Upstream dam construction method for high concentration tailings pond

By counting the 13 calculation parameters and sand volume balance principle of tailings graded dam construction, key parameters and hydraulic cyclone selection were calculated, which solved the problems of tailings pond stability and construction efficiency, and achieved stability of tailings pond Improve performance and improve construction quality.

CN114186307BActive Publication Date: 2024-12-06NANCHANG INST OF SCI & TECH
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202111173487.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-10-08
Publication Date
2024-12-06
Estimated Expiration
2041-10-08

AI Technical Summary

Technical Problem

The existing technology lacks a universal applicability and a complete system of tailings pond grading dam construction technology and parameter calculation methods, which makes it difficult to guarantee the inventory and stability of tailings ponds, and the lack of theoretical guidance on the selection and quantity of hydraulic cyclones, which affects construction. Efficiency and quality.

Method used

By counting the 13 calculation parameters in the site construction of high-concentration tailings graded dams, we provide the principle of sand balance and the theoretical calculation formula for the construction period, bottom flow sand deposition rate and raw ore distribution rate, and propose the separation particle size Methods for selecting and determining the quantity of hydraulic cyclones to ensure dynamic balance relationships and construction needs.

Benefits of technology

It has achieved the stability of tailings ponds, reduced the risk of dam collapse, and improved the efficiency of water resource circulation, provided a systematic calculation method for cyclone grading process parameters, and improved construction quality and efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114186307B_ABST
    Figure CN114186307B_ABST
Patent Text Reader

Abstract

The present invention provides a high-concentration tailings pond upstream dam construction method, summarizes 13 calculation parameters in the field construction process of high-concentration tailings graded dam construction, and provides key parameters such as construction period T, underflow sand settling rate γ based on the principle of sand balance. u and the theoretical calculation formula for the original ore distribution rate η. At the same time, on this basis, a method for selecting and calculating the number of hydrocyclones based on separation particle size is proposed. Finally, the distribution process between the production scale of the concentrator and the dam construction efficiency is explained, and a systematic method for calculating the process parameters of cyclone grading is provided. The deployment of a cyclone grading dam construction system at the dam construction site provides theoretical guidance for determining the volume of the slurry distribution tank, the size and length of the conveying pipeline, and the selection of electromechanical equipment. The present invention provides systematic theoretical guidance and calculation methods for the construction of high-concentration tailings grading dams, which improves the current situation of the lack of theoretical design methods for grading dam systems in the process of high-concentration tailings dam construction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to an upstream dam construction method for a high-concentration ore discharge tailings pond, which can be widely used in the fields of upstream dam construction of tailings ponds of domestic mining enterprises and coastal reclamation projects. Background Art

[0002] In my country, most tailings ponds of nonferrous metal mines are built using the upstream method. p ≤0.03mm, -0.019mm particle content is greater than 50%, +0.074mm particle content is less than 10% and +0.037mm particle content is not less than 30%. This type of tailings belongs to fine-grained tailings and is not suitable for direct damming. However, it can be graded by a hydrocyclone. The highly concentrated sedimentation produced after grading is used for damming. The domestic engineering community calls this damming construction method the tailings grading upstream method. The working principle of the hydrocyclone is divided into two stages: centrifugal sedimentation and graded separation: the slurry enters the cyclone at a high speed under the force of the feed pump, and the large particles in the slurry will move toward the wall of the device, continue to gather around the cylinder, and be discharged through the sand settling nozzle at the bottom of the cyclone; the particles with smaller particle size and most of the liquid are subject to small centrifugal force and gravity, and will stay on the center line of the longitudinal axis of the cylinder and increase and gather. With continuous feeding, this part of the fluid moves upward and eventually flows out through the overflow pipe.

[0003] With the development and innovation of mineral processing technology and equipment, the tailings produced by the mineral processing plant are not only becoming finer and finer, but also the amount of tailings is increasing, which puts strict requirements on the inventory and stability of the tailings pond. The upstream tailings dam has a high infiltration line and is prone to dam breach accidents. Therefore, how to effectively improve the upstream dam method to improve the inventory and safety stability of the tailings pond has always attracted worldwide attention. High-concentration tailings dam can not only reduce the risk of tailings dam breach, but also improve the circulation efficiency of water resources, reduce water waste, and protect the environment. At this stage, high-concentration tailings stacking has become a new safe and environmentally friendly technology and is widely used.

[0004] However, there is still a lack of generally applicable and systematic theoretical research results on the calculation methods of tailings pond grading damming technology and parameters. There is a lack of theoretical design methods for grading damming systems in the process of high-concentration tailings damming, and there is no systematic parameter statistics in actual production. In the process of grading damming, there is a lack of grasp of key parameters, no theoretical methods and calculation formulas for reference, and the construction technology and production quality need to be improved; the selection and quantity determination process of hydrocyclones also requires relevant theoretical guidance. Therefore, it is beneficial for scholars and engineers with certain production experience to propose relevant theoretical guidance methods. At the same time, there is an urgent need for systematic theoretical calculation methods to explain the distribution process between the production scale of the concentrator and the efficiency of damming construction, and to provide theoretical guidance methods for the systematic calculation of cyclone grading process parameters.

[0005] The implementation effect of the upstream method of tailings classification is directly related to the quality and quantity of the sediment produced after classification. The coarser the average particle size of the sediment particles, the better the quality, and the better the molding quality and stability of the tailings dam, but the sedimentation rate will be greatly reduced, resulting in a reduction in the effective dam construction volume; the higher the sedimentation rate and the greater the quantity, the easier it is to meet the earthwork demand for engineering construction, but the average particle size of the sediment particles will decrease, which is not conducive to the overall stability of the tailings dam. Engineering practice experience shows that the quality and quantity of sediment are mainly affected by the properties of the incoming tailings, the specifications of the hydrocyclone, and the process flow and parameters of the cyclone classification. How to select appropriate hydrocyclones and cyclone classification process flow and parameters according to the properties of the incoming tailings, so as to produce sediments with quantity and quality that can meet the needs of dam construction, is the core issue of the upstream method of tailings classification.

[0006] Upstream tailings damming method

[0007] The dam construction method of piling up tailings upstream of the initial dam is characterized in that the axis of the dam crest gradually moves upstream of the initial dam.

[0008] Ore distribution rate η

[0009] In the production of tailings in the ore dressing plant, a part with a separation ratio of η is used as the original tailings participating in classification, and the remaining original tailings not participating in classification are directly discharged into the tailings pond.

[0010] Bottom flow sedimentation rate γ u

[0011] The ratio of the bottom flow volume to the original ore per unit time during the operation of the hydrocyclone.

[0012] Separation particle size 50

[0013] The commonly used particle size for hydrocyclone separation is d 50It means that the probability of a particle of a certain size entering the underflow and overflowing during the hydrocyclone classification process is equal, so the particle size of the particle is d 50 . Summary of the invention

[0014] In view of the current lack of calculation methods for the process and parameters of tailings pond grading damming, and the lack of theoretical research results with universal applicability and a complete system, the present invention proposes a high-concentration discharge tailings pond upstream damming construction method, which includes the following contents:

[0015] like Figure 1 The figure shows the on-site construction flow chart of high-concentration tailings grading damming. The construction of tailings grading damming mainly consists of two parts: the operation of the cyclone grading damming system and the on-site damming construction. The operation process of the cyclone grading damming system is: cyclone grading damming system processing → slurry pipeline and water pipeline connection → cyclone grading damming system on-site commissioning → cyclone grading damming system normal operation → cyclone grading of raw ore → overflow tailings and bottom flow tailings → overflow tailings are discharged into the tailings pond while the bottom flow tailings enter the embankment pool; the on-site damming construction process is: on-site measurement and construction layout → laying geogrids to reinforce the beach surface → artificially construct embankments → discharge bottom flow sediment in the embankment pool → reach the designed elevation → complete the damming length → end the construction. The operation of the cyclone grading damming system and the on-site damming construction are carried out simultaneously. The bottom flow tailings generated by the cyclone grading damming system are the raw materials for the on-site damming construction. The bottom flow sediment entering the embankment pool is used for filling and damming after treatment. The on-site dam construction continuously heightens and lengthens the dam body to intercept the tailings discharged from the dressing plant and the overflow tailings generated by the cyclone grading dam system. Therefore, the operation of the cyclone grading dam system and the on-site dam construction are in a dynamic balance relationship.

[0016] This dynamic equilibrium relationship can be controlled by sand balance. Therefore, the present invention statistically calculates 13 calculation parameters in the on-site construction process of high-concentration tailings grading damming, and provides key parameters based on the principle of sand balance, such as construction period T, underflow sand settling rate γ u And the theoretical calculation formula of the original ore distribution rate η.

[0017] At the same time, through the key parameters of construction period T, bottom flow sand settling rate γ u The theoretical calculation formula of the original ore distribution rate η can determine some relevant parameters of the construction process in the project. On this basis, a method for selecting and determining the number of hydrocyclones based on separation particle size is proposed.

[0018] 1. Summarize the 13 calculation-related parameters of the classification process

[0019] By summarizing and classifying the parameters related to the calculation of graded dam construction, the total engineering volume V of the tailings dam is summarized. dam, dam height H, tailings pond to be built area A, reservoir capacity utilization coefficient Tailings production M, tailings true density G s 、Dry density of sand in tailings dam ρ d 、Natural density of beach tailings ρ b , the content of -200 mesh particles in the original ore P, the content of -200 mesh particles in the sediment P u , separation particle size d 50 , feed concentration C i And the filling slurry concentration C f There are a total of 13 calculation parameters, including , as shown in Table 1.

[0020] Table 1 Parameters related to calculation of hierarchical damming process parameters

[0021]

[0022]

[0023] 2. Key parameters Construction period T, bottom flow sand settling rate γ u Theoretical calculation formula of the original ore distribution rate η

[0024] As the tailings dam is raised, the tailings are also accumulating, and the tailings pond surface will continue to rise. The speed of the tailings dam raising must always be slightly higher than the rising speed of the tailings pond surface. In addition, the output of sedimentation must also meet the demand for dam construction. This process is called sand balance calculation. Based on the sand balance calculation, the key parameters construction period T, bottom flow sedimentation rate γ, and 13 calculation-related parameters of the grading process are summarized and proposed. u Theoretical calculation formula of ore distribution rate η:

[0025]

[0026]

[0027] Where: T is the construction period, d; γ u is the underflow sedimentation rate, %; η is the ore distribution rate, %; M is the tailings output of the concentrator, t / d; V dam is the total volume of the tailings dam, 10,000 m 3 ; H is the height of the dam, m; A is the controlled area of ​​the tailings pond to be built, 10,000 m 2 ; is the storage capacity utilization coefficient; ρ d is the dry density of sand in the tailings dam, kg / m 3 .

[0028] Simultaneous sand settling yield γ uThe size of will directly affect the quality of sedimentation, that is, the content of -200 mesh particles. Generally, the -200 mesh particles of overflow tailings are controlled to be 95%. According to the principle of mass conservation, the bottom flow sedimentation yield γ can be derived. u The calculation formula is:

[0029]

[0030] Where: P is the content of -200 mesh particles in the original tailings, %; P u is the content of -200 mesh particles in the sediment, %, which is directly given according to the sediment quality requirements, generally 30% to 50%. Calculate the yield γ u Then, substitute it back into formula (2) to get the original ore distribution rate η.

[0031] 3. Methods for selecting and determining the number of hydrocyclones

[0032] The present invention uses separation particle size d 50 As the basis for calculating the diameter D of the hydrocyclone, the calculation formula is shown in formula (4); then according to the hydrocyclone of different brands and models, the diameter D and the initial sand trap diameter d are selected and calculated. u Similar hydrocyclones, and then determine the actual hydrocyclone parameters: inlet equivalent diameter d f and overflow diameter d ov On this basis, the number of hydrocyclones N is determined and calculated. The calculation formula is shown in formula (5):

[0033]

[0034] Where: d 50 is the separation particle size, μm, and it is recommended to take about 35-45μm for highly concentrated tailings; D is the calculated diameter of the hydrocyclone, cm; d u is the diameter of the sand settling port, cm; p is the pressure at the feed port, kPa, and for separation particle sizes of about 35 to 45 μm, 120 to 160 kPa is generally used; G s is the true specific gravity of tailings; d ov is the overflow pipe diameter, cm; C i is the feed concentration, %. In order to reduce the amount of water for raw ore dilution and obtain better classification effect, the recommended value range is 35-45%.

[0035] The calculated diameter D of the hydrocyclone is obtained from formula (4). Then, according to the hydrocyclone of different brands and models, the calculated diameter D and the initial sand trap diameter d are selected. u Similar hydrocyclones, and then determine the actual hydrocyclone parameters: inlet equivalent diameter d f and overflow diameter d ov On this basis, the number of hydrocyclones N is determined:

[0036]

[0037] Where: N is the number of hydrocyclones, units; g = 9.81 m / s 2 is the acceleration of gravity; K0 is the coefficient, and the value method can be referred to the "Ore Dressing Engineer's Manual Volume 1 General Theory of Ore Dressing"; d f is the equivalent diameter of the feed inlet, cm. When the feed inlet is a square with width × height = b × l, the conversion formula is:

[0038] like Figure 2 The figure shows the schematic diagram of the construction site of the highly concentrated tailings grading dam. The cyclone grading dam system needs to be laid out at the same time as the on-site dam construction. The construction site has the main dam section, the full tail pipe with enclosure, the cyclone unit, the slurry distribution tank, the pump, the pipeline, the electromechanical facilities and other equipment.

[0039] like Figure 3 The figure shows the process flow chart of high-concentration tailings classification and damming. In the tailings produced by the ore dressing plant, a part of the tailings with a ratio of η is separated as the original tailings participating in the classification, and the remaining original tailings not participating in the classification are directly discharged to the tailings pond; the original tailings participating in the classification are diluted with water in the original ore dilution tank and then transported to the hydrocyclone unit by the feed pump; after the hydrocyclone classification, the overflow tailings are directly discharged to the tailings pond, and the underflow tailings are diluted with water in the underflow dilution tank and then transported to the construction area by the flushing pump for damming. After the original tailings are diluted with water in the original ore dilution tank, they are transported to the hydrocyclone unit by a slurry pump. The underflow tailings generated after the cyclone classification are diluted with water in the underflow dilution tank and then transported to the damming area by the flushing pump pipeline.

[0040] like Figure 2 and Figure 3 As shown, the deployment of the cyclone classification damming system at the damming construction site requires the determination of the volume of the slurry distribution tank, the size and length of the conveying pipeline, and the selection of electromechanical equipment. Therefore, the present invention describes the allocation process between the production scale of the dressing plant and the damming construction efficiency, and derives a systematic cyclone classification process parameter calculation method.

[0041] (1) In the production of tailings in the ore dressing plant, a portion of the tailings with a ratio of η is separated as the original tailings for classification, and the remaining original tailings that are not involved in classification are directly discharged into the tailings pond: The flow rate of the original tailings in this process is Q p , m 3 / h and the original tailings flow rate Q without classification e , m 3 The calculation formula of / h is as follows:

[0042]

[0043]

[0044] Where: Q p is the flow rate of classified original tailings, m 3 / h;Q e is the original tailings flow rate without classification, m 3 / h; η is the ore distribution rate, %; M is the tailings output of the concentrator, t / d; G s is the true specific gravity of tailings; C is the concentration of original ore, %.

[0045] (2) After the raw tailings involved in classification are diluted with water in the raw ore dilution tank, they are transported to the hydrocyclone unit by the feed pump: The feed tailings flow rate Q in this process i , m 3 / h and the original ore water flow rate W p , m 3 The calculation formula of / h is as follows:

[0046]

[0047] W p =Q i -Q p (9)

[0048] Where: Q i is the feed tailings flow rate, m 3 / h;Q p is the flow rate of classified original tailings, m 3 / h; M is the tailings output of the dressing plant, t / d; η is the original ore distribution rate, %; C i is the feed tailings concentration, %; G s W is the true specific gravity of tailings; p is the water replenishment flow rate of the original ore, m 3 / h.

[0049] (3) After classification by the hydrocyclone, the overflow tailings are directly discharged into the tailings pond, and the underflow tailings flow into the underflow dilution tank: In this process, the underflow tailings concentration C u ,%;underflow tailings flow Q u , m 3 / h; overflow tailings concentration C o ,%;Overflow tailings flow Q o , m 3 The calculation formula of / h is as follows:

[0050]

[0051]

[0052]

[0053]

[0054]

[0055]

[0056] Where: Q u is the underflow tailings flow, m 3 / h;Q o is the overflow tailings flow, m 3 / h; C u is the concentration of underflow tailings, %; C o is the overflow tailings concentration, %; C i is the feed concentration, %; K1 and K2 are coefficients, obtained according to formula (11) (13); M is the tailings output of the concentrator, t / d; η is the original ore distribution rate, %; γ u is the bottom flow sedimentation rate, %; G s is the true specific gravity of tailings; S is the stock ratio, d ov is the overflow diameter, cm; d u is the diameter of the sand settling port, cm.

[0057] (4) After the bottom flow tailings are diluted with water in the bottom flow dilution tank, they are transported to the construction area through the flushing pump for dam construction: In this process, the sand concentration of the tailings pond is C dam ,%;Flushing tailings flow Q f , m 3 / h; Underflow tailings water replenishment volume W u , m 3 / h; Dam construction efficiency E dam , m 3 The calculation formula of / h is as follows:

[0058]

[0059]

[0060] W u =Q f -Q u (18)

[0061]

[0062] Where: C dam is the sand concentration in the tailings pond, %; Q f is the tailings filling flow rate, m 3 / h; W u is the amount of water replenishment for underflow tailings, m 3 / h; E dam is the dam construction efficiency, m 3 / h; G sis the true specific gravity of tailings; ρ d is the dry density of sand in the tailings dam, kg / m 3 ρ w is the density of water, kg / m 3 ;Q u is the underflow tailings flow, m 3 / h; M is the tailings output of the concentrator, t / d; η is the original ore distribution rate, %; γ u is the bottom flow sedimentation rate, %; C f is the filling slurry concentration, %.

[0063] Formulas (6) to (19) can be used to calculate the values ​​of various relevant parameters in the process flow of highly concentrated tailings grading damming, and explain the distribution process between the production scale of the concentrator and the efficiency of damming construction. Finally, theoretical design guidance is provided for determining the volume of the slurry distribution tank, the size and length of the conveying pipeline, and the selection of electromechanical equipment for the layout of the cyclone grading damming system at the damming construction site. BRIEF DESCRIPTION OF THE DRAWINGS

[0064] Figure 1 On-site construction flow chart for grading and damming highly concentrated tailings;

[0065] Figure 2 This is a schematic diagram of the construction site plan for high-concentration tailings grading damming.

[0066] Figure 3 Process flow chart for damming high concentrated tailings; DETAILED DESCRIPTION

[0067] Step 1: Collect relevant calculation parameters for tailings pond grading and damming and calculate key parameters

[0068] (1) According to the design plan of the tailings pond, the engineering volume V is obtained dam , dam height H, tailings pond to be built area A, reservoir capacity utilization coefficient Design values ​​of other parameters.

[0069] (2) On-site investigation to obtain the value of the tailings production M of the concentrator.

[0070] (3) The true specific gravity G of tailings can be obtained through indoor test s and dry density of sand in tailings dam ρ d The value of .

[0071] (4) On-site sampling test to obtain the natural density of beach tailings ρ b and the value of -200 mesh particle content P in the original ore, the original tailings concentration C and the filling slurry concentration C f .

[0072] (5) Based on engineering experience, the content of -200 mesh particles in the sediment is Pu , separation particle size d 50 , feed concentration C i And the filling slurry concentration C f The range of parameters is shown in Table 1.

[0073] (6) Using the formula Get the bottom flow sedimentation rate γ u The calculated value of .

[0074] (7) According to the obtained γ u The value of Calculate the calculated value of the original ore distribution rate η.

[0075] (8) Using the formula Calculate the construction period T.

[0076] Step 2: Determine the type and quantity of hydrocyclones

[0077] (1) Assuming the parameters for selecting the hydrocyclone: ​​Assuming the separation particle size d 50 The value range is 35~45μm. According to experience, it is assumed that the diameter of the sand trap is d u , inlet pressure p and overflow diameter d ov Parameter value.

[0078] (2) Calculate the diameter D of the hydrocyclone: ​​Use the formula Obtain the calculated diameter D of the selected model of hydrocyclone, where the parameter separation particle size d 50 , Diameter of sand trap d u , inlet pressure p and overflow diameter d ov is an assumed value, parameter tailings true specific gravity G s , feed concentration C i Obtained from step one.

[0079] (3) Determine the type of hydrocyclone: ​​select and calculate the diameter D and the initial diameter of the sand trap d u Similar hydrocyclones, and then determine the actual hydrocyclone parameters: inlet equivalent diameter d f (When the feed opening is a square with width × height = b × l, ), and the overflow diameter d ov .

[0080] (4) Determine and calculate the number of hydrocyclones N: The coefficient K0 in the formula can be selected by referring to the "Ore Dressing Engineer's Manual Volume 1 General Theory of Ore Dressing". Parameters: ore distribution rate η, tailings production M, tailings true specific gravity G s , feed tailings concentration C iThe equivalent diameter of the feed inlet is obtained in step 1, d f and overflow diameter d ov Obtained in step 2 (3).

[0081] Step 3: Calculate the cyclone classification process flow and parameters

[0082] like Figure 3 As shown in the figure, the parameter calculation process of the basic process of high-concentration tailings classification damming technology is as follows:

[0083] (1) In the production of tailings in the ore dressing plant, a portion of the tailings with a ratio of η is separated as the original tailings for classification, and the remaining original tailings that are not involved in classification are directly discharged into the tailings pond: This process requires the calculation of the process parameter classification original tailings flow rate Q p , and the original tailings flow Q without classification e . Where Q p According to the formula Calculate, Q e According to the formula Calculation. The parameters in the formula are tailings production of the ore dressing plant M, original ore distribution rate η, original tailings concentration C, and true specific gravity of tailings G. s Obtained from step 1;

[0084] (2) After the raw tailings involved in classification are diluted with water in the raw ore dilution tank, they are transported to the hydrocyclone unit by the feed pump: The process parameters that need to be calculated for this process are the feed tailings flow rate Q i With the original ore water flow W p .Q i According to the formula Calculate, W p According to the formula W p =Q i -Q p Calculation. The parameters in the formula are tailings production M of the beneficiation plant, ore distribution rate η, and feed tailings concentration C. i , tailings true specific gravity G s Obtained from step 1;

[0085] (3) After classification by the hydrocyclone, the overflow tailings are directly discharged into the tailings pond, and the underflow tailings flow into the underflow dilution tank: This process requires the calculation of the process parameter underflow tailings concentration C u , underflow tailings flow Q u , overflow tailings concentration C o , overflow tailings flow Q o , C u According to the formula Calculate, Q u According to the formula Calculation, C o According to the formula Calculate, Q o According to the formula Calculation. The parameters in the formula are tailings production M of the beneficiation plant, ore distribution rate η, bottom flow sedimentation rate γ u , tailings true specific gravity G s Obtained in step 1, K1 and K2 are coefficients, obtained according to the empirical formula.

[0086] (4) After the bottom flow tailings are diluted with water in the bottom flow dilution tank, they are transported to the construction area through the flushing pump for dam construction: This process requires the calculation of the process parameter tailings pond sediment concentration C dam , tailings filling flow Q f , underflow tailings water replenishment volume W u , dam construction efficiency E dam . C dam According to the formula Calculate, Q f According to the formula Calculate, W u According to the formula W u =Q f -Q u Calculation, E dam According to the formula Calculation. The parameters in the formula are tailings production M of the beneficiation plant, ore distribution rate η, bottom flow sedimentation rate γ u , tailings true specific gravity G s , filling slurry concentration C f , dry density of sand in tailings dam ρ d For step 1, ρ w is the density of water, kg / m3.

[0087] (5) Select appropriate pump, pipeline, electromechanical and other facility models and quantities based on the cyclone classification process parameters calculated in step 3 (1)(2)(3)(5).

Claims

1. The upstream dam construction method of high-concentration tailings pond is characterized by: include: (1) Collect relevant calculation parameters for tailings pond grading and dam construction and calculate the key parameters such as construction period T and bottom flow sedimentation rate γ u And the value of the ore distribution rate η, that is: (2) Step 2: Determine the type and quantity of hydrocyclones; That is, calculate and determine the selection and quantity of hydrocyclones based on the separation particle size, specifically according to the formula Calculate the diameter D, and then select the diameter D that matches the calculated diameter and the initial sand trap diameter d. u Similar hydrocyclones, and then determine the actual hydrocyclone parameters: inlet equivalent diameter d f and overflow diameter d ov On this basis, according to the formula Determine the number of hydrocyclones N, K0 is the coefficient, d f is the equivalent diameter of the feed inlet; (3) Calculate the parameters of the basic process of high-concentration tailings classification damming technology, specifically: In the production of tailings in the ore dressing plant, a portion of the tailings with a ratio of η is separated as the original tailings for classification, and the remaining original tailings that do not participate in classification are directly discharged into the tailings pond, where the flow rate of the original tailings for classification is Original tailings flow without classification C is the concentration of the original tailings; the original tailings involved in classification are diluted with water in the original ore dilution tank and then transported to the hydrocyclone unit by the feed pump, where the feed tailings flow rate is Raw ore water flow rate W p =Q i -Q p Where Q i is the feed tailings flow rate, M is the tailings output of the concentrator, and η is the original ore distribution rate; After classification by the hydrocyclone, the overflow tailings are directly discharged into the tailings pond, and the underflow tailings flow into the underflow dilution tank. Underflow tailings flow Overflow tailings concentration Overflow tailings flow Among them, K1 and K2 are coefficients, S is the share ratio, η is the ore distribution rate, γ u is the bottom flow sedimentation rate; After the bottom flow tailings are diluted with water in the bottom flow dilution tank, they are transported to the construction area through the flushing pump for dam construction. Tailings filling flow Underflow tailings water replenishment volume W u =Q f -Q u , dam construction efficiency ρ w is the density of water; The parameters used in the calculation process of the above-mentioned high-concentration tailings graded dam construction process include: the total volume of the tailings dam V dam , dam height H, tailings pond to be built area A, reservoir capacity utilization coefficient Tailings production M, tailings true density G s 、Dry density of sand in tailings dam ρ d 、Natural density of beach tailings ρ b , the content of -200 mesh particles in the original ore P, the content of -200 mesh particles in the sediment P u , separation particle size d 50 , feed concentration C i And the filling slurry concentration C f .

2. The upstream dam construction method for high-concentration tailings dam according to claim 1 is characterized in that: The total engineering volume of the tailings dam is V dam , dam height H, tailings pond to be built area A and reservoir capacity utilization coefficient is obtained according to the design of the tailings pond; the tailings output M of the concentrator is obtained through on-site investigation; the true specific gravity of the tailings G s 、Dry density of sand in tailings dam ρ d is obtained through indoor test; the natural density of the beach tailings ρ b , the -200 mesh particle content P in the original ore and the original tailings concentration C are obtained based on on-site sampling tests; the separation particle size d 50 The value is 35~45μm, and the content of -200 mesh particles in the sediment is P u The value of is 30-50%, and the feed concentration C i The value of is 35-45%, and the filling slurry concentration C f The value is 50~55%.

3. The upstream dam construction method for high-concentration tailings dam according to claim 1 is characterized in that: The equivalent diameter of the feed inlet d f The calculation method includes: when the feed opening is a square with width × height = b × l, the equivalent diameter d of the feed opening is f The calculation formula is:

4. The upstream dam construction method for high-concentration tailings dam according to claim 1 is characterized in that: The calculation formulas of the coefficients K1 and K2 include:

5. The upstream dam construction method for high-concentration tailings pond according to claim 1 is characterized in that: The share ratio Among them, d ov is the overflow diameter, d u is the diameter of the sand trap.

6. The upstream dam construction method of a high-concentration tailings pond according to any one of claims 1 to 5, characterized in that: The method further includes: After calculating the parameters of the basic process of high-concentration tailings grading damming technology, the volume of the slurry distribution tank, the size and length of the conveying pipeline and the selection of electromechanical equipment in the high-concentration tailings grading damming process are determined according to the parameters of the basic process of high-concentration tailings grading damming technology.

Citation Information

Patent Citations

  • Strong draining and seepage-based upstream type tailings pond fill dam and damming technology thereof

    CN104480950A

  • Tailings grading and zoning high-concentration discharging system and method

    CN105478225A

  • Tailing dam fill dam tailing sand quality control method

    CN106955798A

  • A granularity analysis test device simulating tailing dam hydraulic sorting and an application method thereof

    CN107560982A

  • Long-distance high-concentration tailing discharge process for damming by tailing midline method

    CN112482313A