Transmission method, priority definition method, apparatus, and communication device

By defining the priority mapping relationship between Uu and SL, the multiplexing problem of sidelink HARQ-ACK when PUSCH and PUCCH overlap is solved, thereby improving the reliability and efficiency of the communication system.

CN114374955BActive Publication Date: 2026-05-12VIVO MOBILE COMM CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
VIVO MOBILE COMM CO LTD
Filing Date
2020-10-15
Publication Date
2026-05-12

AI Technical Summary

Technical Problem

In mobile communication systems, when the Physical Uplink Shared Channel (PUSCH) and the PUCCH carrying the sidelink HARQ-ACK overlap, it is unclear whether and how the PUSCH can reuse the sidelink HARQ-ACK, especially when the Uu and SL priorities are defined differently, leading to reliability and latency issues.

Method used

By defining the Uu and SL priority mapping relationship of the target resource, it is determined whether the target transmission meets the conflict or reuse conditions, ensuring that the understanding between the network side and the terminal side is consistent, and realizing reliable transmission of sidelink HARQ-ACK.

Benefits of technology

It improves the reliability and transmission efficiency of sidelink communication, avoiding reliability degradation or latency increase caused by unclear priorities.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114374955B_ABST
    Figure CN114374955B_ABST
Patent Text Reader

Abstract

The application discloses a transmission method, a priority definition method, a device and a terminal, and belongs to the technical field of communication. In the embodiment of the application, when target resources and first resources at least partially overlap or meet a conflict condition or meet a multiplexing condition, target transmission is determined, consistency of understanding of a network side and a terminal side is ensured, and sidelink reliability is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application belongs to the field of communication technology, specifically relating to a transmission method, a priority definition method, an apparatus, and a communication device. Background Technology

[0002] In mobile communication systems, if the Physical Uplink Shared Channel (PUSCH) and the PUCCH carrying the HARQ ACK for Uu overlap, the HARQ ACK for Uu on the PUCCH can only be multiplexed on the PUSCH if the Uu corresponding to the PUSCH and the PUCCH have the same priority; otherwise, it cannot.

[0003] The definitions of SL priority and Uu priority are different. When the PUSCH carrying data overlaps with the Physical Uplink Controlled Channel (PUCCH) / PUSCH carrying Hybrid Automatic Repeat Request-ACK (HARQ-ACK) for the sidelink, it is unclear whether and how the PUSCH can reuse the sidelink HARQ-ACK. Summary of the Invention

[0004] This application provides a transmission method, a priority definition method, an apparatus, and a communication device that can solve the problem of whether and how PUSCH can reuse sidelink HARQ-ACK.

[0005] In a first aspect, embodiments of this application provide a transmission method applied to a communication device, the method comprising:

[0006] The target transmission is determined when the target resource and the first resource have at least partial overlap, meet the conflict condition, or meet the reuse condition.

[0007] Wherein, the target resource is related to SL, the target resource has or does not have a first Uu priority, the first resource has or does not have a second Uu priority, and the first Uu priority of the target resource includes: the Uu priority of the target resource, and / or, the Uu priority of at least some information corresponding to the target resource.

[0008] Secondly, embodiments of this application provide a priority definition method applied to a communication device, the method comprising:

[0009] Configure or obtain the mapping relationship between the first Uu priority and the first SL priority of the target resource;

[0010] The first Uu priority of the target resource is determined according to the mapping relationship;

[0011] Wherein, the target resource is related to SL, and the first Uu priority of the target resource includes: the Uu priority of the target resource, and / or the Uu priority of at least some information corresponding to the target resource; the first SL priority of the target resource includes: the SL priority of the target resource, and / or the sidelink SL priority of at least some information corresponding to the target resource.

[0012] Thirdly, embodiments of this application provide a transmission device applied to a communication device, the device comprising:

[0013] The first determining module is used to determine the target transmission when the target resource and the first resource have at least partial overlap, meet the conflict condition, or meet the reuse condition;

[0014] Wherein, the target resource is related to the side link SL, the target resource has or does not have a first Uu priority, the first resource has or does not have a second Uu priority, and the first Uu priority of the target resource includes: the Uu priority of the target resource, and / or, the Uu priority of at least some information corresponding to the target resource.

[0015] Fourthly, embodiments of this application provide a priority definition device applied to a communication device, the device comprising:

[0016] The processing module is used to configure or obtain the mapping relationship between the first Uu priority and the first SL priority of the target resource;

[0017] The second determining module is used to determine the first Uu priority of the target resource according to the mapping relationship;

[0018] Wherein, the target resource is related to SL, and the first Uu priority of the target resource includes: the Uu priority of the target resource, and / or the Uu priority of at least some information corresponding to the target resource; the first SL priority of the target resource includes: the SL priority of the target resource, and / or the sidelink SL priority of at least some information corresponding to the target resource.

[0019] Fifthly, embodiments of this application provide a communication device, characterized in that it includes a processor, a memory, and a program or instructions stored in the memory and executable on the processor, wherein when the program or instructions are executed by the processor, they implement the steps of the transmission method as described in the first aspect, or the steps of the priority definition method as described in the second aspect.

[0020] In a sixth aspect, embodiments of this application provide a readable storage medium, characterized in that a program or instructions are stored on the readable storage medium, and when the program or instructions are executed by a processor, they implement the steps of the transmission method as described in the first aspect, or the steps of the priority definition method as described in the second aspect.

[0021] In a seventh aspect, embodiments of this application provide a chip, the chip including a processor and a communication interface, the communication interface being coupled to the processor, the processor being used to run programs or instructions to implement the steps of the transmission method as described in the first aspect, or to implement the steps of the priority definition method as described in the second aspect.

[0022] In this embodiment, when the target resource related to SL overlaps at least partially with the first resource or meets the conflict condition, the target transmission is determined to ensure that the understanding between the network side and the terminal side is consistent and to improve the reliability of the sidelink. Attached Figure Description

[0023] Figure 1 This is a schematic diagram of an existing sidelink communication architecture;

[0024] Figure 2 A schematic flowchart illustrating the transmission method provided in an embodiment of this application;

[0025] Figure 3 A flowchart illustrating the priority definition method provided in this application embodiment;

[0026] Figure 4 This is a schematic diagram of the structure of the transmission device provided in the embodiments of this application;

[0027] Figure 5 A schematic diagram of the priority definition device provided in the embodiments of this application;

[0028] Figure 6 This is a schematic diagram of the communication device structure provided in an embodiment of this application;

[0029] Figure 7 This is a schematic diagram of the terminal structure provided in an embodiment of this application;

[0030] Figure 8 This is a schematic diagram of the network-side device structure provided in an embodiment of this application. Detailed Implementation

[0031] The technical solutions of the embodiments of this application will be clearly described below with reference to the accompanying drawings. Obviously, the described embodiments are only some, not all, of the embodiments of this application. Based on the embodiments of this application, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this application.

[0032] The terms "first," "second," etc., used in the specification and claims of this application are used to distinguish similar objects and not to describe a specific order or sequence. It should be understood that such terms can be used interchangeably where appropriate so that embodiments of this application can be implemented in orders other than those illustrated or described herein, and the objects distinguished by "first" and "second" are generally of the same class, not limited in number; for example, a first object can be one or more. Furthermore, in the specification and claims, "and / or" indicates at least one of the connected objects, and the character " / " generally indicates that the preceding and following objects are in an "or" relationship.

[0033] It is worth noting that the technologies described in this application are not limited to Long Term Evolution (LTE) / LTE-Advanced (LTE-A) systems, but can also be used in other wireless communication systems, such as Code Division Multiple Access (CDMA), Time Division Multiple Access (TDMA), Frequency Division Multiple Access (FDMA), Orthogonal Frequency Division Multiple Access (OFDMA), Single-carrier Frequency-Division Multiple Access (SC-FDMA), and other systems. The terms "system" and "network" in this application are often used interchangeably, and the described technologies can be used with the systems and radio technologies mentioned above, as well as with other systems and radio technologies. The following description describes New Radio (NR) systems for illustrative purposes, and the term NR is used in most of the following description; however, these technologies can also be applied to applications other than NR systems, such as 6th generation (6G) radio systems. th Generation 6G communication system.

[0034] In this embodiment, the communication device can be a terminal or a network-side device. A terminal can also be called a terminal device or user equipment (UE). A terminal can be a mobile phone, tablet computer, laptop computer, personal digital assistant (PDA), handheld computer, netbook, ultra-mobile personal computer (UMPC), mobile internet device (MID), wearable device, vehicle-mounted device (VUE), pedestrian terminal (PUE), etc. Wearable devices include wristbands, headphones, glasses, etc. It should be noted that this embodiment does not limit the specific type of terminal. Network-side equipment can be a base station, which can be referred to as Node B, Evolved Node B, Access Point, Base Transceiver Station (BTS), Radio Base Station, Radio Transceiver, Basic Service Set (BSS), Extended Service Set (ESS), B Node, Evolved B Node (eNB), Home B Node, Home Evolved B Node, WLAN Access Point, WiFi Node, Transmitting Receiving Point (TRP), or any other suitable term in the field, as long as the same technical effect is achieved. The base station is not limited to specific technical terms. It should be noted that in the embodiments of this application, only the base station in the NR system is used as an example, but the specific type of base station is not limited.

[0035] To better understand the solution provided in this application, the following will be described first:

[0036] sidelink transmission

[0037] Sidelink terminals can communicate with other terminals on the sidelink, which are typically vehicles, roadside units (RSUs), mobile phones, etc. that support Ssidelink technology.

[0038] The resource allocation modes for Vehicle-to-X (V2X) terminals are divided into:

[0039] First mode: The base station can schedule or control the terminal's transmission on the sidelink through the Uu interface and allocate corresponding resources to the terminal.

[0040] The second mode: the terminal acquires its own transmission resources on the sidelink, and some terminals may also be able to schedule transmissions of other V2X terminals on the sidelink.

[0041] Hybrid Automatic Repeat Request feedback (HARQfeedback) and reporting

[0042] To improve the reliability and resource utilization of data transmission on the sidelink, a HARQ feedback mechanism is introduced into sidelink technology. When a sidelink receiving user receives sidelink data (transmitted on the Physical Sidelink Feedback Channel (PSFCH), where the Physical Sidelink Shared Channel (PSSCH) is scheduled by System Control Information (SCI), and the SCI is transmitted on the Physical Sidelink Control Channel (PSCCH) and / or PSSCH), it can indicate whether the sidelink transmission was successful or failed by sending a sidelink HARQ-ACK message. This sidelink HARQ-ACK is transmitted on the PSFCH resource. Upon receiving the sidelink HARQ-ACK message, the sidelink sending user can then determine whether the previous transmission was successful or failed. It is important to note that a single sidelink user can perform both receiving and transmitting operations at different times or in different frequency domains.

[0043] The transmission of sidelink packets may occur between the control node and the user (in which case the control node is operating on the sidelink), or it may occur on the sidelink between users. In the latter case, the control node may not be able to directly know whether the transmission of the sidelink packet was successful. The user needs to send the sidelink HARQACK information (such as sidelink ACK / NACK) to the control node via PUCCH or PUSCH so that the control node can further determine whether the transmission on the sidelink was successful.

[0044] The user who sends the sidelink HARQ-ACK information corresponding to a certain sidelink transmission to the base station is the sending user who sends this sidelink transmission. See [link to relevant documentation]. Figure 1 The figure shows an example of a sending user sending a sidelink HARQ-ACK message = NACK to the control node and an example of a receiving user responding with a sidelink HARQ-ACK message = NACK.

[0045] When the control node is a base station, the base station needs to allocate PUCCH or PUSCH resources for reporting sidelink HARQ-ACK information. The allocation of PUCCH or PUSCH resources is achieved by indicating the slot interval between PSFCH and PUCCH, PSFCH-PUCCH offset, in the Radio Resource Control (RRC) or Downlink Control Information (DCI) message.

[0046] sidelink physical channel priority

[0047] Different packets and services within a sidelink have different priorities, represented by values ​​from 1 to 8, with lower values ​​indicating higher priority. Specifically, the priority of sidelink data is indicated by the SCI (Service Control Interface), and the priority of the corresponding feedback resource PSFCH (Power Request Controller) is the same as the data's priority. A single PSFCH time-domain location may have multiple PSFCH resources, each potentially corresponding to different data. The priority of that PSFCH time-domain location is determined by the highest-priority PSFCH resource among these resources. The priority value of the S-SSB (Service-Side Block) can also be from 1 to 8, and its specific priority value can be configured or pre-configured.

[0048] Priority of PUCCH / PUSCH used for reporting sidelink HARQ-ACK

[0049] The base station can instruct PUCCH / PUSCH resources to report sidelink HARQ-ACKs to users. A PUCCH / PUSCH resource may be associated with one or more PSFCH time-domain locations. Before reporting sidelink HARQ-ACK information, the PUCCH / PUSCH resource will first sort and concatenate the sidelink HARQ-ACKs carried by at least some of the PSFCH resources in the associated PSFCH time-domain locations according to a certain order, and then send the sorted and concatenated sidelink HARQ-ACKs to the base station. That is, a PUCCH / PUSCH resource can correspond to one or more data sidelink HARQ-ACKs. In this case, the priority of the PUCCH / PUSCH resource is determined by the highest priority among the corresponding sidelink HARQ-ACKs.

[0050] Uu transmission and Uu HARQ-ACK priority

[0051] For downlink transmission, users will also provide HARQ-ACK feedback. Uu data is divided into two types: Enhanced Mobile Broadband (embb) and Ultra-reliable and Low Latency Communication (URLLC). Users will also support low-priority transmissions, such as priority low or priorityindex=0, and high-priority transmissions, such as priority high or priorityindex 1. The corresponding HARQ-ACK and data priorities are the same, and the priority of the PUCCH / PUSCH carrying the HARQ-ACK is also the same as the priority of the data corresponding to the HARQ-ACK.

[0052] PUCCH / PUSCH are used for HARQ-ACK transmission.

[0053] PUCCH can be used to transmit HARQ-ACK information. When PUCCH and PUSCH carrying HARQ-ACK information overlap, the user will not transmit PUCCH, but will multiplex the HARQ-ACK information that was originally to be transmitted on PUCCH onto PUSCH and transmit it together with the data part on PUSCH.

[0054] For Uu, in order to ensure the performance of high-priority transmission, in the existing technology, high-priority HARQ-ACK cannot be multiplexed on low-priority PUSCH; similarly, low-priority HARQ-ACK cannot be multiplexed on high-priority PUSCH.

[0055] If a PUSCH carrying low-priority or high-priority data overlaps with a PUCCH / PUSCH carrying sidelink HARQ-ACK, it is unclear whether and how the PUSCH can reuse the sidelink HARQ-ACK.

[0056] This is because the priority definitions for SL HARQ-ACK and the PUCCH / PUSCH carrying SL HARQ-ACK are different from those for DL ​​HARQ-ACK and the PUCCH / PUSCH carrying DL HARQ-ACK. They cannot be directly compared. For example, in SL priority, lower priority values ​​indicate higher priority, while in Uu priority, higher priority values ​​indicate higher priority. If sidelink HARQ-ACK is reused in a high-priority PUSCH such as URLLC, it may lead to decreased PUSCH reliability or increased latency. Conversely, if sidelink HARQ-ACK is not reused in a high-priority PUSCH such as URLLC, it may result in the loss of sidelink feedback.

[0057] To solve the above problems, see [link to relevant documentation]. Figure 2 This application provides a transmission method applied to a communication device, which may be a terminal or a network-side device. The method includes:

[0058] Step 201: When the target resource and the first resource have at least partial overlap, or meet the conflict condition or the reuse condition, determine the target transmission;

[0059] Among them, the target resource is related to SL, the target resource has or does not have the first Uu priority, and the first resource has or does not have the second Uu priority;

[0060] The first Uu priority of the target resource includes: the Uu priority of the target resource, and / or, the Uu priority of at least some information corresponding to the target resource; the first SL priority of the target resource includes: the SL priority of the target resource, and / or, the SL priority of at least some information corresponding to the target resource.

[0061] First, the following explanation is provided:

[0062] Uu priority refers to the priority system related to Uu, that is, the priority system related to Uu (priorityindex0, priorityindex1, etc.) is defined as Uu priority; SL priority refers to the priority system related to SL, that is, the priority system related to SL (such as priority values ​​1-8, etc.) is defined as SL priority.

[0063] In this invention, the first SL priority of the target resource can be the highest or lowest SL priority among at least some information corresponding to the target resource, such as the highest or lowest SL priority in the HARQ-ACK corresponding to the target resource; in this invention, the first SL priority value of the target resource can be the highest or lowest SL priority value among at least some information corresponding to the target resource, such as the highest or lowest SL priority value in the HARQ-ACK corresponding to the target resource.

[0064] In this embodiment of the application, when the target resource related to SL and the first resource at least partially overlap, or meet a conflict condition, or meet a reuse condition, it is determined whether to perform transmission. The reuse condition can be understood as at least some of the conditions required to reuse at least some of the information of the other resource on one of the target resource and the first resource for transmission.

[0065] In some implementations, the target transmission is determined based on whether the target resource has a first Uu priority, whether the first resource has a second Uu priority, the first Uu priority of the target resource, and / or the second Uu priority of the first resource.

[0066] For example, if the conditions for reuse are time-domain overlap and meeting priority requirements, then in the case of time-domain overlap between the first resource and the target resource, the final determination of whether reuse is possible is further based on whether the priority requirements are met by the first Uu priority, the second Uu priority, and / or the first SL priority.

[0067] In this embodiment of the application, the target resource and the first resource may or may not have Uu priority. Therefore, the target transmission is determined by using whether the target resource and the first resource have Uu priority, and / or the Uu priority of both, as a condition. That is, the target transmission is determined by at least one of the following:

[0068] Does the target resource have first Uu priority?

[0069] Does the first resource have a second Uu priority?

[0070] The target resource has the highest priority (Uu).

[0071] The second priority of the first resource (Uu).

[0072] In some implementations, the priority of Uu is at least one of the following:

[0073] The priority of physical layer signaling indication;

[0074] Priority of high-level configurations;

[0075] Business priorities;

[0076] Logical channel priority.

[0077] In some implementations, the target transmission is a target uplink transmission.

[0078] The aforementioned target resource and SL-related information refer to the fact that the target resource can be an SL resource or a Uu resource used to transmit SL information. Specifically, in one implementation, the target resource is a Uu resource used to transmit SL HARQ-ACK, such as a PUCCH used to transmit SL HARQ-ACK.

[0079] The target resource is a PUCCH for transmitting SL information, and the first resource is a PUSCH or PUCCH. When the target resource and the first resource have at least partial overlap, or meet the conflict condition or the multiplexing condition, the following four cases can be identified:

[0080] Case 1: One of them has a corresponding DCI; Table 1 shows the cases where there is at least partial overlap between various target resources and the first resource, or the conflict condition or the reuse condition is met:

[0081] Table 1

[0082]

[0083]

[0084] Case 2: One of them has a corresponding DCI; Table 2 shows the cases where there is at least partial overlap between various target resources and the first resource, or where the conflict condition or reuse condition is met:

[0085] Table 2

[0086]

[0087]

[0088] Case 3: All have corresponding DCIs; Table 3 shows the cases where there is at least partial overlap, conflict conditions, or reuse conditions between various target resources and the first resource:

[0089] Table 3

[0090]

[0091]

[0092] Case 4: No DCI; Table 4 shows the cases where there is at least partial overlap between various target resources and the primary resource, or where conflict conditions or reuse conditions are met:

[0093] Table 4

[0094]

[0095]

[0096]

[0097] In this invention, SL DCI is the DCI for scheduling, activating, or deactivating SL resources, such as DCI format 3-0 or DCI format 3-1, or SL-CS-RNTI or SL-RNTI scrambled DCI. SL PUCCH can be understood as a PUCCH used to transmit SL information, such as SL HARQ-ACK. UL DCI is the DCI for scheduling PUSCH, and DL DCI is the DCI for scheduling PDSCH.

[0098] For at least one of the three cases (case 1, case 2, and case 3) that have a corresponding DCI:

[0099] Base station guarantees and / or user expectations: The interval between the target resource and its corresponding DCI is not less than T. proc,2 +delta, and / or, the interval between the first resource and its corresponding DCI is not less than T. proc,2 +delta;

[0100] delta may be 0 or not 0, and may be positive or negative.

[0101] N2 represents the processing time, which may correspond to the user's capabilities.

[0102] T represents the processing time or preparation time, and T may contain N². For example, T can take the following values: T = (N² + d) 2,1 (2048+144)·κ2 -μ ·T C Or T = max((N2+d) 2,1 +d2)(2048+144)·κ2 -μ ·T C +T ext +T switch ,d 2,2 );

[0103] N2 corresponds to the first specific subcarrier spacing (SCS), and T corresponds to the second specific SCS;

[0104] Wherein: the first specific SCS is the minimum or maximum SCS among at least a subset of the SCS of the first resource, the SCS of the control signaling (e.g., DCI or RRC) corresponding to the first resource, the SCS of the target resource, the SCS of the first control signaling (e.g., SL DCI indicating the target resource) corresponding to the target resource, and the SCS of the SL resource corresponding to the target resource (e.g., the SL resource scheduled, activated, or deactivated by the aforementioned SL DCI); specifically, for example, the first specific SCS is the minimum or maximum SCS among the SCS of the first resource, the SCS of the target resource, and the SCS of the SL resource corresponding to the target resource; or for example, the first specific SCS is the minimum or maximum SCS among the SCS of the first resource, the SCS of the control signaling corresponding to the first resource, the SCS of the target resource, the SCS of the first control signaling corresponding to the target resource, and the SCS of the SL resource corresponding to the target resource.

[0105] Alternatively, the first specific SCS is the SCS in the configured SCS that maximizes or minimizes N2;

[0106] Alternatively, the first specific SCS is the SCS that maximizes or minimizes N2;

[0107] Wherein: the second specific SCS is the minimum or maximum SCS among at least a subset of the SCS of the first resource, the SCS of the control signaling corresponding to the first resource, the SCS of the target resource, the SCS of the first control signaling corresponding to the target resource, and the SCS of the SL resource corresponding to the target resource; specifically, for example, the second specific SCS is the minimum or maximum SCS among the SCS of the first resource, the SCS of the target resource, and the SCS of the SL resource corresponding to the target resource; or for example, the second specific SCS is the minimum or maximum SCS among the SCS of the first resource, the SCS of the control signaling corresponding to the first resource, the SCS of the target resource, the SCS of the first control signaling corresponding to the target resource, and the SCS of the SL resource corresponding to the target resource.

[0108] Alternatively, the second specific SCS is the SCS among the configured SCSs that maximizes or minimizes T;

[0109] Alternatively, the second specific SCS is the SCS that maximizes or minimizes T;

[0110] The control signaling corresponding to the first resource mentioned above is the control signaling for scheduling, indicating or activating the first resource (e.g., DCI or RRC);

[0111] The first control signaling corresponding to the target resource can be SL DCI or higher-level signaling that schedules, configures, or instructs the target resource.

[0112] The SL resource corresponding to the target resource can be the SL resource configured, scheduled, activated, or deactivated by the aforementioned SL DCI or higher-level signaling.

[0113] For example, if the target resource is a PUCCH used to transmit SL HARQ-ACK, then the first control signaling corresponding to the target resource is an SL DCI or higher-layer signaling that configures or indicates the target resource.

[0114] In the present invention, for cases where at least some information of the target resource is not ultimately transmitted, the base station can ensure that there is no overlap or conflict between the target resource and the first resource, or that the interval is not less than a preset value, and or that the user does not expect there to be overlap or conflict between the target resource and the first resource, or that the interval is less than a preset value.

[0115] The aforementioned first resource having a second Uu priority can be specifically interpreted as at least one of the following:

[0116] (1) Network side scheduling, configuring or indicating the second Uu priority of the first resource;

[0117] Specifically, in some implementations, the control signaling (e.g., DCI, MACCE, and / or RRC) that schedules, configures, or indicates the first resource carries priority indication information (e.g., priority indicator and / or phy-PriorityIndex);

[0118] (2) Predefine or preconfigure the second Uu priority of the first resource;

[0119] The predefined second Uu priority of the first resource can be protocol predefined. For example, if the control signaling (e.g., DCI, MAC CE, and / or RRC) that schedules, configures, or indicates the first resource does not carry priority indication information (e.g., priorityindicator and / or phy-PriorityIndex), the predefined second Uu priority of the first resource is low priority or priority low or priority index 0.

[0120] The fact that the first resource mentioned above does not have the second Uu priority can be interpreted as at least one of the following:

[0121] (1) The network side does not schedule, configure, or indicate the second Uu priority of the first resource;

[0122] Specifically, in some implementations, the control signaling (e.g., DCI, MACCE, and / or RRC) that schedules, configures, or indicates the first resource does not carry priority indication information (e.g., priority indicator and / or phy-PriorityIndex);

[0123] (2) The second Uu priority is not predefined or preconfigured for the first resource;

[0124] In some implementations, the first resource is used for at least one of the following:

[0125] (1) URLLC transmission;

[0126] (2) Transmissions above the priority threshold, i.e., high-priority transmissions;

[0127] (3) Transmission that exceeds reliability requirements, i.e., high-reliability transmission;

[0128] (4) Transmissions with latency below the latency threshold, packet delay budget (PDB) less than the PDB threshold, or remaining PDB less than the remaining PDB threshold, i.e., low latency, small PDB, or small remaining PDB.

[0129] At least one of (1)-(4) above can be considered to correspond to the first priority;

[0130] (5) eMBB transmission;

[0131] (6) Transmissions below the priority threshold, i.e., low-priority transmissions;

[0132] (7) Transmission below the reliability requirements, i.e., low-reliability transmission;

[0133] (8) Transmissions with latency exceeding the time threshold, PDB greater than the PDB threshold, or remaining PDB greater than the remaining PDB threshold, i.e., high latency, large PDB, or large remaining PDB.

[0134] At least one of (6)-(8) above can be considered to correspond to the second priority;

[0135] In some embodiments, the method further includes:

[0136] According to the mapping relationship, the first Uu priority of the target resource is determined based on the first SL priority; this mapping relationship can be understood as the correspondence between the first SL priority and the first Uu priority.

[0137] In this embodiment of the application, a Uu priority corresponding to or equivalent to the SL priority is predefined for the target resource, that is, a mapping relationship is established between the first Uu priority and the first SL priority of the target resource. According to the predefined mapping relationship, the first Uu priority of the target resource can be determined through the first SL priority of the target.

[0138] Furthermore, the first Uu priority of the target resource is a specific priority; or, when the first SL priority of the target resource meets a specific condition, the first Uu priority of the target resource is a specific priority.

[0139] In the embodiments of this application, when determining the first Uu priority based on the first SL priority, a uniform specific priority may be adopted for all types of first SL priorities, or the first Uu priority may be determined as a specific priority corresponding to a specific condition satisfied by the first SL priority.

[0140] The aforementioned specific priority may include one or more priorities, such as: high, medium, and low priorities, or priority 1, 2, 3, 4, and 5. This application embodiment does not specifically limit the types of priorities included in the specific priority.

[0141] Accordingly, the above-mentioned specific conditions also include one or more conditions. Optionally, different specific conditions may correspond to different specific priorities, or they may correspond to the same specific priority.

[0142] The following description uses a scenario with a specific priority level that includes two priority categories as an example:

[0143] Specifically, a particular priority includes at least one of the first priority and the second priority.

[0144] The aforementioned first priority can be interpreted as high priority, or priority high, or priority index 1, or URLLC. If the first Uu priority of the target resource and / or at least some of its corresponding information is the first priority, it can be understood that the target resource and / or at least some of its corresponding information has high priority, or priority high, or priority index 1, or URLLC. For example, the first priority may correspond to URLLC services. In this case, optionally, the target resource and / or its corresponding information are treated as URLLC, and the first Uu priority of the target resource is considered equivalent to the priority of the URLLC.

[0145] The aforementioned second priority can be interpreted as low priority, or priority index 0, or eMBB. If the first Uu priority of the target resource and / or at least some of its corresponding information is the second priority, it can be understood that the target resource and / or at least some of its corresponding information is of low priority, or priority index 0, or eMBB. For example, the second priority may correspond to eMBB services. In this case, optionally, the target resource and / or its corresponding information are considered eMBB, and the first Uu priority of the target resource is considered equivalent to the priority of eMBB.

[0146] Determining the first Uu priority of the target resource based on its first SL priority can include:

[0147] Case 1: Determine the first priority of the target resource as the first priority;

[0148] Case 2: Determine the first Uu priority of the target resource as the second priority;

[0149] Specifically, the specific conditions include at least one of the first condition and the second condition;

[0150] Determining the first Uu priority of the target resource based on its first SL priority may also include:

[0151] Case 3: When the first SL priority of the target resource meets the first condition, the first Uu priority of the target resource is the first priority; and or, when the first SL priority of the target resource meets the second condition, the first Uu priority of the target resource is the second priority.

[0152] Furthermore, the first condition includes one or more of the following:

[0153] The first priority level (SL) of the target resource is higher than or equal to the first preset priority.

[0154] The first priority value of the target resource is lower than or equal to the first preset priority value;

[0155] The condition that the second preset priority and / or second preset priority value is not configured or obtained needs to be clarified. Specifically, if the communication device of the executing entity is a network-side device (e.g., a base station), then this condition means the second preset priority and / or second preset priority value is not configured. In one optional embodiment, the second priority is the aforementioned first priority; in another optional embodiment, the second priority value is the aforementioned first priority value. If the communication device of the executing entity is a terminal, then this condition means the second preset priority and / or second preset priority value is not obtained; for example, the base station may not be configured, or the protocol may not be predefined.

[0156] The second condition is not met.

[0157] The second condition includes one or more of the following:

[0158] The first priority level (SL) of the target resource is higher than or equal to the third preset priority level;

[0159] The first priority value of the target resource is lower than or equal to the third preset priority value;

[0160] If a fourth preset priority and / or a fourth preset priority value is not configured or obtained, in one optional embodiment, the fourth priority is the first priority, the second priority and / or the third priority mentioned above; in another optional embodiment, the fourth priority value is the first priority value, the second priority value and / or the third priority value mentioned above.

[0161] The first priority level (SL) of the target resource is lower than or equal to the fifth preset priority level;

[0162] The first SL priority value of the target resource is higher than or equal to the fifth preset priority value. In one optional embodiment, the fifth priority is the first priority mentioned above. In another optional embodiment, the fifth priority value is the first priority value mentioned above.

[0163] The first condition is not met.

[0164] It should be noted that at least some of the first to fifth preset priorities mentioned above can correspond to the priorities corresponding to sl-PriorityThresholdULURLLC and / or sl-PriorityThreshold, and at least some of the first to fifth preset priority values ​​mentioned above can correspond to the priority values ​​corresponding to sl-PriorityThresholdULURLLC and / or sl-PriorityThreshold.

[0165] For example:

[0166] When the first SL priority of the target resource meets the first condition, the first Uu priority of the target resource is the first priority. One embodiment is that when the first SL priority value of the target resource is equal to or lower than sl-PriorityThreshold or sl-PriorityThresholdULURLLC, the target resource is the first priority.

[0167] When the first SL priority of the target resource meets the second condition, the first Uu priority of the target resource is the second priority. One embodiment is that when the first SL priority value of the target resource is equal to or higher than sl-PriorityThreshold or sl-PriorityThresholdULURLLC, the target resource is the second priority.

[0168] In this embodiment, the first SL priority of the target resource can be the lowest priority value in the SL HARQ-ACK corresponding to the target resource.

[0169] It should be noted that the first to fifth preset priorities (values) mentioned above may be the same or different, and this application embodiment does not specifically limit this.

[0170] Based on the same principle, if a specific priority includes three priorities: high, medium, and low, then determining the first Uu priority based on the first SL priority can include:

[0171] (1) The first Uu priority is high priority;

[0172] (2) The first Uu priority is medium priority;

[0173] (3) The first Uu priority is low priority;

[0174] (4) When the first SL priority satisfies the first condition, the first Uu priority is the higher priority;

[0175] (5) When the first SL priority satisfies the second condition, the first Uu priority is a medium priority;

[0176] (6) When the first SL priority satisfies the third condition (the specific content of the third condition can be set with reference to the first and second conditions), the first Uu priority is low priority;

[0177] For other priority types and quantities of specific priorities, the method of determining the first Uu priority based on the first SL priority can be set based on the same principle, and will not be elaborated further.

[0178] In some implementations, the first Uu priority of the target resource includes one or more of the following:

[0179] (1) The first specific Uu priority in the Uu priority of at least some information corresponding to the target resource;

[0180] The aforementioned first specific Uu priority can be the highest or lowest Uu priority among the Uu priorities of the information corresponding to the target resource;

[0181] Preferably, at least part of the information corresponding to the target resource is all the information corresponding to the target resource, such as all HARQ-ACK bits corresponding to the target resource;

[0182] For example: if the target resource corresponds to 3 HARQ-ACK bits, and the corresponding Uu priorities are high, low, and high respectively, then the Uu priority of the target resource is high or low.

[0183] (2) The Uu priority corresponding to a specific SL priority in the SL priority of at least some information corresponding to the target resource;

[0184] The specific SL priority mentioned above can be the Uu priority corresponding to the highest or lowest SL priority among the SL priorities of the information corresponding to the target resource;

[0185] Preferably, at least part of the information corresponding to the target resource is all the information corresponding to the target resource, such as all HARQ-ACK bits corresponding to the target resource;

[0186] For example: the target resource corresponds to 3 HARQ-ACK bits, and the corresponding SL priorities are priority values ​​1, 1, and 8 respectively. The SL priority value 1 corresponds to a high Uu priority, so the Uu priority of the target resource is high.

[0187] (3) The Uu priority of at least some information corresponding to the target resource.

[0188] Preferably, at least part of the information corresponding to the target resource is all the information corresponding to the target resource, such as all HARQ-ACK bits corresponding to the target resource;

[0189] For example: if the target resource corresponds to 3 HARQ-ACK bits, and the corresponding Uu priorities are high / low / high respectively, then the Uu priority of the target resource includes both high and low.

[0190] Similarly, the first Uu priority value of the target resource includes one or more of the following:

[0191] (1) The first specific Uu priority value in the Uu priority values ​​of at least some information corresponding to the target resource;

[0192] The aforementioned first specific Uu priority value can be the highest or lowest Uu priority value among the Uu priority values ​​of the information corresponding to the target resource;

[0193] Preferably, at least some of the information corresponding to the target resource is all the information corresponding to the target resource;

[0194] For example: if the target resource corresponds to 3 HARQ-ACK bits, and the corresponding Uu priority values ​​are 1, 1, 0, then the Uu priority value of the target resource is 1 or 0.

[0195] (2) The Uu priority value corresponding to a specific SL priority value in at least some of the information corresponding to the target resource;

[0196] The specific SL priority value mentioned above can be the Uu priority value corresponding to the highest or lowest SL priority value among the SL priority values ​​of the information corresponding to the target resource;

[0197] Preferably, at least some of the information corresponding to the target resource is all the information corresponding to the target resource;

[0198] For example: if the target resource corresponds to 3 HARQ-ACK bits, with corresponding SL priority values ​​of 1, 1, and 8, and the Uu priority value corresponding to 1 is 1, then the Uu priority value of the target resource is 1.

[0199] (3) The Uu priority value of at least some information corresponding to the target resource.

[0200] Preferably, at least some of the information corresponding to the target resource is all the information corresponding to the target resource;

[0201] For example: if the target resource corresponds to 3 HARQ-ACK bits, and the corresponding Uu priority values ​​are 1, 1, and 0 respectively, then the Uu priority value of the target resource includes 1 and 0.

[0202] It should be noted that in the embodiments of this application, the correspondence between priority values ​​and priorities can be either ascending or descending order. Ascending order means that the larger the priority value, the higher the priority; descending order means that the larger the priority value, the lower the priority. The above examples are described in the descending order, but it is understood that the same applies to the ascending order. When corresponding to the ascending order, if a priority value in the description of this invention is higher than another priority value, it is correspondingly replaced with a priority value lower than another priority value, and / or, if it is written that a priority value is lower than another priority value, it is correspondingly replaced with another priority value.

[0203] In some implementations, the target resource includes one or more of the following:

[0204] (1) The resource where the target object is located, such as an SL resource or a Uu resource, the target object includes SL channels, SL signals, SL signaling, SL information and / or SL messages;

[0205] For example: SL information is SL HARQ-ACK.

[0206] (2) Uu channels, signals and / or resources used to transmit or indicate target content, the target content including SL signals, SL signaling, SL information and / or SL messages;

[0207] The aforementioned transmissions include: forwarding, carrying, transmitting, and reporting;

[0208] For example: PUCCH and / or PUSCH carrying SL HARQ-ACK; or PUCCH carrying SL SR; or PUCCH and / or PUSCH carrying SL Channel-State Information (CSI);

[0209] (3)SL HARQ-ACK;

[0210] (4) Uplink resources (PUCCH and / or PUSCH) carrying SL HARQ-ACK.

[0211] In some implementations, the information corresponding to the target resource can be at least one of the following:

[0212] (1) Information that the target resources intend, expect, or may forward, carry, and / or report;

[0213] (2) Information related to the target resources.

[0214] In some implementations, the target resource does not have a first Uu priority, which can be interpreted as at least one of the following:

[0215] (1) The network side does not schedule, configure or indicate the first Uu priority of the target resource;

[0216] Specifically, in some implementations, the control signaling (e.g., DCI, MACCE, and / or RRC) that schedules, configures, or indicates the first resource does not carry priority indication information (e.g., priority indicator and / or phy-PriorityIndex);

[0217] (2) The first Uu priority is not predefined or preconfigured for the target resource.

[0218] The following describes the methods for determining the target transmission under various conditions. In some embodiments, after determining the target transmission, the target transmission is performed on the first resource. The following description will take the target transmission performed on the first resource as an example:

[0219] 1. The target resource has a first Uu priority, and the first resource has a second Uu priority. Determining the target transmission includes at least one of the following:

[0220] (1) When the first Uu priority of the target resource and the second Uu priority of the first resource are the same or the difference is less than the first preset difference, at least part of the information corresponding to the target resource is transmitted on the first resource, that is, multiplexing transmission is only possible when the Uu priorities are the same.

[0221] Specifically, when the first Uu priority of the target resource and the second Uu priority of the first resource are the same and are of the first priority, at least some information corresponding to the target resource is transmitted on the first resource;

[0222] Optionally, this situation can be combined with Case 1 in the aforementioned determination of the first Uu priority based on the first SL priority. Alternatively, it can be combined with Case 2 and Case 3 in the determination of the first Uu priority based on the first SL priority.

[0223] Specifically, when the first Uu priority of the target resource and the second Uu priority of the first resource are the same and the second priority is the second priority, at least some information corresponding to the target resource is transmitted on the first resource.

[0224] Optionally, this situation can be combined with Case 2 in the aforementioned determination of the first Uu priority based on the first SL priority. Alternatively, Case 1 and Case 3 in the determination of the first Uu priority based on the first SL priority can also be combined.

[0225] (2) When the first Uu priority of the target resource and the second Uu priority of the first resource are different or the difference is greater than the second preset difference, at least part of the information corresponding to the target resource is not transmitted on the first resource, that is, transmission cannot be reused when the Uu priorities are different.

[0226] Specifically, when the first Uu priority of the target resource is the first priority and the second Uu priority of the first resource is the second priority, at least some information corresponding to the target resource is not transmitted on the first resource;

[0227] This situation can be combined with Case 1 in the aforementioned determination of the first Uu priority based on the first SL priority. It can also be combined with Case 2 and Case 3 in the determination of the first Uu priority based on the first SL priority.

[0228] Specifically, when the first Uu priority of the target resource is the second priority and the second Uu priority of the first resource is the first priority, at least some information corresponding to the target resource is not transmitted on the first resource.

[0229] This situation can be combined with Case 2 in the aforementioned determination of the first Uu priority based on the first SL priority. It can also be combined with Case 1 and Case 3 in the determination of the first Uu priority based on the first SL priority.

[0230] Furthermore, when the first Uu priority of the target resource and the second Uu priority of the first resource are different, the target resource or the first resource is transmitted according to the Uu priority.

[0231] Specifically, when the first Uu priority of the target resource and the second Uu priority of the first resource are different, the one with the higher Uu priority is transmitted. For example, when the Uu priority corresponding to the target resource is high, or priority high, or priority index 1, and the Uu priority corresponding to the first resource is low, or priority low, or priority index 0, the target resource is transmitted.

[0232] When the priority of the target resource is low (or priority low or priority index 0), and the priority of the first resource is high (or priority high or priority index 1), the first resource is transmitted.

[0233] It should be noted that while transmitting the Uu with higher priority, the Uu with lower priority is discarded.

[0234] 2. The target resource has a first Uu priority, and the first resource may or may not have a second Uu priority; that is, it does not matter whether the first resource has a second Uu priority at this time. Determining the target transmission includes at least one of the following:

[0235] (1) When the first Uu priority of the target resource is higher than or equal to the first specific priority and / or lower than or equal to the second specific priority, at least part of the information corresponding to the target resource is transmitted on the first resource;

[0236] (2) When the first Uu priority of the target resource is higher than or equal to the third specific priority, and / or lower than or equal to the fourth specific priority, at least part of the information corresponding to the target resource shall not be transmitted on the first resource;

[0237] That is, transmissions cannot be reused when the Uu priorities of the target resources are different and the requirements are met.

[0238] Optionally, at least some of the aforementioned first specific priority, second specific priority, third specific priority, and fourth specific priority may be priorities corresponding to sl-PriorityThresholdULURLLC and / or sl-PriorityThreshold, such as the Uu priority corresponding to sl-PriorityThresholdULURLLC and / or sl-PriorityThreshold.

[0239] In this invention, the priorities corresponding to sl-PriorityThresholdULURLLC and / or sl-PriorityThreshold are the Uu priority or SL priority corresponding to sl-PriorityThresholdULURLLC and / or sl-PriorityThreshold. In one embodiment, sl-PriorityThresholdULURLLC and / or sl-PriorityThreshold are priority values, and the SL priority corresponding to sl-PriorityThresholdULURLLC and / or sl-PriorityThreshold is the SL priority corresponding to that value. In one embodiment, the Uu priority corresponding to sl-PriorityThresholdULURLLC and / or sl-PriorityThreshold can be interpreted as the Uu priority corresponding to the SL priority corresponding to sl-PriorityThresholdULURLLC and / or sl-PriorityThreshold.

[0240] 3. The target resource may or may not have a first Uu priority, and the first resource has a second Uu priority. That is, at this time, it does not matter whether the target resource has a first Uu priority or whether the Uu priority of the target resource is defined. It can be determined by the combination of case 1 / 2 / 3 in the above-mentioned determination of the first Uu priority based on the first SL priority, or it can work when the Uu priority of the target resource is not defined, determining the target transmission, including at least one of the following:

[0241] (1) When the second Uu priority of the first resource is the first priority, at least part of the information corresponding to the target resource is not transmitted on the first resource;

[0242] (2) When the second Uu priority of the first resource is the second priority, at least part of the information corresponding to the target resource is transmitted on the first resource;

[0243] The first priority is higher than the second priority.

[0244] That is, transmission can be reused only when the first Uu resource and / or its corresponding information is of low priority or priority low or priorityindex 0 or embb.

[0245] 4. The target resource may or may not have a first Uu priority, and the first resource has a second Uu priority. That is, at this time, it does not matter whether the target resource has a first Uu priority or whether the Uu priority of the target resource is defined. It can be determined by the combination of case 1 / 2 / 3 in the above-mentioned determination of the first Uu priority based on the first SL priority, or it can work when the Uu priority of the target resource is not defined, determining the target transmission, including at least one of the following:

[0246] (1) When the second Uu priority of the first resource is the first priority, at least part of the information corresponding to the target resource is transmitted on the first resource;

[0247] (2) When the second Uu priority of the first resource is the second priority, at least part of the information corresponding to the target resource is not transmitted on the first resource;

[0248] The first priority is higher than the second priority.

[0249] That is, transmission can be reused only when the first Uu resource and / or its corresponding information is of high priority or priority high or priorityindex 1 or URLLC.

[0250] 5. Determine the target transmission, including at least one of the following:

[0251] (1) Transmit at least some information corresponding to the target resource on the first resource;

[0252] (2) When the first SL priority of the target resource is higher than or equal to the fifth specific priority, and / or lower than or equal to the sixth specific priority, at least part of the information corresponding to the target resource is transmitted on the first resource;

[0253] (3) When the first SL priority of the target resource is higher than or equal to the seventh specific priority and / or lower than or equal to the eighth specific priority, at least part of the information corresponding to the target resource is transmitted on the first resource.

[0254] Optionally, at least some of the aforementioned fifth to eighth specific priorities may be sl-PriorityThresholdULURLLC and / or the SL priority corresponding to sl-PriorityThreshold.

[0255] For example: if the first SL priority of the target resource is equal to or higher than sl-PriorityThresholdURLLC or the SL priority corresponding to sl-PriorityThreshold, then at least part of the information corresponding to the target resource can be transmitted;

[0256] Furthermore, when the first resource is the first priority, if the first SL priority of the target resource is equal to or higher than the SL priority corresponding to sl-PriorityThresholdULURLLC or sl-PriorityThreshold, then at least part of the information corresponding to the target resource can be transmitted.

[0257] For example, if the first SL priority of the target resource is equal to or lower than the SL priority corresponding to sl-PriorityThreshold or sl-PriorityThresholdURLLC, then at least some information corresponding to the target resource can be transmitted.

[0258] Furthermore, when the first resource is the second priority, if the first SL priority of the target resource is equal to or lower than the SL priority corresponding to sl-PriorityThreshold or sl-PriorityThresholdURLLC, then at least some information corresponding to the target resource can be transmitted.

[0259] Example 1. The target resource is a PUCCH used for transmitting SL HARQ-ACK, and the first resource is a PUSCH; it includes at least one of the following:

[0260] i. SL HARQ-ACK will only be multiplexed to PUSCH if its SL priority value is greater than or equal to the priority value corresponding to sl-PriorityThreshold or sl-PriorityThresholdULURLLC. Alternatively, SL HARQ-ACK will only be multiplexed to PUSCH if its SL priority is equal to or lower than the priority corresponding to sl-PriorityThreshold or sl-PriorityThresholdULURLLC.

[0261] ii. SL HARQ-ACK will only be reused in PUSCH if its SL priority value is less than or equal to sl-PriorityThresholdULURLLC or the priority value corresponding to sl-PriorityThreshold. Alternatively, SL HARQ-ACK will only be reused in PUSCH if its SL priority is equal to or higher than the priority value corresponding to sl-PriorityThresholdULURLLC or sl-PriorityThreshold.

[0262] Example 2.

[0263] i. If the first resource is of low priority (either priority low, priority index 0, or embb), SL HARQ-ACK will only be multiplexed to PUSCH if its SL priority value is greater than or equal to sl-PriorityThreshold. Alternatively, SL HARQ-ACK will only be multiplexed to PUSCH if its SL priority is equal to or lower than the priority corresponding to sl-PriorityThreshold.

[0264] ii. If the first resource is of low priority (either priority low, priority index 0, or embb), SL HARQ-ACK will only be multiplexed to PUSCH if the SL priority value of SL HARQ-ACK is greater than or equal to sl-PriorityThresholdULURLLC. Alternatively, SL HARQ-ACK will only be multiplexed to PUSCH if the SL priority of SL HARQ-ACK is equal to or lower than the priority corresponding to sl-PriorityThresholdULURLLC.

[0265] iii. When the first resource has a high priority (or priority high, priorityindex 1, or URLLC), SL HARQ-ACK will only be reused in PUSCH if its SL priority value is less than or equal to sl-PriorityThresholdULURLLC. Alternatively, SL HARQ-ACK will only be reused in PUSCH if its SL priority is equal to or higher than the priority corresponding to sl-PriorityThresholdULURLLC.

[0266] v. When the first resource has a high priority (or priority high, priority index 1, or URLLC), SLHARQ-ACK will only be reused in PUSCH if its SL priority value is less than or equal to sl-PriorityThreshold. Alternatively, SLHARQ-ACK will only be reused in PUSCH if its SL priority is equal to or higher than the priority corresponding to sl-PriorityThreshold.

[0267] It should be noted that the "at least part of the information" mentioned here and the "at least part of the information" mentioned earlier in determining the target transmission based on relevant priorities may refer to different objects or the same objects.

[0268] 6. When the first resource has a second Uu priority, and / or the first control signaling carries priority indication information (e.g., priority indicator and / or phy-PriorityIndex), at least some information corresponding to the target resource is transmitted on the first resource; wherein the first control signaling is used to schedule, configure or indicate the first resource, such as DCI, MAC CE and / or RRC.

[0269] 7. When the first resource does not have a second Uu priority, and / or the first control signaling does not carry priority indication information (e.g., priority indicator and / or phy-PriorityIndex), at least some information corresponding to the target resource is transmitted on the first resource; wherein, the first control signaling is used to schedule, configure or indicate the first resource, such as DCI, MAC CE and / or RRC.

[0270] Furthermore, when transmitting at least a portion of the information corresponding to the target resource on the first resource, the at least a portion of the information includes at least one of the following:

[0271] (a) All information corresponding to the target resource, that is, all information corresponding to the target resource can be transmitted on the first resource;

[0272] (b) Information that has the same Uu priority as the first resource;

[0273] That is, information with the same priority as the Uu corresponding to the first resource can be transmitted on the first resource from the information corresponding to the target resource:

[0274] For example, if the first resource is of high priority, priority high, priority index 1, or URLLC, then the information corresponding to the high priority, priority high, priority index 1, or URLLC in the target resource information can be transmitted.

[0275] For example, if the first resource is of low priority, priority low, priority index 0, or embb, then the information corresponding to the low priority, priority low, priority index 0, or embb in the target resource information can be transmitted.

[0276] (c) Information with a second Uu priority not lower than that of the first resource;

[0277] For example, if the first resource is of high priority, priority high, priority index 1, or URLLC, then the information corresponding to the high priority, priority high, priority index 1, or URLLC in the target resource information can be transmitted.

[0278] For example, if the first resource is of low priority or priority index 0 or embb, then the information corresponding to the target resource, which is of low priority or priority index 0 or embb, and the information corresponding to high priority or priority index 1 or URLLC, can be transmitted.

[0279] (d) Information with a priority no higher than that of the first resource's second Uu priority;

[0280] For example, if the first resource is of high priority or priority high or priority index 1 or URLLC, then the information corresponding to the target resource, which corresponds to low priority or priority low or priority index 0 or embb, and the information corresponding to high priority or priority high or priority index 1 or URLLC, can be transmitted.

[0281] For example, if the first resource is of low priority, priority low, priority index 0, or embb, then the information corresponding to the low priority, priority low, priority index 0, or embb in the target resource information can be transmitted.

[0282] (e) corresponds to a first SL priority that is higher than the sixth preset priority;

[0283] (f) Information that the first SL priority value is lower than the sixth preset priority value;

[0284] (g) corresponds to a first Uu priority that is higher than the seventh preset priority;

[0285] (h) indicates that the first Uu priority value is lower than the seventh preset priority value;

[0286] (i) The corresponding first SL priority is lower than the eighth preset priority;

[0287] (j) Information whose first SL priority value is higher than the eighth preset priority value;

[0288] (k) corresponds to a first Uu priority that is lower than the ninth preset priority;

[0289] (l) The information that the first Uu priority value is higher than the ninth preset priority value.

[0290] The aforementioned sixth to ninth preset priorities (values) may be the same or different. Optionally, at least a portion of the aforementioned sixth to ninth preset priorities may correspond to the priority corresponding to sl-PriorityThresholdULURLLC, and / or the priority corresponding to sl-PriorityThreshold. For example, at least a portion of the aforementioned sixth to ninth preset priorities may correspond to the SL priority corresponding to sl-PriorityThresholdULURLLC, the SL priority corresponding to sl-PriorityThreshold, the Uu priority corresponding to sl-PriorityThresholdULURLLC, and / or the Uu priority corresponding to sl-PriorityThreshold.

[0291] Furthermore, when at least some information corresponding to the target resource is not transmitted on the first resource, the at least some information includes at least one of the following:

[0292] (a) All information corresponding to the target resource, i.e., all information corresponding to the target resource cannot be transmitted on the first resource;

[0293] (b) Information with a different Uu priority from the first resource, i.e., information with a different Uu priority from the information corresponding to the target resource and the Uu priority corresponding to the first Uu resource cannot be transmitted on the first resource;

[0294] For example, if the first resource has high priority, priority index 1, or URLLC, then information corresponding to low priority, priority index 0, or eMBB in the target resource's information cannot be transmitted.

[0295] For example, if the first resource has a low priority, priority low, priority index 0, or embb, then the information corresponding to the target resource with a high priority, priority high, priority index 1, or URLLC cannot be transmitted.

[0296] (c) Information with a second Uu priority not lower than that of the first resource;

[0297] For example, if the first Uu resource is of high priority or priority high or priority index 1 or URLLC, then the information corresponding to the high priority or priority high or priority index 1 or URLLC in the target resource cannot be transmitted.

[0298] For example, if the first Uu resource is of low priority or priority low or priority index 0 or embb, then the information corresponding to the low priority or priority low or priority index 0 or embb and the information corresponding to the high priority or priority high or priority index 1 or URLLC in the target resource cannot be transmitted.

[0299] (d) Information with a priority no higher than that of the first resource's second Uu priority;

[0300] For example, if the first Uu resource is of high priority or priority high or priority index 1 or URLLC, then the information corresponding to the target resource that corresponds to low priority or priority low or priority index 0 or embb, and the information corresponding to high priority or priority high or priority index 1 or URLLC, cannot be transmitted.

[0301] For example, if the first Uu resource is of low priority or priority low or priority index 0 or embb, then the information corresponding to the low priority or priority low or priority index 0 or embb in the target resource's information cannot be transmitted.

[0302] (e) The first SL priority is lower than the tenth preset priority;

[0303] (f) Information that the first SL priority value is higher than the tenth preset priority value;

[0304] (g) corresponds to a first Uu priority that is lower than the eleventh preset priority;

[0305] (h) indicates that the first Uu priority value is higher than the eleventh preset priority value;

[0306] (i) The first SL priority is higher than the twelfth preset priority;

[0307] (j) Information that the first SL priority value is lower than the twelve preset priority values;

[0308] (k) corresponds to a first Uu priority that is higher than the thirteenth preset priority;

[0309] (l) The information that the first Uu priority value is lower than the thirteenth preset priority value.

[0310] The aforementioned tenth to thirteenth preset priorities (values) may be the same or different. Optionally, at least a portion of the aforementioned tenth to thirteenth preset priorities may correspond to the priority corresponding to sl-PriorityThresholdULURLLC, and / or the priority corresponding to sl-PriorityThreshold. Optionally, at least a portion of the aforementioned tenth to thirteenth preset priorities may correspond to the SL priority corresponding to sl-PriorityThresholdULURLLC, the SL priority corresponding to sl-PriorityThreshold, the Uu priority corresponding to sl-PriorityThresholdULURLLC, and / or the Uu priority corresponding to sl-PriorityThreshold.

[0311] If the transmitted information is part of all the information corresponding to the target resource, or not part of all the information corresponding to the target resource, it can be understood that at least part of the information is discarded.

[0312] In some implementations, the target resource includes multiple Uu priorities, and / or the information corresponding to the target resource corresponds to different Uu priorities. Furthermore, when multiple first resources overlap with the target resource, meet conflict conditions, or meet reuse conditions, this method further includes:

[0313] The target transmission is determined based on the second Uu priority of each first resource.

[0314] Specifically, the target transmission is determined by considering each first resource according to the methods described above.

[0315] For example, information corresponding to a certain Uu priority can be reused on the first Uu resource with the same Uu priority;

[0316] For example: if the target resource PUCCH corresponds to two sidelink HARQ-ACK bits with high and low Uu priorities respectively, and the target resource and two PUSCHs with high and low Uu priorities overlap, then the sidelink HARQ-ACK bit with the high Uu priority will be multiplexed on the PUSCH with the high Uu priority, and the sidelink HARQ-ACK bit with the low Uu priority will be multiplexed on the PUSCH with the low Uu priority.

[0317] In some implementations, when multiple first resources overlap with the target resource, or meet conflict conditions, or meet reuse conditions, the method further includes:

[0318] (1) Determine the target transmission according to the second Uu priority of each first resource in a preset order; wherein, the preset order includes: the time domain order of multiple first resources, the frequency domain order of multiple first resources, the identification order of multiple first resources, and / or the second Uu priority order of multiple first resources; for example, the order of time domain resources, specifically the order of time domain start points, the order of time domain end points; the order of frequency domain position, etc.

[0319] (2) Determine the target transmission based on the second specific Uu priority in the second Uu priority.

[0320] For example: Consider the first resource with the highest priority, lowest priority, higher than threshold 1, or lower than threshold 2 among multiple first resources to determine the target transmission.

[0321] In some implementations, the priority of the target transmission is any one of the following:

[0322] The second Uu priority of the first resource;

[0323] The target resource has the highest priority (Uu).

[0324] The first SL priority of the target resource.

[0325] Furthermore, when the priority of the target transmission is the second Uu priority of the first resource, the second Uu priority of the first resource is higher than the first Uu priority or the first SL priority of the target resource;

[0326] Alternatively, when the priority of the target transmission is the first Uu priority or the first SL priority of the target resource, the first Uu priority or the first SL priority of the target resource is higher than the second Uu priority of the first resource.

[0327] Similarly, in some implementations, the priority value of the target transmission is any one of the following:

[0328] The second Uu priority value of the first resource;

[0329] The first Uu priority value of the target resource;

[0330] The first priority value of the target resource.

[0331] Furthermore, when the priority value of the target transmission is the second Uu priority value of the first resource, the second Uu priority value of the first resource is lower than the first Uu priority value or the first SL priority value of the target resource;

[0332] Alternatively, when the priority value of the target transmission is the first Uu priority value or the first SL priority value of the target resource, the first Uu priority value or the first SL priority value of the target resource is lower than the second Uu priority value of the first resource.

[0333] In some implementations, the first resource is a PUCCH and / or PUSCH resource, such as a PUCCH and / or PUSCH with Uu priority. For example, it can be a PUCCH and / or PUSCH corresponding to information with corresponding Uu priority, or it can be other uplink signals, such as uplink reference signals. Specifically, there are SRS and Positioning RS.

[0334] See Figure 3 This application provides a priority definition method applied to a communication device, which may be a terminal or a network-side device. The method includes:

[0335] Step 301: Configure or obtain the mapping relationship between the first Uu priority and the first SL priority of the target resource;

[0336] It should be noted that if the communication device of the executing entity is a network-side device (such as a base station), then this step is to configure the mapping relationship between the first Uu priority and the first SL priority of the target resource; if the communication device of the executing entity is a terminal, then this step is to obtain the mapping relationship between the first Uu priority and the first SL priority of the target resource; for example, it can be base station configuration, protocol predefined, preconfigured, user-defined, etc.

[0337] Step 302: Determine the first Uu priority of the target resource based on the mapping relationship;

[0338] The above mapping relationship can be understood as the correspondence between the first SL priority and the first Uu priority.

[0339] It should be noted that the above mapping relationship can include cases where different first SL priorities correspond to different first Uu priorities, or cases where the first Uu priority is defined as the same priority regardless of the first SL priority of the target resource, such as defining them as the first priority or the second priority.

[0340] In this embodiment of the application, the target resource is related to SL. Being related to SL means that the target resource can be an SL resource or a Uu resource used to transmit SL-related information.

[0341] The first Uu priority of the target resource includes: the Uu priority of the target resource, and / or the Uu priority of at least some information corresponding to the target resource; the first SL priority of the target resource includes: the SL priority of the target resource, and / or the SL priority of at least some information corresponding to the target resource.

[0342] In some implementations, the mapping relationship satisfies:

[0343] The first Uu priority of the target resource is a specific priority;

[0344] or,

[0345] When the first SL priority of the target resource meets a specific condition, the first Uu priority of the target resource is the specific priority corresponding to the specific condition.

[0346] In this embodiment of the application, a Uu priority corresponding to or equivalent to the SL priority is predefined for the target resource, that is, a mapping relationship is established between the first Uu priority and the first SL priority of the target resource. According to the predefined mapping relationship, the first Uu priority of the target resource can be determined through the first SL priority of the target.

[0347] Furthermore, the first Uu priority of the target resource is a specific priority; or, when the first SL priority of the target resource meets a specific condition, the first Uu priority of the target resource is a specific priority.

[0348] In the embodiments of this application, when determining the first Uu priority based on the first SL priority, a uniform specific priority may be adopted for all types of first SL priorities, or the first Uu priority may be determined as a specific priority corresponding to a specific condition satisfied by the first SL priority.

[0349] The aforementioned specific priority may include one or more priorities, such as: high, medium, and low priorities, or priority 1, 2, 3, 4, and 5. This application embodiment does not specifically limit the types of priorities included in the specific priority.

[0350] Accordingly, the aforementioned specific conditions also include one or more conditions, that is, different specific conditions correspond to different specific priorities.

[0351] The following description uses a scenario with a specific priority level that includes two priority categories as an example:

[0352] Specifically, a particular priority includes at least one of the first priority and the second priority.

[0353] The aforementioned "first priority" can be interpreted as high priority, or priority high, or priority index 1, or URLLC. If the first Uu priority of the target resource and / or at least some of its corresponding information is the first priority, it can be understood that the target resource and / or its corresponding at least some information has high priority, or priority high, or priority index 1, or URLLC. For example, the first priority may correspond to URLLC services. In this case, optionally, the target resource and / or its corresponding information can be considered as URLLC, and the first Uu priority of the target resource is considered equivalent to the priority of the URLLC.

[0354] The aforementioned second priority can be interpreted as low priority, or priority index 0, or eMBB. If the first Uu priority of the target resource and / or at least some of its corresponding information is the second priority, it can be understood that the target resource and / or at least some of its corresponding information is of low priority, or priority index 0, or eMBB. For example, the second priority may correspond to eMBB services. In this case, optionally, the target resource and / or its corresponding information can be considered as eMBB, and the first Uu priority of the target resource is considered equivalent to the priority of eMBB.

[0355] Determining the first Uu priority of the target resource based on its first SL priority can include:

[0356] Case 1: Determine the first priority of the target resource as the first priority;

[0357] Case 2: Determine the first Uu priority of the target resource as the second priority;

[0358] Specifically, the specific conditions include at least one of the first condition and the second condition;

[0359] Determining the first Uu priority of the target resource based on its first SL priority may also include:

[0360] Case 3: When the first SL priority of the target resource meets the first condition, the first Uu priority of the target resource is the first priority; and or, when the first SL priority of the target resource meets the second condition, the first Uu priority of the target resource is the second priority.

[0361] Furthermore, the first condition includes one or more of the following:

[0362] The first priority level (SL) of the target resource is higher than or equal to the first preset priority.

[0363] The first priority value of the target resource is lower than or equal to the first preset priority value;

[0364] The second preset priority and / or the second preset priority value has not been configured or obtained.

[0365] The second condition is not met.

[0366] The second condition includes one or more of the following:

[0367] The first priority level (SL) of the target resource is higher than or equal to the third preset priority level;

[0368] The first priority value of the target resource is lower than or equal to the third preset priority value;

[0369] The fourth preset priority and / or the fourth preset priority value have not been configured or obtained.

[0370] The first priority level (SL) of the target resource is lower than or equal to the fifth preset priority level;

[0371] The first SL priority value of the target resource is higher than or equal to the fifth preset priority value. In an optional embodiment, the fifth priority is the first priority mentioned above.

[0372] The first condition is not met.

[0373] It should be noted that at least some of the first to fifth preset priorities mentioned above can correspond to the priorities corresponding to sl-PriorityThresholdULURLLC and / or sl-PriorityThreshold, and at least some of the first to fifth preset priority values ​​mentioned above can correspond to the priority values ​​corresponding to sl-PriorityThresholdULURLLC and / or sl-PriorityThreshold.

[0374] It should be noted that the first to fifth preset priorities (values) mentioned above may be the same or different, and this application embodiment does not specifically limit this.

[0375] Based on the same principle, if a specific priority includes three priorities: high, medium, and low, then determining the first Uu priority based on the first SL priority can include:

[0376] (1) The first Uu priority is high priority;

[0377] (2) The first Uu priority is medium priority;

[0378] (3) The first Uu priority is low priority;

[0379] (4) When the first SL priority satisfies the first condition, the first Uu priority is the higher priority;

[0380] (5) When the first SL priority satisfies the second condition, the first Uu priority is a medium priority;

[0381] (6) When the first SL priority satisfies the third condition (the specific content of the third condition can be set with reference to the first and second conditions), the first Uu priority is low priority;

[0382] For other priority types and quantities of specific priorities, the method of determining the first Uu priority based on the first SL priority can be set based on the same principle, and will not be elaborated further.

[0383] In some implementations, the first Uu priority of the target resource includes one or more of the following:

[0384] (1) The first specific Uu priority in the Uu priority of at least some information corresponding to the target resource;

[0385] The aforementioned first specific Uu priority can be the highest or lowest Uu priority among the Uu priorities of the information corresponding to the target resource;

[0386] Preferably, at least some of the information corresponding to the target resource is all the information corresponding to the target resource;

[0387] For example: if the target resource corresponds to 3 HARQ-ACK bits, and the corresponding Uu priorities are high, low, and high respectively, then the Uu priority of the target resource is high or low.

[0388] (2) The Uu priority corresponding to a specific SL priority in the SL priority of at least some information corresponding to the target resource;

[0389] The specific SL priority mentioned above can be the Uu priority corresponding to the highest or lowest SL priority among the SL priorities of the information corresponding to the target resource;

[0390] Preferably, at least some of the information corresponding to the target resource is all the information corresponding to the target resource;

[0391] For example: the target resource corresponds to 3 HARQ-ACK bits, and the corresponding SL priorities are priority values ​​1, 1, and 8 respectively. The SL priority value 1 corresponds to a high Uu priority, so the Uu priority of the target resource is high.

[0392] (3) The Uu priority of at least some information corresponding to the target resource.

[0393] For example: if the target resource corresponds to 3 HARQ-ACK bits, and the corresponding Uu priorities are high / low / high respectively, then the Uu priority of the target resource includes both high and low.

[0394] Similarly, the first Uu priority value of the target resource includes one or more of the following:

[0395] (1) The first specific Uu priority value in the Uu priority values ​​of at least some information corresponding to the target resource;

[0396] The aforementioned first specific Uu priority value can be the highest or lowest Uu priority value among the Uu priority values ​​of the information corresponding to the target resource;

[0397] Preferably, at least some of the information corresponding to the target resource is all the information corresponding to the target resource;

[0398] For example: if the target resource corresponds to 3 HARQ-ACK bits, and the corresponding Uu priority values ​​are 1, 1, and 0 respectively, then the Uu priority value of the target resource is 1 or 0.

[0399] (2) The Uu priority value corresponding to a specific SL priority value in at least some of the information corresponding to the target resource;

[0400] The specific SL priority value mentioned above can be the Uu priority value corresponding to the highest or lowest SL priority value among the SL priority values ​​of the information corresponding to the target resource;

[0401] Preferably, at least some of the information corresponding to the target resource is all the information corresponding to the target resource;

[0402] For example: if the target resource corresponds to 3 HARQ-ACK bits, with corresponding SL priority values ​​of 1, 1, and 8, and the Uu priority value corresponding to 1 is 1, then the Uu priority value of the target resource is 1.

[0403] (3) The Uu priority value of at least some information corresponding to the target resource.

[0404] Preferably, at least some of the information corresponding to the target resource is all the information corresponding to the target resource;

[0405] For example: if the target resource corresponds to 3 HARQ-ACK bits, and the corresponding Uu priority values ​​are 1, 1, and 0 respectively, then the Uu priority value of the target resource includes 1 and 0.

[0406] It should be noted that in the embodiments of this application, the correspondence between priority value and priority can be either ascending or descending order. Ascending order means that the larger the priority value, the higher the priority; descending order means that the larger the priority value, the lower the priority. The above example is described in the case of descending order, but it can be understood that the same applies to the case of ascending order.

[0407] In some implementations, the target resource includes one or more of the following:

[0408] (1) The resource where the target object is located, such as an SL resource, which includes SL channels, SL signals, SL signaling, SL information and / or SL messages;

[0409] For example: SL information is SL HARQ-ACK.

[0410] (2) Uu channels, signals and / or resources used to transmit or indicate target content, the target content including SL signals, SL signaling, SL information and / or SL messages;

[0411] The aforementioned transmissions include: forwarding, carrying, transmitting, and reporting;

[0412] For example: a PUCCH and / or PUSCH carrying SL HARQ-ACK; or a PUCCH carrying SL SR; or a PUCCH and / or PUSCH carrying SLCSI;

[0413] (3)SL HARQ-ACK;

[0414] (4) Uplink resources (PUCCH and / or PUSCH) carrying SL HARQ-ACK.

[0415] In some implementations, the information corresponding to the target resource can be at least one of the following:

[0416] (1) Information that the target resources intend, expect, or may forward, carry, and / or report;

[0417] (2) Information related to the target resources.

[0418] The method provided in this application is described below with reference to specific embodiments:

[0419] In the following embodiment, SL PUCCH is a PUCCH that carries SL-related information (e.g., SL HARQ-ACK).

[0420] Example 1: Different priorities cannot be reused;

[0421] Optionally, if a Uu PUSCH with a low priority, or a priority index of 0 or an embb, overlaps with an SL PUCCH with a high priority, or a priority index of 1 or a URLLC, or if the SL PUCCH meets the conflict condition or the reuse condition, the SL HARQ-ACK on the SL PUCCH cannot be reused on the PUSCH.

[0422] Optionally, if a Uu PUSCH with a high priority, priority high, priority index 1 or URLLC overlaps with an SL PUCCH with a low priority, priority low, priority index 0 or embb, or meets the conflict condition or the reuse condition, the SL HARQ-ACK on the SL PUCCH cannot be reused on the PUSCH.

[0423] Example 2: Items with the same priority can be reused;

[0424] Optionally, when a Uu PUSCH with a high priority, priority index 1, or URLLC overlaps with an SL PUCCH with a high priority, priority index 1, or URLLC, or meets the conflict condition or the reuse condition, the SL HARQ-ACK on the SL PUCCH can be reused on the PUSCH.

[0425] Optionally, when a Uu PUSCH with a low priority, or a priority index of 0 or an embb overlaps with a SLPUCCH with a low priority, or a priority index of 0 or an embb, or meets the conflict condition or the reuse condition, the SL HARQ-ACK on the SL PUCCH can be reused on the PUSCH.

[0426] Example 3: Can only be reused on PUSCHs that have not been indicated with priority or low priority, or with priority low, priority index 0, or embb;

[0427] Optionally, when a Uu PUSCH with no indicated priority or low priority, or with priority low or priority index 0 or embb overlaps with an SL PUCCH, or meets the conflict condition or the reuse condition, the SL HARQ-ACK on the SL PUCCH can be reused on a PUSCH with priority embb.

[0428] Optionally, if a Uu PUSCH with a priority of indicated priority or high priority, or priority high, or priority index 1 or URLLC overlaps with an SL PUCCH or meets a conflict condition or a reuse condition, the SL HARQ-ACK on the SL PUCCH cannot be reused on a PUSCH with a priority of indicated priority or high priority, or priority high, or priority index 1 or URLLC.

[0429] Example 4: SL HARQ-ACK can only be multiplexed on low-priority PUSCHs, or PUSCHs with priority low, priorityindex 0, or embb, or PUSCHs without priority (e.g., PUSCHs scheduled by DCI format that do not have a priority indicator field).

[0430] See Figure 4 This application provides a transmission device 400, applied to a communication device, which may be a terminal or a network-side device. The device 400 includes:

[0431] The first determining module 401 is used to determine the target transmission when the target resource and the first resource have at least partial overlap, or meet the conflict condition or the reuse condition;

[0432] Wherein, the target resource is related to the side link SL, the target resource may or may not have a first Uu priority, the first resource may or may not have a second Uu priority, the first Uu priority of the target resource includes: the Uu priority of the target resource, and / or, the Uu priority of at least some information corresponding to the target resource, the target resource has a first SL priority, the first SL priority of the target resource includes: the SL priority of the target resource, and / or, the side link SL priority of at least some information corresponding to the target resource.

[0433] In some implementations, the first resource having a second Uu priority specifically includes at least one of the following:

[0434] The network side schedules, configures, or indicates the second Uu priority of the first resource;

[0435] Predefine or preconfigure the second Uu priority of the first resource.

[0436] In some implementations, the first resource not having a second Uu priority specifically includes at least one of the following:

[0437] The network side does not schedule, configure, or indicate the second Uu priority of the first resource;

[0438] There is no predefined or preconfigured second Uu priority for the first resource.

[0439] In some implementations, the first resource is used for at least one of the following:

[0440] URLLC transmission;

[0441] Transmissions exceeding the priority threshold;

[0442] Transmission exceeding reliability requirements;

[0443] Transmissions below the latency threshold, where the packet delay budget (PDB) is less than the PDB threshold, or where the remaining PDB is less than the remaining PDB threshold;

[0444] eMBB transmission;

[0445] Transmissions below the priority threshold;

[0446] Transmissions that fall below reliability requirements;

[0447] Transmissions exceeding the latency threshold, PDB greater than the PDB threshold, or remaining PDB greater than the remaining PDB threshold.

[0448] In some embodiments, the method further includes:

[0449] Based on the mapping relationship, the first Uu priority of the target resource is determined according to the first SL priority of the target resource.

[0450] In some implementations, the first Uu priority of the target resource is a specific priority;

[0451] or,

[0452] When the first SL priority of the target resource meets a specific condition, the first Uu priority of the target resource is a specific priority.

[0453] In some implementations, the specific priority includes at least one of a first priority and a second priority.

[0454] In some implementations, the specific condition includes at least one of a first condition and a second condition.

[0455] In some implementations, when the first SL priority of the target resource satisfies a first condition, the first Uu priority of the target resource is the first priority;

[0456] And / or,

[0457] When the first SL priority of the target resource meets the second condition, the first Uu priority of the target resource becomes the second priority.

[0458] In some implementations, the first condition includes one or more of the following:

[0459] The first SL priority of the target resource is higher than or equal to the first preset priority;

[0460] The first SL priority value of the target resource is lower than or equal to the first preset priority value;

[0461] The second preset priority and / or the second preset priority value has not been configured or obtained.

[0462] The second condition is not met.

[0463] In some implementations, the second condition includes one or more of the following:

[0464] The first SL priority of the target resource is higher than or equal to the third preset priority;

[0465] The first SL priority value of the target resource is lower than or equal to the third preset priority value;

[0466] The fourth preset priority and / or the fourth preset priority value are not configured;

[0467] The first SL priority of the target resource is lower than or equal to the fifth preset priority;

[0468] The first SL priority value of the target resource is higher than or equal to the fifth preset priority value;

[0469] The first condition is not met.

[0470] In some implementations, the first Uu priority of the target resource includes one or more of the following:

[0471] The first specific Uu priority in the Uu priority of at least some information corresponding to the target resource;

[0472] The Uu priority corresponding to a specific SL priority in the SL priority of at least some information corresponding to the target resource;

[0473] The Uu priority of at least some information corresponding to the target resource.

[0474] In some implementations, the first Uu priority value of the target resource includes one or more of the following:

[0475] The first specific Uu priority value in the Uu priority values ​​of at least some information corresponding to the target resource;

[0476] The Uu priority value corresponding to a specific SL priority value in at least some of the information corresponding to the target resource;

[0477] The Uu priority value of at least some information corresponding to the target resource.

[0478] In some implementations, the target resource includes one or more of the following:

[0479] The resource where the target object is located, wherein the target object includes SL channels, SL signals, SL signaling, SL information and / or SL messages;

[0480] Uu channels, signals, and / or resources used for transmitting or indicating target content, the target content including SL signals, SL signaling, SL information, and / or SL messages;

[0481] SL Hybrid Automatic Repeat Request Response (HARQ-ACK);

[0482] Uplink resources carrying SL HARQ-ACK.

[0483] In some implementations, the target resource has a first Uu priority, the first resource has a second Uu priority, and the determining module is specifically used for at least one of the following:

[0484] When the first Uu priority of the target resource and the second Uu priority of the first resource are the same or the difference is less than the first preset difference, at least some information corresponding to the target resource is transmitted.

[0485] When the first Uu priority of the target resource and the second Uu priority of the first resource are not the same or the difference is greater than a second preset difference, at least some information corresponding to the target resource is not transmitted.

[0486] In some embodiments, the apparatus further includes:

[0487] The transmission module is used to transmit the target resource or the first resource according to the Uu priority when the first Uu priority of the target resource and the second Uu priority of the first resource are not the same or the difference is greater than a second preset difference.

[0488] In some implementations, the determining module is specifically used for at least one of the following:

[0489] When the first Uu priority of the target resource and the second Uu priority of the first resource are the same and are both the first priority, at least some information corresponding to the target resource is transmitted.

[0490] When the first Uu priority of the target resource and the second Uu priority of the first resource are the same and the second priority is the second priority, at least some information corresponding to the target resource is transmitted.

[0491] In some implementations, the first determining module is specifically used for at least one of the following:

[0492] When the first Uu priority of the target resource is the first priority and the second Uu priority of the first resource is the second priority, at least some information corresponding to the target resource is not transmitted.

[0493] When the first Uu priority of the target resource is the second priority and the second Uu priority of the first resource is the first priority, at least some information corresponding to the target resource is not transmitted.

[0494] In some implementations, the target resource has a first Uu priority, the first resource may or may not have a second Uu priority, and the first determining module is specifically used for at least one of the following:

[0495] When the first Uu priority of the target resource is higher than or equal to the first specific priority, and / or lower than or equal to the second specific priority, at least some information corresponding to the target resource is transmitted;

[0496] When the first Uu priority of the target resource is higher than or equal to the third specific priority, and / or lower than or equal to the fourth specific priority, at least some information corresponding to the target resource is not transmitted.

[0497] In some implementations, the target resource may or may not have a first Uu priority, the first resource has a second Uu priority, and the first determining module is specifically used for at least one of the following:

[0498] When the second Uu priority of the first resource is the first priority, at least some information corresponding to the target resource is not transmitted;

[0499] When the second Uu priority of the first resource is the second priority, at least some information corresponding to the target resource is transmitted;

[0500] The first priority is higher than the second priority.

[0501] In some implementations, the target resource may or may not have a first Uu priority, the first resource has a second Uu priority, and the first determining module is specifically used for at least one of the following:

[0502] When the second Uu priority of the first resource is the first priority, at least some information corresponding to the target resource is transmitted;

[0503] When the second Uu priority of the first resource is the second priority, at least some information corresponding to the target resource is not transmitted;

[0504] The first priority is higher than the second priority.

[0505] In some implementations, the first determining module is specifically used for at least one of the following:

[0506] Transmit at least a portion of the information corresponding to the target resource on the first resource;

[0507] When the first SL priority of the target resource is higher than or equal to the fifth specific priority, and / or lower than or equal to the sixth specific priority, at least some information corresponding to the target resource is transmitted;

[0508] When the first SL priority of the target resource is higher than or equal to the seventh specific priority, and / or lower than or equal to the eighth specific priority, at least some information corresponding to the target resource is not transmitted.

[0509] In some implementations, when the first resource has a second Uu priority and / or the first control signaling carries priority indication information, at least some information corresponding to the target resource is transmitted;

[0510] The first control signaling is used to schedule, configure, or instruct the first resource.

[0511] In some implementations, when the first resource does not have a second Uu priority and / or the first control signaling does not carry priority indication information, at least some information corresponding to the target resource is transmitted;

[0512] The first control signaling is used to schedule, configure, or instruct the first resource.

[0513] In some implementations, when transmitting at least a portion of the information corresponding to the target resource, the at least a portion of the information includes at least one of the following:

[0514] All information corresponding to the target resource;

[0515] Information that is the same as the second Uu priority of the first resource;

[0516] Information with a second Uu priority not lower than that of the first resource;

[0517] Information with a priority no higher than that of the first resource (second Uu priority);

[0518] The corresponding first SL priority is higher than the sixth preset priority;

[0519] The information that the first SL priority value is lower than the sixth preset priority value;

[0520] The corresponding first Uu priority is higher than the seventh preset priority;

[0521] The information that the first Uu priority value is lower than the seventh preset priority value;

[0522] The corresponding first SL priority is lower than the eighth preset priority;

[0523] The information corresponding to the first SL priority value being higher than the eighth preset priority value;

[0524] The corresponding first Uu priority is lower than the ninth preset priority;

[0525] The information corresponding to the first Uu priority value being higher than the ninth preset priority value.

[0526] In some implementations, when at least a portion of the information corresponding to the target resource is not transmitted, the at least a portion of the information includes at least one of the following:

[0527] All information corresponding to the target resource;

[0528] Information that has a different priority from the second Uu corresponding to the first resource;

[0529] Information with a priority no lower than that of the second Uu corresponding to the first resource;

[0530] Information that is not higher than the priority of the second Uu corresponding to the first resource;

[0531] The corresponding first SL priority is lower than the tenth preset priority;

[0532] The information corresponding to the first SL priority value being higher than the tenth preset priority value;

[0533] The corresponding first Uu priority is lower than the eleventh preset priority;

[0534] The information that the first Uu priority value is higher than the eleventh preset priority value;

[0535] The corresponding first SL priority is higher than the twelfth preset priority;

[0536] The information that the first SL priority value is lower than the twelve preset priority values;

[0537] The corresponding first Uu priority is higher than the thirteenth preset priority;

[0538] The information that the first Uu priority value is lower than the thirteenth preset priority value.

[0539] In some implementations, when multiple first resources overlap with the target resource, or meet conflict conditions, or meet reuse conditions, the first determining module is further configured to:

[0540] The target transmission is determined based on the first Uu priority of the target resource and / or the second Uu priority of each of the first resources.

[0541] In some implementations, when multiple first resources overlap with the target resource, or meet conflict conditions, or meet reuse conditions, the first determining module is further configured to:

[0542] According to a preset order, the target transmission is determined based on the second Uu priority of each of the first resources; wherein the preset order includes: the time-domain order of the plurality of first resources, the frequency-domain position order of the plurality of first resources, the identification order of the plurality of first resources, and / or the second Uu priority order of the plurality of first resources.

[0543] or,

[0544] The target transmission is determined based on the second specific Uu priority in the second Uu priority.

[0545] In some implementations, the priority of the target transmission is any one of the following:

[0546] The second Uu priority of the first resource;

[0547] The first Uu priority of the target resource;

[0548] The first SL priority of the target resource.

[0549] In some implementations, when the priority of the target transmission is the second Uu priority of the first resource, the second Uu priority of the first resource is higher than the first Uu priority or the first SL priority of the target resource;

[0550] Alternatively, when the priority of the target transmission is the first Uu priority or the first SL priority of the target resource, the first Uu priority or the first SL priority of the target resource is higher than the second Uu priority of the first resource.

[0551] In some implementations, the first resource is a Physical Uplink Control Channel (PUCCH) and / or a Physical Uplink Shared Channel (PUSCH) resource. For example, it could be a PUCCH and / or PUSCH with Uu priority. For instance, it could be a PUCCH and / or PUSCH corresponding to information with a corresponding Uu priority; it could also be other uplink signals, such as uplink reference signals, specifically SRS and PRS.

[0552] In some implementations, the priority of Uu is at least one of the following:

[0553] The priority of physical layer signaling indication;

[0554] Priority of high-level configurations;

[0555] Business priorities;

[0556] Logical channel priority.

[0557] In this embodiment, when the target resource and the first resource have at least partial overlap or meet conflict conditions, the target transmission is determined based on whether the target resource has a first Uu priority, whether the first resource has a second Uu priority, the first Uu priority of the target resource, and / or the second Uu priority of the first resource. This ensures that the understanding between the network side and the terminal side is consistent and improves the reliability of the sidelink.

[0558] See Figure 5 This application provides a priority definition device 500, applied to a communication device, which may be a terminal or a network-side device. The device 500 includes:

[0559] Processing module 501 is used to configure or obtain the mapping relationship between the first Uu priority and the first SL priority of the target resource;

[0560] The second determining module 502 determines the first Uu priority of the target resource according to the mapping relationship;

[0561] Wherein, the target resource is related to SL, and the first Uu priority of the target resource includes: the Uu priority of the target resource, and / or the Uu priority of at least some information corresponding to the target resource; the first SL priority of the target resource includes: the SL priority of the target resource, and / or the sidelink SL priority of at least some information corresponding to the target resource.

[0562] In some implementations, the mapping relationship satisfies:

[0563] The first Uu priority of the target resource is a specific priority;

[0564] or,

[0565] When the first SL priority of the target resource meets a specific condition, the first Uu priority of the target resource is the specific priority corresponding to the specific condition.

[0566] In some implementations, the specific priority includes at least one of a first priority and a second priority.

[0567] In some implementations, the specific condition includes at least one of a first condition and a second condition.

[0568] In some implementations, when the first SL priority of the target resource satisfies a first condition, the first Uu priority of the target resource is the first priority;

[0569] And / or, when the first SL priority of the target resource satisfies the second condition, the first Uu priority of the target resource becomes the second priority.

[0570] In some implementations, the first condition includes one or more of the following:

[0571] The first SL priority of the target resource is higher than or equal to the first preset priority;

[0572] The first SL priority value of the target resource is lower than or equal to the first preset priority value;

[0573] The second preset priority and / or the second preset priority value has not been configured or obtained.

[0574] The second condition is not met.

[0575] In some implementations, the second condition includes one or more of the following:

[0576] The first SL priority of the target resource is higher than or equal to the third preset priority;

[0577] The first SL priority value of the target resource is lower than or equal to the third preset priority value;

[0578] The fourth preset priority and / or the fourth preset priority value have not been configured or obtained.

[0579] The first SL priority of the target resource is lower than or equal to the fifth preset priority;

[0580] The first SL priority value of the target resource is higher than or equal to the fifth preset priority value;

[0581] The first condition is not met.

[0582] In some implementations, the first Uu priority of the target resource is any one of the following:

[0583] The first specific Uu priority in the Uu priority of at least some information corresponding to the target resource;

[0584] The Uu priority corresponding to a specific SL priority in the SL priority of at least some information corresponding to the target resource;

[0585] The Uu priority of the information corresponding to the target resource.

[0586] In some implementations, the first Uu priority value of the target resource is any one of the following:

[0587] The first specific Uu priority value in the Uu priority values ​​of at least some information corresponding to the target resource;

[0588] The Uu priority value corresponding to a specific SL priority value in at least some of the information corresponding to the target resource;

[0589] The Uu priority value of at least some information corresponding to the target resource.

[0590] In some implementations, the target resource includes one or more of the following:

[0591] The resource where the target object is located, wherein the target object includes SL channels, SL signals, SL signaling, SL information and / or SL messages;

[0592] Uu channels, signals, and / or resources used to transmit or indicate target content, the target content including SL signals, SL signaling, and / or SL messages;

[0593] SL HARQ-ACK;

[0594] Uplink resources carrying SL HARQ-ACK.

[0595] The transmission device and priority definition device in the above embodiments of this application can be devices with an operating system. This operating system can be Android, iOS, or other possible operating systems; this application does not specifically limit the specific operating system used.

[0596] The transmission device provided in this application embodiment can realize Figure 2The various processes implemented in the method embodiments of this application, and the priority definition device provided in the embodiments of this application, can implement... Figure 3 The various processes implemented in the method embodiments achieve the same technical effect, and will not be described again here to avoid repetition.

[0597] like Figure 6 As shown, this application embodiment also provides a communication device 600, including a processor 601, a memory 602, and a program or instructions stored in the memory 602 and executable on the processor 601. For example, when the communication device 600 is a terminal or network-side device, the program or instructions, when executed by the processor 601, implement the various processes of the above-described transmission method embodiment, or implement the various processes of the above-described priority definition method embodiment, and achieve the same technical effect. To avoid repetition, further details are omitted here.

[0598] This application also provides a readable storage medium storing a program or instructions. When the program or instructions are executed by a processor, they implement the various processes of the above-described transmission method embodiments or the various processes of the above-described priority definition method embodiments, and can achieve the same technical effect. To avoid repetition, they will not be described again here.

[0599] The processor mentioned above is the processor in the terminal described in the above embodiments. The readable storage medium includes computer-readable storage media, such as computer read-only memory (ROM), random access memory (RAM), magnetic disk, or optical disk.

[0600] The communication device in this application embodiment can specifically be a terminal. Figure 7 A schematic diagram of the hardware structure of a terminal to implement an embodiment of this application.

[0601] The terminal 700 includes, but is not limited to, components such as: radio frequency unit 701, network module 702, audio output unit 703, input unit 704, sensor 705, display unit 706, user input unit 707, interface unit 708, memory 709, and processor 710.

[0602] Those skilled in the art will understand that the terminal 700 may also include a power supply (such as a battery) for supplying power to various components. The power supply may be logically connected to the processor 710 through a power management system, thereby enabling functions such as managing charging, discharging, and power consumption through the power management system. Figure 7 The terminal structure shown does not constitute a limitation on the terminal. The terminal may include more or fewer components than shown, or combine certain components, or have different component arrangements, which will not be elaborated here.

[0603] It should be understood that, in this embodiment, the input unit 704 may include a graphics processing unit (GPU) 7041 and a microphone 7042. The GPU 7041 processes image data of still images or videos obtained by an image capture device (such as a camera) in video capture mode or image capture mode. The display unit 706 may include a display panel 7061, which may be configured in the form of a liquid crystal display, an organic light-emitting diode, or the like. The user input unit 707 includes a touch panel 7071 and other input devices 7072. The touch panel 7071 is also called a touch screen. The touch panel 7071 may include a touch detection device and a touch controller. Other input devices 7072 may include, but are not limited to, a physical keyboard, function keys (such as volume control buttons, power buttons, etc.), a trackball, a mouse, and a joystick, which will not be described in detail here.

[0604] In this embodiment, the radio frequency unit 701 receives downlink data from the wireless access network (WLAN) side device and processes it with the processor 710; additionally, it sends uplink data to the WLAN side device. Typically, the radio frequency unit 701 includes, but is not limited to, an antenna, at least one amplifier, a transceiver, a coupler, a low-noise amplifier, and a duplexer.

[0605] The memory 709 can be used to store software programs or instructions and various data. The memory 709 may primarily include a program or instruction storage area and a data storage area. The program or instruction storage area may store the operating system, application programs or instructions required for at least one function (such as sound playback, image playback, etc.). Furthermore, the memory 709 may include high-speed random access memory and non-volatile memory, wherein the non-volatile memory may be read-only memory (ROM), programmable read-only memory (PROM), erasable programmable read-only memory (EPROM), electrically erasable programmable read-only memory (EEPROM), or flash memory. For example, at least one disk storage device, flash memory device, or other non-volatile solid-state storage device.

[0606] Processor 710 may include one or more processing units; optionally, processor 710 may integrate an application processor and a modem processor, wherein the application processor mainly handles the operating system, user interface, and applications or instructions, and the modem processor mainly handles wireless communication, such as a baseband processor. It is understood that the aforementioned modem processor may also not be integrated into processor 710.

[0607] The processor 710 is used in the first determining module 401 to determine the target transmission when the target resource and the first resource have at least partial overlap or meet the conflict condition or the reuse condition.

[0608] Wherein, the target resource is related to the side link SL, the target resource has or does not have a first Uu priority, the first resource has or does not have a second Uu priority, and the first Uu priority of the target resource includes: the Uu priority of the target resource, and / or, the Uu priority of at least some information corresponding to the target resource.

[0609] In some implementations, the first resource having a second Uu priority specifically includes at least one of the following:

[0610] The network side schedules, configures, or indicates the second Uu priority of the first resource;

[0611] Predefine or preconfigure the second Uu priority of the first resource.

[0612] In some implementations, the first resource not having a second Uu priority specifically includes at least one of the following:

[0613] The network side does not schedule, configure, or indicate the second Uu priority of the first resource;

[0614] There is no predefined or preconfigured second Uu priority for the first resource.

[0615] In some implementations, the first resource is used for at least one of the following:

[0616] URLLC transmission;

[0617] Transmissions exceeding the priority threshold;

[0618] Transmission exceeding reliability requirements;

[0619] Transmissions below the latency threshold, where the packet delay budget (PDB) is less than the PDB threshold, or where the remaining PDB is less than the remaining PDB threshold;

[0620] eMBB transmission;

[0621] Transmissions below the priority threshold;

[0622] Transmissions that fall below reliability requirements;

[0623] Transmissions exceeding the latency threshold, PDB greater than the PDB threshold, or remaining PDB greater than the remaining PDB threshold.

[0624] In some implementations, the processor 710 is configured to determine the first Uu priority of the target resource according to the mapping relationship and based on the first SL priority of the target resource;

[0625] The first SL priority of the target resource includes: the SL priority of the target resource, and / or the sidelink SL priority of at least some information corresponding to the target resource.

[0626] In some implementations, the first Uu priority of the target resource is a specific priority;

[0627] or,

[0628] When the first SL priority of the target resource meets a specific condition, the first Uu priority of the target resource is a specific priority.

[0629] In some implementations, the specific priority includes at least one of a first priority and a second priority.

[0630] In some implementations, the specific condition includes at least one of a first condition and a second condition.

[0631] In some implementations, when the first SL priority of the target resource satisfies a first condition, the first Uu priority of the target resource is the first priority;

[0632] And / or,

[0633] When the first SL priority of the target resource meets the second condition, the first Uu priority of the target resource becomes the second priority.

[0634] In some implementations, the first condition includes one or more of the following:

[0635] The first SL priority of the target resource is higher than or equal to the first preset priority;

[0636] The first SL priority value of the target resource is lower than or equal to the first preset priority value;

[0637] The second preset priority and / or the second preset priority value has not been configured or obtained.

[0638] The second condition is not met.

[0639] In some implementations, the second condition includes one or more of the following:

[0640] The first SL priority of the target resource is higher than or equal to the third preset priority;

[0641] The first SL priority value of the target resource is lower than or equal to the third preset priority value;

[0642] The fourth preset priority and / or the fourth preset priority value are not configured;

[0643] The first SL priority of the target resource is lower than or equal to the fifth preset priority;

[0644] The first SL priority value of the target resource is higher than or equal to the fifth preset priority value;

[0645] The first condition is not met.

[0646] In some implementations, the first Uu priority of the target resource includes one or more of the following:

[0647] The first specific Uu priority in the Uu priority of at least some information corresponding to the target resource;

[0648] The Uu priority corresponding to a specific SL priority in the SL priority of at least some information corresponding to the target resource;

[0649] The Uu priority of at least some information corresponding to the target resource.

[0650] In some implementations, the first Uu priority value of the target resource includes one or more of the following:

[0651] The first specific Uu priority value in the Uu priority values ​​of at least some information corresponding to the target resource;

[0652] The Uu priority value corresponding to a specific SL priority value in at least some of the information corresponding to the target resource;

[0653] The Uu priority value of at least some information corresponding to the target resource.

[0654] In some implementations, the target resource includes one or more of the following:

[0655] The resource where the target object is located, wherein the target object includes SL channels, SL signals, SL signaling, SL information and / or SL messages;

[0656] Uu channels, signals, and / or resources used for transmitting or indicating target content, the target content including SL signals, SL signaling, SL information, and / or SL messages;

[0657] SL Hybrid Automatic Repeat Request Response (HARQ-ACK);

[0658] Uplink resources carrying SL HARQ-ACK.

[0659] In some implementations, the target resource has a first Uu priority, the first resource has a second Uu priority, and the processor 710 is used for at least one of the following:

[0660] When the first Uu priority of the target resource and the second Uu priority of the first resource are the same or the difference is less than the first preset difference, at least some information corresponding to the target resource is transmitted.

[0661] When the first Uu priority of the target resource and the second Uu priority of the first resource are not the same or the difference is greater than a second preset difference, at least some information corresponding to the target resource is not transmitted.

[0662] In some implementations, the processor 710 is configured to transmit the target resource or the first resource according to the Uu priority when the first Uu priority of the target resource and the second Uu priority of the first resource are not the same or the difference is greater than a second preset difference.

[0663] In some implementations, the processor 710 is used for at least one of the following:

[0664] When the first Uu priority of the target resource and the second Uu priority of the first resource are the same and are both the first priority, at least some information corresponding to the target resource is transmitted.

[0665] When the first Uu priority of the target resource and the second Uu priority of the first resource are the same and the second priority is the second priority, at least some information corresponding to the target resource is transmitted.

[0666] In some implementations, the processor 710 is used for at least one of the following:

[0667] When the first Uu priority of the target resource is the first priority and the second Uu priority of the first resource is the second priority, at least some information corresponding to the target resource is not transmitted.

[0668] When the first Uu priority of the target resource is the second priority and the second Uu priority of the first resource is the first priority, at least some information corresponding to the target resource is not transmitted.

[0669] In some implementations, the target resource has a first Uu priority, and the first resource may or may not have a second Uu priority; the processor 710 is configured to perform at least one of the following:

[0670] When the first Uu priority of the target resource is higher than or equal to the first specific priority, and / or lower than or equal to the second specific priority, at least some information corresponding to the target resource is transmitted;

[0671] When the first Uu priority of the target resource is higher than or equal to the third specific priority, and / or lower than or equal to the fourth specific priority, at least some information corresponding to the target resource is not transmitted.

[0672] In some implementations, the target resource may or may not have a first Uu priority, the first resource has a second Uu priority, and the processor 710 is configured to perform at least one of the following:

[0673] When the second Uu priority of the first resource is the first priority, at least some information corresponding to the target resource is not transmitted;

[0674] When the second Uu priority of the first resource is the second priority, at least some information corresponding to the target resource is transmitted;

[0675] The first priority is higher than the second priority.

[0676] In some implementations, the target resource may or may not have a first Uu priority, the first resource has a second Uu priority, and the processor 710 is configured to perform at least one of the following:

[0677] When the second Uu priority of the first resource is the first priority, at least some information corresponding to the target resource is transmitted;

[0678] When the second Uu priority of the first resource is the second priority, at least some information corresponding to the target resource is not transmitted;

[0679] The first priority is higher than the second priority.

[0680] In some implementations, the processor 710 is used for at least one of the following:

[0681] Transmit at least a portion of the information corresponding to the target resource on the first resource;

[0682] When the first SL priority of the target resource is higher than or equal to the fifth specific priority, and / or lower than or equal to the sixth specific priority, at least some information corresponding to the target resource is transmitted;

[0683] When the first SL priority of the target resource is higher than or equal to the seventh specific priority, and / or lower than or equal to the eighth specific priority, at least some information corresponding to the target resource is not transmitted.

[0684] In some implementations, when the first resource has a second Uu priority and / or the first control signaling carries priority indication information, at least some information corresponding to the target resource is transmitted;

[0685] The first control signaling is used to schedule, configure, or instruct the first resource.

[0686] In some implementations, when the first resource does not have a second Uu priority and / or the first control signaling does not carry priority indication information, at least some information corresponding to the target resource is transmitted;

[0687] The first control signaling is used to schedule, configure, or instruct the first resource.

[0688] In some implementations, when transmitting at least a portion of the information corresponding to the target resource, the at least a portion of the information includes at least one of the following:

[0689] All information corresponding to the target resource;

[0690] Information that is the same as the second Uu priority of the first resource;

[0691] Information with a second Uu priority not lower than that of the first resource;

[0692] Information with a priority no higher than that of the first resource (second Uu priority);

[0693] The corresponding first SL priority is higher than the sixth preset priority;

[0694] The information that the first SL priority value is lower than the sixth preset priority value;

[0695] The corresponding first Uu priority is higher than the seventh preset priority;

[0696] The information that the first Uu priority value is lower than the seventh preset priority value;

[0697] The corresponding first SL priority is lower than the eighth preset priority;

[0698] The information corresponding to the first SL priority value being higher than the eighth preset priority value;

[0699] The corresponding first Uu priority is lower than the ninth preset priority;

[0700] The information corresponding to the first Uu priority value being higher than the ninth preset priority value.

[0701] In some implementations, when at least a portion of the information corresponding to the target resource is not transmitted, the at least a portion of the information includes at least one of the following:

[0702] All information corresponding to the target resource;

[0703] Information that has a different priority from the second Uu corresponding to the first resource;

[0704] Information with a priority no lower than that of the second Uu corresponding to the first resource;

[0705] Information that is not higher than the priority of the second Uu corresponding to the first resource;

[0706] The corresponding first SL priority is lower than the tenth preset priority;

[0707] The information corresponding to the first SL priority value being higher than the tenth preset priority value;

[0708] The corresponding first Uu priority is lower than the eleventh preset priority;

[0709] The information that the first Uu priority value is higher than the eleventh preset priority value;

[0710] The corresponding first SL priority is higher than the twelfth preset priority;

[0711] The information that the first SL priority value is lower than the twelve preset priority values;

[0712] The corresponding first Uu priority is higher than the thirteenth preset priority;

[0713] The information that the first Uu priority value is lower than the thirteenth preset priority value.

[0714] In some implementations, when multiple first resources overlap with the target resource, or meet conflict conditions, or meet reuse conditions, the processor 710 is configured to:

[0715] The target transmission is determined based on the first Uu priority of the target resource and / or the second Uu priority of each of the first resources.

[0716] In some implementations, when multiple first resources overlap with the target resource, or meet conflict conditions, or meet reuse conditions, the processor 710 is configured to:

[0717] According to a preset order, the target transmission is determined based on the second Uu priority of each of the first resources; wherein the preset order includes: the time-domain order of the plurality of first resources, the frequency-domain position order of the plurality of first resources, the identification order of the plurality of first resources, and / or the second Uu priority order of the plurality of first resources.

[0718] or,

[0719] The target transmission is determined based on the second specific Uu priority in the second Uu priority.

[0720] In some implementations, the priority of the target transmission is any one of the following:

[0721] The second Uu priority of the first resource;

[0722] The first Uu priority of the target resource;

[0723] The first SL priority of the target resource.

[0724] In some implementations, when the priority of the target transmission is the second Uu priority of the first resource, the second Uu priority of the first resource is higher than the first Uu priority or the first SL priority of the target resource;

[0725] Alternatively, when the priority of the target transmission is the first Uu priority or the first SL priority of the target resource, the first Uu priority or the first SL priority of the target resource is higher than the second Uu priority of the first resource.

[0726] In some implementations, the first resource is a Physical Uplink Control Channel (PUCCH) and / or a Physical Uplink Shared Channel (PUSCH) resource. For example, it could be a PUCCH and / or PUSCH with Uu priority. For instance, it could be a PUCCH and / or PUSCH corresponding to information with a corresponding Uu priority; it could also be other uplink signals, such as uplink reference signals, specifically SRS and PRS.

[0727] In some implementations, the priority of Uu is at least one of the following:

[0728] The priority of physical layer signaling indication;

[0729] Priority of high-level configurations;

[0730] Business priorities;

[0731] Logical channel priority.

[0732] In this embodiment, when the target resource and the first resource have at least partial overlap, or meet conflict conditions or reuse conditions, the target transmission is determined to ensure that the understanding between the network side and the terminal side is consistent and improve the reliability of the sidelink.

[0733] The processor 710 is used to configure or obtain the mapping relationship between the first Uu priority and the first SL priority of the target resource;

[0734] The first Uu priority of the target resource is determined according to the mapping relationship;

[0735] Wherein, the target resource is related to SL, and the first Uu priority of the target resource includes: the Uu priority of the target resource, and / or the Uu priority of at least some information corresponding to the target resource; the target resource has a first SL priority, and the first SL priority of the target resource includes: the SL priority of the target resource, and / or the sidelink SL priority of at least some information corresponding to the target resource.

[0736] In some implementations, the mapping relationship satisfies:

[0737] The first Uu priority of the target resource is a specific priority;

[0738] or,

[0739] When the first SL priority of the target resource meets a specific condition, the first Uu priority of the target resource is the specific priority corresponding to the specific condition.

[0740] In some implementations, the specific priority includes at least one of a first priority and a second priority.

[0741] In some implementations, the specific condition includes at least one of a first condition and a second condition.

[0742] In some implementations, when the first SL priority of the target resource satisfies a first condition, the first Uu priority of the target resource is the first priority;

[0743] And / or, when the first SL priority of the target resource satisfies the second condition, the first Uu priority of the target resource becomes the second priority.

[0744] In some implementations, the first condition includes one or more of the following:

[0745] The first SL priority of the target resource is higher than or equal to the first preset priority;

[0746] The first SL priority value of the target resource is lower than or equal to the first preset priority value;

[0747] The second preset priority and / or the second preset priority value has not been configured or obtained.

[0748] The second condition is not met.

[0749] In some implementations, the second condition includes one or more of the following:

[0750] The first SL priority of the target resource is higher than or equal to the third preset priority;

[0751] The first SL priority value of the target resource is lower than or equal to the third preset priority value;

[0752] The fourth preset priority and / or the fourth preset priority value have not been configured or obtained.

[0753] The first SL priority of the target resource is lower than or equal to the fifth preset priority;

[0754] The first SL priority value of the target resource is higher than or equal to the fifth preset priority value;

[0755] The first condition is not met.

[0756] In some implementations, the first Uu priority of the target resource is any one of the following:

[0757] The first specific Uu priority in the Uu priority of at least some information corresponding to the target resource;

[0758] The Uu priority corresponding to a specific SL priority in the SL priority of at least some information corresponding to the target resource;

[0759] The Uu priority of the information corresponding to the target resource.

[0760] In some implementations, the first Uu priority value of the target resource is any one of the following:

[0761] The first specific Uu priority value in the Uu priority values ​​of at least some information corresponding to the target resource;

[0762] The Uu priority value corresponding to a specific SL priority value in at least some of the information corresponding to the target resource;

[0763] The Uu priority value of at least some information corresponding to the target resource.

[0764] In some implementations, the target resource includes one or more of the following:

[0765] The resource where the target object is located, wherein the target object includes SL channels, SL signals, SL signaling, SL information and / or SL messages;

[0766] Uu channels, signals, and / or resources used to transmit or indicate target content, the target content including SL signals, SL signaling, and / or SL messages;

[0767] SL HARQ-ACK;

[0768] Uplink resources carrying SL HARQ-ACK.

[0769] In this embodiment, when the target resource and the first resource have at least partial overlap, or meet conflict conditions or reuse conditions, the target transmission is determined to ensure that the understanding between the network side and the terminal side is consistent and improve the reliability of the sidelink.

[0770] The communication device in this application embodiment can specifically be a network-side device, such as... Figure 8 As shown, the network-side device 800 includes: an antenna 81, a radio frequency (RF) device 82, and a baseband device 83. The antenna 81 is connected to the RF device 82. In the uplink direction, the RF device 82 receives information through the antenna 81 and sends the received information to the baseband device 83 for processing. In the downlink direction, the baseband device 83 processes the information to be transmitted and sends it to the RF device 82. The RF device 82 processes the received information and then transmits it through the antenna 81.

[0771] The aforementioned frequency band processing device can be located in the baseband device 83. The method executed by the network-side device in the above embodiments can be implemented in the baseband device 83, which includes a processor 84 and a memory 85.

[0772] Baseband device 83 may include, for example, at least one baseband board on which multiple chips are disposed, such as... Figure 8 As shown, one of the chips, for example, is a processor 84, which is connected to a memory 85 to call the program in the memory 85 and execute the network-side device operations shown in the above method embodiments.

[0773] The baseband device 83 may also include a network interface 86 for exchanging information with the radio frequency device 82, such as a common public radio interface (CPRI).

[0774] Specifically, the network-side device in this embodiment of the invention further includes: instructions or programs stored in memory 85 and executable on processor 84, wherein processor 84 calls the instructions or programs in memory 85 to execute. Figure 4 or Figure 5 The methods executed by each module shown achieve the same technical effect, and to avoid repetition, they will not be described in detail here.

[0775] This application embodiment also provides a chip, which includes a processor and a communication interface. The communication interface is coupled to the processor. The processor is used to run terminal programs or instructions to implement the various processes of the above-described transmission method embodiment or the various processes of the above-described priority definition method embodiment, and can achieve the same technical effect. To avoid repetition, it will not be described again here.

[0776] It should be understood that the chip mentioned in the embodiments of this application may also be referred to as a system-on-a-chip, system chip, chip system, or system-on-a-chip, etc.

[0777] It should be noted that, in this document, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such a process, method, article, or apparatus. Without further limitations, an element defined by the phrase "comprising one..." does not exclude the presence of other identical elements in the process, method, article, or apparatus that includes that element. Furthermore, it should be noted that the scope of the methods and apparatuses in the embodiments of this application is not limited to performing functions in the order shown or discussed, but may also include performing functions substantially simultaneously or in the reverse order, depending on the functions involved. For example, the described methods may be performed in a different order than described, and various steps may be added, omitted, or combined. Additionally, features described with reference to certain examples may be combined in other examples.

[0778] Through the above description of the embodiments, those skilled in the art can clearly understand that the methods of the above embodiments can be implemented by means of software plus necessary general-purpose hardware platforms. Of course, they can also be implemented by hardware, but in many cases the former is a better implementation method. Based on this understanding, the technical solution of this application, in essence, or the part that contributes to the prior art, can be embodied in the form of a software product. This computer software product is stored in a storage medium (such as ROM / RAM, magnetic disk, optical disk) and includes several instructions to cause a terminal (which may be a mobile phone, computer, server, air conditioner, or network-side device, etc.) to execute the methods described in the various embodiments of this application.

[0779] The embodiments of this application have been described above with reference to the accompanying drawings. However, this application is not limited to the specific embodiments described above. The specific embodiments described above are merely illustrative and not restrictive. Those skilled in the art can make many other forms under the guidance of this application without departing from the spirit and scope of the claims, and all of these forms are within the protection scope of this application.

Claims

1. A transmission method applied to a communication device, characterized in that, The method includes: The target transmission is determined when the target resource and the first resource overlap at least partially, or when a conflict condition or a reuse condition is met. Wherein, the target resource is related to the side link SL, the target resource may or may not have a first Uu priority, the first resource has a second Uu priority, and the first Uu priority of the target resource includes: the Uu priority of the target resource, and / or, the Uu priority of at least some information corresponding to the target resource; The determination of the target transmission includes at least one of the following: When the second Uu priority of the first resource is the first priority, at least some information corresponding to the target resource is not transmitted; When the second Uu priority of the first resource is the second priority, at least some information corresponding to the target resource is transmitted; Wherein, the first priority is a high priority or a corresponding high priority value or a priority index 1, and the second priority is a low priority or a corresponding low priority value or a priority index 0.

2. The method according to claim 1, characterized in that, The first priority is higher than the second priority, or the priority value of the first priority is higher than the priority value of the second priority.

3. The method according to claim 1, characterized in that, The first resource having a second Uu priority is determined based on at least one of the following: The network side schedules, configures, or indicates the second Uu priority of the first resource; Predefine or preconfigure the second Uu priority of the first resource.

4. The method according to claim 1, characterized in that, The first resource does not have the second Uu priority based on at least one of the following: The network side did not schedule, configure, or indicate the second Uu priority of the first resource; There is no predefined or preconfigured second Uu priority for the first resource.

5. The method according to claim 1, characterized in that, The first resource is used for at least one of the following: URLLC transmission; Transmissions exceeding the priority threshold; Transmission exceeding reliability requirements; Transmissions below the latency threshold, where the packet delay budget (PDB) is less than the PDB threshold, or where the remaining PDB is less than the remaining PDB threshold; eMBB transmission; Transmissions below the priority threshold; Transmissions that fall below reliability requirements; Transmissions exceeding the latency threshold, PDB greater than the PDB threshold, or remaining PDB greater than the remaining PDB threshold.

6. The method according to claim 1, characterized in that, The method further includes: Based on the mapping relationship, the first Uu priority of the target resource is determined according to the first SL priority of the target resource; The first SL priority of the target resource includes: the SL priority of the target resource, and / or the sidelink SL priority of at least some information corresponding to the target resource.

7. The method according to claim 1 or 6, characterized in that, The first Uu priority of the target resource is a specific priority; or, When the first SL priority of the target resource meets a specific condition, the first Uu priority of the target resource is a specific priority.

8. The method according to claim 7, characterized in that, The specific priority includes at least one of the first priority and the second priority.

9. The method according to claim 7, characterized in that, The specific conditions include at least one of the first condition and the second condition.

10. The method according to claim 7, characterized in that, When the first SL priority of the target resource meets the first condition, the first Uu priority of the target resource is the first priority; And / or, When the first SL priority of the target resource meets the second condition, the first Uu priority of the target resource becomes the second priority.

11. The method according to claim 10, characterized in that, The first condition includes one or more of the following: The first SL priority of the target resource is higher than or equal to the first preset priority; The first SL priority value of the target resource is lower than or equal to the first preset priority value; The second preset priority and / or the second preset priority value has not been configured or obtained. The second condition is not met.

12. The method according to claim 10, characterized in that, The second condition includes one or more of the following: The first SL priority of the target resource is higher than or equal to the third preset priority; The first SL priority value of the target resource is lower than or equal to the third preset priority value; The fourth preset priority and / or the fourth preset priority value have not been configured or obtained. The first SL priority of the target resource is lower than or equal to the fifth preset priority; The first SL priority value of the target resource is higher than or equal to the fifth preset priority value; The first condition is not met.

13. The method according to claim 1, characterized in that, The first Uu priority of the target resource includes one or more of the following: The first specific Uu priority in the Uu priority of at least some information corresponding to the target resource; The Uu priority corresponding to a specific SL priority in the SL priority of at least some information corresponding to the target resource; The Uu priority of at least some information corresponding to the target resource.

14. The method according to claim 1, characterized in that, The first Uu priority value of the target resource includes one or more of the following: The first specific Uu priority value in the Uu priority values ​​of at least some information corresponding to the target resource; The Uu priority value corresponding to a specific SL priority value in at least some of the information corresponding to the target resource; The Uu priority value of at least some information corresponding to the target resource.

15. The method according to claim 1, characterized in that, The target resource includes one or more of the following: The resource where the target object is located, wherein the target object includes SL channels, SL signals, SL signaling, SL information and / or SL messages; Uu channels, signals, and / or resources used for transmitting or indicating target content, the target content including SL signals, SL signaling, SL information, and / or SL messages; SL Hybrid Automatic Repeat Request Response (HARQ-ACK); Uplink resources carrying SL HARQ-ACK.

16. The method according to claim 1, characterized in that, The target resource has a first Uu priority, the first resource has a second Uu priority, and determining the target transmission includes at least one of the following: When the first Uu priority of the target resource and the second Uu priority of the first resource are the same or the difference is less than the first preset difference, at least some information corresponding to the target resource is transmitted. When the first Uu priority of the target resource and the second Uu priority of the first resource are not the same or the difference is greater than a second preset difference, at least some information corresponding to the target resource is not transmitted.

17. The method according to claim 16, characterized in that, The method further includes: When the first Uu priority of the target resource and the second Uu priority of the first resource are not the same or the difference is greater than a second preset difference, the target resource or the first resource is transmitted according to the Uu priority.

18. The method according to claim 16, characterized in that, The determination of the target transmission includes at least one of the following: When the first Uu priority of the target resource and the second Uu priority of the first resource are the same and are both the first priority, at least some information corresponding to the target resource is transmitted. When the first Uu priority of the target resource and the second Uu priority of the first resource are the same and the second priority is the second priority, at least some information corresponding to the target resource is transmitted.

19. The method according to claim 16, characterized in that, The determination of the target transmission includes at least one of the following: When the first Uu priority of the target resource is the first priority and the second Uu priority of the first resource is the second priority, at least some information corresponding to the target resource is not transmitted. When the first Uu priority of the target resource is the second priority and the second Uu priority of the first resource is the first priority, at least some information corresponding to the target resource is not transmitted.

20. The method according to claim 1, characterized in that, The target resource has a first Uu priority, and the first resource may or may not have a second Uu priority. Determining the target transmission includes at least one of the following: When the first Uu priority of the target resource is higher than or equal to the first specific priority, and / or lower than or equal to the second specific priority, at least some information corresponding to the target resource is transmitted; When the first Uu priority of the target resource is higher than or equal to the third specific priority, and / or lower than or equal to the fourth specific priority, at least some information corresponding to the target resource is not transmitted.

21. The method according to claim 1, characterized in that, The target resource may or may not have a first Uu priority, the first resource has a second Uu priority, and determining the target transmission includes at least one of the following: When the second Uu priority of the first resource is the first priority, at least some information corresponding to the target resource is transmitted; When the second Uu priority of the first resource is the second priority, at least some information corresponding to the target resource is not transmitted; The first priority is higher than the second priority.

22. The method according to claim 1, characterized in that, The determination of the target transmission includes at least one of the following: Transmit at least some information corresponding to the target resource; When the first SL priority of the target resource is higher than or equal to the fifth specific priority, and / or lower than or equal to the sixth specific priority, at least some information corresponding to the target resource is transmitted; When the first SL priority of the target resource is higher than or equal to the seventh specific priority, and / or lower than or equal to the eighth specific priority, at least part of the information corresponding to the target resource is not transmitted.

23. The method according to claim 1, characterized in that, The determination of the target transmission includes: When the first resource has a second Uu priority, and / or the first control signaling carries priority indication information, at least some information corresponding to the target resource is transmitted; The first control signaling is used to schedule, configure, or instruct the first resource.

24. The method according to claim 1, characterized in that, The determination of the target transmission includes: When the first resource does not have a second Uu priority, and / or the first control signaling does not carry priority indication information, at least some information corresponding to the target resource is transmitted; The first control signaling is used to schedule, configure, or instruct the first resource.

25. The method according to any one of claims 15 to 24, characterized in that, When transmitting at least a portion of the information corresponding to the target resource, the at least a portion of the information includes at least one of the following: All information corresponding to the target resource; Information that is the same as the second Uu priority of the first resource; Information with a second Uu priority not lower than that of the first resource; Information with a priority no higher than that of the first resource (second Uu priority); The corresponding first SL priority is higher than the sixth preset priority; The information that the first SL priority value is lower than the sixth preset priority value; The corresponding first Uu priority is higher than the seventh preset priority; The information that the first Uu priority value is lower than the seventh preset priority value; The corresponding first SL priority is lower than the eighth preset priority; The information corresponding to the first SL priority value being higher than the eighth preset priority value; The corresponding first Uu priority is lower than the ninth preset priority; The information corresponding to the first Uu priority value being higher than the ninth preset priority value.

26. The method according to any one of claims 15 to 24, characterized in that, When at least some information corresponding to the target resource is not transmitted, the at least some information includes at least one of the following: All information corresponding to the target resource; Information that differs from the second Uu priority of the first resource; Information with a second Uu priority not lower than that of the first resource; Information with a priority no higher than that of the first resource (second Uu priority); The corresponding first SL priority is lower than the tenth preset priority; The information corresponding to the first SL priority value being higher than the tenth preset priority value; The corresponding first Uu priority is lower than the eleventh preset priority; The information that the first Uu priority value is higher than the eleventh preset priority value; The corresponding first SL priority is higher than the twelfth preset priority; The information that the first SL priority value is lower than the twelve preset priority values; The corresponding first Uu priority is higher than the thirteenth preset priority; The information that the first Uu priority value is lower than the thirteenth preset priority value.

27. The method according to any one of claims 15 to 24, characterized in that, When multiple instances of the first resource overlap with the target resource, meet conflict conditions, or meet reuse conditions, the method further includes: The target transmission is determined based on the first Uu priority of the target resource and / or the second Uu priority of each of the first resources.

28. The method according to any one of claims 15 to 24, characterized in that, When multiple instances of the first resource overlap with the target resource, meet conflict conditions, or meet reuse conditions, the method further includes: According to a preset order, the target transmission is determined based on the second Uu priority of each of the first resources; wherein the preset order includes: the time-domain order of the plurality of first resources, the frequency-domain position order of the plurality of first resources, the identification order of the plurality of first resources, and / or the second Uu priority order of the plurality of first resources. or, The target transmission is determined based on the second specific Uu priority in the second Uu priority.

29. The method according to claim 1, characterized in that, The priority of the target transmission is any one of the following: The second Uu priority of the first resource; The first Uu priority of the target resource; The first SL priority of the target resource.

30. The method according to claim 29, characterized in that, When the priority of the target transmission is the second Uu priority of the first resource, the second Uu priority of the first resource is higher than the first Uu priority or the first SL priority of the target resource. or, When the priority of the target transmission is the first Uu priority or the first SL priority of the target resource, the first Uu priority or the first SL priority of the target resource is higher than the second Uu priority of the first resource.

31. The method according to claim 1, characterized in that, The first resource is the Physical Uplink Control Channel (PUCCH) and / or the Physical Uplink Shared Channel (PUSCH) resource.

32. The method according to claim 1, characterized in that, After determining the target transmission, the target transmission is performed on the first resource.

33. The method according to claim 1, characterized in that, Uu priority is at least one of the following: The priority of physical layer signaling indication; Priority of high-level configurations; Business priorities; Logical channel priority.

34. A priority definition method, applied to communication equipment, characterized in that, The method includes: Configure or obtain the mapping relationship between the first Uu priority and the first SL priority of the target resource; The first Uu priority of the target resource is determined according to the mapping relationship; Wherein, the target resource is related to SL, the target resource may or may not have a first Uu priority, the first Uu priority of the target resource includes: the Uu priority of the target resource, and / or the Uu priority of at least some information corresponding to the target resource; the first SL priority of the target resource includes: the SL priority of the target resource, and / or the SL priority of at least some information corresponding to the target resource; Among them, the first resource has the second Uu priority; When the target resource at least partially overlaps with the first resource, or meets a conflict condition, or meets a reuse condition, the target transmission is determined, including at least one of the following: When the second Uu priority of the first resource is the first priority, at least some information corresponding to the target resource is not transmitted; When the second Uu priority of the first resource is the second priority, at least some information corresponding to the target resource is transmitted; Wherein, the first priority is a high priority or a corresponding high priority value or a priority index 1, and the second priority is a low priority or a corresponding low priority value or a priority index 0.

35. The method according to claim 34, characterized in that, The first priority is higher than the second priority, or the priority value of the first priority is higher than the priority value of the second priority.

36. The method according to claim 34, characterized in that, The mapping relationship satisfies: The first Uu priority of the target resource is a specific priority; or, When the first SL priority of the target resource meets a specific condition, the first Uu priority of the target resource is the specific priority corresponding to the specific condition.

37. The method according to claim 36, characterized in that, The specific priority includes at least one of the first priority and the second priority.

38. The method according to claim 36, characterized in that, The specific conditions include at least one of the first condition and the second condition.

39. The method according to claim 34, characterized in that, When the first SL priority of the target resource meets the first condition, the first Uu priority of the target resource is the first priority; And / or, When the first SL priority of the target resource meets the second condition, the first Uu priority of the target resource becomes the second priority.

40. The method according to claim 39, characterized in that, The first condition includes one or more of the following: The first SL priority of the target resource is higher than or equal to the first preset priority; The first SL priority value of the target resource is lower than or equal to the first preset priority value; The second preset priority and / or the second preset priority value has not been configured or obtained. The second condition is not met.

41. The method according to claim 39, characterized in that, The second condition includes one or more of the following: The first SL priority of the target resource is higher than or equal to the third preset priority; The first SL priority value of the target resource is lower than or equal to the third preset priority value; The fourth preset priority and / or the fourth preset priority value have not been configured or obtained. The first SL priority of the target resource is lower than or equal to the fifth preset priority; The first SL priority value of the target resource is higher than or equal to the fifth preset priority value; The first condition is not met.

42. The method according to claim 34, characterized in that, The Uu priority of the target resource is any one of the following: The first specific Uu priority in the Uu priority of at least some information corresponding to the target resource; The Uu priority corresponding to a specific SL priority in the SL priority of at least some information corresponding to the target resource; The Uu priority of at least some information corresponding to the target resource.

43. The method according to claim 34, characterized in that, The Uu priority value of the target resource is any one of the following: The first specific Uu priority value in the Uu priority values ​​of at least some information corresponding to the target resource; The Uu priority value corresponding to a specific SL priority value in at least some of the information corresponding to the target resource; The Uu priority value of at least some information corresponding to the target resource.

44. The method according to claim 34, characterized in that, The target resource includes one or more of the following: The resource where the target object is located, wherein the target object includes SL channels, SL signals, SL signaling, SL information and / or SL messages; Uu channels, signals, and / or resources used for transmitting or indicating target content, the target content including SL signals, SL signaling, SL information, and / or SL messages; SL HARQ-ACK; Uplink resources carrying SL HARQ-ACK.

45. A transmission device, applied to communication equipment, characterized in that, The device includes: The first determining module is used to determine the target transmission when the target resource and the first resource have at least partial overlap, meet the conflict condition, or meet the reuse condition; Wherein, the target resource is related to SL, the target resource may or may not have a first Uu priority, the first resource has a second Uu priority, and the first Uu priority of the target resource includes: the Uu priority of the target resource, and / or, the Uu priority of at least some information corresponding to the target resource; The first determining module is specifically used for at least one of the following: When the second Uu priority of the first resource is the first priority, at least some information corresponding to the target resource is not transmitted; When the second Uu priority of the first resource is the second priority, at least some information corresponding to the target resource is transmitted; Wherein, the first priority is a high priority or a corresponding high priority value or a priority index 1, and the second priority is a low priority or a corresponding low priority value or a priority index 0.

46. ​​A priority definition device, applied to a communication device, characterized in that, The device includes: The processing module is used to configure or obtain the mapping relationship between the first Uu priority and the first SL priority of the target resource; The second determining module is used to determine the first Uu priority of the target resource according to the mapping relationship; Wherein, the target resource is related to SL, the target resource may or may not have a first Uu priority, the first Uu priority of the target resource includes: the Uu priority of the target resource, and / or the Uu priority of at least some information corresponding to the target resource; the first SL priority of the target resource includes: the SL priority of the target resource, and / or the sidelink SL priority of at least some information corresponding to the target resource; Among them, the first resource has the second Uu priority; When the target resource at least partially overlaps with the first resource, or meets a conflict condition, or meets a reuse condition, the second determining module is further configured to determine the target transmission, specifically for at least one of the following: When the second Uu priority of the first resource is the first priority, at least some information corresponding to the target resource is not transmitted; When the second Uu priority of the first resource is the second priority, at least some information corresponding to the target resource is transmitted; Wherein, the first priority is a high priority or a corresponding high priority value or a priority index 1, and the second priority is a low priority or a corresponding low priority value or a priority index 0.

47. A communication device, characterized in that, It includes a processor, a memory, and a program or instructions stored in the memory and executable on the processor, wherein when the program or instructions are executed by the processor, they implement the steps of the transmission method as described in any one of claims 1 to 33, or the steps of the priority definition method as described in any one of claims 34 to 43.

48. A readable storage medium, characterized in that, The readable storage medium stores a program or instructions that, when executed by a processor, implement the steps of the transmission method as described in any one of claims 1 to 33, or the steps of the priority definition method as described in any one of claims 34 to 43.