A visual tool error prevention method and system for rail transit parts maintenance

By introducing a visual tool error prevention system in the maintenance of rail transit parts, using database, digital toolbox, encoding and card control module management tools, the problems of irregular tool placement and difficulty in finding are solved, the maintenance efficiency and quality are improved, and the maintenance efficiency and quality are achieved. The standardized use and management of tools is carried out.

CN114492871BActive Publication Date: 2024-12-06CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210100805.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-01-27
Publication Date
2024-12-06
Estimated Expiration
2042-01-27

AI Technical Summary

Technical Problem

The existing methods for preventing errors from rail transit parts maintenance tools include irregular tool placement, random placement or loss of tools, wrongly taken or searching for too long, which affects maintenance efficiency and quality.

Method used

An error-proof system for the maintenance of rail transit parts is designed, including database module, digital toolbox module, encoding module and card control module. Through a unique encoding management tool, the visual device is used to display the tool position and realize it through the card control module. Unlocking and locking of the tool ensures that the tool is used correctly during specific overhaul steps.

Benefits of technology

It significantly reduces the use of finding the right tools, reduces the misuse rate during the use of tools, improves maintenance efficiency and quality, and ensures that the tools are stored in accordance with regulations, making it easy to manage and maintain.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114492871B_ABST
    Figure CN114492871B_ABST
Patent Text Reader

Abstract

The present invention discloses a visual tool error prevention system for rail transit parts maintenance, including a database module, a digital toolbox module, a coding module and a card control module; the database module is used to record the status information of the maintenance tool and update it in time, track the use status of the tool in real time, and store the maintenance process data of the parts maintenance line; the digital toolbox module is used to store the tools and determine the tools required for each maintenance step; the coding module is used to uniquely encode the tools, and is accompanied by a visualization device for visually displaying the position of the tools in the digital toolbox module; the card control module is used to unlock and lock the tools. The present invention designs more reasonable and practical error prevention means for the links of taking, using, storing, and maintaining the parts maintenance tools, reduces the time spent in finding the correct tools, and ensures the quality and production efficiency in the maintenance process.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of rail transit component maintenance error prevention, and in particular relates to a rail transit component maintenance visualization tool error prevention method and system. Background Art

[0002] Error proofing is the design and development of products and manufacturing processes to prevent possible mistakes in production and the production of defective products. As people's requirements for production efficiency continue to increase, the frequency of use of production tools is increasing, and the need for error proofing in the use and management of tools in the production process is becoming more and more urgent.

[0003] The maintenance of EMU locomotive parts is an important part of the locomotive maintenance process, which is directly related to whether the locomotive can operate smoothly. Tool error prevention is an important part of the parts maintenance process, which has a direct impact on the maintenance quality and efficiency.

[0004] Existing methods for tool error prevention in operation processes are mostly divided into two types. One is to number each tool, and select and use the required tool number by searching the manual in the specific process.

[0005] Another method is to design a tool error-proofing tray or box, and match the tools one by one to fixed positions on the error-proofing tray or box to ensure the correct use of the tools.

[0006] However, the former method does not regulate the placement of tools, so that tools may be randomly placed or lost, affecting maintenance efficiency. When there are too many tools or maintenance steps, the latter method may also cause problems such as taking the wrong tool or taking too long to find the tool. Therefore, a comprehensive error-proofing solution for component maintenance tools is urgently needed to reduce losses caused by improper use of tools during maintenance. Summary of the invention

[0007] In response to at least one of the above defects or improvement needs in the prior art, the present invention provides a method and system for preventing errors in visual tools for rail transit component maintenance, and designs more reasonable and practical error prevention measures for the picking, use, storage, and maintenance of component maintenance tools, thereby reducing the time spent in finding the correct tool and ensuring the quality and production efficiency during the maintenance process.

[0008] To achieve the above-mentioned object, according to one aspect of the present invention, there is provided a rail transit component maintenance visualization tool error prevention system, comprising a database module, a digital toolbox module, an encoding module and a card control module;

[0009] The database module is used to record the status information of the maintenance tool and update it in time, track the use status of the tool in real time, and store the maintenance process data of the parts maintenance line;

[0010] The digital toolbox module is used to store tools and determine the tools required for each maintenance step;

[0011] The encoding module is used to uniquely encode the tool and is provided with a visualization device for visually displaying the position of the tool in the digital toolbox module;

[0012] The card control module is used to unlock and lock the tool.

[0013] To achieve the above object, according to another aspect of the present invention, there is also provided a method for preventing errors in visual tools for the maintenance of rail transit parts, comprising the steps of:

[0014] S1. First, all maintenance tools are stored in the digital tool box of the error-proofing system, classified and sorted according to the work steps on the parts maintenance line, and uniformly coded according to the coding module;

[0015] S2. For the parts maintenance line, the digital toolbox automatically reads the maintenance process data in the database module, and when performing one of the maintenance steps, determines the tools required for this maintenance step;

[0016] S3, unlocking only the tool corresponding to the maintenance step through the card control module, and displaying its position through the visualization device through the encoding module;

[0017] S4, when the tool is used, the database module reads and records the tool usage status information;

[0018] S5. After confirming that the tool has been used, the card control module is used to relock the tool so that it cannot be used. At this time, the database module updates and records the status information of the tool in real time;

[0019] S6. The tool is finally returned to the digital tool box for storage, waiting for next use.

[0020] Further preferably, wireless or wired information transmission is adopted between the database module, the digital toolbox module, the encoding module and the card control module.

[0021] Further preferably, in the digital toolbox, after the card control module completes unlocking the tool, status information indicating that the tool has left the digital toolbox is sent to the database module.

[0022] Further preferably, after the card control module locks the tool in the digital tool box, it sends status information indicating that the tool has been returned to the digital tool box to the database module.

[0023] Further preferably, when the tool arrives at the maintenance step, its unique code is scanned to send status information that the tool has arrived at the maintenance step to the database module, and then verify whether the tool is the tool required for the maintenance step. If not, an error is reported and / or the card control module locks the tool to make it unusable.

[0024] Further preferably, when the tool leaves the maintenance step, its unique code is scanned, thereby sending status information that the tool has left the maintenance step to the database module;

[0025] And / or, when the tool leaves the maintenance step, the card control module locks the tool so that it cannot be used.

[0026] Further preferably, the digital toolbox module is provided with a first card control module, and the first card control module is used to lock and unlock the physical connection between the tool and the digital toolbox module;

[0027] When it is determined that the next maintenance step requires the use of a predetermined tool, the first card control module unlocks the physical connection between the tool and the digital tool box module, allowing the tool to be taken;

[0028] When the tool is finally returned to the digital toolbox, the first card control module locks the physical connection between the tool and the digital toolbox module, and the tool is in a storage state.

[0029] Further preferably, a second card control module is provided on the tool, and the second card control module is used to lock and unlock the usable state of the tool;

[0030] When the tool reaches the current maintenance step, but the database module verifies that the tool does not belong to the tool required for the maintenance step, the second card control module locks the tool to make it unusable;

[0031] When the tool reaches a matching maintenance step, the second card control module unlocks the tool to make it usable.

[0032] Further preferably, the visualization device comprises a lighting device for lighting a tool required for use.

[0033] The above-mentioned preferred technical features can be combined with each other as long as they do not conflict with each other.

[0034] In general, the above technical solution conceived by the present invention has the following beneficial effects compared with the prior art:

[0035] 1. The rail transit parts maintenance visualization tool error prevention method and system of the present invention designs more reasonable and practical error prevention means for the picking, use, storage, maintenance and other links of the parts maintenance tools, reduces the time spent on finding the correct tools, and ensures the quality and production efficiency during the maintenance process.

[0036] 2. For operators, for a certain maintenance step, they only need to find the highlighted tool on the digital tool box, which greatly reduces the time to pick up the tool. When a tool is in use, other tools in the tool box will be locked to avoid misuse. Tools are only stored in the corresponding position on the tool box, which is easy to manage and maintain.

[0037] 3. Compared with the existing error-proofing methods for maintenance tools, it can significantly reduce the misuse rate of tools during use, and avoid the situation of searching for required tools in a large-scale tool library, thereby ensuring the quality of maintenance and improving maintenance efficiency.

[0038] 4. The biggest feature of the present invention is that it has established a visual error-proofing system for tool use, which standardizes the tool picking, use, storage, and maintenance. Compared with the traditional tool error-proofing method, the code of the tool required for this step is first retrieved from the system database, which can greatly reduce the misuse rate of the tool and ensure the quality of the product. On the other hand, the visualization device can save the operator's time in finding the tool and improve production efficiency. At the same time, the tools are managed in a unified manner, eliminating the phenomenon of tools being randomly discarded, which is convenient for tool maintenance. BRIEF DESCRIPTION OF THE DRAWINGS

[0039] Figure 1 is a schematic diagram of a rail transit component maintenance visualization tool error prevention system according to an embodiment of the present invention;

[0040] Figure 2 It is a flow chart of a method for preventing errors using a visual tool for repairing rail transit parts according to an embodiment of the present invention; DETAILED DESCRIPTION

[0041] In order to make the purpose, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention. In addition, the technical features involved in each embodiment of the present invention described below can be combined with each other as long as they do not conflict with each other. The present invention is further described in detail below in conjunction with specific embodiments.

[0042] As a preferred embodiment of the present invention, Figure 1 As shown, the present invention provides a visual tool error prevention system for rail transit parts maintenance, including a database module, a digital toolbox module, a coding module and a card control module;

[0043] The database module is used to record the status information of the maintenance tool and update it in time, track the use status of the tool in real time, and store the maintenance process data of the parts maintenance line;

[0044] The digital toolbox module is used to store tools and determine the tools required for each maintenance step;

[0045] The encoding module is used to uniquely encode the tool and is provided with a visualization device for visually displaying the position of the tool in the digital toolbox module;

[0046] The card control module is used to unlock and lock the tool.

[0047] Further preferably, the rail transit parts are EMU parts. Further preferably, the EMU parts include but are not limited to brake calipers, EMU gearboxes, and EMU motors.

[0048] like Figure 2 As shown, according to another aspect of the present invention, a method for preventing errors in visual tools for the maintenance of rail transit parts is also provided, comprising the steps of:

[0049] S1. First, all maintenance tools are stored in the digital tool box of the error-proofing system, classified and sorted according to the work steps on the parts maintenance line, and uniformly coded according to the coding module;

[0050] S2. For the parts maintenance line, the digital toolbox automatically reads the maintenance process data in the database module, and when performing one of the maintenance steps, determines the tools required for this maintenance step;

[0051] S3, unlocking only the tool corresponding to the maintenance step through the card control module, and displaying its position through the visualization device through the encoding module;

[0052] S4, when the tool is used, the database module reads and records the tool usage status information;

[0053] S5. After confirming that the tool has been used, the card control module is used to relock the tool so that it cannot be used. At this time, the database module updates and records the status information of the tool in real time;

[0054] S6. The tool is finally returned to the digital tool box for storage, waiting for next use.

[0055] Through the above tool error prevention method and system, each tool can only be activated and used in a specific maintenance step, ensuring the correct use of the tool during the operation process.

[0056] For operators, for a certain maintenance step, they only need to find the highlighted tool on the digital tool box, which greatly reduces the time to pick up the tool. When a tool is in use, other tools in the tool box will be locked to avoid misuse. Tools are only stored in the corresponding position on the tool box, which is easy to manage and maintain.

[0057] The above tool error prevention methods and systems all have the following characteristics.

[0058] Further preferably, the rail transit parts are EMU parts. Further preferably, the EMU parts include but are not limited to brake calipers, EMU gearboxes, and EMU motors.

[0059] Further preferably, wireless or wired information transmission is adopted between the database module, the digital toolbox module, the encoding module and the card control module.

[0060] Further preferably, in the digital toolbox, after the card control module completes unlocking the tool, status information indicating that the tool has left the digital toolbox is sent to the database module.

[0061] Further preferably, after the card control module locks the tool in the digital tool box, it sends status information indicating that the tool has been returned to the digital tool box to the database module.

[0062] Further preferably, when the tool arrives at the maintenance step, its unique code is scanned by the code scanning device of the maintenance step, and the tool information contained in the code is read, so as to send the status information that the tool has arrived at the maintenance step to the database module, and then the database module verifies whether the tool belongs to the tool required by the maintenance step. If not, an error alarm prompt is issued, and / or the card control module locks the tool so that it cannot be used. If it belongs, the correct arrival information is recorded, and no other operations are performed.

[0063] Further preferably, when the tool leaves the maintenance step, its unique code is scanned by the code scanning device of the maintenance step, and the tool information contained in the code is read, thereby sending the status information that the tool has left the maintenance step to the database module;

[0064] And / or, when the tool leaves the maintenance step, the card control module locks the tool so that it cannot be used.

[0065] Further preferably, the encoding module may include a first card control module and a second card control module.

[0066] Further preferably, a first card control module is provided in the digital toolbox module, and the first card control module is used to lock and unlock the physical connection between the tool and the digital toolbox module; when it is determined that a predetermined tool is required for the next maintenance step, the first card control module unlocks the physical connection between the tool and the digital toolbox module, allowing the tool to be taken; when the tool is finally returned to the digital toolbox, the first card control module locks the physical connection between the tool and the digital toolbox module, and the tool is in a storage state.

[0067] Further preferably, a second card control module is provided on the tool, which is used to lock and unlock the usable state of the tool; when the tool reaches the current maintenance step, but the database module verifies that the tool does not belong to the tool required for the maintenance step, the second card control module locks the tool and makes it unusable; when the tool reaches the maintenance step that matches it, the second card control module unlocks the tool and puts it in a usable state.

[0068] Further preferably, the visualization device includes a lighting device for lighting the tool to be used. The lighting device and the unique code may be integrated, and further, the lighting device lights up the tool by lighting up the unique code, so that the operator can quickly find the tool in the digital toolbox. The lighting device and the unique code may be separate, and further, the lighting device is a breathing light on the tool, and the breathing light of the tool to be used is always on or flashing to light up the tool, so that the operator can quickly find the tool in the digital toolbox.

[0069] Further preferably, the digital toolbox may also have another set of visualization devices, such as a small searchlight, which illuminates only the tools that need to be used, clearly distinguishing them from other tools in a darker state, so that the operator can quickly find the tool in the digital toolbox.

[0070] In summary, compared with the prior art, the solution of the present invention has the following significant advantages:

[0071] The rail transit component maintenance visualization tool error prevention method and system of the present invention designs more reasonable and practical error prevention means for the picking up, use, storage, maintenance and other links of the component maintenance tools, reduces the time spent in finding the correct tool process, and ensures the quality and production efficiency of the maintenance process.

[0072] For operators, for a certain maintenance step, they only need to find the highlighted tool on the digital tool box, which greatly reduces the time to pick up the tool. When a tool is in use, other tools in the tool box will be locked to avoid misuse. Tools are only stored in the corresponding position on the tool box, which is easy to manage and maintain.

[0073] Compared with the existing error-proofing methods for maintenance tools, it can significantly reduce the misuse rate during tool use and avoid the situation of searching for required tools in a large-scale tool library, thereby ensuring the quality of maintenance and improving maintenance efficiency.

[0074] The biggest feature of the present invention is that it has established a visual error-proofing system for tool use, which standardizes the tool picking, use, storage, and maintenance. Compared with the traditional tool error-proofing method, the code of the tool required for this step is first retrieved from the system database, which can greatly reduce the misuse rate of the tool and ensure the quality of the product. On the other hand, the visualization device can save the operator's time in finding the tool and improve production efficiency. At the same time, the tools are managed in a unified manner, eliminating the phenomenon of tools being randomly discarded, which is convenient for tool maintenance.

[0075] The present invention improves production efficiency while ensuring product quality, and is also beneficial to tool management, thus having significant economic benefits.

[0076] It is to be understood that the embodiments of the system described above are merely illustrative, and the units described as separate components may or may not be physically separated, and may be located in one place, or may be distributed on different network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the solution of this embodiment. Those of ordinary skill in the art may understand and implement the solution without creative effort.

[0077] In addition, it should be understood by those skilled in the art that, in the application documents of the embodiments of the present invention, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, an element defined by the sentence "comprises a ..." does not exclude the presence of other identical elements in the process, method, article or device including the element.

[0078] In the description of the embodiment of the present invention, a large number of specific details are described. However, it should be understood that the embodiment of the embodiment of the present invention can be practiced without these specific details. In some examples, known methods, structures and techniques are not shown in detail so as not to obscure the understanding of this specification. Similarly, it should be understood that in order to streamline the disclosure of the embodiment of the present invention and help understand one or more of the various inventive aspects, in the above description of the exemplary embodiments of the embodiment of the present invention, the various features of the embodiment of the present invention are sometimes grouped together into a single embodiment, figure, or description thereof.

[0079] This method of disclosure, however, is not to be interpreted as reflecting an intention that the claimed embodiments of the invention require more features than are expressly recited in each claim. Rather, as the claims reflect, inventive aspects lie in less than all features of a single foregoing disclosed embodiment. Thus, the claims following the Detailed Description are hereby expressly incorporated into this Detailed Description, with each claim standing on its own as a separate embodiment of an embodiment of the invention.

[0080] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the embodiments of the present invention, rather than to limit them. Although the embodiments of the present invention have been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions recorded in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the embodiments of the present invention.

Claims

1. A visual tool error-proofing system for rail transit parts maintenance, characterized by: It includes database module, digital toolbox module, encoding module and card control module; The database module is used to record the status information of the maintenance tool and update it in time, track the use status of the tool in real time, and store the maintenance process data of the parts maintenance line; The digital toolbox module is used to store tools and determine the tools required for each maintenance step; The encoding module is used to uniquely encode the tool and is provided with a visualization device for visually displaying the position of the tool in the digital toolbox module; The card control module is used to unlock and lock the tool; The card control module includes a first card control module and a second card control module. The digital tool box module is provided with the first card control module, which is used to lock and unlock the physical connection between the tool and the digital tool box module; the tool is provided with a second card control module, which is used to lock and unlock the usable state of the tool; When a tool arrives at a maintenance step, its unique code is scanned to send status information that the tool has arrived at the maintenance step to the database module, and then check whether the tool is the tool required for the maintenance step. If not, an error is reported and / or the card control module locks the tool so that it cannot be used; When a tool leaves a maintenance step, its unique code is scanned, thereby sending status information that the tool has left the maintenance step to the database module; and / or, when the tool leaves the maintenance step, the card control module locks the tool so that it cannot be used; The rail transit components are EMU components, and the EMU components include brake calipers, EMU gearboxes, and EMU motors.

2. A visual tool error prevention method for rail transit parts maintenance, characterized in that: Includes steps: S1. First, all maintenance tools are stored in the digital toolbox module, classified and sorted according to the work steps on the parts maintenance line, and unified coding management is performed according to the coding module; S2. For the parts maintenance line, the digital toolbox module automatically reads the maintenance process data in the database module, and when performing one of the maintenance steps, determines the tools required for this maintenance step; S3, unlocking only the tool corresponding to the maintenance step through the card control module, and displaying its position through the visualization device through the encoding module; S4, when the tool is used, the database module reads and records the tool usage status information; S5. After confirming that the tool has been used, the card control module is used to relock the tool so that it cannot be used. At this time, the database module updates and records the status information of the tool in real time; S6, the tool is finally returned to the digital toolbox module for storage, waiting for the next use; The card control module includes a first card control module and a second card control module. The digital tool box module is provided with the first card control module, which is used to lock and unlock the physical connection between the tool and the digital tool box module; the tool is provided with a second card control module, which is used to lock and unlock the usable state of the tool; When a tool arrives at a maintenance step, its unique code is scanned to send status information that the tool has arrived at the maintenance step to the database module, and then check whether the tool is the tool required for the maintenance step. If not, an error is reported and / or the card control module locks the tool so that it cannot be used; When a tool leaves a maintenance step, its unique code is scanned, thereby sending status information that the tool has left the maintenance step to the database module; and / or, when the tool leaves the maintenance step, the card control module locks the tool so that it cannot be used; The rail transit components are EMU components, and the EMU components include brake calipers, EMU gearboxes, and EMU motors.

3. The rail transit component maintenance visualization tool error prevention method according to claim 2, characterized in that: The database module, the digital toolbox module, the encoding module and the card control module use wireless or wired information transmission between each other.

4. The rail transit component maintenance visualization tool error prevention method according to claim 2, characterized in that: In the digital toolbox module, when the card control module completes unlocking the tool, the status information indicating that the tool has left the digital toolbox module is sent to the database module.

5. The rail transit component maintenance visualization tool error prevention method according to claim 2, characterized in that: After the card control module locks the tool in the digital toolbox module, it sends status information indicating that the tool has been returned to the digital toolbox module to the database module.

6. The rail transit component maintenance visualization tool error prevention method according to claim 2, characterized in that: When it is determined that the next maintenance step requires the use of a predetermined tool, the first card control module unlocks the physical connection between the tool and the digital tool box module, allowing the tool to be taken; When the tool is finally returned to the digital toolbox module, the first card control module locks the physical connection between the tool and the digital toolbox module, and the tool is in a storage state.

7. The rail transit component maintenance visualization tool error prevention method according to claim 2, characterized in that: When the tool reaches the current maintenance step, but the database module verifies that the tool does not belong to the tool required for the maintenance step, the second card control module locks the tool to make it unusable; When the tool reaches a matching maintenance step, the second card control module unlocks the tool to make it usable.

8. The rail transit component maintenance visualization tool error prevention method according to claim 2, characterized in that: The visualization device comprises a lighting device, which is used to light the tool to be used.