Double prestressed beam and construction method thereof

By using H-shaped perforated steel plate connectors and double prestressed construction methods in precast steel concrete beams, the problems of prestress loss and insufficient crack resistance in traditional prestressed construction are solved, and higher crack resistance and durability are achieved. performance while reducing material costs.

CN114293709BActive Publication Date: 2024-10-01XI'AN UNIVERSITY OF ARCHITECTURE AND TECHNOLOGY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210044170.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-01-14
Publication Date
2024-10-01
Estimated Expiration
2042-01-14

AI Technical Summary

Technical Problem

Traditional prestressed construction methods have strict requirements on tension control stress, which can easily cause cracking of precast beams and loss of prestress. Flexible connectors are severely deformed under the action of longitudinal shear, resulting in serious loss of prestress.

Method used

H-shaped perforated steel plate connectors are used as flexible connectors to increase the concrete pressure-bearing area, and a double prestressed beam structure is used, in which the prefabricated part and the cast-in-place part are combined. Double prestressing is applied through the cooperation of auxiliary section steel and section steel, using H-shaped perforated steel plate connectors and reinforced concrete tenons resist longitudinal shear and prevent concrete from lifting.

Benefits of technology

Effectively reduce prestress loss, enhance crack resistance, improve durability during use, reduce material costs, avoid cracking and reverse arching during the prefabrication stage, and improve stress performance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114293709B_ABST
    Figure CN114293709B_ABST
Patent Text Reader

Abstract

A double prestressed beam mainly includes two parts: a prefabricated part and a cast-in-place part. The prefabricated part is manufactured in a factory and includes steel sections, prestressed tendons, longitudinal reinforcements, stirrups, shear bolts, H-shaped perforated steel plate connectors and precast concrete. During the manufacturing process, a vertical load is first applied to the steel sections to cause a certain degree of bending deformation, and then the prefabricated concrete is poured and cured. When the concrete reaches a certain strength, it is unloaded and the auxiliary steel sections are removed. The shrinkage of the lower steel sections applies the first prestress to the concrete; however, due to the constraint of the concrete, the deformation of the lower steel sections cannot be completely restored and there is still a certain degree of deflection. At this time, the prestressed tendons are tensioned to completely restore the deformation, and the second prestress is applied to the concrete due to the action of the prestressed tendons. The present invention applies double prestress to the concrete successively only by changing the construction process, which greatly improves the cracking load and the durability during the use stage.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of construction, and in particular relates to a double prestressed beam and a construction method thereof. Background Art

[0002] Partially prefabricated steel-concrete beams combine the good mechanical properties of steel-concrete and the advantages of prefabricated assembly structures in construction. They have the characteristics of high mechanization, easy quality control, simple on-site procedures and time saving. However, their crack resistance is average. Some scholars have combined prestressing technology with partially prefabricated steel-concrete to apply prestress to the prefabricated part during the prefabrication stage. However, the traditional prestressing construction method has extremely strict requirements on tension control stress. If the tension stress is not properly controlled, it will cause tensile cracking on the upper edge of the prefabricated beam and beam arching. In addition, the lower part of the traditional composite beam often uses studs to resist the longitudinal shear force. As a flexible connector, the studs will undergo large deformation under the action of the longitudinal shear force, and the prestress loss is relatively serious. Summary of the invention

[0003] In order to overcome the shortcomings of the above-mentioned prior art, the purpose of the present invention is to provide a double prestressed beam and a construction method thereof, which uses an H-shaped perforated steel plate connector to solve the problem of serious prestress loss in the flexible connector. It has greater rigidity and can effectively restrain the concrete and reduce the loss of prestress; the H-shaped end flange increases the concrete bearing area and can effectively prevent the phenomenon of local crushing damage to the prestressed concrete; the reinforced concrete tenon can effectively resist the longitudinal shear force and has the function of preventing the concrete from lifting, which is equivalent to the function of the large head part in the bolt

[0004] In order to achieve the above object, the technical solution adopted by the present invention is:

[0005] A double prestressed beam comprising a prefabricated part and a cast-in-place part wherein:

[0006] The prefabricated part includes a steel section, and a plurality of longitudinal bars and a plurality of open stirrups are arranged around the steel section. The length direction of the longitudinal bars is parallel to the length direction of the steel section and is perpendicular to the plane where each open stirrup is located. The open stirrups are opened above the upper flange of the steel section, and the opening is bent and extended outward horizontally. Each open stirrup is overlapped with each longitudinal bar respectively. The precast concrete covers the lower flange of the steel section and part of the web. Prestressed bars are arranged through the precast concrete, and the prestressed bars are respectively located on both sides of the steel section web.

[0007] The cast-in-place part includes negative reinforcement of the slab support and cast-in-place concrete. The negative reinforcement of the slab support is arranged above the upper flange of the steel section. The negative reinforcement of the slab support is overlapped with the longitudinal reinforcement located at the upper flange of the steel section and the horizontal bent extension part of the end of the open stirrup. The cast-in-place concrete casts the negative reinforcement of the slab support, the upper flange of the steel section and the precast concrete into one.

[0008] In one embodiment, the cross-sectional width of the cast-in-place part is greater than the cross-sectional width of the steel section, and the cross-sectional width of the double prestressed beam is T-shaped.

[0009] In one embodiment, a plurality of H-shaped perforated steel plate connectors are welded to the outer side of the lower flange of the steel section, the web of the H-shaped perforated steel plate connector is parallel to the web of the steel section, and the flange is perpendicular to the flange of the steel section. The H-shaped perforated steel plate connector is a circular hole opened at the web position of the H-shaped steel plate, and a steel bar is passed through the circular hole and fixed on the open stirrup.

[0010] In one embodiment, the negative reinforcement of the slab support is composed of multiple layers, each layer is composed of crisscrossed steel bars, and the transverse reinforcement of one layer serves as the sealing part of the upper part of the open stirrups, and the number and position match the open stirrups.

[0011] In one embodiment, a stiffening rib 1 perpendicular to the web is welded on the web of the steel section, and circular holes 3 are opened on the stiffening rib 1, and embedded pipes pass through each of the circular holes 3, and the embedded pipes are used to penetrate the prestressed tendons; a circular hole 2 is opened on the web of the steel section, and a steel bar 2 passes through the circular hole 2 and is fixed on the open stirrup.

[0012] In one embodiment, a bolt hole is opened on the upper flange of the steel section, and a shear bolt is installed on the bolt hole. The shear bolt consists of nut 1, nut 2 and a double-threaded hole bolt. Nut 1 and nut 2 are respectively located below and above the upper flange of the steel section.

[0013] The present invention also provides a construction method of the double prestressed beam, comprising the following steps:

[0014] Step 1), in the factory, the auxiliary steel and the steel are first processed and formed, and then the auxiliary steel is placed above the steel, positioned and fixed, and the steel bars are tied. A vertical load is applied to the upper part of the auxiliary steel to generate a certain deflection, and precast concrete is poured. After the precast concrete reaches the set strength, it is unloaded and the auxiliary steel is removed. At this time, the steel shrinks to generate the first prestress on the precast concrete;

[0015] Step 2), in the factory, due to the restraint of precast concrete, the deformation of the steel section cannot be completely restored and still has a certain deflection. At this time, the prestressed tendons are tensioned again to completely restore the deformation of the beam, thus completing the application of the second prestress;

[0016] Step 3), on site, the prefabricated parts are hoisted into position and fixed, the steel bars are tied, the formwork is supported and the cast-in-place concrete is poured.

[0017] In one embodiment, the auxiliary steel and the steel have exactly the same cross-section, and the position and number of the openings on their lower flanges correspond one-to-one to those on the upper flanges of the steel. The auxiliary steel and the steel are positioned and fixed with shear bolts. A stiffening rib 1 perpendicular to the web is welded on the web of the steel, and a stiffening rib 2 perpendicular to the web is welded on the web of the auxiliary steel. The positions of stiffening rib 1 and stiffening rib 2 are the same, and both are concentrated load action points. The shear bolts need to be installed twice and disassembled once during the prefabrication process. The first installation is used to fix the auxiliary steel and the steel. After the prefabricated concrete is cured to the set strength, the shear bolts are removed to separate the auxiliary steel from the steel. Then the removed shear bolts are installed again on the upper flange of the steel to resist longitudinal shear force and prevent concrete from being lifted during normal use.

[0018] In one embodiment, in step 1), the magnitude of the vertical load ensures that the steel section and the auxiliary steel section undergo only elastic deformation, and after the load is removed, the auxiliary steel section is completely restored to its original shape and can be repeatedly used as a permanent auxiliary component.

[0019] In one embodiment, the precast concrete is penetrated with prestressed tendons, which are prestressed steel strands and constructed by post-tensioning. During construction, the prestressed tendons are passed through the embedded pipes and tensioned at both ends. When the deformation of the beam is completely restored, the two ends of the prestressed tendons are fixed with anchors. The precast concrete is ultra-high performance concrete. After the pre-bending load is applied to the beam and a certain deflection is reached, the ultra-high performance concrete is poured. After the pouring is completed, it is steam-cured. The cast-in-place concrete is ordinary concrete. After the steel bars are tied and the formwork is supported, ordinary concrete is poured. After the pouring is completed, it is naturally cured.

[0020] Compared with the prior art, the present invention has the following beneficial effects:

[0021] 1. Significant benefits

[0022] The invention has a simple process and convenient materials, and the auxiliary steel and the lower steel adopt the same structure. Compared with the traditional prestressed steel concrete beam, under the premise of no increase in material cost, only the construction method is changed in the prefabrication stage, and the prestressing load is applied to the steel to obtain the double prestressing effect provided by the steel and the prestressed tendons, which greatly improves the cracking load and enhances the durability in the use stage. At the same time, the number of prestressed tendons in the traditional prestressed steel concrete beam can be reduced, which greatly saves costs.

[0023] 2. Reasonable force

[0024] The first-stage prestressing force of the present invention is provided by the restoring force of the steel section. Since the first-stage prestressing force needs to apply a preload to the steel section, after the precast concrete reaches a certain strength and releases the preload, the steel section is constrained by the precast concrete and cannot return to its original state and still has residual deflection deformation. At this time, the reverse arch effect generated by re-tensioning the prestressed tendons of the precast concrete offsets the residual deflection deformation caused by the first-stage preload, so that the steel section returns to its initial geometric state, which is convenient for the later "beam-beam" connection and "beam-column" connection installation. At the same time, the precast concrete at the web and bottom of the beam is subjected to the dual prestressing effect provided by the steel section and the prestressed tendons, and the force-bearing performance is greatly improved.

[0025] 3. Superior performance

[0026] The present invention adopts a composite beam prestressing construction process. Compared with directly applying the load to the lower steel section, this method can solve the problem of excessive deflection of the steel section under the action of the first-stage prestressing, and achieve the effect of small deflection and high stress. At the same time, since the position of the neutral axis is raised to the upper flange of the composite beam steel section, the effective prestressing area generated by the first-stage prestressing of the steel section is increased, and the crack resistance is greatly enhanced. The bonded prestress provided by the first-stage prestressed steel section improves the problem of concentrated cracks caused by the unbonded prestressing using only prestressed tendons. The double prestressing acts on the precast concrete part, which improves the force performance of the composite beam from the construction stage to the use stage.

[0027] 4. Small prestress loss

[0028] The present invention provides an H-shaped perforated steel plate connector for solving the problem of serious prestress loss in flexible connectors. The H-shaped steel plate connector has greater rigidity, can effectively restrain concrete, and reduce the loss of prestress; the H-shaped end flange increases the concrete bearing area, and can effectively prevent the phenomenon of local crushing damage of prestressed concrete; the reinforced concrete tenon can effectively resist longitudinal shear force, and has the function of preventing concrete from being lifted, which is equivalent to the function of the large head part of the bolt. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 It is a schematic diagram of the structure of the present invention.

[0030] Figure 2 It is a schematic diagram of reinforcement of the present invention.

[0031] Figure 3 It is a schematic diagram of applying a pre-compression load to a steel section according to the present invention.

[0032] Figure 4 It is a schematic diagram of pouring prefabricated concrete in the present invention.

[0033] Figure 5 It is a schematic diagram of the present invention after the auxiliary steel is removed.

[0034] Figure 6 It is a schematic diagram of the present invention after the prestressed tendons are tensioned.

[0035] Figure 7 It is a schematic diagram of the steel structure of the present invention.

[0036] Figure 8 It is a schematic diagram of the shear bolt of the present invention.

[0037] Fig. 9 It is a schematic diagram of disassembly of the shear bolt of the present invention.

[0038] Fig.10 It is a schematic diagram of the H-shaped perforated steel plate connecting piece of the present invention. DETAILED DESCRIPTION

[0039] The embodiments of the present invention are described in detail below with reference to the accompanying drawings and examples.

[0040] The invention relates to a double prestressed beam, comprising a prefabricated part and a cast-in-place part.

[0041] The prefabricated parts are made in the factory, such as Figure 1 to Figure 7 As shown, it includes a steel section 1, and a plurality of longitudinal bars 3 and a plurality of open stirrups 4 are arranged around the steel section 1. Among them, the longitudinal bars 3 are parallel to the length direction of the steel section 1 in the length direction, and are perpendicular to the plane where each open stirrup 4 is located. The open stirrups 4 can be arranged at equal intervals along the length direction of the steel section 1. The open stirrups 4 are opened above the upper flange of the steel section 1, and the opening is horizontally bent and extended outward for a distance, and each open stirrup 4 overlaps each longitudinal bar 3 respectively. For example, at the bottom, each longitudinal bar 3 is inside the open stirrup 4, and at the top, each longitudinal bar 3 is below the horizontally bent extension of the open stirrup 4, that is, outside the open stirrup 4. The precast concrete 7 covers the lower flange and part of the web of the steel section 1, that is, after the precast concrete 7 is poured, the upper flange and part of the web of the steel section 1 are located outside the precast concrete 7, which is used to ensure that the precast part concrete 7 and the cast-in-place part concrete 8 can be tightly combined. At the same time, a part of the open stirrup 4 is pre-embedded in the concrete 7, and a part is located outside the concrete 7. Prestressed tendons 2 are arranged through the precast concrete 7. The prestressed tendons 2 are respectively located on both sides of the web of the steel section 1. For example, the prestressed tendons 2 on both sides can be symmetrically arranged.

[0042] The cast-in-place part is completed on-site, including the slab support negative reinforcement 9 and cast-in-place concrete 8. The slab support negative reinforcement 9 is arranged above the upper flange of the steel section 1. The slab support negative reinforcement 9 is overlapped with the longitudinal reinforcement 3 located at the upper flange of the steel section 1 and the horizontal bent extension part of the end of the open stirrup 4. The cast-in-place concrete 8 casts the slab support negative reinforcement 9, the upper flange of the steel section 1 and the precast concrete 7 into one.

[0043] In the present invention, the cross-sectional width of the cast-in-place part is much larger than the cross-sectional width of the steel section 1, and the cross-sectional width of the double prestressed beam is T-shaped.

[0044] In one embodiment of the present invention, a plurality of H-shaped perforated steel plate connectors 6 are welded to the outer side of the lower flange of the steel section 1. The H-shaped perforated steel plate connectors 6 are rigid shear connectors, whose webs are parallel to the webs of the steel section 1 and whose flanges are perpendicular to the flanges of the steel section 1. For example, referring to Fig.10 The H-shaped perforated steel plate connector 6 is formed by opening a circular hole 19 at the web position of the H-shaped steel plate, and a steel bar 17 is passed through the circular hole 19 and fixed on the open stirrup 4.

[0045] In one embodiment of the present invention, the negative reinforcement 9 of the plate support is composed of multiple layers, each layer is composed of crisscrossed steel bars, and the transverse reinforcement of one layer is used as the sealing part of the upper part of the open stirrup 4, the number and position match the open stirrup 4, and cannot be disconnected at the plate support and a certain anchorage length should be ensured. When crossing the steel section 1, the corresponding transverse reinforcement is interrupted.

[0046] In one embodiment of the present invention, a stiffening rib 11 perpendicular to the web is welded on the web of the steel section 1, and a circular hole 3 15 is opened on the stiffening rib 11. The embedded pipe 13 passes through each circular hole 3 15. The embedded pipe 13 passes through the circular hole 3 15 and is fixed while the steel bars are tied. The embedded pipe 13 is used to penetrate the prestressed tendon 2. The lower part of the stiffening rib 11 can have a certain distance from the lower flange of the steel section 1, and the circular hole 3 15 can be lower than the center line of the web of the steel section 1. The web of the steel section 1 has a circular hole 20, and the through steel bar 2 18 passes through the circular hole 20 and is fixed on the open stirrup 4.

[0047] refer to Figure 8-Figure 9 In one embodiment of the present invention, a bolt hole 16 is formed on the upper flange of the steel section 1, and a shear bolt 5 is installed on the bolt hole 16. The shear bolt 5 is composed of a nut 1 21, a nut 22 and a double-threaded hole bolt 23. The nut 1 21 and the nut 22 are respectively located below and above the upper flange of the steel section 1. The shear bolt 5 is in a stressed state during disassembly, so it cannot be pulled out directly. During disassembly, the nut 1 21 should be removed first, and then the nut 22 should be rotated to a certain height, inserted into the U-shaped part 24, and the nut 22 should be fixed so that it does not move. The double-threaded hole bolt 23 can be rotated counterclockwise to complete the disassembly. Specifically, the inner diameter of the U-shaped part 24 is slightly larger than the diameter of the smooth screw of the double-threaded hole bolt 23, and it needs to be temporarily fixed with a pin 25 after being inserted into the U-shaped part 24.

[0048] The specific construction method of the double prestressed beam of the present invention is:

[0049] Step 1, in the factory, first process and shape the auxiliary steel 10 and the lower steel 1, then use shear bolts 5 to position and fix the auxiliary steel 10 and the lower steel 1, tie the steel bars, apply vertical load on the upper part of the auxiliary steel 10 and generate a certain deflection, pour concrete 7, and unload the concrete 7 after it reaches a certain strength, remove the auxiliary steel 10, and at this time, the steel 1 shrinks to generate the first prestress on the concrete 7.

[0050] refer to Figure 3 The auxiliary steel section 10 of the present invention has the same cross section as the steel section 1, and the position and number of the openings on its lower flange correspond to those on the upper flange of the steel section 1. As a temporary component in the prefabrication process, it is only used to apply a preload. Since the deformation is always within the elastic range, it can be reused as a permanent auxiliary component. Therefore, the size of the vertical load should ensure that the steel section 1 and the auxiliary steel section 10 only undergo elastic deformation. After the load is removed, the deformation of the auxiliary steel section 10 is completely restored and can be repeatedly used as a permanent auxiliary component.

[0051] Specifically, the auxiliary steel section 10 is processed in the same manner as the steel section 1, the opening positions are both on the single-side flange, and the size and position of the holes are exactly the same. A stiffening rib 12 is required to be provided on the auxiliary steel section 10. The stiffening rib 12 is perpendicular to the web, and its position is the same as that of the stiffening rib 11 on the steel section 1, and both are concentrated load application points.

[0052] Specifically, the precast concrete 7 uses ultra-high performance concrete. After a pre-bending load is applied to the beam and a certain deflection is reached, the ultra-high performance concrete is poured. After the pouring is completed, it is steam-cured.

[0053] Step 2, in the factory, due to the restraining effect of the precast concrete 7, the deformation of the lower steel section 1 cannot be completely restored and still has a certain deflection. At this time, the prestressed tendons 2 are tensioned again to completely restore the deformation of the beam, thereby completing the application of the second prestress.

[0054] Specifically, the prestressed tendons 2 are inserted into the precast concrete 7. The prestressed tendons 2 are prestressed steel strands and are constructed by post-tensioning. During construction, the prestressed tendons 2 are passed through the embedded pipes 13 and tensioned at both ends. When the deformation of the beam is completely restored, the two ends of the prestressed tendons 2 are fixed with anchors 14.

[0055] Step 3, on site, the prefabricated part is hoisted, positioned and fixed, steel bars are tied, formwork is supported and concrete is poured 8. Specifically, the cast-in-place concrete 8 uses ordinary concrete, and ordinary concrete is poured after steel bars are tied and formwork is supported. After pouring, it is naturally cured.

[0056] During the prefabrication process, the shear bolts 5 need to be installed twice and removed once. The first installation is used to fix the auxiliary steel 10 and the steel 1. After the precast concrete 7 is cured to the set strength, the shear bolts 5 are removed to separate the auxiliary steel 10 from the steel 1. Then the removed shear bolts 5 are installed again on the upper flange of the steel to resist the longitudinal shear force and prevent the concrete from being lifted during normal use.

[0057] In summary, the prestressing construction process of the present invention can be divided into two stages: the prestressing in the first stage is provided by the steel section, firstly a vertical load is applied to the steel section and a certain deflection is generated, then concrete is poured, and the concrete is unloaded after being cured to a certain strength, and the concrete generates the first prestressing due to the shrinkage of the steel section; the prestressing in the second stage is provided by the prestressing tendons, which are tensioned by the post-tensioning method, and anchored when the deformation of the beam is completely restored, at which time the concrete generates the second prestressing. Compared with the traditional prestressing construction method, the result after the two prestressing does not cause the tensile cracking of the upper edge of the precast beam, the beam back arching and other phenomena, and there is no need to perform crack resistance verification in the precast stage.

Claims

1. A construction method for a double prestressed beam, the double prestressed beam comprising a prefabricated part and a cast-in-place part, the prefabricated part comprising a steel section (1), a plurality of longitudinal bars (3) and a plurality of open stirrups (4) are arranged around the steel section (1), the longitudinal bars (3) are parallel to the longitudinal direction of the steel section (1) in length direction, and are perpendicular to the plane where each open stirrup (4) is located, the open stirrups (4) are open above the upper flange of the steel section (1), the opening is bent outward horizontally and extends, each open stirrup (4) is overlapped with each longitudinal bar (3), a precast concrete (7) covers the lower flange and part of the web of the steel section (1), a prestressed bar (2) is arranged through the precast concrete (7), and the prestressed bar (2) is respectively located on both sides of the web of the steel section (1); The cast-in-place part comprises a slab support negative reinforcement (9) and cast-in-place concrete (8), wherein the slab support negative reinforcement (9) is arranged above the upper flange of the profile steel (1), the slab support negative reinforcement (9) overlaps with the longitudinal reinforcement (3) located at the upper flange of the profile steel (1) and the horizontally bent extension portion of the end of the open stirrup (4), and the cast-in-place concrete (8) casts the slab support negative reinforcement (9), the upper flange of the profile steel (1) and the precast concrete (7) into one body; It is characterized in that The construction method includes the following steps: Step 1), in the factory, the auxiliary steel section (10) and the steel section (1) are first processed and formed, and then the auxiliary steel section (10) is placed above the steel section (1), positioned and fixed, and the steel bars are tied, and a vertical load is applied to the upper part of the auxiliary steel section (10) to generate a certain deflection, and the precast concrete (7) is poured. After the precast concrete (7) reaches a set strength, it is unloaded and the auxiliary steel section (10) is removed. At this time, the steel section (1) shrinks to generate a first prestress on the precast concrete (7); Step 2), in the factory, due to the restraining effect of the precast concrete (7), the deformation of the steel section (1) cannot be completely restored and still has a certain deflection. At this time, the prestressed tendons (2) are tensioned again to completely restore the deformation of the beam, thus completing the application of the second prestress; Step 3), on site, the prefabricated parts are hoisted, positioned and fixed, steel bars are tied, formwork is supported and cast-in-place concrete is poured (8).

2. The construction method of the double prestressed beam according to claim 1, It is characterized in that The cross-sectional width of the cast-in-place part is greater than the cross-sectional width of the steel section (1), and the cross-sectional width of the double prestressed beam is T-shaped.

3. The construction method of the double prestressed beam according to claim 1, It is characterized in that A plurality of H-shaped perforated steel plate connectors (6) are welded to the outer side of the lower flange of the steel section (1); the web of the H-shaped perforated steel plate connector (6) is parallel to the web of the steel section (1), and the flange is perpendicular to the flange of the steel section (1); the H-shaped perforated steel plate connector (6) is formed by opening a circular hole (19) at the web position of the H-shaped steel plate, and a steel bar (17) is passed through the circular hole (19) and fixed to the open stirrup (4).

4. The construction method of the double prestressed beam according to claim 1, It is characterized in that The slab support negative reinforcement (9) is composed of multiple layers, each layer is composed of crisscrossed steel bars, wherein the transverse reinforcement of one layer serves as the sealing part of the upper part of the open stirrup (4), and the number and position match the open stirrup (4).

5. The construction method of the double prestressed beam according to claim 1, It is characterized in that A stiffening rib (11) perpendicular to the web is welded on the web of the section steel (1); three circular holes (15) are formed on the stiffening rib (11); a pre-buried pipe (13) passes through each of the three circular holes (15); the pre-buried pipe (13) is used to penetrate the prestressed tendons (2); a second circular hole (20) is formed on the web of the section steel (1); a second through-steel bar (18) passes through the second circular hole (20) and is fixed on the open stirrup (4).

6. The construction method of the double prestressed beam according to claim 1, It is characterized in that The upper flange of the steel section (1) is provided with a bolt hole (16), and a shear bolt (5) is installed on the bolt hole (16). The shear bolt (5) is composed of a nut 1 (21), a nut 2 (22) and a double-threaded hole bolt (23). The nut 1 (21) and the nut 2 (22) are respectively located below and above the upper flange of the steel section (1).

7. The construction method of the double prestressed beam according to claim 1, It is characterized in that The auxiliary steel section (10) and the steel section (1) have the same cross section, and the position and number of the openings on the lower flange thereof correspond to those on the upper flange of the steel section (1). The auxiliary steel section (10) and the steel section (1) are positioned and fixed by shear bolts (5); a first stiffening rib (11) perpendicular to the web is welded to the web of the steel section (1); a second stiffening rib (12) perpendicular to the web is welded to the web of the auxiliary steel section (10); the first stiffening rib (11) and the second stiffening rib (12) are welded to the web of the auxiliary steel section (10); The positions are the same and are all concentrated load application points; the shear bolts (5) need to be installed twice and removed once during the prefabrication process. The first installation is used to fix the auxiliary steel section (10) and the steel section (1). After the prefabricated concrete (7) is cured to a set strength, the shear bolts (5) are removed to separate the auxiliary steel section (10) from the steel section (1). Then the removed shear bolts (5) are installed again on the upper flange of the steel section to resist the longitudinal shear force and prevent the concrete from being lifted during the normal use stage.

8. The construction method of the double prestressed beam according to claim 7, It is characterized in that In the step 1), the magnitude of the vertical load ensures that the steel section (1) and the auxiliary steel section (10) undergo only elastic deformation. After the load is removed, the auxiliary steel section (10) is completely restored to its original shape and can be repeatedly used as a permanent auxiliary component.

9. The construction method of the double prestressed beam according to claim 7, It is characterized in that Prestressed tendons (2) are inserted into the precast concrete (7), and the prestressed tendons (2) use prestressed steel strands and are constructed using a post-tensioning method. During construction, the prestressed tendons (2) are passed through a pre-buried pipe (13) and tensioned at both ends. After the deformation of the beam is completely restored, the two ends of the prestressed tendons (2) are fixed with anchors (14); the precast concrete (7) uses ultra-high performance concrete, and after a pre-bending load is applied to the beam and a certain deflection is reached, the ultra-high performance concrete is poured, and after the pouring is completed, it is steam-cured; the cast-in-place concrete (8) uses ordinary concrete, and after the steel bars are tied and the formwork is supported, the ordinary concrete is poured, and after the pouring is completed, it is naturally cured.