A production process of DB plug
Through integrated injection molding and the use of hot melt sealant, the production process of DB plugs is simplified, the complex production steps in the existing technology are solved, and the production efficiency and product stability are improved.
Patent Information
- Application Number
- CN202111397895.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-11-23
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2041-11-23
AI Technical Summary
The production process of DB plugs is complicated, resulting in a long production time, especially the multi-step installation and welding process, which affects efficiency.
The small needle is preset in the shell by using an integrated injection molding process, and a large needle is installed by press-installation, and hot melt sealant is used during the dispensing process to enhance the fixing effect of the protective enclosure, simplifying production steps and improving stability.
The production steps are simplified, the installation steps of small needles are reduced, and the fixing effect of the protective fence is enhanced by hot melt sealant, improving overall production efficiency and product stability.
Smart Images

Figure CN114122865B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of DB plugs, and in particular to a production process of DB plugs. Background Art
[0002] DB plug is an electronic component widely used in computer equipment to connect various devices.
[0003] At present, DB plugs are mostly attached Figure 1 As shown in the figure, it includes an upper connection seat, a lower connection seat and a protective shell, wherein the lower connection seat is provided with a small needle and a large needle, and the upper connection seat has a through hole for the small needle and the large needle to pass through, and after the upper connection seat and the lower connection seat are connected by riveting, bolting or any other means, the large needle and the small needle are also inserted into the through hole. The protective shell has a protective edge for surrounding the pin.
[0004] For the above-mentioned related technologies, it is necessary to prepare the upper and lower connecting seats, thread the needles, and connect them, then weld the large needles, and finally install the protective shell. The overall production steps are complicated and the production takes a long time. Summary of the invention
[0005] In order to improve the production efficiency of DB plugs, the present application provides a production process of DB plugs.
[0006] The present application provides a production process for a DB plug, which adopts the following technical solution:
[0007] A production process of a DB plug comprises the following steps:
[0008] Shell injection molding, the shell is injection molded by an injection mold, and the small needle is pre-set into the injection mold during the shell injection molding, so that the molded shell directly covers the small needle, and the molded shell reserves a perforation for the installation of the large needle;
[0009] The large needle is installed by pressing the large needle into the hole of the shell, and one side of the large needle passes through the shell after the installation is completed;
[0010] Large needle welding, welding the joint between the large needle and the shell;
[0011] Installation of protective enclosure: protective enclosure is set around the large needle;
[0012] Glue the end of the large needle that passes through the shell with glue, and glue and fix the protective enclosure at the same time;
[0013] Wherein, a mounting groove for the protective enclosure to be inserted into is provided on the shell, and the protective enclosure is inserted into the mounting groove to achieve positioning.
[0014] By adopting the above technical solution, since the diameter of the small needle is small, the small needle can be covered by the one-piece injection-molded shell, and there is no need to install the small needle; the large needle is initially positioned by press-fitting, and the protective enclosure is also initially positioned through the installation groove on the shell, and the large needle is sealed by dispensing glue, and the protective enclosure can be simultaneously bonded and fixed.
[0015] Optionally, a protruding forming table is provided on the shell, the large needle and the small needle both pass through the forming table, and the protective enclosure is installed on the outer side of the forming table and fits with the forming table.
[0016] By adopting the above technical solution, the protective enclosure is fitted with the forming table, and the fixed position during bonding is the inner side of the protective enclosure, and there is a certain gap with the bottom of the protective enclosure. During the gluing process, part of the glue can enter the gap of the protective enclosure to fill the gap.
[0017] Optionally, the shell is provided with an enclosing rib on the outer peripheral side of the forming table, and the mounting groove is formed between the forming table and the enclosing rib.
[0018] By adopting the above technical solution, the installation of the protective enclosure is facilitated by cooperating with the enclosing retaining edge and the forming table, and at the same time, the enclosing retaining edge can prevent the protective enclosure from expanding and deforming outward.
[0019] Optionally, the height of the enclosing rib protruding from the shell is greater than the height of the forming table protruding from the shell, and the height of the enclosing rib protruding from the shell is lower than the height of the protective enclosure.
[0020] By adopting the above technical solution, the height of the enclosing rib is greater than the height of the forming table, and the enclosing rib can be raised during use.
[0021] Optionally, a sealant is filled into the installation groove before the protective enclosure is inserted into the installation groove.
[0022] By adopting the above technical solution, sealant is first filled into the installation groove, and after the protective enclosure is installed, the bottom of the protective enclosure can be bonded and fixed, thereby improving the fixing effect of the protective enclosure.
[0023] Optionally, a through hole is provided at the bottom of the protective enclosure.
[0024] By adopting the above technical solution, due to the through-holes at the bottom, the sealant in the installation groove can be squeezed out during the insertion of the protective enclosure into the installation groove. Part of the sealant will enter the through-holes during the upward extrusion process, and after solidification, it can form a fixing strip that runs across the through-holes, thereby further improving the fixing effect of the protective enclosure.
[0025] Optionally, the perforations are oblique holes.
[0026] By adopting the above technical solution, the perforation is set as an inclined hole. In the process of the sealant being squeezed upward by the protective enclosure, it can flow along the inclined hole under the action of gravity through the inclined hole position and preferentially converge at the inclined lower end of the inclined hole; if the amount of sealant entering the inclined hole is not large in time, it can also solidify into a fixed strip at the inclined lower end of the inclined hole.
[0027] Optionally, a through rubber-coating hole is provided on the protective enclosure, and a notch communicating with the rubber-coating hole is provided on a side of the forming table.
[0028] By adopting the above technical solution, the rubber coating hole is opened, and the gap on the side of the forming table is connected with the rubber coating hole. In the subsequent gluing process, part of the glue can enter the rubber coating hole, and then after solidification, it can form a fixing strip that crosses the protective enclosure, thereby improving its fixing effect.
[0029] Optionally, the glue used in the dispensing is a hot melt sealant.
[0030] By adopting the above technical solution, since the glue is a hot-melt sealant, the overall temperature will be relatively high. During the dispensing process, the protective enclosure will expand due to the heat, thereby reducing the gap between the protective enclosure and the installation groove, and the sealant in the installation groove can be better squeezed into the perforation. At the same time, after the sealant cools and solidifies, it is not easy to have holes and bubbles due to its own tension, which further enhances the fixing effect of the protective enclosure.
[0031] In summary, the present application includes at least one of the following beneficial effects:
[0032] 1. The small needle can be covered by the one-piece injection-molded shell, eliminating the need to install the small needle, thus simplifying the overall production steps;
[0033] 2. The protective enclosure is provided with perforations. When the protective enclosure is inserted into the installation groove, the sealant can be squeezed into the perforations and then form a transverse fixing strip after the sealant solidifies, thereby enhancing the fixing effect of the protective enclosure;
[0034] 3 During the gluing process, the protective enclosure expands due to heat, which can better squeeze the sealant from the installation groove into the perforation, further enhancing the stability of the protective enclosure after installation. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] Figure 1 is a production process flow chart of the DB plug in this embodiment 1;
[0036] Figure 2 is a schematic diagram of the overall structure of the DB plug in this embodiment 1;
[0037] Figure 3 is a cross-sectional structural diagram of the DB plug in the present embodiment 1;
[0038] Figure 4 It is a cross-sectional structural diagram of the DB plug in this embodiment 2.
[0039] Explanation of the reference numerals: 1. Shell; 11. Forming table; 12. Enclosing rib; 13. Mounting groove; 3. Large needle; 4. Small needle; 5. Protective enclosure; 51. Perforation; 52. Rubber-coated hole; 53. Notch. DETAILED DESCRIPTION
[0040] The following is combined with Figure 1-4 This application is described in further detail.
[0041] The embodiment of the present application discloses a production process of a DB plug.
[0042] Embodiment 1:
[0043] Reference Figure 1 and Figure 2 , the production process includes the following steps:
[0044] S1, shell injection molding, the shell 1 is injection molded by an injection mold, and the small needle 4 is first embedded in the injection mold during injection molding, so that the molded shell 1 can directly wrap the small needle 4; wherein a groove for the small needle 4 to be inserted is provided inside the injection mold, and the small needle 4 is inserted into the internal groove for positioning, and the small needle 4 can be directly wrapped after the injection molding is completed. At the same time, after the injection molding is completed, the shell 1 will also reserve a through hole for the installation of the large needle 3. The molding of the through hole only requires the corresponding setting of a molding column in the injection mold. The setting of the injection mold can be designed according to the product structure, and will not be specifically demonstrated in this embodiment.
[0045] S2. Install the large needle 3 into the shell 1 by press-fitting. After the press-fitting is completed, one end of the large needle 3 passes through the outside of the shell 1, and then the joint between the large needle 3 and the shell 1 is welded, so as to improve the stability of the large needle 3 after installation.
[0046] S3. Installation of protective enclosure: a protective enclosure 5 is arranged around the large needle 3, and the protective enclosure 5 encloses the large needle 3 and the small needle 4.
[0047] S4, dispensing glue, cover the end of the large needle 3 that passes through the shell 1, and at the same time glue and fix the protective enclosure 5.
[0048] Specifically, refer to Figure 2 and Figure 3A protruding forming table 11 is provided on the shell 1, and the large needle 3 and the small needle 4 both pass through the forming table 11. The shell 1 is provided with an enclosing rib 12 on the circumferential outer side of the forming table 11, and a mounting groove 13 for the protective enclosure 5 to be inserted is formed between the forming table 11 and the enclosing rib 12, wherein the height of the enclosing rib 12 protruding from the shell 1 is greater than the height of the forming table 11 protruding from the shell 1, and is less than the height of the protective enclosure 5.
[0049] Optionally, before S3, the installation groove 13 is filled with sealant, and after the sealant is filled, the protective enclosure 5 is quickly inserted into the installation groove 13. At the same time, in order to facilitate the installation of the protective enclosure 5, the width of the protective enclosure 5 will be slightly smaller than the groove width of the installation groove 13 during production, which will also cause a gap between the protective enclosure 5 and the wall of the installation groove 13 after installation. During the process of inserting the protective enclosure 5 into the installation groove 13, the sealant will be squeezed upward to fill the gap and enhance the stability of the protective enclosure 5 after installation.
[0050] At the same time, the bottom of the protective enclosure 5 is provided with through holes 51 spaced apart along its circumference, and the through holes 51 are all inclined holes, and the inclined upper ends of the through holes 51 are close to the center of the protective enclosure 5. When the protective enclosure 5 is inserted into the installation groove 13, the sealant will be squeezed into the through holes 51, and after the sealant is fixed in the through holes 51, it can form a fixing strip that crosses the middle of the protective enclosure 5, thereby improving the stability of the protective enclosure 5 after being fixed.
[0051] In addition, the applicant needs to explain that the glue used in the dispensing process is hot-melt epoxy resin glue, and its temperature during dispensing is at least above 70 degrees Celsius. The hot-melt glue will increase the temperature of the protective enclosure 5 during the dispensing process. The protective enclosure 5 absorbs heat and expands, thereby reducing the gap between it and the installation groove 13, and squeezing more sealant into the perforation 51. At the same time, during the cooling and solidification process of the sealant, due to its own tension, the shrinkage of the protective enclosure 5 will not cause the appearance of voids.
[0052] Embodiment 2:
[0053] The difference between this embodiment and the first embodiment is that there is no need to fill part of the glue in the installation groove 13 in advance, and only one-time glue dispensing is required.
[0054] The protective enclosure 5 is provided with a glue-encapsulating hole 52 which also penetrates the protective enclosure 5 . The molding table 11 is provided with a notch 111 which is connected with the protective enclosure 5 . During the gluing process, part of the epoxy resin glue can enter the glue-encapsulating hole 52 through the notch 111 , and enhance stability after solidification.
[0055] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A production process for a DB plug, characterized in that: The steps include: Shell injection molding, the shell (1) is injection molded by an injection mold, and at the same time, when the shell (1) is injection molded, the small needle (4) is pre-installed in the injection mold, so that the molded shell (1) directly covers the small needle (4), and at the same time, the molded shell (1) reserves a perforation (51) for installing the large needle (3); The large needle is installed by pressing the large needle (3) into the through hole (51) of the housing (1), and after the installation is completed, one side of the large needle (3) passes through the housing (1); Large needle welding, welding the joint between the large needle (3) and the shell (1); Installation of protective enclosure: a protective enclosure (5) is arranged around the large needle (3); Dispensing glue to coat the end of the large needle (3) that passes through the housing (1) with glue, and at the same time, glue and fix the protective enclosure (5); The housing (1) is provided with a mounting groove (13) for the protective enclosure (5) to be inserted into, and the protective enclosure (5) is inserted into the mounting groove (13) to achieve positioning; The housing (1) is provided with a protruding forming platform (11), the large needle (3) and the small needle (4) both pass through the forming platform (11), and the protective enclosure (5) is installed on the outside of the forming platform (11) and fits with the forming platform (11); The shell (1) is provided with an enclosing rib (12) on the outer peripheral side of the forming platform (11), and the mounting groove (13) is formed between the forming platform (11) and the enclosing rib (12); Before the protective enclosure (5) is inserted into the installation groove (13), a sealant is first filled into the installation groove (13); The bottom of the protective enclosure (5) is provided with a through hole (51); The glue used in dispensing is hot melt epoxy resin glue.
2. The production process of a DB plug according to claim 1, characterized in that: The height of the enclosing rib (12) protruding from the shell (1) is greater than the height of the forming table (11) protruding from the shell (1), and the height of the enclosing rib (12) protruding from the shell (1) is lower than the height of the protective enclosure (5).
3. The production process of a DB plug according to claim 2, characterized in that: The through hole (51) is an oblique hole.