Automatic voltage control method, device, computer equipment and storage medium
By constructing a distribution network coordination control area in the power grid and counting multi-level reactive power and voltage indicators, and adjusting the operating status, the problem of low automatic voltage control efficiency is solved, and a more comprehensive control strategy and more efficient power grid operation are achieved.
Patent Information
- Application Number
- CN202111367454.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-11-18
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2041-11-18
AI Technical Summary
The efficiency of automatic voltage control in the power grid is low, mainly due to the large granularity of evaluation, which results in insufficient consideration of the control strategy.
Query the electrical equipment located in the preset area in the distribution network, build a distribution network coordination control area, and count the reactive power and voltage indicators of the electrical equipment in the area at multiple levels, and adjust the operating status based on these indicators.
The evaluation granularity of automatic voltage control is reduced, the dimension of reactive power indicators is increased, ensuring the comprehensiveness of the control strategy, thereby improving the efficiency of automatic voltage control.
Smart Images

Figure CN114094591B_ABST
Abstract
Description
Technical Field
[0001] Embodiments of the present invention relate to the technical field of electric power, and in particular, to an automatic voltage control method, device, computer equipment, and storage medium. Background Art
[0002] Automatic Voltage Control (AVC) is an important means to achieve safe (improving voltage stability margin), economic (reducing network losses), and high-quality (improving voltage qualification rate) operation of the power grid. The AVC system architecture is based on the power grid energy management system EMS. It can use the power grid model and real-time operation data to decide the best adjustment plan from the perspective of global power grid optimization.
[0003] Currently, the granularity of evaluation under automatic voltage control is large, which leads to a lack of consideration of the control strategy and causes low efficiency of automatic voltage control. Summary of the invention
[0004] The embodiments of the present invention provide an automatic voltage control method, device, computer equipment and storage medium to solve the problem of low efficiency of automatic voltage control in a power grid.
[0005] In a first aspect, an embodiment of the present invention provides an automatic voltage control method, comprising:
[0006] Query the electrical equipment located in a preset area in the distribution network to build a distribution network coordination control area;
[0007] Counting reactive power indicators of the electrical equipment in the distribution network coordination control area at multiple levels;
[0008] Counting voltage indicators of the electrical equipment in the distribution network coordination control area;
[0009] The operating state of the distribution network coordination control area is adjusted according to the reactive power index and the voltage index.
[0010] In a second aspect, an embodiment of the present invention further provides an automatic voltage control device, comprising:
[0011] A control area construction module is used to query the electrical equipment located in a preset area in the distribution network to build a distribution network coordination control area;
[0012] A reactive power index statistics module, used for calculating reactive power index statistics of the electrical equipment in the distribution network coordination control area at multiple levels;
[0013] A voltage index statistics module, used for collecting voltage index statistics of the electrical equipment in the distribution network coordination control area;
[0014] An operating status adjustment module is used to adjust the operating status of the distribution network coordination control area according to the reactive power index and the voltage index.
[0015] In a third aspect, an embodiment of the present invention further provides a computer device, the computer device comprising:
[0016] one or more processors;
[0017] a memory for storing one or more programs,
[0018] When the one or more programs are executed by the one or more processors, the one or more processors implement the automatic voltage control method as described in the first aspect.
[0019] In a fourth aspect, an embodiment of the present invention further provides a computer-readable storage medium, on which a computer program is stored, and when the computer program is executed by a processor, the automatic voltage control method as described in the first aspect is implemented.
[0020] In this embodiment, electrical equipment located in a preset area is queried in the distribution network to construct a distribution network coordination control area, reactive power indicators are counted for the electrical equipment in the distribution network coordination control area at multiple levels, voltage indicators are counted for the electrical equipment in the distribution network coordination control area, and the operating status of the distribution network coordination control area is adjusted according to the reactive power indicators and the voltage indicators, thereby reducing the granularity of the evaluation under automatic voltage control, increasing the dimension of evaluating reactive power indicators, ensuring the comprehensiveness of the control strategy, and thus improving the efficiency of automatic voltage control. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 A flowchart of an automatic voltage control method provided in Embodiment 1 of the present invention;
[0022] Figure 2 A schematic diagram of the structure of a power distribution network provided in Embodiment 1 of the present invention;
[0023] Figure 3 A schematic diagram of the structure of an automatic voltage control device provided in Embodiment 2 of the present invention;
[0024] Figure 4 A schematic diagram of the structure of a computer device provided in Embodiment 3 of the present invention. DETAILED DESCRIPTION
[0025] The present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the present invention, rather than to limit the present invention. It should also be noted that, for ease of description, only parts related to the present invention, rather than all structures, are shown in the accompanying drawings.
[0026] Embodiment 1
[0027] Figure 1 This is a flow chart of an automatic voltage control method provided in Embodiment 1 of the present invention. This embodiment is applicable to the case where automatic voltage control is performed in fine granularity. The method can be performed by an automatic voltage control device. The automatic voltage control device can be implemented by software and / or hardware and can be configured in a computer device, such as a server, a workstation, a personal computer, etc. Specifically, the method includes the following steps:
[0028] Step 101: Query the electrical equipment located in a preset area in the distribution network to build a distribution network coordination control area.
[0029] In the power system, it is generally divided into ultra-high voltage power grid, transmission network, power supply network and distribution network. The ultra-high voltage power grid includes 750kV, 500kV, 330kV, and 220kV, which constitute the skeleton of the regional power grid and the connecting lines between regional power grids; the transmission network includes 220kV and 110kV, which constitute a complex transmission network to transmit electric energy between regions; the power supply network includes 110kV, 66kV, and 35kV, which is transmitted from the hub substation to the local substation close to the load area; the distribution network includes 10kV and 380V civil electricity, and the local substation transmits electricity to the distribution transformer or distribution room in the residential area.
[0030] The control objects (power equipment) of the distribution network AVC master station include 10kV capacitors and voltage regulators carried by 10kV distribution network lines; 10kV grid-connected new energy power stations and small hydropower stations; as well as capacitors on the low-voltage side of the transformer and distributed power sources (rooftop photovoltaics, energy storage batteries, etc.) connected to the 380V grid-connected low-voltage side of the transformer. Among them, 10kV capacitors, reactors, and voltage regulators can be directly controlled by issuing remote control and remote adjustment commands through the distribution network automation system, and 10kV grid-connected new energy power stations are controlled by sending grid-connected point voltage reactive power to the AVC substation; capacitors on the low-voltage side of the transformer and distributed power sources connected to the 380V grid-connected low-voltage side of the transformer are controlled by the AVC substation deployed in the transformer. In distribution network operation, radial operation is often adopted, that is, one or several 10kV lines of 110kV and 35kV substations carry out several 10kV distribution network feeders and transformers, and open-loop operation is adopted between different 10kV outgoing lines (groups) without direct electrical connection.
[0031] When the control cycle arrives, the model of the power grid in the specified area is obtained from the power grid energy management system, and the model of the distribution network is obtained from the distribution point automation system, thereby generating the basic computing and control unit of the distribution network AVC - the distribution network coordination control area.
[0032] For example, starting from the 10kV busbar, the area covered by the 10kV outgoing line (group) forms a distribution network coordination control area. It is expressed as:
[0033]
[0034] in:
[0035] It represents 10kV bus, one or multiple buses running in parallel, i.e., the power root node of the area, belonging to 110kV or 35kV substation, totaling N.
[0036] It represents 10kV outgoing line, one or multiple lines running in a ring, that is, the line connected to the 10kV busbar, which is subordinate to a certain 10kV busbar, totaling M lines.
[0037] Represents a 10kV line segment, which is a number of 10kV distribution network feeder line segments connected from the 10kV outgoing line, with their ends connected to the upper 10kV line or other line segments, totaling H lines.
[0038] Represents a 10kV capacitor, a reactive compensation capacitor connected to a 10kV line segment, with its endpoints connected to a certain 10kV line segment node, totaling J units.
[0039] Represents a 10kV reactor, a reactive compensation reactor connected to a 10kV line segment, with its endpoints connected to a certain 10kV line segment node, totaling F units.
[0040] It represents a 10kV voltage regulator, which is connected to a 10kV line segment. Its head end and the end end are connected to the 10kV line segment node, with a total of K units.
[0041] It represents a 10kV grid-connected new energy power station. Through the 10kV grid-connected new energy station, it acts as an adjustable equivalent generator in the distribution network, and its endpoints are connected to a certain 10kV line segment node, with a total of P seats.
[0042] It represents a 10kV transformer, a substation transformer connected to a 10kV line segment, whose high-voltage side winding is connected to a 10kV line segment node, and the low-voltage side is connected to the load or distributed adjustable reactive resources, totaling 0 units.
[0043] Represents 0.4kV load, connected to the low-voltage side of the transformer in the substation, totaling W stations.
[0044] In one example, if Figure 2As shown in the figure, the left side is a 110KV substation, and the right side is a 35KV substation. A distribution network coordination control area is generated for the substation on the left. as follows:
[0045] Bus1(Bus2)-L1-C1-S1-R1-G1-S2-T1
[0046] Bus2(Bus1)-L2-C2-S3-R2-G2-S4-T2
[0047] Generate a distribution network coordination control area for the substation on the right as follows:
[0048] Bus3-L3-C3-S5-R3-G3-S6-T3
[0049] Step 102: Count reactive power indicators of electrical equipment in the distribution network coordination control area at multiple levels.
[0050] In this embodiment, reactive power indicators can be set in advance for electrical equipment in the distribution network coordination control area at multiple levels. The so-called level may refer to the reactive power indicators of this level being obtained by combining the reactive power indicators of the previous level. Dividing the reactive power indicators into levels can not only improve the diversity of features, but also improve the depth of features.
[0051] These reactive power indicators are initialized, and some or all reactive power indicators are set to 0. When the distribution network coordinated control area is operating, reactive power indicators of electrical equipment in the distribution network coordinated control area are counted at multiple levels.
[0052] In one embodiment of the present invention, step 102 may include the following steps:
[0053] Step 1021: Count reactive power indicators of electrical equipment in the distribution network coordination control area under reactive power supply, reactive exchange, reactive load, and reactive loss.
[0054] In this embodiment, one or more reactive indicators under reactive power supply, reactive exchange, reactive load, and reactive loss may be counted for the electrical equipment in the distribution network coordination control area as primary reactive indicators.
[0055] In the specific implementation, the primary reactive power index is processed as follows:
[0056] 1. Reactive power supply
[0057] 1.1. For lines
[0058] Query charging reactive power for each line in the distribution network coordination control area Reactive power for charging all lines Sum and obtain the total charging reactive power of all lines in the distribution network coordinated control area Right now
[0059] 1.2. For capacitors
[0060] Query the rated capacity of each capacitor in the distribution network coordination control area Rated power for all capacitors Sum to obtain the total configuration reactive power of all capacitors in the distribution network coordinated control area Right now,
[0061] Reactive power of all capacitors currently in operation Measure and calculate the reactive power of all capacitors currently operating in the distribution network coordinated control area. Right now, Among them, j′ is the capacitor currently in operation, with a total of J′ units.
[0062] Calculate the reactive power of all capacitors The total configuration reactive power of all capacitors The ratio between them is used as the capacitor input rate Right now,
[0063] 1.3. Reactor
[0064] Query the rated capacity of each reactor in the distribution network coordination control area Rated capacity of all reactors Sum to obtain the total configuration reactive power of all reactors in the distribution network coordinated control area Right now,
[0065] Reactive power measurement of all reactors currently in operation Sum and obtain the reactive power of all reactors currently running in the distribution network coordinated control area. Right now, Among them, f′ is the reactor currently in operation, totaling F′.
[0066] Calculate the reactive power of all reactors Total reactive power of all reactors The ratio between them is used as the input rate of the reactor Right now,
[0067] 1.4. For new energy power stations
[0068] Query the current reactive power output of each grid-connected renewable energy power station in the distribution network coordination control area Maximum delayed phase reactive power Maximum phase leading reactive power
[0069] Maximum delayed reactive power for all renewable energy power stations Sum and obtain the total delayed-phase reactive power of all renewable energy power stations in the distribution network coordinated control area Right now,
[0070] The maximum phase leading reactive power for all new energy power stations Sum and obtain the total leading phase reactive power of all renewable energy power stations in the distribution network coordinated control area Right now,
[0071] Reactive power output of all new energy power stations Sum and obtain the total reactive power output of all renewable energy power stations in the distribution network coordinated control area Right now,
[0072] If there is no reactive power output If it is greater than or equal to 0, the total reactive power output is calculated. Total delay is ineffective The ratio between them is used as the investment rate of new energy power stations. Or, if the total reactive power output If it is less than 0, the total reactive power output is calculated. With the total leading phase reactive The ratio between them is used as the investment rate of new energy power stations.
[0073] Right now,
[0074] 2. Reactive power exchange
[0075] 2.1. Regarding the upper power grid
[0076] Query the reactive exchange q for each outgoing line connected to the busbar of the substation in the distribution network coordination control area. m , for all outgoing lines the reactive exchange q m Sum and obtain the reactive power exchange between the distribution network coordination control area and the upper power grid Right now,
[0077] 2.2. Coordination control area with external distribution network
[0078] Query the reactive exchange q for each transmission line in the distribution network coordination control area connected to the external distribution network coordination control area h′ , the reactive exchange q for all transmission lines h′Sum and obtain the reactive power exchange between the distribution network coordinated control area and the external distribution network coordinated control area Right now,
[0079] 3. Reactive load
[0080] Query the reactive load q of each electrical equipment in the distribution network coordination control area w , sum the reactive loads of all electrical equipment to obtain the total reactive load of all electrical equipment in the distribution network coordinated control area Right now,
[0081] 4. Reactive power loss
[0082] 4.1. For transmission lines
[0083] Query reactive power loss for each transmission line in the distribution network coordination control area Reactive power loss on all transmission lines Sum and obtain the reactive power loss of the total line in the distribution network coordinated control area Right now,
[0084] 4.2. For the main transformer
[0085] Query reactive power loss of each main transformer in the distribution network coordination control area Reactive power loss of all main transformers Sum and obtain the reactive power loss of all main transformers in the distribution network coordinated control area
[0086] Step 1022: perform combined operation on at least two reactive indicators of reactive power supply, reactive exchange, reactive load, and reactive loss to obtain reactive indicators under capacitive reactive power and inductive reactive power.
[0087] In this embodiment, at least two reactive indicators among reactive power supply, reactive exchange, reactive load and reactive loss can be combined and calculated to obtain one or more reactive indicators under capacitive reactive power and inductive reactive power as secondary reactive indicators.
[0088] In the specific implementation, the secondary reactive power indicator is processed as follows:
[0089] 1. Capacitive reactive power
[0090] Total charging reactive power for all lines The total configuration of capacitors is reactive Total delayed reactive power of new energy power station Sum and obtain the regional capacitive reactive resources in the distribution network coordinated control area Right now,
[0091] Reactive power loss to the total line Reactive power losses of all main transformers First variable Second variable Negative value of the third variable Sum and obtain the regional capacitive reactive power demand in the distribution network coordinated control area
[0092] Among them, if the total reactive load of all electrical equipment is greater than 0, then the first variable is the total reactive load of all electrical equipment If the total reactive load of all electrical equipment is less than or equal to 0, then the first variable is 0.
[0093] If the reactive power exchange with the upper power grid is less than 0, then the second variable For reactive power exchange with the upper power grid If the reactive power exchange with the upper power grid is greater than or equal to 0, then the second variable is 0.
[0094] If the reactive power exchange in the control area is coordinated with the external distribution network is greater than 0, then the third variable To coordinate the reactive power exchange of the control area with the external distribution network If the reactive power exchange in the control area is coordinated with the external distribution network is less than or equal to 0, then the third variable is 0.
[0095] Right now,
[0096]
[0097]
[0098]
[0099] Calculate regional capacitive reactive resources and regional capacitive reactive power demand The ratio between them is used to obtain the regional capacitive reactive power balance rate of the distribution network coordinated control area. Right now,
[0100] 2. Inductive reactive power
[0101] The total configuration reactive power of the reactor Negative value, total leading phase reactive power of all new energy power stations Negative value of total line reactive power loss Reactive losses of all main transformers Sum and obtain the regional inductive reactive resources in the distribution network coordinated control area Right now,
[0102] Total charging reactive power for all lines The fourth variable The fifth variable Negative value of the sixth variable Sum and obtain the regional inductive reactive power demand in the distribution network coordinated control area
[0103] Among them, if the total reactive load of all electrical equipment is less than 0, then the fourth variable is the total reactive load of all electrical equipment If the total reactive load of all electrical equipment is negative is greater than or equal to 0, then the fourth variable is 0;
[0104] If the reactive power exchange with the upper power grid is greater than 0, then the fifth variable For reactive power exchange with the upper grid If the reactive power is exchanged with the upper grid, is less than or equal to 0, then the fifth variable is 0;
[0105] If the reactive power exchange in the control area is coordinated with the external distribution network is less than 0, then the sixth variable To coordinate the reactive power exchange of the control area with the external distribution network If the reactive power exchange in the control area is coordinated with the external distribution network, is greater than or equal to 0, then the sixth variable is 0.
[0106] Right now,
[0107]
[0108]
[0109]
[0110] Calculate regional inductive reactive resources and regional inductive reactive power demand The ratio between them is used to obtain the regional inductive reactive power balance rate of the distribution network coordinated control area. Right now,
[0111] Step 103: Count the voltage indicators of the electrical equipment in the distribution network coordination control area.
[0112] In this embodiment, voltage indicators may be pre-set for electrical equipment in the distribution network coordination control area, and these voltage indicators are initialized to 0. When the distribution network coordination control area is running, voltage indicators of the electrical equipment in the distribution network coordination control area are counted.
[0113] In a specific implementation, a first number of electrical devices in the distribution network coordination control area is counted. Each electrical device has a voltage value V.
[0114] The statistical voltage value V is greater than or equal to the upper limit value V High (i.e. V ≥ V High ) of the second number of electrical equipment
[0115] The statistical voltage value V is less than the upper limit value V High , and is less than or equal to the upper limit value V High Subtract the first threshold f NearH的 The difference (i.e., V High -f NearH ≤V<V High , indicating that the voltage value V is close to the upper limit value V High ) of the third number of electrical equipment
[0116] The statistical voltage value V is less than or equal to the lower limit value V Low (i.e. V<V Low ) of the fourth number of electrical equipment
[0117] The statistical voltage value V is greater than the lower limit value V Low , and is less than or equal to the lower limit V Low Add the second threshold f NearL The sum of the values (i.e., V Low +f NearL ≤V<V Low , indicating that the voltage value V is close to the lower limit value V Low ) of the fifth number of electrical equipment
[0118] Calculate the second quantity With the first quantity The ratio between them is used as the first probability of the electrical equipment exceeding the upper limit Right now,
[0119] Calculate the third quantity With the first quantity The ratio between them is used as the second probability of the electrical equipment approaching the upper limit Right now,
[0120] Calculate the fourth quantity With the first quantity The ratio between them is used as the third probability that the electrical equipment exceeds the lower limit. Right now,
[0121] Calculate the fifth quantity With the first quantity The ratio between the two is used as the fourth probability that the electrical equipment is close to the lower limit. Right now,
[0122] Step 104: Adjust the operating state of the distribution network coordination control area according to the reactive power index and the voltage index.
[0123] The basic principle of automatic voltage control is to achieve a reasonable distribution of reactive voltage in the power grid by coordinating and controlling the reactive output of generators, transformer taps and reactive compensation power equipment. Power system voltage and reactive power control is a problem related to ensuring power supply quality, meeting users' reactive power requirements and system voltage stability. It is also a very effective measure to reduce line losses and improve the economic efficiency of power grid operation.
[0124] With the continuous development and growth of the power industry, reactive power optimization has also become a key research object for power system control and operation. Under power market conditions, the quality of power supply voltage is one of the important indicators of power quality of power system, and the quality of power supply voltage mainly depends on whether the reactive power flow distribution of power system is reasonable. Therefore, reactive power optimization is an effective means to reasonably distribute reactive power flow of power system and ensure safe and economical operation of the system. The so-called reactive power optimization refers to a reactive power regulation method that optimizes some specific control variables under certain constraints under given system structure parameters and loads, so that one or more performance indicators of the system can be optimized.
[0125] Reactive power optimization of the power system can reasonably use voltage reactive power regulation methods, enhance the ability to regulate voltage reactive power, improve the grid voltage qualification rate to ensure the quality of power, and make the operating indicators of the power department and the user's overall equipment reach the best state.
[0126] On the premise of safe and stable operation of the power system, the reactive power regulation system of the regional power grid conducts comprehensive voltage and reactive power control with the goal of improving the voltage and reactive power qualification and the economic efficiency of power grid operation, so as to achieve high-level voltage operation in the region and layered and zoned on-site reactive power balance as much as possible.
[0127] Therefore, this embodiment evaluates the control effect of the reactive system by combining the reactive index and the voltage index, and modifies the control strategy according to the evaluation result to adjust the operating state of the distribution network coordinated control area.
[0128] In one embodiment of the present invention, step 104 may include the following steps:
[0129] Step 1041: Construct a node using one or more conditions.
[0130] Step 1042: traverse the conditions in the node in turn by the reactive power index and the voltage index to determine the method of adjusting the operating state of the distribution network coordination control area.
[0131] Step 1043: Adjust the operating status of the distribution network coordination control area according to the method.
[0132] In this embodiment, conditions can be set for reactive power indicators and voltage indicators according to the specifications of automatic voltage control, one or more conditions can be used to construct nodes, and these nodes can be used to establish an orderly link according to logical relationships, wherein each of these nodes points to the next node on the link or adjusts the operating status of the distribution network coordination control area.
[0133] The reactive power index and the voltage index are traversed in the conditions of the node in the order of the link. At the end of the traversal, a method for adjusting the operating state of the distribution network coordination control area is obtained, and then the method is executed to achieve the adjustment of the operating state of the distribution network coordination control area.
[0134] In a specific implementation, the process of traversing nodes in a link is as follows, where S1-S8 represent nodes:
[0135] S1. Detect the voltage indicators of electrical equipment (check whether the voltage exceeds the upper / lower limit, or is close to the upper / lower limit), including:
[0136] S1.1. Determine the first probability of electrical equipment exceeding the upper limit Is it greater than the upper threshold value X? OverHDoor (Right now, ), or the second probability that the electrical equipment is close to the upper limit Is it greater than or close to the upper threshold value X? NearHDoor (Right now, ); if yes, execute S3.
[0137] S1.2. Determine the third probability of electrical equipment exceeding the lower limit Is it greater than the lower limit threshold value X? OverLDoor (Right now, ), or the fourth probability that the electrical equipment is close to the lower limit Is it greater than or close to the lower limit threshold value X? NearLDoor (Right now, ); if yes, execute S5.
[0138] S2. Detect the reactive power exchange between electrical equipment and the upper power grid, including:
[0139] S2.1. Determine reactive power exchange with the upper power grid Is it less than the first reactive power threshold value E? r (Right now, ), the first reactive power threshold E r If it is less than 0, it means that the distribution network coordination control area feeds reactive power back to the upper power grid; if so, execute S3.
[0140] S2.2. Determine reactive power exchange with the upper power grid Is it greater than the second reactive power threshold value E? c (Right now, ), the second reactive power threshold E c If it is greater than 0, it means that the distribution network coordination control area absorbs reactive power from the upper power grid; if so, execute S5.
[0141] S3. Conduct the first test on the capacitive reactive input of the electrical equipment, including:
[0142] S3.1. Determine the input rate of capacitors Is it greater than 0, or does it meet the investment rate of new energy power stations at the same time? Greater than 0, total reactive power output of all new energy power stations Greater than 0 (i.e., or, ), if so, it means that there are capacitors in operation or the new energy power station emits delayed-phase reactive power in the current operating state, then the controllable capacitors can be cut off or the delayed-phase reactive power output of the controllable new energy power station can be reduced (a method of adjusting the operating state of the distribution network coordination control area).
[0143] S3.2. Determine the input rate of capacitors Is it equal to 0, and the total reactive power output of all new energy power stations Is it less than or equal to 0 (i.e., ), if yes, it means that the capacitor is not put into use or the new energy power station does not generate delayed-phase reactive power in the current operating state, then S4 is executed.
[0144] S4. Conduct the first test on the inductive reactive input of the electrical equipment, including:
[0145] S4.1. Determine the input voltage of the reactor Is it less than the inductive reactive power reserve coefficient K? r1 , or, the investment rate of new energy power stations Less than the phase leading reactive rotating reserve coefficient K r2 (Right now, or, ), if yes, it means that in the current operating state, there are reactors that are not put into use or the new energy power station can generate leading reactive power, then the controllable reactor is put into use or the leading reactive power output of the controllable new energy power station is increased (a method of adjusting the operating state of the distribution network coordinated control area).
[0146] S4.2. Determine the input rate of the reactor Is it equal to 1, and the investment rate of new energy power stations Is it equal to 1? The total reactive power output of all new energy power stations Less than 0 (i.e., ); if so, execute S7.
[0147] S5. Conduct a second test on the inductive reactive input of the electrical equipment, including:
[0148] S5.1. Determine the input rate of the reactor Is it greater than 0, or does it meet the investment rate of new energy power stations at the same time? Greater than 0, total reactive power output of all new energy power stations Less than 0 (i.e., or, ); If yes, it means that in the current operating state, a reactor is put into use or the new energy power station can generate leading reactive power, then the controllable reactor is removed or the leading reactive power output of the controllable new energy power station is reduced (a method of adjusting the operating state of the distribution network coordinated control area).
[0149] S5.2. Determine the input rate of the reactor Is it equal to 0, or the total reactive power output of all renewable energy power stations Is it greater than or equal to 0 (i.e., or, ); If yes, it means that the reactor is not put into operation or the new energy power station does not generate phase leading reactive power in the current operating state, then S6 is executed.
[0150] S6. Conduct a second test on the capacitive reactive input of electrical equipment, including:
[0151] S6.1. Determine the input rate of capacitors Is it less than the capacitive reactive power reserve coefficient Kc1, or the investment rate of the new energy power station Less than the delayed phase reactive rotating reserve coefficient Kc2 (i.e., or, ); If yes, it means that there are capacitors that have not been put into use or the new energy power station can generate delayed-phase reactive power under the current operating status, then the controllable capacitors are put into use or the delayed-phase reactive power output of the controllable new energy power station is increased (a method of adjusting the operating status of the distribution network coordination control area), and the next distribution network coordination control area is processed until all distribution network coordination control areas are processed.
[0152] S6.2. Determine the input rate of capacitors Is it equal to 1, and the investment rate of new energy power stations Equal to 1, the total reactive power output of all new energy power stations Is it greater than 0 (i.e., ); If so, it means that under the current operating state, all capacitors have been put into use or the new energy power station has reached the maximum delayed phase reactive power, then execute S8.
[0153] S7. Determine the regional inductive reactive power balance rate of the distribution network coordination control area Is it less than the inductive reactive resource margin factor X? r0 (Right now, ); if so, it is determined that the regional inductive reactive resources are insufficient and there is no available way to adjust the operating status of the distribution network coordination control area, and the next distribution network coordination control area is processed until all distribution network coordination control areas are processed; if not, it is determined that there is no available way to adjust the operating status of the distribution network coordination control area, and the next distribution network coordination control area is processed until all distribution network coordination control areas are processed.
[0154] S8. Determine the regional capacitive reactive power balance rate of the distribution network coordinated control area Is it less than the capacitive reactive resource margin factor X? c0 (Right now, ); if so, it is determined that the regional capacitive reactive resources are insufficient, and there is no available way to adjust the operating status of the distribution network coordination control area, and the next distribution network coordination control area is processed until all distribution network coordination control areas are processed; if not, it is determined that there is no available way to adjust the operating status of the distribution network coordination control area, and the next distribution network coordination control area is processed until all distribution network coordination control areas are processed.
[0155] In this embodiment, a set of evaluation index system is constructed to comprehensively evaluate the reactive power control effect of the system, so as to comprehensively evaluate the voltage reactive power operation status and track the causes of unreasonable operation status, thereby providing a reference for the operation parameter setting, control strategy optimization and compensation capacity configuration of the actual system.
[0156] In this embodiment, electrical equipment located in a preset area is queried in the distribution network to construct a distribution network coordination control area, reactive power indicators are counted for the electrical equipment in the distribution network coordination control area at multiple levels, voltage indicators are counted for the electrical equipment in the distribution network coordination control area, and the operating status of the distribution network coordination control area is adjusted according to the reactive power indicators and the voltage indicators, thereby reducing the granularity of the evaluation under automatic voltage control, increasing the dimension of evaluating reactive power indicators, ensuring the comprehensiveness of the control strategy, and thus improving the efficiency of automatic voltage control.
[0157] It should be noted that, for the sake of simplicity, the method embodiments are described as a series of action combinations, but those skilled in the art should be aware that the embodiments of the present invention are not limited by the order of the actions described, because according to the embodiments of the present invention, certain steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also be aware that the embodiments described in the specification are all preferred embodiments, and the actions involved are not necessarily required by the embodiments of the present invention.
[0158] Embodiment 2
[0159] Figure 3 The structure block diagram of an automatic voltage control device provided in the second embodiment of the present invention may specifically include the following modules:
[0160] The control area construction module 301 is used to query the electrical equipment located in a preset area in the distribution network to construct a distribution network coordination control area;
[0161] A reactive power index statistics module 302 is used to count reactive power indexes of the electrical equipment in the distribution network coordination control area at multiple levels;
[0162] A voltage index statistics module 303 is used to count voltage indexes of the electrical equipment in the distribution network coordination control area;
[0163] The operation status adjustment module 304 is used to adjust the operation status of the distribution network coordination control area according to the reactive power index and the voltage index.
[0164] In one embodiment of the present invention, the reactive power index statistics module 302 is further used for:
[0165] For the electrical equipment in the distribution network coordination control area, respectively, reactive power indicators under reactive power supply, reactive exchange, reactive load and reactive loss are counted;
[0166] At least two of the reactive indicators among the reactive power source, the reactive exchange, the reactive load, and the reactive loss are combined and calculated to obtain reactive indicators under capacitive reactive power and inductive reactive power.
[0167] In one embodiment of the present invention, the reactive power index statistics module 302 is further used for:
[0168] querying charging reactive power for each line in the distribution network coordination control area;
[0169] Sum the charging reactive power of all the lines to obtain the total charging reactive power of all the lines in the distribution network coordination control area;
[0170] querying the rated capacity of each capacitor in the distribution network coordination control area respectively;
[0171] Sum the rated powers of all the capacitors to obtain the total configured reactive power of all the capacitors in the distribution network coordinated control area;
[0172] Summing the reactive power measurements of all the capacitors currently in operation to obtain the reactive power input of all the capacitors currently in operation in the distribution network coordination control area;
[0173] Calculating the ratio of the reactive power input of all the capacitors to the total reactive power configuration of all the capacitors as the input rate of the capacitors;
[0174] querying the rated capacity of each reactor in the distribution network coordinated control area respectively;
[0175] Summing the rated capacities of all the reactors to obtain the total configured reactive power of all the reactors in the distribution network coordinated control area;
[0176] Summing the reactive power measurements of all the reactors currently in operation to obtain the reactive power input of all the reactors currently in operation in the distribution network coordinated control area;
[0177] Calculating the ratio of the reactive power of all the reactors to the total reactive power of all the reactors as the input rate of the reactor;
[0178] Query reactive power output, maximum delayed-phase reactive power, and maximum advanced-phase reactive power of each grid-connected new energy power station in the distribution network coordination control area;
[0179] Summing the maximum delayed-phase reactive power of all the new energy power stations to obtain the total delayed-phase reactive power of all the new energy power stations in the distribution network coordinated control area;
[0180] Summing the maximum phase-leading reactive power of all the new energy power stations to obtain the total phase-leading reactive power of all the new energy power stations in the distribution network coordinated control area;
[0181] Summing the reactive outputs of all the new energy power stations to obtain the total reactive outputs of all the new energy power stations in the distribution network coordination control area;
[0182] If the total reactive output is greater than or equal to 0, the ratio of the total reactive output to the total delayed reactive output is calculated as the input rate of the new energy power station, or, if the total reactive output is less than 0, the ratio of the total reactive output to the total advanced reactive output is calculated as the input rate of the new energy power station;
[0183] querying reactive power exchange for each outgoing line connected to the busbar of the substation in the distribution network coordination control area;
[0184] Summing the reactive power exchanges of all the outgoing lines to obtain the reactive power exchanges between the distribution network coordination control area and the upper power grid;
[0185] querying reactive power exchange for each transmission line in the distribution network coordination control area connected to an external distribution network coordination control area;
[0186] Summing the reactive power exchanges of all the transmission lines to obtain the reactive power exchanges between the distribution network coordination control area and an external distribution network coordination control area;
[0187] Querying reactive load of each of the electrical devices in the distribution network coordination control area;
[0188] Summing the reactive loads of all the electrical devices to obtain the total reactive loads of all the electrical devices in the distribution network coordination control area;
[0189] Querying reactive power loss of each transmission line in the distribution network coordination control area;
[0190] Summing the reactive power losses of all the transmission lines to obtain the reactive power loss of the total lines in the distribution network coordination control area;
[0191] Querying reactive power loss of each main transformer in the distribution network coordination control area;
[0192] The reactive losses of all the main transformers are summed to obtain the reactive losses of all the main transformers in the distribution network coordination control area.
[0193] In one embodiment of the present invention, the reactive power index statistics module 302 is further used for:
[0194] Summing the reactive loss of the main line, the reactive loss of all the main transformers, the first variable, the negative value of the second variable, and the third variable to obtain the regional capacitive reactive demand of the distribution network coordination control area;
[0195] Wherein, if the total reactive load of all the electrical devices is greater than 0, the first variable is the total reactive load of all the electrical devices; if the total reactive load of all the electrical devices is less than or equal to 0, the first variable is 0;
[0196] If the reactive power exchange with the upper power grid is less than 0, the second variable is the reactive power exchange with the upper power grid; if the reactive power exchange with the upper power grid is greater than or equal to 0, the second variable is 0;
[0197] If the reactive exchange with the external distribution network coordinated control area is greater than 0, the third variable is the reactive exchange with the external distribution network coordinated control area; if the reactive exchange with the external distribution network coordinated control area is less than or equal to 0, the third variable is 0;
[0198] Calculating the ratio between the regional capacitive reactive resources and the regional capacitive reactive demand to obtain the regional capacitive reactive balance rate of the distribution network coordinated control area;
[0199] The negative value of the total configuration reactive power of the reactor, the negative value of the total leading phase reactive power of all the new energy power stations, the reactive power loss of the total line, and the reactive power loss of all the main transformers are summed to obtain the regional inductive reactive resources of the distribution network coordination control area;
[0200] Summing the total charging reactive power of all the lines, the fourth variable, the negative value of the fifth variable, and the sixth variable to obtain the regional inductive reactive power demand of the distribution network coordinated control area;
[0201] Wherein, if the total reactive load of all the electrical devices is less than 0, the fourth variable is the negative value of the total reactive load of all the electrical devices; if the total reactive load of all the electrical devices is greater than or equal to 0, the fourth variable is 0;
[0202] If the reactive power exchange with the upper power grid is greater than 0, the fifth variable is the negative value of the reactive power exchange with the upper power grid; if the reactive power exchange with the upper power grid is less than or equal to 0, the fifth variable is 0;
[0203] If the reactive exchange with the external distribution network coordinated control area is less than 0, the sixth variable is the negative value of the reactive exchange with the external distribution network coordinated control area; if the reactive exchange with the external distribution network coordinated control area is greater than or equal to 0, the sixth variable is 0;
[0204] The ratio between the regional inductive reactive resources and the regional inductive reactive demand is calculated to obtain the regional inductive reactive balance rate of the distribution network coordinated control area.
[0205] In one embodiment of the present invention, the voltage indicator statistics module 303 is further used for:
[0206] Counting a first number of the electrical devices in the distribution network coordination control area, each of the electrical devices having a voltage value;
[0207] Counting a second number of the electrical devices whose voltage value is greater than or equal to the upper limit value;
[0208] Counting a third number of the electrical devices whose voltage values are less than an upper limit value and less than or equal to a difference between the upper limit value and a first threshold value;
[0209] Counting a fourth number of the electrical devices whose voltage value is less than or equal to the lower limit value;
[0210] Counting a fifth number of the electrical devices whose voltage values are greater than a lower limit value and less than or equal to a sum of the lower limit value and a second threshold value;
[0211] calculating a ratio between the second number and the first number as a first probability that the electrical device exceeds an upper limit;
[0212] calculating a ratio between the third number and the first number as a second probability that the electrical device is close to an upper limit;
[0213] calculating a ratio between the fourth number and the first number as a third probability that the electrical device exceeds a lower limit;
[0214] The ratio between the fifth number and the first number is calculated as a fourth probability that the electrical device is close to a lower limit. In one embodiment of the present invention, the operating state adjustment module 304 is further configured to:
[0215] Constructing nodes using one or more conditions, each of which points to the next node or a method of adjusting the operating state of the distribution network coordination control area;
[0216] The reactive power index and the voltage index are sequentially traversed through the conditions in the node to determine a method for adjusting the operating state of the distribution network coordination control area;
[0217] The operating status of the distribution network coordination control area is adjusted in the manner described.
[0218] In one embodiment of the present invention, the operation status adjustment module 304 is further configured to:
[0219] S1. Detecting the voltage index of the electrical equipment, including:
[0220] S1.1, determine whether the first probability of the electrical device exceeding the upper limit is greater than the exceeding upper limit threshold value, or whether the second probability of the electrical device approaching the upper limit is greater than the approaching upper limit threshold value; if so, execute S3;
[0221] S1.2, determine whether the third probability of the electrical device crossing the lower limit is greater than the crossing lower limit threshold value, or whether the fourth probability of the electrical device approaching the lower limit is greater than the approaching lower limit threshold value; if so, execute S5;
[0222] S2. Detecting reactive power exchange between the electrical equipment and the upper power grid, including:
[0223] S2.1. Determine whether the reactive power exchange with the upper power grid is less than a first reactive power threshold value, wherein the first reactive power threshold value is less than 0; if so, execute S3;
[0224] S2.2, determine whether the reactive power exchange with the upper power grid is greater than a second reactive power threshold value, and the second reactive power threshold value is greater than 0; if so, execute S5;
[0225] S3, performing a first detection on the capacitive reactive power input of the electrical equipment, including:
[0226] S3.1. Determine whether the input rate of the capacitor is greater than 0, or whether the input rate of the new energy power station is greater than 0 and the total reactive output of all new energy power stations is greater than 0. If so, remove the capacitor or reduce the delayed reactive output of the new energy power station;
[0227] S3.2, determine whether the capacitor input rate is equal to 0, and whether the total reactive power output of all new energy power stations is less than or equal to 0. If so, execute S4;
[0228] S4, performing a first detection on the inductive reactive power input of the electrical equipment, including:
[0229] S4.1. Determine whether the input rate of the reactor is less than the inductive reactive power reserve coefficient, or whether the input rate of the new energy power station is less than the leading reactive rotating reserve coefficient. If so, put the reactor into operation or increase the leading reactive output of the new energy power station;
[0230] S4.2, determine whether the input rate of the reactor is equal to 1, and whether the input rate of the new energy power station is equal to 1, and the total reactive power output of all new energy power stations is less than 0; if so, execute S7;
[0231] S5. Performing a second detection on the inductive reactive power input of the electrical equipment, including:
[0232] S5.1. Determine whether the input rate of the reactor is greater than 0, or whether the input rate of the new energy power station is greater than 0 and the total reactive output of all new energy power stations is less than 0 at the same time; if so, remove the reactor or reduce the reactive output of the new energy power station;
[0233] S5.2, determine whether the input rate of the reactor is equal to 0, or whether the total reactive power output of all new energy power stations is greater than or equal to 0; if so, execute S6;
[0234] S6. Performing a second detection on the capacitive reactive power input of the electrical equipment, including:
[0235] S6.1. Determine whether the input rate of the capacitor is less than the capacitive reactive power reserve coefficient, or the input rate of the new energy power station is less than the delayed reactive rotating reserve coefficient; if so, put the capacitor into operation or increase the delayed reactive power output of the new energy power station;
[0236] S6.2, determine whether the input rate of the capacitor is equal to 1, and whether the input rate of the new energy power station is equal to 1, and whether the total reactive power output of all new energy power stations is greater than 0; if so, execute S8;
[0237] S7, judging whether the regional inductive reactive power balance rate of the distribution network coordination control area is less than the inductive reactive power resource margin coefficient; if so, determining that the regional inductive reactive power resources are insufficient and there is no available way to adjust the operating state of the distribution network coordination control area; if not, determining that there is no available way to adjust the operating state of the distribution network coordination control area;
[0238] S8. Determine whether the regional capacitive reactive power balance rate of the distribution network coordination control area is less than the capacitive reactive power resource margin coefficient; if so, determine that the regional capacitive reactive power resources are insufficient and there is no available way to adjust the operating status of the distribution network coordination control area; if not, determine that there is no available way to adjust the operating status of the distribution network coordination control area.
[0239] The automatic voltage control device provided in the embodiment of the present invention can execute the automatic voltage control method provided in any embodiment of the present invention, and has the corresponding functional modules and beneficial effects of the execution method.
[0240] Embodiment 3
[0241] Figure 4 A schematic diagram of the structure of a computer device provided in Embodiment 3 of the present invention. Figure 4 A block diagram of an exemplary computer device 12 suitable for use in implementing embodiments of the present invention is shown. Figure 4 The computer device 12 shown is only an example and should not bring any limitation to the functions and scope of use of the embodiments of the present invention.
[0242] like Figure 4 As shown, the computer device 12 is in the form of a general-purpose computing device. The components of the computer device 12 may include, but are not limited to: one or more processors or processing units 16, a system memory 28, and a bus 18 that connects various system components (including the system memory 28 and the processing unit 16).
[0243] Bus 18 represents one or more of several types of bus structures, including a memory bus or memory controller, a peripheral bus, an accelerated graphics port, a processor or a local bus using any of a variety of bus architectures. By way of example, these architectures include, but are not limited to, an Industry Standard Architecture (ISA) bus, a Micro Channel Architecture (MAC) bus, an Enhanced ISA bus, a Video Electronics Standards Association (VESA) local bus, and a Peripheral Component Interconnect (PCI) bus.
[0244] The computer device 12 typically includes a variety of computer system readable media. These media can be any available media that can be accessed by the computer device 12, including volatile and non-volatile media, removable and non-removable media.
[0245] The system memory 28 may include computer system readable media in the form of volatile memory, such as random access memory (RAM) 30 and / or cache memory 32. The computer device 12 may further include other removable / non-removable, volatile / non-volatile computer system storage media. By way of example only, the storage system 34 may be used to read and write non-removable, non-volatile magnetic media ( Figure 4 not shown, usually called a "hard drive"). Although Figure 4 Not shown in the figure, a disk drive for reading and writing to a removable non-volatile disk (e.g., a "floppy disk"), and an optical disk drive for reading and writing to a removable non-volatile optical disk (e.g., a CD-ROM, a DVD-ROM, or other optical media) may be provided. In these cases, each drive may be connected to the bus 18 via one or more data medium interfaces. The memory 28 may include at least one program product having a set (e.g., at least one) of program modules that are configured to perform the functions of the various embodiments of the present invention.
[0246] A program / utility 40 having a set (at least one) of program modules 42 may be stored, for example, in the memory 28, such program modules 42 including, but not limited to, an operating system, one or more application programs, other program modules, and program data, each of which or some combination may include an implementation of a network environment. The program modules 42 generally perform the functions and / or methods of the embodiments described herein.
[0247] The computer device 12 may also communicate with one or more external devices 14 (e.g., keyboards, pointing devices, displays 24, etc.), may communicate with one or more devices that enable a user to interact with the computer device 12, and / or may communicate with any device that enables the computer device 12 to communicate with one or more other computing devices (e.g., network cards, modems, etc.). Such communication may be performed via an input / output (I / O) interface 22. Furthermore, the computer device 12 may also communicate with one or more networks (e.g., local area networks (LANs), wide area networks (WANs), and / or public networks, such as the Internet) via a network adapter 20. As shown, the network adapter 20 communicates with other modules of the computer device 12 via a bus 18. It should be understood that, although not shown in the figure, other hardware and / or software modules may be used in conjunction with the computer device 12, including, but not limited to, microcode, device drivers, redundant processing units, external disk drive arrays, RAID systems, tape drives, and data backup storage systems.
[0248] The processing unit 16 executes various functional applications and data processing by running the programs stored in the system memory 28, such as implementing the automatic voltage control method provided by the embodiment of the present invention.
[0249] Embodiment 4
[0250] Embodiment 4 of the present invention further provides a computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, the various processes of the above-mentioned automatic voltage control method are implemented, and the same technical effect can be achieved. To avoid repetition, it will not be repeated here.
[0251] Among them, computer-readable storage media may include, for example, but are not limited to, electrical, magnetic, optical, electromagnetic, infrared, or semiconductor systems, devices or devices, or any combination of the above. More specific examples of computer-readable storage media (a non-exhaustive list) include: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In this document, a computer-readable storage medium may be any tangible medium containing or storing a program that can be used by or in conjunction with an instruction execution system, device or device.
[0252] Note that the above are only preferred embodiments of the present invention and the technical principles used. Those skilled in the art will understand that the present invention is not limited to the specific embodiments described herein, and that various obvious changes, readjustments and substitutions can be made by those skilled in the art without departing from the scope of protection of the present invention. Therefore, although the present invention has been described in more detail through the above embodiments, the present invention is not limited to the above embodiments, and may include more other equivalent embodiments without departing from the concept of the present invention, and the scope of the present invention is determined by the scope of the appended claims.
Claims
1. An automatic voltage control method, It is characterized in that include: Query the electrical equipment located in a preset area in the distribution network to build a distribution network coordination control area; Counting reactive power indicators of the electrical equipment in the distribution network coordination control area at multiple levels; Counting voltage indicators of the electrical equipment in the distribution network coordination control area; Adjusting the operating state of the distribution network coordination control area according to the reactive power index and the voltage index; The counting of voltage indicators of the electrical equipment in the distribution network coordination control area includes: Counting a first number of the electrical devices in the distribution network coordination control area, each of the electrical devices having a voltage value; Counting a second number of the electrical devices whose voltage value is greater than or equal to the upper limit value; Counting a third number of the electrical devices whose voltage values are less than an upper limit value and less than or equal to a difference between the upper limit value and a first threshold value; Counting a fourth number of the electrical devices whose voltage value is less than or equal to the lower limit value; Counting a fifth number of the electrical devices whose voltage values are greater than a lower limit value and less than or equal to a sum of the lower limit value and a second threshold value; calculating a ratio between the second number and the first number as a first probability that the electrical device exceeds an upper limit; calculating a ratio between the third number and the first number as a second probability that the electrical device is close to an upper limit; calculating a ratio between the fourth number and the first number as a third probability that the electrical device exceeds a lower limit; A ratio between the fifth number and the first number is calculated as a fourth probability that the electrical device is approaching a lower limit.
2. The method according to claim 1, It is characterized in that The counting of reactive power indicators of the electrical equipment in the distribution network coordination control area at multiple levels includes: For the electrical equipment in the distribution network coordination control area, respectively, reactive power indicators under reactive power supply, reactive exchange, reactive load and reactive loss are counted; At least two of the reactive indicators among the reactive power source, the reactive exchange, the reactive load, and the reactive loss are combined and calculated to obtain reactive indicators under capacitive reactive power and inductive reactive power.
3. The method according to claim 2, It is characterized in that The reactive power indicators of the electrical equipment in the distribution network coordination control area under reactive power supply, reactive exchange, reactive load and reactive loss are counted respectively, including: querying charging reactive power for each line in the distribution network coordination control area; Sum the charging reactive power of all the lines to obtain the total charging reactive power of all the lines in the distribution network coordination control area; querying the rated capacity of each capacitor in the distribution network coordination control area respectively; Sum the rated powers of all the capacitors to obtain the total configured reactive power of all the capacitors in the distribution network coordinated control area; Summing the actual operating reactive power of all the capacitors currently in operation to obtain the input reactive power of all the capacitors currently in operation in the distribution network coordinated control area; Calculating the ratio of the reactive power input of all the capacitors to the total reactive power configuration of all the capacitors as the input rate of the capacitors; querying the rated capacity of each reactor in the distribution network coordinated control area respectively; Summing the rated capacities of all the reactors to obtain the total configured reactive power of all the reactors in the distribution network coordinated control area; The actual operating reactive power of all the reactors currently in operation is summed to obtain the input reactive power of all the reactors currently in operation in the distribution network coordinated control area; Calculating the ratio of the reactive power of all the reactors to the total reactive power of all the reactors as the input rate of the reactor; Query reactive power output, maximum delayed-phase reactive power, and maximum advanced-phase reactive power of each grid-connected new energy power station in the distribution network coordination control area; Summing the maximum delayed-phase reactive power of all the new energy power stations to obtain the total delayed-phase reactive power of all the new energy power stations in the distribution network coordinated control area; Summing the maximum phase-leading reactive power of all the new energy power stations to obtain the total phase-leading reactive power of all the new energy power stations in the distribution network coordinated control area; Summing the reactive outputs of all the new energy power stations to obtain the total reactive outputs of all the new energy power stations in the distribution network coordination control area; If the total reactive output is greater than or equal to 0, the ratio of the total reactive output to the total delayed reactive output is calculated as the input rate of the new energy power station, or, if the total reactive output is less than 0, the ratio of the total reactive output to the total advanced reactive output is calculated as the input rate of the new energy power station; querying reactive power exchange for each outgoing line connected to the busbar of the substation in the distribution network coordination control area; Summing the reactive power exchanges of all the outgoing lines to obtain the reactive power exchanges between the distribution network coordination control area and the upper power grid; querying reactive power exchange for each transmission line in the distribution network coordination control area connected to an external distribution network coordination control area; Summing the reactive power exchanges of all the transmission lines to obtain the reactive power exchanges between the distribution network coordination control area and an external distribution network coordination control area; Querying reactive load of each of the electrical devices in the distribution network coordination control area; Summing the reactive loads of all the electrical devices to obtain the total reactive loads of all the electrical devices in the distribution network coordination control area; Querying reactive power loss of each transmission line in the distribution network coordination control area; Summing the reactive power losses of all the transmission lines to obtain the reactive power loss of the total lines in the distribution network coordination control area; Querying reactive power loss of each main transformer in the distribution network coordination control area; The reactive losses of all the main transformers are summed to obtain the reactive losses of all the main transformers in the distribution network coordination control area.
4. The method according to claim 3, It is characterized in that The combining operation of at least two of the reactive indicators among the reactive power source, the reactive exchange, the reactive load, and the reactive loss to obtain reactive indicators under capacitive reactive power and inductive reactive power includes: Summing the total charging reactive power of all the lines, the total configuration reactive power of the capacitors, and the total delayed-phase reactive power of the new energy power station to obtain the regional capacitive reactive resources of the distribution network coordinated control area; Summing the reactive power loss of the main line, the reactive power loss of all the main transformers, the first variable, the negative value of the second variable, and the third variable to obtain the regional capacitive reactive power demand of the distribution network coordination control area; Wherein, if the total reactive load of all the electrical devices is greater than 0, the first variable is the total reactive load of all the electrical devices; if the total reactive load of all the electrical devices is less than or equal to 0, the first variable is 0; If the reactive power exchange with the upper power grid is less than 0, the second variable is the reactive power exchange with the upper power grid; if the reactive power exchange with the upper power grid is greater than or equal to 0, the second variable is 0; If the reactive exchange with the external distribution network coordinated control area is greater than 0, the third variable is the reactive exchange with the external distribution network coordinated control area; if the reactive exchange with the external distribution network coordinated control area is less than or equal to 0, the third variable is 0; Calculating the ratio between the regional capacitive reactive resources and the regional capacitive reactive demand to obtain the regional capacitive reactive balance rate of the distribution network coordinated control area; The negative value of the total configuration reactive power of the reactor, the negative value of the total leading reactive power of all the new energy power stations, the reactive power loss of the total line, and the reactive power loss of all the main transformers are summed to obtain the regional inductive reactive resources of the distribution network coordination control area; Summing the total charging reactive power of all the lines, the fourth variable, the negative value of the fifth variable, and the sixth variable to obtain the regional inductive reactive power demand of the distribution network coordinated control area; Wherein, if the total reactive load of all the electrical devices is less than 0, the fourth variable is the negative value of the total reactive load of all the electrical devices; if the total reactive load of all the electrical devices is greater than or equal to 0, the fourth variable is 0; If the reactive power exchange with the upper power grid is greater than 0, the fifth variable is the negative value of the reactive power exchange with the upper power grid; if the reactive power exchange with the upper power grid is less than or equal to 0, the fifth variable is 0; If the reactive exchange with the external distribution network coordinated control area is less than 0, the sixth variable is the negative value of the reactive exchange with the external distribution network coordinated control area; if the reactive exchange with the external distribution network coordinated control area is greater than or equal to 0, the sixth variable is 0; The ratio between the regional inductive reactive resources and the regional inductive reactive demand is calculated to obtain the regional inductive reactive balance rate of the distribution network coordinated control area.
5. The method according to any one of claims 1 to 4, It is characterized in that The adjusting the operating state of the distribution network coordination control area according to the reactive power index and the voltage index includes: Constructing nodes using one or more conditions, each of which points to the next node or a method of adjusting the operating state of the distribution network coordination control area; The reactive power index and the voltage index are sequentially traversed through the conditions in the node to determine a method for adjusting the operating state of the distribution network coordination control area; The operating status of the distribution network coordination control area is adjusted in the manner described.
6. The method according to claim 5, It is characterized in that The step of sequentially traversing the conditions in the node with the reactive power index and the voltage index to determine a method for adjusting the operating state of the distribution network coordination control area includes: S1. Detecting the voltage index of the electrical equipment, including: S1.1, determine whether the first probability of the electrical device exceeding the upper limit is greater than the exceeding upper limit threshold value, or whether the second probability of the electrical device approaching the upper limit is greater than the approaching upper limit threshold value; if so, execute S3; S1.2, determine whether the third probability of the electrical device crossing the lower limit is greater than the crossing lower limit threshold value, or whether the fourth probability of the electrical device approaching the lower limit is greater than the approaching lower limit threshold value; if so, execute S5; S2. Detecting reactive power exchange between the electrical equipment and the upper power grid, including: S2.
1. Determine whether the reactive power exchange with the upper power grid is less than a first reactive power threshold value, wherein the first reactive power threshold value is less than 0; if so, execute S3; S2.2, determine whether the reactive power exchange with the upper power grid is greater than a second reactive power threshold value, and the second reactive power threshold value is greater than 0; if so, execute S5; S3, performing a first detection on the capacitive reactive power input of the electrical equipment, including: S3.
1. Determine whether the input rate of the capacitor is greater than 0, or whether the input rate of the new energy power station is greater than 0 and the total reactive output of all new energy power stations is greater than 0. If so, remove the capacitor or reduce the delayed reactive output of the new energy power station; S3.2, determine whether the capacitor input rate is equal to 0, and whether the total reactive power output of all new energy power stations is less than or equal to 0. If so, execute S4; S4, performing a first detection on the inductive reactive power input of the electrical equipment, including: S4.
1. Determine whether the input rate of the reactor is less than the inductive reactive power reserve coefficient, or whether the input rate of the new energy power station is less than the leading reactive rotating reserve coefficient. If so, put the reactor into operation or increase the leading reactive output of the new energy power station; S4.2, determine whether the input rate of the reactor is equal to 1, and whether the input rate of the new energy power station is equal to 1, and the total reactive power output of all new energy power stations is less than 0; if so, execute S7; S5. Performing a second detection on the inductive reactive power input of the electrical equipment, including: S5.
1. Determine whether the input rate of the reactor is greater than 0, or whether the input rate of the new energy power station is greater than 0 and the total reactive output of all new energy power stations is less than 0 at the same time; if so, remove the reactor or reduce the reactive output of the new energy power station; S5.2, determine whether the input rate of the reactor is equal to 0, or whether the total reactive power output of all new energy power stations is greater than or equal to 0; if so, execute S6; S6. Performing a second detection on the capacitive reactive power input of the electrical equipment, including: S6.
1. Determine whether the input rate of the capacitor is less than the capacitive reactive power reserve coefficient, or the input rate of the new energy power station is less than the delayed reactive rotating reserve coefficient; if so, put the capacitor into operation or increase the delayed reactive power output of the new energy power station; S6.2, determine whether the input rate of the capacitor is equal to 1, and whether the input rate of the new energy power station is equal to 1, and whether the total reactive power output of all new energy power stations is greater than 0; if so, execute S8; S7, judging whether the regional inductive reactive power balance rate of the distribution network coordination control area is less than the inductive reactive power resource margin coefficient; if so, determining that the regional inductive reactive power resources are insufficient and there is no available way to adjust the operating state of the distribution network coordination control area; if not, determining that there is no available way to adjust the operating state of the distribution network coordination control area; S8. Determine whether the regional capacitive reactive power balance rate of the distribution network coordination control area is less than the capacitive reactive power resource margin coefficient; if so, determine that the regional capacitive reactive power resources are insufficient and there is no available way to adjust the operating status of the distribution network coordination control area; if not, determine that there is no available way to adjust the operating status of the distribution network coordination control area.
7. An automatic voltage control device, which is controlled by the automatic voltage control method according to any one of claims 1 to 6. It is characterized in that include: A control area construction module is used to query the electrical equipment located in a preset area in the distribution network to build a distribution network coordination control area; A reactive power index statistics module, used for calculating reactive power index statistics of the electrical equipment in the distribution network coordination control area at multiple levels; A voltage index statistics module, used for collecting voltage index statistics of the electrical equipment in the distribution network coordination control area; An operating status adjustment module is used to adjust the operating status of the distribution network coordination control area according to the reactive power index and the voltage index.
8. A computer device, It is characterized in that The computer device comprises: one or more processors; a memory for storing one or more programs, When the one or more programs are executed by the one or more processors, the one or more processors implement the automatic voltage control method according to any one of claims 1 to 6.