Method for using ecological flow dispatching system of cascade power plants in river basin

By using flow measurement and monitoring devices in river basin cascade power plants, combined with control hosts for ecological flow management, the problem of river interruption during power plant operation is solved, and ecological flow is always maintained in the river to meet ecological and power grid needs.

CN114169728BActive Publication Date: 2024-10-18HUBEI QINGJIANG HYDROPOWER DEV
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202111444054.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-11-30
Publication Date
2024-10-18
Estimated Expiration
2041-11-30

AI Technical Summary

Technical Problem

Watershed cascade power plants in the same basin will cause rivers to cut off when they are not generating electricity. In severe cases, the river section may be completely dehydrated, destroying the ecological balance and failing to meet ecological flow needs.

Method used

Using a system including a flow measurement device, a computing device, a power generation monitoring device, an ecological flow management information receiving device and a control host, through real-time monitoring and analysis of data, ecological flow control, early warning and alarm are carried out to ensure that the lowest ecological flow is maintained in the river.

Benefits of technology

It achieves maintaining the minimum ecological flow within 24 hours to meet the ecological balance needs. By flexibly adjusting the power generation flow and load, it ensures that there is always sufficient water flow in the river, avoids exposure of the river bed, and meets the needs of the power grid and ecological flow.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114169728B_ABST
    Figure CN114169728B_ABST
Patent Text Reader

Abstract

The present invention provides an ecological flow dispatching system for cascade power plants in a river basin and a method for using the system, including a flow measuring device, a flow calculating device, a power generation monitoring device, an ecological flow management information receiving device, a control host, and human-computer interaction. The control host is used to receive and analyze relevant information and perform ecological flow control, monitoring, early warning, and alarm. Automatic control and dispatching ensure that there is ecological flow in the river to maintain ecological construction, and the dispatching is timely and efficient, and the flow control is accurate and reliable.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of dispatching management, and in particular to a method for using an ecological flow dispatching system for a river basin cascade power plant. Background Art

[0002] Ecological flow refers to the water flow required to maintain the ecological environment in the water flow area. Generally, there is a minimum ecological flow requirement when building a dam, which is the minimum water flow to maintain the ecological balance of downstream organisms.

[0003] For cascade power plants in the same river basin, because multiple reservoirs divide a river into multiple reservoirs, when the cascade power plants in each river basin are not generating electricity, the entire river will be in a state of dry flow, which is not conducive to ecological requirements. Therefore, river management departments and the state require that large and small rivers need a certain amount of ecological flow to maintain ecological construction.

[0004] The arrangement of multiple power plants on a river will cause the river to dry up. In serious cases, it may cause a long section of the river to be completely dry. Each reservoir has upstream and downstream water levels. For example, the downstream water level of the upper reservoir is 200 meters, and the upstream water level of the next reservoir is 196 meters. This will cause the middle section of the river to be dry and the riverbed to be completely exposed. At this time, when the power plant of the upper reservoir is generating electricity, there will be a certain flow, so that the riverbed can be kept in the water to maintain ecological balance. Summary of the invention

[0005] The main purpose of the present invention is to provide a method for using an ecological flow dispatching system for cascade power plants in a river basin, so as to solve the problem of ecological flow dispatching for cascade power plants in a river basin.

[0006] In order to solve the above technical problems, the technical solution adopted by the present invention is: including a flow measuring device, a flow calculating device, a power generation monitoring device, an ecological flow management information receiving device, a control host, and human-computer interaction. The control host is used to receive and analyze relevant information and perform ecological flow control, monitoring, early warning and alarm.

[0007] In the preferred solution, the flow measurement device is used for flow measurement, real-time monitoring of power generation flow and rainfall inflow flow, and transmission of measurement data to the control host;

[0008] The flow calculation device is used to calculate the motor power generation flow, and the generator flow is calculated through the load of the generator.

[0009] In the preferred embodiment, the power generation monitoring device is used to monitor the power generation load of the generator and transmit the generator load situation to the control host for early warning and alarm of the power generation flow calculation load situation. The power generation monitoring device receives the power generation plan information of the power grid, which is the same as ecological flow control.

[0010] In the preferred solution, the ecological flow management information receiving device is used to send and receive information to the ecological flow management department, and propose power generation methods and make power generation operation suggestions to the on-duty personnel.

[0011] In the preferred solution, ecological flow control is achieved by controlling the host computer to perform ecological flow control analysis and calculation based on the water level of cascade reservoirs, weather and rainfall conditions, grid load demand, and the generator's own power generation.

[0012] In the preferred solution, when the ecological flow control fails to meet the requirements and there is still time to remedy the situation, an early warning will be issued, and suggestions for subsequent power generation operations will be provided;

[0013] When the ecological flow can no longer meet the requirements, an alarm will be issued to prompt staff to promptly report the situation to the ecological flow management department.

[0014] In the preferred solution, human-computer interaction is used to display the power generation flow and real-time inflow information of cascade power plants, self-contained power plants and small hydropower in the basin. It can display alarm and early warning information, as well as suggestions for ecological flow control methods.

[0015] The method is as follows: S1. The flow generated by rainfall entering the reservoir needs to be monitored and calculated in time. The monitoring flow result is compared with the calculated flow result to obtain the rainfall entering the reservoir flow. When the flow meets the ecological flow demand, the power generation of the cascade power plants and the self-inferior power plants in the basin is not controlled. When the rainfall entering the reservoir flow does not meet the ecological flow demand, the ecological flow control calculation is performed, and the ecological flow control is performed by controlling the power generation situation;

[0016] S2. By monitoring the flow of small hydropower plants in the basin and performing calculations, if the flow of small hydropower plants in the basin meets the ecological flow demand, the staff will be notified that the ecological flow has been met and no ecological flow control will be performed through power generation. If the flow of small hydropower plants in the basin does not meet the demand, the flow will be controlled through cascade power plants in the basin or self-provided power plants.

[0017] S3. When the flow of small hydropower generation in the basin cannot meet the ecological flow, or the small hydropower generation cannot be controlled, the ecological flow is controlled by controlling the power generation of the self-provided power plants of the cascade power plants in the basin, the ecological flow control calculation is performed based on the difference between the current flow and the ecological flow, and the ecological flow is controlled by controlling the power generation flow of the self-provided power plants;

[0018] S4. While meeting the power generation needs of the power grid, if the power generation flow of self-contained power plants or small hydropower cannot meet the ecological flow needs, that is, the ecological flow is controlled by controlling the power generation flow of cascade power plants in the basin. During the flood season or continuous rainfall, and when the cascade reservoirs are operating at high water levels, the water level of each cascade reservoir needs to drop to the normal operating water level range as soon as possible. At this time, priority is given to power generation by cascade power plants in the basin. In this case, the ecological flow needs can basically be met.

[0019] In the preferred scheme, ecological flow control during the low valley period is divided into ecological flow control during the low valley period of the flood season and ecological flow control during the low valley period of the non-flood season;

[0020] In general, there are flood limit water level requirements during the flood season. Therefore, the power generation flow of the cascade power plants in the basin can generally meet the ecological flow demand. When the ecological flow demand is not met, the power generation plan can be adjusted to control the power generation flow to meet the ecological flow demand. There is a lot of rainfall during the flood season. After the rainfall forms the inflow flow, the power generation flow can be reduced in time or continuously increased to control the ecological flow. When discharging flood water during the flood season, the ecological flow demand can be met. At this time, the power generation flow of the cascade power plants in the basin is not required to meet the ecological flow.

[0021] In general, during the non-flood season, the power grid's demand for power generation is relatively small during low-peak periods, the cascade power plants in the basin generate less power, or all units of a power plant are shut down. In this case, the ecological flow demand cannot be met, and it is necessary to adjust the control strategy in a timely manner to control the ecological flow by modifying the power generation plan or adjusting self-contained power plants and small hydropower generation.

[0022] In the preferred scheme, when the cascade power plants in the basin discharge floods, the operating water level of the reservoir is high and there is a continuous inflow. During the flood discharge period, except for the case of power generation equipment failure, the cascade water plants in the basin remain at full power, with a large power generation flow. At the same time, the flood discharge flow of the upper-level reservoir is also large. The flow in this state meets the ecological flow control needs, and ecological flow control is no longer performed by controlling the power generation flow.

[0023] The present invention provides a method for using an ecological flow dispatching system for a cascade power plant in a river basin, and has the following beneficial effects: (1) Instantaneous flow control: that is, for 24 hours, the cascade power plants in the river basin must ensure the minimum ecological flow requirements, and must generate electricity to ensure the minimum flow. (2) Average flow control: Under special circumstances, the average flow can be used to control the ecological flow, that is, the average flow within 24 hours meets the ecological flow control requirements, but it is necessary to have flow for 24 hours, and the power plant needs to generate electricity for 24 hours, but it does not need to meet the ecological flow requirements every moment. (3) Power generation control: When the water level of each reservoir is high, power generation control can be performed, and the power generation is converted into the sum of the power generation flow, and then converted into the 24-hour average flow. As long as the average flow meets the ecological flow control requirements, the demand can be met. In this case, it is not necessary to start power generation 24 hours a day. (4) No ecological flow control: During the flood season or when the water level of cascade reservoirs is too high, the entire river is full of water and there is no exposed riverbed, and the river management department has no requirements for ecological flow, there is no requirement for ecological flow control, and it can be arranged according to the actual operation of the cascade power plants in the basin. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] The present invention will be further described below in conjunction with the accompanying drawings and embodiments:

[0025] Figure 1 It is a flow chart of system connection of the present invention;

[0026] Figure 2 It is the flow chart of ecological flow control of the present invention;

[0027] Figure 3 It is a schematic diagram of the layout of power plants at various levels on the river according to the present invention. DETAILED DESCRIPTION

[0028] Example 1

[0029] like Figures 1 to 3 As shown in the figure, the method of using the ecological flow dispatching system of the cascade power plant in the basin, the control of the cascade power plant in the basin: each cascade reservoir corresponds to a cascade power plant in the basin, and the cascade power plant in the basin has a power generation task every day. The generator of the cascade power plant in the basin generates electricity normally, generally maintaining a certain load, which can meet the requirements of ecological power generation flow. However, due to the low period at night, the power grid does not need too much load, which requires the generator to operate with a small load. Although the ecological flow is met, it affects the efficiency of power generation. To control the ecological flow through the power generation of the cascade power plant in the basin, it is necessary to ensure that the cascade power plant in the basin maintains a minimum power generation load or above for power generation 24 hours a day (the minimum power generation load corresponds to the ecological flow demand).

[0030] Self-provided power plants and small hydropower control in the basin: The basin cascade power plants in larger basins all have self-provided power plants. At the same time, there will be multiple tributaries in the basin, and there will be small hydropower plants on the tributaries. Ecological flow control can be carried out through self-provided power plants and small hydropower. Calculate the maximum power generation flow and average power generation flow of small hydropower and self-provided power plants. If the self-provided power plant can meet the ecological flow demand, the self-provided power plant will be the main one, and the ecological flow control will be mainly carried out. If the self-provided power plant cannot meet the ecological flow demand, the ecological flow can be controlled jointly with the small hydropower in the basin.

[0031] Control during rainfall: During rainfall in the basin, the inflow flow will be calculated (measured through rainfall measurement stations distributed in the basin). When the inflow flow reaches the ecological flow control requirements, ecological flow control may be discontinued with the permission of the ecological flow management department. Ecological flow control will be implemented again when the rainfall inflow flow decreases.

[0032] Other situations where ecological flow control is not required: When the water level of each cascade reservoir is too high and the riverbed of the entire river is not exposed, you can apply to the ecological flow management department to stop controlling the ecological flow, and then perform ecological flow control again when control is needed. During the flood season, when the water level of the entire river is high, or during flood discharge, ecological flow control is no longer required. When the water conservancy department or other departments have related work and have requirements for water level and flow, they can obtain permission from the ecological flow management department to stop ecological flow control.

[0033] Example 2

[0034] like Figures 1 to 3 As shown, combined with Example 1, it is further explained that the flow measurement is mainly performed by the flow measurement device, and the measured data is transmitted to the host through the data transmission system. The measured flow is mainly to observe whether the current flow meets the ecological flow demand. The system can be set to measure the flow and transmit the flow data according to the time period (24 hours a day, the time period can be set according to the actual situation) to ensure that the flow is monitored in real time in each time period, and the flow data can be stably and reliably transmitted to the host system. To ensure the accuracy of the flow data, the flow measurement is performed multiple times in each time period (the number of measurements can be set according to the actual situation), and the flow average value is calculated. The calculated data is transmitted to the host, and the host makes a data judgment. After the data is accurate, the flow data is used. In order to ensure the timeliness of the flow data, the flow data update monitoring is carried out. If the flow data is not updated within the specified time, the system will alarm and prompt the staff to check the equipment.

[0035] The flow calculation has the following two functions: First, it calculates the flow through the power generation load, transmits the calculated flow result to the host, compares the calculated flow with the flow measured by the flow measurement device, judges the rationality of the data, and sets a certain flow deviation, that is, the difference between the calculated flow and the measured flow is within a reasonable range (the difference can be set according to the actual situation) and is normal. Second, it performs ecological flow control calculations, calculates according to the current power generation operation and weather and rainfall conditions, calculates the required flow control requirements and control methods, and prompts the staff to handle them in time.

[0036] The calculation principles and control principles of ecological flow control are as follows:

[0037] 1. The power generation demand of the power grid must be met on the premise of meeting the ecological flow: The power generation demand of the power grid is equally important as the ecological flow control, and both need to complete the relevant work goals in a timely manner. However, ensuring the safe operation of the power grid is the most important thing. Therefore, it is necessary to give priority to meeting the power generation demand of the power grid, and ensure the ecological flow control requirements on the premise of meeting the power generation demand of the power grid;

[0038] 2. Taking no water abandonment as the prerequisite goal: When calculating power generation production, the system takes no water abandonment as the main calculation basis while ensuring the minimum ecological flow demand, and increases the reservoir operating water level under the control principle of no water abandonment, thereby improving power generation efficiency;

[0039] 3. Control water level as calculation target: When carrying out ecological flow dispatching and control, reservoir optimization dispatching is also required. When allowed, high water level operation is beneficial to power generation production. However, when running at high water level and encountering heavy rainfall, the reservoir water level will rise rapidly, which may cause water abandonment. When carrying out ecological flow control calculation, the maximum operating water level demand is usually considered (in different periods, there are requirements for the upper limit of reservoir water level operation, especially in the later period of heavy rainfall, the water level control requirements are higher). When carrying out ecological flow control, the reservoir operating water level cannot exceed its maximum operating water level.

[0040] 4. Rainfall: When rainfall occurs in the basin, it is necessary to distinguish the rainfall conditions. When the inflow generated by rainfall reaches the ecological flow demand (the cascade power plant divides the river into multiple reservoirs, and the inflow of each reservoir needs to be considered), ecological flow control can be stopped, and the power generation tasks of the cascade power plants in the basin can be arranged according to the current operating conditions;

[0041] 5. Unit operation status: The unit operation status (start-up and shutdown status) has a great impact on the ecological flow control. When multiple units are connected to the grid, the power generation flow at the lowest load fully meets the ecological flow demand, so there is no need to perform ecological flow control calculation. When the number of generator sets in operation is small (1 or 2 units), ecological flow control calculation is required, because the power generation flow at the lowest load cannot meet the ecological flow demand. In summary, when performing the basin ecological flow control calculation, it is necessary to judge the start-up and shutdown status of the units, and then perform the ecological flow control calculation according to the start-up and shutdown status;

[0042] 6. Maintenance situation (maintenance of power generation equipment, power grid maintenance): Under normal circumstances, when a power plant is carrying out maintenance work on a generator set, usually only one unit is under maintenance within a period of time. This generator set cannot generate electricity, but other generator sets can operate normally. In this case, the ecological flow control calculation is not affected. When a power plant is carrying out busbar maintenance or transmission line maintenance, it may cause multiple units in the power plant to be unable to generate electricity. Especially when the transmission line is under maintenance, all the generator sets in the plant cannot generate electricity. At this time, the ecological flow demand cannot be met, and it is necessary to communicate with the ecological flow management department in a timely manner. When the power grid system is under maintenance, it may affect the start-up and operation of the generator set, or limit the operating load of the generator. At this time, it will affect the ecological flow control. In this case, it is necessary to understand the power grid maintenance situation in advance, understand the impact on the power plant's power generation load, and add restrictions to the ecological flow control calculation in advance.

[0043] 7. Restricted power generation: Restricted power generation of cascade power plants mainly occurs in the following situations: (1) Power grid system maintenance (2) Voltage or load exceeding the limit (3) Water level restriction (4) Making room for load for other power plants; In the case of power grid system maintenance and voltage or load exceeding the limit, timely understand the restriction situation and add the restriction conditions in the process of ecological flow control calculation. When there is water level restriction and making room for load, it is necessary to timely perform ecological flow control calculation to avoid the situation where the water level of the reservoir itself is high and cannot meet the ecological flow.

[0044] The statistical analysis method is as follows:

[0045] 1. Statistical analysis by time period: Conduct flow statistics analysis for each time period throughout the year, store all monitored flow data in the database, and conduct statistical analysis on flow data. Perform statistical analysis according to different time periods, and compare historical flow data for the same period to compile the later power generation plan according to the flow situation;

[0046] 2. Conduct statistical analysis based on unfulfilled ecological flow requirements: store the specific conditions that do not meet the ecological flow control requirements throughout the year (such as weather conditions, power generation conditions, surrounding river conditions, power grid operation conditions, etc.), analyze the reasons for not meeting ecological flow control, and use it as a guide for analysis when encountering the same situation later;

[0047] 3. Statistical analysis of power generation: Compare and analyze the power generation of cascade power plants in the basin with the ecological flow control in the same period, and analyze the impact of power generation on ecological flow control, which can be used as a reference for the preparation of power generation plans in the later stage;

[0048] 4. Optimal ecological flow control method: Calculate the optimal ecological flow control operation mode throughout the year, and continuously optimize this mode as the main operation mode in the later period;

[0049] 5. Statistical analysis of water level and flow: Reservoir scheduling takes water level as the control target, and ecological flow control takes flow as the control target. Under different water levels, the ecological flow control method is different. Statistical analysis of the ecological flow control method under each water level is carried out, and continuous optimization is carried out as the basis for the preparation of subsequent power generation plan.

[0050] Flow monitoring and early warning function: The system monitors the real-time flow of the basin, and issues an early warning when the real-time flow value is less than the minimum ecological flow control, prompting the on-duty personnel to handle it in time. Maintain the current flow, and issue an early warning when the ecological flow demand cannot be met in the future. The system performs rolling calculations on the ecological flow control demand, calculates the time that has passed within 24 hours and the flow required in the future. When the current flow is small and the flow control needs to be increased in the future, an early warning is issued to prompt the staff to adjust the power generation flow in time to meet the ecological flow demand.

[0051] Flow data interruption alarm function: When flow data is interrupted and has not been updated for a certain period of time (this time can be set according to actual conditions), a data interruption alarm will be issued to prompt the staff to deal with it in time. Flow data abnormality alarm function: When flow data is abnormal (flow data suddenly changes, that is, flow data reaches an impossible value or changes greatly, and the power generation flow changes in time, and the flow change in a short time will not exceed a maximum value), a data abnormality alarm will be issued to prompt the staff to deal with it in time. Ecological flow alarm function: When the current flow cannot meet the ecological flow demand, the system will alarm and prompt the staff to adjust the power generation flow in time to meet the ecological flow demand.

[0052] The above embodiments are only preferred technical solutions of the present invention and should not be regarded as limiting the present invention. The protection scope of the present invention shall be the technical solutions recorded in the claims, including equivalent replacement solutions of the technical features in the technical solutions recorded in the claims. That is, equivalent replacement improvements within this scope are also within the protection scope of the present invention.

Claims

1. The method for using the ecological flow dispatching system of cascade power plants in a river basin is characterized by: The ecological flow dispatching system of cascade power plants in the river basin includes flow measurement devices, flow calculation devices, power generation monitoring devices, ecological flow management information receiving devices, control hosts, and human-computer interaction. The control hosts are used to receive and analyze relevant information and perform ecological flow control, monitoring, early warning, and alarm. The flow measurement device is used for flow measurement, real-time monitoring of power generation flow and rainfall inflow flow, and transmission of measurement data to the control host; The flow calculation device is used to calculate the motor power generation flow, and the generator flow calculation is performed through the load of the generator; The power generation monitoring device is used to monitor the power generation load of the generator and transmit the load situation of the generator to the control host for early warning and alarm of the power generation flow calculation load situation. The power generation monitoring device receives the power generation plan information of the power grid, which is the same as the ecological flow control; The ecological flow management information receiving device is used to send and receive information to the ecological flow management department, and propose power generation methods and power generation operation suggestions to the duty personnel; Ecological flow control is to analyze and calculate the ecological flow control by controlling the host according to the water level of cascade reservoirs, weather and rainfall conditions, grid load demand, and the power generation of the generator itself; When the ecological flow control fails to meet the requirements and there is still time to remedy the situation, an early warning will be issued, and suggestions for subsequent power generation operations will be provided; When the ecological flow rate can no longer meet the requirements, an alarm will be issued to prompt the staff to report the situation to the ecological flow management department in a timely manner; Human-computer interaction is used to display the power generation flow and real-time inflow information of cascade power plants, self-provided power plants, and small hydropower in the basin. It can also display alarm and early warning information, as well as suggestions for ecological flow control methods; The method is as follows: S1. The flow generated by rainfall entering the reservoir needs to be monitored and calculated in time. The monitoring flow result is compared with the calculated flow result to obtain the rainfall entering the reservoir flow. When the flow meets the ecological flow demand, the power generation of the cascade power plants and self-provided power plants in the basin is not controlled. When the rainfall entering the reservoir does not meet the ecological flow demand, the ecological flow control calculation is performed, and the ecological flow control is performed by controlling the power generation situation; S2. By monitoring the flow of small hydropower plants in the basin and performing calculations, if the flow of small hydropower plants in the basin meets the ecological flow demand, the staff will be notified that the ecological flow has been met and no ecological flow control will be performed through power generation. If the flow of small hydropower plants in the basin does not meet the demand, the flow will be controlled through cascade power plants in the basin or self-provided power plants. S3. When the flow of small hydropower generation in the basin cannot meet the ecological flow, or the small hydropower generation cannot be controlled, the ecological flow is controlled by controlling the power generation of the self-provided power plants of the cascade power plants in the basin, the ecological flow control calculation is performed based on the difference between the current flow and the ecological flow, and the ecological flow is controlled by controlling the power generation flow of the self-provided power plants; S4. While meeting the power generation needs of the power grid, if the power generation flow of self-contained power plants or small hydropower cannot meet the ecological flow needs, that is, the ecological flow is controlled by controlling the power generation flow of cascade power plants in the basin. During the flood season or continuous rainfall, and when the cascade reservoirs are operating at high water levels, the water level of each cascade reservoir needs to drop to the normal operating water level range as soon as possible. At this time, priority is given to power generation by cascade power plants in the basin. In this case, the ecological flow needs can basically be met.

2. The method for using the ecological flow dispatching system of the cascade power plant in the river basin according to claim 1 is characterized by: Ecological flow control during the low valley period is divided into ecological flow control during the flood season low valley period and ecological flow control during the non-flood season low valley period; In general, there are flood limit water level requirements during the flood season. Therefore, the power generation flow of the cascade power plants in the basin can generally meet the ecological flow demand. When the ecological flow demand is not met, the power generation plan can be adjusted to control the power generation flow to meet the ecological flow demand. There is a lot of rainfall during the flood season. After the rainfall forms the inflow flow, the power generation flow can be reduced in time or continuously increased to control the ecological flow. When discharging flood water during the flood season, the ecological flow demand can be met. At this time, the power generation flow of the cascade power plants in the basin is not required to meet the ecological flow. In general, during the non-flood season, the power grid's demand for power generation is relatively small during low-peak periods, the cascade power plants in the basin generate less power, or all units of a power plant are shut down. In this case, the ecological flow demand cannot be met, and it is necessary to adjust the control strategy in a timely manner to control the ecological flow by modifying the power generation plan or adjusting self-contained power plants and small hydropower generation.

3. The method for using the ecological flow dispatching system of the cascade power plant in the river basin according to claim 1 is characterized by: When the cascade power plants in the basin are discharging floods, the operating water level of the reservoirs is relatively high and there is a continuous inflow. During the flood discharge period, except in the case of power generation equipment failure, the cascade water plants in the basin remain at full power, with a large power generation flow. At the same time, the flood discharge flow of the upper-level reservoir is also large. The flow in this state meets the ecological flow control needs, and ecological flow control is no longer performed by controlling the power generation flow.

Citation Information

Patent Citations

  • Fish habitat protection cascade reservoir hydropower station group scheduling control system and method

    CN107506909A