is similar to that of the upper or lower layer, it also needs to be generalized with the upper or lower layer in the borehole.

[0178] If there is a missing layer section in the middle of the borehole, the thickness of the corresponding stratum should be checked. If the corresponding stratum thickness is less than 0.5m, it can be generalized with the upper or lower layer in the three-dimensional geological model; if the lithology of the missing layer section is relatively close to that of the upper or lower layer, it can also be generalized with the upper or lower layer section in the three-dimensional geological model.

[0179] If there is a mismatch between the stratum and the borehole vector, the accuracy of the borehole should be tested first using other nearby boreholes or geophysical data; if the test is passed, the interlayer with a thickness of less than 0.5m in the borehole will be merged with the strata above and below it. If the lithology of the corresponding layer after merging is close to that of the upper or lower layer, it will be merged again until there is no stratum less than 0.5m in the borehole vector and the lithology of adjacent strata is different. Then the borehole vector and the stratum will be compared again. If there is still no match, the minimum generalized thickness will be adjusted to 0.8m and generalized again. If there is still no match after generalization, the correctness of the model needs to be verified.

[0180] like Figure 8As shown in the figure, if there is a missing upper layer of the geological layer corresponding to the engineering geological borehole, after the simulated geological layer rotation adjustment is completed, the missing strata in the upper layer of the engineering geological borehole are assumed to be the 0th to mth layers. The intersection of the borehole and the DEM should be taken as the starting point, and the midpoint between the DEM and the bottom interface of the m+1th layer should be taken as the end point to establish a geological layer from the borehole to the watershed. The lithology of the lower stratum is the first-layer lithology of the borehole vector, and the upper part is the original stratum lithology of the three-dimensional geological model. Although this treatment reduces the accuracy of the geological layer at the single watershed, it reduces the number of missing strata as much as possible and ensures the continuity of the geological layer at the watershed.

[0181] like Fig. 9 and Fig.10 As shown in the figure, if there is a missing aquifer segment in the simulated geological layer, after the rotation and adjustment of the geological layer is completed, the upper or (and) lower boundary of the missing layer segment corresponding to the borehole vector should be used as the reference plane, and the local geological interface should be constructed in the 3D geological model, and its distribution state should be consistent with the adjacent geological layer as much as possible; then the layer should be vertically pulled at the watershed of the monomer area to merge it with the upper or lower layer, so as to form a geological pinch-out surface with the borehole as the center and the watershed as the end. The above pinch-out refers to the phenomenon that an object with a certain volume gradually shrinks until it disappears. The pinch-out of the stratum refers to the phenomenon that the thickness of the sedimentary layer gradually becomes thinner until there is no sedimentation towards the edge of the sedimentary basin, and the pinch-out surface expresses the smooth surface of the stratum pinch-out phenomenon.

[0182] like Fig.11 and Fig.12 As shown in the figure, if there is a missing aquifer segment in the corresponding simulated geological layer in the engineering geological borehole, after the rotation and adjustment of the geological layer is completed, the middle point of the upper and lower boundaries of the missing layer segment in the borehole vector should be used as the convergence point, and the corresponding layer in the three-dimensional geological model should be pulled from the borehole vector to the convergence point, thereby forming a geological pinch-out surface with the convergence point as the end point and the watershed as the center.

[0183] The above-mentioned three-dimensional space model integration system 100 may further include a foundation model construction module 140, and the foundation model construction module 140 is used to process the foundation model, specifically including:

[0184] The foundation model construction module 140 constructs a foundation model of the corresponding building model based on the three-dimensional building model, and integrates the foundation model with the three-dimensional building model and the three-dimensional geological model.

[0185] The foundation model construction module 140 can form a building foundation model corresponding to the building model based on the corresponding building model included in the above-mentioned corresponding single building model. Specifically, according to the physical building of the building model, with reference to the building type and building height, planning documents, orthophotos, construction drawings and other documents can be used, or foundation simulation calculation methods can be used to identify and calculate the foundations of buildings and infrastructure, and the foundations can be cut and filled at the corresponding positions in the model to form a building foundation model corresponding to the building model.

[0186] The processor 130 uses simulated geological drilling to process the spatial topological relationship of the monomer area model. After forming the correct topological relationship, the ground base is cut, excavated, filled and other spatial operations are performed in the three-dimensional building model and the geological model, and the foundation is placed in the accurate position of the ground and underground integrated model based on the three-dimensional terrain model. According to the type of geological space entity, a collection of ground and underground models is formed in the geological area.

[0187] The processor 130 further includes a format conversion unit 134, which converts the three-dimensional building model, the building foundation model and the three-dimensional geological model into a standard format suitable for mutual combination.

[0188] The standardization of three-dimensional building models is to convert the spatial data format of the building model, check the spatial topological relationship, verify the accuracy of the three-dimensional terrain model, convert the coordinate system, and convert the volume-surface format; the spatial data format of the three-dimensional building model is generally SHP, OBJ, OSG, etc., and its spatial coordinate system is generally CGCS2000, Beijing 1954, Xi'an 80, etc., which needs to be converted into a unified SHP format and use the CGCS2000 coordinate system according to the integration requirements; the spatial topological errors of the model are generally inaccurate intersection, separation, and overlap between geological space entities, which need to be handled with reference to the planning and construction drawings.

[0189] The standardization of three-dimensional geological models involves the conversion of spatial data formats, checking of spatial topological relationships, conversion of spatial coordinate systems, restoration of vertical scales, and conversion of volume-surface formats.

[0190] The spatial data format of the three-dimensional geological model is generally SHP, OBJ, OSG, etc., and its spatial coordinate system is generally CGCS2000, Beijing 1954, Xi'an 80, etc. It needs to be converted into a unified SHP format and use the CGCS2000 coordinate system according to the integration requirements; the model space topology error is generally the inaccurate intersection, separation, coincidence and other relationships between geological levels, which need to be processed with reference to the modeling boreholes; after the model is standardized, the Grid / Tin hybrid data model will be used to express the geological level, which can be stored in ArcGIS Multi-Patch vector format, so that it can be integrated with the B-Rep-based three-dimensional building model; for the expression of topological relationships, the extended dimensional 9-intersection model (DE-9IM) will be used as the theoretical framework, and the 3DFDS data structure model will be used as the carrier of the topological data model to describe the topological relationship between the above-ground and underground model bodies. The topological relationship is mainly expressed as intersection, separation, coincidence, equality, covering, covered, contained, and contained.

[0191] In this implementation, the single building model is stored as a "boundary expression modeling (B-Rep)" data structure based on the building monomer to meet the building geometry structure of the LoD3 specification. The basic unit of the single building model construction is a triangular patch, which is specifically stored in ArcGIS's Multi-Patch vector format.

[0192] In this embodiment, the simulated geological boreholes can be standardized. The standardized simulated geological boreholes are made to have engineering geological boreholes with unified rock classification and naming rules and unified rock and soil stratification marks, and are stored in a standardized format; among the selected boreholes, the benchmark boreholes with macroscopic control significance for the strata are selected again and stored in a standardized format; finally, the hole mouth elevations of all the boreholes are measured in the field.

[0193] The processor 130 further includes a verification unit 135, which is used to verify the three-dimensional city model after the three-dimensional building model and the three-dimensional geological model are combined with each other.

[0194] In this embodiment, the borehole verification method is used to check and process the inaccurate topological relationships such as intersection, separation, and overlap between model assemblies in each geological area.

[0195] The verification unit 135 includes topological relationship inspection and verification of the single area (single building model and corresponding single geological model) and the global area (target model). The continuity of the strata, the accuracy of the building foundation, and the closure of the pinch-out body are checked within the single area; the continuity of the strata, the closure of the pinch-out geological body, the rationality of the underground space, the rationality of the foundation, and the continuity of the strata at the single watershed are checked in the whole area.

[0196] The urban three-dimensional model integration method in the above-mentioned embodiment of the present invention is mainly suitable for areas where multiple sets of urban three-dimensional models and urban geological models have been established. It can process three-dimensional model data of different sources, types and formats, has low additional requirements for the original model, and has accurate spatial topology after integration. The method can be based on existing three-dimensional building models, three-dimensional geological models, etc. combined with engineering geological drilling, urban planning data, architectural design drawings, orthophotos and other multi-source data, solves spatial topological errors such as geological body interlacing and building suspension during the integration process, realizes seamless integration of ground-underground integrated three-dimensional models, provides ground-underground integrated support for urban planning and construction, and can be used to guide the planning and construction of cities, especially megacities in plain areas.

[0197] The urban three-dimensional model construction system 100 in the above-mentioned embodiment of the present invention is mainly suitable for areas where multiple sets of urban three-dimensional models and urban geological models have been established. It can process three-dimensional model data of different sources, types and formats, has low additional requirements for the original model, and has accurate spatial topology after integration. The method can be based on existing three-dimensional building models, three-dimensional geological models, etc. combined with engineering geological drilling, urban planning data, architectural design drawings, orthophotos and other multi-source data, solves spatial topological errors such as geological body interlacing and building suspension during the integration process, realizes seamless integration of ground-underground integrated three-dimensional models, provides ground-underground integrated support for urban planning and construction, and can be used to guide the planning and construction of cities, especially megacities in plain areas.

[0198] Another preferred embodiment of the present invention discloses a computer storage medium, wherein the storage medium includes a stored program, wherein when the program is executed, the device where the storage medium is located is controlled to execute the above method.

[0199] The computer storage medium in the above-mentioned embodiment of the present invention utilizes the urban three-dimensional model integration method, which is mainly suitable for areas where multiple sets of urban three-dimensional models and urban geological models have been established. It can process three-dimensional model data of different sources, types and formats, has low additional requirements for the original model, and has accurate spatial topology after integration. The method can be based on existing three-dimensional building models, three-dimensional geological models, etc., combined with engineering geological drilling, urban planning data, architectural design drawings, orthophotos and other multi-source data, solves spatial topological errors such as geological body interlacing and building suspension during the integration process, realizes seamless integration of ground-underground integrated three-dimensional models, provides ground-underground integrated support for urban planning and construction, and can be used to guide the planning and construction of cities, especially megacities in plain areas.

[0200] It should be noted that the computer-readable medium disclosed above may be a computer-readable signal medium or a computer-readable storage medium or any combination of the above two. The computer-readable storage medium may be, for example, but not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device or device, or any combination of the above. More specific examples of computer-readable storage media may include, but are not limited to: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In the present disclosure, a computer-readable storage medium may be any tangible medium containing or storing a program that may be used by or in combination with an instruction execution system, device or device. In the present disclosure, a computer-readable signal medium may include a data signal propagated in a baseband or as part of a carrier wave, in which a computer-readable program code is carried. This propagated data signal may take a variety of forms, including but not limited to an electromagnetic signal, an optical signal, or any suitable combination of the above. The computer readable signal medium may also be any computer readable medium other than a computer readable storage medium, which may send, propagate or transmit a program for use by or in conjunction with an instruction execution system, apparatus or device. The program code contained on the computer readable medium may be transmitted using any suitable medium, including but not limited to: wires, optical cables, RF (radio frequency), etc., or any suitable combination of the above.

[0201] In some embodiments, the client and the server may communicate using any currently known or future developed network protocol such as HTTP (HyperText Transfer Protocol), and may be interconnected with any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include a local area network ("LAN"), a wide area network ("WAN"), an internet (e.g., the Internet), and a peer-to-peer network (e.g., an ad hoc peer-to-peer network), as well as any currently known or future developed network.

[0202] The computer-readable medium may be included in the electronic device, or may exist independently without being incorporated into the electronic device.

[0203] The computer-readable medium carries one or more programs. When the one or more programs are executed by the electronic device, the electronic device:

[0204] The technical features of the above-described embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above-described embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0205] The above-mentioned embodiments only express several implementation methods of the present invention, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the invention patent. It should be pointed out that, for ordinary technicians in this field, several variations and improvements can be made without departing from the concept of the present invention, and these all belong to the protection scope of the present invention. Therefore, the protection scope of the patent of the present invention shall be subject to the attached claims.

Claims

1. A method for integrating a three-dimensional urban model, characterized in that: include: Obtaining a three-dimensional building model; Acquire a three-dimensional geological model, wherein the three-dimensional geological model includes a plurality of simulated geological layers; Constructing at least one simulated engineering geological borehole and a simulated borehole geological layer corresponding to the simulated engineering geological borehole position; Based on the simulated engineering geological borehole and the simulated borehole geological layer, topologically processing the three-dimensional geological model to adjust the simulated geological layer so that the three-dimensional building model and the three-dimensional geological model are integrated with each other; The method comprises: Performing monomer processing on the three-dimensional building model to form a monomer building model, wherein the monomer building model includes at least one building model; The three-dimensional geological model is processed into monomers to form a monomer geological model, wherein the monomer geological model area corresponds to a plurality of monomer building models having the same spatial position, and the monomer geological model includes at least one simulated engineering geological borehole; The topological processing of the three-dimensional geological model based on the simulated engineering geological borehole and the simulated borehole geological layer to adjust the simulated geological layer so that the three-dimensional building model and the three-dimensional geological model are integrated with each other includes: Screening the simulated engineering geological boreholes to obtain reference boreholes, wherein the reference boreholes can penetrate all simulated geological layers included in the geological model; Based on the reference borehole, adjusting the simulated geological layer corresponding to the three-dimensional geological model to pre-integrate the three-dimensional building model with the three-dimensional geological model; The adjusting, based on the reference borehole, the simulated geological layer corresponding to the three-dimensional geological model to pre-integrate the three-dimensional building model with the three-dimensional geological model includes: Adjusting the vertical movement direction of the simulated geological layer; The adjusting the vertical movement direction of the simulated geological layer comprises: Determining the position information of the reference borehole; Based on the location of the reference borehole, construct a vector line segment vertical to the stratum; According to the vector line segment, the position relationship of the remaining simulated geological layers of the three-dimensional geological model is adjusted so that the position of the remaining simulated geological layers matches the simulated geological layers at the location of the reference borehole.

2. The urban three-dimensional model integration method according to claim 1, characterized in that: After the step of pre-integrating the three-dimensional building model with the three-dimensional geological model, the method further includes: Based on at least one of the simulated engineering geological boreholes included in each monomer geological model, adjusting the simulated geological layer corresponding to the monomer geological model to perform secondary integration of the monomer geological model and the corresponding three-dimensional building model; The step of adjusting the simulated geological layer corresponding to the monomer geological model based on at least one simulated engineering geological borehole contained in each monomer geological model to perform secondary integration of the monomer geological model and the corresponding three-dimensional building model includes: Adjusting the vertical movement direction, curvature and rotation angle of the simulated geological layer; The adjusting the rotation angle of the simulated geological layer comprises: Taking the location of the simulated engineering geological borehole as the origin and the vector of the simulated engineering geological borehole as the vertical constraint axis, the corresponding simulated geological layer of the single geological model is rotated and adjusted; In the step of rotating and adjusting the corresponding simulated geological layer of the single geological model with the location of the simulated engineering geological borehole as the origin and the vector of the simulated engineering geological borehole as the vertical constraint axis, the simulated geological layer is rotated from the surface layer to the bottom, and the rotation angle and curvature of the corresponding simulated geological layer are rotated and adjusted.

3. The urban three-dimensional model integration method according to claim 1, characterized in that: The method further comprises: Based on the three-dimensional building model, construct a foundation model corresponding to the three-dimensional building model; The foundation model is integrated with the three-dimensional building model and the three-dimensional geological model.

4. The urban three-dimensional model integration method according to claim 1, characterized in that: The step of constructing at least one simulated engineering geological borehole and a simulated borehole geological layer corresponding to the position of the simulated engineering geological borehole comprises: Drilling at least one engineering geological borehole in the target real scene area to obtain the borehole geological layer contained in the corresponding position of the engineering geological borehole; Based on the engineering geological boreholes and the corresponding borehole geological layers, simulated geological boreholes and simulated borehole geological layers are constructed at corresponding positions of the three-dimensional geological model.

5. A city three-dimensional model integration system, characterized in that: include: An information acquisition module is used to obtain a three-dimensional building model and a three-dimensional geological model, wherein the three-dimensional geological model includes several simulated geological layers; A borehole construction module, used to construct at least one simulated engineering geological borehole and a simulated borehole geological layer corresponding to the simulated engineering geological borehole position; a processor, electrically connected to the information acquisition module and the drilling module, for performing topological processing on the three-dimensional geological model based on the simulated engineering geological drilling and the simulated drilling geological layer, so as to adjust the simulated geological layer so that the three-dimensional building model and the three-dimensional geological model are integrated with each other; Performing monomer processing on the three-dimensional building model to form a monomer building model, wherein the monomer building model includes at least one building model; The three-dimensional geological model is processed into monomers to form a monomer geological model, wherein the monomer geological model area corresponds to a plurality of monomer building models having the same spatial position, and the monomer geological model includes at least one simulated engineering geological borehole; The topological processing of the three-dimensional geological model based on the simulated engineering geological borehole and the simulated borehole geological layer to adjust the simulated geological layer so that the three-dimensional building model and the three-dimensional geological model are integrated with each other includes: Screening the simulated engineering geological boreholes to obtain reference boreholes, wherein the reference boreholes can penetrate all simulated geological layers included in the geological model; Based on the reference borehole, adjusting the simulated geological layer corresponding to the three-dimensional geological model to pre-integrate the three-dimensional building model with the three-dimensional geological model; The adjusting, based on the reference borehole, the simulated geological layer corresponding to the three-dimensional geological model to pre-integrate the three-dimensional building model with the three-dimensional geological model includes: Adjusting the vertical movement direction of the simulated geological layer; The adjusting the vertical movement direction of the simulated geological layer comprises: Determining the position information of the reference borehole; Based on the location of the reference borehole, construct a vector line segment vertical to the stratum; According to the vector line segment, the position relationship of the remaining simulated geological layers of the three-dimensional geological model is adjusted so that the position of the remaining simulated geological layers matches the simulated geological layers at the location of the reference borehole.

6. A computer storage medium, characterized in that: The storage medium includes a stored program, wherein when the program is executed by a processor, the device where the storage medium is located is controlled to execute the method according to any one of claims 1 to 4.

Citation Information

Patent Citations

  • Virtual city overground space and underground space integrated 3D modeling method

    CN103279988A

  • Three dimension uniform model construction method of water conservancy hydropower engineering geological information

    CN1858803A