A cross-regional road infrastructure intelligent networking monitoring and supervision system
Through the cross-regional road infrastructure intelligent network monitoring and supervision system, distributed edge computing is used to process multi-parameter data and generate prioritized analysis results, solving the problems of information islands and slow data transmission in highway management, and achieving efficient supervision. and decision support.
Patent Information
- Application Number
- CN202210105679.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-01-28
- Publication Date
- 2024-10-08
- Estimated Expiration
- 2042-01-28
AI Technical Summary
In the existing technology, highway infrastructure management has information islands, inconsistent data standards, low digitalization level, and poor information interactivity, resulting in slow data transmission and processing speed, making it impossible to achieve real-time supervision and unified management.
An intelligent networked monitoring and supervision system for cross-regional road infrastructure is designed, including a monitoring module, a communication module, a cloud center and a decision-making module. It processes multi-parameter data through distributed edge computing, generates prioritized analysis results, and passes The decision-making module generates decision-making plans, and the display module is used to display the road network and decision-making plans.
It improves the response speed of the supervision system, reduces the calculation amount of the cloud center, improves the processing efficiency, provides a switching mode between a three-dimensional road network diagram and a two-dimensional plan diagram, and enhances the display effect and supervision efficiency.
Smart Images

Figure CN114363316B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the field of road supervision, and in particular relates to an intelligent networked monitoring and supervision system for cross-regional road infrastructure. Background Art
[0002] my country's expressways have basically achieved "network coverage". At the current stage, the digitalization of infrastructure mostly uses 2D GIS maps for data display, and rarely conducts in-depth application research based on the integration of construction and maintenance data and data management and analysis capabilities. The information in two-dimensional images is flat, and the horizontal and vertical correlations are weak, making it difficult to transmit data information to the stages of supervision, construction, and operation and maintenance.
[0003] In the process of highway management, there is an information island phenomenon. Different projects and professions use different information systems and databases. Moreover, the technical means between systems are different and the data standards are not unified, resulting in scattered information and lack of integrity. In addition, the traditional management solution has a low level of digitization, inaccurate accuracy, and poor information interactivity. Some infrastructure is just a simple ledger record, which brings certain difficulties to the subsequent maintenance management. It cannot form unified management and monitoring at the road network level, and cannot perform one-stop management. In addition, the existing road network-level management system has the problem of slow data transmission, which will cause the lag of key information. In addition, due to the large amount of data collected by the road network, the processing speed is slow and the efficiency of real-time supervision cannot be guaranteed. In the face of many problems existing in the existing technology, a method is urgently needed to solve them. Summary of the invention
[0004] The purpose of the present invention is to provide a cross-regional road infrastructure intelligent networking monitoring and supervision system to solve the problems existing in the above-mentioned prior art.
[0005] To achieve the above objectives, the present invention provides a cross-regional road infrastructure intelligent networking monitoring and supervision system, comprising:
[0006] Monitoring module, communication module, cloud center, decision module and display module;
[0007] The monitoring module is used to monitor multi-parameter data at different locations on a number of roads in the road network;
[0008] The communication module is used to pre-process the multi-parameter data and transmit it to the cloud center;
[0009] The cloud center is used to receive and analyze the pre-processed multi-parameter data to generate analysis results;
[0010] The decision module is used to generate several decision plans based on the analysis results, which are selected and executed by the staff;
[0011] The display module is used to display the road network and the decision-making plan.
[0012] Optionally, the monitoring module includes a vehicle speed monitoring module, a traffic volume monitoring module, a weather monitoring module, a road surface monitoring module, a toll station data monitoring module and a highway video monitoring module.
[0013] Optionally, the multi-parameter data includes vehicle speed data, traffic data, weather data, road surface data, toll station data and highway video data;
[0014] The traffic data includes the number of vehicles passing through the traffic volume monitoring module;
[0015] The road surface data includes the degree of road damage and the degree of road age;
[0016] The toll station data includes the vehicle's entrance toll station, the vehicle's exit toll station, the time of entering the highway and the time of exiting the highway;
[0017] The highway video data includes vehicle video data and ground video data.
[0018] Optionally, the communication module includes a data transceiver module and an edge computing module;
[0019] The edge computing module is used to process the received multi-parameter data based on distributed edge computing technology and prioritize the processed data;
[0020] The data transceiver module is used to receive and send the multi-parameter data, wherein the data is sent based on a priority level.
[0021] Optionally, the edge computing module includes a data processing module and a priority division module;
[0022] The data processing module is used to process the multi-parameter data, delete useless data therein, obtain a congestion index based on the vehicle speed data and the traffic data, obtain a meteorological index based on the meteorological data, and obtain a road surface index based on the road surface data;
[0023] The process of obtaining the congestion index includes: performing weighted average calculation on the traffic data and the vehicle speed data to obtain the average traffic volume and average vehicle speed per hour, and then obtaining the traffic congestion index by subtracting the average traffic volume from the preset traffic volume;
[0024] The priority classification module is used to prioritize the processed data, classifying the congestion index into a first-level priority, the meteorological index into a second-level priority, and the road surface index into a third-level priority, wherein the first-level priority has the highest priority.
[0025] Optionally, the cloud center includes a congestion analysis module, a meteorological analysis module, a road surface analysis module and an accident analysis module;
[0026] The congestion analysis module is used to generate a traffic congestion level based on the traffic congestion index, and to rank the traffic congestion indexes of all road sections in the road network based on different traffic congestion levels, wherein the traffic congestion levels include: unblocked, basically unblocked, light congestion, moderate congestion and severe congestion, and to calculate the expected congestion time and congestion length of the congested road section, the possibility of the congested road section causing congestion to its surrounding road sections in the road network, and the expected congestion level;
[0027] The meteorological analysis module is used to generate a meteorological grade based on the meteorological index, and is also used to generate a meteorological diffusion grade of the impact of the meteorological conditions of the current road section on the surrounding road sections and an estimated time to eliminate the impact;
[0028] The pavement analysis module is used to generate a pavement grade based on a pavement index, and is also used to generate an impact index of the pavement grade on other road sections in the road network and a congestion trend estimated based on historical data and the impact index;
[0029] The accident analysis module is used to conduct video verification of congested road sections according to the ranking of the congestion index to determine whether there is an accident. If an accident occurs, the accident attributes are determined and the geographical location of the accident is obtained. It is also used to predict the congestion time and congestion level caused by the accident based on the traffic data and the congestion index, and analyze the scope of the impact on other sections in the road network.
[0030] Optionally, the decision module includes a congestion elimination module, a maintenance module, a road section closure module and an accident handling module;
[0031] The congestion elimination module is used to traverse the surrounding roads in the road network based on the expected congestion time, the expected congestion length, the possibility of causing congestion to other surrounding road sections, and the expected congestion level, analyze feasible detour routes, and generate diversion detour decision plans. If there is no detour plan, the road section is marked as a road section to be expanded, the road section to be expanded is processed based on the congestion ranking, and a construction decision plan is generated based on the expansion funds and the impact of the expansion length on the surrounding roads;
[0032] The maintenance module is used to analyze the influence coefficient of the road surface grade on congestion in the congested road section, and if the influence coefficient is higher than a predetermined threshold, the corresponding road section is listed as a road section to be maintained, and a maintenance decision is generated based on the maintenance cost of the maintained road section and the influence coefficient of the maintained road section on the surrounding road sections.
[0033] The road section closing module is used to compare the meteorological level with a preset meteorological level threshold. If the meteorological level is greater than or equal to the preset meteorological level threshold, a road section closing plan is generated and future meteorological change patterns are predicted through meteorological information and measured meteorological data. The impact range and impact coefficient of the meteorological on the road network are determined according to the future meteorological change patterns. A decision to close the affected road section in advance is made according to the impact coefficient and impact range. The road section that is not affected by the meteorological weather at present is used as a detour section to be selected. The road section that will not be affected by the meteorological weather in the future is determined as a detour section to be selected in the future according to the time required to eliminate the meteorological impact. A detour decision plan is generated based on the detour sections to be selected and the detour sections to be selected in the future.
[0034] The accident handling module is used to generate a decision plan for mobilizing surrounding emergency resources and a decision plan for dispatching emergency personnel based on the accident attributes and the accident geographical location, and is also used to traverse feasible detour sections around the road where the accident location is located to generate several detour plans.
[0035] Optionally, the display module includes a two-dimensional road network display module, a three-dimensional road network display module, an analysis result display module, a two-dimensional and three-dimensional switching module and a decision preview module;
[0036] The two-dimensional road network display module is used to display a two-dimensional plan view of the road network;
[0037] The three-dimensional road network display module is used to display a three-dimensional stereogram of the road network, and is also used to display a three-dimensional stereogram of the lane level on the road section, the location of the lane occupied by the accident where the accident occurred, and the related lanes where congestion occurred;
[0038] The analysis result display module is used to display the congestion level, the weather level, the road level and the geographical location of the accident on the two-dimensional plane map and the three-dimensional stereogram respectively;
[0039] The two-dimensional and three-dimensional switching module is used to switch between a two-dimensional display mode and a three-dimensional display mode;
[0040] The decision preview module is used to display several decision solutions on the two-dimensional plane diagram and the three-dimensional stereogram.
[0041] Optionally, the three-dimensional road network display module includes a road history data collection module and a BIM construction module;
[0042] The road historical data collection module is used to collect historical data during the road construction process, and the historical data includes topographic and geomorphic survey data, cross-section data survey data, highway surrounding geological environment survey data and bridge and culvert hydrological data;
[0043] The BIM construction module is used to construct a three-dimensional road network map based on the historical data and the BIM model.
[0044] The technical effects of the present invention are:
[0045] The present invention provides a cross-regional road infrastructure intelligent networking monitoring and supervision system, which obtains multi-parameter data of roads in the road network through a monitoring module, and processes the multi-parameter data in advance through a communication module using distributed edge computing, sorts the generated results according to priority, and transmits them according to priority, so that data with high priority is transmitted first, thereby improving the response speed of the supervision system, and processing the data through distributed edge computing, reducing the amount of data while reducing the amount of calculation of the cloud center, improving the cloud center's data analysis speed, and improving processing efficiency. The decision module compares the preset standard and the actual parameter level collected, generates different decision plans for situations that do not meet the standards, and displays the decision plans on the display module for the convenience of staff to view and make decisions. The present invention also provides a mode for switching between a three-dimensional road network map and a two-dimensional plane road network map. When viewing the details of a road section with longitudinal overlap, the three-dimensional map is much better than the two-dimensional plane map, thereby improving the display effect. The two-dimensional plane map is more suitable for displaying macro information, and the staff can switch between three-dimensional and two-dimensional to view, thereby improving supervision efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0046] The drawings constituting a part of the present application are used to provide a further understanding of the present application. The illustrative embodiments and descriptions of the present application are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:
[0047] Figure 1 Schematic diagram of the structure of the embodiment of the present invention. DETAILED DESCRIPTION
[0048] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0049] It should be noted that the steps shown in the flowcharts of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and that, although a logical order is shown in the flowcharts, in some cases, the steps shown or described can be executed in an order different from that shown here.
[0050] like Figure 1 As shown, in this embodiment, a cross-regional road infrastructure intelligent networking monitoring and supervision system is provided, including:
[0051] Monitoring module, communication module, cloud center, decision module and display module;
[0052] The monitoring module is used to monitor multi-parameter data at different locations on several roads in the road network;
[0053] The communication module is used to pre-process the multi-parameter data and transmit it to the cloud center;
[0054] The cloud center is used to receive and analyze the pre-processed multi-parameter data and generate analysis results;
[0055] The decision-making module is used to generate several decision-making plans based on the analysis results, which are selected and executed by the staff;
[0056] The display module is used to display the road network and analysis results.
[0057] The monitoring modules in this embodiment may include a vehicle speed monitoring module, a traffic volume monitoring module, a weather monitoring module, a road surface monitoring module, a toll station data monitoring module and a highway video monitoring module.
[0058] The meteorological monitoring module includes a meteorological monitoring station and a network meteorological data acquisition module for acquiring meteorological data through a network channel;
[0059] Vehicle speed monitoring module, traffic volume monitoring module, weather monitoring module, road surface monitoring module and highway video monitoring module are installed on both sides of the highway;
[0060] The toll station data monitoring module is set at the toll station.
[0061] The multi-parameter data in this embodiment includes vehicle speed data, traffic data, weather data, road surface data, toll station data and highway video data;
[0062] The traffic data includes the number of vehicles passing through the traffic volume monitoring module;
[0063] Meteorological data include temperature and humidity, air pressure, wind speed, wind direction, rainfall and visibility;
[0064] Pavement data include the degree of pavement damage and pavement age;
[0065] Toll station data includes the vehicle’s entry toll station, vehicle’s exit toll station, time of entering the expressway, and time of exiting the expressway;
[0066] The highway video data includes vehicle video data and ground video data.
[0067] The communication module in this embodiment includes a data transceiver module and an edge computing module;
[0068] The edge computing module is used to process the received multi-parameter data based on distributed edge computing technology and prioritize the processed data;
[0069] The data transceiver module is used to receive and send multi-parameter data, wherein the data is sent based on the priority level.
[0070] The edge computing module includes a data processing module and a priority division module;
[0071] The data processing module is used to process the multi-parameter data, delete useless data, obtain the congestion index based on the vehicle speed data and the traffic data, obtain the meteorological index based on the meteorological data, and obtain the road surface index based on the road surface data;
[0072] The process of obtaining the congestion index includes: performing weighted average calculation on the traffic data and the vehicle speed data to obtain the average traffic volume and the average vehicle speed per hour, and then subtracting the average traffic volume from the preset traffic volume to obtain the traffic congestion index;
[0073] Pavement index includes smoothness, skid resistance and pavement condition index PCI;
[0074] The priority classification module is used to prioritize the processed data, classifying the congestion index into the first-level priority, the meteorological index into the second-level priority, and the road surface index into the third-level priority, among which the first-level priority has the highest priority.
[0075] The cloud center in this embodiment includes a congestion analysis module, a weather analysis module, a road surface analysis module, and an accident analysis module;
[0076] The congestion analysis module is used to generate traffic congestion levels based on the traffic congestion index, and to rank the traffic congestion indexes of all road sections in the road network based on different traffic congestion levels, where the traffic congestion levels include: smooth, basically smooth, light congestion, moderate congestion and severe congestion, and calculate the possibility of the congested road section causing congestion to its surrounding road sections in the road network and the estimated congestion degree;
[0077] The meteorological analysis module is used to generate meteorological grades based on the "Highway Traffic Meteorological Condition Grades" issued by the China Meteorological Administration and meteorological indexes, analyze meteorological impact coefficients based on propagation speed and meteorological grades, determine the impact on other roads in the road network based on the meteorological impact coefficients, and determine the estimated time to eliminate the impact based on the meteorological impact coefficients and the existing meteorological grades;
[0078] The pavement analysis module is used to generate pavement grades based on pavement indexes, analyze the impact coefficient of road sections with low pavement grades on other road sections in the road network, and estimate the future congestion trend of this road section based on historical data;
[0079] The accident analysis module is used to conduct video verification of congested road sections according to the ranking of the congestion index to determine whether an accident has occurred. If an accident has occurred, the accident attributes are determined and the geographical location of the accident is obtained. The video is a highway video collected by the highway video surveillance module, and the congestion time and congestion level that may be caused by the accident are calculated based on the traffic flow and congestion index, and the scope of the road section that is expected to be affected is determined.
[0080] The decision-making modules in this embodiment include a congestion elimination module, a maintenance module, a road section closure module, and an accident handling module;
[0081] The congestion elimination module is used to compare the applicable traffic volume of the road section with the actual traffic volume in a preset time period. If the quotient obtained is greater than 1, it means that this road section is often in a congested state. Such road sections are included in the sequence of congestion to be eliminated, and the influence coefficient of this road section on the surrounding road sections in the road network is calculated to determine whether this road section will cause congestion in other road sections. Other roads in the road network are traversed to analyze feasible detour sections and generate detour plans to eliminate congestion by diversion. If there is no detour plan, consider expanding the congested road, sort the roads to be expanded according to the traffic volume and congestion level in a period of time, and generate expansion suggestions according to the sorting. The expansion suggestions are generated based on the expansion funds and the expected impact of the expanded road on other road sections;
[0082] The congestion elimination module can also connect to the highway construction data in the engineering construction system and generate relevant decision-making plans based on the highway construction data;
[0083] The maintenance module is used to compare the road surface grade with the preset road surface grade threshold. If the road surface grade is less than or equal to the preset road surface grade threshold, it is listed as a road section to be maintained. A comprehensive maintenance decision is calculated based on the weight coefficient or priority of each parameter, the maintenance cost of the maintenance object, and the influence coefficient of the road section to be maintained on the traffic conditions of the surrounding sections, and a comprehensive road maintenance decision is generated for selection by the staff; for example, the road surface grade is sorted according to the correlation between the traffic volume and the congestion level. The maintenance priority of congestion caused by the road surface is high. The maintenance priorities of the same road sections are sorted according to the traffic volume. The maintenance priority of the road section with high traffic volume is high. After the road surface maintenance ranking is determined, the appropriate maintenance time is generated according to the traffic volume and congestion index of the specific road section within a period of time;
[0084] The maintenance module can also connect to the highway maintenance data in the road administration system and generate relevant decision-making plans based on the highway maintenance data;
[0085] The road section closing module is used to compare the meteorological level with a preset meteorological level threshold. If the meteorological level is greater than or equal to the preset meteorological level threshold, a road section closing plan is generated and future meteorological change patterns are predicted through meteorological information and measured meteorological data. The impact range and impact coefficient of the meteorological on the road network are determined according to the future meteorological change patterns. A decision to close the affected road section in advance is made according to the impact coefficient and impact range. The road section that is not affected by the meteorological weather at present is used as a detour section to be selected. The road section that will not be affected by the meteorological weather in the future is determined as a detour section to be selected in the future according to the time required to eliminate the meteorological impact. A detour decision plan is generated based on the detour sections to be selected and the detour sections to be selected in the future.
[0086] The road section closure module can also connect to the meteorological station to directly obtain relevant meteorological information of the highway network, and automatically determine whether it is necessary to close certain highway sections in the network based on the meteorological information;
[0087] The accident handling module is used to generate decision plans for mobilizing surrounding emergency resources and dispatching emergency personnel based on the accident attributes and geographical location. For example, after a traffic accident with casualties occurs, a decision plan is generated for dispatching medical staff, ambulances, traffic police and police cars. The road network around the accident location is traversed to generate several detour plans to avoid worsening congestion.
[0088] After the decision plan is generated, the final decision on which decision plan to choose lies in the hands of the relevant staff, and the system is only responsible for automatically generating decision plans.
[0089] The display module in this embodiment includes a two-dimensional road network display module, a three-dimensional road network display module, an analysis result display module, a two-dimensional and three-dimensional switching module and a decision preview module.
[0090] The two-dimensional road network display module is used to display the two-dimensional plan view of the road network, and the three-dimensional road network display module is used to display the three-dimensional stereoscopic view of the road network.
[0091] The analysis result display module is used to display the congestion level, weather level, road surface level and accident geographical location on a two-dimensional plane map and a three-dimensional stereogram respectively. The congestion level, weather level, road surface level and accident geographical location are displayed in different display methods, including displaying the analysis results in different colors, different patterns and different text labels. Taking the display of the congestion level as an example: severe congestion is displayed in red, moderate congestion is displayed in yellow, mild congestion is displayed in light yellow, basically unobstructed is displayed in green, and unobstructed is displayed as colorless, or severe congestion, moderate congestion and congestion are directly displayed in text on the relevant road sections, or the congestion status of the relevant road sections is marked with different patterns.
[0092] The two-dimensional and three-dimensional switching module is used to switch between the two-dimensional display mode and the three-dimensional display mode; the decision preview module is used to display several decision plans on the two-dimensional plane map and the three-dimensional stereogram.
[0093] The three-dimensional road network display module includes a road historical data collection module and a BIM construction module; the road historical data collection module is used to collect historical data during the road construction process, including topographic and geomorphic survey data, cross-section data survey data, highway surrounding geological environment survey data, and bridge and culvert hydrological data; the BIM construction module is used to construct a three-dimensional road network model based on historical data and BIM models. BIM technology realizes efficient management of road network information and optimal allocation of resources.
[0094] In addition, the display module can also display the analysis views of the cloud platform for multi-dimensional parallel analysis based on demand. The analysis views include statistical charts, statistical tables, single column charts, clustered column charts, stacked column charts and bubble charts.
[0095] The above is only a preferred specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any changes or substitutions that can be easily thought of by a person skilled in the art within the technical scope disclosed in the present application should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.
Claims
1. A cross-regional road infrastructure intelligent networking monitoring and supervision system, characterized in that: include: Monitoring module, communication module, cloud center, decision module and display module; The monitoring module is used to monitor multi-parameter data at different locations on a number of roads in the road network; The communication module is used to pre-process the multi-parameter data and transmit it to the cloud center; The cloud center is used to receive and analyze the pre-processed multi-parameter data to generate analysis results; The decision module is used to generate several decision plans based on the analysis results, which are selected and executed by the staff; The display module is used to display the road network and the decision-making plan; The cloud center includes a congestion analysis module, a weather analysis module, a road surface analysis module and an accident analysis module; The congestion analysis module is used to generate a traffic congestion level based on the traffic congestion index, and to rank the traffic congestion indexes of all road sections in the road network based on different traffic congestion levels, wherein the traffic congestion levels include: unblocked, basically unblocked, light congestion, moderate congestion and severe congestion, and to calculate the expected congestion time and expected congestion length of the congested road section, and the possibility and expected congestion level of the congested road section causing congestion to its surrounding road sections in the road network; The meteorological analysis module is used to generate a meteorological grade based on the meteorological index, and is also used to generate a meteorological diffusion grade of the impact of the meteorological conditions of the current road section on the surrounding road sections and an estimated time to eliminate the impact; The pavement analysis module is used to generate a pavement grade based on a pavement index, and is also used to generate an impact index of the pavement grade on other road sections in the road network and a congestion trend estimated based on historical data and the impact index; The accident analysis module is used to conduct video verification of congested road sections according to the ranking of the congestion index to determine whether there is an accident. If there is an accident, the accident attributes are determined and the geographical location of the accident is obtained. It is also used to estimate the congestion time and congestion level caused by the accident based on the traffic data and the congestion index, and analyze the scope of the impact on other road sections in the road network; The decision-making module includes a congestion elimination module, a maintenance module, a road section closure module and an accident handling module; The congestion elimination module is used to traverse the surrounding roads in the road network based on the expected congestion time, the expected congestion length, the possibility of causing congestion to other surrounding road sections, and the expected congestion level, analyze feasible detour routes, and generate diversion detour decision plans. If there is no detour plan, the road section is marked as a road section to be expanded, the road section to be expanded is processed based on the congestion ranking, and a construction decision plan is generated based on the expansion funds and the impact of the expansion length on the surrounding roads; The maintenance module is used to analyze the influence coefficient of the road surface grade on congestion in the congested road section, and if the influence coefficient is higher than a predetermined threshold, the corresponding road section is listed as a road section to be maintained, and a maintenance decision is generated based on the maintenance cost of the maintained road section and the influence coefficient of the maintained road section on the surrounding road sections. The road section closing module is used to compare the meteorological level with a preset meteorological level threshold. If the meteorological level is greater than or equal to the preset meteorological level threshold, a road section closing plan is generated and future meteorological change patterns are predicted through meteorological information and measured meteorological data. The impact range and impact coefficient of the meteorological on the road network are determined according to the future meteorological change patterns. A decision to close the affected road section in advance is made according to the impact coefficient and impact range. The road section that is not affected by the meteorological weather at present is used as a detour section to be selected. The road section that will not be affected by the meteorological weather in the future is determined as a detour section to be selected in the future according to the time required to eliminate the meteorological impact. A detour decision plan is generated based on the detour sections to be selected and the detour sections to be selected in the future. The accident handling module is used to generate a decision plan for mobilizing surrounding emergency resources and a decision plan for dispatching emergency personnel based on the accident attributes and the accident geographical location, and is also used to traverse feasible detour sections around the road where the accident location is located to generate several detour plans; The monitoring module includes a vehicle speed monitoring module, a traffic volume monitoring module, a weather monitoring module, a road surface monitoring module, a toll station data monitoring module and a highway video monitoring module; The multi-parameter data includes vehicle speed data, traffic data, weather data, road surface data, toll station data and highway video data; The traffic data includes the number of vehicles passing through the traffic volume monitoring module; The road surface data includes the degree of road damage and the degree of road age; The toll station data includes the vehicle's entrance toll station, the vehicle's exit toll station, the time of entering the highway and the time of exiting the highway; The highway video data includes vehicle video data and ground video data; The communication module includes a data transceiver module and an edge computing module; The edge computing module is used to process the received multi-parameter data based on distributed edge computing technology and prioritize the processed data; The data transceiver module is used to receive and send the multi-parameter data, wherein the data is sent based on a priority level; The edge computing module includes a data processing module and a priority division module; The data processing module is used to process the multi-parameter data, delete useless data therein, obtain a congestion index based on the vehicle speed data and the traffic data, obtain a meteorological index based on the meteorological data, and obtain a road surface index based on the road surface data; The process of obtaining the congestion index includes: performing weighted average calculation on the traffic data and the vehicle speed data to obtain the average traffic volume and average vehicle speed per hour, and then obtaining the traffic congestion index by subtracting the average traffic volume from the preset traffic volume; The priority classification module is used to classify the processed data into priorities, classifying the congestion index into a first-level priority, the weather index into a second-level priority, and the road surface index into a third-level priority, wherein the first-level priority has the highest priority; The display module includes a two-dimensional road network display module, a three-dimensional road network display module, an analysis result display module, a two-dimensional and three-dimensional switching module and a decision preview module; The two-dimensional road network display module is used to display a two-dimensional plan view of the road network; The three-dimensional road network display module is used to display a three-dimensional stereogram of the road network, and is also used to display a three-dimensional stereogram of the lane level on the road section, the location of the lane occupied by the accident where the accident occurred, and the related lanes where congestion occurred; The analysis result display module is used to display the congestion level, the weather level, the road level and the geographical location of the accident on the two-dimensional plane map and the three-dimensional stereogram respectively; The two-dimensional and three-dimensional switching module is used to switch between a two-dimensional display mode and a three-dimensional display mode; The decision preview module is used to display several decision solutions on the two-dimensional plane map and the three-dimensional stereogram; The three-dimensional road network display module includes a road history data collection module and a BIM construction module; The road historical data collection module is used to collect historical data during the road construction process, and the historical data includes topographic and geomorphic survey data, cross-section data survey data, highway surrounding geological environment survey data and bridge and culvert hydrological data; The BIM construction module is used to construct a three-dimensional road network map based on the historical data and the BIM model.
