A method for generating cloud diagrams for data evaluation of power grid construction project groups based on COWA operator and cloud model

Through the COWA operator and cloud model, the data evaluation cloud diagram of the power grid engineering construction project group is generated, which solves the problems of fuzziness and arbitrariness in evaluation in the existing technology, and realizes the scientific measurement and management optimization of the project group performance.

CN114254988BActive Publication Date: 2024-10-18ECONOMIC TECH RES INST OF STATE GRID ANHUI ELECTRIC POWER +2
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202111394263.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-11-23
Publication Date
2024-10-18
Estimated Expiration
2041-11-23

AI Technical Summary

Technical Problem

The lack of scientific indicator systems and evaluation methods in the existing technology makes it difficult to effectively measure the performance of power grid construction project groups, and the evaluation is ambiguous and arbitrary.

Method used

Using a method based on the COWA operator and cloud model, by obtaining data from the power grid engineering construction project group, applying the COWA operator to weight the indicators, using the cloud model to build an evaluation matrix and a comprehensive evaluation matrix, and generating a data evaluation cloud diagram to solve qualitative problems quantitative analysis.

Benefits of technology

It realizes the scientific evaluation of the power grid engineering construction project group, reveals the hidden content in the project group management, helps to timely discover problems and formulate optimization strategies, and improves the scientificity and effectiveness of the project group management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114254988B_ABST
    Figure CN114254988B_ABST
Patent Text Reader

Abstract

The present invention relates to a method for generating a data evaluation cloud map of a power grid engineering construction project group based on a COWA operator and a cloud model. Compared with the prior art, the method solves the defect that it is difficult to generate a data cloud map for a power grid engineering construction project group. The present invention comprises the following steps: obtaining data of a power grid engineering construction project group; generating an evaluation factor set; constructing an evaluation matrix E; constructing a comprehensive evaluation matrix I; and generating a data evaluation cloud map of a power grid engineering construction project group. The present invention weights evaluation indicators based on the COWA operator, establishes an evaluation model using the cloud model theory, and introduces weights into the evaluation model, and finally obtains an evaluation cloud map.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of data cloud graphs, and in particular to a method for generating data evaluation cloud graphs for power grid engineering construction project groups based on a COWA operator and a cloud model. Background Art

[0002] A project group refers to a collection of construction projects that establish a common goal system for multiple projects based on organizational strategy and achieve benefits and results that cannot be achieved by a single project through collaborative management. Project group management refers to the unified and coordinated management of a group of projects in order to achieve the strategic goals and interests of the organization. Project group management requires the use of knowledge and resources to define, plan, execute and summarize all aspects of the client's complex projects.

[0003] Many evaluations of power grid engineering construction project groups are rough qualitative judgments made by experts based on their impressions of the projects. Such judgments are somewhat vague and arbitrary. Without a set of standardized and reasonable indicator systems and evaluation methods, it is difficult to ensure the scientificity and effectiveness of the evaluation, resulting in the inability to measure performance well.

[0004] The COWA operator method can process and merge uncertain information in a fuzzy decision environment. It is a solution for multi-attribute decision making, mainly for interval decision making. The fundamental characteristics of this operator are: re-sorting attribute values ​​from large to small and weighting them by the position of the attribute values ​​before aggregation.

[0005] The cloud model is proposed on the basis of comprehensive fuzzy mathematics, probability theory and other theoretical knowledge. The model can interpret knowledge through the mutual conversion between the connotation and extension of qualitative concepts and quantitative data, and then characterize the fuzziness and randomness of objective objects, that is, combine the fuzziness and randomness of qualitative concepts to form a conversion relationship between qualitative and quantitative. At present, cloud models have various distribution forms such as rectangular cloud, normal cloud, triangular cloud and trapezoidal cloud. The cloud model used in this evaluation is a normal cloud model based on Gaussian distribution. Three categories are mainly used in the application process, including forward cloud generator, reverse cloud generator, comprehensive cloud generator and forward cloud generator. Among them, the forward cloud generator is a mapping from qualitative concepts to quantitative expressions, and it generates cloud droplets according to the digital characteristics of the cloud model. The reverse cloud generator is a conversion model that realizes the conversion from quantitative values ​​to qualitative concepts, and can convert a certain amount of precise data into qualitative concepts represented by the digital characteristics of the cloud model. The comprehensive cloud generator combines the weights of each indicator with the digital characteristics of the cloud model to construct a comprehensive evaluation matrix.

[0006] Therefore, how to use COWA operators and cloud models to realize cloud map generation of power grid engineering construction project groups has become a technical problem that needs to be solved urgently. Summary of the invention

[0007] The purpose of the present invention is to solve the defect that it is difficult to generate data cloud maps for power grid engineering construction project groups in the prior art, and to provide a method for generating data evaluation cloud maps for power grid engineering construction project groups based on the COWA operator and cloud model to solve the above problem.

[0008] In order to achieve the above object, the technical solution of the present invention is as follows:

[0009] A method for generating a data evaluation cloud map of a power grid engineering construction project group based on a COWA operator and a cloud model comprises the following steps:

[0010] Acquisition of power grid engineering construction project group data: Acquisition of power grid engineering construction project group data, which is secondary key indicator data extracted from four aspects: schedule management capability E1, quality management capability E2, cost management capability E3 and collaborative management capability E4;

[0011] Generation of evaluation factor set: Apply COWA operator to weight the indicators and determine the evaluation factor set W;

[0012] Construct the evaluation matrix E: Apply the reverse cloud generator to construct the evaluation matrix E and obtain the digital features of each indicator cloud model (E x ,E n ,H e );

[0013] Constructing the comprehensive evaluation matrix I: Applying the comprehensive cloud generator, and obtaining the cloud droplets of each sub-project of the project group, combining the weights of each indicator with the digital characteristics of the cloud model, constructing the comprehensive evaluation matrix I, and obtaining the cloud droplets of each sub-project of the project group;

[0014] Generation of data evaluation cloud maps for power grid engineering construction project groups: The forward cloud generator is run through MATLAB software to output the digital features of the comprehensive cloud model in the form of a cloud map.

[0015] The generation of the evaluation factor set comprises the following steps:

[0016] Obtain the importance scores of n experts in the database for the i-th indicator to form the original indicator decision data set A (a1, a2, ..., a n ), and arrange the elements of the original data set from small to large, denoted as B(b0,b1,...,b n-1 ), where b0≤b1≤b2≤...≤b n-1 ;

[0017] Calculate the weight vector w of the combination number of raw data of indicator decision i+1 , and its calculation formula is as follows:

[0018]

[0019] in, The number of combinations of selecting i data from n-1 data, i = 0, 1, 2, ..., n-1;

[0020] Calculating absolute weights The calculation formula is as follows:

[0021]

[0022] Among them, m is the number of indicators;

[0023] Normalize the weights to get the final relative weight W j :

[0024]

[0025] According to the relative weight W j Vector, combined with the given four first-level indicators of schedule management capability E1, quality management capability E2, cost management capability E3 and collaborative management capability E4 and the extracted second-level key indicator data, the evaluation factor set W is obtained.

[0026] The construction of the evaluation matrix E comprises the following steps:

[0027] Calculate the sample mean E of the data x , which is the expectation and variance S of the cloud droplets 2 , E x is the expected formula of cloud droplets, n represents the number of samples, x i represents the data value of the i-th sample,

[0028]

[0029]

[0030] Calculate the entropy E of cloud droplets using sample mean n , and its calculation formula is as follows:

[0031]

[0032] Using the sample variance S 2 and entropy E n Calculate the super entropy H e , output digital features (E x ,E n ,H e ),

[0033]

[0034] Calculate the numerical characteristics of each secondary indicator (E x,E n ,H e ), thus forming the evaluation matrix E.

[0035] The construction of the comprehensive evaluation matrix I comprises the following steps:

[0036] Assume that any n normal clouds C1(E x1 ,E n1 ,H e1 )、C2(E x2 ,E n2 ,H e2 ), C n (E xn ,E nn ,H en ) and the constant w i (i=1,2,…,n), then the comprehensive cloud model C(E x ,E n ,H e ) is calculated by the following formula:

[0037]

[0038]

[0039]

[0040] After the above steps, the comprehensive cloud model C(E x ,E n ,H e ) is the comprehensive digital feature of a single sub-project in the project group, from which the cloud droplets of all sub-projects in the project group are calculated to form a comprehensive evaluation matrix I.

[0041] Beneficial Effects

[0042] The method for generating a data evaluation cloud map of a power grid engineering construction project group based on the COWA operator and the cloud model of the present invention, compared with the prior art, weights the evaluation indicators based on the COWA operator, establishes an evaluation model using the cloud model theory, and introduces the weights into the evaluation model, and finally obtains an evaluation cloud map.

[0043] The method described in the present invention not only realizes the quantitative analysis of qualitative problems, but also uses scientific methods to quantify the completion quality of the project group, reveal the hidden content in the implementation of the project group, and is helpful to understand the management status of the project group, timely discover the problems of the project group, formulate management optimization strategies and apply them to the future project group management. More importantly, it has made great strides in innovation in means, using the COWA operator that can currently be applied to the evaluation of enterprise operating benefits and facility construction projects to empower the evaluation indicators, and using the cloud model theory to establish an evaluation model, which intuitively and efficiently displays the evaluation results.

[0044] The present invention constructs a project group evaluation model based on the combination of COWA operator and cloud model. COWA operator can weaken the influence of extreme values, and cloud model can rate project groups. First, a comprehensive project group evaluation index system that can reflect the characteristics of project groups is constructed; second, a project group evaluation model based on COWA operator and cloud model is established; finally, the implementation example is verified with the help of relevant data of power grid engineering construction project groups, and the results are output. The implementation example verifies that the model constructed by the present invention is operable and effective. BRIEF DESCRIPTION OF THE DRAWINGS

[0045] Figure 1 is a method sequence diagram of the present invention;

[0046] Figure 2 This is a cloud diagram of the cloud model C=(0.5, 0.2, 0.03) involved in the present invention;

[0047] Figure 3 A cloud chart of the grade assessment involved in the embodiment of the present invention;

[0048] Figure 4 It is a data evaluation cloud diagram of a power grid engineering construction project group involved in an embodiment of the present invention. DETAILED DESCRIPTION

[0049] In order to have a further understanding and recognition of the structural features and the effects achieved by the present invention, a preferred embodiment and accompanying drawings are used for detailed description as follows:

[0050] like Figure 1 As shown, the method for generating a data evaluation cloud map of a power grid engineering construction project group based on the COWA operator and the cloud model of the present invention comprises the following steps:

[0051] The first step is to obtain the data of the power grid engineering construction project group: obtain the data of the power grid engineering construction project group, which is the secondary key indicator data extracted from the four aspects of progress management capability E1, quality management capability E2, cost management capability E3 and collaborative management capability E4.

[0052] In practical applications, in order to scientifically evaluate the performance of power grid project groups, it is necessary to establish a comprehensive and systematic evaluation index system. Combined with the characteristics of power grid project construction, the project group is evaluated from four aspects: schedule management capability, quality management capability, cost management capability, and other management capabilities. The four aspects are subdivided and secondary key indicators are extracted. The specific explanation is as follows.

[0053] (1) Schedule management capability. Construction project groups have a long cycle. If effective schedule management is not carried out, they will be terminated during the planning or implementation process. Therefore, the schedule management of project groups should be strengthened. Project group schedule management mainly includes schedule planning, schedule change control, and schedule completion rate. Schedule control requires monitoring the progress of each project during the implementation phase and comparing it with the project group schedule. When the progress shows a trend of deviation, corrective measures should be taken in a timely manner to ensure the realization of the project schedule.

[0054] (2) Quality management capability. Construction project groups are large in scale and interrelated with each other. Any quality problem in each project may cause the failure of the entire project group. Therefore, construction project groups should pay more attention to quality management. This study divides project group quality management into quality planning, quality monitoring and improvement, and engineering quality rate. Project group quality control regularly checks the quality completion of the project group through project quality self-inspection and joint inspection, timely discovers potential or existing quality problems and solves them in a timely manner to ensure the quality of the project group.

[0055] (3) Cost management capability. Project groups are prone to cost overruns. In order to achieve the goal of minimizing the cost of the entire project group throughout its life cycle, it is necessary to strengthen the cost management of the project group. Project group cost management is mainly divided into cost budgeting, cost change control, budget execution rate and other aspects. On the one hand, project group cost control requires monitoring the cost execution of each project, timely discovering cost deviations and taking corrective measures. On the other hand, cost control must be coordinated with the progress and quality management of the project group, and timely adjustments must be made according to changes in progress and quality execution.

[0056] (4) Collaborative management capabilities. The collaborative management capabilities of a project group mainly include goal coordination capabilities, resource coordination capabilities, organizational coordination capabilities, information coordination capabilities, and system coordination capabilities. Goal coordination emphasizes that the success of a project group is the common success of a group of projects rather than just the success of individual projects. It requires consistency in goals among projects to ensure the realization of the overall goals of the project group. Resource coordination requires that scarce resources be reasonably allocated among projects and achieve a dynamic balance so that resources can be used to the maximum extent and the strategic goals of the project group can be achieved. Organizational coordination emphasizes strengthening communication and coordination among organizations, enabling organizations to integrate with each other and take advantage of each other’s strengths to form consistency in actions and concepts among organizations. System coordination emphasizes the establishment of formal and lean general processes, performance appraisal and reward and punishment incentive systems, problem-solving and decision-making methods, etc., that is, establishing unified and streamlined processes and standardized systems.

[0057] The second step is to generate the evaluation factor set: apply the COWA operator to weight the indicators and determine the evaluation factor set W.

[0058] The characteristics of the COWA operator are: first, each score value is weighted, and then the weighted score values ​​are re-sorted in order from large to small and aggregated through weighted aggregation, and the weight is related to the i-th position in the order of the aggregation process, and they only consider the importance of the location of each data. The COWA operator is different from the WAA operator and the traditional OWA operator. It fully combines the two weight aggregation methods of attribute weighting and position weighting. It not only considers the importance of each data itself, but also reflects the importance of the location of the data, and extends the multi-attribute decision-making problem of determining numerical values ​​to the fuzzy field. Therefore, in practical applications, this operator can better reflect the actual situation. The specific steps are as follows:

[0059] (1) Obtain the importance scores of n experts in the database for the i-th indicator to form the original indicator decision data set A (a1, a2, ..., a n ), and arrange the elements of the original data set from small to large, denoted as B(b0,b1,...,b n-1 ), where b0≤b1≤b2≤...≤b n-1 .

[0060] (2) Calculate the weight vector w of the combination number of the original data of the indicator decision i+1 , and its calculation formula is as follows:

[0061]

[0062] in, The number of combinations of selecting i data from n-1 data, i = 0, 1, 2, ..., n-1.

[0063] (3) Calculate absolute weight The calculation formula is as follows:

[0064]

[0065] Among them, m is the number of indicators.

[0066] (4) Normalize the weights to get the final relative weight W j :

[0067]

[0068] (5) According to the relative weight W j Vector, combined with the given four first-level indicators of schedule management capability E1, quality management capability E2, cost management capability E3 and collaborative management capability E4 and the extracted second-level key indicator data, the evaluation factor set W is obtained.

[0069] The third step is to construct the evaluation matrix E: Apply the reverse cloud generator to construct the evaluation matrix E and obtain the digital features of each indicator cloud model (E x ,E n ,H e ).

[0070] Cloud models have been successfully applied to natural language processing, data mining, decision analysis, intelligent control, image processing and other fields. Cloud models can combine the fuzziness and randomness of qualitative concepts to form a conversion relationship between qualitative and quantitative. Currently, cloud models have a variety of distribution forms such as rectangular clouds, normal clouds, triangular clouds and trapezoidal clouds. The cloud model used in the evaluation of this invention is a normal cloud model based on Gaussian distribution.

[0071] Definition: Given a quantitative domain U, T is a qualitative concept in U space. If the membership degree C of a quantitative value x(x∈X) to T T (x)∈[0,1] is a random number with a stable tendency, as shown in the following formula. Then the distribution of the mapping of concept T from the domain U to the interval [0,1] in the number domain space becomes a cloud, and each x is a cloud droplet.

[0072]

[0073] Usually, the expected E x 、Entropy E n and super entropy H e To reflect the overall "skeleton" of the cloud model, that is, the digital characteristics of the cloud model, abbreviated as C(E x ,E n ,H e ), where E xrepresents the mathematical expectation of the distribution of cloud droplets in the domain space; E n It represents the measure of uncertainty of qualitative concepts. The larger the entropy, the more macroscopic the concept. e It is a measure of entropy uncertainty. The more acceptable a concept is, the smaller its super entropy is. The more difficult it is to reach a consensus on a concept, the larger its super entropy is. Figure 2 This is the cloud image of the cloud model C=(0.5, 0.2, 0.03).

[0074] The specific steps to construct the evaluation matrix E are as follows:

[0075] (1) Calculate the sample mean E of the data x , which is the expectation and variance S of the cloud droplets 2 , E x is the expected formula of cloud droplets, n represents the number of samples, x i represents the data value of the i-th sample,

[0076]

[0077]

[0078] (2) Calculate the entropy E of cloud droplets using the sample mean n , and its calculation formula is as follows:

[0079]

[0080] (3) Using the sample variance S 2 and entropy E n Calculate the super entropy H e , output digital features (E x ,E n ,H e ),

[0081]

[0082] (4) Calculate the numerical characteristics of each secondary indicator (E x ,E n ,H e ), thus forming the evaluation matrix E.

[0083] The fourth step is to construct the comprehensive evaluation matrix I: apply the comprehensive cloud generator and obtain the cloud droplets of each sub-project of the project group based on it. Combine the weight of each indicator with the digital characteristics of the cloud model to construct the comprehensive evaluation matrix I and obtain the cloud droplets of each sub-project of the project group.

[0084] The basic algorithm in the cloud model is called a cloud generator. This evaluation uses three types of cloud generators: reverse cloud generator, comprehensive cloud generator, and forward cloud generator. The specific algorithms are as follows:

[0085] a) Reverse Cloud Generator

[0086] Calculate the sample mean E of the data x (i.e., the expectation of cloud droplets) and variance S 2 , where n represents the number of samples, x i Represents the data value of the i-th sample.

[0087]

[0088]

[0089] Using the sample mean E x Calculate the entropy E of cloud droplets n .

[0090]

[0091]

[0092] Using the sample variance S 2 and entropy E n Calculate the super entropy H e , output digital features (E x ,E n ,H e ).

[0093] b) Integrated cloud generator

[0094] Assume that any n normal clouds C1(E x1 ,E n1 ,H e1 )、C2(E x2 ,E n2 ,H e2 ), C n (E xn ,E nn ,H en ) and the constant w i (i=1,2,…,n), then the comprehensive cloud model C(E x ,E n ,H e ) can be calculated by the following formula:

[0095]

[0096]

[0097]

[0098] c) Forward Cloud Generator

[0099] First generate an expected value E n , the standard deviation is H e Normally distributed random number E n ′, and then generate an expected value E x , the standard deviation is Abs(E n ′) and calculate the cloud droplet membership: Finally, x is regarded as a cloud droplet of the qualitative concept corresponding to u. Repeat the above four steps until the required number of cloud droplets is generated.

[0100] The specific steps to construct the comprehensive evaluation matrix I are as follows:

[0101] (1) Assume that any n normal clouds C1(E x1 ,E n1 ,H e1 )、C2(E x2 ,E n2 ,H e2 ), C n (E xn ,E nn ,H en ) and the constant w i (i=1,2,…,n), then the comprehensive cloud model C(E x ,E n ,H e ) is calculated by the following formula:

[0102]

[0103]

[0104]

[0105] (2) After the above steps, the comprehensive cloud model C(E x ,E n ,H e ) is the comprehensive digital feature of a single sub-project in the project group, from which the cloud droplets of all sub-projects in the project group are calculated to form a comprehensive evaluation matrix I.

[0106] The fifth step is to generate the data evaluation cloud map of the power grid engineering construction project group: run the forward cloud generator through MATLAB software to output the digital features of the comprehensive cloud model in the form of a cloud map.

[0107] The present invention generates an evaluation cloud chart for a power grid engineering construction project group data, the project group data includes 29 sub-projects, compares and analyzes the expected goals of the project group with the realization status, and makes a judgment according to relevant scoring rules.

[0108] (1) Apply the COWA operator to weight the indicators and determine the evaluation factor set W.

[0109] The evaluation index set is determined based on the COWA operator, and the original data of the experts' scores are shown in Table 1.

[0110] Table 1 Original data table of expert ratings of indicator importance

[0111] index Expert 1 Expert 2 Expert 3 Expert 4 Expert 5 Expert 6 Schedule Planning E11 3 3.5 4.5 3.5 2.5 2 Schedule Change Control E12 5 4.5 4 4 3.5 4.5 Progress completion status E13 4 3.5 4.5 4.5 4 5 Quality Plan Construction E21 5 4 4.5 3.5 5 4 Quality Monitoring and Improvement E22 3.5 4 3 4.5 3 3 Project quality rate E23 2 2.5 3 1.5 2 1 Cost budget preparation E31 3.5 4 2.5 2 3 3.5 Cost Change Control E32 4 3.5 3 2.5 2 1.5 Budget execution rate E33 4.5 3.5 4 5 4 4.5 Resource coordination capability E41 1.5 2.5 2 1 1.5 2 Information collaboration capability E42 3 3.5 2.5 1.5 2 2.5 Target coordination capability E43 3.5 2 2.5 3 3.5 3 Institutional coordination capability E44 2 3 2.5 3 4 3 Organizational coordination ability E45 2.5 4 3 3.5 3 2.5

[0112] Arrange the elements of the original data in order from small to large, and obtain the weight of each indicator through the CWOA operator mentioned above. Table 2 shows the weight of each evaluation indicator.

[0113] Table 2 Evaluation index weight table

[0114] index E11 E12 E13 E21 E22 E23 E31 Weight 0.071 0.095 0.095 0.097 0.075 0.045 0.071 index E32 E33 E41 E42 E43 E44 E45 Weight 0.062 0.095 0.039 0.056 0.067 0.065 0.067

[0115] Because the above calculation is the weight of the secondary indicators, in order to facilitate the calculation of the cloud model, the weight of the secondary indicators above is weighted according to the classification of the primary indicators, and the weight of each secondary indicator under the primary indicator is calculated, and the weights of the primary indicators are 0.25, 0.25, 0.25, and 0.25 respectively.

[0116] Table 3 Evaluation index weights for input cloud model calculation

[0117] index E11 E12 E13 E21 E22 E23 E31 Weight 0.272 0.364 0.364 0.447 0.347 0.206 0.311 index E32 E33 E41 E42 E43 E44 E45 Weight 0.271 0.418 0.133 0.190 0.227 0.222 0.229

[0118] (2) Establish a project group evaluation set M.

[0119] According to the nature and degree of the evaluation indicators, they are divided into 5 levels. The evaluation set is M = {M1, M2, ..., M5}, where Mj is the score of the jth level, which are A (100 points-90 points), B (89 points-80 points), C (79 points-70 points), D (69 points-60 points), and E (below 60 points). The cloud digital features corresponding to these 5 levels are calculated by the following formula:

[0120]

[0121] In the formula, k is a constant, which indicates the uncertainty and randomness of the grading, and is determined by experts. This time, k = 0.03. The numerical distribution range of the evaluation grade and the corresponding cloud digital characteristics are shown in Table 4, where x represents the comprehensive score of the project group, and the grade evaluation cloud diagram is shown in Figure 3 shown.

[0122] Table 4 Evaluation grade table

[0123] grade Comprehensive score range <![CDATA[(E x ,E n ,H e )]]> A 90≤x≤100 (95.0,1.67,0.03) B 80≤x<90 (85.0,1.67,0.03) C 70≤x<80 (75.0,1.67,0.03) D 60≤x<70 (65.0,1.67,0.03) E 0≤x<60 (30.0,10.0,0.03)

[0124] (3) Apply the reverse cloud generator to construct the evaluation matrix E.

[0125] Taking a sub-project of project group A as an example, the expert scoring results are passed through the reverse cloud generator to output the final cloud digital features and construct the evaluation matrix E, as shown in Table 5.

[0126] Table 5 Evaluation matrix

[0127]

[0128]

[0129] (4) Apply the comprehensive cloud generator to construct the comprehensive evaluation matrix I, as shown in Table 6.

[0130] Table 6 Comprehensive evaluation matrix of a sub-project of Project Group A

[0131]

[0132] According to the above method, the cloud droplets of each sub-project of the project group can be obtained, as shown in Table 7 below.

[0133] Table 7 Comprehensive evaluation matrix of project group A

[0134]

[0135]

[0136] (5) Apply the forward cloud generator to output the project group cloud map, whose comprehensive cloud digital features are: (86.1, 0.38, 0.14). 86.1 represents the expected value of the comprehensive score of the project group, that is, the comprehensive score of the project group. At the same time, the degree of controversy among experts on the scores of each sub-project in this project group can be reflected by the entropy value, which is 0.38 in the form of a project group; the degree of uncertainty of the experts' own scores can be reflected by the super entropy, which is 0.14 in the form of a project group. The cloud model output results of the project group data are as follows Figure 4 shown.

[0137] The evaluation of the present invention improves and supplements the meaning of the success evaluation level based on the reference to the typical project success evaluation table, making it more targeted. The importance of the project has been more accurately and specifically reflected through empowerment, and the success level of the project is divided into five levels through a scoring system, as shown in Table 8.

[0138] Table 8 Project group success evaluation criteria

[0139]

[0140] Through the above method, the project group is evaluated, and the evaluation results are (86.1, 0.38, 0.14). With the help of the project group success evaluation method, within the range of 80≤x<90, the comprehensive evaluation level of the project group is B, indicating that the project group has achieved its main key goals and is basically successful.

[0141] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The above embodiments and descriptions only describe the principles of the present invention. The present invention may be subject to various changes and improvements without departing from the spirit and scope of the present invention. These changes and improvements fall within the scope of the present invention. The scope of protection claimed by the present invention is defined by the attached claims and their equivalents.

Claims

1. A method for generating cloud charts for data evaluation of power grid construction project groups based on COWA operator and cloud model. It is characterized in that The following steps are involved: 11) Acquisition of power grid engineering construction project group data: Acquisition of power grid engineering construction project group data, which is secondary key indicator data extracted from four aspects: schedule management capability E1, quality management capability E2, cost management capability E3 and collaborative management capability E4; 12) Generation of evaluation factor set: Apply COWA operator to weight the indicators and determine the evaluation factor set W; The generation of the evaluation factor set comprises the following steps: 121) Obtain the importance scores of n experts in the database for the i-th indicator to form the original indicator decision data set A(a 1 ,a 2 ,K,a n ), and arrange the elements of the original data set from small to large, denoted as B(b 0 ,b 1 ,K,b n-1 ), where b 0 ≤ b 1 ≤ b 2 ≤K≤b n-1 ; 122) Calculate the weight vector w of the combination number of raw data of indicator decision i+1 , and its calculation formula is as follows: in, The number of combinations of selecting i data from n-1 data, i = 0, 1, 2, K, n-1; 123) Calculate absolute weight The calculation formula is as follows: Among them, m is the number of indicators; 124) Normalize the weights to get the final relative weight W j : 125) According to the relative weight W j Vector, combined with the given four first-level indicators of schedule management capability E1, quality management capability E2, cost management capability E3 and collaborative management capability E4 and the extracted second-level key indicator data, the evaluation factor set W is obtained; 13) Construct the evaluation matrix E: Use the reverse cloud generator to construct the evaluation matrix E and obtain the digital features of each indicator cloud model (E x ,E n ,H e ); The construction of the evaluation matrix E comprises the following steps: 131) Calculate the sample mean E of the data x , which is the expectation and variance S of the cloud droplets 2 , E x is the expected formula of cloud droplets, n represents the number of samples, x i represents the data value of the i-th sample, 132) Calculate the entropy E of cloud droplets using sample mean n , and its calculation formula is as follows: 133) Using the sample variance S 2 and entropy E n Calculate the super entropy H e , output digital features (E x ,E n ,H e ), 134) Calculate the numerical characteristics of each secondary indicator (E x ,E n ,H e ), thereby forming an evaluation matrix E; 14) Constructing the comprehensive evaluation matrix I: Applying the comprehensive cloud generator, and obtaining the cloud droplets of each sub-project of the project group, combining the weights of each indicator with the digital characteristics of the cloud model, constructing the comprehensive evaluation matrix I, and obtaining the cloud droplets of each sub-project of the project group; The construction of the comprehensive evaluation matrix I comprises the following steps: 141) Assume that there are any n normal clouds C 1 (E x1 ,E n1 ,H e1 ), C 2 (E x2 ,E n2 ,H e2 ), C n (E xn ,E nn ,H en ) and the constant w i (i=1,2,L,n), then the comprehensive cloud model C(E x ,E n ,H e ) is calculated by the following formula: 142) After the above steps, the comprehensive cloud model C(E x ,E n ,H e ) is the comprehensive digital feature of a single sub-project in the project group, from which the cloud droplets of all sub-projects in the project group are calculated to form a comprehensive evaluation matrix I; 15) Generation of data evaluation cloud map for power grid engineering construction project group: Run the forward cloud generator through MATLAB software to output the digital features of the comprehensive cloud model in the form of cloud map.

Citation Information

Patent Citations

  • Construction engineering project cluster establishment method introducing cloud model for evaluation and selection

    CN105046453A

  • Power distribution network project financing lease risk assessment method

    CN106780117A

  • Quantitative evaluation method for cost rationality of intelligent transformer station

    CN107292503A