Method, device, electronic device and storage medium for dynamic scheduling of power grid resources

By obtaining user resource scheduling requests and adjusting transmit power according to priority and signal-to-interference-noise ratio, the problems of resource allocation fairness and system capacity in the power grid are solved, and efficient utilization of power grid resources and meeting business needs are achieved.

CN114521027BActive Publication Date: 2024-12-03STATE GRID HENAN INFORMATION & TELECOMM CO +4
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210003200.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-01-04
Publication Date
2024-12-03
Estimated Expiration
2042-01-04

AI Technical Summary

Technical Problem

How to reasonably allocate communication and network resources in the power grid to meet the differentiated needs of various business of different slice users, improve the fairness of resource allocation and system capacity, and solve the challenges of resource scheduling in wireless communications in the power industry.

Method used

By obtaining the user's resource scheduling request, determining the resource scheduling priority, and dynamically adjusting the transmission power according to the priority and signal-to-interference noise ratio, reasonably allocating resource blocks to ensure that the business needs of different users are met.

Benefits of technology

It realizes the fairness of user resource allocation and system throughput while meeting the differentiated business needs of different slice users, and optimizes the utilization efficiency of power grid resources.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114521027B_ABST
    Figure CN114521027B_ABST
Patent Text Reader

Abstract

The present invention discloses a method, device, electronic device and storage medium for dynamic scheduling of power grid resources, including: obtaining resource scheduling requests of multiple users at the current moment and multiple resource blocks to be allocated from different base stations; determining the resource scheduling priority of each user according to the amount of data to be sent, resource transmission rate, and data packet queuing delay; and scheduling multiple resource blocks to be allocated according to the resource scheduling priority. The present invention reasonably schedules channel resources by adjusting the resource scheduling priority of the user and dynamically updating the priority of each service terminal, thereby improving the fairness of resource allocation to users in the cell while meeting the differentiated needs of various services of users in different slices.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of communication technology, and in particular to a method, device, electronic equipment and storage medium for dynamic scheduling of power grid resources. Background Art

[0002] With the development of energy Internet, in order to adapt to the new power grid model, power grid applications have put forward more stringent carrying requirements for wireless networks. Power services such as precise load control, video monitoring, and intelligent distributed distribution automation require communications to provide high-quality services in terms of bandwidth, latency, and reliability.

[0003] The network slicing technology in the fifth generation of mobile communications logically divides the physical network into multiple virtual networks, which can well meet the differentiated communication performance requirements of various power services. However, as the scale of power grid services continues to expand, how to reasonably allocate communication and network resources to meet the differentiated business requirements of different slice users and improve allocation fairness and system capacity has become a hot research issue in the field of wireless communications in the power industry.

[0004] In summary, there is an urgent need for a method for dynamic scheduling of power grid resources to solve the problems existing in the above-mentioned prior art. Summary of the invention

[0005] Since the existing methods have the above-mentioned problems, the present invention proposes a method, device, electronic device and storage medium for dynamic scheduling of power grid resources.

[0006] In a first aspect, the present invention provides a method for dynamic scheduling of power grid resources, comprising:

[0007] Obtain resource scheduling requests of multiple users at the current moment and multiple resource blocks to be allocated from different base stations; the resource scheduling requests include the amount of data to be sent, the resource transmission rate, and the data packet queuing delay of each user; the user is a network slice user;

[0008] Determine the resource scheduling priority of each user according to the amount of data to be sent, the resource transmission rate, and the data packet queuing delay;

[0009] The multiple resource blocks to be allocated are scheduled according to the resource scheduling priority.

[0010] Further, scheduling the multiple resource blocks to be allocated according to the resource scheduling priority includes:

[0011] Determine a first user set according to the resource scheduling priority; each user in the first user set corresponds to a different base station; the resource scheduling priority of each user in the first user set is the highest among multiple users covered by the corresponding base station;

[0012] Determine a signal to interference plus noise ratio corresponding to each base station according to the first user set;

[0013] Determine the transmit power of each base station according to the signal to interference noise ratio corresponding to each base station;

[0014] The multiple resource blocks to be allocated are allocated to users in the first user set according to the transmission power of each base station.

[0015] Furthermore, the resource transmission rate is determined by the channel bandwidth, noise power and transmission power of the base station corresponding to the user; and the transmission power of the base station corresponding to each user among the multiple users is equal.

[0016] Further, determining the transmit power of each base station according to the signal to interference plus noise ratio corresponding to each base station includes:

[0017] Determine the first base station and the upper limit of the transmit power according to the signal-to-interference-plus-noise ratios corresponding to the base stations; the signal-to-interference-plus-noise ratio corresponding to the first base station is the lowest;

[0018] Using the upper limit of the transmit power as the transmit power of the first base station;

[0019] The transmission power of the second base station is determined according to the principle of equal signal to interference noise ratio; the second base station is a base station other than the first base station among the multiple base stations corresponding to the first user set.

[0020] Further, after scheduling the multiple resource blocks to be allocated according to the resource scheduling priority, the method further includes:

[0021] Deleting the plurality of resource blocks to be allocated from the current resource block list;

[0022] Determine whether the resource block list is empty;

[0023] If it is empty, the scheduling is terminated; otherwise, the allocation is continued until the resource block list is empty.

[0024] In a second aspect, the present invention provides a device for dynamic scheduling of power grid resources, comprising:

[0025] An acquisition module, used to acquire resource scheduling requests of multiple users at the current moment and multiple resource blocks to be allocated from different base stations; the resource scheduling requests include the amount of data to be sent, the resource transmission rate, and the data packet queuing delay of each user; the user is a network slice user;

[0026] A processing module, configured to determine the resource scheduling priority of each user according to the amount of data to be sent, the resource transmission rate, and the data packet queuing delay;

[0027] The multiple resource blocks to be allocated are scheduled according to the resource scheduling priority.

[0028] Furthermore, the processing module is specifically used for:

[0029] Determine a first user set according to the resource scheduling priority; each user in the first user set corresponds to a different base station; the resource scheduling priority of each user in the first user set is the highest among multiple users covered by the corresponding base station;

[0030] Determine a signal to interference plus noise ratio corresponding to each base station according to the first user set;

[0031] Determine the transmit power of each base station according to the signal to interference noise ratio corresponding to each base station;

[0032] The multiple resource blocks to be allocated are allocated to users in the first user set according to the transmission power of each base station.

[0033] Furthermore, the acquisition module is specifically used for:

[0034] The resource transmission rate is determined by the channel bandwidth, noise power and transmission power of the base station corresponding to the user; the transmission power of the base station corresponding to each user among the multiple users is equal.

[0035] Furthermore, the processing module is specifically used for:

[0036] Determine the first base station and the upper limit of the transmit power according to the signal-to-interference-plus-noise ratios corresponding to the base stations; the signal-to-interference-plus-noise ratio corresponding to the first base station is the lowest;

[0037] Using the upper limit of the transmit power as the transmit power of the first base station;

[0038] The transmission power of the second base station is determined according to the principle of equal signal to interference noise ratio; the second base station is a base station other than the first base station among the multiple base stations corresponding to the first user set.

[0039] Furthermore, the processing module is also used for:

[0040] After scheduling the multiple resource blocks to be allocated according to the resource scheduling priority, deleting the multiple resource blocks to be allocated from the current resource block list;

[0041] Determine whether the resource block list is empty;

[0042] If it is empty, the scheduling is terminated; otherwise, the allocation is continued until the resource block list is empty.

[0043] In a third aspect, the present invention further provides an electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the computer program, the method for dynamic scheduling of power grid resources as described in the first aspect is implemented.

[0044] In a fourth aspect, the present invention further provides a non-transitory computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the method for dynamic scheduling of power grid resources as described in the first aspect.

[0045] It can be seen from the above technical solution that the method, device, electronic device and storage medium for dynamic scheduling of power grid resources provided by the present invention adjust the user's resource scheduling priority and dynamically update the priority of each service terminal to reasonably schedule channel resources, thereby meeting the differentiated needs of various services of users in different slices and improving the fairness of resource allocation to users in the cell. BRIEF DESCRIPTION OF THE DRAWINGS

[0046] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0047] Figure 1 A system framework for the method for dynamic scheduling of power grid resources provided by the present invention;

[0048] Figure 2 A schematic diagram of a flow chart of a method for dynamic scheduling of power grid resources provided by the present invention;

[0049] Figure 3 A schematic diagram of a flow chart of a method for dynamic scheduling of power grid resources provided by the present invention;

[0050] Figure 4 A schematic diagram of the structure of the device for dynamic scheduling of power grid resources provided by the present invention;

[0051] Figure 5 This is a schematic structural diagram of an electronic device provided by the present invention. DETAILED DESCRIPTION

[0052] The specific implementation of the present invention is further described below in conjunction with the accompanying drawings. The following embodiments are only used to more clearly illustrate the technical solution of the present invention, and cannot be used to limit the protection scope of the present invention.

[0053] In the embodiment of the present invention, it is assumed that there are U adjacent cells with co-channel interference, there are M randomly distributed users in each cell, the number of radio resource blocks of each cell base station is N, and the system bandwidth is B.

[0054] Specifically, each resource block in each cell is allocated to one user during a scheduling period, and there is co-channel interference between users in different cells.

[0055] The signal to interference plus noise ratio (SINR) of resource block n allocated to user m in cell u is as follows:

[0056]

[0057] Among them, G u,m,n is the channel gain of user m in cell u for resource block n, is the gain of user m on the co-channel interference channel of other cells, p u,m,n is the downlink transmission power of resource block n allocated to user m in cell u, and z is Gaussian white noise.

[0058] Furthermore, according to the Shannon formula, under a certain bit error rate condition, the specific calculation formula for the maximum throughput of resource block n allocated to user m in cell u is as follows:

[0059]

[0060] Where B0 = B / N, is a constant, B represents the system bandwidth, N represents the number of resource blocks in each cell, and BER represents the bit error rate.

[0061] Furthermore, the specific calculation formula for the total downlink throughput is as follows:

[0062]

[0063] Among them, λ u,m,n =1 means that base station u allocates resource block n to user m, otherwise, λ u,m,n =0 indicates that base station u does not allocate resource block n to user m.

[0064] Furthermore, considering the fairness and throughput requirements of the multi-cell system in the grid slicing service scenario, the embodiment of the present invention proposes that the dynamic scheduling target of the grid resources is max C(λ u,m,n ,p u,m,n ).

[0065] Specifically, the constraints are as follows:

[0066]

[0067] C2:λ u,m,n ∈{0,1}

[0068]

[0069] Among them, C1 and C2 are constraints on resource blocks. C1 means that each resource block in each cell is allocated to one user during the scheduling period. C3 is the power constraint for each base station. u represents the upper limit of the transmission power of base station u; C4 is the resource transmission rate constraint for user m in cell u.

[0070] In order to achieve the above-mentioned power grid resource dynamic scheduling goal, the power grid resource dynamic scheduling method provided by the embodiment of the present invention can be applied to the following Figure 1 In the system architecture shown, the system architecture includes a base station 100 and a user 200 .

[0071] In the embodiment of the present invention, the base station 100 is used to obtain resource scheduling requests of multiple users 200 at the current moment.

[0072] It should be noted that the resource scheduling request includes the amount of data to be sent by each user, the resource transmission rate, and the data packet queuing delay.

[0073] In the embodiment of the present invention, the user is a network slice user.

[0074] Furthermore, network slicing includes multiple slice types, such as video type, voice type, etc.

[0075] For example, there are 10 adjacent cells with co-channel interference, each cell has 20 randomly distributed users, and the 10 cells correspond to 10 base stations. The cell corresponding to base station 1 contains two slice types, namely slice type A and slice type B. Slice type A contains 6 users, and slice type B contains 4 users.

[0076] The base station 100 is used to determine the resource scheduling priority of each user according to the amount of data to be sent, the resource transmission rate, and the data packet queuing delay, and schedule multiple resource blocks to be allocated according to the resource scheduling priority.

[0077] It should be noted that Figure 1 This is only an example of the system architecture of the embodiment of the present invention, and the present invention does not make any specific limitation to this.

[0078] Based on the system architecture shown above, Figure 2 A schematic diagram of a flow chart corresponding to a method for dynamic scheduling of power grid resources provided in an embodiment of the present invention, such as Figure 2 As shown, the method includes:

[0079] Step 201: obtaining resource scheduling requests of multiple users at the current moment and multiple resource blocks to be allocated from different base stations.

[0080] It should be noted that the resource scheduling request includes the amount of data to be sent by each user, the resource transmission rate, and the data packet queuing delay.

[0081] Furthermore, in an embodiment of the present invention, the user is a network slice user.

[0082] It should be noted that the fifth generation of mobile communications provides customized services to users in the form of network slicing. Different users require different service qualities. The embodiments of the present invention perform on-demand resource scheduling on the wireless access network side for different service qualities to achieve end-to-end service requirements of different users.

[0083] Step 202: Determine the resource scheduling priority of each user according to the amount of data to be sent, the resource transmission rate, and the data packet queuing delay.

[0084] Specifically, the calculation formula for the resource scheduling priority of user m at time t is as follows:

[0085]

[0086] in, represents the amount of data to be sent by user m in cell u at time t, Represents the amount of data to be sent by all users at time t. represents the resource transmission rate of user m at time t, represents the average resource transmission rate of user m in the preset time period before time t, represents the queuing delay of the data packet of user m in the buffer at time t, represents the maximum queuing delay corresponding to user m, represents the packet loss rate limit of user m, Taking the logarithm will result in a negative number.

[0087] It should be noted that the maximum queuing delay and packet loss rate limit corresponding to user m are determined by the service type of the network slice corresponding to the user.

[0088] In order to reduce the complexity of the algorithm, the embodiment of the present invention decomposes the above optimization problem into the following two steps:

[0089] Step 1: Allocate resources to each cell under equal power conditions.

[0090] Step 2: Based on the resource allocation results of each cell, power is allocated between cells.

[0091] Specifically, the resource transmission rate is determined by the channel bandwidth, noise power and transmission power of the base station corresponding to the user; the transmission power of the base station corresponding to each user among multiple users is equal.

[0092] In the embodiment of the present invention: r=wlog2(1+s / n), s represents the base station transmission power. In the embodiment of the present invention, the transmission power s of the base station corresponding to each user is made equal, that is, resources are allocated to each cell under equal power.

[0093] Step 203: Schedule multiple resource blocks to be allocated according to resource scheduling priorities.

[0094] For example, user A1 has the highest resource scheduling priority among the users covered by base station A, and the first resource block of base station A is allocated to user A1. User B1 has the highest resource scheduling priority among the users covered by base station B, and the first resource block of base station B is allocated to user B1.

[0095] The above solution rationally schedules channel resources by adjusting the user's resource scheduling priority and dynamically updating the priority of each service terminal. It not only meets the differentiated service needs of users in different slices, but also takes into account the transmission rate, latency and scheduling fairness of slice users, thus achieving efficient use of network resources and maximizing the system throughput.

[0096] Furthermore, after the resource allocation under equal power in each cell is completed, due to λ u,m,n It has been determined, so c u,m,n , γ u,m,n and p u,m,n can be simplified to c u,n , γ u,n and p u,n .

[0097] In the embodiment of the present invention, the specific calculation formula of the total downlink throughput is as follows:

[0098]

[0099] Furthermore, based on the above formula, we can get:

[0100]

[0101] From the above formula, we can see that we only need to satisfy the maximum, then the downlink throughput of the power grid system is maximum.

[0102] It is not difficult to prove from the mean value theorem of inequalities and the properties of convex functions that if The value of reaches its maximum only when That is γ 1,n =... =γ U,nTime satisfaction.

[0103] In the embodiment of the present invention, the signal to interference noise ratio of the user on the resource block is affected by the power. Therefore, in order to ensure the total throughput of the multi-cell system, it is necessary to make As close as possible in, Depend on Simplified after resource block allocation.

[0104] Based on the above principle, in step 203 of the embodiment of the present invention, the step flow is as follows: Figure 3 As shown, the details are as follows:

[0105] Step 301: determine a first user set according to a resource scheduling priority.

[0106] It should be noted that each user in the first user set corresponds to a different base station; and the resource scheduling priority of each user in the first user set is the highest among the multiple users covered by the corresponding base station.

[0107] For example, base station A covers user 1, user 2, and user 3, among which user 2 has the highest resource scheduling priority, and base station A allocates resource blocks to user 2; base station B covers user 4, user 5, and user 6, among which user 6 has the highest resource scheduling priority, and base station B allocates resource blocks to user 6. User 2 and user 6 are both in the first user set.

[0108] Step 302: Determine a signal to interference plus noise ratio corresponding to each base station according to the first user set.

[0109] In a possible implementation manner, the standard deviation of the signal to interference noise ratio of the same-frequency resource block {σ1,σ2,...,σ N}.

[0110] in,

[0111] Step 303: determine the transmit power of each base station according to the signal to interference and noise ratio corresponding to each base station.

[0112] Specifically, the first base station and the upper limit of the transmission power are determined according to the signal to interference plus noise ratio corresponding to each base station.

[0113] It should be noted that the signal to interference and noise ratio corresponding to the first base station is the lowest.

[0114] According to σ1:σ2:...:σ N , calculate the power upper limit of the same-frequency resource block, the specific calculation formula is as follows:

[0115]

[0116] In the embodiment of the present invention, the power upper limit in the same-frequency resource block is obtained by using the ratio of the standard deviations of the signal to interference plus noise ratios of the same-frequency channels.

[0117] Furthermore, the upper limit of the transmission power is used as the transmission power of the first base station.

[0118] The transmit power of the second base station is determined according to the principle of equal signal to interference and noise ratio.

[0119] It should be noted that the second base station is a base station other than the first base station among the multiple base stations corresponding to the first user set.

[0120] In the embodiment of the present invention, the resource blocks of other base stations are based on γ 1,n =... =γ U,n Perform power allocation. The power of each cell should meet the following inequality:

[0121]

[0122] The above scheme allocates the maximum power to the channel resources with the worst signal-to-interference-noise ratio, balances the signal-to-interference-noise ratio of users in the same frequency slice, reduces the same-frequency interference between cells, and further improves the throughput of the multi-cell system of the power grid.

[0123] Step 304: allocate multiple resource blocks to be allocated to users in the first user set according to the transmit power of each base station.

[0124] In the embodiment of the present invention, the downlink transmission power of the sub-channel is coordinated to meet γ 1,n =... =γ I,n At the same time, considering the fairness of edge users, the maximum power is allocated to the channel resource with the worst signal-to-interference-noise ratio.

[0125] The above scheme, by addressing the problem of co-channel interference in multi-cell resource scheduling in power scenarios, reasonably allocates transmission power to users who obtain channel resources, improves system throughput while reducing co-channel interference between cells, reduces throughput loss caused by co-channel interference, improves the fairness of resource allocation for different users in multi-cell power business scenarios, and better meets the service quality requirements of different power business terminals.

[0126] Furthermore, in the embodiment of the present invention, after step 203, the plurality of resource blocks to be allocated are deleted from the current resource block list;

[0127] Determine whether the resource block list is empty;

[0128] If it is empty, the scheduling ends; otherwise, the allocation continues until the resource block list is empty.

[0129] The above solution improves the efficiency of scheduling channel resources through the resource block list.

[0130] Based on the same inventive concept, Figure 4 An apparatus for dynamic scheduling of power grid resources provided by an embodiment of the present invention is exemplarily shown, and the apparatus may be a process for dynamic scheduling of power grid resources.

[0131] The device comprises:

[0132] The acquisition module 401 is used to obtain resource scheduling requests of multiple users at the current moment and multiple resource blocks to be allocated from different base stations; the resource scheduling requests include the amount of data to be sent, the resource transmission rate and the data packet queuing delay of each user; the user is a network slice user;

[0133] A processing module 402 is used to determine the resource scheduling priority of each user according to the amount of data to be sent, the resource transmission rate, and the data packet queuing delay;

[0134] The multiple resource blocks to be allocated are scheduled according to the resource scheduling priority.

[0135] Furthermore, the processing module 402 is specifically used for:

[0136] Determine a first user set according to the resource scheduling priority; each user in the first user set corresponds to a different base station; the resource scheduling priority of each user in the first user set is the highest among multiple users covered by the corresponding base station;

[0137] Determine a signal to interference plus noise ratio corresponding to each base station according to the first user set;

[0138] Determine the transmit power of each base station according to the signal to interference noise ratio corresponding to each base station;

[0139] The multiple resource blocks to be allocated are allocated to users in the first user set according to the transmission power of each base station.

[0140] Furthermore, the acquisition module 401 is specifically used for:

[0141] The resource transmission rate is determined by the channel bandwidth, noise power and transmission power of the base station corresponding to the user; the transmission power of the base station corresponding to each user among the multiple users is equal.

[0142] Furthermore, the processing module 402 is specifically used for:

[0143] Determine the first base station and the upper limit of the transmit power according to the signal-to-interference-plus-noise ratios corresponding to the base stations; the signal-to-interference-plus-noise ratio corresponding to the first base station is the lowest;

[0144] Using the upper limit of the transmit power as the transmit power of the first base station;

[0145] The transmission power of the second base station is determined according to the principle of equal signal to interference noise ratio; the second base station is a base station other than the first base station among the multiple base stations corresponding to the first user set.

[0146] Furthermore, the processing module 402 is also used for:

[0147] After scheduling the multiple resource blocks to be allocated according to the resource scheduling priority, deleting the multiple resource blocks to be allocated from the current resource block list;

[0148] Determine whether the resource block list is empty;

[0149] If it is empty, the scheduling is terminated; otherwise, the allocation is continued until the resource block list is empty.

[0150] Based on the same inventive concept, another embodiment of the present invention provides an electronic device, see Figure 5 , the electronic device specifically includes the following contents: a processor 501, a memory 502, a communication interface 503 and a communication bus 504;

[0151] The processor 501, the memory 502, and the communication interface 503 communicate with each other through the communication bus 504; the communication interface 503 is used to realize information transmission between various devices;

[0152] The processor 501 is used to call the computer program in the memory 502, and the processor implements all the steps of the above-mentioned method for dynamic scheduling of power grid resources when executing the computer program. For example, the processor implements the following steps when executing the computer program: obtaining resource scheduling requests of multiple users at the current moment and multiple resource blocks to be allocated from different base stations; the resource scheduling request includes the amount of data to be sent, the resource transmission rate and the data packet queuing delay of each user; the user is a network slice user; the resource scheduling priority of each user is determined according to the amount of data to be sent, the resource transmission rate and the data packet queuing delay; and the multiple resource blocks to be allocated are scheduled according to the resource scheduling priority.

[0153] Based on the same inventive concept, another embodiment of the present invention provides a non-transitory computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, all the steps of the above-mentioned method for dynamic scheduling of power grid resources are implemented. For example, when the processor executes the computer program, the following steps are implemented: obtaining resource scheduling requests of multiple users at the current moment and multiple resource blocks to be allocated from different base stations; the resource scheduling request includes the amount of data to be sent, the resource transmission rate and the data packet queuing delay of each user; the user is a network slice user; the resource scheduling priority of each user is determined according to the amount of data to be sent, the resource transmission rate and the data packet queuing delay; and the multiple resource blocks to be allocated are scheduled according to the resource scheduling priority.

[0154] In addition, the logic instructions in the above-mentioned memory can be implemented in the form of software functional units and can be stored in a computer-readable storage medium when sold or used as an independent product. Based on this understanding, the technical solution of the present invention is essentially or the part that contributes to the prior art or the part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions to enable a computer device (which can be a personal computer, a device for dynamic scheduling of power grid resources, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk and other media that can store program code.

[0155] The device embodiments described above are merely illustrative, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the embodiments of the present invention. Those of ordinary skill in the art may understand and implement them without creative effort.

[0156] Through the description of the above implementation methods, those skilled in the art can clearly understand that each implementation method can be implemented by means of software plus a necessary general hardware platform, and of course, it can also be implemented by hardware. Based on this understanding, the above technical solution is essentially or the part that contributes to the prior art can be embodied in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, a disk, an optical disk, etc., including a number of instructions for a computer device (which can be a personal computer, a device for dynamic scheduling of power grid resources, or a network device, etc.) to execute the method for dynamic scheduling of power grid resources described in each embodiment or some parts of the embodiment.

[0157] In addition, in the present invention, terms such as "first" and "second" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0158] In addition, in the present invention, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the statement "comprise a ..." do not exclude the presence of other identical elements in the process, method, article or device including the elements.

[0159] In addition, in the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.

[0160] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A method for dynamic scheduling of power grid resources, characterized in that: include: Obtain resource scheduling requests of multiple users at the current moment and multiple resource blocks to be allocated from different base stations; The resource scheduling request includes the amount of data to be sent, resource transmission rate and data packet queuing delay of each user; The user is a network slice user; Determine the resource scheduling priority of each user according to the amount of data to be sent, the resource transmission rate, and the data packet queuing delay; Scheduling the multiple resource blocks to be allocated according to the resource scheduling priority includes: Determine a first user set according to the resource scheduling priority; each user in the first user set corresponds to a different base station; the resource scheduling priority of each user in the first user set is the highest among multiple users covered by the corresponding base station; Determine a signal to interference plus noise ratio corresponding to each base station according to the first user set; Determining the transmit power of each base station according to the signal to interference plus noise ratio corresponding to each base station, including: determining a first base station and an upper limit of the transmit power according to the signal to interference plus noise ratio corresponding to each base station; the signal to interference plus noise ratio corresponding to the first base station is the lowest; Using the upper limit of the transmit power as the transmit power of the first base station; Determine the transmit power of the second base station according to the principle of equal signal to interference noise ratio; the second base station is a base station other than the first base station among the multiple base stations corresponding to the first user set; The multiple resource blocks to be allocated are allocated to users in the first user set according to the transmission power of each base station.

2. The method for dynamic scheduling of power grid resources according to claim 1, characterized in that: The resource transmission rate is determined by the channel bandwidth, noise power and transmission power of the base station corresponding to the user; the transmission power of the base station corresponding to each user among the multiple users is equal.

3. The method for dynamic scheduling of power grid resources according to claim 1, characterized in that: After scheduling the multiple resource blocks to be allocated according to the resource scheduling priority, the method further includes: Deleting the plurality of resource blocks to be allocated from the current resource block list; Determine whether the resource block list is empty; If it is empty, the scheduling is terminated; otherwise, the allocation is continued until the resource block list is empty.

4. A device for dynamic scheduling of power grid resources, characterized in that: include: An acquisition module, used to acquire resource scheduling requests of multiple users at the current moment and multiple resource blocks to be allocated from different base stations; The resource scheduling request includes the amount of data to be sent, resource transmission rate and data packet queuing delay of each user; The user is a network slice user; A processing module, configured to determine the resource scheduling priority of each user according to the amount of data to be sent, the resource transmission rate, and the data packet queuing delay; Scheduling the multiple resource blocks to be allocated according to the resource scheduling priority includes: Determine a first user set according to the resource scheduling priority; each user in the first user set corresponds to a different base station; the resource scheduling priority of each user in the first user set is the highest among multiple users covered by the corresponding base station; Determine a signal to interference plus noise ratio corresponding to each base station according to the first user set; Determining the transmit power of each base station according to the signal to interference plus noise ratio corresponding to each base station, including: determining a first base station and an upper limit of transmit power according to the signal to interference plus noise ratio corresponding to each base station, the signal to interference plus noise ratio corresponding to the first base station being the lowest, taking the upper limit of transmit power as the transmit power of the first base station, and determining the transmit power of a second base station according to a principle of equal signal to interference plus noise ratio, the second base station being a base station other than the first base station among the multiple base stations corresponding to the first user set; The multiple resource blocks to be allocated are allocated to users in the first user set according to the transmission power of each base station.

5. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the program, the steps of the method according to any one of claims 1 to 3 are implemented.

6. A non-transitory computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 3 are implemented.