Ground-based monitoring station deployment calculation method, device, equipment and readable storage medium
Through the combination of Qgis map, genetic algorithm and Monte Carlo method, the deployment plan of the foundation monitoring station is optimized, and the problems of solid limits and high cost in resource allocation of foundation monitoring network are solved, and the rationality and efficiency of deployment are improved. .
Patent Information
- Application Number
- CN202111617196.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-27
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2041-12-27
AI Technical Summary
When solving the problem of resource allocation of foundation monitoring networks for spatial targets, the limitations of fixed monitoring capabilities and high cost and low fault tolerance are not fully considered, and the theoretical deployment fails to fully consider uncontrollable factors under actual conditions, resulting in the deployment location. Insufficient rationality and optimality.
Using Qgis map as the simulation model, combining genetic algorithm and Monte Carlo method, the comprehensive situation of foundation monitoring network and spatial targets is constructed through the simulation engine, and iteratively optimizes the optimal deployment plan for generating foundation monitoring stations, and the number of foundation monitoring stations is preferred and Location.
The optimal solution optimization of the deployment of foundation monitoring stations has been achieved, monitoring capabilities and resource utilization have been improved, data is provided to support the site selection of foundation monitoring stations, and construction costs have been reduced.
Smart Images

Figure CN114372619B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of space target surveillance and survey, and in particular to a method, device, equipment and readable storage medium for calculating the deployment of a ground-based monitoring station. Background Art
[0002] At present, the key to solving the problem of resource allocation of ground-based monitoring network for space targets is to improve the detection accuracy and resource utilization of networking equipment as much as possible in the deployment of ground-based monitoring network, and give full play to the monitoring capability of ground-based monitoring network. Since the monitoring capability of the current ground-based monitoring network is fixed, if we verify whether the monitoring capability of space targets can be enhanced to the greatest extent by actually increasing the construction of ground-based monitoring stations, it will not only be very expensive, but also have a low fault tolerance and is difficult to change; and if we only rely on theory to verify the deployment location of ground-based monitoring stations, we fail to fully consider the impact of many uncontrollable factors under realistic conditions, and cannot fully represent the rationality and optimality of the value. Summary of the invention
[0003] The purpose of the present invention is to provide a ground-based monitoring station deployment calculation method, device, equipment and readable storage medium to improve the above-mentioned problems.
[0004] In order to achieve the above objectives, the present application provides the following technical solutions:
[0005] On the one hand, an embodiment of the present application provides a method for calculating the deployment of a ground-based monitoring station, the method comprising:
[0006] Acquire first data, second data, third data and fourth data, wherein the first data includes a Qgis map, the second data includes a ground-based monitoring station set, the ground-based monitoring station set includes location information of each ground-based monitoring station, the third data includes at least one piece of spatial target information, and the fourth data includes the number of deployment experiments, and each of the deployment experiments is independent of each other;
[0007] Building a ground-based monitoring network required for conducting each of the deployment experiments based on the first data, the second data, and the third data;
[0008] Using a genetic algorithm and a ground-based monitoring network required for each deployment experiment, a selection result of the ground-based monitoring station corresponding to each deployment experiment is calculated;
[0009] The Monte Carlo method is used to calculate the deployment plan of the ground-based monitoring station based on the selection result of the ground-based monitoring station corresponding to each of the deployment experiments and the fourth data.
[0010] Optionally, constructing a ground-based monitoring network required for performing each deployment experiment based on the first data, the second data, and the third data includes:
[0011] According to the second data, the ground-based monitoring station is added to the Qgis map in the form of a simulation model, and according to the third data, the space target is added to the Qgis map in the form of a simulation model;
[0012] When performing each of the deployment experiments, a first number of the ground-based monitoring stations are randomly selected to form a ground-based monitoring network required for performing each of the deployment experiments.
[0013] Optionally, the using of a genetic algorithm and a ground-based monitoring network required for performing each of the deployment experiments to calculate a selection result of the ground-based monitoring station corresponding to each of the deployment experiments includes:
[0014] driving the space target to move in orbit and driving the ground-based monitoring station in the ground-based monitoring network to monitor the space target, thereby obtaining the monitoring capability of the ground-based monitoring network;
[0015] The location information and number of the ground monitoring stations in the ground monitoring network are used as genetic factors, and the monitoring capability of the ground monitoring network is used as the benefit value. Evolution is performed through a genetic algorithm, and after the evolution is completed, the selection results of the ground monitoring stations corresponding to each deployment experiment are obtained.
[0016] Optionally, the driving the space target to move in orbit and driving the ground-based monitoring station in the ground-based monitoring network to monitor the space target to obtain the monitoring capability of the ground-based monitoring network includes:
[0017] Get the simulation step and simulation time period;
[0018] According to the simulation step, the simulation scenario is driven to run within the simulation time period, wherein the space target is driven to continuously change its current position with time, so that the space target can achieve on-orbit motion; the ground-based monitoring station in the ground-based monitoring network is driven to continuously monitor the position of the space target, so as to obtain the monitoring capability of the ground-based monitoring network.
[0019] Optionally, the using of a genetic algorithm and a ground-based monitoring network required for performing each of the deployment experiments to calculate a selection result of the ground-based monitoring station corresponding to each of the deployment experiments includes:
[0020] Obtaining the number of iteration terminations corresponding to the genetic algorithm and the number of times the current population is not updated continuously;
[0021] Gridding the Qgis map to obtain a gridded Qgis map;
[0022] The number and location information of the ground-based monitoring stations in the ground-based monitoring network on the gridded Qgis map are taken as a first population, and a first population objective function value corresponding to the first population is calculated;
[0023] Based on the genetic algorithm, performing selection, crossover and mutation operations on the first population in turn to iteratively generate a second population, and calculating a second population objective function value corresponding to the second population;
[0024] The difference between the objective function value of the second population and the objective function value of the first population is calculated to obtain a difference calculation result, and the difference calculation result is analyzed. If the difference calculation result is greater than 0, the first population is replaced by the second population until an iteration termination condition is reached, wherein the iteration termination condition includes that the number of iterations reaches the iteration termination number or the number of consecutive failures to update the current population exceeds the number threshold of consecutive failures to update the current population. After the iteration termination condition is reached, the final population is used as the selection result of the ground-based monitoring station.
[0025] Optionally, the using of the Monte Carlo method to calculate the deployment scheme of the ground-based monitoring station based on the selection result of the ground-based monitoring station corresponding to each of the deployment experiments and the fourth data includes:
[0026] Gridding the Qgis map to obtain a gridded Qgis map;
[0027] The selection results of the ground-based monitoring stations corresponding to each of the deployment experiments are clustered and analyzed in the form of grid merging of first-specification grids on the gridded Qgis map, wherein the probability of the selection results of the ground-based monitoring stations is estimated based on the frequency of their occurrence in the grids of the first specification, and the center coordinates of the grid of the first specification when the probability is maximized are used as the deployment plan of the ground-based monitoring stations, and the deployment plan includes the determined number of the ground-based monitoring stations and the deployment location information of each of the ground-based monitoring stations.
[0028] In a second aspect, an embodiment of the present application provides a ground-based monitoring station deployment calculation method, wherein the device includes an acquisition module, a first calculation module, a second calculation module, and a third calculation module.
[0029] An acquisition module, used for acquiring first data, second data, third data and fourth data, wherein the first data includes a Qgis map, the second data includes a ground-based monitoring station set, the ground-based monitoring station set includes location information of each ground-based monitoring station, the third data includes at least one piece of spatial target information, and the fourth data includes the number of deployment experiments, and each of the deployment experiments is independent of each other;
[0030] A first computing module, used for constructing a ground-based monitoring network required for performing each of the deployment experiments based on the first data, the second data and the third data;
[0031] A second calculation module is used to calculate the selection result of the ground-based monitoring station corresponding to each of the deployment experiments by using a genetic algorithm and the ground-based monitoring network required for each of the deployment experiments;
[0032] The third calculation module is used to calculate the deployment plan of the ground-based monitoring station by using the Monte Carlo method based on the selection result of the ground-based monitoring station corresponding to each of the deployment experiments and the fourth data.
[0033] Optionally, the first computing module includes:
[0034] an adding unit, configured to add the ground-based monitoring station to the Qgis map in the form of a simulation model according to the second data, and to add the space target to the Qgis map in the form of a simulation model according to the third data;
[0035] The selection unit is used to randomly select a first number of the ground-based monitoring stations to form a ground-based monitoring network required for each deployment experiment.
[0036] Optionally, the second computing module includes:
[0037] A monitoring unit, used for driving the space target to move on orbit and driving the ground-based monitoring station in the ground-based monitoring network to monitor the space target, so as to obtain the monitoring capability of the ground-based monitoring network;
[0038] The first calculation unit is used to use the location information and number of the ground monitoring stations in the ground monitoring network as genetic factors and the monitoring capability of the ground monitoring network as the benefit value, and to evolve through a genetic algorithm. After the evolution is completed, the selection results of the ground monitoring stations corresponding to each of the deployment experiments are obtained.
[0039] Optionally, the monitoring unit includes:
[0040] An acquisition subunit is used to acquire a simulation step and a simulation time period;
[0041] The monitoring subunit is used to promote the operation of the simulation scene within the simulation time period according to the simulation step size, wherein the space target is driven to continuously change its current position with the change of time so that the space target can achieve on-orbit motion; and the ground-based monitoring station in the ground-based monitoring network is driven to continuously monitor the position of the space target to obtain the monitoring capability of the ground-based monitoring network.
[0042] Optionally, the second computing module includes:
[0043] An acquisition unit, used to acquire the number of iteration terminations corresponding to the genetic algorithm and a threshold value of the number of times the current population is not updated continuously;
[0044] The first processing unit is used to grid the Qgis map to obtain a gridded Qgis map;
[0045] A second calculation unit is used to use the number and location information of the ground-based monitoring stations in the ground-based monitoring network on the gridded Qgis map as a first population, and calculate a first population objective function value corresponding to the first population;
[0046] a third calculation unit, configured to perform selection, crossover and mutation operations on the first population in sequence based on the genetic algorithm to iteratively generate a second population, and calculate a second population objective function value corresponding to the second population;
[0047] a fourth calculation unit, for performing difference calculation on the objective function value of the second population and the objective function value of the first population to obtain a difference calculation result, and analyzing the difference calculation result; if the difference calculation result is greater than 0, replacing the first population with the second population until an iteration termination condition is reached, wherein reaching the iteration termination condition includes the number of iterations reaching the iteration termination number or the number of consecutive failures to update the current population exceeding the threshold number of consecutive failures to update the current population; after reaching the iteration termination condition, the final population is used as the selection result of the ground-based monitoring station.
[0048] Optionally, the third calculation module includes:
[0049] The second processing unit is used to grid the Qgis map to obtain a gridded Qgis map;
[0050] The fifth computing unit is used to perform cluster analysis on the Qgis map after gridding processing on the selection results of the ground-based monitoring stations corresponding to each of the deployment experiments in the form of grid merging of the first specification, wherein the probability of the selection results of the ground-based monitoring stations is estimated based on the frequency of their occurrence in the grid of the first specification, and the center coordinates of the grid of the first specification when the probability is maximized are used as the deployment plan of the ground-based monitoring stations, and the deployment plan includes the determined number of the ground-based monitoring stations and the deployment location information of each of the ground-based monitoring stations.
[0051] In a third aspect, an embodiment of the present application provides a ground-based monitoring station deployment calculation device, the device comprising a memory and a processor. The memory is used to store a computer program; the processor is used to implement the steps of the above-mentioned ground-based monitoring station deployment calculation method when executing the computer program.
[0052] In a fourth aspect, an embodiment of the present application provides a readable storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the steps of the above-mentioned ground-based monitoring station deployment calculation method are implemented.
[0053] The beneficial effects of the present invention are:
[0054] 1. The present invention takes Qgis map as the basis of simulation model, uses the Monte Carlo method combined with genetic algorithm, and constructs the comprehensive situation of ground-based monitoring network and space targets through the driving of simulation engine. It continuously iterates and optimizes to generate the best solution for the deployment of ground-based monitoring stations, which is an effective way to solve the problem of resource allocation of ground-based monitoring network.
[0055] 2. After the user inputs the location information of some ground-based monitoring stations, the method of the present invention can be used to optimize these ground-based monitoring stations. The final deployment plan of the ground-based monitoring stations includes the number of ground-based monitoring stations and the final location information of these ground-based monitoring stations, wherein the final location information of the ground-based monitoring stations may be inconsistent with the location information initially input. The method of the present invention can be used to simulate the optimization process of the ground-based monitoring station deployment problem, provide data support for the site selection of the ground-based monitoring station, and combine with relevant theoretical knowledge to finally determine the construction location of the ground-based monitoring station.
[0056] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or be understood by implementing the embodiments of the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures particularly pointed out in the written description, claims, and drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0057] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.
[0058] Figure 1 It is a schematic diagram of the flow of the calculation method for ground-based monitoring station deployment described in an embodiment of the present invention;
[0059] Figure 2 It is a schematic diagram of the structure of the ground-based monitoring station deployment computing device described in an embodiment of the present invention;
[0060] Figure 3 It is a schematic diagram of the structure of the computing equipment deployed in the ground-based monitoring station described in an embodiment of the present invention. DETAILED DESCRIPTION
[0061] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, rather than all of the embodiments. The components of the embodiments of the present invention generally described and shown in the drawings here can be arranged and designed in various different configurations. Therefore, the following detailed description of the embodiments of the present invention provided in the drawings is not intended to limit the scope of the claimed invention, but merely represents selected embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0062] It should be noted that similar reference numerals or letters represent similar items in the following drawings, so once an item is defined in one drawing, it does not need to be further defined and explained in the subsequent drawings. At the same time, in the description of the present invention, the terms "first", "second", etc. are only used to distinguish the description and cannot be understood as indicating or implying relative importance.
[0063] Example 1
[0064] like Figure 1 As shown, this embodiment provides a ground-based monitoring station deployment calculation method, which includes step S1, step S2, step S3 and step S4.
[0065] Step S1, obtaining first data, second data, third data and fourth data, wherein the first data includes a Qgis map, the second data includes a ground-based monitoring station set, the ground-based monitoring station set includes location information of each ground-based monitoring station, the third data includes at least one spatial target information, and the fourth data includes the number of deployment experiments, and each deployment experiment is independent of each other;
[0066] Step S2, constructing a ground-based monitoring network required for each deployment experiment based on the first data, the second data and the third data;
[0067] Step S3, using a genetic algorithm and the ground-based monitoring network required for each deployment experiment, to calculate the selection result of the ground-based monitoring station corresponding to each deployment experiment;
[0068] Step S4: using the Monte Carlo method, based on the selection result of the ground-based monitoring station corresponding to each of the deployment experiments and the fourth data, calculate and obtain the deployment plan of the ground-based monitoring station.
[0069] In this embodiment, the user can determine the location information of each ground-based monitoring station and the location information of the spatial target in the spatial target information in a customized manner according to the needs; when constructing the ground-based monitoring network, the ground-based monitoring station is first added to the Qgis map in the form of a simulation model according to the location information of each ground-based monitoring station, and then the spatial target is added to the Qgis map in the form of a simulation model according to the location information of the spatial target included in the spatial target information;
[0070] In this embodiment, the number of deployment experiments can be customized according to user needs. In this embodiment, the number of deployment experiments is 200, and the process of performing each deployment experiment is as follows:
[0071] After adding the ground-based monitoring stations and the space targets to the Qgis map in the form of simulation models, a certain number of ground-based monitoring stations are randomly selected to form the ground-based monitoring network required for the deployment experiment;
[0072] According to the system simulation step, the simulation scene is driven to run within the set simulation time period; the space target is driven to continuously change its current position over time to achieve on-orbit motion; the ground-based monitoring station is driven to continuously detect the position of the space target on the Qgis map;
[0073] The selection result of the foundation monitoring station is obtained by using a genetic algorithm and a foundation monitoring network, wherein the location and number of the foundation monitoring station are used as genetic factors, and the monitoring capability of the foundation monitoring network is used as a benefit value. The deployment location of each foundation monitoring station in the foundation monitoring network is continuously optimized by using a genetic algorithm, and the overall monitoring capability of the foundation monitoring network is calculated until an optimal deployment solution is obtained, i.e., the selection result of the foundation monitoring station;
[0074] After 200 independent deployment experiments are carried out according to the above process, the selection results of 200 ground-based monitoring stations are obtained. Then, the final deployment plan of the ground-based monitoring stations can be obtained by using the Monte Carlo method and the selection results of these 200 ground-based monitoring stations.
[0075] This embodiment uses Qgis map as the simulation model basis, and uses a method combining Monte Carlo method and genetic algorithm to construct a comprehensive situation of both the ground-based monitoring network and the space target through the driving of the simulation engine. It continuously iterates and optimizes to generate the best solution for the deployment of ground-based monitoring stations, which is an effective way to solve the problem of resource allocation of the ground-based monitoring network.
[0076] When the user inputs the location information of some ground-based monitoring stations, the method of this embodiment can be used to optimize these ground-based monitoring stations. The final deployment plan of the ground-based monitoring stations includes the number of ground-based monitoring stations and the final location information of these ground-based monitoring stations, wherein the final location information of the ground-based monitoring stations may be inconsistent with the location information initially input. Through the method of this embodiment, the simulation of the optimization and solution process of the ground-based monitoring station deployment problem can be realized, providing data support for the site selection of the ground-based monitoring station, and combined with relevant theoretical knowledge, the construction location of the ground-based monitoring station can be finally determined.
[0077] In a specific implementation of the present disclosure, the step S2 may further include step S21 and step S22.
[0078] Step S21: adding the ground-based monitoring station to the Qgis map in the form of a simulation model according to the second data, and adding the space target to the Qgis map in the form of a simulation model according to the third data;
[0079] Step S22: When performing each of the deployment experiments, a first number of the ground-based monitoring stations are randomly selected to form a ground-based monitoring network required for performing each of the deployment experiments.
[0080] In this embodiment, a variety of different ground monitoring networks can be formed by random selection, and then the selection results of multiple ground monitoring stations can be obtained, and the final deployment plan of the ground monitoring stations can be obtained; at the same time, the first number can be customized according to user needs. In this embodiment, the first number is 50, that is, 50 ground monitoring stations are randomly selected to form a ground monitoring network.
[0081] In a specific implementation of the present disclosure, the step S3 may further include step S31 and step S32.
[0082] Step S31, driving the space target to move on orbit and driving the ground-based monitoring station in the ground-based monitoring network to monitor the space target, thereby obtaining the monitoring capability of the ground-based monitoring network;
[0083] Step S32: taking the location information and quantity of the ground monitoring stations in the ground monitoring network as genetic factors, and taking the monitoring capability of the ground monitoring network as the benefit value, and evolving through a genetic algorithm, after the evolution is completed, obtaining the selection result of the ground monitoring stations corresponding to each of the deployment experiments.
[0084] In a specific implementation of the present disclosure, the step S31 may further include step S311 and step S312.
[0085] Step S311, obtaining the simulation step length and simulation time period;
[0086] Step S312: according to the simulation step length, the simulation scene is driven to run within the simulation time period, wherein the space target is driven to continuously change its current position with the change of time so that the space target can achieve on-orbit motion; the ground-based monitoring station in the ground-based monitoring network is driven to continuously monitor the position of the space target to obtain the monitoring capability of the ground-based monitoring network.
[0087] In a specific implementation of the present disclosure, the step S3 may further include step S33, step S34, step S35, step S36 and step S37.
[0088] Step S33, obtaining the number of iteration terminations corresponding to the genetic algorithm and the number of times the current population is not updated continuously;
[0089] Step S34, gridding the Qgis map to obtain a gridded Qgis map;
[0090] Step S35, taking the number and location information of the ground-based monitoring stations in the ground-based monitoring network on the gridded Qgis map as the first population, and calculating the first population objective function value corresponding to the first population;
[0091] Step S36: Based on the genetic algorithm, perform selection, crossover and mutation operations on the first population in turn to iteratively generate a second population, and calculate a second population objective function value corresponding to the second population;
[0092] Step S37, calculate the difference between the second population objective function value and the first population objective function value to obtain a difference calculation result, analyze the difference calculation result, and if the difference calculation result is greater than 0, use the second population to replace the first population until the iteration termination condition is reached, and the iteration termination condition is reached, including the number of iterations reaching the iteration termination number or the number of consecutive failures to update the current population exceeding the number threshold of consecutive failures to update the current population. After the iteration termination condition is reached, the final population is used as the selection result of the ground-based monitoring station.
[0093] In this embodiment, the thresholds of the number of iteration terminations and the number of consecutive failures to update the current population corresponding to the genetic algorithm can be customized according to user needs;
[0094] The present embodiment is specifically as follows:
[0095] The Qgis map is gridded, the geographic longitude and latitude coordinates are converted into binary parameter grid coordinates, and the parameters are binary-encoded to obtain the gridded Qgis map; after the gridding, the location information of the ground-based monitoring station in the ground-based monitoring network is converted from the geographic longitude and latitude coordinate information into binary-encoded information, and then the number of the ground-based monitoring stations and the converted location information are used as the first population, and the first population objective function value corresponding to the first population is calculated; then based on the first population, the second population is obtained by using conventional technical means in the art, and then the second population objective function value corresponding to the second population is calculated;
[0096] The second population objective function value corresponding to the second population is subtracted from the first population objective function value corresponding to the first population to obtain a difference calculation result, wherein if the difference calculation result is greater than 0, the second population is accepted as the current population, and iterations are continuously performed according to this logic. When the population has not been updated, that is, the number of times the current population has not been updated continuously exceeds the threshold number of times the current population has not been updated continuously, the iteration is stopped, and the final population is used as the selection result of the ground-based monitoring station (for example, the threshold number of times the current population has not been updated continuously is 2 times. If the third population is obtained after the third iteration, the population is not updated after the fourth iteration, the population is not updated after the fifth iteration, and the population is not updated after the sixth iteration. At this time, the number of times the current population has not been updated continuously is 3 times, which has exceeded the threshold number of times the current population has not been updated continuously. In this case, the iteration is stopped, and the third population is used as the selection result of the ground-based monitoring station); if the population has been updated, the iteration is stopped when the number of iterations reaches the iteration termination number, and the final population is used as the selection result of the ground-based monitoring station;
[0097] In a method for calculating the maximum objective function value, the monitoring capability of the ground-based monitoring network can be used as the objective function to measure the fitness in the genetic algorithm, and the solution is solved with the constraint that the deployment latitude of the ground-based monitoring station must be less than the orbital inclination of the space target it monitors; wherein, when calculating the objective function, the five parameters of the responsibility area coverage, key area coverage, coverage strictness, joint detection accuracy and resource utilization corresponding to the current population (that is, the current ground-based monitoring network) can be obtained through each iteration, and then the five parameters of responsibility area coverage, key area coverage, coverage strictness, joint detection accuracy and resource utilization are respectively assigned weights (the weights can be customized according to user needs) and then linearly added to obtain the objective function, and the objective function is maximized through the genetic algorithm, aiming to achieve the three scheduling goals of the largest number of space targets successfully detected by the ground-based monitoring network, the highest observation quality, and the highest comprehensive priority;
[0098] Among them, the explanations of the five parameters of responsibility area coverage, key area coverage, coverage strictness, joint detection accuracy and resource utilization are:
[0099] Responsibility area coverage: For all space targets that need to be monitored in the mission, monitoring responsibility areas are demarcated according to their on-orbit motion space range. The larger the coverage of the ground-based monitoring network in the monitoring responsibility area, the stronger the monitoring capability of the space target;
[0100] Key area coverage: Key monitoring areas are set up according to the importance (priority) and distribution density of the space targets in the monitoring tasks. The larger the coverage of the ground-based monitoring network in the key monitoring area, the stronger the key monitoring capability of the space targets.
[0101] Coverage tightness: The reasonable overlapping coverage of the monitored space of each base monitoring station can ensure the tightness of the monitoring area coverage and achieve seamless connection of the monitoring area coverage;
[0102] Joint detection accuracy: The ground-based monitoring network is composed of the ground-based monitoring stations, and its detection accuracy of the space target is determined by the detection accuracy upper limit of the networked equipment and the detection accuracy distribution of each equipment, forming a joint detection accuracy;
[0103] Resource utilization: When meeting the monitoring task requirements, the scientific and reasonable deployment of the above-mentioned ground-based monitoring stations can reduce the degree of redundant coverage, save the detection resources of the ground-based monitoring network, and effectively improve resource utilization.
[0104] In a specific implementation of the present disclosure, the step S4 may further include step S41 and step S42.
[0105] Step S41, gridding the Qgis map to obtain a gridded Qgis map;
[0106] Step S42, clustering analysis is performed on the gridded Qgis map in the form of a grid merge of the first specification for the selection results of the ground-based monitoring stations corresponding to each of the deployment experiments, wherein the probability of the selection results of the ground-based monitoring stations is estimated based on the frequency of their occurrence in the grid of the first specification, and the center coordinates of the grid of the first specification when the probability is maximized are used as the deployment plan of the ground-based monitoring stations, and the deployment plan includes the determined number of the ground-based monitoring stations and the deployment location information of each of the ground-based monitoring stations.
[0107] In this embodiment, the selection results of 200 ground-based monitoring stations calculated by the above method are clustered and analyzed in the form of 10×10 grids on the gridded Qgis map, and their probabilities are estimated based on the frequencies of their appearance in the clustered grids. The center coordinates of the 10×10 clustered grids when the probability is maximized are taken as the optimal locations, i.e., the deployment plan of the ground-based monitoring stations.
[0108] Example 2
[0109] like Figure 2 As shown, this embodiment provides a ground-based monitoring station deployment computing device, which includes an acquisition module 701 , a first computing module 702 , a second computing module 703 and a third computing module 704 .
[0110] The acquisition module 701 is used to acquire first data, second data, third data and fourth data, wherein the first data includes a Qgis map, the second data includes a ground-based monitoring station set, the ground-based monitoring station set includes location information of each ground-based monitoring station, the third data includes at least one spatial target information, and the fourth data includes the number of deployment experiments, and each deployment experiment is independent of each other;
[0111] A first calculation module 702, configured to construct a ground-based monitoring network required for performing each of the deployment experiments based on the first data, the second data, and the third data;
[0112] The second calculation module 703 is used to calculate the selection result of the ground-based monitoring station corresponding to each deployment experiment by using a genetic algorithm and the ground-based monitoring network required for each deployment experiment;
[0113] The third calculation module 704 is used to calculate the deployment plan of the ground-based monitoring station by using the Monte Carlo method based on the selection result of the ground-based monitoring station corresponding to each of the deployment experiments and the fourth data.
[0114] This embodiment uses Qgis map as the simulation model basis, and uses a method combining Monte Carlo method and genetic algorithm to construct a comprehensive situation of both the ground-based monitoring network and the space target through the driving of the simulation engine. It continuously iterates and optimizes to generate the best solution for the deployment of ground-based monitoring stations, which is an effective way to solve the problem of resource allocation of the ground-based monitoring network.
[0115] In a specific implementation of the present disclosure, the first calculation module 702 further includes an adding unit 7021 and a selecting unit 7022 .
[0116] An adding unit 7021 is used to add the ground-based monitoring station to the Qgis map in the form of a simulation model according to the second data, and to add the space target to the Qgis map in the form of a simulation model according to the third data;
[0117] The selection unit 7022 is used to randomly select a first number of the ground-based monitoring stations to form a ground-based monitoring network required for each deployment experiment.
[0118] In a specific implementation of the present disclosure, the second calculation module 703 further includes a monitoring unit 7031 and a first calculation unit 7032 .
[0119] The monitoring unit 7031 is used to drive the space target to move on orbit and drive the ground-based monitoring station in the ground-based monitoring network to monitor the space target, so as to obtain the monitoring capability of the ground-based monitoring network;
[0120] The first calculation unit 7032 is used to use the location information and number of the ground-based monitoring stations in the ground-based monitoring network as genetic factors and the monitoring capability of the ground-based monitoring network as the benefit value, and to perform evolution through a genetic algorithm. After the evolution is completed, the selection result of the ground-based monitoring station corresponding to each of the deployment experiments is obtained.
[0121] In a specific implementation of the present disclosure, the monitoring unit 7031 further includes an acquisition subunit 70311 and a monitoring subunit 70312 .
[0122] An acquisition subunit 70311 is used to acquire a simulation step length and a simulation time period;
[0123] The monitoring subunit 70312 is used to promote the operation of the simulation scene within the simulation time period according to the simulation step size, wherein the space target is driven to continuously change its current position with the change of time so that the space target can achieve on-orbit motion; and the ground-based monitoring station in the ground-based monitoring network is driven to continuously monitor the position of the space target to obtain the monitoring capability of the ground-based monitoring network.
[0124] In a specific implementation of the present disclosure, the second calculation module 703 further includes an acquisition unit 7033 , a first processing unit 7034 , a second calculation unit 7035 , a third calculation unit 7036 and a fourth calculation unit 7037 .
[0125] An acquisition unit 7033 is used to acquire the number of iteration terminations corresponding to the genetic algorithm and the number of times the current population is not updated continuously;
[0126] The first processing unit 7034 is used to grid the Qgis map to obtain a gridded Qgis map;
[0127] The second calculation unit 7035 is used to use the number and location information of the ground-based monitoring stations in the ground-based monitoring network on the gridded Qgis map as a first population, and calculate a first population objective function value corresponding to the first population;
[0128] A third calculation unit 7036 is used to iteratively generate a second population by performing selection, crossover and mutation operations on the first population in sequence based on the genetic algorithm, and calculate a second population objective function value corresponding to the second population;
[0129] The fourth calculation unit 7037 is used to perform difference calculation on the objective function value of the second population and the objective function value of the first population to obtain a difference calculation result, and analyze the difference calculation result. If the difference calculation result is greater than 0, the first population is replaced by the second population until the iteration termination condition is reached, and the iteration termination condition is reached, including the number of iterations reaching the iteration termination number or the number of consecutive failures to update the current population exceeding the threshold number of consecutive failures to update the current population. After the iteration termination condition is reached, the final population is used as the selection result of the ground-based monitoring station.
[0130] In a specific implementation of the present disclosure, the third calculation module 704 further includes a second processing unit 7041 and a fifth calculation unit 7042 .
[0131] The second processing unit 7041 is used to grid the Qgis map to obtain a gridded Qgis map;
[0132] The fifth computing unit 7042 is used to perform cluster analysis on the gridded Qgis map in the form of a grid merge of the selection results of the ground-based monitoring stations corresponding to each of the deployment experiments, wherein the probability of the selection results of the ground-based monitoring stations is estimated based on the frequency of their occurrence in the grid of the first specification, and the center coordinates of the grid of the first specification when the probability is maximized are used as the deployment plan of the ground-based monitoring stations, and the deployment plan includes the determined number of the ground-based monitoring stations and the deployment location information of each of the ground-based monitoring stations.
[0133] It should be noted that, regarding the device in the above embodiment, the specific manner in which each module performs the operation has been described in detail in the embodiment of the method, and will not be elaborated here.
[0134] Example 3
[0135] Corresponding to the above method embodiments, the embodiments of the present disclosure further provide a ground-based monitoring station deployment computing device. The ground-based monitoring station deployment computing device described below and the ground-based monitoring station deployment computing method described above can be referenced to each other.
[0136] Figure 3 FIG. 8 is a block diagram of a ground-based monitoring station deployment computing device 800 according to an exemplary embodiment. Figure 3 As shown, the ground-based monitoring station deployment computing device 800 may include: a processor 801 and a memory 802. The ground-based monitoring station deployment computing device 800 may also include one or more of a multimedia component 803, an input / output (I / O) interface 804, and a communication component 805.
[0137] The processor 801 is used to control the overall operation of the ground-based monitoring station deployment computing device 800 to complete all or part of the steps in the above-mentioned ground-based monitoring station deployment computing method. The memory 802 is used to store various types of data to support the operation of the ground-based monitoring station deployment computing device 800, and these data may include, for example, instructions for any application or method operated on the ground-based monitoring station deployment computing device 800, and application-related data, such as contact data, sent and received messages, pictures, audio, video, etc. The memory 802 can be implemented by any type of volatile or non-volatile storage device or a combination thereof, such as static random access memory (SRAM), electrically erasable programmable read-only memory (EEPROM), erasable programmable read-only memory (EPROM), programmable read-only memory (PROM), read-only memory (ROM), magnetic memory, flash memory, disk or optical disk. The multimedia component 803 may include a screen and an audio component. The screen may be, for example, a touch screen, and the audio component is used to output and / or input audio signals. For example, the audio component may include a microphone for receiving external audio signals. The received audio signal may be further stored in the memory 802 or sent via the communication component 805. The audio component also includes at least one speaker for outputting audio signals. The I / O interface 804 provides an interface between the processor 801 and other interface modules, and the above-mentioned other interface modules can be keyboards, mice, buttons, etc. These buttons can be virtual buttons or physical buttons. The communication component 805 is used for wired or wireless communication between the ground-based monitoring station deployment computing device 800 and other devices. Wireless communication, such as Wi-Fi, Bluetooth, Near Field Communication (NFC), 2G, 3G or 4G, or a combination of one or more of them, so the corresponding communication component 805 can include: Wi-Fi module, Bluetooth module, NFC module.
[0138] In an exemplary embodiment, the ground-based monitoring station deployment computing device 800 can be implemented by one or more application-specific integrated circuits (ASIC), digital signal processors (DSP), digital signal processing devices (DSPD), programmable logic devices (PLD), field programmable gate arrays (FPGA), controllers, microcontrollers, microprocessors or other electronic components to execute the above-mentioned ground-based monitoring station deployment calculation method.
[0139] In another exemplary embodiment, a computer-readable storage medium including program instructions is also provided, and when the program instructions are executed by a processor, the steps of the above-mentioned ground-based monitoring station deployment calculation method are implemented. For example, the computer-readable storage medium can be the above-mentioned memory 802 including program instructions, and the above-mentioned program instructions can be executed by the processor 801 of the ground-based monitoring station deployment calculation device 800 to complete the above-mentioned ground-based monitoring station deployment calculation method.
[0140] Example 4
[0141] Corresponding to the above method embodiment, the embodiment of the present disclosure further provides a readable storage medium. The readable storage medium described below and the ground-based monitoring station deployment calculation method described above can refer to each other.
[0142] A readable storage medium stores a computer program, which, when executed by a processor, implements the steps of the ground-based monitoring station deployment calculation method of the above-mentioned method embodiment.
[0143] The readable storage medium may specifically be a U disk, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk, or other readable storage medium that can store program codes.
[0144] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. Calculation method for deployment of ground-based monitoring stations, It is characterized in that include: Acquire first data, second data, third data and fourth data, wherein the first data includes a Qgis map, the second data includes a ground-based monitoring station set, the ground-based monitoring station set includes location information of each ground-based monitoring station, the third data includes at least one piece of spatial target information, and the fourth data includes the number of deployment experiments, and each of the deployment experiments is independent of each other; Building a ground-based monitoring network required for conducting each of the deployment experiments based on the first data, the second data, and the third data; Using a genetic algorithm and a ground-based monitoring network required for each deployment experiment, a selection result of the ground-based monitoring station corresponding to each deployment experiment is calculated; Using the Monte Carlo method, based on the selection result of the ground-based monitoring station corresponding to each of the deployment experiments and the fourth data, a deployment plan of the ground-based monitoring station is calculated; The method of using a genetic algorithm and a ground-based monitoring network required for each deployment experiment to calculate the selection result of the ground-based monitoring station corresponding to each deployment experiment includes: driving the space target to move in orbit and driving the ground-based monitoring station in the ground-based monitoring network to monitor the space target, thereby obtaining the monitoring capability of the ground-based monitoring network; The location information and number of the ground-based monitoring stations in the ground-based monitoring network are used as genetic factors, and the monitoring capability of the ground-based monitoring network is used as the objective function. Evolution is performed through a genetic algorithm. After the evolution is completed, the selection result of the ground-based monitoring station corresponding to each deployment experiment is obtained. The objective function is the result of weighted summation of the responsibility area coverage, key area coverage, coverage strictness, joint detection accuracy and resource utilization corresponding to the current ground-based monitoring network; Wherein, driving the space target to move in orbit and driving the ground-based monitoring station in the ground-based monitoring network to monitor the space target to obtain the monitoring capability of the ground-based monitoring network includes: Get the simulation step and simulation time period; According to the simulation step length, the simulation scenario is driven to run within the simulation time period, wherein the space target is driven to continuously change its current position as time changes, so that the space target can achieve on-orbit motion; the ground-based monitoring station in the ground-based monitoring network is driven to continuously monitor the position of the space target, so as to obtain the monitoring capability of the ground-based monitoring network; Wherein, using the Monte Carlo method, based on the selection result of the ground-based monitoring station corresponding to each of the deployment experiments and the fourth data, the deployment scheme of the ground-based monitoring station is calculated, including: Gridding the Qgis map to obtain a gridded Qgis map; The selection results of the ground-based monitoring stations corresponding to each of the deployment experiments are clustered and analyzed in the form of grid merging of first-specification grids on the gridded Qgis map, wherein the probability of the selection results of the ground-based monitoring stations is estimated based on the frequency of their occurrence in the grids of the first specification, and the center coordinates of the grid of the first specification when the probability is maximized are used as the deployment plan of the ground-based monitoring stations, and the deployment plan includes the determined number of the ground-based monitoring stations and the deployment location information of each of the ground-based monitoring stations.
2. The ground-based monitoring station deployment calculation method according to claim 1, It is characterized in that The constructing of a ground-based monitoring network required for each deployment experiment based on the first data, the second data, and the third data includes: According to the second data, the ground-based monitoring station is added to the Qgis map in the form of a simulation model, and according to the third data, the space target is added to the Qgis map in the form of a simulation model; When performing each of the deployment experiments, a first number of the ground-based monitoring stations are randomly selected to form a ground-based monitoring network required for performing each of the deployment experiments.
3. Deploy computing devices at ground-based monitoring stations. It is characterized in that include: An acquisition module, used to acquire first data, second data, third data and fourth data, wherein the first data includes a Qgis map, the second data includes a ground-based monitoring station set, the ground-based monitoring station set includes location information of each ground-based monitoring station, the third data includes at least one piece of spatial target information, and the fourth data includes the number of deployment experiments, and each of the deployment experiments is independent of each other; A first computing module, used for constructing a ground-based monitoring network required for performing each of the deployment experiments based on the first data, the second data and the third data; A second calculation module is used to calculate the selection result of the ground-based monitoring station corresponding to each of the deployment experiments by using a genetic algorithm and the ground-based monitoring network required for each of the deployment experiments; a third calculation module, configured to calculate a deployment plan of the ground-based monitoring station by using a Monte Carlo method based on a selection result of the ground-based monitoring station corresponding to each of the deployment experiments and the fourth data; Wherein, the second calculation module includes: A monitoring unit, used for driving the space target to move on orbit and driving the ground-based monitoring station in the ground-based monitoring network to monitor the space target, so as to obtain the monitoring capability of the ground-based monitoring network; A first computing unit is used for taking the location information and number of the ground-based monitoring stations in the ground-based monitoring network as genetic factors, taking the monitoring capability of the ground-based monitoring network as an objective function, and performing evolution through a genetic algorithm. After the evolution is completed, a selection result of the ground-based monitoring station corresponding to each deployment experiment is obtained, and the objective function is a weighted summation result of the responsibility area coverage, key area coverage, coverage strictness, joint detection accuracy, and resource utilization rate corresponding to the current ground-based monitoring network; Wherein, the monitoring unit comprises: An acquisition subunit is used to acquire a simulation step and a simulation time period; The monitoring subunit is used to drive the simulation scene to run within the simulation time period according to the simulation step length, wherein the space target is driven to continuously change its current position with the change of time, so that the space target can realize on-orbit motion; the ground-based monitoring station in the ground-based monitoring network is driven to continuously monitor the position of the space target, so as to obtain the monitoring energy of the ground-based monitoring network; Wherein, the third calculation module includes: The second processing unit is used to grid the Qgis map to obtain a gridded Qgis map; The fifth computing unit is used to perform cluster analysis on the Qgis map after gridding processing on the selection results of the ground-based monitoring stations corresponding to each of the deployment experiments in the form of grid merging of the first specification, wherein the probability of the selection results of the ground-based monitoring stations is estimated based on the frequency of their occurrence in the grid of the first specification, and the center coordinates of the grid of the first specification when the probability is maximized are used as the deployment plan of the ground-based monitoring stations, and the deployment plan includes the determined number of the ground-based monitoring stations and the deployment location information of each of the ground-based monitoring stations.
4. The ground-based monitoring station deployment computing device according to claim 3, It is characterized in that The first calculation module includes: an adding unit, configured to add the ground-based monitoring station to the Qgis map in the form of a simulation model according to the second data, and to add the space target to the Qgis map in the form of a simulation model according to the third data; The selection unit is used to randomly select a first number of the ground-based monitoring stations to form a ground-based monitoring network required for each deployment experiment.
5. Deploy computing equipment at ground-based monitoring stations. It is characterized in that include: Memory for storing computer programs; A processor, configured to implement the steps of the ground-based monitoring station deployment calculation method as described in any one of claims 1 to 2 when executing the computer program.
6. A readable storage medium, Features: The readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the ground-based monitoring station deployment calculation method according to any one of claims 1 to 2 are implemented.