Method and device for determining cementing quality

By obtaining drilling and logging information, combined with a linear regression equation, the cementing quality is calculated, which solves the problem of low cementing quality accuracy in the existing technology, achieves comprehensive consideration of cement cementation and drilling engineering quality, and improves the quality of cementing. Accuracy of cementing quality.

CN114508342BActive Publication Date: 2024-10-29PETROCHINA CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202011276421.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-11-16
Publication Date
2024-10-29
Estimated Expiration
2040-11-16

AI Technical Summary

Technical Problem

In the existing technology, the determination of cementing quality relies on the cement bonding results, and there is a lack of methods that combine the quality of drilling projects, resulting in low accuracy of cementing quality.

Method used

By obtaining the drilling information and logging information of multiple target wells, the weight and influence of each drilling parameter are determined, and the cementing quality is calculated using a linear regression equation combined with the drilling engineering quality and cement bonding quality.

Benefits of technology

It improves the accuracy of cementing quality, adds reference factors, and ensures comprehensive consideration of cement bonding quality and drilling engineering quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114508342B_ABST
    Figure CN114508342B_ABST
Patent Text Reader

Abstract

The present application provides a method and device for determining cementing quality. It belongs to the field of oil drilling engineering technology. The method includes: obtaining drilling information and logging information of multiple target wells, the drilling information includes multiple drilling parameters, the logging information includes a first section length and a first logging rate, based on the drilling information of multiple target wells, respectively determining the weight of each drilling parameter and the influence of each drilling parameter of each target well, based on the weight of each drilling parameter and the influence of each drilling parameter of each target well, determining the first quality parameter of each target well, based on the first section length of each target well and the length of the oil and gas layer sealing section, determining the second logging rate, based on the second logging rate and the first logging rate of each target well, determining the second quality parameter of each target well, based on the first quality parameter and the second quality parameter of each target well, determining the cementing quality of each target well. The method improves the accuracy of the determined cementing quality.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of oil drilling engineering, and in particular to a method and device for determining cementing quality. Background Art

[0002] Cementing is a key technology to ensure the production of oil and gas wells, and the quality of cementing is of great significance to the production development and capacity construction of oil and gas wells. Therefore, generally after completing the cementing operation of oil and gas wells, the quality of cementing must be determined to verify whether the cemented oil and gas wells meet the production requirements.

[0003] In the related art, the cement bonding result after cementing is determined, and the cementing quality is determined based on the cement bonding result after cementing. Since the cementing quality is affected by the quality of the drilling project, the cementing quality is determined only based on the cement bonding result after cementing, and the result obtained has certain limitations, making the accuracy of the determined cementing quality low. Summary of the invention

[0004] The embodiment of the present application provides a method and device for determining cementing quality, which can improve the accuracy of the determined cementing quality. The technical solution is as follows:

[0005] In one aspect, a method for determining cementing quality is provided, the method comprising:

[0006] Acquire drilling information and logging information of multiple target wells to be evaluated, wherein the drilling information includes multiple drilling parameters, wherein the multiple drilling parameters include completed well depth, length of oil and gas layer sealing section, maximum well inclination angle, well diameter expansion rate and return height ratio, wherein the return height ratio is the ratio of cement return height to completed well depth, and the logging information includes a first section length and a first logging rate, wherein the first section length is the section length of the target well section whose cementing quality exceeds a preset value, and the first logging rate is the ratio of the first section length to the length of the oil and gas layer sealing section;

[0007] Based on the drilling information of the plurality of target wells, respectively determining a weight of each drilling parameter and an influence degree of each drilling parameter of each target well;

[0008] Determining a first quality parameter of each target well based on a weight of each drilling parameter and an influence of each drilling parameter of each target well;

[0009] Determining a second logging rate based on the first section length and the oil and gas layer sealing section length of each target well;

[0010] determining a second quality parameter of each target well based on the second logging rate and the first logging rate of each target well;

[0011] The cementing quality of each target well is determined based on the first quality parameter and the second quality parameter of each target well.

[0012] In a possible implementation, the weight of each drilling parameter and the influence of each drilling parameter of each target well are determined based on the drilling information of the multiple target wells, including:

[0013] Determining an average value of each drilling parameter based on the drilling information of the plurality of target wells;

[0014] Determining the influence of each drilling parameter of each target well based on each drilling parameter of each target well and an average value of each drilling parameter;

[0015] Determining a univariate linear regression equation for each drilling parameter based on the influence degree of each drilling parameter of each target well and the first logging rate of each target well;

[0016] Based on a univariate linear regression equation of each drilling parameter, a weight of each drilling parameter is determined.

[0017] In a possible implementation, determining the influence of each drilling parameter of each target well based on each drilling parameter of each target well and the average value of each drilling parameter includes:

[0018] Based on each drilling parameter of each target well and the average value of each drilling parameter, the influence degree of each drilling parameter of each target well is determined by the following formula 1;

[0019] Formula 1:

[0020] in, is the influence of the jth drilling parameter of the i-th target well; i is the serial number of the target well, and j is the serial number of the drilling parameter; is the jth drilling parameter of the i-th target well; is the average value of the jth drilling parameter.

[0021] In a possible implementation, the determining of a univariate linear regression equation for each drilling parameter based on the influence of each drilling parameter of each target well and the first logging rate of each target well includes:

[0022] For each drilling parameter, the influence degree of the drilling parameter of the multiple target wells and the first logging rate are fitted to obtain a univariate linear regression equation of the drilling parameter, and the univariate linear regression equation is used to express the functional relationship between the influence degree and the first logging rate.

[0023] In a possible implementation, the weight of each drilling parameter is determined based on a univariate linear regression equation of each drilling parameter, including:

[0024] For each drilling parameter, determining a regression coefficient of the univariate linear regression equation based on the univariate linear regression equation of the drilling parameter;

[0025] Based on the regression coefficient, the weight of each drilling parameter is determined by the following formula 2;

[0026] Formula 2:

[0027] Among them, p j is the weight of the jth drilling parameter; b j is the regression coefficient of the univariate linear regression equation of the j-th drilling parameter; b j1 is the absolute value of the regression coefficient of the univariate linear regression equation of the j-th drilling parameter; j is the serial number of the drilling parameter.

[0028] In a possible implementation, determining the first quality parameter of each target well based on the weight of each drilling parameter and the influence of each drilling parameter of each target well includes:

[0029] Based on the weight of each drilling parameter and the influence of each drilling parameter of each target well, the first quality parameter of each target well is determined by the following formula 3;

[0030] Formula 3:

[0031] Among them, M i is the first quality parameter of the i-th target well; p j is the weight of the jth drilling parameter; is the influence degree of the jth drilling parameter of the i-th target well; i is the serial number of the target well; j is the serial number of the drilling parameter.

[0032] In a possible implementation, determining the second quality parameter of each target well based on the second logging rate and the first logging rate of each target well includes:

[0033] Based on the second logging rate and the first logging rate of each target well, a second quality parameter of each target well is determined by the following formula 4;

[0034] Formula 4:

[0035] Among them, N i is the second quality parameter of the i-th target well; y iis the first logging rate of the i-th target well; is the second logging rate; i is the serial number of the target well.

[0036] In a possible implementation, determining the cementing quality of each target well based on the first quality parameter and the second quality parameter of each target well includes:

[0037] Based on the first quality parameter and the second quality parameter of each target well, the cementing quality of each target well is determined by the following formula 5:

[0038] Formula 5: U i =M i +N i

[0039] Among them, U i is the cementing quality of the i-th target well; M i is the first quality parameter of the i-th target well; N i is the second quality parameter of the i-th target well; i is the sequence number of the target well.

[0040] In a possible implementation, determining the second logging rate based on the first section length and the oil and gas layer sealing section length of each target well includes:

[0041] Determining a first sum of the first segment lengths of the plurality of target wells based on the first segment length of each target well;

[0042] Determining a second sum of the oil and gas layer sealing section lengths of the plurality of target wells based on the oil and gas layer sealing section length of each target well;

[0043] The ratio of the first sum to the second sum is determined to obtain the second logging rate.

[0044] In another aspect, a device for determining cementing quality is provided, the device comprising:

[0045] An acquisition module is used to acquire drilling information and logging information of multiple target wells to be evaluated, wherein the drilling information includes multiple drilling parameters, wherein the multiple drilling parameters include completed well depth, length of oil and gas layer sealing section, maximum well inclination angle, well diameter expansion rate and return height ratio, wherein the return height ratio is the ratio of cement return height to completed well depth, and the logging information includes a first section length and a first logging ratio, wherein the first section length is the section length of the target well section whose cementing quality exceeds a preset value, and the first logging ratio is the ratio of the first section length to the length of the oil and gas layer sealing section;

[0046] A first determination module, configured to determine the weight of each drilling parameter and the influence of each drilling parameter of each target well based on the drilling information of the plurality of target wells;

[0047] A second determination module, configured to determine a first quality parameter of each target well based on a weight of each drilling parameter and an influence of each drilling parameter of each target well;

[0048] A third determination module is used to determine a second logging rate based on the first section length and the oil and gas layer sealing section length of each target well;

[0049] a fourth determination module, configured to determine a second quality parameter of each target well based on the second logging rate and the first logging rate of each target well;

[0050] The fifth determination module is used to determine the cementing quality of each target well based on the first quality parameter and the second quality parameter of each target well.

[0051] In a possible implementation, the first determining module includes:

[0052] A first determining unit, configured to determine an average value of each drilling parameter based on the drilling information of the plurality of target wells;

[0053] A second determining unit, configured to determine the influence of each drilling parameter of each target well based on each drilling parameter of each target well and an average value of each drilling parameter;

[0054] A third determination unit is used to determine a univariate linear regression equation of each drilling parameter based on the influence degree of each drilling parameter of each target well and the first logging rate of each target well;

[0055] The fourth determination unit is used to determine the weight of each drilling parameter based on a univariate linear regression equation of each drilling parameter.

[0056] In a possible implementation, the second determining unit includes:

[0057] A second determining subunit is configured to determine the influence of each drilling parameter of each target well by using the following formula 1 based on each drilling parameter of each target well and an average value of each drilling parameter;

[0058] Formula 1:

[0059] in, is the influence of the jth drilling parameter of the i-th target well; i is the serial number of the target well, and j is the serial number of the drilling parameter; is the jth drilling parameter of the i-th target well; is the average value of the jth drilling parameter.

[0060] In a possible implementation, the third determining unit includes:

[0061] The third determination subunit is used to fit the influence of the drilling parameter of the multiple target wells and the first logging rate for each drilling parameter to obtain a univariate linear regression equation of the drilling parameter, wherein the univariate linear regression equation is used to represent the functional relationship between the influence and the first logging rate.

[0062] In a possible implementation, the fourth determining unit includes:

[0063] a fourth determination subunit, configured to determine, for each drilling parameter, a regression coefficient of the univariate linear regression equation based on the univariate linear regression equation of the drilling parameter;

[0064] Based on the regression coefficient, the weight of each drilling parameter is determined by the following formula 2;

[0065] Formula 2:

[0066] Among them, p j is the weight of the jth drilling parameter; b j is the regression coefficient of the univariate linear regression equation of the j-th drilling parameter; b j1 is the absolute value of the regression coefficient of the univariate linear regression equation of the j-th drilling parameter; j is the serial number of the drilling parameter.

[0067] In a possible implementation, the second determining module includes:

[0068] a fifth determining unit, configured to determine the first quality parameter of each target well by using the following formula 3 based on the weight of each drilling parameter and the influence of each drilling parameter of each target well;

[0069] Formula 3:

[0070] Among them, M i is the first quality parameter of the i-th target well; p j is the weight of the jth drilling parameter; is the influence degree of the jth drilling parameter of the i-th target well; i is the serial number of the target well; j is the serial number of the drilling parameter.

[0071] In a possible implementation, the fourth determining module includes:

[0072] a sixth determining unit, configured to determine a second quality parameter of each target well based on the second logging rate and the first logging rate of each target well by using the following formula 4;

[0073] Formula 4:

[0074] Among them, N i is the second quality parameter of the i-th target well; y i is the first logging rate of the i-th target well; is the second logging rate; i is the serial number of the target well.

[0075] In a possible implementation, the fifth determining module includes:

[0076] A seventh determination unit is used to determine the cementing quality of each target well based on the first quality parameter and the second quality parameter of each target well by using the following formula 5:

[0077] Formula 5: U i =M i +N i

[0078] Among them, U i is the cementing quality of the i-th target well; M i is the first quality parameter of the i-th target well; N i is the second quality parameter of the i-th target well; i is the sequence number of the target well.

[0079] In a possible implementation, the third determining module includes:

[0080] an eighth determining unit, configured to determine a first sum of the first section lengths of the plurality of target wells based on the first section length of each target well;

[0081] a ninth determining unit, configured to determine a second sum of the oil and gas layer sealing section lengths of the plurality of target wells based on the oil and gas layer sealing section length of each target well;

[0082] A tenth determining unit is used to determine the ratio of the first sum to the second sum to obtain the second logging rate.

[0083] On the other hand, a terminal is provided, comprising a processor and a memory, wherein the memory stores at least one program code, and the at least one program code is loaded and executed by the processor to implement instructions of the method for determining cementing quality described in any of the above implementations.

[0084] On the other hand, a computer-readable storage medium is provided, in which at least one program code is stored. The at least one program code is loaded and executed by a processor to implement the steps in the method for determining cementing quality described in any of the above implementations.

[0085] The beneficial effects of the technical solution provided by the embodiments of the present application include at least:

[0086] In the embodiment of the present application, since the completed well depth, the length of the oil and gas layer sealing section, the maximum well inclination angle, the well diameter expansion rate and the return height ratio are the drilling information of the drilling, the first quality parameter determined based on the completed well depth, the length of the oil and gas layer sealing section, the maximum well inclination angle, the well diameter expansion rate and the return height ratio is used to represent the quality of the drilling project. The first section length and the first logging rate are the logging information of cement bonding, and the second quality parameter determined based on the first section length and the first logging rate is used to represent the quality of cement bonding. Therefore, in the present application, the cementing quality is determined based on the first quality parameter and the second quality parameter, which can achieve the determination of the cementing quality based on the quality of cement bonding and the quality of the drilling project, thereby increasing the reference factors for determining the cementing quality and improving the accuracy of the determined cementing quality. BRIEF DESCRIPTION OF THE DRAWINGS

[0087] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0088] Figure 1 is a flow chart of a method for determining cementing quality provided in an embodiment of the present application;

[0089] Figure 2 This is an Excel data analysis interface diagram provided in an embodiment of the present application;

[0090] Figure 3 This is another Excel data analysis interface diagram provided in an embodiment of the present application;

[0091] Figure 4 It is a univariate linear regression equation curve graph provided in an embodiment of the present application;

[0092] Figure 5 It is another univariate linear regression equation curve graph provided in the embodiment of the present application;

[0093] Figure 6 It is another univariate linear regression equation curve graph provided in an embodiment of the present application;

[0094] Figure 7 It is another univariate linear regression equation curve graph provided in the embodiment of the present application;

[0095] Figure 8 It is another univariate linear regression equation curve graph provided in an embodiment of the present application;

[0096] Fig. 9 It is a schematic diagram of a device for determining cementing quality provided in an embodiment of the present application;

[0097] Fig.10 It is a structural diagram of a terminal provided in an embodiment of the present application. DETAILED DESCRIPTION

[0098] In order to make the objectives, technical solutions and advantages of the present application clearer, the implementation methods of the present application will be further described in detail below with reference to the accompanying drawings.

[0099] This embodiment provides a method for determining cementing quality. Figure 1 , the method comprising:

[0100] Step 101: The terminal obtains drilling information and logging information of multiple target wells to be evaluated.

[0101] Among them, the drilling information includes multiple drilling parameters, including the completed well depth, the length of the oil and gas layer sealing section, the maximum well inclination angle, the well diameter expansion rate and the return height ratio, and the return height ratio is the ratio of the cement return height to the completed well depth. The logging information includes the first section length and the first logging rate. The first section length is the section length of the target well section whose cementing quality exceeds the preset value, and the first logging rate is the ratio of the first section length to the length of the oil and gas layer sealing section. That is, the first section length is the high-quality section length, and the first logging rate is the high-quality logging rate.

[0102] The terminal divides the target wells into conventional wells and complex structure wells according to the maximum well deviation angle. For each target well, when the maximum well deviation angle of the target well is less than 60°, the terminal determines that the target well is a conventional well. When the maximum well deviation angle of the target well is not less than 60°, the terminal determines that the target well is a complex structure well. Based on the determined conventional wells and complex structure wells, the terminal determines the cementing quality of the conventional wells and the complex structure wells respectively through the following steps 102-106.

[0103] Among them, the number of target wells can be set and changed as needed; the number of target wells is not specifically limited in the embodiment of the present application; for example, the number of target wells is 50. In addition, the multiple target wells can be target wells completed by the same unit in different periods, or target wells completed by different units in the same period; for example, the multiple target wells are target wells completed by units A, B and C in the same quarter. In addition, the multiple target wells can all be conventional wells, or all be complex structure wells, or some of the target wells can be conventional wells and some of the target wells can be complex structure wells.

[0104] For example, the drilling parameters of 50 conventional wells obtained by the terminal are shown in Tables 1, 2 and 3 below:

[0105] Table 1

[0106]

[0107] Table 2

[0108]

[0109] Table 3

[0110]

[0111] Step 102: The terminal determines the weight of each drilling parameter and the influence of each drilling parameter of each target well based on the drilling information of the multiple target wells.

[0112] This step can be implemented by following steps 1021-1024.

[0113] Step 1021: The terminal determines an average value of each drilling parameter based on the drilling information of multiple target wells.

[0114] Among them, the terminal determines the average value of each drilling parameter based on the drilling information of multiple target wells through the following public six.

[0115] Formula 6:

[0116] Where i is the serial number of the target well, j is the serial number of the drilling parameter; n is the number of target wells; is the average value of the jth drilling parameter; is the jth drilling parameter of the ith target well.

[0117] The multiple target wells may be the 50 conventional wells in Table 1, Table 2, and Table 3. For example, the terminal determines the average value of each drilling parameter based on the drilling information of the 50 conventional wells.

[0118] For example, the average value of each drilling parameter determined by the terminal is shown in Table 4 below.

[0119] Table 4

[0120]

[0121] Step 1022: The terminal determines the influence of each drilling parameter of each target well based on each drilling parameter of each target well and the average value of each drilling parameter.

[0122] For each target well, the influence of each drilling parameter is the ratio of each drilling parameter to the average value of each drilling parameter.

[0123] The terminal determines the influence of each drilling parameter of each target well through the following formula 1 based on each drilling parameter of each target well and the average value of each drilling parameter.

[0124] Formula 1:

[0125] in, is the influence of the jth drilling parameter of the i-th target well; i is the serial number of the target well, and j is the serial number of the drilling parameter; is the jth drilling parameter of the i-th target well; is the average value of the jth drilling parameter.

[0126] The target wells may be the 50 conventional wells in Table 1, Table 2, and Table 3, and each target well is each conventional well in the 50 conventional wells. For example, the terminal determines the influence of each drilling parameter of each conventional well based on each drilling parameter of each conventional well and the average value of each drilling parameter.

[0127] For example, the influence of each drilling parameter of each conventional well determined by the terminal is shown in Tables 5, 6 and 7 below.

[0128] Table 5

[0129]

[0130] Table 6

[0131]

[0132] Table 7

[0133]

[0134] Step 1023: The terminal determines a univariate linear regression equation for each drilling parameter based on the influence of each drilling parameter of each target well and the first logging rate of each target well.

[0135] For each drilling parameter, the terminal fits the influence of the drilling parameters of multiple target wells and the first logging rate to obtain a univariate linear regression equation for the drilling parameter, which is used to represent the functional relationship between the influence and the first logging rate.

[0136] Among them, the fitting method adopts the regression function in the data analysis function in Excel.

[0137] See also Figure 2, the terminal displays the first interface, which includes multiple function buttons. When the function button is triggered, multiple function options, a confirmation button, a cancel button and a help button are displayed. The multiple function options include histogram, moving average, random number generator, ranking and percentage ranking, regression, sampling, etc. The user can select the regression function option. When the regression option is triggered and the confirmation button is triggered, the terminal enters the regression function in the data analysis function.

[0138] See also Figure 3 After the terminal enters the regression function in the data analysis function, the terminal displays the second interface, which includes input options, output options, residual options, normal distribution options, confirmation buttons, cancel buttons and help buttons. The input options include the Y value input area and the X value input area. The user can select the input options. When the Y value input area is triggered, the terminal selects the first logging rate of multiple target wells. When the X value input area is triggered, the terminal selects the influence of each drilling parameter of multiple target wells in turn. Y represents the dependent variable of the univariate linear regression equation, and X represents the independent variable of the univariate linear regression equation.

[0139] When the user selects input values ​​for the Y value input area and the X value input area respectively, and the confirmation button is triggered, the terminal displays a third interface, which includes a univariate linear regression curve and a univariate linear regression equation for each drilling parameter.

[0140] The target wells may be the 50 conventional wells in Table 1, Table 2, and Table 3, and each target well is each conventional well in the 50 conventional wells. For example, the terminal determines a univariate linear regression equation for each drilling parameter based on the influence of each drilling parameter of each conventional well and the first logging rate of each conventional well.

[0141] For example, see Figure 4 The influence degree of the sealing section length of the oil and gas layer of 50 wells and the first logging rate were fitted, and the univariate linear regression equation of the sealing section length of the oil and gas layer was obtained as y=-0.1506x+0.8753.

[0142] For example, see Figure 5 The influence degree of the maximum well inclination angle of 50 wells and the first logging rate were fitted, and the univariate linear regression equation of the maximum well inclination angle was obtained as y=0.0131x+0.7083.

[0143] For example, see Figure 6 The influence degree of the wellbore expansion rate of 50 wells and the first logging rate were fitted, and the univariate linear regression equation of the wellbore expansion rate was obtained as y=0.11x+0.6109.

[0144] For example, see Figure 7The influence degree of the return height ratio of 50 wells and the first logging rate were fitted, and the univariate linear regression equation of the return height ratio was obtained as y=-0.0701x+0.7926.

[0145] For example, see Figure 8 The influence of the completion depth of 50 wells and the first logging rate were fitted, and the univariate linear regression equation of the completion depth was obtained as y=-0.265x+0.9877.

[0146] Step 1024: The terminal determines the weight of each drilling parameter based on the univariate linear regression equation of each drilling parameter.

[0147] This step can be achieved by following the steps (1) and (2), including:

[0148] (1) For each drilling parameter, the terminal determines the regression coefficient of the univariate linear regression equation based on the univariate linear regression equation of the drilling parameter.

[0149] Among them, the following formula 7 is the expression of the univariate linear regression equation.

[0150] Formula 7:

[0151] Among them, y j is the first logging rate of the univariate linear regression equation of the jth drilling parameter; a j is the regression constant of the univariate linear regression equation of the jth drilling parameter; b j is the regression coefficient of the univariate linear regression equation of the jth drilling parameter; is the influence of the jth drilling parameter of the i-th target well.

[0152] In a possible implementation, the regression coefficient of the linear regression equation of each drilling parameter is obtained by b in Formula 7. j Determine that the regression constant of the linear regression equation for each drilling parameter is obtained by a in Formula 7 j Sure.

[0153] In another possible implementation, the regression coefficient and regression constant of the univariate linear regression equation are determined by the following formula eight and formula nine, respectively.

[0154] Formula 8:

[0155] Formula 9:

[0156] Among them, b j is the regression coefficient of the univariate linear regression equation of the jth drilling parameter; a jis the regression constant of the univariate linear regression equation of the jth drilling parameter; is the average value of the jth drilling parameter; is the jth drilling parameter of the i-th target well; y i is the first logging rate of the i-th target well; is the second logging rate; i is the serial number of the target well, j is the serial number of the drilling parameter; n is the number of the target wells.

[0157] The regression coefficient represents the average increase in the first logging rate when the influence of each drilling parameter increases by one unit. Therefore, for multiple drilling parameters, the regression constant can be used to determine the weight of each drilling parameter.

[0158] The target wells may be the 50 conventional wells in Table 1, Table 2 and Table 3, and each target well is each well in the 50 conventional wells. For example, for each drilling parameter, the terminal determines the regression coefficient of the univariate linear regression equation based on the univariate linear regression equation of the drilling parameter.

[0159] For example, see Figure 4 The univariate linear regression equation of the length of the oil and gas layer sealing section is y=-0.1506x+0.8753, wherein -0.1506 is the regression coefficient of the univariate linear regression equation of the length of the oil and gas layer sealing section.

[0160] For example, see Figure 5 The univariate linear regression equation of the maximum well deviation angle is y=0.0131x+0.7083, where 0.0131 is the regression coefficient of the univariate linear regression equation of the maximum well deviation angle.

[0161] For example, see Figure 6 The linear regression equation of the wellbore expansion rate is y=0.11x+0.6109, where 0.11 is the regression coefficient of the linear regression equation of the maximum wellbore inclination.

[0162] For example, see Figure 7 The univariate linear regression equation of the return-high ratio is y=-0.0701x+0.7926, where -0.0701 is the regression coefficient of the univariate linear regression equation of the return-high ratio.

[0163] For example, see Figure 8 The univariate linear regression equation of the maximum well deviation angle is y=-0.265x+0.9877, where -0.265 is the regression coefficient of the univariate linear regression equation of the maximum well deviation angle.

[0164] For example, the regression coefficients of the univariate linear regression equation for each drilling parameter determined by the terminal are shown in Table 8 below.

[0165] Table 8

[0166]

[0167] (2) The terminal determines the weight of each drilling parameter based on the regression coefficient using the following formula 2.

[0168] Formula 2:

[0169] Among them, p j is the weight of the jth drilling parameter; b j is the regression coefficient of the univariate linear regression equation of the jth drilling parameter; b j1 is the absolute value of the regression coefficient of the univariate linear regression equation of the jth drilling parameter; j is the serial number of the drilling parameter.

[0170] Among them, p j With b j The sign of b is opposite. j When it is a negative number, it means that as the influence of the drilling parameters increases, the first logging rate decreases more, which further indicates that the influence of the drilling parameters on the cementing quality is relatively difficult to control.

[0171] In a possible implementation, when the terminal divides multiple target wells into conventional wells and complex structure wells according to the maximum well deviation angle, step 102 includes: for conventional wells, the terminal determines the weight of each drilling parameter and the influence of each drilling parameter of each conventional well according to the drilling parameters of multiple conventional wells. For complex structure wells, the terminal determines the weight of each drilling parameter and the influence of each drilling parameter of each complex structure well according to the drilling parameters of multiple complex structure wells.

[0172] The target wells may be the 50 conventional wells in Table 1, Table 2, and Table 3, and each target well is each well in the 50 conventional wells. For example, the terminal determines the weight of each drilling parameter of the 50 conventional wells.

[0173] For example, the weight of each drilling parameter determined by the terminal is shown in Table 9 below.

[0174] Table 9

[0175]

[0176] Step 103: The terminal determines a first quality parameter of each target well based on the weight of each drilling parameter and the influence of each drilling parameter of each target well.

[0177] The terminal determines the first quality parameter of each target well through the following formula three based on the weight of each drilling parameter and the influence of each drilling parameter of each target well.

[0178] The terminal obtains a plurality of product values ​​based on the product of the weight of each drilling parameter and the influence of each drilling parameter of each target well, and obtains the first quality parameter based on the sum of the plurality of product values.

[0179] Formula 3:

[0180] Among them, M i is the first quality parameter of the i-th target well; p j is the weight of the jth drilling parameter; is the influence of the jth drilling parameter of the i-th target well; i is the serial number of the target well; j is the serial number of the drilling parameter.

[0181] In a possible implementation, when the terminal divides multiple target wells into conventional wells and complex structure wells according to the maximum well deviation angle, step 103 includes: for conventional wells, the terminal determines the first quality parameter of each conventional well based on the weight of each drilling parameter and the influence of each drilling parameter of each conventional well. For complex structure wells, the terminal determines the first quality parameter of each complex structure well based on the weight of each drilling parameter and the influence of each drilling parameter of each complex structure well.

[0182] The target wells may be the 50 conventional wells in Table 1, Table 2, and Table 3, and each target well is each well in the 50 conventional wells. For example, the terminal determines the first quality parameter of each conventional well based on the weight of each drilling parameter and the influence of each drilling parameter of each conventional well.

[0183] For example, the product of the influence of the drilling parameters of each conventional well and the weight of the drilling parameters is shown in Tables 10, 11 and 12 below.

[0184] Table 10

[0185]

[0186] Table 11

[0187]

[0188] Table 12

[0189]

[0190] Step 104: The terminal determines a second logging rate based on the first section length and the oil and gas layer sealing section length of each target well.

[0191] In a possible implementation, the terminal determines a first sum of the first section lengths of the plurality of target wells based on the first section length of each target well. The terminal determines a second sum of the oil and gas layer sealing section lengths of the plurality of target wells based on the oil and gas layer sealing section length of each target well. The terminal determines a ratio of the first sum to the second sum to obtain a second logging rate.

[0192] In another possible implementation, the terminal determines an average value of the first logging rates based on the first logging rates of the plurality of target wells to obtain the second logging rate.

[0193] In a possible implementation, when the terminal divides the plurality of target wells into conventional wells and complex structure wells according to the maximum well deviation angle, step 104 includes: for conventional wells, the terminal determines the second logging rate based on the first section length and the oil and gas layer sealing section length of each conventional well. For complex structure wells, the terminal determines the second logging rate based on the first section length and the oil and gas layer sealing section length of each complex structure well.

[0194] The target wells may be the 50 conventional wells in Table 1, Table 2 and Table 3, and each target well is each of the 50 conventional wells. For example, the terminal determines that the second logging rate is 64.43% based on the first section length and the oil and gas layer sealing section length of each conventional well.

[0195] Step 105: The terminal determines a second quality parameter of each target well based on the second logging rate and the first logging rate of each target well.

[0196] The terminal determines the second quality parameter of each target well based on the second logging rate and the first logging rate of each target well through the following formula 4.

[0197] The second quality parameter of each target well is the ratio of the first logging rate to the second logging rate.

[0198] Formula 4:

[0199] Among them, N i is the second quality parameter of the i-th target well; y i is the first logging rate of the i-th target well; is the second logging rate; i is the serial number of the target well.

[0200] In a possible implementation, when the terminal divides the plurality of target wells into conventional wells and complex structure wells according to the maximum well deviation angle, step 105 includes: for conventional wells, the terminal determines the second quality parameter of each conventional well based on the second logging rate and the first logging rate of each conventional well. For complex structure wells, the terminal determines the second quality parameter of each complex structure well based on the second logging rate and the first logging rate of each complex structure well.

[0201] The target wells may be the 50 conventional wells in Table 1, Table 2 and Table 3, and each target well is each well in the 50 conventional wells. For example, the terminal determines the second quality parameter of each conventional well based on the second logging rate 64.43% and the first logging rate of each conventional well.

[0202] Step 106: The terminal determines the cementing quality of each target well based on the first quality parameter and the second quality parameter of each target well.

[0203] The terminal determines the cementing quality of each target well based on the first quality parameter and the second quality parameter of each target well by the following formula 5. The cementing quality of each target well is the sum of the first quality parameter and the second quality parameter of each target well.

[0204] Formula 5: U i =M i +N i

[0205] Among them, U i is the cementing quality of the i-th target well; M i is the first quality parameter of the i-th target well; N i is the second quality parameter of the i-th target well; i is the sequence number of the target well.

[0206] In a possible implementation, when the terminal divides the plurality of target wells into conventional wells and complex structure wells according to the maximum well deviation angle, step 106 includes: for conventional wells, the terminal determines the cementing quality of each conventional well based on the first quality parameter and the second quality parameter of each conventional well. For complex structure wells, the terminal determines the cementing quality of each complex structure well based on the first quality parameter and the second quality parameter of each complex structure well.

[0207] The target wells may be the 50 conventional wells in Table 1, Table 2, and Table 3, and each target well is each well in the 50 conventional wells. For example, the terminal determines the cementing quality of each conventional well based on the first quality parameter and the second quality parameter of each conventional well.

[0208] For example, taking i as A1, the terminal determines the cementing quality of the A1 well based on the first quality parameter and the second quality parameter of the A1 well by using Formula 5.

[0209] U A1 =M A1 +N A1

[0210] =21.11% / 64.43%+{2.0585*24.74%+1.2384*(-2.15%)+1.2320*(-18.07%)+0.76*11.51%+1.7462*43.53%}=1.4351.

[0211] The terminal determined that the cementing quality of Well A1 was 1.4351.

[0212] By analogy, the terminal determines the cementing quality of each conventional well based on the first quality parameter and the second quality parameter of each conventional well through Formula 5.

[0213] Among them, the cementing quality of the 50 conventional wells determined is shown in Tables 10, 11 and 12.

[0214] Through calculation, the total score of cementing quality of 18 wells in unit A is 30.4697, the total score of cementing quality of 18 wells in unit B is 31.1678, and the total score of cementing quality of 14 wells in unit C is 23.8361. Unit B has the highest score for cementing quality, and the overall quality is the best considering the engineering quality and construction difficulty. Unit C has the lowest score for cementing quality due to factors such as the number of wells and well depth.

[0215] In the embodiment of the present application, the cementing quality is determined based on the first quality parameter and the second quality parameter, and the cementing quality can be determined based on the quality of cement bonding and the quality of drilling engineering, thereby increasing the reference factors for determining the cementing quality and improving the accuracy of the determined cementing quality. The cementing quality of 50 wells constructed by different construction units is determined, making the comparison of the cementing quality of the 50 wells more accurate, thereby achieving the comparison of the cementing quality of different construction units.

[0216] In the embodiment of the present application, since the completed well depth, the length of the oil and gas layer sealing section, the maximum well inclination angle, the well diameter expansion rate and the return height ratio are the drilling information of the drilling, the first quality parameter determined based on the completed well depth, the length of the oil and gas layer sealing section, the maximum well inclination angle, the well diameter expansion rate and the return height ratio is used to represent the quality of the drilling project. The first section length and the first logging rate are the logging information of cement bonding, and the second quality parameter determined based on the first section length and the first logging rate can represent the quality of cement bonding. Therefore, in the present application, the cementing quality is determined based on the first quality parameter and the second quality parameter, and it is possible to determine the cementing quality based on the quality of cement bonding and in combination with the quality of the drilling project, thereby increasing the reference factors for determining the cementing quality and improving the accuracy of the determined cementing quality.

[0217] The present application also provides a device for determining cementing quality, see Fig. 9 , the device comprises:

[0218] The acquisition module 901 is used to acquire drilling information and logging information of multiple target wells to be evaluated, wherein the drilling information includes multiple drilling parameters, and the multiple drilling parameters include the completed well depth, the length of the oil and gas layer cementing section, the maximum well inclination angle, the well diameter expansion rate and the return height ratio, the return height ratio is the ratio of the cement return height to the completed well depth, and the logging information includes the first section length and the first logging rate, the first section length is the section length of the target well section whose cementing quality exceeds a preset value, and the first logging rate is the ratio of the first section length to the completed well depth;

[0219] A first determination module 902 is used to determine the weight of each drilling parameter and the influence of each drilling parameter of each target well based on the drilling information of multiple target wells;

[0220] A second determination module 903 is used to determine a first quality parameter of each target well based on a weight of each drilling parameter and an influence of each drilling parameter of each target well;

[0221] A third determination module 904 is used to determine a second logging rate based on the first section length and the oil and gas layer sealing section length of each target well;

[0222] A fourth determination module 905 is used to determine a second quality parameter of each target well based on the second logging rate and the first logging rate of each target well;

[0223] The fifth determination module 906 is used to determine the cementing quality of each target well based on the first quality parameter and the second quality parameter of each target well.

[0224] In a possible implementation, the first determining module 902 includes:

[0225] A first determining unit, configured to determine an average value of each drilling parameter based on drilling information of a plurality of target wells;

[0226] a second determination unit, configured to determine the influence of each drilling parameter of each target well based on each drilling parameter of each target well and an average value of each drilling parameter;

[0227] A third determination unit is used to determine a univariate linear regression equation of each drilling parameter based on the influence degree of each drilling parameter of each target well and the first logging rate of each target well;

[0228] The fourth determination unit is used to determine the weight of each drilling parameter based on a univariate linear regression equation of each drilling parameter.

[0229] In a possible implementation, the second determining unit includes:

[0230] A second determination subunit is used to determine the influence degree of each drilling parameter of each target well through the following formula 1 based on each drilling parameter of each target well and the average value of each drilling parameter;

[0231] Formula 1:

[0232] in, is the influence of the jth drilling parameter of the i-th target well; i is the serial number of the target well, and j is the serial number of the drilling parameter; is the jth drilling parameter of the i-th target well; is the average value of the jth drilling parameter.

[0233] In a possible implementation, the third determining unit includes:

[0234] The third determination subunit is used to fit the influence of the drilling parameters of multiple target wells and the first logging rate for each drilling parameter to obtain a univariate linear regression equation of the drilling parameter, which is used to represent the functional relationship between the influence and the first logging rate.

[0235] In a possible implementation, the fourth determining unit includes:

[0236] A fourth determination subunit is used to determine the regression coefficient of the univariate linear regression equation for each drilling parameter based on the univariate linear regression equation of the drilling parameter;

[0237] Based on the regression coefficient, the weight of each drilling parameter is determined by the following formula 2:

[0238] Formula 2:

[0239] Among them, p j is the weight of the jth drilling parameter; b j is the regression coefficient of the univariate linear regression equation of the jth drilling parameter; b j1 is the absolute value of the regression coefficient of the univariate linear regression equation of the jth drilling parameter; j is the serial number of the drilling parameter.

[0240] In a possible implementation, the second determining module 903 includes:

[0241] a fifth determining unit, configured to determine a first quality parameter of each target well by using the following formula 3 based on the weight of each drilling parameter and the influence of each drilling parameter of each target well;

[0242] Formula 3:

[0243] Among them, M iis the first quality parameter of the i-th target well; p j is the weight of the jth drilling parameter; is the influence of the jth drilling parameter of the i-th target well; i is the serial number of the target well; j is the serial number of the drilling parameter.

[0244] In a possible implementation, the fourth determining module 905 includes:

[0245] a sixth determining unit, configured to determine a second quality parameter of each target well based on the second logging rate and the first logging rate of each target well by using the following formula 4;

[0246] Formula 4:

[0247] Among them, N i is the second quality parameter of the i-th target well; y i is the first logging rate of the i-th target well; is the second logging rate; i is the serial number of the target well.

[0248] In a possible implementation, the fifth determining module 906 includes:

[0249] A seventh determination unit is used to determine the cementing quality of each target well based on the first quality parameter and the second quality parameter of each target well by using the following formula 5:

[0250] Formula 5: U i =M i +N i

[0251] Among them, U i is the cementing quality of the i-th target well; M i is the first quality parameter of the i-th target well; N i is the second quality parameter of the i-th target well; i is the sequence number of the target well.

[0252] In a possible implementation, the third determining module 904 includes:

[0253] An eighth determining unit, configured to determine a first sum of first section lengths of a plurality of target wells based on the first section length of each target well;

[0254] a ninth determining unit, configured to determine a second sum of the oil and gas layer sealing section lengths of the plurality of target wells based on the oil and gas layer sealing section length of each target well;

[0255] The tenth determining unit is used to determine the ratio of the first sum to the second sum to obtain a second logging rate.

[0256] In the embodiment of the present application, since the completed well depth, the length of the oil and gas layer sealing section, the maximum well inclination angle, the well diameter expansion rate and the return height ratio are the drilling information of the drilling, the first quality parameter determined based on the completed well depth, the length of the oil and gas layer sealing section, the maximum well inclination angle, the well diameter expansion rate and the return height ratio is used to represent the quality of the drilling project. The first section length and the first logging rate are the logging information of cement bonding, and the second quality parameter determined based on the first section length and the first logging rate can represent the quality of cement bonding. Therefore, in the present application, the cementing quality is determined based on the first quality parameter and the second quality parameter, and it is possible to determine the cementing quality based on the quality of cement bonding and in combination with the quality of the drilling project, thereby increasing the reference factors for determining the cementing quality and improving the accuracy of the determined cementing quality.

[0257] An embodiment of the present application further provides a terminal, the terminal comprising a processor and a memory, the memory storing at least one program code, the at least one program code being loaded and executed by the processor to implement instructions of the method for determining cementing quality in any of the above implementations.

[0258] Fig.10 The structure block diagram of a terminal 1000 provided by an exemplary embodiment of the present application is shown. The terminal 1000 may be a portable mobile terminal, such as a smart phone, a tablet computer, an MP3 player (Moving Picture Experts Group Audio Layer III), an MP4 player (Moving Picture Experts Group Audio Layer IV), a laptop computer or a desktop computer. The terminal 1000 may also be called a user device, a portable terminal, a laptop terminal, a desktop terminal or other names.

[0259] Typically, the terminal 1000 includes a processor 1001 and a memory 1002 .

[0260] The processor 1001 may include one or more processing cores, such as a 4-core processor, an 8-core processor, etc. The processor 1001 may be implemented in at least one hardware form of DSP (Digital Signal Processing), FPGA (Field-Programmable Gate Array), and PLA (Programmable Logic Array). The processor 1001 may also include a main processor and a coprocessor. The main processor is a processor for processing data in the awake state, also known as a CPU (Central Processing Unit); the coprocessor is a low-power processor for processing data in the standby state. In some embodiments, the processor 1001 may be integrated with a GPU (Graphics Processing Unit), which is responsible for rendering and drawing the content to be displayed on the display screen. In some embodiments, the processor 1001 may also include an AI (Artificial Intelligence) processor, which is used to process computing operations related to machine learning.

[0261] The memory 1002 may include one or more computer-readable storage media, which may be non-transitory. The memory 1002 may also include a high-speed random access memory and a non-volatile memory, such as one or more disk storage devices and flash memory storage devices. In some embodiments, the non-transitory computer-readable storage medium in the memory 1002 is used to store at least one instruction, which is used to be executed by the processor 1001 to implement the method for determining the cementing quality provided in the method embodiment of the present application.

[0262] In some embodiments, the terminal 1000 may also optionally include: a peripheral device interface 1003 and at least one peripheral device. The processor 1001, the memory 1002 and the peripheral device interface 1003 may be connected via a bus or a signal line. Each peripheral device may be connected to the peripheral device interface 1003 via a bus, a signal line or a circuit board. Specifically, the peripheral device includes: at least one of a radio frequency circuit 1004, a display screen 1005, a camera assembly 1006, an audio circuit 1007, a positioning assembly 1008 and a power supply 1009.

[0263] The peripheral device interface 1003 may be used to connect at least one peripheral device related to I / O (Input / Output) to the processor 1001 and the memory 1002. In some embodiments, the processor 1001, the memory 1002, and the peripheral device interface 1003 are integrated on the same chip or circuit board; in some other embodiments, any one or two of the processor 1001, the memory 1002, and the peripheral device interface 1003 may be implemented on a separate chip or circuit board, which is not limited in this embodiment.

[0264] The radio frequency circuit 1004 is used to receive and transmit RF (Radio Frequency) signals, also known as electromagnetic signals. The radio frequency circuit 1004 communicates with the communication network and other communication devices through electromagnetic signals. The radio frequency circuit 1004 converts the electrical signal into an electromagnetic signal for transmission, or converts the received electromagnetic signal into an electrical signal. Optionally, the radio frequency circuit 1004 includes: an antenna system, an RF transceiver, one or more amplifiers, a tuner, an oscillator, a digital signal processor, a codec chipset, a user identity module card, etc. The radio frequency circuit 1004 can communicate with other terminals through at least one wireless communication protocol. The wireless communication protocol includes but is not limited to: the World Wide Web, a metropolitan area network, an intranet, various generations of mobile communication networks (2G, 3G, 4G and 5G), a wireless local area network and / or a WiFi (Wireless Fidelity) network. In some embodiments, the radio frequency circuit 1004 may also include circuits related to NFC (Near Field Communication), which is not limited in this application.

[0265] The display screen 1005 is used to display a UI (User Interface). The UI may include graphics, text, icons, videos, and any combination thereof. When the display screen 1005 is a touch display screen, the display screen 1005 also has the ability to collect touch signals on the surface or above the surface of the display screen 1005. The touch signal can be input to the processor 1001 as a control signal for processing. At this time, the display screen 1005 can also be used to provide virtual buttons and / or virtual keyboards, also known as soft buttons and / or soft keyboards. In some embodiments, the display screen 1005 can be one, arranged on the front panel of the terminal 1000; in other embodiments, the display screen 1005 can be at least two, respectively arranged on different surfaces of the terminal 1000 or in a folding design; in other embodiments, the display screen 1005 can be a flexible display screen, arranged on a curved surface or a folding surface of the terminal 1000. Even, the display screen 1005 can also be arranged as a non-rectangular irregular figure, that is, a special-shaped screen. The display screen 1005 can be made of materials such as LCD (Liquid Crystal Display) and OLED (Organic Light-Emitting Diode).

[0266] The camera assembly 1006 is used to capture images or videos. Optionally, the camera assembly 1006 includes a front camera and a rear camera. Typically, the front camera is arranged on the front panel of the terminal, and the rear camera is arranged on the back of the terminal. In some embodiments, there are at least two rear cameras, which are any one of a main camera, a depth of field camera, a wide-angle camera, and a telephoto camera, so as to realize the fusion of the main camera and the depth of field camera to realize the background blur function, the fusion of the main camera and the wide-angle camera to realize the panoramic shooting and VR (Virtual Reality) shooting function or other fusion shooting functions. In some embodiments, the camera assembly 1006 may also include a flash. The flash can be a monochrome temperature flash or a dual-color temperature flash. A dual-color temperature flash refers to a combination of a warm light flash and a cold light flash, which can be used for light compensation at different color temperatures.

[0267] The audio circuit 1007 may include a microphone and a speaker. The microphone is used to collect sound waves from the user and the environment, and convert the sound waves into electrical signals and input them into the processor 1001 for processing, or input them into the radio frequency circuit 1004 to achieve voice communication. For the purpose of stereo acquisition or noise reduction, there may be multiple microphones, which are respectively arranged at different parts of the terminal 1000. The microphone may also be an array microphone or an omnidirectional acquisition microphone. The speaker is used to convert the electrical signal from the processor 1001 or the radio frequency circuit 1004 into sound waves. The speaker may be a traditional film speaker or a piezoelectric ceramic speaker. When the speaker is a piezoelectric ceramic speaker, it can not only convert the electrical signal into sound waves audible to humans, but also convert the electrical signal into sound waves inaudible to humans for purposes such as ranging. In some embodiments, the audio circuit 1007 may also include a headphone jack.

[0268] The positioning component 1008 is used to locate the current geographical location of the terminal 1000 to implement navigation or LBS (Location Based Service). The positioning component 1008 can be a positioning component based on the US GPS (Global Positioning System), China's Beidou system or Russia's Galileo system.

[0269] The power supply 1009 is used to power various components in the terminal 1000. The power supply 1009 can be an alternating current, a direct current, a disposable battery, or a rechargeable battery. When the power supply 1009 includes a rechargeable battery, the rechargeable battery can be a wired rechargeable battery or a wireless rechargeable battery. A wired rechargeable battery is a battery charged through a wired line, and a wireless rechargeable battery is a battery charged through a wireless coil. The rechargeable battery can also be used to support fast charging technology.

[0270] In some embodiments, the terminal 1000 further includes one or more sensors 1010 , including but not limited to: an acceleration sensor 1011 , a gyroscope sensor 1012 , a pressure sensor 1013 , a fingerprint sensor 1014 , an optical sensor 1015 , and a proximity sensor 1016 .

[0271] The acceleration sensor 1011 can detect the magnitude of acceleration on the three coordinate axes of the coordinate system established by the terminal 1000. For example, the acceleration sensor 1011 can be used to detect the components of gravity acceleration on the three coordinate axes. The processor 1001 can control the display screen 1005 to display the user interface in a horizontal view or a vertical view according to the gravity acceleration signal collected by the acceleration sensor 1011. The acceleration sensor 1011 can also be used to collect motion data of games or users.

[0272] The gyro sensor 1012 can detect the body direction and rotation angle of the terminal 1000, and the gyro sensor 1012 can cooperate with the acceleration sensor 1011 to collect the user's 3D actions on the terminal 1000. The processor 1001 can implement the following functions based on the data collected by the gyro sensor 1012: motion sensing (such as changing the UI according to the user's tilt operation), image stabilization during shooting, game control, and inertial navigation.

[0273] The pressure sensor 1013 can be set on the side frame of the terminal 1000 and / or the lower layer of the display screen 1005. When the pressure sensor 1013 is set on the side frame of the terminal 1000, it can detect the user's holding signal of the terminal 1000, and the processor 1001 performs left and right hand recognition or shortcut operation according to the holding signal collected by the pressure sensor 1013. When the pressure sensor 1013 is set on the lower layer of the display screen 1005, the processor 1001 controls the operability controls on the UI interface according to the user's pressure operation on the display screen 1005. The operability controls include at least one of a button control, a scroll bar control, an icon control, and a menu control.

[0274] The fingerprint sensor 1014 is used to collect the user's fingerprint, and the processor 1001 identifies the user's identity based on the fingerprint collected by the fingerprint sensor 1014, or the fingerprint sensor 1014 identifies the user's identity based on the collected fingerprint. When the user's identity is identified as a trusted identity, the processor 1001 authorizes the user to perform relevant sensitive operations, including unlocking the screen, viewing encrypted information, downloading software, paying, and changing settings. The fingerprint sensor 1014 can be set on the front, back, or side of the terminal 1000. When a physical button or a manufacturer logo is set on the terminal 1000, the fingerprint sensor 1014 can be integrated with the physical button or the manufacturer logo.

[0275] The optical sensor 1015 is used to collect the ambient light intensity. In one embodiment, the processor 1001 can control the display brightness of the display screen 1005 according to the ambient light intensity collected by the optical sensor 1015. Specifically, when the ambient light intensity is high, the display brightness of the display screen 1005 is increased; when the ambient light intensity is low, the display brightness of the display screen 1005 is reduced. In another embodiment, the processor 1001 can also dynamically adjust the shooting parameters of the camera assembly 1006 according to the ambient light intensity collected by the optical sensor 1015.

[0276] The proximity sensor 1016, also called a distance sensor, is usually arranged on the front panel of the terminal 1000. The proximity sensor 1016 is used to collect the distance between the user and the front of the terminal 1000. In one embodiment, when the proximity sensor 1016 detects that the distance between the user and the front of the terminal 1000 is gradually decreasing, the processor 1001 controls the display screen 1005 to switch from the screen-on state to the screen-off state; when the proximity sensor 1016 detects that the distance between the user and the front of the terminal 1000 is gradually increasing, the processor 1001 controls the display screen 1005 to switch from the screen-off state to the screen-on state.

[0277] Those skilled in the art will understand that Fig.10 The structure shown in the figure does not constitute a limitation on the terminal 1000, and the terminal 1000 may include more or less components than those shown in the figure, or combine some components, or adopt a different component arrangement.

[0278] An embodiment of the present application also provides a computer-readable storage medium, in which at least one program code is stored. The at least one program code is loaded and executed by a processor to implement the steps in the method for determining cementing quality in any of the above implementations.

[0279] In the embodiment of the present application, since the completed well depth, the length of the oil and gas layer sealing section, the maximum well inclination angle, the well diameter expansion rate and the return height ratio are the drilling information of the drilling, the first quality parameter determined based on the completed well depth, the length of the oil and gas layer sealing section, the maximum well inclination angle, the well diameter expansion rate and the return height ratio is used to represent the quality of the drilling project. The first section length and the first logging rate are the logging information of cement bonding, and the second quality parameter determined based on the first section length and the first logging rate can represent the quality of cement bonding. Therefore, in the present application, the cementing quality is determined based on the first quality parameter and the second quality parameter, and it is possible to determine the cementing quality based on the quality of cement bonding and in combination with the quality of the drilling project, thereby increasing the reference factors for determining the cementing quality and improving the accuracy of the determined cementing quality.

[0280] The above are only optional embodiments of the present application and are not intended to limit the present application. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present application should be included in the protection scope of the present application.

Claims

1. A method for determining cementing quality, characterized in that: The method comprises: Acquire drilling information and logging information of multiple target wells to be evaluated, wherein the drilling information includes multiple drilling parameters, wherein the multiple drilling parameters include completed well depth, length of oil and gas layer sealing section, maximum well inclination angle, well diameter expansion rate and return height ratio, wherein the return height ratio is the ratio of cement return height to completed well depth, and the logging information includes a first section length and a first logging rate, wherein the first section length is the section length of the target well section whose cementing quality exceeds a preset value, and the first logging rate is the ratio of the first section length to the length of the oil and gas layer sealing section; Based on the drilling information of the plurality of target wells, respectively determining a weight of each drilling parameter and an influence degree of each drilling parameter of each target well; Based on the weight of each drilling parameter and the influence of each drilling parameter of each target well, the first quality parameter of each target well is determined by the following formula 3; Formula 3: Among them, M i is the first quality parameter of the i-th target well; p j is the weight of the jth drilling parameter; is the influence degree of the jth drilling parameter of the i-th target well; i is the serial number of the target well; j is the serial number of the drilling parameter; Determining a first sum of the first segment lengths of the plurality of target wells based on the first segment length of each target well; Determining a second sum of the oil and gas layer sealing section lengths of the plurality of target wells based on the oil and gas layer sealing section length of each target well; determining a ratio of the first sum to the second sum to obtain a second logging ratio; Based on the second logging rate and the first logging rate of each target well, a second quality parameter of each target well is determined by the following formula 4; Formula 4: Among them, N i is the second quality parameter of the i-th target well; y i is the first logging rate of the i-th target well; is the second logging rate; i is the serial number of the target well; The cementing quality of each target well is determined based on the first quality parameter and the second quality parameter of each target well.

2. The method for determining cementing quality according to claim 1, characterized in that: The step of determining the weight of each drilling parameter and the influence of each drilling parameter of each target well based on the drilling information of the plurality of target wells comprises: Determining an average value of each drilling parameter based on the drilling information of the plurality of target wells; Determining the influence of each drilling parameter of each target well based on each drilling parameter of each target well and an average value of each drilling parameter; Determining a univariate linear regression equation for each drilling parameter based on the influence degree of each drilling parameter of each target well and the first logging rate of each target well; Based on a univariate linear regression equation of each drilling parameter, a weight of each drilling parameter is determined.

3. The method for determining cementing quality according to claim 2, characterized in that: Determining the influence of each drilling parameter of each target well based on each drilling parameter of each target well and the average value of each drilling parameter includes: Based on each drilling parameter of each target well and the average value of each drilling parameter, the influence degree of each drilling parameter of each target well is determined by the following formula 1; Formula 1: in, is the influence of the jth drilling parameter of the i-th target well; i is the serial number of the target well, and j is the serial number of the drilling parameter; is the jth drilling parameter of the i-th target well; is the average value of the jth drilling parameter.

4. The method for determining cementing quality according to claim 2, characterized in that: The method of determining a univariate linear regression equation for each drilling parameter based on the influence degree of each drilling parameter of each target well and the first logging rate of each target well comprises: For each drilling parameter, the influence degree of the drilling parameter of the multiple target wells and the first logging rate are fitted to obtain a univariate linear regression equation of the drilling parameter, and the univariate linear regression equation is used to express the functional relationship between the influence degree and the first logging rate.

5. The method for determining cementing quality according to claim 2, characterized in that: The weight of each drilling parameter is determined based on a univariate linear regression equation of each drilling parameter, include, For each drilling parameter, determining a regression coefficient of the univariate linear regression equation based on the univariate linear regression equation of the drilling parameter; Based on the regression coefficient, the weight of each drilling parameter is determined by the following formula 2; Formula 2: Among them, p j is the weight of the jth drilling parameter; b j is the regression coefficient of the univariate linear regression equation of the j-th drilling parameter; b j1 is the absolute value of the regression coefficient of the univariate linear regression equation of the j-th drilling parameter; j is the serial number of the drilling parameter.

6. The method for determining cementing quality according to claim 1, characterized in that: determining the cementing quality of each target well based on the first quality parameter and the second quality parameter of each target well, include, Based on the first quality parameter and the second quality parameter of each target well, the cementing quality of each target well is determined by the following formula 5; Formula 5: U i =M i +N i Among them, U i is the cementing quality of the i-th target well; M i is the first quality parameter of the i-th target well; N i is the second quality parameter of the i-th target well; i is the sequence number of the target well.

7. A device for determining cementing quality, characterized in that: The device comprises: An acquisition module is used to acquire drilling information and logging information of multiple target wells to be evaluated, wherein the drilling information includes multiple drilling parameters, wherein the multiple drilling parameters include completed well depth, length of oil and gas layer sealing section, maximum well inclination angle, well diameter expansion rate and return height ratio, wherein the return height ratio is the ratio of cement return height to completed well depth, and the logging information includes a first section length and a first logging ratio, wherein the first section length is the section length of the target well section whose cementing quality exceeds a preset value, and the first logging ratio is the ratio of the first section length to the length of the oil and gas layer sealing section; A first determination module, configured to determine the weight of each drilling parameter and the influence of each drilling parameter of each target well based on the drilling information of the plurality of target wells; A second determination module is used to determine the first quality parameter of each target well by the following formula 3 based on the weight of each drilling parameter and the influence of each drilling parameter of each target well; Formula 3: Among them, M i is the first quality parameter of the i-th target well; p j is the weight of the jth drilling parameter; is the influence degree of the jth drilling parameter of the i-th target well; i is the serial number of the target well; j is the serial number of the drilling parameter; A third determination module is used to determine a first sum of the first section lengths of the plurality of target wells based on the first section length of each target well; determine a second sum of the oil and gas layer sealing section lengths of the plurality of target wells based on the oil and gas layer sealing section length of each target well; determine a ratio of the first sum to the second sum to obtain a second logging rate; a fourth determination module, configured to determine a second quality parameter of each target well based on the second logging rate and the first logging rate of each target well by using the following formula 4; Formula 4: Among them, N i is the second quality parameter of the i-th target well; y i is the first logging rate of the i-th target well; is the second logging rate; i is the serial number of the target well; The fifth determination module is used to determine the cementing quality of each target well based on the first quality parameter and the second quality parameter of each target well.

Citation Information

Patent Citations

  • Method for evaluating well body quality for well cementing

    CN109296358A

  • Technical index determination method and device and storage medium

    CN110633877A