A satellite platform reliability growth assessment method and system

Through the satellite platform reliability growth assessment method, natural logarithm fitting and exponential distribution assumptions are used to evaluate the reliability of the satellite platform, which solves the problem of changes in technical status, provides accurate reliability assessment and growth rate, and is suitable for continuous improvement. satellite platform.

CN114491966BActive Publication Date: 2024-10-25AEROSPACE DONGFANGHONG SATELLITE
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111663262.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-12-31
Publication Date
2024-10-25
Estimated Expiration
2041-12-31

AI Technical Summary

Technical Problem

Existing technologies are difficult to effectively assess the changing technical status of satellite systems, making traditional reliability assessment methods inapplicable.

Method used

Using the satellite platform reliability growth assessment method, by collecting on-orbit reliability information of launched satellites, calculating the platform's cumulative operating time and number of failures, performing natural logarithmic linear fitting, determining correlation coefficients and empirical formulas, and evaluating the instantaneous average failure interval time, and assess reliability levels using the exponential distribution assumption.

Benefits of technology

It solves the problem of changes in the technical status of samples, provides the current reliability assessment and reliability growth rate of the satellite platform, helps evaluate reliability improvements, and significantly improves the accuracy and practicality of the assessment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114491966B_ABST
    Figure CN114491966B_ABST
Patent Text Reader

Abstract

The present invention discloses a satellite platform reliability growth assessment method and system, the method comprising: collecting on-orbit reliability information of launched satellites; sorting the launched satellites, calculating the cumulative platform operation time, the cumulative number of associated failures and the cumulative average failure interval of the satellite platform up to the i-th launched satellite; performing linear fitting to obtain the correlation coefficient and determine the empirical formula; according to the empirical formula, solving the instantaneous average failure interval of the satellite platform up to the current moment, and using the exponential distribution assumption to assess the reliability level of the satellite platform to be analyzed during its typical life cycle. The present invention regards the continuous improvement of the satellite platform as an unplanned reliability growth process, uses a reliability growth model to assess the reliability of the satellite platform, and gives the current reliability level of the satellite platform, solving the problem that the traditional reliability assessment method cannot cope with the constantly changing technical status of the sample.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of satellite overall design, and in particular relates to a satellite platform reliability growth assessment method and system. Background Art

[0002] The reliability assessment of satellite systems has always been plagued by the problem of insufficient sample size. Except for large constellation systems, there are generally few satellites that are exactly the same. Even for the same model, equipment satellites will make appropriate improvements based on the first launch satellite as quality issues are resolved and technology is upgraded. Small sample size and continuous changes in technology are common in satellite systems.

[0003] Although most satellite payloads vary greatly, for satellite platforms, which have a relatively fixed technical status in satellite systems, satellites based on the same platform have basically similar platform technical status.

[0004] Both the classical reliability assessment method and the Bayesian method need to assume that the technical status of the sample being evaluated is stable and unchanged. Therefore, for samples whose technical status is constantly improving, neither the classical reliability assessment method nor the Bayesian method is applicable. Summary of the invention

[0005] The technology of the present invention solves the problem: overcomes the shortcomings of the existing technology, provides a satellite platform reliability growth assessment method and system, regards the continuous improvement of the satellite platform as an unplanned reliability growth process, uses a reliability growth model to assess the reliability of the satellite platform, and gives the current reliability level of the satellite platform, solving the problem that traditional reliability assessment methods are unable to cope with the constantly changing technical status of samples.

[0006] In order to solve the above technical problems, the present invention discloses a satellite platform reliability growth assessment method, comprising:

[0007] Collect the on-orbit reliability information of all launched satellites on the satellite platform, and determine the cumulative operating time and cumulative number of associated failures of each launched satellite;

[0008] According to the chronological order of the launch time of each launched satellite, all launched satellites on the satellite platform are sorted and renumbered: 1, 2, ..., i, ..., K; where K represents the total number of all launched satellites on the satellite platform;

[0009] According to the determined cumulative operating time of each launched satellite and the cumulative number of associated failures, the cumulative operating time T of the satellite platform up to the i-th launched satellite is calculated. i 、N, the number of platform-related cumulative failures i and platform cumulative mean time between failures (MTBF) ∑i;

[0010] To T i and MTBF ∑i After taking the natural logarithm, a linear fit is performed to obtain the correlation coefficient ρ, and the first empirical formula and the second empirical formula are determined;

[0011] According to the first empirical formula and the second empirical formula, the instantaneous mean time between failures of the satellite platform up to the current moment is calculated;

[0012] Based on the calculated instantaneous mean time between failures of the satellite platform up to the current moment, the exponential distribution assumption is adopted to evaluate the reliability level of the satellite platform to be analyzed during its typical life cycle.

[0013] In the above satellite platform reliability growth assessment method, the cumulative operating time T of the satellite platform up to the i-th launched satellite is i for:

[0014]

[0015] Among them, t j represents the cumulative operating time of the jth launched satellite, j = 1, 2, ..., i.

[0016] In the above satellite platform reliability growth assessment method, the number of cumulative correlated failures of the satellite platform up to the i-th launched satellite is N i for:

[0017]

[0018] Among them, n j Represents the cumulative number of associated failures of the jth launched satellite.

[0019] In the above satellite platform reliability growth assessment method, the satellite platform’s cumulative mean time between failures (MTBF) up to the i-th launched satellite is ∑i for:

[0020]

[0021] In the above satellite platform reliability growth assessment method, the calculation formula of the correlation coefficient ρ is as follows:

[0022]

[0023] In the above satellite platform reliability growth assessment method,

[0024] The first empirical formula is expressed as follows:

[0025]

[0026] in, Indicates the satellite platform up to the current time The platform cumulative mean time between failures, a and m are the parameters to be solved;

[0027] The second empirical formula is expressed as follows:

[0028]

[0029] in, Indicates the satellite platform up to the current time The platform’s instantaneous mean time between failures.

[0030] In the above satellite platform reliability growth assessment method, the first empirical formula and the second empirical formula are determined, including:

[0031] To T i and MTBF ∑i The natural logarithm ln(T i ) and ln(MTBF ∑i ) performs multi-point least squares fitting to obtain the values ​​of the parameters a and m to be solved;

[0032] Substituting the values ​​of the parameters a and m to be solved into formulas (2) and (3) respectively, the first empirical formula and the second empirical formula can be obtained.

[0033] In the above satellite platform reliability growth assessment method, the solution formulas for the parameters a and m to be solved are as follows:

[0034]

[0035]

[0036] In the above-mentioned satellite platform reliability growth assessment method, the on-orbit reliability information includes: launch time, the number of on-orbit associated failures and the time of occurrence of each on-orbit associated failure; among them, failures that have been confirmed to be caused by failure to use according to the specified conditions, or failures that have been confirmed to be caused only by a design that will not be adopted are collectively referred to as on-orbit non-associated failures, otherwise they are on-orbit associated failures.

[0037] Correspondingly, the present invention also discloses a satellite platform reliability growth assessment system, comprising:

[0038] A data acquisition module is used to collect the on-orbit reliability information of all launched satellites on the satellite platform and determine the cumulative operating time and cumulative number of associated failures of each launched satellite;

[0039] A sorting module is used to sort and renumber all launched satellites on the satellite platform according to the order of the launch time of each launched satellite: 1, 2, ..., i, ..., K; wherein K represents the total number of all launched satellites on the satellite platform;

[0040] The first calculation module is used to calculate the cumulative operation time T of the satellite platform up to the i-th launched satellite according to the determined cumulative operation time and cumulative number of associated failures of each launched satellite. i 、N, the number of platform-related cumulative failures i and platform cumulative mean time between failures (MTBF) ∑i ;

[0041] The second calculation module is used to calculate T i and MTBF ∑i After taking the natural logarithm, a linear fit is performed to obtain the correlation coefficient ρ, and the first empirical formula and the second empirical formula are determined;

[0042] The third calculation module calculates the instantaneous mean time between failures of the satellite platform up to the current moment according to the first empirical formula and the second empirical formula;

[0043] The evaluation module evaluates the reliability level of the satellite platform to be analyzed during its typical life cycle based on the calculated instantaneous mean time between failures of the satellite platform up to the current moment and adopts the exponential distribution hypothesis.

[0044] The present invention has the following advantages:

[0045] The present invention discloses a satellite platform reliability growth assessment scheme, which regards the continuous improvement of the satellite platform as an unplanned reliability growth process, uses a reliability growth model to assess the reliability of the satellite platform, and gives the current reliability level of the satellite platform, solving the problem that the traditional reliability assessment method cannot cope with the changing technical status of the sample. Secondly, the reliability growth rate assessed by the present invention can be used to assess the reliability improvement of the satellite platform. BRIEF DESCRIPTION OF THE DRAWINGS

[0046] Figure 1 is a flowchart of the steps of a satellite platform reliability growth assessment method in an embodiment of the present invention;

[0047] Figure 2 A satellite platform ln(T i ) and ln(MTBF ∑i )’s linear fitting plot. DETAILED DESCRIPTION

[0048] In order to make the objectives, technical solutions and advantages of the present invention more clear, the embodiments disclosed in the present invention will be further described in detail below with reference to the accompanying drawings.

[0049] like Figure 1 In this embodiment, the satellite platform reliability growth assessment method includes:

[0050] Step 101, collecting the on-orbit reliability information of all launched satellites on the satellite platform, and determining the cumulative operating time and the cumulative number of associated failures of each launched satellite.

[0051] In this embodiment, the orbit reliability information includes but is not limited to: launch time, the number of on-orbit associated faults and the time of each on-orbit associated fault; among them, faults that have been confirmed to be caused by failure to use according to the specified conditions, or faults that have been confirmed to be caused only by a design that will not be adopted are collectively referred to as on-orbit non-associated faults, otherwise they are on-orbit associated faults.

[0052] Step 102, sorting and renumbering all launched satellites on the satellite platform according to the chronological order of the launch time of each launched satellite: 1, 2, ..., i, ..., K.

[0053] In this embodiment, K represents the total number of all launched satellites on the satellite platform. For example, the sorted and renumbered launched satellites are represented as follows:

[0054] Serial number satellite Number of associated faults Elapsed time 1 Satellite 1 6 9 years and 8 months 2 Satellite 2 0 7 years and 7 months 3 Satellite 3 0 7 years and 1 month 4 Satellite 4 0 5 years and 8 months 5 Satellite 5 0 5 years and 8 months … … … …

[0055] Table 1, List of launched satellites

[0056] Step 103: Calculate the cumulative operation time T of the satellite platform up to the i-th launched satellite based on the determined cumulative operation time and cumulative associated failure times of each launched satellite. i 、N, the number of platform-related cumulative failures i and platform cumulative mean time between failures (MTBF) ∑i .

[0057] In this embodiment, according to the order of the launch time of each launched satellite, the cumulative platform operation time T of the satellite platform up to the i-th launched satellite is i 、N, the number of platform-related cumulative failures i and platform cumulative mean time between failures (MTBF) ∑i The solution formulas are as follows:

[0058]

[0059]

[0060]

[0061] Among them, t j represents the cumulative operating time of the jth launched satellite, n j represents the cumulative number of associated failures of the jth launched satellite, j = 1, 2, ..., i.

[0062] Preferably, based on Table 1, t j and n j With T i 、N i and MTBF ∑i The relationship is shown in Table 2:

[0063] satellite <![CDATA[t j (h)]]> <![CDATA[n j (times)]]> <![CDATA[T i (h)]]> <![CDATA[N i (times)]]> <![CDATA[MTBF ∑i ]]> Satellite 1 85032 6 85032 6 14172 Satellite 2 151464 6 236496 12 19708 Satellite 3 213840 6 450336 18 25018.6 Satellite 4 263880 6 714216 24 29759 Satellite 5 313920 6 1028136 30 34271.2 … … … …

[0064] Table 2, t j and n j With T i 、N i and MTBF ∑i Relationship diagram

[0065] Step 104, T i and MTBF ∑i After taking the natural logarithm, a linear fit is performed to obtain the correlation coefficient ρ, and the first empirical formula and the second empirical formula are determined.

[0066] In this embodiment, the calculation formula of the correlation coefficient ρ is as follows:

[0067]

[0068] The first empirical formula is expressed as follows:

[0069]

[0070] in, Indicates the satellite platform up to the current time The platform cumulative mean time between failures; a and m are the parameters to be solved, It is used to characterize the initial MTBF level of the satellite platform, and m represents the MTBF growth rate of the satellite platform.

[0071] The second empirical formula is expressed as follows:

[0072]

[0073] in, Indicates the satellite platform up to the current time The platform’s instantaneous mean time between failures.

[0074] To T i and MTBF∑i The natural logarithm ln(T i ) and ln(MTBF ∑i ) to perform multi-point least squares fitting to obtain the values ​​of the parameters a and m to be solved:

[0075]

[0076]

[0077] Substituting the values ​​of the parameters a and m obtained by solving formulas (4) and (5) into formulas (2) and (3), respectively, the first empirical formula and the second empirical formula can be obtained.

[0078] Step 105, according to the first empirical formula and the second empirical formula, the instantaneous mean time between failures of the satellite platform up to the current moment is calculated.

[0079] Step 106 , based on the calculated instantaneous mean time between failures of the satellite platform up to the current moment, an exponential distribution assumption is adopted to evaluate the reliability level of the satellite platform to be analyzed during its typical life cycle.

[0080] Based on the above embodiment, a specific example is given below for explanation.

[0081] (1) Collect the on-orbit reliability information of all launched satellites on the satellite platform.

[0082] A certain satellite platform launched 20 satellites into orbit in the 10 years from 2004 to 2014. As of May 23, 2014, the satellites on this platform have accumulated 75.42 satellite-years of operation. After continuous improvement and perfection, the satellite platform has a very high technical maturity and on-orbit reliability.

[0083] (2) All launched satellites on the satellite platform are sorted and renumbered according to the chronological order of their launch time: 1, 2, ..., i, ..., K.

[0084] According to the chronological order of the launch time of each launched satellite, the 20 satellites launched into orbit by this satellite platform from 2004 to 2014 (as of 2014-05-23) are sorted, and the following Table 3 is obtained:

[0085] satellite <![CDATA[t j (h)]]> <![CDATA[n j (times)]]> Satellite 1 85032 6 Satellite 2 66432 0 Satellite 3 62376 0 Satellite 4 50040 0 Satellite 5 50040 0 Satellite 6 48864 0 Satellite 7 39672 1 Satellite 8 36960 0 Satellite 9 36960 0 Satellite 10 36960 1 Satellite 11 31800 0 Satellite 12 25248 2 Satellite 13 24696 1 Satellite 14 13056 0 Satellite 15 13056 0 Satellite 16 13056 0 Satellite 17 7488 0 Satellite 18 6312 0 Satellite 19 6312 0 Satellite 20 6312 0

[0086] Table 3

[0087] (3) Calculate the cumulative operating time T of the satellite platform up to the i-th launched satellite i 、N, the number of platform-related cumulative failures iand platform cumulative mean time between failures (MTBF) ∑i , as shown in Table 4:

[0088]

[0089]

[0090] Table 4

[0091] (4) For T i and MTBF ∑i After taking the natural logarithm, a linear fit is performed to obtain the correlation coefficient ρ, and the first empirical formula and the second empirical formula are determined.

[0092] To T i and MTBF ∑i Take the natural logarithm and perform linear fitting, such as Figure 2 As shown, the correlation coefficient ρ = 0.0940 is obtained.

[0093] For the data in Table 4, ln(T i ) and ln(MTBF ∑i ) was fitted by multi-point least square method and obtained m=0.6126, a=0.0548.

[0094] The first empirical formula is expressed as follows:

[0095]

[0096] The second empirical formula is expressed as follows:

[0097]

[0098] Substituting m = 0.6126, a = 0.0548 into equation (2) and equation (3), we can obtain:

[0099]

[0100]

[0101] (5) According to the first empirical formula and the second empirical formula, the instantaneous mean time between failures of the satellite platform up to the current moment is calculated.

[0102] Through calculation, the satellite platform's instantaneous mean time between failures as of May 23, 2014 is 173126.2 hours, recorded as: MTBF now =173126.2h.

[0103] (6) Based on the calculated mean time between failures of the satellite platform up to the current moment, the exponential distribution assumption is used to evaluate the reliability level of the satellite platform to be analyzed during its typical life cycle.

[0104] The reliability growth level of the satellite platform is analyzed as shown in Table 5 below:

[0105]

[0106] Table 5

[0107] When conducting a planned reliability growth test, m = 0.3 ~ 0.7 is generally taken. When m = 0.1, it means that basically no improvement measures were taken during the growth process; when m = 0.6 ~ 0.7, it means that strong fault analysis and improvement measures were taken during the growth process, and a large growth effect was achieved. Although this method only regards the continuous improvement of the satellite platform as an unplanned reliability growth process, the analysis results of the specific embodiment show that the reliability growth of the satellite platform is significant.

[0108] On the basis of the above embodiments, the present invention further discloses a satellite platform reliability growth assessment system, including: a data acquisition module, used to collect on-orbit reliability information of all launched satellites on the satellite platform, and determine the cumulative operating time and cumulative number of associated failures of each launched satellite; a sorting module, used to sort all launched satellites on the satellite platform in the order of the launch time of each launched satellite and renumber them: 1, 2, ..., i, ..., K; a first calculation module, used to calculate the platform cumulative operating time T of the satellite platform up to the i-th launched satellite according to the determined cumulative operating time and cumulative number of associated failures of each launched satellite. i 、N, the number of platform-related cumulative failures i and platform cumulative mean time between failures (MTBF) ∑i ; The second calculation module is used to calculate T i and MTBF ∑i After taking the natural logarithm, linear fitting is performed to obtain the correlation coefficient ρ, and the first empirical formula and the second empirical formula are determined; the third calculation module, according to the first empirical formula and the second empirical formula, solves the instantaneous average failure interval of the satellite platform up to the current moment; the evaluation module, according to the calculated platform instantaneous average failure interval of the satellite platform up to the current moment, adopts the exponential distribution hypothesis to evaluate the reliability level of the satellite platform to be analyzed during its typical life cycle.

[0109] As for the system embodiment, since it corresponds to the method embodiment, the description is relatively simple, and the relevant parts can be referred to the description of the method embodiment part.

[0110] Although the present invention has been disclosed as above in the form of a preferred embodiment, it is not intended to limit the present invention. Any person skilled in the art may make possible changes and modifications to the technical solution of the present invention by using the methods and technical contents disclosed above without departing from the spirit and scope of the present invention. Therefore, any simple modifications, equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention without departing from the content of the technical solution of the present invention shall fall within the protection scope of the technical solution of the present invention.

[0111] The contents not described in detail in the specification of the present invention belong to the common knowledge of the professionals in this field.

Claims

1. A satellite platform reliability growth assessment method, characterized in that: include: Collect the on-orbit reliability information of all launched satellites on the satellite platform, and determine the cumulative operating time and cumulative number of associated failures of each launched satellite; According to the chronological order of the launch time of each launched satellite, all launched satellites on the satellite platform are sorted and renumbered: 1, 2, ..., i, ..., K; where K represents the total number of all launched satellites on the satellite platform; According to the determined cumulative operating time of each launched satellite and the cumulative number of associated failures, the cumulative operating time T of the satellite platform up to the i-th launched satellite is calculated. i 、N, the number of platform-related cumulative failures i and platform cumulative mean time between failures MTBF ∑i ; To T i and MTBF ∑i After taking the natural logarithm, a linear fit is performed to obtain the correlation coefficient ρ, and the first empirical formula and the second empirical formula are determined; According to the first empirical formula and the second empirical formula, the instantaneous mean time between failures of the satellite platform up to the current moment is calculated; Based on the calculated mean time between failures of the satellite platform up to the current moment, the reliability level of the satellite platform to be analyzed during its typical life cycle is evaluated using the exponential distribution assumption. The first empirical formula is expressed as follows: The second empirical formula is expressed as follows: Determine the first empirical formula and the second empirical formula, including: i and MTBF ∑i The natural logarithm ln(T i ) and ln(MTBF ∑i ) to perform multi-point least squares fitting to obtain the values ​​of the parameters a and m to be solved; the obtained values ​​of the parameters a and m to be solved are substituted into formulas (2) and (3) respectively to obtain the first empirical formula and the second empirical formula; The solution formulas for the parameters a and m to be solved are as follows: in, Indicates the satellite platform up to the current time The platform cumulative mean time between failures, a and m are the parameters to be solved, Indicates the satellite platform up to the current time The platform’s instantaneous mean time between failures.

2. The satellite platform reliability growth assessment method according to claim 1, characterized in that: The cumulative operating time of the satellite platform up to the launch of the i-th satellite is T i for: Among them, t j represents the cumulative operating time of the jth launched satellite, j = 1, 2, ..., i.

3. The satellite platform reliability growth assessment method according to claim 2, characterized in that: The number of satellite platform-related failures accumulated up to the launch of the i-th satellite is N i for: Among them, n j Represents the cumulative number of associated failures of the jth launched satellite.

4. The satellite platform reliability growth assessment method according to claim 3, characterized in that: The satellite platform’s cumulative mean time between failures (MTBF) up to the launch of the i-th satellite ∑i for:

5. The satellite platform reliability growth assessment method according to claim 4, characterized in that: The solution formula of the correlation coefficient ρ is as follows:

6. The satellite platform reliability growth assessment method according to claim 1, characterized in that: On-orbit reliability information includes: launch time, number of on-orbit associated failures and occurrence time of each on-orbit associated failure; among them, failures that have been confirmed to be caused by failure to use under specified conditions, or failures that have been confirmed to be caused only by a design that will not be adopted are collectively referred to as on-orbit non-associated failures, otherwise they are on-orbit associated failures.

7. A satellite platform reliability growth assessment system for implementing the method as claimed in claim 1, characterized in that: include: A data acquisition module is used to collect the on-orbit reliability information of all launched satellites on the satellite platform and determine the cumulative operating time and cumulative number of associated failures of each launched satellite; A sorting module is used to sort and renumber all launched satellites on the satellite platform according to the order of the launch time of each launched satellite: 1, 2, ..., i, ..., K; wherein K represents the total number of all launched satellites on the satellite platform; The first calculation module is used to calculate the cumulative operation time T of the satellite platform up to the i-th launched satellite according to the determined cumulative operation time and cumulative number of associated failures of each launched satellite. i 、N, the number of platform-related cumulative failures i and platform cumulative mean time between failures MTBF ∑i ; The second calculation module is used to calculate T i and MTBF ∑i After taking the natural logarithm, a linear fit is performed to obtain the correlation coefficient ρ, and the first empirical formula and the second empirical formula are determined; The third calculation module calculates the instantaneous mean time between failures of the satellite platform up to the current moment according to the first empirical formula and the second empirical formula; The evaluation module evaluates the reliability level of the satellite platform to be analyzed during its typical life cycle based on the calculated instantaneous mean time between failures of the satellite platform up to the current moment and adopts the exponential distribution hypothesis.