A reactor pressure vessel support installation method

Through the pre-processing and precise installation method of the reactor pressure vessel support steel foundation, the problem of on-site installation of independent reactor pressure vessel supports has been solved, the installation efficiency and accuracy have been improved, and the support surface flatness and contact area requirements have been ensured.

CN114582530BActive Publication Date: 2024-10-15CHINA NUCLEAR IND FIFTH CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210089848.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-01-25
Publication Date
2024-10-15
Estimated Expiration
2042-01-25

AI Technical Summary

Technical Problem

The installation process of independent reactor pressure vessel supports is different from that of conventional structures, and there are installation difficulties, especially the high accuracy requirements for the production and installation of positioning holes in a narrow space on site.

Method used

Pre-processing of the reactor pressure vessel support steel foundation is used, including positioning, leveling and processing on the big corbels, marking the installation reference axis, adjusting the support position, installing positioning bolts, making stepped threaded blind holes, and passing the hole making equipment and tooling platform Carry out precise processing and positioning, and finally tighten the anchor bolts and install the cover plate.

Benefits of technology

It improves the installation efficiency and accuracy of the independent reactor pressure vessel support, solves the problem of positioning hole production and installation accuracy in the narrow space on site, and ensures that the support surface is flat and the contact area reaches more than 75%.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114582530B_ABST
    Figure CN114582530B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for installing a reactor pressure vessel support, which relates to the technical field of construction of a pressurized water reactor nuclear power plant, including S1, processing of a reactor pressure vessel support steel foundation; S2, measurement and layout of the pressure vessel support; S3, installation and adjustment of the pressure vessel support; S4, installation of the pressure vessel support positioning bolts; S5, tightening of the pressure vessel support anchor bolts; S6, installation of the pressure vessel support cover plate; and S7, finished product protection. In the present invention, a method for installing a reactor pressure vessel support can solve the difficult problem of installing an independent reactor pressure vessel support, and further, through the pre-processing of the reactor pressure vessel support steel foundation, it is convenient for on-site installation of the pressure vessel support and improves installation efficiency; and through the coordination of the reactor pressure vessel support steel foundation and the pressure vessel support, it can solve the problem of high installation accuracy of the on-site pressure vessel support and difficulty in making positioning holes in the narrow space on site.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of construction of a pressurized water reactor nuclear power plant, and in particular to a method for supporting and installing a reactor pressure vessel. Background Art

[0002] The installation technology of the pressure vessel support ring of the conventional pressurized water reactor nuclear island reactor is mainly to hoist the pressure vessel support ring into position in the room, align the installation axis on the body with the axis of the installation position, and then adjust its horizontality and elevation position through the bottom adjustment bolts, and then pour concrete in the fixed area for grouting fixation.

[0003] A new type of reactor pressure vessel support is designed from a conventional independent ring into 4 sets of independent support seats, which are large in size and heavy in weight (the maximum size is 3800×450×950mm, and each set weighs 6700kg). The top support surface of each support seat is required to be coplanar and flat, and each support seat needs to be equipped with a large M60 threaded positioning hole with the pre-buried steel foundation on site, and finally fixed with positioning bolts and pre-buried bolts.

[0004] The installation process of this independent reactor pressure vessel support is completely different from the installation of conventional structures, so a new installation process needs to be developed. Summary of the invention

[0005] The object of the present invention is to provide a reactor pressure vessel support installation method for solving the above technical problems.

[0006] The technical solution adopted by the present invention is as follows:

[0007] A reactor pressure vessel support installation method, comprising:

[0008] S1. Processing of reactor pressure vessel support steel foundation;

[0009] In the pressure vessel chamber, four large bull legs distributed in a ring are positioned and leveled, and then the four corners of the support frame are positioned on the large bull legs and fixed by positioning bolts, and then the upper surface of the reactor pressure vessel support steel foundation is processed, and the processing starts from the highest point of the reactor pressure vessel support steel foundation, and then the processing is continued until its elevation and horizontality meet the design requirements, and finally the above processing method is repeated to process the remaining reactor pressure vessel support steel foundations;

[0010] S2. Measurement and layout of pressure vessel supports;

[0011] Marking the installation reference axis of the pressure vessel support on the reactor pressure vessel support steel foundation, and marking the installation position of the pressure vessel support;

[0012] S3. Installation and adjustment of pressure vessel supports;

[0013] Install the pressure vessel support on the upper end of the reactor pressure vessel support steel foundation, check the contact area between the pressure vessel support and the reactor pressure vessel support steel foundation and calculate the non-contact area, so that the contact area is not less than 75%, then adjust the position of the pressure vessel support, and properly tighten the anchor bolts on the pressure vessel support;

[0014] S4. Installation of pressure vessel support positioning bolts;

[0015] A step-type threaded blind hole is made in a narrow space on the pressure vessel support by using a hole-making device and tapped, and then a pressure vessel support positioning bolt is installed in the threaded blind hole;

[0016] S5. Tightening of the anchor bolts supporting the pressure vessel;

[0017] Remove the nut from the anchor bolt, install the locking washer and the nut on the anchor bolt in sequence, and then tighten and fix them with the setscrew;

[0018] S6. Installation of pressure vessel support cover;

[0019] An inlet is formed on the side wall of the pressure vessel support, and a cover plate of the pressure vessel support is fixed at the inlet by means of hexagonal screws;

[0020] S7, finished product protection;

[0021] After the pressure vessel support is installed, the support surface of the pressure vessel support is hard protected and then protected against moisture with a three-proof cloth.

[0022] Preferably, in S1, each of the bull legs is provided with a bull leg positioning hole, a positioning pin is installed in the bull leg positioning hole, and then the corner of the support frame is pre-fixed on the bull leg by the positioning pin, ensuring that the bolt hole of the support frame is aligned with the positioning bolt hole on the bull leg, and then the positioning pin is removed, and the support frame is connected to the bull leg by the positioning bolt.

[0023] As a further preference, after the support frame is connected to the large bull leg, the horizontality of the support frame is measured with the four corners of the support frame as a reference. If the horizontality of the support frame meets the requirements, the positioning bolts are finally tightened.

[0024] As a further preference, a plane machining machine is installed on the support frame, and a block is provided between the plane machining machine and the support frame. Then, the upper surface elevation and levelness of the reactor pressure vessel support steel foundation are measured by a laser measuring instrument and modeled, and appropriate processing parameters are selected so that the elevation and levelness after processing meet the design requirements.

[0025] Preferably, in S3, the pressure vessel support is hoisted onto the reactor pressure vessel support steel foundation by means of a lifting lug at the top of the pressure vessel support.

[0026] As a further preference, if the contact area is less than 75%, it is necessary to grind the raised points on the contact surface with a grinding sheet, a scraper or an oilstone in combination with light oil so that the contact area is not less than 75%.

[0027] Preferably, in S4, the hole-making device is fixed on the tooling platform, and the horizontality and position of the hole-making device are adjusted, and then the hole-making operation is performed by the hole-making device.

[0028] As a further preferred embodiment, the hole making operation includes: a drilling operation, first checking the verticality of the drill bit of the hole making equipment, and after ensuring that it is qualified, the hole is processed to a specified depth in a progressive manner of processing positioning holes, small holes, medium holes, and large holes;

[0029] Boring operation: first check the verticality of the boring bar of the hole-making equipment. After ensuring that it is qualified, install two dial indicators on the hole-making equipment to monitor whether the boring bar is offset, and then bore the hole to process the hole to the final design requirements;

[0030] For the tapping operation, first check the verticality of the tap of the hole-making equipment, and after ensuring that it is qualified, install the tapping tooling. After the threaded blind hole processing is completed, clean up the debris in the threaded blind hole.

[0031] The above technical solution has the following advantages or beneficial effects:

[0032] In the present invention, a reactor pressure vessel support installation method can solve the problem of independent reactor pressure vessel support installation, and further, through the pre-processing of the reactor pressure vessel support steel foundation, it is convenient for the on-site installation of the pressure vessel support and improves the installation efficiency; and through the coordination of the reactor pressure vessel support steel foundation and the pressure vessel support, it can solve the problem of high installation accuracy of the on-site pressure vessel support and difficulty in making positioning holes in the narrow space on site. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] Figure 1 is a flow chart of the reactor pressure vessel support installation method of the present invention;

[0034] Figure 2It is a schematic diagram of processing the reactor pressure vessel support steel foundation in the present invention;

[0035] Figure 3 yes Figure 2 AA section view in the figure;

[0036] Figure 4 It is a schematic structural diagram of the pressure vessel support in the present invention;

[0037] Figure 5 is a front view structural schematic diagram of the pressure vessel support in the present invention;

[0038] Figure 6 is a three-dimensional diagram of a pressure vessel support in the present invention;

[0039] Figure 7 It is a schematic diagram of the installation of the tooling platform in the present invention;

[0040] Figure 8 It is a structural schematic diagram of the threaded blind hole in the present invention;

[0041] Fig. 9 It is a schematic diagram of the installation of the reactor pressure vessel in the present invention.

[0042] In the figure: 1. Reactor pressure vessel support steel foundation; 2. Large bull leg; 3. Support frame; 4. Pressure vessel support; 5. Anchor bolt hole; 6. Threaded blind hole; 7. Support base plate; 8. Pressure vessel support cover plate; 9. Hexagon screw; 10. Pressure vessel support stop block; 11. Adjustment gasket; 12. Planar processing machine tool; 13. Plug; 14. Track; 15. Pad; 16. Tooling platform; 17. Pressure vessel; 18. Pressure vessel support positioning bolt. DETAILED DESCRIPTION

[0043] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0044] In the description of the present invention, it should be noted that, if the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. appear, the orientation or position relationship indicated is based on the orientation or position relationship shown in the drawings, which is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, if the terms "first", "second", "third" appear, they are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.

[0045] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected" and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0046] Figure 1 is a flow chart of the reactor pressure vessel support installation method of the present invention; Figure 2 It is a schematic diagram of processing the reactor pressure vessel support steel foundation in the present invention; Figure 3 yes Figure 2 AA section view in the figure; Figure 4 It is a schematic structural diagram of the pressure vessel support in the present invention; Figure 5 is a front view structural schematic diagram of the pressure vessel support in the present invention; Figure 6 is a three-dimensional diagram of a pressure vessel support in the present invention; Figure 7 It is a schematic diagram of the installation of the tooling platform in the present invention; Figure 8 It is a structural schematic diagram of the threaded blind hole in the present invention; Fig. 9 This is a schematic diagram of the installation of the reactor pressure vessel in the present invention, see Figures 1 to 9 As shown, a preferred embodiment is shown, and a method for installing a reactor pressure vessel support 4 is shown, comprising:

[0047] S1. Processing of reactor pressure vessel supporting steel foundation 1.

[0048] In the pressure vessel chamber, four large bull legs 2 distributed in a ring are positioned and leveled, and then the four corners of the support frame 3 are positioned on the large bull legs 2 and fixed by positioning bolts. A high-precision adjustable plug 13 is installed on the support frame 3, and a track 14 of a surface processing machine is installed on the plug 13. A surface processing machine 12 is installed on the track 14. By adjusting the plug 13, the horizontality and flatness of the surface processing machine 12 are ensured. Then, the upper surface of the reactor pressure vessel support steel foundation 1 is processed. During the processing, milling starts from the highest point of the reactor pressure vessel support steel foundation 1, and then the processing is continued until its elevation and horizontality meet the design requirements. Finally, the above processing method is repeated to process the remaining reactor pressure vessel support steel foundations 1. In this embodiment, as Figure 2 As shown, there are four reactor pressure vessel support steel foundations 1 in total, and the four reactor pressure vessel support steel foundations 1 are arranged in a ring, rectangular or diamond array, wherein the four corners of the support frame 3 are connected and fixed to the large brackets 2 in the four reactor pressure vessel support steel foundations 1.

[0049] S2. Measurement and layout of pressure vessel support 4.

[0050] The installation reference axis of the pressure vessel support 4 is marked on the reactor pressure vessel support steel foundation 1, and the installation position of the pressure vessel support 4 is marked. In this embodiment, the position for installing the pressure vessel support 4 is marked on the upper end of the reactor pressure vessel support steel foundation 1, which is convenient for directly installing the pressure vessel support 4 and can improve the installation efficiency and installation accuracy.

[0051] S3. Installation and adjustment of pressure vessel support 4.

[0052] Install the pressure vessel support 4 on the upper end of the reactor pressure vessel support steel foundation 1, check the contact area between the pressure vessel support 4 and the reactor pressure vessel support steel foundation 1 and calculate the non-contact area so that the contact area is not less than 75%, then adjust the position of the pressure vessel support 4, and properly tighten the anchor bolts on the pressure vessel support 4. An anchor bolt hole 5 is provided on the pressure vessel support 4, and the anchor bolt is installed in the anchor bolt hole 5. When the pressure vessel support 4 is installed on the reactor pressure vessel support steel foundation 1, it is necessary to measure the contact surface between the reactor pressure vessel support steel foundation 1 and the pressure vessel support 4 and the area where the reactor pressure vessel support steel foundation 1 is not in contact with the pressure vessel support 4. When the contact area is greater than or equal to 75% of the sum of the contact and non-contact areas, it indicates that the installation requirements are met. In this embodiment, a pressure vessel support 4 is provided, and it is necessary to ensure that the support surfaces at the top of the four pressure vessel supports 4 are flat and coplanar. The bottom of the pressure vessel 17 in this embodiment is fixed to the top of the four pressure vessel supports 4.

[0053] S4. Installation of pressure vessel support positioning bolts 18.

[0054] A step-type threaded blind hole 6 is made in a narrow space on the pressure vessel support 4 by using a hole-making device and tapped, and then a pressure vessel support positioning bolt 18 is installed in the threaded blind hole 6. In this embodiment, Figure 4-6 As shown, a plurality of overall triangular reinforcing plates are provided at both ends of the pressure vessel support 4, and the threaded blind hole 6 (positioning hole) is between two adjacent reinforcing plates. Under the condition that the minimum horizontal clearance of the operating space is 130 mm and the maximum vertical obstacle height is 345 mm, the maximum aperture of the threaded blind hole 6 is The maximum depth is 220mm, the processing accuracy is less than 0.05mm, and the threaded blind hole 6 needs to be tapped after processing. The bottom of the pressure vessel support 4 has a support base plate 7, and the support base plate 7 is connected to the reactor pressure vessel support steel foundation 1 at the bottom through the pressure vessel support positioning bolt 18, wherein the distance between the top of the pressure vessel support positioning bolt 18 and the support base plate 7 meets 71.4±3.3mm. During installation, the threaded part of the pressure vessel support positioning bolt 18 is coated with thread fastener. Figure 8 As shown, the threaded blind hole 6 is stepped, and the threaded blind hole 6 extends into the reactor pressure vessel support steel foundation 1. The pressure vessel support positioning bolt 18 in this embodiment also has a nut and a gasket. The gasket is first put on the pressure vessel support positioning bolt 18, and then the nut is put on, and finally the nut is fixed by a screw to prevent the nut from falling off.

[0055] S5. Tighten the anchor bolts of the pressure vessel support 4.

[0056] Remove the nut from the anchor bolt, install the locking washer and nut on the anchor bolt in sequence, and then tighten it with the set screw. Apply thread fastener to the threaded part of the anchor bolt. The set screw is installed on the nut. The nut can be fixed by tightening the set screw. During installation, apply thread fastener to the thread of the set screw to ensure that the set screw contacts the thread on the anchor bolt. Then bend the corners of the locking washer to a vertical position so that it fits around the nut.

[0057] S6. Installation of the pressure vessel support cover plate 8.

[0058] An inlet is formed on the side wall of the pressure vessel support 4, and the pressure vessel support cover plate 8 is fixed at the inlet by means of hexagonal screws 9. Figure 6 As shown, the pressure vessel support cover plate 8 is used to close the inlet on the side wall of the pressure vessel support 4. When installing the hexagonal screw 9, a thread fastener should be applied. Figure 6As shown, a pressure vessel support stopper 10 is also provided at one end of the pressure vessel support 4, and an adjustment gasket 11 is provided between the pressure vessel support stopper 10 and the pressure vessel support 4 to achieve the purpose of eliminating the gap. The adjustment gasket 11 is processed according to the actual measurement data on site. The adjustment gaskets 11 and the adjustment gasket 11 and the pressure vessel support stopper 10 are spot welded and fixed, and finally the gap value reaches 0 to 0.2 mm.

[0059] S7. Finished product protection.

[0060] After the installation of the pressure vessel support 4 is completed, the supporting surface of the pressure vessel support 4 is hard-protected, and then protected against moisture with three-proof cloth, and conspicuous signs are placed to prevent collisions. A scaffolding is built in the pressure vessel chamber, and wooden boards are laid on the scaffolding to prevent falling objects from damaging the pressure vessel support 4, and conspicuous signs are placed to prevent collisions.

[0061] Further, as a preferred embodiment, in S1, each large corbel is provided with a large corbel 2 positioning hole, a positioning pin is installed in the positioning hole of the large corbel 2, and then the corner of the support frame 3 is pre-fixed on the large corbel by the positioning pin, ensuring that the bolt hole of the support frame 3 is aligned with the positioning bolt hole on the large corbel 2, and then the positioning pin is removed, and the support frame 3 is connected to the large corbel by the positioning bolt. The positioning pin in this embodiment is used to locate the position of the support frame 3, which can ensure the accuracy of the installation position of the support frame 3. The positioning pin is removed after the support frame 3 is fixed to the large corbel by the positioning bolt.

[0062] Further, as a preferred embodiment, after the support frame 3 is connected to the large bracket, the horizontality of the support frame 3 is measured with the four corners of the support frame 3 as a reference. If the horizontality of the support frame 3 meets the requirements, the positioning bolts are finally tightened.

[0063] Further, as a preferred embodiment, a plane machining machine 12 is installed on the support frame 3, and a plug 13 is provided between the plane machining machine 12 and the support frame 3. Then, the upper surface elevation and levelness of the reactor pressure vessel support steel foundation 1 are measured by a laser measuring instrument and modeled, and appropriate processing parameters are selected so that the elevation and levelness after processing meet the design requirements. In this embodiment, if Figure 3 As shown, a pad 15 is provided between the large bull leg and the support frame 3, and at least three plugs 13 are provided, and plugs 13 of different heights can be replaced to adjust the height and levelness of the surface processing machine 12. A track 14 is provided at the upper end of the plug 13, and the surface processing machine 12 is set on the track 14 and can slide on the track 14. Figure 1As shown, the two ends of the track 14 are built on two opposite reactor pressure vessel support steel foundations 1, which are used to adjust the position of the plane processing machine 12, so as to facilitate processing at different positions on the upper surface of the reactor pressure vessel support steel foundation 1. Among them, the horizontality deviation of the measuring points on the four corners of the support frame 3 must be within 0.1mm.

[0064] Before processing the upper surface of the first reactor pressure vessel support steel foundation 1, ensure that milling starts from the highest point during processing, and then process until its elevation and levelness meet the design requirements. Then process the remaining reactor pressure vessel support steel foundations 1 in sequence.

[0065] Further, as a preferred embodiment, in S3, the pressure vessel support 4 is hoisted to the reactor pressure vessel support steel foundation 1 by the lifting lugs on the top of the pressure vessel support 4. In this embodiment, the pressure vessel support 4 is hoisted into place by the lifting lugs on the top, and the anchor bolts are well protected to prevent bumps. Two H-shaped steels are placed directly above the pressure vessel chamber to cooperate with the grinding work, and a 10t fall chain is hung on the H-shaped steel. The pressure vessel support 4 is hoisted by the 10t fall chain.

[0066] Furthermore, as a preferred embodiment, if the contact area is less than 75%, it is necessary to grind the raised points on the contact surface with a grinding sheet, a scraper or an oil stone in combination with light oil so that the contact area is not less than 75%.

[0067] Further, as a preferred implementation, in S4, the hole-making device is fixed on the tooling platform 16, and the levelness and position of the hole-making device are adjusted to ensure smooth and reliable hole-making operation, and then the hole-making operation is performed by the hole-making device.

[0068] Furthermore, as a preferred embodiment, the hole making operation includes: a drilling operation, first checking the verticality of the drill bit of the hole making equipment, and after ensuring that it is qualified, the holes are processed to a specified depth in a progressive manner by processing positioning holes, small holes, medium holes, and large holes.

[0069] During boring operation, first check the verticality of the boring bar of the hole-making equipment. After ensuring it is qualified, install two dial indicators on the hole-making equipment to monitor whether the boring bar is offset. The allowable offset should not exceed 0.03mm. Then, perform boring. The number of boring times is determined according to the actual data to process the hole to the final design requirements.

[0070] For the tapping operation, first check the verticality of the tap of the hole-making equipment. After ensuring that it is qualified, install the tapping tooling. After the threaded blind hole 6 is processed, clean up the debris in the threaded blind hole 6, and use a go gauge and a stop gauge to check to ensure that it meets the design requirements.

[0071] The above description is only a preferred embodiment of the present invention, and does not limit the implementation mode and protection scope of the present invention. For those skilled in the art, it should be aware that all solutions obtained by equivalent substitutions and obvious changes made using the description and illustrations of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for supporting and installing a reactor pressure vessel, characterized in that: include: S1. Processing of reactor pressure vessel support steel foundation; In the pressure vessel chamber, four large bull legs distributed in a ring are positioned and leveled, and then the four corners of the support frame are positioned on the large bull legs and fixed by positioning bolts, and then the upper surface of the reactor pressure vessel support steel foundation is processed, and the processing starts from the highest point of the reactor pressure vessel support steel foundation, and then the processing is continued until its elevation and horizontality meet the design requirements, and finally the above processing method is repeated to process the remaining reactor pressure vessel support steel foundations; S2. Measurement and layout of pressure vessel supports; Marking the installation reference axis of the pressure vessel support on the reactor pressure vessel support steel foundation, and marking the installation position of the pressure vessel support; S3. Installation and adjustment of pressure vessel supports; Install the pressure vessel support on the upper end of the reactor pressure vessel support steel foundation, check the contact area between the pressure vessel support and the reactor pressure vessel support steel foundation and calculate the non-contact area, so that the contact area is not less than 75%, then adjust the position of the pressure vessel support, and properly tighten the anchor bolts on the pressure vessel support; S4. Installation of pressure vessel support locating bolts; A step-type threaded blind hole is made in a narrow space on the pressure vessel support by using a hole-making device and tapped, and then a pressure vessel support positioning bolt is installed in the threaded blind hole; S5. Tightening of the anchor bolts supporting the pressure vessel; Remove the nut from the anchor bolt, install the locking washer and the nut on the anchor bolt in sequence, and then tighten and fix them with the setscrew; S6. Installation of pressure vessel support cover; An inlet is formed on the side wall of the pressure vessel support, and a cover plate of the pressure vessel support is fixed at the inlet by means of hexagonal screws; S7, finished product protection; After the pressure vessel support is installed, the support surface of the pressure vessel support is hard protected, and then three-proof cloth is used for moisture-proof protection; In S1, each of the large corbels is provided with a corbel positioning hole, a positioning pin is installed in the corbel positioning hole, and then the corner of the support frame is pre-fixed on the large corbel by the positioning pin, ensuring that the bolt hole of the support frame is aligned with the positioning bolt hole on the large corbel, and then the positioning pin is removed, and the support frame is connected to the large corbel by the positioning bolt; After the support frame is connected to the large bracket, the horizontality of the support frame is measured with the four corners of the support frame as a reference. If the horizontality of the support frame meets the requirements, the positioning bolts are finally tightened; A plane machining machine is installed on the support frame, a plug is provided between the plane machining machine and the support frame, and then the upper surface elevation and levelness of the reactor pressure vessel support steel foundation are measured by a laser measuring instrument and modeled, and appropriate machining parameters are selected so that the elevation and levelness after machining meet the design requirements; In S4, the hole-making device is fixed on a tooling platform, and the levelness and position of the hole-making device are adjusted, and then the hole-making operation is performed by the hole-making device; The hole making operation includes: drilling operation, first checking the verticality of the drill bit of the hole making equipment, and after ensuring that it is qualified, the hole is processed to a specified depth in a progressive manner of processing positioning holes, small holes, medium holes, and large holes; Boring operation: first check the verticality of the boring bar of the hole-making equipment. After ensuring that it is qualified, install two dial indicators on the hole-making equipment to monitor whether the boring bar is offset, and then bore the hole to process the hole to the final design requirements; For the tapping operation, first check the verticality of the tap of the hole-making equipment, and after ensuring that it is qualified, install the tapping tooling. After the threaded blind hole processing is completed, clean up the debris in the threaded blind hole.

2. The reactor pressure vessel support installation method according to claim 1, characterized in that: In S3, the pressure vessel support is hoisted onto the reactor pressure vessel support steel foundation through the lifting lugs on the top of the pressure vessel support.

3. The reactor pressure vessel support installation method according to claim 2, characterized in that: If the contact area is less than 75%, it is necessary to grind the raised points on the contact surface with a grinding sheet, a scraper or an oil stone in combination with light oil so that the contact area is not less than 75%.