A processing method and system for adjusting production factors in a multi-process integrated system

By determining the debugging range and minimum interval difference of production factors in the multi-process integrated system, modifying the process layout data, and generating debugging production layout data, the problem of cumbersome and low-efficiency system adjustment process is solved, and efficient and flexible production factor adjustment is achieved. , reducing costs.

CN114254813BActive Publication Date: 2024-10-29SKS TECH (ZHUHAI) CO LTD
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
CN202111473330.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-12-02
Publication Date
2024-10-29
Estimated Expiration
2041-12-02

AI Technical Summary

Technical Problem

The multi-process integrated system has the problems of cumbersome process, low efficiency and high cost when locally adjusting process steps.

Method used

By determining the production factors that need to be adjusted, defining the debugging range and minimum interval difference, modifying the process layout data, generating debugging production layout data, driving the multi-process integrated system to produce debugged products, determining the optimal state, and automatically synchronizing to the normal production mode, only for Parametric modifications are made to relevant process sections.

Benefits of technology

It improves production efficiency and reliability, reduces costs, avoids repeated manual debugging, and achieves flexible adjustment of production factors.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114254813B_ABST
    Figure CN114254813B_ABST
Patent Text Reader

Abstract

The present invention provides a processing method and system for adjusting production factors in a multi-process integrated system, the method comprising: determining at least one production factor that needs to be adjusted, defining the debugging range and minimum interval difference of the production factor; identifying the process layout data corresponding to the production factor in the original production layout data, and parameterizing and modifying the process layout data according to the definition of the production factor to obtain the adjusted debugging production layout data; driving the multi-process integrated system with the debugging production layout data to produce a number of debugging products; determining the optimal state among the several debugging products to determine the corresponding optimal process layout data. The present invention uses data drive to preset the debugging range and parameters of the production factors that need to be adjusted, and based on this, modify the parameters to obtain the debugging production layout data, and then use the debugging production layout data to drive the multi-process integrated system. Using data drive, it avoids repeated manual modulation of the system, and has high efficiency, high reliability and low cost.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of industrial production, and in particular relates to a processing method and system for adjusting production factors in a multi-process integrated system. Background Art

[0002] As the technological level of industrial products becomes higher and higher, and the process steps become more and more complicated, the current industrial production system integrates a lot of process manufacturing equipment in order to continuously complete multiple related processes on a production line. This approach can achieve the goal of multi-process high-concentration production.

[0003] However, in order to adapt to personalized customer needs and changing production tasks, the multi-process integration system often needs to make some local adjustments. Since the multi-process integration system has integrated multiple process steps and bound multiple process manufacturing equipment, when traditional technology makes local adjustments to a process step, it often requires the entire production system to conduct multiple rounds of complete trial production before the adjustment can be successful. This adjustment method is cumbersome, time-consuming, labor-intensive, and inefficient. Summary of the invention

[0004] The purpose of the present invention is to overcome the shortcomings of the above-mentioned prior art and to provide a method and system for adjusting production factors in a multi-process integrated system, which is mainly used to solve the problems in the prior art of complicated adjustment process, low efficiency and high cost of the multi-process integrated system when adjusting process steps locally.

[0005] In order to achieve the above object, in a first aspect, the present invention provides a processing method for adjusting production factors in a multi-process integrated system, comprising the following steps:

[0006] Determine at least one production factor that needs to be adjusted, and define a debugging range and a minimum interval difference of the production factor;

[0007] In the original production layout data, the process layout data corresponding to the production factor is identified, and according to the definition of the production factor, the process layout data is parameterized and modified to obtain the adjusted debugging production layout data;

[0008] Using the debugging production layout data to drive a multi-process integrated system to produce a number of debugging products;

[0009] An optimal state is determined among a plurality of the debugged products to determine corresponding optimal process layout data.

[0010] In some embodiments, before producing the debug product, the number of debug layouts that need to be produced is also defined.

[0011] In some embodiments, when the debugging products are produced, the process layout data corresponding to each of the debugging products is printed thereon.

[0012] In some embodiments, the original production layout data includes a set of process layout data for personalized debugging, and each of the production factors corresponds to at least one of the process layout data.

[0013] In some embodiments, when determining the optimal state among the plurality of debugged products, an inspection step is performed on the debugged products, the inspection step including but not limited to waste discharge processing, wherein the waste discharge processing is configured to remove waste generated after die cutting.

[0014] In some embodiments, the mode is switched to debug mode to enter a control interface for selecting and defining production factors; the optimal process layout data is confirmed in debug mode and automatically synchronized to the original production layout data in normal production mode.

[0015] In some embodiments, the multi-process integrated system is segmented to determine the process segment corresponding to the production factor, and the layout data of this process segment is parameterized to obtain adjusted segmented debugging production layout data, which is used to drive the production of the corresponding process segment.

[0016] In some embodiments, the adjusted debugging production layout data includes but is not limited to printing data, die-cutting data, waste data and execution data.

[0017] In a second aspect, the present invention provides a processing system applied to the above processing method, comprising:

[0018] Mode switching module, used to switch between debugging mode and normal production mode;

[0019] An adjustment input module, used to determine at least one production factor that needs to be adjusted in the debugging mode, and define the debugging range and minimum interval difference of the production factor;

[0020] A production debugging module, used for generating debugging production layout data, wherein the debugging production layout data is configured to be obtained by identifying the process layout data corresponding to the production factor in the original production layout data, and parameterizing and modifying the process layout data according to the definition of the production factor;

[0021] A multi-process integrated system is used for producing according to the debugged production layout data and / or the original production layout data.

[0022] In some embodiments, an inspection module is also included, which is used to perform inspection steps on the debugged product.

[0023] Compared with the prior art, the beneficial effects of the present invention include at least:

[0024] The production layout data is used to drive the multi-process integrated system for production. When a specific production factor needs to be adjusted, the corresponding process layout data is modified in a targeted manner. The obtained debugging production layout data includes multiple process layout data with the minimum interval difference as the difference within the debugging range. The debugging production layout data is then used to drive the multi-process integrated system to determine the optimal state of the debugged product, thereby determining the optimal value among multiple process layout data. The debugging range and parameters are preset by data driving to avoid repeated manual modulation of the system, which is efficient, reliable and low cost.

[0025] By printing the process layout data corresponding to each of the debugging products on it, it is convenient to intuitively obtain the optimal process layout data after the optimal state of the debugging product is determined later, thus eliminating the need for manual tracing work;

[0026] The production factors are associated with the process sections, and only the process sections related to the production factors that need to be adjusted are debugged, which is highly flexible, more cost-effective and more efficient. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] The present invention is further described using the accompanying drawings, but the embodiments in the accompanying drawings do not constitute any limitation to the present invention. A person skilled in the art can obtain other drawings based on the following drawings without creative work.

[0028] Figure 1 It is a flow chart of a processing method for adjusting production factors in a multi-process integrated system provided by the present invention.

[0029] Figure 2 It is a schematic diagram of a processing system for adjusting production factors in a multi-process integrated system provided by the present invention. DETAILED DESCRIPTION

[0030] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0031] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

[0032] Reference Figure 1 In a first aspect, the present invention provides a method for adjusting production factors in a multi-process integrated system, comprising the following steps:

[0033] Determine at least one production factor that needs to be adjusted, and define a debugging range and a minimum interval difference of the production factor;

[0034] In the original production layout data, the process layout data corresponding to the production factor is identified, and according to the definition of the production factor, the process layout data is parameterized and modified to obtain the adjusted debugging production layout data;

[0035] Using the debugging production layout data to drive a multi-process integrated system to produce a number of debugging products;

[0036] An optimal state is determined among a plurality of the debugged products to determine corresponding optimal process layout data.

[0037] It should be noted that this multi-process integrated system includes multiple process steps and is bound to multiple process manufacturing equipment. Moreover, multiple process manufacturing equipment can drive production through production layout data, and each process step has a corresponding production factor. When one or more process steps need to be adjusted, the specific production factors related to them should be determined first. These production factors can be expressed parameterically to define the debugging range and minimum spacing difference of the production factors. For example, on a whole sheet of self-adhesive material, multiple custom labels are laid out. This production factor is the spacing distance between the labels. Therefore, the debugging range and minimum spacing difference of this spacing distance are defined. For example, if the debugging range is 1 to 10 cm, 1 cm is the minimum spacing difference.

[0038] Since the original production layout data includes the process layout data corresponding to each process step, the corresponding process layout data is found by determining the production factors, and the corresponding process layout data is parameterized according to the debugging range and minimum spacing difference of the defined production factors. For example, the spacing distance D between the corresponding labels is modified to 1 to 10, for a total of 10 groups, so as to obtain the adjusted debugging production layout data.

[0039] Then, the multi-process integrated system is driven by the debugging production layout data, and several debugging products are produced. The optimal state is determined from the several debugging products, and the corresponding adjusted debugging production layout data is determined, which is defined as the optimal process layout data. The present invention uses data drive, presets the debugging range and parameters, avoids repeated manual modulation of the system, and has high debugging efficiency, high reliability, and low cost.

[0040] Of course, the determination and definition of production factors can be selected and set through the human-computer interaction interface. After determination, the corresponding data is automatically identified and modified in the preset original production layout data, without manual selection and modification of specific process layout parameters, with high automation and accuracy.

[0041] As an implementation method, before producing the debugging products, the number of debugging layouts that need to be produced is also defined. For example, 10 comparison groups need to be produced, and 5 products need to be produced in each group. Since the debugging results of the samples are accidental, when the debugging sample size is appropriately increased, the optimal state of the debugging product can be obtained more accurately. In addition, different production factors correspond to different sample sizes, and adjustments can be made here according to actual needs.

[0042] As an implementation method, in order to more conveniently and intuitively know the optimal process layout data, when producing the debugging products, the process layout data corresponding to each debugging product is printed on it. After producing several debugging products, the optimal process layout data corresponding to the optimal state can be directly obtained, eliminating the work of manual tracing. Of course, if the data is numerous, several groups of debugging production layout data can be numbered, marked with 1, 2, 3, etc., to facilitate subsequent comparison.

[0043] In this embodiment, the original production layout data includes a group of process layout data for personalized debugging, and each of the production factors corresponds to at least one process layout data. In more detail, in order to improve the accuracy of adjustment and avoid random modification of the original production layout data, a group of process layout data for personalized debugging is preset in the original production layout data in advance. The meaning corresponding to each process layout data is different. In this case, when a certain production factor needs to be adjusted, one or more process layout data are actually required for support. For example, the die-cutting size needs to be adjusted to verify which size of the label is more suitable. Therefore, the die-cutting size production factor is related to the die-cutting length and width. The debugging range and minimum interval difference of the die-cutting length and width need to be defined respectively to meet the debugging requirements.

[0044] As an implementation mode, when determining the optimal state among several of the debugging products, an inspection step is performed on the debugging products, and the inspection step includes but is not limited to waste discharge processing, and the waste discharge processing is configured to remove the waste generated after die-cutting. This implementation mode is suitable for the optimal state that cannot be distinguished by the naked eye, that is, it is necessary to use corresponding inspection steps to determine the optimal state. For example, whether the spacing distance between labels is appropriate and whether it is convenient for subsequent waste discharge, it is necessary to perform waste discharge on the produced debugging products one by one to see at which spacing distance it is easy to discharge waste without damaging the label itself and wasting materials.

[0045] In this embodiment, there are two modes, namely debugging mode and normal production mode. Switching to debugging mode enters the control interface for selecting and defining production factors; confirming the optimal process layout data in debugging mode, automatically synchronizing it with the original production layout data in normal production mode, and making targeted process layout data modifications to the original production layout data. Then, the debugged data is used to drive the multi-process integrated system for production, eliminating the trouble of reprogramming and modifying the original production layout data, thereby improving production efficiency.

[0046] In this embodiment, since the multi-process integrated system includes multiple process steps, the production factors that need to be adjusted often only involve one or several process steps. Therefore, the multi-process integrated system is segmented, the process segment corresponding to the production factor is determined, the process segment that needs to be debugged is selected from several process segments, and the layout data of this process segment is parameterized to obtain the adjusted segmented debugging production layout data. The segmented debugging production layout data is used to drive the production of the corresponding process segment, avoiding the situation where the entire production line is involved in debugging. The production factors are associated with the process segments, and only the process segments related to the production factors that need to be adjusted are debugged, thereby achieving the purpose of point-to-point modification and point-to-point testing, with high flexibility, greater cost savings, and higher debugging efficiency.

[0047] As an implementation mode, the adjusted debugging production typesetting data includes but is not limited to printing data, die-cutting data, waste discharge data and execution data. Different data are used to drive different process steps in the multi-process integrated system, including printing, die-cutting, waste discharge and execution processes. The execution data means controlling the drive motor to execute forward rotation, reverse rotation, speed, etc.

[0048] Embodiment 1:

[0049] In this embodiment 1, the multi-process integrated system is a self-adhesive label integrated multi-process integrated production line of printing + die-cutting + waste discharge + quality inspection. Now, due to the need to switch to a new production material, the tension characteristics of the new production material are relatively weak, so that when the original production process is used, the connection of the label product is more likely to break during the die-cutting step. Therefore, it is necessary to rearrange the layout according to the characteristics of the new production material, and appropriately widen the width of the connection of the label product to avoid breaking.

[0050] First, determine the production factor as the interval distance between two labels, and the interval distance between two labels on the plane can be divided into length distance and width distance. Therefore, when defining the debugging range and minimum interval difference of the production factor, it is necessary to define the length distance and width distance separately. For example, the debugging range of the length distance is 5 to 10 cm, with 1 cm as the minimum interval difference, for a total of 6 groups; the debugging range of the width distance is 1 to 5 cm, with 0.8 cm as the minimum interval difference, for a total of 6 groups.

[0051] Identify and adjust the process layout data for the spacing distance between the two labels from the original production layout data, such as L represents the length direction distance between the two labels, and the parameterized modification results of L are 5, 6, 7, 8, 9, and 10, and H represents the width direction distance between the two labels, and the parameterized modification results of H are 1.0, 1.8, 2.6, 3.4, 4.2, and 5.0, and obtain the adjusted debugging production layout data. In this embodiment 1, there are 36 groups of debugging production layout data, and each L data must be combined with all H data separately, so there are 6×6=36 groups of data, and each group of data corresponds to a debugging product. Of course, in one production, one debugging product can be produced in multiples. By adjusting multiple continuous layouts, the labels of each layout are die-cut with different spacing distances according to the set rules, thereby increasing the sample volume and improving the debugging accuracy.

[0052] The corresponding process layout data is printed on each debugging product to record the performance of each debugging product in the waste discharge step, determine the optimal waste discharge state, and then correspond to the optimal debugging product. The corresponding optimal process layout data can be found from the marks printed on the debugging product.

[0053] It should be noted that in this embodiment, since only the spacing distance of the labels is adjusted and it has nothing to do with the content printed inside the labels, the printing process segment does not need to participate in this debugging process, and only the die-cutting and waste discharge processes need to be performed, which saves the debugging cost and improves the debugging efficiency.

[0054] Reference Figure 2 In a second aspect, the present invention provides a processing system applied to the above processing method, comprising:

[0055] Mode switching module, used to switch between debugging mode and normal production mode;

[0056] An adjustment input module, used to determine at least one production factor that needs to be adjusted in the debugging mode, and define the debugging range and minimum interval difference of the production factor;

[0057] A production debugging module, used for generating debugging production layout data, wherein the debugging production layout data is configured to be obtained by identifying the process layout data corresponding to the production factor in the original production layout data, and parameterizing and modifying the process layout data according to the definition of the production factor;

[0058] A multi-process integrated system is used for producing according to the debugged production layout data and / or the original production layout data.

[0059] As an implementation mode, it further includes an inspection module, which is a module in the multi-process integrated system and is used to perform an inspection step on the debugged product. The inspection step is to remove the waste generated after die cutting. The corresponding inspection module is a waste discharge module, which includes:

[0060] A feeding mechanism, used for conveying the self-adhesive material, wherein the self-adhesive material comprises an upper layer material and a lower layer material that are bonded to each other;

[0061] A limiting mechanism, used for limiting the upper layer material and the lower layer material respectively, wherein the direction of the limiting force applied to the upper layer material and the lower layer material is perpendicular to the transmission direction of the self-adhesive material;

[0062] An end separation mechanism, used for separating the front end portions of the upper layer material and the lower layer material that are bonded together along the conveying direction;

[0063] A driving mechanism, used to flip the limited upper layer material and / or lower layer material and separate the upper layer material from the lower layer material in one piece;

[0064] A collecting mechanism is used to collect the separated waste materials.

[0065] Compared with the prior art, the present invention provides a processing method and system for adjusting production factors in a multi-process integrated system, which uses production layout data to drive the multi-process integrated system to produce. When a specific production factor needs to be adjusted, the corresponding process layout data is modified in a targeted manner. The obtained debugging production layout data includes multiple process layout data with the minimum interval difference as the difference within the debugging range. The debugging production layout data is then used to drive the multi-process integrated system to determine the optimal state of the debugged product, thereby determining the optimal value in the multiple process layout data. The debugging range and parameters are preset by data driving to avoid repeated manual modulation of the system, which has high efficiency, high reliability and low cost.

[0066] By printing the process layout data corresponding to each of the debugging products on it, it is convenient to intuitively obtain the optimal process layout data after the optimal state of the debugging product is determined later, thus eliminating the need for manual tracing work;

[0067] The production factors are associated with the process sections, and only the process sections related to the production factors that need to be adjusted are debugged, which is highly flexible, more cost-effective and more efficient.

[0068] Finally, it should be emphasized that the present invention is not limited to the above-mentioned implementation mode. The above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

[0069] The above description is the main process steps of the invention, which may be interspersed with other functional steps and may disrupt the above logical order and process steps. If the data is processed in the form of this process step or the core idea of ​​data processing is similar or identical, it should be protected.

Claims

1. A processing method for adjusting production factors in a multi-process integrated system for producing self-adhesive labels, It is characterized in that The following steps are involved: Determine at least one production factor that needs to be adjusted, define a debugging range and a minimum spacing difference of the production factor, the production factor including a spacing distance between two tags; In the original production layout data, the process layout data corresponding to the production factor is identified, and according to the definition of the production factor, the process layout data is parameterized and modified to obtain the adjusted debugging production layout data; Using the debugging production layout data to drive a multi-process integrated system to produce a number of debugging products; Determine the optimal state among the plurality of the debugged products to determine the corresponding optimal process layout data; When determining the optimal state of the plurality of debugged products, performing an inspection step on the debugged products, the inspection step includes but is not limited to a waste discharge process, wherein the waste discharge process is configured to remove waste generated after die cutting; Performing process segmentation on the multi-process integrated system, determining the process segment corresponding to the production factor, performing parameter modification on the layout data of the process segment, and obtaining adjusted segmented debugging production layout data, wherein the segmented debugging production layout data is used to drive the production of the corresponding process segment; Before producing the debugging product, the number of debugging layouts to be produced is also defined; When producing the debugging products, printing the process layout data corresponding to each debugging product on the debugging products; The original production layout data includes a set of process layout data for personalized debugging, and each of the production factors corresponds to at least one of the process layout data; Switch to debug mode and enter the control interface for selecting and defining production factors; Confirm the optimal process layout data in the debugging mode and automatically synchronize it to the original production layout data in the normal production mode; The adjusted debugging production typesetting data includes but is not limited to printing data, die-cutting data, waste discharge data and execution data.

2. A processing system applied to the processing method as claimed in claim 1, It is characterized in that include: Mode switching module, used to switch between debugging mode and normal production mode; An adjustment input module, used to determine at least one production factor that needs to be adjusted in the debugging mode, and define the debugging range and minimum interval difference of the production factor; A production debugging module, used for generating debugging production layout data, wherein the debugging production layout data is configured to be obtained by identifying the process layout data corresponding to the production factor in the original production layout data, and parameterizing and modifying the process layout data according to the definition of the production factor; A multi-process integrated system for producing according to the debugged production layout data and / or the original production layout data; It also includes an inspection module, which is used to perform inspection steps on the debugged product.

Citation Information

Patent Citations

  • Bottle production machine production line integrated intelligent control system and implementation method thereof

    CN105527949A

  • Numerical method for fast determining process parameters of hot punching production line

    CN106503389A

  • Arc profile tolerance test method for 2.5D cover plate sample and manufacture method for 2.5D cover plate

    CN109029327A

  • System for optimization of industrial machine operation through modification of standard process parameter input

    CN109564416A

  • Efficient die cutting and waste discharging process for self-adhesive labels

    CN111599264A