Oil and water well plugging device and use method

By designing the oil and water well plugging device of the spigot, material barrel and control assembly, the problems of low construction efficiency and poor plugging effect in the existing technology are solved, and the rapid judgment of the underground plugging situation and accurate depth adjustment are achieved. The sealing success rate and construction efficiency are improved, and the cost is reduced.

CN114482914BActive Publication Date: 2024-10-22CHINA PETROLEUM & CHEMICAL CORP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202011166761.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-10-27
Publication Date
2024-10-22
Estimated Expiration
2040-10-27

AI Technical Summary

Technical Problem

Existing oil and water well plugging technology has problems in construction such as low construction efficiency, high labor intensity, poor plugging effect, and difficulty in achieving accurate plugging when the distance between the production layer and the plugging layer is less than 1m.

Method used

An oil and water well plugging device is designed, including a spigot, a material holding barrel and a control assembly. It uses components such as a transmission guide wheel, a tension gauge, a magnetic positioning nipple, a sliding sleeve and a striker sleeve to quickly determine the downhole sealing Blockage conditions, accurate depth adjustment and efficient sand filling and ash coating reduce construction costs.

Benefits of technology

Significantly improves the efficiency and success rate of oil and water well plugging construction, reduces the labor intensity of operators, reduces plugging position errors, avoids the occurrence of "flagpole" and "enema" phenomena, and performs well under small interlayer conditions The integrated operation of sealing and depth adjustment was realized.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114482914B_ABST
    Figure CN114482914B_ABST
Patent Text Reader

Abstract

The present invention is an oil and water well plugging device and a method of use. The present invention includes a faucet, a material holding barrel and a control assembly, the faucet is connected to the material holding barrel and the control assembly in sequence; the transmission guide wheel includes a transverse guide wheel and a center guide wheel, and a tension meter is also installed in the cable hanging the center guide wheel; the control assembly is provided with an injection outer barrel, a sliding sleeve and a striker sleeve, the body of the sliding sleeve is provided with a sliding sleeve overflow port, the body of the injection outer barrel is provided with an external overflow port, the sliding sleeve is installed in the injection outer barrel above the shear pin, the striker sleeve is fixed in the injection outer barrel below the shear pin, and the striker is installed in the striker sleeve; one end of the material holding barrel hoisting cable is connected to the power device, and the other end is connected to the faucet after passing between the transverse guide wheel and the center guide wheel. The present invention transmits through the material holding barrel hoisting cable, the construction speed is fast, and the labor intensity of the operator is low; not only can the ash covering operation be realized, but also the sand filling operation can be realized, the construction efficiency is greatly improved, and there is no risk of stuck pipe column.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a plugging device for oil and water wells in the petroleum industry and a use method thereof, in particular to a plugging device for oil and water wells and a use method thereof. Background Art

[0002] With the continuous deepening of oil field exploration and development, there are more and more old wells. In order to improve the recovery rate of crude oil, wells that need to be sealed and modified are also emerging. According to statistics, the number of oil and water wells that need to be sealed and modified in oil fields increases every year.

[0003] At present, the commonly used method for sealing and modifying layers of oil and water wells is to use pump trucks and tank trucks on the ground to cooperate with the working pipe string lowered into the well to achieve mechanical sealing of the working pipe string or to drop the working pipe string underground to fill the oil and water layer with sand or inject cement plugs. Among them, sand filling is the simplest sealing method, but the permeability of sand is good. When the filled sand column is not high enough, the sealing effect of the oil and water layer is not good. It is necessary to cover the sand surface with about 5m of cement mortar to ensure the sealing effect. If the pressure of the blocked oil and water layer is too high and there is overflow, covering the bridge plug or sand surface with cement can enhance the sealing effect. In addition, sand filling and cement covering are also used in the following situations:

[0004] 1. The operating pipe string left underground by the release method has been working for a long time, and the changes in the underground production dynamics are inconsistent with the geological analysis. Therefore, when checking the pump, the release device is probed back. If the position of the release device has not changed, it may be that the release device has failed. It is also necessary to cover the release device with 0.5m of sand and then about 5m of cement mortar.

[0005] 2. If the position of the releasing device is normal during the releasing operation, but the pressure test fails, it is also necessary to cover the releasing device with 0.5m of sand and then about 5m of cement mortar.

[0006] The process of cement injection using the working pipe connected by the oil pipe is as follows: after the working pipe is lowered to the set position in the well, the mortar prepared on the ground is pumped into the well by the pump truck, and then the working pipe is replaced and lifted to a safe position. From the perspective of the entire process, the workload of cement injection using the working pipe is large, the construction efficiency is low, and the operation time is long. Due to sudden pump stop during construction, leakage in the construction pipe, or abnormal increase in the pressure of the pump truck, the mortar solidifies in the entire pipe string, and the forward and reverse wells cannot be washed, which is the so-called "enema" phenomenon; only part of the mortar replaces the pipe shoe, the forward and reverse wells cannot be washed, and the pipe string cannot be pulled out, which is the so-called "flagpole insertion" phenomenon.

[0007] In order to solve the problems in the cement injection construction of oil and water well plugging, there are currently several cement injection methods and devices:

[0008] The patent document with application number 201621085059.6 discloses a cable-transported impact cement injection device for oil well plugging. The upper end of the upper joint of the device is connected to the perforating faucet, and the lower end is connected to the cement injection cylinder. The cement injection cylinder has a slurry inlet; the cement injection cylinder has a built-in casing for slurry injection, and a glass sheet is at the bottom; the upper end of the lower joint is threadedly connected to the lower end of the cement injection cylinder, and the lower end is threadedly connected to the impact tail valve; the impact tail valve consists of a balancing slider and a striker. When in use, first connect the faucet, tilt the cement injection cylinder with the ground, and pour cement slurry. Then put it into the well, and the striker falls by its own weight, so that the top of the striker is at a safe distance from the glass sheet. During the process of going down the well, since the bottom of the striker is located in the center of the wellbore, even if it encounters resistance due to deformation of the wellbore, the striker will not hit it by mistake. After reaching the target depth, the cable is lowered faster to cause the cement injection cylinder to encounter resistance. When the striker encounters resistance, the striker moves upward to break the glass sheet, and the cement slurry falls to complete the cement injection. Although the device has a simple structure and is easy to operate, the glass sheets are fragile and have poor impact resistance. In addition, the weight of the mortar injection device filled with mortar is very small compared to the weight of the entire well entry system, and it is impossible to immediately determine whether the construction is successful after a collision.

[0009] Patent document No. 99247367.5 discloses a casing oil layer isolation device, which does not use cement trucks and tank trucks, but only uses cable trucks to complete the ash injection operation. The cable ash injector is mainly composed of an ignition system, a power transmission system and an ash injection tool. It is characterized in that the ignition head of the ignition system is connected to the combustion chamber and the gunpowder chamber by a thread, and the gunpowder chamber, the combustion chamber, the top liquid cylinder and the hollow piston and the inner piston form a high-pressure sealing area, the top liquid cylinder is connected to the power liquid pipe, the power liquid pipe is connected to the bottom liquid cylinder, and the bottom of the bottom liquid cylinder is connected to the lower joint, cement barrel, ash pouring liquid cylinder and lower plug in turn. The gunpowder in this device has great safety hazards during transportation and use.

[0010] The patent document with application number 201420595630.3 discloses a ash injection barrel, which includes an upper joint, an upper cone, a cylinder and a lower joint. The lower outer side of the upper joint is fixed to the upper inner side of the upper cone, the lower end of the upper cone is fixed to the upper end of the cylinder, the lower inner side of the cylinder is fixed to the upper outer side of the lower joint, a gland is fixedly installed on the lower outer side of the lower joint, the bottom end of the gland is located below the bottom end of the lower joint, there is a through hole at the bottom end of the gland, a glass plate is fixedly installed on the inner side of the bottom end of the gland, a striker capable of smashing the glass plate upward is fixed on the gland below the glass plate, and at least two longitudinal through holes are distributed on the upper cone. In the process of injecting cement slurry, the cement slurry can be accurately injected into the well section above the bridge plug, which improves the reliability of wellbore plugging, ensures the orderly progress of subsequent downhole operations, and improves work efficiency. However, the ash injection barrel still relies on being connected to the oil pipe and is lowered to the designated position with the oil pipe to achieve the purpose of ash injection. The glass pieces in the device are also fragile and have poor impact resistance.

[0011] Although the above-mentioned device and method can achieve the plugging and lime injection of oil and water wells and have a certain effect, when the distance between the production layer and the plugging layer is less than 1m, the above-mentioned plugging method and device have no depth calibration function and it is difficult to achieve effective plugging of the target layer. Summary of the invention

[0012] The purpose of the present invention is to provide an oil and water well plugging device and a method of use, which can be covered with ash or filled with sand, and can quickly determine the plugging operation status of the well, thereby improving the efficiency and success rate of oil and water well plugging construction, reducing the labor intensity of construction personnel, and reducing operating costs.

[0013] The technical solution of the present invention is:

[0014] An oil and water well plugging device comprises a faucet, a material holding barrel and a control assembly, wherein the material holding barrel is provided with a filling port, the barrel is filled with filling materials, and the control assembly is provided with a striker, wherein:

[0015] The faucet is connected to the material container and the control assembly in sequence;

[0016] The transmission guide wheel includes a transverse guide wheel and a center guide wheel. The center guide wheel is suspended at the wellhead by a cable. A tension meter is also installed in the cable suspending the center guide wheel.

[0017] The control assembly is provided with an injection outer cylinder, a sliding sleeve and a striker sleeve, a sliding sleeve overflow port is provided in the body of the sliding sleeve, an external overflow port is provided in the body of the injection outer cylinder, the sliding sleeve is installed in the injection outer cylinder above the shear pin, the striker sleeve is fixed in the injection outer cylinder below the shear pin, and the striker is installed in the striker sleeve;

[0018] One end of the material barrel hoisting cable is connected to the power device, and the other end is connected to the faucet after passing between the transverse guide wheel and the central guide wheel.

[0019] A discharge cavity is provided at the bottom of the sliding sleeve, and the discharge cavity is a hollow isosceles trapezoidal inner cavity; the overflow port of the sliding sleeve and the discharge cavity are both arranged at the lower part of the sliding sleeve, and at least one overflow port of the sliding sleeve is provided.

[0020] The firing pin is a T-shaped pin, and a booster spring is arranged between the firing pin and the firing pin sleeve. The maximum outer diameter of the firing pin is smaller than the minimum inner diameter of the discharge cavity.

[0021] The upper end of the injection outer cylinder is an upper joint of the control assembly with a connecting thread, the middle part of the inner cavity of the injection outer cylinder is provided with a sliding sleeve limiting step, and the lower part of the inner cavity is provided with an external overflow port; the external overflow port is arranged below the shear pin and corresponds to the striker sleeve, when the striker in the striker sleeve encounters an obstacle and breaks the shear pin and the sliding sleeve falls onto the striker sleeve, the external overflow port corresponds to the sliding sleeve overflow port.

[0022] The booster spring is installed in the cylinder of the striker sleeve and the upper end is welded to the lower end surface of the large diameter end of the striker. The lower end of the booster spring is welded to the upper end surface of the lower end of the striker sleeve. The outer diameter of the large diameter end of the striker is larger than the inner diameter of the cylinder of the striker sleeve.

[0023] The lower end of the striker is connected to the chassis by welding or threading, and the diameter of the chassis is set between 65% and 75% of the inner diameter of the casing of the working well.

[0024] A rubber plug is embedded or bonded on the lower end surface of the chassis, and the rubber plug is made of a water-expandable material.

[0025] The dynamometer is a dynamometer with a remote transmission function; the upper end of the faucet is also provided with a universal joint, and the universal joint is connected to the lifting cable of the material barrel.

[0026] The material barrel consists of a barrel short section and a barrel. The barrel short section is threadedly connected to the barrel. The filling port is arranged in the barrel short section. The filler in the material barrel can be mortar or quartz sand. The outer diameter of the material barrel is 8mm-12mm smaller than the inner diameter of the casing in the working well. The capacity of the material barrel is set between 36 liters and 160 liters.

[0027] A magnetic positioning nipple is also arranged between the material containing barrel and the faucet.

[0028] A method of using an oil and water well plugging device is:

[0029] A. Determine whether to use a magnetic positioning nipple in the plugging device according to the plugging construction layer conditions in the operating well;

[0030] B. Select the outer diameter of the barrel according to the inner diameter of the casing in the operating well;

[0031] C. Insert the material into the barrel to complete the sealing operation.

[0032] When the distance between the production layer and the plugging layer is less than 1m, a magnetic positioning nipple is installed between the material holding barrel and the faucet of the plugging device, and the material holding barrel hoisting cable is replaced with a logging cable.

[0033] The plugging operation of lowering the material barrel includes lowering the material barrel once to complete the sand filling and ash covering operations at the same time and lowering the material barrel once to complete the sand filling or ash covering operation alone; after the ash covering operation is successful for 24 hours, the ash covering operation can be repeated for another 24 hours; after the sand filling operation is successful, the sand filling operation can be carried out immediately.

[0034] When the sand filling and ash covering operations are completed simultaneously by lowering the material barrel in one trip, the filler at the lower part of the material barrel is quartz sand, and the filler at the upper part is mortar.

[0035] Compared with the prior art, the present invention has the following remarkable effects:

[0036] 1. The present invention uses a material barrel to transmit via a cable, which has a fast construction speed and low labor intensity for operators; it can not only realize ash covering operations, but also sand filling operations. According to tests, for a well with a depth of 3100m and a wellbore temperature of 118°, a ash covering or sand filling operation only takes 2 hours, while conventional construction devices and methods require 48 hours. The labor intensity of operators is greatly reduced, while the construction efficiency is greatly improved and there is no risk of pipe string jamming.

[0037] 2. In the present invention, a tension meter is installed in the cable that suspends the central guide wheel. It is best to use a tension meter with a remote transmission function so that the data of the tension meter hung high in the big hook of the operating derrick pulley can be transmitted remotely, so that the ground operating personnel can easily judge whether the underground plugging operation is successful based on the changes in the tension data.

[0038] 3. The present invention can also connect a magnetic positioning short section between the faucet and the material holding barrel, and can accurately determine the plugging position when the distance between the production layer and the plugging layer is less than 1m, that is, under the condition of a small interlayer. The faucet is connected to the magnetic positioning short section through the oil pipe thread, and the electric measuring cable and the magnetic positioning short section are used in combination, so that the depth can be accurately calibrated, especially when the interlayer is less than 1m, which greatly reduces the error of the plugging position, realizes the integrated operation of plugging and depth calibration, and avoids the defects in the prior art.

[0039] 4. A sliding sleeve is provided in the control assembly. After the shear pin is broken by the striker, the sliding sleeve with the sliding sleeve overflow port slides down and presses on the striker sleeve, so that the sliding sleeve overflow port corresponds to the outer overflow port of the injection outer cylinder, which can quickly discharge the filler in the material cylinder and effectively avoid the occurrence of "flagpole insertion" or "enema" phenomenon.

[0040] 5. In the present invention, a sliding sleeve is used to seal the filler in the material holding barrel. The sliding sleeve has strong pressure resistance and impact resistance, which greatly improves the success rate of the operation.

[0041] 6. The present invention also provides a chassis and a rubber plug at the lower end of the striker. The chassis can increase the upward impact force of the striker and can successfully break the shear pin. The additional rubber plug can also block the artificial well bottom in the event of leakage at the artificial well bottom of the working well, preventing the leakage of the filler at the artificial well bottom and improving the plugging effect.

[0042] 7. The lifting cable of the barrel is connected to the faucet through a universal joint. The universal joint can prevent the lifting cable of the barrel from twisting, making construction more convenient.

[0043] 8. The outer diameter of the container is selected according to the inner diameter of the casing in the operating well. It can not only realize the ash covering or sand filling operation in ordinary casing, but also realize the ash covering or sand filling operation in 4-inch small casing. 1 / 2When used in casing wells, the maximum volume of the material barrel can reach 160 liters, the ash coating or sand filling thickness can reach 13.3m, the ash coating thickness reaches more than 5m, the ash test pressure is 15MPa, and the pressure drop is 0 in 30 minutes. After the ash coating construction is successful for 24 hours, the ash coating construction can also be carried out in a cycle. After the sand filling construction is successful, the sand filling construction can be continued immediately. According to the needs of the construction plan, the present invention can be put into a material barrel to complete the ash coating and sand filling construction at the same time, or it can be put into a material barrel to complete the ash coating or sand filling construction alone. The prepared filler has high utilization rate and less waste.

[0044] The control assembly uses a matching opening method of a sleeve and a shear pin, which has strong resistance to internal pressure and impact. When the striker encounters resistance while going down, it breaks the shear pin, and the sleeve is released and slides down. The external overflow port corresponds to the overflow port of the sleeve, and the discharge cavity at the bottom of the sleeve is a hollow isosceles trapezoidal cavity, which is convenient for the filler to overflow quickly and cleanly.

[0045] The invention provides a chassis at the lower end of the striker and embeds or bonds a rubber plug that swells when in contact with water under the chassis, so that when leakage occurs at the bottom of the artificial well, the leakage of filler can be prevented.

[0046] In summary, the present invention has significant use effects and can generate significant economic benefits. BRIEF DESCRIPTION OF THE DRAWINGS

[0047] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:

[0048] Figure 1 It is a schematic diagram of the working principle and overall structure of the present invention.

[0049] Figure 2 yes Figure 1 Schematic diagram of the structure of the control assembly.

[0050] In the figure: dynamometer 1, center guide wheel 2, lateral guide wheel 3, material barrel suspension cable 4, universal joint 5, bridle 6, positioning short section 7, stuffing port 8, stuffing 9, material barrel 10, control assembly 11, chassis 12, rubber plug 13, control assembly upper joint 111, injection outer cylinder 112, sliding sleeve 113, sliding sleeve overflow port 115, discharge chamber 114, shear pin 116, external overflow port 117, striker sleeve 118, striker 119, assist spring 1110, control assembly lower joint 1111. DETAILED DESCRIPTION

[0051] The accompanying drawings are for reference and illustration only and are not intended to limit the scope of protection of the present invention. The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.

[0052] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.

[0053] In the description of the present invention, it should be understood that the terms "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, in the description of the present invention, "multiple" means two or more, unless otherwise clearly and specifically defined.

[0054] See also Figure 1 and Figure 2 An oil and water well plugging device includes a faucet 6, a material holding barrel 10 and a control assembly 11, wherein the material holding barrel 10 is provided with a filling port 8, the barrel is filled with a filling material 9, and the control assembly 11 is provided with a striker 119, wherein:

[0055] The faucet 6 is connected to the material container 10 and the control assembly 11 in sequence;

[0056] The transmission guide wheel includes a lateral guide wheel 3 and a center guide wheel 2. The center guide wheel 2 is suspended at the wellhead by a cable. The cable suspending the center guide wheel 2 is also equipped with a tension meter 1.

[0057] The control assembly 11 is provided with an injection outer cylinder 112, a sliding sleeve 113 and a striker sleeve 118. The body of the sliding sleeve 113 is provided with a sliding sleeve overflow port 115, the body of the injection outer cylinder 112 is provided with an external overflow port 117, the sliding sleeve 113 is installed in the injection outer cylinder 112 above the shear pin 116, the striker sleeve 118 is fixed in the injection outer cylinder 112 below the shear pin 116, and the striker 119 is installed in the striker sleeve 118;

[0058] One end of the barrel hoisting cable 4 is connected to the power device, and the other end is connected to the faucet 6 after passing between the lateral guide wheel 3 and the central guide wheel 2. Since the present invention does not use a working pipe string to send the barrel 10 used for ash coating or sand filling construction, not only the method is simple but also there is no risk of jamming the working pipe string, and it has a significant use effect.

[0059] Based on the above embodiment 1, the present invention also has the following embodiments:

[0060] A discharge cavity 114 is provided at the bottom of the sliding sleeve 113 , and the discharge cavity 114 is a hollow isosceles trapezoidal inner cavity; the sliding sleeve overflow port 115 and the discharge cavity 114 are both provided at the lower part of the sliding sleeve 113 , and at least one sliding sleeve overflow port 115 is provided.

[0061] The firing pin 119 is a T-shaped pin, and a booster spring 1110 is installed between the firing pin 119 and the firing pin sleeve 118 . The maximum outer diameter of the firing pin 119 is smaller than the minimum inner diameter of the discharge chamber 114 .

[0062] The upper end of the injection outer cylinder 112 is a control assembly upper joint 111 with a connecting thread. The middle of the inner cavity of the injection outer cylinder 112 is provided with a sliding sleeve limiting step, and the lower part of the inner cavity is provided with an external overflow port 117; the external overflow port 117 is arranged below the shear pin 116 and corresponds to the striker sleeve 118. When the striker 119 in the striker sleeve 118 encounters resistance and breaks the shear pin 116 and the sliding sleeve 113 falls onto the striker sleeve 118, the external overflow port 117 corresponds to the sliding sleeve overflow port 115. The control assembly upper joint 111 can be connected to the material holding barrel 10, and the control assembly lower joint 1111 can be connected to a protective cylinder after the processing and construction are completed to protect the device. In this way, the filler 9 can be injected into the wellbore from the overflow port 115 of the sliding sleeve and the outer overflow port 117 of the injection outer tube 112 along the slopes on both sides of the discharge cavity 114, and the filler 9 can be discharged quickly without causing problems such as flagpole insertion and enema.

[0063] The booster spring 1110 is installed in the cylinder of the striker sleeve 118 and the upper end is welded to the lower end surface of the large diameter end of the striker 119. The lower end of the booster spring 1110 is welded to the upper end surface of the lower end of the striker sleeve 118. The outer diameter of the large diameter end of the striker 119 is larger than the inner diameter of the cylinder of the striker sleeve 118.

[0064] The lower end of the striker 119 is connected to the chassis 12 by welding or threading, and the diameter of the chassis 12 is set between 65% and 75% of the inner diameter of the casing of the working well. The lower end of the striker 119 is connected to the chassis 12 to help the striker 119 generate sufficient impact force upward.

[0065] A rubber plug 13 is embedded or bonded on the lower end surface of the chassis 12. The rubber plug 13 is made of a water-swelling material, such as water-swelling rubber or water-swelling putty. The rubber plug 13 is embedded or bonded on the lower end of the chassis 12. After the packing 9 is impacted and leaked, if the artificial well bottom of the working well leaks, the rubber plug 13 can be blocked at the artificial well bottom to prevent the packing 9 from leaking.

[0066] The dynamometer 1 is a dynamometer with a remote transmission function; the dynamometer 1 can use the MHCY80 type and the MHCY120 type with a remote transmission function. Since the center guide wheel 2 is suspended on the big hook of the operating derrick pulley, 7-8 meters away from the ground, the use of the dynamometer 1 with a remote transmission function can facilitate the operator to observe the value changes of the dynamometer 1, and timely grasp the injection situation of the filler 9 in the downhole material barrel 10, and can quickly judge whether the material is successfully discharged through the change of data.

[0067] The upper end of the faucet 6 is also provided with a universal joint 5, which is connected to the barrel suspension cable 4. After the universal joint 5 is installed, the barrel suspension cable 4 can be prevented from twisting, which is more conducive to the lowering of the barrel 10.

[0068] The material barrel 10 is composed of a barrel short section and a barrel. The barrel short section is threadedly connected to the barrel. The filling port 8 is arranged in the barrel short section. The filler 9 in the material barrel 10 can be mortar or quartz sand. The outer diameter of the material barrel 10 is 8mm-12mm smaller than the inner diameter of the casing in the working well. The capacity of the material barrel 10 is set between 36 liters and 160 liters.

[0069] A magnetic positioning nipple 7 is also installed between the material containing barrel 10 and the faucet 6 .

[0070] A method of using an oil and water well plugging device is:

[0071] A. Determine whether to use the magnetic positioning sub 7 in the plugging device according to the plugging construction layer conditions in the operating well;

[0072] B. Select the outer diameter of the container 10 according to the inner diameter of the casing in the working well;

[0073] C. Insert the material holding barrel 10 to complete the plugging operation.

[0074] When the distance between the production layer and the plugging layer is less than 1m, a magnetic positioning sub is installed between the material barrel and the faucet of the plugging device, and the material barrel suspension cable is replaced with a logging cable. The magnetic positioning sub 7 contains two permanent magnets and a coil. During the lowering process, when there is no abnormal magnetic resistance change in the surrounding medium, the coil is in a constant magnetic field, the induced potential difference is zero, and the magnetic positioning curve is a straight line. When there is a change in magnetic resistance, that is, when encountering a coupling, a packer, a perforation section, etc., the magnetic lines of force through the coil in the magnetic positioning sub 7 will be redistributed, the amount of magnetic lines of force passing through will change, an induced electromotive force will be generated in the coil, a potential difference will be output, and there will be obvious electrical signal changes on the magnetic positioning curve. The magnetic positioning sub 7 can use two models, ST5008 and JD3124.

[0075] The plugging operation completed by lowering the material barrel 10 includes lowering the material barrel 10 once to complete the sand filling and ash covering operations at the same time, and lowering the material barrel 10 once to complete the sand filling or ash covering operation alone; after the ash covering operation is successful for 24 hours, the ash covering operation can be repeated for another 24 hours; after the sand filling operation is successful, the sand filling operation can be carried out immediately.

[0076] When the sand filling and ash covering operations are completed simultaneously by lowering the material barrel 10, the filler 9 at the bottom of the material barrel 10 is quartz sand, and the filler 9 at the top is mortar.

[0077] The embodiments described above are only typical embodiments, but the present invention is not limited to these embodiments, and those skilled in the art can make modifications without departing from the spirit and enlightenment of the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions recorded in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. Any modifications, equivalent replacements, improvements, etc. made within the creative spirit and creative concept of the present invention should be included in the protection scope of the present invention. Therefore, the protection scope is not limited to the above description.

Claims

1. An oil and water well plugging device, comprising a faucet, a material holding barrel and a control assembly, wherein the material holding barrel is provided with a filling port, the barrel is filled with fillers, and the control assembly is provided with a striker, wherein the characteristics are: The horse head is connected with the material holding barrel and the control assembly in sequence; the transmission guide wheel includes a transverse guide wheel and a center guide wheel, the center guide wheel is suspended at the wellhead by a cable, and a tension gauge is also installed in the cable suspending the center guide wheel; the control assembly is provided with an injection outer barrel, a sliding sleeve and a striker sleeve, the body of the sliding sleeve is provided with a sliding sleeve overflow port, the body of the injection outer barrel is provided with an external overflow port, the sliding sleeve is installed in the injection outer barrel above the shear pin, the striker sleeve is fixed in the injection outer barrel below the shear pin, and the striker sleeve is fixed in the injection outer barrel below the shear pin. Installed in the striker sleeve; one end of the barrel hoisting cable is connected to the power device, and the other end is connected to the faucet after passing between the lateral guide wheel and the central guide wheel; a magnetic positioning short section can also be connected and installed between the barrel and the faucet; a discharge cavity is provided at the bottom of the sliding sleeve, and the discharge cavity is a hollow isosceles trapezoidal inner cavity; the lower end of the striker is connected to the chassis by welding or threading; a rubber plug is inlaid or bonded on the lower end surface of the chassis, and the rubber plug is made of water-swelling material.

2. The oil and water well plugging device according to claim 1, characterized in that: The overflow port of the sliding sleeve and the discharge cavity are both arranged at the lower part of the sliding sleeve, and there is at least one overflow port of the sliding sleeve.

3. The oil and water well plugging device according to claim 1, characterized in that: The firing pin is a T-shaped pin, and a booster spring is arranged between the firing pin and the firing pin sleeve. The maximum outer diameter of the firing pin is smaller than the minimum inner diameter of the discharge cavity.

4. The oil and water well plugging device according to claim 2, characterized in that: The upper end of the injection outer cylinder is an upper joint of the control assembly with a connecting thread, the middle part of the inner cavity of the injection outer cylinder is provided with a sliding sleeve limiting step, and the lower part of the inner cavity is provided with an external overflow port; the external overflow port is arranged below the shear pin and corresponds to the striker sleeve, when the striker in the striker sleeve encounters an obstacle and breaks the shear pin and the sliding sleeve falls onto the striker sleeve, the external overflow port corresponds to the sliding sleeve overflow port.

5. The oil and water well plugging device according to claim 3, characterized in that: The booster spring is installed in the cylinder of the striker sleeve and the upper end is welded to the lower end surface of the large diameter end of the striker. The lower end of the booster spring is welded to the upper end surface of the lower end of the striker sleeve. The outer diameter of the large diameter end of the striker is larger than the inner diameter of the cylinder of the striker sleeve.

6. The oil and water well plugging device according to claim 5, characterized in that: The diameter of the chassis is set between 65% and 75% of the inner diameter of the casing of the operating well.

7. The oil and water well plugging device according to claim 1, characterized in that: The dynamometer is a dynamometer with a remote transmission function; the upper end of the faucet is also provided with a universal joint, and the universal joint is connected to the lifting cable of the material barrel.

8. The oil and water well plugging device according to claim 1, characterized in that: The material barrel consists of a barrel short section and a barrel. The barrel short section is threadedly connected to the barrel. The filling port is arranged in the barrel short section. The filler in the material barrel can be mortar or quartz sand. The outer diameter of the material barrel is 8mm-12mm smaller than the inner diameter of the casing in the working well. The capacity of the material barrel is set between 36 liters and 160 liters.

9. A method for using the oil-water well plugging device according to any one of claims 1 to 8, characterized in that: The following steps are involved: A. Determine whether to use a magnetic positioning nipple in the plugging device based on the conditions of the plugging construction layer in the operating well; B. Select the outer diameter of the material holding barrel based on the inner diameter of the casing in the operating well; C. Lower the material holding barrel to complete the plugging operation.

10. The method for using the oil and water well plugging device according to claim 9, characterized in that: When the distance between the production layer and the plugging layer is less than 1m, a magnetic positioning nipple is installed between the material holding barrel and the faucet of the plugging device, and the material holding barrel hoisting cable is replaced with a logging cable.

11. A method for using the oil and water well plugging device as claimed in claim 10, characterized in that: The plugging operation of lowering the material barrel includes lowering the material barrel to complete the sand filling and ash covering operations at the same time and lowering the material barrel to complete the sand filling or ash covering operation alone; after the ash covering operation is successful for 24 hours, the ash covering operation can be circulated for another 24 hours; After the sand filling operation is successful, the sand filling operation can be carried out immediately.

12. A method for using the oil and water well plugging device as claimed in claim 11, characterized in that: When the sand filling and ash covering operations are completed simultaneously by lowering the material barrel in one trip, the filler at the lower part of the material barrel is quartz sand, and the filler at the upper part is mortar.