An intelligent method and device for automatically reviewing and optimizing power outage orders

The intelligent platform automatically reviews power outage orders, eliminates duplicate users and optimizes line segments, solving the problems of slow manual review and low accuracy, and achieving efficient and accurate power outage order review.

CN114049237BActive Publication Date: 2024-10-25JIANGMEN POWER SUPPLY BUREAU OF GUANGDONG POWER GRID CO LTD +1
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202111354928.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-11-16
Publication Date
2024-10-25
Estimated Expiration
2041-11-16

AI Technical Summary

Technical Problem

In the existing technology, manual review of power outage orders results in slow processing speed, untimely review and analysis of results, and inaccurate optimization measures.

Method used

An intelligent platform is used to automatically review and optimize power outage orders. By judging power outage application forms and reliability platform data, users with repeated power outages and important users are eliminated, and the GIS system is used to locate and prioritize line segments to achieve automatic calculation and optimization suggestions.

Benefits of technology

It improves the processing efficiency and analysis accuracy of power outage orders, realizes automated review, and solves the problems of slow manual review and untimely results.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114049237B_ABST
    Figure CN114049237B_ABST
Patent Text Reader

Abstract

The present invention provides an intelligent method and device for automatically reviewing and optimizing power outage forms, belonging to the field of electric power dispatching technology. It includes using a developed intelligent platform to compare the power outage data of a power outage application form with the power outage data derived from a reliability platform, thereby determining whether the power outage application form is passed or not, and further adding optimization suggestions to the returned power outage application form, so that the processing of the power outage application form is more intelligent. The present invention realizes the automated review of the power outage application form by using an intelligent platform, and can achieve efficient and accurate review according to the method, solving the problems of slow processing speed, untimely review and analysis of results, and inaccurate corresponding optimization measures caused by the current manual review and analysis of power outage forms.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of electric power dispatching, and in particular relates to an intelligent method and device for automatically reviewing and optimizing power outage orders. Background Art

[0002] In the power grid system, power supply reliability refers to whether the power supply system can safely, stably and continuously provide power services. It is also an important assessment standard for the power supply system's operating quality, service level and customer satisfaction. The following standards are usually used to evaluate the power supply reliability of an electric power company: customer outage time, user outage time, number of outages, and the proportion of users with repeated outages.

[0003] To strengthen the control of power supply reliability indicators, it is necessary to improve the comprehensive power outage control and strengthen the planned power outage management. The review and optimization of power outage orders is the key link. The current power outage order review management adopts a manual review optimization method. First, the person in charge of the operation and maintenance team initiates a power outage order in the comprehensive power outage management module of the power grid management platform. Then, the power outage order is sent to the reliability specialist of the production planning department for review. The reliability specialist reviews and compares the power outage order. The specific approach is as follows: First, query the data generated by the power outage order from the comprehensive power outage management module of the power grid management platform, such as the number of households when the power outage occurs, the number of households when the power outage occurs, and the details of medium-voltage users involved in the power outage. Then manually calculate the customer outage time value and user outage time value that will be generated if the power outage order is implemented.

[0004] Then, the power supply reliability system is used to query the accumulated customer power outage time values, user power outage time values, and medium-voltage user event details involving power outages in the entire region. Formulas are set for the medium-voltage user event details involving power outages using an EXCEL table to calculate the accumulated power outage times of medium-voltage users involved in power outages and the proportion of users with repeated power outages.

[0005] Finally, the power supply reliability specialist compares the data to determine whether the customer (user) power outage time, power outage frequency, and repeated power outage user ratio generated after the execution of this power outage order exceed the annual indicator control range. If it does not exceed the annual indicator control range, the power outage order will be reviewed and approved. If it exceeds the annual indicator control range, targeted power outage optimization measures will be proposed, and then the power outage order will be returned with feedback, requiring the operation and maintenance team to re-optimize the power outage strategy.

[0006] The above is the whole process of manually reviewing the outage order. Although the methods and ideas of manual investigation are mature at this stage, the indicator data derived from the outage event brings tedious workload and challenges to reliability management personnel in processing and analysis. Obviously, manual analysis and processing are slow, the results are not timely, and the corresponding optimization measures are not accurate enough. Therefore, there is an urgent need for a method to automatically review and analyze the outage order, so that the indicator data items derived from the outage order can be intelligently calculated, and the analysis results and optimization measures can be fed back to the outage applicant in a timely manner. Summary of the invention

[0007] In view of this, the present invention aims to solve the problems of slow processing speed, untimely result review and analysis, and inaccurate corresponding optimization measures caused by the existing manual review and analysis of power outage orders.

[0008] In order to solve the above technical problems, the present invention provides the following technical solutions:

[0009] In a first aspect, the present invention provides an intelligent method for automatically reviewing and optimizing power outage orders, which is applied to an intelligent platform and includes the following steps:

[0010] Determine whether there is a power outage application form. If not, return to re-determine. If yes, read the annual indicators and important users, export the reliability platform data, and then execute the subsequent steps;

[0011] Determine whether the first power outage data generated based on the power outage application form and the reliability platform data exceeds the annual index. If not, approve the power outage application form and pass it to the superior, and send a text message notification. If yes, remove the repeated power outage users and important users and recalculate the power outage data. After obtaining the second power outage data, execute the subsequent steps;

[0012] Determine whether the second power outage data exceeds the annual target. If not, add optimization suggestions to the power outage application form and return it, and send a text message notification. If yes, locate the line segments where repeated power outage users and important users are located in the GIS system, remove some of the located line segments and recalculate the power outage data. After obtaining the third power outage data, continue to execute subsequent steps;

[0013] Determine whether the third power outage data exceeds the annual target. If not, add optimization suggestions to the power outage application form and return it, and send a text message notification. If yes, export the number of households in each line segment in the GIS system, remove some line segments according to the priority of transferable power supply, and recalculate the power outage data. After obtaining the fourth power outage data, execute the subsequent steps;

[0014] Determine whether the fourth power outage data exceeds the annual target. If not, return the power outage application form with additional optimization suggestions and send a text message notification. If so, return the power outage application form and send a text message notification.

[0015] Further, judging whether the first power outage data generated based on the power outage application form and the reliability platform data exceeds the annual index specifically includes:

[0016] The customer outage time value and user outage time value calculated according to the outage application form and the customer outage time value and user outage time value of the outage obtained from the reliability platform data are added together to obtain the first customer outage time value and the first user outage time value;

[0017] The details of users involved in power outages in the power outage application form are compared with the details of users who have experienced power outages in the reliability platform data to obtain users who have experienced repeated power outages for no less than 2 times and the corresponding proportion of users who have experienced repeated power outages;

[0018] Determine whether the first power outage data generated by the first customer power outage time value, the first user power outage time value, the users with repeated power outages at least twice, and the corresponding repeated power outage user ratio exceeds the annual indicator of the unit where the initiator of the power outage application form is located.

[0019] Furthermore, the power outage data is recalculated by eliminating users with repeated power outages and important users, and the second power outage data specifically includes:

[0020] Eliminate users and important users who have experienced repeated power outages for no less than 2 times from the power outage user details list in the power outage application form, calculate the customer power outage time values ​​and user power outage time values ​​corresponding to the power outage application form after elimination, and record the eliminated repeated power outage users and important users;

[0021] Subtract the power outage time values ​​of the customers and users that have experienced power outages obtained from the reliability platform data from the power outage time values ​​of the customers and users corresponding to the eliminated power outage application forms, respectively, to obtain the second customer power outage time value and the second user power outage time value;

[0022] The second power outage data is obtained based on the second customer power outage time value and the second user power outage time value.

[0023] Furthermore, the line segments where users with repeated power outages and important users are located are located in the GIS system, and the power outage data is recalculated after removing some of the located line segments. The third power outage data specifically includes:

[0024] In the GIS system, locate the line sections where the users with repeated power outages and important users are located according to the power outage application form, users with repeated power outages and important users;

[0025] After sorting the priorities of the located line segments, accumulate them one by one and calculate the corresponding power outage data at the same time, until the calculated power outage data after accumulation is greater than the second power outage data, then stop accumulating and use the accumulated line segment as the first line segment to be eliminated, record the first line segment and its priority sorting, and calculate the corresponding customer power outage time value and user power outage time value;

[0026] Subtract the power outage time values ​​of the customers and users that have experienced power outages obtained from the reliability platform data from the power outage time values ​​of the customers and users corresponding to the first line segment to obtain the third customer power outage time values ​​and the third user power outage time values;

[0027] The third power outage data is obtained based on the third customer power outage time value and the third user power outage time value.

[0028] Furthermore, the number of households in each line segment is derived in the GIS system, and the power outage data is recalculated after removing some line segments according to the priority of the transferable power supply, and the fourth power outage data specifically includes:

[0029] In the GIS system, the power outage line is located according to the power outage application form and the number of customers and users of each line segment is derived. After the priority of each line segment is sorted, it is accumulated one by one and the corresponding power outage data is calculated at the same time. Until the accumulated power outage data is greater than the third power outage data, the accumulation is stopped and the accumulated line segment is used as the second line segment to be eliminated. The second line segment and its priority ranking are recorded, and the corresponding customer power outage time value and user power outage time value are calculated;

[0030] Subtract the power outage time values ​​of the customers and users obtained from the reliability platform data from the power outage time values ​​of the customers and users corresponding to the second line segment to obtain the fourth power outage time values ​​of the customers and users;

[0031] The fourth power outage data is obtained based on the fourth customer power outage time value and the fourth user power outage time value.

[0032] In a second aspect, the present invention provides an intelligent device for automatically reviewing and optimizing power outage orders, comprising:

[0033] The first judgment module is used to judge whether there is a power outage application form. If not, it returns to re-judge. If so, it reads the annual indicators and important users, exports the reliability platform data, and then executes the subsequent steps;

[0034] The second judgment module is used to judge whether the first power outage data generated based on the power outage application form and the reliability platform data exceeds the annual index. If not, the power outage application form is approved and passed to the superior, and a text message is notified at the same time. If so, the repeated power outage users and important users are eliminated and the power outage data is recalculated. After the second power outage data is obtained, the subsequent steps are executed;

[0035] The third judgment module is used to judge whether the second power outage data exceeds the annual index. If not, the power outage application form is returned after adding optimization suggestions and a text message notification is sent. If so, the line segments where repeated power outage users and important users are located are located in the GIS system, and the power outage data is recalculated after removing some of the located line segments. After obtaining the third power outage data, the subsequent steps are continued;

[0036] The fourth judgment module is used to judge whether the third power outage data exceeds the annual index. If not, the power outage application form is returned after adding optimization suggestions and a text message notification is sent. If yes, the number of households in each line segment is exported in the GIS system, and the power outage data is recalculated after removing some line segments according to the priority of transferable power supply. After obtaining the fourth power outage data, the subsequent steps are executed;

[0037] The fifth judgment module is used to judge whether the fourth power outage data exceeds the annual index. If not, the power outage application form is returned after adding optimization suggestions and a text message notification is sent. If so, the power outage application form is returned and a text message notification is sent.

[0038] Further, the second judgment module includes: a first power consumption data judgment module;

[0039] The first power consumption data judgment module is used to add the customer power outage time value and the user power outage time value calculated according to the power outage application form and the customer power outage time value and the user power outage time value of the power outage that has occurred obtained from the reliability platform data to obtain the first customer power outage time value and the first user power outage time value;

[0040] It is also used to compare the details of users involved in power outages in the power outage application form with the details of users who have experienced power outages in the reliability platform data, and obtain users who have repeated power outages for no less than 2 times and the corresponding proportion of users with repeated power outages;

[0041] It is also used to determine whether the first power outage data generated by the first customer's power outage time value, the first user's power outage time value, the users with repeated power outages at least twice, and the corresponding proportion of users with repeated power outages exceeds the annual indicator of the unit where the initiator of the power outage application form is located.

[0042] Furthermore, the second judgment module further includes: a second power consumption data generation module;

[0043] The second power consumption data generation module is used to remove users and important users who have repeated power outages for no less than 2 times from the power outage user list of the power outage application form, calculate the customer power outage time value and user power outage time value corresponding to the power outage application form after removal, and record the removed repeated power outage users and important users;

[0044] It is also used to subtract the power outage time value of the customer and the power outage time value of the user that has experienced power outage obtained from the reliability platform data from the power outage time value of the customer and the power outage time value of the user corresponding to the eliminated power outage application form, respectively, to obtain a second customer power outage time value and a second user power outage time value;

[0045] It is also used to obtain second power outage data based on the second customer power outage time value and the second user power outage time value.

[0046] Further, the third judgment module includes: a third power consumption data generation module;

[0047] The third power consumption data generation module is used to locate the line sections where the repeated power outage users and important users are located according to the power outage application form, repeated power outage users and important users in the GIS system;

[0048] It is also used to prioritize the located line segments and then accumulate them one by one and calculate the corresponding power outage data at the same time, until the power outage data calculated after accumulation is greater than the second power outage data, then stop accumulating and use the accumulated line segment as the first line segment to be eliminated, record the first line segment and its priority ranking, and calculate the corresponding customer power outage time value and user power outage time value;

[0049] It is also used to subtract the power outage time value of the customer and the power outage time value of the user obtained from the reliability platform data from the power outage time value of the customer and the power outage time value of the user corresponding to the first line segment to obtain a third customer power outage time value and a third user power outage time value;

[0050] It is also used to obtain third power outage data based on the third customer power outage time value and the third user power outage time value.

[0051] Further, the fourth determination module includes: a fourth power consumption data generation module;

[0052] The fourth electricity consumption data generation module is used to locate the power outage line according to the power outage application form in the GIS system and derive the number of customers and users of each line segment, and after sorting the priority of each line segment, accumulate and calculate the corresponding power outage data one by one, until the calculated power outage data after accumulation is greater than the third power outage data, then stop accumulating and use the accumulated line segment as the second line segment to be eliminated, record the second line segment and its priority ranking, and calculate the corresponding customer power outage time value and user power outage time value;

[0053] It is also used to subtract the customer outage time value and the user outage time value obtained from the reliability platform data from the customer outage time value and the user outage time value corresponding to the second line segment to obtain a fourth customer outage time value and a fourth user outage time value;

[0054] It is also used to obtain fourth power outage data based on a fourth customer power outage time value and a fourth user power outage time value.

[0055] In summary, the present invention provides an intelligent method and device for automatically reviewing and optimizing power outage forms, including using a developed intelligent platform to compare the power outage data of the power outage application form with the power outage data exported by the reliability platform, thereby determining whether the power outage application form is passed or not, and further adding optimization suggestions to the returned power outage application form, so that the processing of the power outage application form is more intelligent. The present invention realizes the automatic review of the power outage application form by using an intelligent platform, and can achieve efficient and accurate review according to the method, solving the problems of slow processing speed, untimely review and analysis of results, and inaccurate corresponding optimization measures caused by the current manual review and analysis of power outage forms. BRIEF DESCRIPTION OF THE DRAWINGS

[0056] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0057] Figure 1 A flow chart of an intelligent method for automatically reviewing and optimizing power outage orders provided in an embodiment of the present invention. DETAILED DESCRIPTION

[0058] In order to make the purpose, features and advantages of the present invention more obvious and easy to understand, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the embodiments described below are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0059] The present invention provides an intelligent method and device for automatically reviewing and optimizing power outage orders, which is used to solve the problems of slow processing speed, untimely review and analysis of results, and inaccurate corresponding optimization measures caused by the current manual review and analysis of power outage orders.

[0060] The following is a detailed introduction to an embodiment of an intelligent method for automatically reviewing and optimizing power outage orders of the present invention.

[0061] See also Figure 1 This embodiment provides an intelligent method for automatically reviewing and optimizing power outage orders, which is applied to an intelligent platform and includes the following steps:

[0062] S1: Determine whether there is a power outage application form. If so, go to step S2. If not, re-determine.

[0063] It should be noted that the intelligent platform is a set of process software developed based on existing computer programming languages ​​(such as phython) that can be used to automate processes.

[0064] The person in charge of power supply reliability sets up the intelligent platform in advance and starts it up every day. It automatically uses a dedicated account to query the power outage orders received that day in the comprehensive power outage management module of the power grid management platform, and records the power outage order number, initiator, initiator's unit, and the name ID of the power outage line. It then queries the data generated by the power outage order, such as the number of households at the time of the power outage, the number of households at the time of the power outage, and the details of users involved in the power outage. It also automatically calculates the customer power outage time and the user power outage time, forming the first step record and entering S2. If no power outage order is received, it will be re-queried after 1 minute until a power outage order is generated.

[0065] S2: Read annual indicators and important users, and export reliability platform data.

[0066] It should be noted that the robot reads the annual indicator record sheet and the important user list set in a fixed folder by the responsible person in advance according to the date of the day, and then automatically logs into the reliability platform using the responsible person's account to query the accumulated customer power outage time values, user power outage time values, and user event details involving power outages in the entire region, and then proceeds to step S3 after forming the record of step 2.

[0067] S3: Determine whether the power outage order exceeds the index, if not, proceed to step S4, if yes, proceed to step S5.

[0068] It should be noted that to determine whether the power outage order exceeds the annual index, add the customer power outage time values ​​and user power outage time values ​​in the first step record and the second step record; then, find the similarities between the user details involved in the power outage in the first step record and the user details of the power outage that has actually occurred in the second step record. The similarities are "users who have experienced repeated power outages 2 or more times", and the corresponding proportion of users with repeated power outages is found. Finally, the three data obtained form the third step record and are compared with the annual index decomposed to the sponsor unit. If the index is exceeded, go to step S5, and if the index is not exceeded, go to S4. The data recorded in step 3 is the first power outage data.

[0069] S4: Agree to approve the power outage order, pass it to the superior, and notify via SMS.

[0070] It should be noted that the intelligent platform agrees to approve the power outage order in the power grid management platform, passes it to the superior person in charge according to the process, and queries the mobile phone numbers of the initiator, the responsible person and the superior person in charge in the system address book, and sends a text message notification in the format of: "The power outage order with order number XXX has passed the review and has been delivered to XX, please be informed."

[0071] S5: Eliminate repeated power outages and recalculate the power outage time for important users.

[0072] It should be noted that, from the power outage user list of the power outage order in step 1, the "users with repeated power outages for 2 or more times" in step 3 and the important users in step 2 are removed. After removal, the corresponding customer power outage time value and user power outage time value are calculated, and the five-step record is formed together with the list of repeated power outage users and important users, and then enter S6.

[0073] S6: Determine whether the index is exceeded after elimination. If not, proceed to step S7; if yes, proceed to step S8.

[0074] It should be noted that to determine whether the power outage data recalculated after elimination exceeds the annual index, the customer power outage time value and user power outage time value recorded in step 2 are subtracted from the value recorded in step 5; finally, the two data obtained are formed into the record of step 6, and compared with the annual index decomposed to the sponsor unit. If it exceeds the index, it goes to step S8, and if it does not exceed the index, it goes to S7. The record in step 6 is the second power outage data.

[0075] S7: Return the power outage ticket, attach optimization suggestions, and send SMS notification.

[0076] It should be noted that the intelligent platform returns the outage order in the power grid management platform and passes it to the initiator according to the process. Then, the list of repeated outage users and important users in the record of step 5 is sent to the initiator in the OA, and the initiator and the responsible mobile phone number are found in the system address book, and a text message notification is sent in the format of: "The outage order with order number XXX has been returned, and X repeated outage users and X important users should be eliminated. The detailed list has been sent to the initiator through OA, and arrangements for power transfer and power generation vehicles should be made. Please be informed."

[0077] S8: Locate the line sections with repeated power outages and important users in the GIS system, remove the line sections and recalculate.

[0078] It should be noted that the robot uses a dedicated account to log in to the GIS system, locates the line segments where repeated power outages and important users are located through the power outage line ID recorded in step 1 and the repeated power outage and important user list recorded in step 5, counts the number of other users and customers on these line segments, and sorts these line segments with the first priority being the power supply that can be transferred, the second priority being the number of other customers, and the third priority being the number of other users. By accumulating one by one until it is greater than the difference between the annual index recorded in step 2 and the power outage single index recorded in step 5 (i.e., the record in step 6), these line segments are used as the eliminated line segments. The eliminated line segments and their sorting priorities, as well as the corresponding customer power outage time values ​​and user power outage time values, form the record in step 8, and enter S9.

[0079] S9: Determine whether the index is exceeded after elimination. If not, proceed to step S10; if yes, proceed to step S11.

[0080] It should be noted that to determine whether the power outage data recalculated after removing the line segment exceeds the annual index, the customer power outage time value and the user power outage time value recorded in step 2 are subtracted from the value recorded in step 8; finally, the two data obtained are formed into the record of step 9 and compared with the annual index decomposed to the sponsor unit. If it exceeds the index, it goes to step S11, and if it does not exceed the index, it goes to S10. The record in step 9 is the third power outage data.

[0081] S10: Return the power outage ticket, attach optimization suggestions, and send SMS notification.

[0082] It should be noted that the intelligent platform returns the outage order from the power grid management platform and passes it to the initiator according to the process. Then, the list of repeated outage users and important users in the record of step 5 and the line segments removed in the record of step 8 and their sorting priority, the corresponding customer outage time values ​​and user outage time values ​​are sent to the initiator in OA, and the initiator and the responsible mobile phone number are queried in the system address book, and a text message notification is sent in the format of: "The outage order with order number XXX has been returned. X repeated outage users and X important users should be removed. In addition, some line segments should be removed to meet the requirements. The detailed list has been sent to the initiator through OA. It is recommended to arrange the power supply and power generation vehicles according to priority. Please be informed."

[0083] S11: Export the number of households in each line section on the GIS system and remove them according to the priority of transferable power supply.

[0084] It should be noted that the intelligent platform locates and exports the number of customers and users of each line segment through the outage line ID recorded in step 1 on the GIS system, and sorts these line segments with the first priority being the number of power supply that can be transferred, the second priority being the number of other customers, and the third priority being the number of other users, until it is greater than the difference between the annual index recorded in step 2 and the outage single index recorded in step 9. These line segments are then used as line segments for further elimination. The further eliminated line segments and their sorting priorities, as well as the corresponding customer outage time values ​​and user outage time values, form the 11th step record, and enter S12.

[0085] S12: Determine whether the index is exceeded after removal, if not, proceed to step S13, if yes, proceed to step S14.

[0086] It should be noted that, to determine whether the power outage data recalculated after further eliminating the line segment exceeds the annual index, the customer power outage time value and the user power outage time value recorded in step 2 are subtracted from the value recorded in step 11; finally, the two data obtained are formed into the record of step 12, and compared with the annual index decomposed to the sponsor unit. If it exceeds the index, it goes to step S14, and if it does not exceed the index, it goes to S13. The record of step 12 is the fourth power outage data.

[0087] S13: Return the power outage ticket, attach optimization suggestions, and send SMS notification.

[0088] It should be noted that the intelligent platform returns the outage order from the power grid management platform and passes it to the initiator according to the process. Then, the list of repeated outage users and important users in the 5th step record and the line segments removed in the 11th step record and their sorting priority, the corresponding customer outage time values, and the user outage time values ​​are sent to the initiator in the OA. The initiator and the responsible mobile phone number are queried in the system address book, and a text message notification is sent in the format of: "The outage order with order number XXX has been returned. X repeated outage users and X important users should be removed. In addition, some line segments should be removed to meet the requirements. The detailed list has been sent to the initiator through OA. It is recommended to arrange the power supply and power generation vehicles according to priority. Please be informed."

[0089] S14: Return the power outage ticket and send a text message notification.

[0090] It should be noted that the intelligent platform returns the outage order in the power grid management platform, passes it to the initiator according to the process, and finds the initiator and the responsible person's mobile phone number in the system address book, and sends a text message notification in the format of: "The outage order with order number XXX has been returned, because the lines involved in the outage order exceeded the quota as soon as they were shut down, and no more arrangements can be made this year. If you have any other questions, please contact the power supply reliability specialist, mobile phone XXXXXX."

[0091] This embodiment provides an intelligent method for automatically reviewing and optimizing power outage forms, including using the developed intelligent platform to compare the power outage data of the power outage application form with the power outage data exported by the reliability platform, so as to determine whether the power outage application form is passed or not, and further add optimization suggestions to the returned power outage application form, so that the processing of the power outage application form is more intelligent. The present invention realizes the automatic review of the power outage application form by using the intelligent platform, and can realize efficient and accurate review according to the method, solving the problems of slow processing speed, untimely review and analysis of results, and inaccurate corresponding optimization measures caused by the current manual review and analysis of power outage forms.

[0092] The above is a detailed introduction to an embodiment of an intelligent method for automatically reviewing and optimizing power outage orders of the present invention. The following is a detailed introduction to an embodiment of an intelligent device for automatically reviewing and optimizing power outage orders of the present invention.

[0093] The present embodiment provides an intelligent device for automatically reviewing and optimizing power outage orders, characterized in that it includes: a first judgment module, a second judgment module, a third judgment module, a fourth judgment module and a fifth judgment module.

[0094] In this embodiment, the first judgment module is used to judge whether there is a power outage application form. If not, it returns to re-judge. If so, it reads the annual indicators and important users, exports the reliability platform data, and then executes the subsequent steps.

[0095] In this embodiment, the second judgment module is used to determine whether the first power outage data generated based on the power outage application form and the reliability platform data exceeds the annual index. If not, the power outage application form is approved and passed to the superior, and a text message notification is sent at the same time. If so, the repeated power outage users and important users are eliminated and the power outage data is recalculated. After obtaining the second power outage data, the subsequent steps are executed.

[0096] It should be noted that the second judgment module specifically includes a first power consumption data judgment module and a second power consumption data generation module.

[0097] Among them, the first electricity consumption data judgment module is used to add the customer power outage time value and user power outage time value calculated according to the power outage application form and the customer power outage time value and user power outage time value obtained from the reliability platform data to obtain the first customer power outage time value and the first user power outage time value; it is also used to compare the user details involved in the power outage in the power outage application form with the user details of the power outage that have occurred in the reliability platform data to obtain the users who have repeated power outages at least twice and the corresponding proportion of users with repeated power outages; it is also used to determine whether the first power outage data generated by the first customer power outage time value, the first user power outage time value, the users who have repeated power outages at least twice and the corresponding proportion of users with repeated power outages exceeds the annual indicator of the unit where the initiator of the power outage application form is located.

[0098] The second electricity consumption data generation module is used to eliminate users and important users who have experienced repeated power outages for no less than two times from the power outage user list of the power outage application form, calculate the customer power outage time values ​​and user power outage time values ​​corresponding to the power outage application form after elimination, and record the eliminated users and important users with repeated power outages; it is also used to subtract the customer power outage time values ​​and user power outage time values ​​obtained from the reliability platform data from the customer power outage time values ​​and user power outage time values ​​corresponding to the power outage application form after elimination, respectively, to obtain a second customer power outage time value and a second user power outage time value; it is also used to obtain second power outage data based on the second customer power outage time value and the second user power outage time value.

[0099] In this embodiment, the third judgment module is used to determine whether the second power outage data exceeds the annual indicator. If not, the power outage application form is returned after adding optimization suggestions, and a text message notification is sent. If so, the line segments where repeated power outage users and important users are located are located in the GIS system, and the power outage data is recalculated after eliminating some of the located line segments. After obtaining the third power outage data, the subsequent steps are continued.

[0100] It should be noted that the third determination module includes a third power consumption data generation module.

[0101] The third electricity consumption data generation module is used to locate the line segments where repeated power outage users and important users are located according to the power outage application form, repeated power outage users and important users in the GIS system; it is also used to prioritize the located line segments, accumulate them one by one and calculate the corresponding power outage data at the same time, until the calculated power outage data after accumulation is greater than the second power outage data, then stop accumulating and use the accumulated line segment as the first line segment to be eliminated, record the first line segment and its priority ranking, and calculate the corresponding customer power outage time value and user power outage time value; it is also used to subtract the customer power outage time value and user power outage time value obtained from the reliability platform data from the customer power outage time value and user power outage time value corresponding to the first line segment to obtain a third customer power outage time value and a third user power outage time value; it is also used to obtain third power outage data based on the third customer power outage time value and the third user power outage time value.

[0102] In this embodiment, the fourth judgment module is used to determine whether the third power outage data exceeds the annual indicator. If not, the power outage application form is returned after adding optimization suggestions, and a text message notification is sent. If so, the number of households in each line segment is exported in the GIS system, and the power outage data is recalculated after removing some line segments according to the priority of transferable power supply, and the subsequent steps are executed after obtaining the fourth power outage data.

[0103] It should be noted that the fourth determination module includes a fourth power consumption data generation module.

[0104] The fourth electricity consumption data generation module is used to locate the power outage line according to the power outage application form in the GIS system and export the number of customers and users of each line segment, prioritize each line segment, accumulate them one by one and calculate the corresponding power outage data at the same time, until the accumulated calculated power outage data is greater than the third power outage data, then stop accumulating and use the accumulated line segment as the second line segment to be eliminated, record the second line segment and its priority ranking, and calculate the corresponding customer power outage time value and user power outage time value; it is also used to subtract the customer power outage time value and user power outage time value obtained from the reliability platform data from the customer power outage time value and user power outage time value corresponding to the second line segment to obtain a fourth customer power outage time value and a fourth user power outage time value; it is also used to obtain fourth power outage data based on the fourth customer power outage time value and the fourth user power outage time value.

[0105] In this embodiment, the fifth judgment module is used to judge whether the fourth power outage data exceeds the annual index. If not, the power outage application form is returned after adding optimization suggestions and a text message notification is sent. If so, the power outage application form is returned and a text message notification is sent.

[0106] It should be noted that the intelligent device for automatically reviewing and optimizing power outage orders provided in this embodiment is used to implement the intelligent method for automatically reviewing and optimizing power outage orders in the aforementioned embodiment. The specific settings of each module are based on the implementation of this method and will not be repeated here.

[0107] This embodiment provides an intelligent device for automatically reviewing and optimizing power outage forms, including comparing the power outage data of the power outage application form with the power outage data exported by the reliability platform, thereby determining whether the power outage application form is passed or not, and further adding optimization suggestions to the returned power outage application form, so that the processing of the power outage application form is more intelligent. The present invention realizes efficient and accurate review through automated review of the power outage application form.

[0108] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. An intelligent method for automatically reviewing and optimizing power outage orders, It is characterized in that Applied to intelligent platform, including the following steps: Determine whether there is a power outage application form. If not, return to re-determine. If yes, read the annual indicators and important users, export the reliability platform data, and then execute the subsequent steps; Determine whether the first power outage data generated based on the power outage application form and the reliability platform data exceeds the annual index. If not, approve the power outage application form and pass it to the superior, and notify it by SMS. If yes, remove the repeated power outage users and important users and recalculate the power outage data. After obtaining the second power outage data, execute the subsequent steps; Determine whether the second power outage data exceeds the annual index. If not, add optimization suggestions to the power outage application form and return it, and notify it by SMS. If so, locate the line segments where the repeated power outage users and important users are located in the GIS system, remove the located part of the line segments and recalculate the power outage data, and continue to execute subsequent steps after obtaining the third power outage data; Determine whether the third power outage data exceeds the annual index. If not, add optimization suggestions to the power outage application form and return it, and send a text message notification. If yes, export the number of households in each line segment in the GIS system, remove some line segments according to the priority of transferable power supply, and recalculate the power outage data. After obtaining the fourth power outage data, execute the subsequent steps; Determine whether the fourth power outage data exceeds the annual index; if not, return the power outage application form after adding optimization suggestions and notify by SMS; if yes, return the power outage application form and notify by SMS; The determining whether the first power outage data generated based on the power outage application form and the reliability platform data exceeds the annual index specifically includes: Add the customer outage time value and user outage time value calculated according to the outage application form and the customer outage time value and user outage time value of the outage obtained from the reliability platform data to obtain the first customer outage time value and the first user outage time value; The details of users involved in the power outage in the power outage application form are compared with the details of users who have experienced power outages in the reliability platform data to obtain users who have experienced repeated power outages for no less than 2 times and the corresponding proportion of users who have experienced repeated power outages; Determine whether the first power outage data generated by the power outage time value of the first customer, the power outage time value of the first user, the users with repeated power outages of not less than 2 times, and the corresponding proportion of users with repeated power outages exceed the annual indicator of the unit where the initiator of the power outage application form is located; The step of eliminating users with repeated power outages and important users and recalculating the power outage data to obtain the second power outage data specifically includes: Eliminate the users who have experienced repeated power outages for no less than 2 times and the important users from the power outage user list of the power outage application form, calculate the customer power outage time value and user power outage time value corresponding to the power outage application form after elimination, and record the eliminated repeated power outage users and the important users; Subtract the power outage time value of the customer and the power outage time value of the user obtained from the reliability platform data from the power outage time value of the customer and the power outage time value of the user corresponding to the power outage application form after elimination, respectively, to obtain a second customer power outage time value and a second user power outage time value; Obtain second power outage data based on the second customer power outage time value and the second user power outage time value; The method of locating the line segments where the users with repeated power outages and important users are located in the GIS system, removing some of the located line segments and recalculating the power outage data to obtain the third power outage data specifically includes: In the GIS system, according to the power outage application form, the repeated power outage user and the important user, the line segment where the repeated power outage user and the important user are located is located; After sorting the priorities of the located line segments, they are accumulated one by one and the corresponding power outage data is calculated at the same time, until the accumulated power outage data is greater than the second power outage data, then the accumulation is stopped and the accumulated line segments are used as the first line segments to be eliminated, the first line segments and their priority sorting are recorded, and the corresponding customer power outage time values ​​and user power outage time values ​​are calculated; Subtract the power outage time values ​​of the customers and the power outage time values ​​of the users that have experienced power outages obtained from the reliability platform data from the power outage time values ​​of the customers and the power outage time values ​​of the users corresponding to the first line segment to obtain a third power outage time value of the customers and the power outage time value of the users; The third power outage data is obtained based on the third customer power outage time value and the third user power outage time value.

2. According to claim 1, the intelligent method for automatically reviewing and optimizing power outage orders, It is characterized in that The number of households in each line segment is derived in the GIS system, and the power outage data is recalculated after removing some line segments according to the priority of transferable power supply, and the fourth power outage data specifically includes: In the GIS system, the power outage line is located according to the power outage application form and the number of customers and users of each line segment is derived. After each line segment is prioritized, the power outage data is accumulated one by one and the corresponding power outage data is calculated at the same time. When the accumulated power outage data is greater than the third power outage data, the accumulation is stopped and the accumulated line segment is used as the second line segment to be eliminated. The second line segment and its priority ranking are recorded, and the corresponding customer power outage time value and user power outage time value are calculated. Subtract the power outage time value of the customer and the power outage time value of the user obtained from the reliability platform data from the power outage time value of the customer and the power outage time value of the user corresponding to the second line segment to obtain a fourth power outage time value of the customer and the fourth power outage time value of the user; Fourth power outage data is obtained based on the fourth customer power outage time value and the fourth user power outage time value.

3. An intelligent device for automatically reviewing and optimizing power outage orders, It is characterized in that include: The first judgment module is used to judge whether there is a power outage application form. If not, it returns to re-judge. If so, it reads the annual indicators and important users, exports the reliability platform data, and then executes the subsequent steps; The second judgment module is used to judge whether the first power outage data generated based on the power outage application form and the reliability platform data exceeds the annual index. If not, the power outage application form is approved and passed to the superior, and a text message is notified at the same time. If yes, the power outage data is recalculated by eliminating repeated power outage users and important users, and the subsequent steps are executed after the second power outage data is obtained; The third judgment module is used to judge whether the second power outage data exceeds the annual index. If not, the power outage application form is returned after adding optimization suggestions and a text message notification is sent. If so, the line segments where the repeated power outage users and important users are located are located in the GIS system, and the power outage data is recalculated after removing some of the located line segments. After obtaining the third power outage data, the subsequent steps are continued; The fourth judgment module is used to judge whether the third power outage data exceeds the annual index. If not, the power outage application form is returned after adding optimization suggestions and a text message notification is sent. If yes, the number of households in each line segment is exported in the GIS system, and the power outage data is recalculated after removing some line segments according to the priority of transferable power supply, and the subsequent steps are executed after the fourth power outage data is obtained; a fifth judgment module, configured to judge whether the fourth power outage data exceeds the annual index; if not, the power outage application form is returned after adding optimization suggestions and a text message notification is sent; if yes, the power outage application form is returned and a text message notification is sent; The second judgment module includes: a first power consumption data judgment module; The first power consumption data judgment module is used to add the customer power outage time value and the user power outage time value calculated according to the power outage application form and the customer power outage time value and the user power outage time value of the power outage obtained from the reliability platform data to obtain a first customer power outage time value and a first user power outage time value; It is also used to compare the details of users involved in power outages in the power outage application form with the details of users who have experienced power outages in the reliability platform data, to obtain users who have experienced repeated power outages for no less than 2 times and the corresponding proportion of users who have experienced repeated power outages; It is also used to determine whether the first power outage data generated by the power outage time value of the first customer, the power outage time value of the first user, the users with repeated power outages of not less than 2 times, and the corresponding proportion of users with repeated power outages exceed the annual indicator of the unit where the initiator of the power outage application form is located; The second judgment module further includes: a second power consumption data generation module; The second power consumption data generation module is used to remove the users who have repeated power outages for no less than 2 times and the important users from the power outage user list of the power outage application form, calculate the customer power outage time value and the user power outage time value corresponding to the power outage application form after removal, and record the removed repeated power outage users and the important users; It is also used to subtract the power outage time value of the customer and the power outage time value of the user obtained from the reliability platform data from the power outage time value of the customer and the power outage time value of the user corresponding to the power outage application form after elimination, to obtain a second power outage time value of the customer and a second power outage time value of the user; Also used for obtaining second power outage data based on the second customer power outage time value and the second user power outage time value; The third judgment module includes: a third power consumption data generation module; The third power consumption data generation module is used to locate the line segment where the repeated power outage user and the important user are located according to the power outage application form, the repeated power outage user and the important user in the GIS system; It is also used to prioritize the located line segments and then accumulate them one by one and calculate the corresponding power outage data at the same time, until the power outage data calculated after accumulation is greater than the second power outage data, then stop accumulating and use the accumulated line segment as the first line segment to be eliminated, record the first line segment and its priority ranking, and calculate the corresponding customer power outage time value and user power outage time value; It is also used to subtract the customer outage time value and the user outage time value obtained from the reliability platform data from the customer outage time value and the user outage time value corresponding to the first line segment to obtain a third customer outage time value and a third user outage time value; It is also used to obtain third power outage data based on the third customer power outage time value and the third user power outage time value.

4. The intelligent device for automatically reviewing and optimizing power outage orders according to claim 3, It is characterized in that The fourth judgment module includes: a fourth power consumption data generation module; The fourth power consumption data generation module is used to locate the power outage line according to the power outage application form in the GIS system and derive the number of customers and users of each line segment, prioritize each line segment, accumulate them one by one and calculate the corresponding power outage data at the same time, until the accumulated power outage data is greater than the third power outage data, then stop accumulating and use the accumulated line segment as the second line segment to be eliminated, record the second line segment and its priority ranking, and calculate the corresponding customer power outage time value and user power outage time value; It is also used to subtract the customer outage time value and the user outage time value obtained from the reliability platform data from the customer outage time value and the user outage time value corresponding to the second line segment to obtain a fourth customer outage time value and a fourth user outage time value; It is also used to obtain fourth power outage data based on the fourth customer power outage time value and the fourth user power outage time value.

Citation Information

Patent Citations

  • Power failure event business data acquisition method, device and system

    CN107093017A

  • Power failure reservation application processing method and device, computer equipment and medium

    CN110889524A

  • Novel power failure management method based on intelligent analysis decision theory technology

    CN111915048A

  • Real-Time Outage Analytics And Reliability Benchmarking System

    US20170212157A1