Construction method and application of fire extinguishing agent consumption prediction model for high-voltage switchgear fault

By constructing a fire-extinguishing agent dosage prediction model for high-voltage switchgear faults, the problem of lack of early warning parameters and waste of fire-extinguishing agent for high-voltage switchgear fires is solved, and accurate prediction of fires and optimization of fire-extinguishing agent dosage are achieved.

CN114595530BActive Publication Date: 2024-10-18STATE GRID ANHUI ELECTRIC POWER CO LTD ELECTRIC POWER SCI RES INST +2
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202210212781.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-03-04
Publication Date
2024-10-18
Estimated Expiration
2042-03-04

AI Technical Summary

Technical Problem

Existing technology cannot provide accurate early warning before a fire occurs in a high-voltage switchgear, resulting in unpredictable amounts of fire extinguishing agent and waste.

Method used

Construct a fire-extinguishing agent consumption prediction model for high-voltage switchgear faults. Through fault simulation of different fault types, collect the fire time, temperature change and fire-extinguishing agent consumption data of the fault point, establish a piecewise linear regression model, predict the fire-extinguishing agent consumption, and predict the fire-extinguishing agent consumption. Optimize the activation of the fire extinguishing system based on the fire development curve.

Benefits of technology

It achieves rich early warning parameters for high-voltage switchgear fires, reduces the waste of fire extinguishing agents, and improves the accuracy of fire warning and fire extinguishing efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114595530B_ABST
    Figure CN114595530B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for constructing a prediction model for the amount of fire extinguishing agent used in a high-voltage switch cabinet fault and its application. The present invention is composed of a high-voltage switch cabinet body, a video acquisition unit, a current adding system, a temperature measurement unit, and a fire extinguishing system. By simulating various typical fault defect modes, the ignition time t of the fault point ignition is obtained. 着火 , the time t for the fire source to be extinguished after the gas fire extinguishing agent is applied 熄灭 ; The fire extinguishing system determines the amount of fire extinguishing agent L required to extinguish the fire source based on the fire extinguishing time; different flow addition times t are preset through the flow addition system 预设 , get the fault point ignition duration Δt 持续 =(t 预设 ‑t 着火 ) and the required amount of fire extinguishing agent L, and establish a univariate linear regression segmented prediction model for the amount of fire extinguishing agent and the duration of fire. The present invention solves the problem that the characteristic parameters of typical fault defects in high-voltage switch cabinets are scarce and different amounts of fire extinguishing agents cannot be evaluated online in real time.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of electric energy distribution and line protection equipment, and in particular to a method for constructing a high-voltage switch cabinet fault extinguishing agent usage prediction model and its application. Background Art

[0002] As a device for power distribution and line protection, high-voltage switchgear is widely used in power generation, transmission, transformation, and distribution. High-voltage switchgear is in a high-load operation state for a long time, resulting in frequent switchgear tripping and fire accidents, which seriously threaten the safety of the power grid and personnel. Cable insulation failure, phase-to-phase insulation failure, and contact overheating failure are the three typical failure modes that lead to high-voltage switchgear fires.

[0003] Application No. 201611168648.5 discloses a high-voltage switch cabinet cable partial discharge detection simulation system, which can carry out various high-voltage switch cabinet cable partial discharge simulation experiments. It is suitable for multi-component gas generation and online monitoring experiments in the laboratory, as well as indirect simulation and judgment of the operating status of energized equipment, and provides technical support for the research of partial discharge monitoring methods.

[0004] Another example is the highly efficient simulation device for partial discharge modes under various faults in high-voltage switchgear disclosed in application number 201310144929.7, which can simulate the electromagnetic pulse signal generated by partial discharge and the pulse sequence signal corresponding to the partial discharge modes such as cavitation, surface and corona, improving the assessment and evaluation methods of various current geomagnetic wave measuring instruments, filling the gap in the generation of partial discharge signals and defect mode recognition. The shell can withstand high voltage, the total weight of the device is less than 50Og, and it is portable and safe, which is particularly suitable for power companies to carry out partial discharge research on high-voltage switchgear, assessment of commercial test instruments and employee skills training.

[0005] From the above two patent documents, it can be seen that the existing research mainly focuses on the identification of partial discharge patterns of switch cabinets. Partial discharge is the previous stage of fire in high-voltage switch cabinets. There is a lack of systematic research on typical faults of switch cabinets; there is a lack of fire characteristic parameters that can be used as a basis for disasters caused by typical fault defects, making it difficult to provide accurate early warning before a fire occurs in a high-voltage switch cabinet; after a typical fault causes a fire in a high-voltage switch cabinet, the existing fire extinguishing technology can only determine whether the fire extinguishing agent continues to be released through video monitoring in the cabinet, and cannot predict the amount of fire extinguishing agent to be used in advance based on the size of the fire in the cabinet, resulting in excessive abuse of fire extinguishing agent. Summary of the invention

[0006] The technical problem to be solved by the present invention is that when a fire occurs in a high-voltage switch cabinet, it is currently impossible to predict the amount of fire extinguishing agent to be used according to the current fire intensity, resulting in a great degree of waste of fire extinguishing agent.

[0007] The present invention solves the above technical problems through the following technical means:

[0008] The method for constructing a high-voltage switch cabinet fault extinguishing agent consumption prediction model includes the following steps:

[0009] Step 1: Simulate multiple fault points of different types in sequence:

[0010] The current is increased in steps to the preset current I in each fault mode. 预设 Disconnect the power supply; collect the video of the fault point and its surrounding area, and obtain the ignition time t of the fault point in three fault modes 着火 ; Record the temperature variation range within the fault point monitoring range in each fault defect mode, and record the ignition temperature threshold T of the fault point in this fault mode 着火, ; Determine the temperature characteristic database of the fault point and its surroundings in each fault defect mode; Set multiple fire extinguishing system start time points t 预设 , on fire 着火 The difference after 预设 Start the fire extinguishing system at the time point, release the fire extinguishing agent until the fault point is no longer on fire, and record the time t when the fire source is extinguished by the fire extinguishing agent 熄灭 and the amount of extinguishing agent applied L 灭火剂 ; where t 预设 =t 着火 +iΔt, i is a positive integer;

[0011] Step 2: Establish a fire extinguishing agent dosage prediction model:

[0012] According to the single fire extinguishing agent or the combination of two or more fire extinguishing agents, the amount of fire extinguishing agent required at time t is L 预测 , where t∈(t 着火 +iΔt,t 着火 +(i+1)Δt); where t>t 着火 , the duration of fire before the fire extinguisher is activated iΔt=(t 预设 -t 着火 );i represents the i-th t 预设 ;

[0013] (t 着火 The amount of fire extinguishing agent obtained from the test at the time of +iΔt) is L (t着火+iΔt) ,{t 着火 The amount of fire extinguishing agent obtained at the time of +(i+1)Δt} is L (t着火+(i+1)Δt) ;

[0014] The piecewise univariate linear regression model is L = at + b0, where in It means 着火The amount of fire extinguishing agent released when the fire extinguishing system is activated at the moment.

[0015] The present invention simulates various types of high-voltage switch cabinets with different degrees of failure, obtains relevant data, and constructs a fire extinguishing agent usage prediction model when a failure occurs. The fire extinguishing agent usage prediction model is actually applied to predict the amount of fire extinguishing agent used for the current fire, and the fire extinguishing system is started to extinguish the fire according to the predicted value, which can greatly reduce the waste of fire extinguishing agent. By collecting data such as the ignition point time and the ignition point temperature threshold at different degrees of failures of different types of faults, a fire development curve can be obtained, which greatly facilitates the acquisition of typical fault disaster characteristic parameters; a database of typical fault disaster characteristic parameters of high-voltage switch cabinets is established, enriching the switch cabinet early fire warning parameters, and solving the problem of few early warning parameters and high misjudgment rate of high-voltage switch cabinet fires.

[0016] Furthermore, the high-voltage switchgear model sets a cable insulation fault point, a contact thermal fault point, and a phase-to-phase insulation fault point, and respectively sets an image acquisition unit, a temperature measurement unit, and a fire extinguishing agent nozzle near the three fault points; the three fault points are all electrically connected to the current addition control system; the image acquisition unit and the temperature measurement unit are both communicatively connected to the host computer.

[0017] Furthermore, the high-voltage switchgear model includes four chambers (busbar chamber, cable chamber, instrument chamber and trolley chamber), wherein the cable insulation fault point is located in the cable chamber, the phase-to-phase insulation fault point is located in the busbar chamber, and the contact overheating fault point is also in the cable chamber (close to the trolley chamber).

[0018] Furthermore, the specific structure of the cable insulation fault point is:

[0019] The cable insulation fault point is located at the cable outlet of the bottom chamber of the high-voltage switch cabinet; a hole is drilled at the cable outlet, and a conductor is inserted into the hole to be electrically connected with the cable line.

[0020] Furthermore, the external leakage end of the conductor has a thread, a heat-resistant clamp is fixed on the cable, and the conductor is inserted into the hole through the clamp; the conductor is fixed inside and outside the clamp by nuts.

[0021] Furthermore, the contact thermal fault point is located in the middle chamber of the high-voltage switch cabinet; a piece of paper or a loose metal pad and a fastening nut are placed between the copper bus 18 and the contact to realize the contact thermal fault simulation.

[0022] Furthermore, when the input current reaches a preset value I 预设 Afterwards, the minimum temperature when the insulating sheath on the copper busbar 18 near the contact thermal fault point is cracked is collected, and this minimum temperature is regarded as the ignition temperature threshold T 着 , and record the time, i.e. the ignition time t 着火 ; The fire extinguishing system is not activated in this mode.

[0023] Furthermore, the interphase insulation fault point is located in the upper cavity of the cabinet, and the specific structure is: a conductor is overlapped between phases B and C in the high-voltage switch cabinet to simulate a conductive channel formed by high voltage breakdown discharge.

[0024] Furthermore, the image acquisition unit is a miniature camera, and the temperature measurement unit is a thermocouple group.

[0025] The present invention also provides a high-voltage switch cabinet monitoring system, comprising a temperature measurement unit, an image acquisition unit, a fire extinguisher nozzle, a processor, and a controller arranged in different chambers in the high-voltage switch cabinet; the temperature measurement unit, the image acquisition unit, and the processor are all communicatively connected to the controller; the processor is equipped with the above-mentioned fire extinguishing agent usage prediction model; the controller judges the current fault development stage based on the current temperature information and image information sent by the temperature measurement unit and the temperature measurement unit, if an open fire has occurred, uses the fire extinguishing agent usage prediction model to predict the fire extinguishing agent usage, and starts the fire extinguisher to perform the fire extinguishing action.

[0026] The advantages of the present invention are:

[0027] The present invention obtains relevant data by simulating various types of faults of different degrees in high-voltage switchgear, and constructs a fire extinguishing agent usage prediction model when a fault occurs. The fire extinguishing agent usage prediction model is actually applied to predict the fire extinguishing agent usage according to the current fire intensity, and the fire extinguishing system is started to extinguish the fire according to the predicted value, which can greatly reduce the waste of fire extinguishing agent.

[0028] By collecting data such as the ignition point time and ignition point temperature threshold for different types of faults and different degrees of faults, a fire development curve can be obtained, which greatly facilitates the acquisition of characteristic parameters of typical fault disasters. A database of characteristic parameters of typical fault disasters in high-voltage switchgear has been established, enriching the early fire warning parameters of the switchgear, solving the problem of few early warning parameters and high misjudgment rate of high-voltage switchgear fires. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 This is a schematic diagram of the overall structure of the high-voltage switchgear in Embodiment 1 of the present invention;

[0030] Figure 2 The interphase insulation fault simulation structure in Embodiment 1 of the present invention;

[0031] Figure 3 The cable fault defect simulation structure in Embodiment 1 of the present invention;

[0032] Figure 4 This is the contact thermal fault defect simulation structure in Example 1 of the present invention. DETAILED DESCRIPTION

[0033] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in combination with the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0034] Example 1

[0035] This embodiment discloses a method for constructing a fire extinguishing agent usage prediction model for a high-voltage switch cabinet fault, comprising the following steps:

[0036] Step 1: Design a high-voltage switchgear model. The high-voltage switchgear model in this embodiment uses a full-size high-voltage switchgear, which can be an armored type (KYN type, KGN type), a compartment type (JYN type) or a box type (XGN type) switchgear. The voltage level varies from 3.6kV to 550kV to obtain more accurate data. The specific structure is as follows:

[0037] like Figure 1 As shown in the figure, the high-voltage switch cabinet model includes a cabinet body, and the inner cavity of the cabinet body is divided into an upper chamber (busbar chamber), a middle chamber (cable chamber and trolley chamber, not separated in the figure) and a lower chamber (cable chamber) instrument chamber, a total of 4 chambers. Multiple cables 1 pass through the upper chamber and enter the middle chamber through the partition. Contacts are also installed in the middle chamber, and the contacts are electrically connected to the cables 1 through copper bars; the contacts are also electrically connected to the cables 1 in the lower chamber through copper bars 18, and the cables 1 in the lower chamber pass through the bottom of the cabinet body. The designs of the above cables 1, copper bars 18, and contacts all simulate the structures in the actual high-voltage switch cabinet, and are convenient for designing fault points. There are inherent temperature measurement units and image acquisition units in each chamber. The image acquisition unit uses a micro camera. The thermocouple is fixed near the fault point, and the micro camera is generally installed at the top corner of the chamber, and the shooting area covers the fault point and the surrounding area of ​​the fault point. Each chamber is respectively fixed with a fire extinguisher nozzle, and the multiple fire extinguisher nozzles are connected to the fire extinguisher pressure storage tank 17 through the fire extinguisher delivery pipeline 15; and the fire extinguisher release electromagnetic valves 16-1, 16-2, and 16-3 are fixed on each fire extinguisher delivery pipeline 15. In this embodiment, the fire extinguisher is selected from gas phase or liquid phase fire extinguisher, and a single CO2, aerosol, heptafluoropropane, perfluorohexanone, NY5112 perfluorohexanone fire extinguisher can be selected, or two or more kinds of fire extinguishers can be mixed and sprayed through the fire extinguisher nozzle.

[0038] The cable 1 entering the cabinet is electrically connected to the current generator 9, and the current generator 9 is respectively connected to the current adding control console 10 and the inductive voltage regulator 8 for communication. The current adding control system has the functions of automatic voltage return to zero after tripping, test temperature and test time can be set, recorder can display temperature and current, overcurrent protection, zero voltage start, etc. Its input voltage: AC 220 V / 380V; output voltage: 10V~20V; maximum output current: 5000A. The AC current transformer is connected to the current generator in the current adding control system and is used to measure the output current I of the current generator. 输出 Value; measurement range 0~4000A, output current range 0~5A; powered by 24V power supply, the output current of the current generator is converted into DC0-5V signal and output to the voltage signal acquisition system. The AC voltage transmitter is connected to the current generator in the current control system to measure the output voltage U of the current generator. 输出 The value is measured in the range of 0 to 800 V. The input voltage of the current generator is converted into a DC0-5V signal and output to the voltage signal acquisition system. The voltage signal acquisition system is connected to the AC current transformer and the AC voltage transmitter to collect 0 to 5V DC voltage signals with a sampling rate of 100Hz. The voltage signal acquisition system is powered by a 24V DC power supply to ensure its normal operation.

[0039] The temperature measurement unit and the image acquisition unit are both connected to the host computer 14 through the data acquisition module 13. The host computer 14 can display the current temperature curve and fault image in real time, where 14-1 is the in-cabinet video monitoring system interface displayed by the host computer 14; 14-2 is the temperature display curve page of the temperature acquisition system; 14-3 is the fire extinguishing system release page; 14-4 is the data saving page. In this embodiment, 20 groups of fire extinguisher start time t are preset in the host computer. 预设 , which is used to simulate the activation of the fire extinguishing system at different time points after the fire occurs. For details, see the simulation process description.

[0040] In this implementation, the phase insulation fault point 5, the contact thermal fault point 4, and the cable 1 insulation fault point 2 are designed in the upper, middle and lower three chambers respectively. The specific structures of the three fault points are as follows:

[0041] Phase insulation fault point 5, such as Figure 2 As shown, the fault defect is realized by building a right angle iron 5-2 between the two-phase cables 11. The third thermocouple 3-3 is used to collect the temperature near the interphase insulation fault point, and the third micro camera 7-3 and the third fire extinguishing agent nozzle 6-3 are respectively fixed at the opposite side corners of the top of the upper chamber.

[0042] Contact thermal fault point 4, such as Figure 3As shown, the contact defect simulation is achieved by adding a paper sheet 4-2 or a loose metal gasket and a fastening nut 4-4 between the copper bar 18 and the contact 4-1. The second thermocouple 3-2 is used to collect the temperature near the contact defect fault point, and the second micro camera 7-2 and the third fire extinguishing agent nozzle 6-2 are respectively fixed at the opposite side corners of the top of the middle chamber.

[0043] Cable insulation fault point 2, such as Figure 4 As shown, 2-1 is a steel needle with a diameter of 3mm. By drilling a hole with a diameter of 3mm on the cable 11, the steel needle 2-1 is inserted into the hole until it is in close contact with the core of the cable 1 and the tail has a threaded structure; 2-2 is a nut, one before and one after the steel needle 2-1, used to fix the steel needle 2-1; 2-3 is a metal steel clamp, used to fix the steel needle 2-1 in the hole of the cable 1. The first thermocouple 3-1 is used to collect the temperature near the insulation fault point of the cable 1, and the first micro camera 7-1 and the first fire extinguishing agent nozzle 6-1 are respectively fixed at the opposite corners of the top of the upper chamber.

[0044] In this embodiment, in the cable insulation fault mode, an S-type armored thermocouple is used near the cable perforation or the phase insulation sheath under the phase insulation fault, and the temperature measurement range is 0-1300°C, which can meet the temperature measurement requirements of the cable defect or the insulation sheath when it catches fire; in the contact fault mode, only the temperature near the contact is measured, and a K-type armored thermocouple is selected, with a temperature measurement range of 0-800°C, which can meet the measurement requirements of the surrounding environment temperature under the contact overheating condition. The S-type thermocouple uses a 0.5mm diameter type, and the K-type thermocouple uses a 1.0mm diameter type.

[0045] Step 2: After the above hardware equipment is set up, you can simulate various faults. The specific methods are as follows:

[0046] (1) Data collection of cable insulation fault points

[0047] After the current control system is connected to the incoming cable 1 in the cabinet, in order to prevent the risk of electric shock, the high-voltage switch cabinet is grounded with a wire; after the preparation is completed, the current control system (current control console 8, current generator 9 and induction voltage regulator 100) is started, and the high-voltage switch cabinet is energized through the incoming cable; in the cable insulation fault mode, the preset value I of the current in the fault defect mode is set on the current control console 8. 预设 , the current generator increases in a step-by-step manner (step-by-step current increase refers to the current of the cable passing through the high-voltage switch cabinet increasing to a preset value at equal intervals; the current preset value I in the cable insulation fault mode 预设 The current preset value I in the phase insulation fault mode is 2000A. 预设 2000A, contact overheat fault I 预设At the same time, the AC current sensor and AC voltage sensor installed on the current generator feed back the output current and voltage information of the current generator 9 to the current generator 9 until the preset current value I is reached. 预设 At this time, the current generator 9 is no longer boosting the current.

[0048] Start the temperature acquisition system 3-1 and the video acquisition unit 7-1, and transmit the temperature acquisition and video acquisition data or video images to the data acquisition module 13. The temperature acquisition data is transmitted to the host computer 14 through the 3-1' data acquisition module 13. The host computer 14 realizes online display of the temperature curve information 14-2 and video information 14-1 of the fault point in the cabinet until the fire position at the fault point 2 is reached. The video acquisition page 14-1 records the fire time t at this time. 着火 The temperature acquisition system 3-1 records the minimum value of the temperature measured by the three thermocouples under the fault defect mode, which is the ignition temperature threshold T 着火 ;

[0049] According to 20 groups of fire extinguishing agent release start times preset on the host computer 14, that is, 20 groups of different t 预设 Value: t 着火 ~t 着火 +19Δt. The host computer 14 monitors the fault point 2 from the ignition t 着火 Start to preset time t 预设 When the fire extinguishing action is started, the fire extinguishing agent release valve 16-1 is opened, and the fire extinguishing agent storage tank 17 releases the gaseous fire extinguishing agent. The gaseous fire extinguishing agent is released from the release nozzle 6-1 until the fire source at the fault point 2 is extinguished. The micro camera records the time when the fire source is extinguished t 熄灭 , the fire extinguishing agent release system evaluates the release amount of fire extinguishing agent L 灭火剂 Repeat the above operation, replace the damaged cable 1 in each test, and obtain 20 groups of Δt for each fire extinguishing agent 持续 =(t 预设 -t 着火 ) and the amount of fire extinguishing agent L 灭火剂 The corresponding value of .

[0050] (2) Phase insulation failure

[0051] This fault defect is realized by building a straight angle iron 5-2 between the two-phase cables 1. The preparation work is consistent with the cable insulation fault, and the cable sheath fire time t connected to the angle iron is obtained. 着火 and the ignition temperature threshold T 着 ; consistent with the cable insulation failure, repeat the above operation, replace the damaged phase cable 1 each time, and obtain 20 groups of Δt for each fire extinguishing agent 持续 =(t 预设 -t 着火) and the amount of fire extinguishing agent L 灭火剂 The corresponding value of .

[0052] (3) Contact thermal failure point

[0053] In the contact overheat fault simulation mode (which is achieved by processing the moving and static contacts of the switch cabinet, such as loosening the moving and static contact clamping bolts, grinding the silver-plated layer on the surface of the moving and static contacts, and placing a small piece of insulating paper between the moving and static contacts), when the input current reaches the preset value I 预设 Afterwards, when the micro camera 7-2 obtains the crack of the insulating sheath on the copper busbar near the fault point 4, the current temperature acquisition system 3-3 is disconnected to record the minimum temperature at this time, which is regarded as the ignition temperature threshold T 着 The video acquisition unit records the moment of ignition, i.e. the moment of ignition t 着火 In this mode, the fire extinguishing system is not activated, and only the temperature and ignition time when the sheath on the copper busbar 18 is cracked are studied.

[0054] The above ignition time t 着火 It refers to the three typical fault modes in which the current reaches the preset value I 预设 The reference fault point reaches the moment of burning or cracking (the fault point is based on burning in cable insulation fault or phase-to-phase insulation fault mode, and the copper busbar insulation sheath is based on cracking in contact fault mode); ignition time t 着火 The size of is evaluated by the video acquisition unit, and the time of fire is determined based on the video image at the time of fire.

[0055] At this point, the ignition time and ignition temperature database is established, and the corresponding defect failure mode of each extinguishing agent is established. 持续 =(t 预设 -t 着火 ) and the amount of fire extinguishing agent L 灭火剂 The segmented univariate linear regression model can be used to predict the amount of fire extinguishing agent used in advance. In this embodiment, the fault point ignition temperature threshold T 着火 For cable insulation fault and phase insulation fault modes, the minimum temperature T of the ambient temperature measurement unit when the reference fault point ignites is taken. min ; For the contact failure mode, take the minimum temperature value T of the thermocouple measurement near the contact min In this embodiment, the temperature database refers to the corresponding values ​​of the starting time and temperature obtained by the temperature acquisition system before the high-voltage switch cabinet starts the flow control system under the three characteristic fault modes, and the time and minimum temperature T collected by the temperature acquisition system when the fault point ignites after the pressurization and flow control system is started. min The corresponding value of the temperature when the fire extinguishing system is started to extinguish the fire source and the maximum temperature T max The corresponding value of .

[0056] The above-mentioned piecewise univariate linear regression model is specifically:

[0057] According to the single fire extinguishing agent or the combination of two or more fire extinguishing agents, the amount of fire extinguishing agent required at time t is L 预测 , where t∈(t 着火 +iΔt,t 着火 +(i+1)Δt); where t>t 着火 , the duration of fire before the fire extinguisher is activated Δt = (t 预设 -t 着火 );i represents the i-th t 预设 ;

[0058] t 着火 The amount of fire extinguishing agent obtained from the test at time +iΔt is L (t着火+iΔt) ,t 着火 The amount of fire extinguishing agent obtained at the time of +(i+1)Δt is L (t着火+(i+1)Δt) ;

[0059] The piecewise univariate linear regression model is L = at + b0, where in It means 着火 The amount of fire extinguishing agent released when the fire extinguishing system is activated at the moment.

[0060] In this embodiment, the time interval Δt is 2 minutes, and the time span of 20 time points is 40 minutes, covering the process from the ignition of cable insulation fault or phase insulation fault cable or phase insulation sheath to the complete development of fire. Extinguishing time t 熄灭 , refers to the moment when the open fire of the cable in the cable insulation mode of the fault point in the cabinet or the insulating sheath in the phase insulation fault mode is extinguished, which can be obtained by the micro camera; the amount of fire extinguishing agent L 灭火剂 , refers to the fire extinguishing system activation time t 预设 Until the fire is extinguished 熄灭 The control module determines the amount of fire extinguishing agent released during this period of time based on the ignition status of the fault point in the cabinet or the preset time t 预设 When the fire extinguishing action is initiated, it will be transmitted to the solenoid valve of the fire extinguishing system, starting the release of the fire extinguishing agent.

[0061] Example 2

[0062] This embodiment discloses a high-voltage switch cabinet monitoring system, which applies the above-mentioned fire extinguishing agent prediction model. In order to apply the model, a thermocouple group and a micro camera are installed in a traditional high-voltage switch cabinet, and the above-mentioned fire extinguishing agent dosage prediction model is installed in the processor. In order to ensure the precise operation of the fire extinguishing system, the fire extinguishing system is started when the thermocouple temperature threshold and image recognition reach the threshold at the same time. When the information collected by the thermocouple and the micro camera shows that a fire has occurred in the cabinet, it is necessary to consider that the temperature collected by the thermocouple is affected by factors such as the oxygen content in the cabinet, the air movement state and the working state. At the same time, the influence of partial discharge on the judgment of the fire video image of the micro camera should also be considered, so that the thermocouple and the micro camera are not synchronized in recognizing the occurrence of the fire, resulting in a time error between the two, so the fire extinguishing system will have a delayed start phenomenon. In order to consider the actual delay in the start-up of the fire extinguishing system, the start-up time of different fire extinguishing agents is considered in the fire extinguishing agent prediction model. The processor determines the current fault type based on the current temperature curve and image feature extraction, and uses the fire extinguishing agent prediction model under different segmented intervals to predict the amount of fire extinguishing agent used based on the difference between the time when the temperature threshold is reached and the time when the fire characteristic image is formed. The fire extinguisher system is started to extinguish the fire based on the predicted result of the fire extinguishing agent usage, thus solving the problem of large-scale abuse of fire extinguishing agents.

[0063] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A method for constructing a prediction model for the amount of fire extinguishing agent used in high-voltage switchgear faults, characterized in that: The following steps are involved: Step 1: Simulate multiple fault points of different types in sequence: The current is increased in steps to the preset current I in each fault mode. 预设 Disconnect the power supply; collect the video of the fault point and its surrounding area, and obtain the ignition time t of the fault point in three fault modes 着火 ; Record the temperature variation range within the fault point monitoring range in each fault defect mode, and record the ignition temperature threshold T of the fault point in this fault mode 着火 ; Determine the temperature characteristic database of the fault point and its surroundings in each fault defect mode; Set multiple fire extinguishing time points t 预设 , on fire 着火 The difference after 预设 Start the fire extinguishing system, release the fire extinguishing agent to the fault point until the fire is no longer on fire, and record the time t when the fire source is extinguished by the fire extinguishing agent 熄灭 and the amount of extinguishing agent applied L 灭火剂 ; where t 预设 =t 着火 +Δt,i is a positive integer; Step 2: Establish a fire extinguishing agent dosage prediction model: According to the single fire extinguishing agent or the combination of two or more fire extinguishing agents, the amount of fire extinguishing agent required at time t is L 预测 , where t∈(t 着火 +iΔt,t 着火 +(i+1)Δt); where t>t 着火 , the duration of fire before the fire extinguisher is activated Δt = (t 预设 -t 着火 );i represents the i-th t 预设 ; t 着火 The amount of fire extinguishing agent obtained from the test at time +iΔt is L (t着火+iΔt) ,t 着火 The amount of fire extinguishing agent obtained at the time of +(i+1)Δt is L (t着火+(i+1)Δt) ; The piecewise univariate linear regression model is L = at + b0, where in It means 着火 The amount of fire extinguishing agent released when the fire extinguishing system is activated at the moment.

2. The method for constructing a high-voltage switch cabinet fault extinguishing agent dosage prediction model according to claim 1, characterized in that: The high-voltage switchgear model is provided with a cable insulation fault point, a contact thermal fault point, and a phase-to-phase insulation fault point, and an image acquisition unit, a temperature measurement unit, and a fire extinguisher nozzle are respectively arranged near the three fault points; the three fault points are all electrically connected to the current addition control system; the image acquisition unit and the temperature measurement unit are both communicatively connected to the host computer.

3. The method for constructing a high-voltage switch cabinet fault extinguishing agent dosage prediction model according to claim 2, characterized in that: The three fault points are located in three chambers of the high-voltage switchgear.

4. The method for constructing a high-voltage switch cabinet fault extinguishing agent dosage prediction model according to claim 3, characterized in that: The specific structure of the cable insulation fault point is: The cable insulation fault point is located at the cable outlet of the bottom chamber of the high-voltage switch cabinet; a hole is drilled at the cable cabinet, and a conductor is inserted into the hole to be electrically connected with the cable line.

5. The method for constructing a high-voltage switch cabinet fault extinguishing agent dosage prediction model according to claim 4, characterized in that: The external leakage end of the conductor has a thread, a heat-resistant clamp is fixed on the cable, and the conductor passes through the clamp and is inserted into the hole; the conductor is fixed inside and outside the clamp by nuts.

6. The method for constructing a high-voltage switch cabinet fault extinguishing agent dosage prediction model according to claim 3, characterized in that: The contact thermal fault point is located in the middle chamber of the high-voltage switch cabinet; a piece of paper or a loose metal pad and a fastening nut are placed between the copper bus 18 and the contact to realize the contact thermal fault simulation.

7. The method for constructing a high-voltage switch cabinet fault extinguishing agent dosage prediction model according to claim 6, characterized in that: When the input current reaches the preset value I 预设 Afterwards, the minimum temperature when the insulating sheath on the copper busbar 18 near the contact thermal fault point is cracked is collected, and this minimum temperature is regarded as the ignition temperature threshold T 着 , and record the time, i.e. the ignition time t 着火 ; The fire extinguishing system is not activated in this mode.

8. The method for constructing a high-voltage switch cabinet fault extinguishing agent usage prediction model according to claim 3, characterized in that: The interphase insulation fault point is located in the upper cavity of the cabinet, and the specific structure is: a conductor is overlapped between phases B and C in the high-voltage switch cabinet to simulate a conductive channel formed by high voltage breakdown discharge.

9. The method for constructing a high-voltage switch cabinet fault extinguishing agent dosage prediction model according to claim 2, characterized in that: The image acquisition unit is a miniature camera, and the temperature measurement unit is a thermocouple group.

10. High voltage switch cabinet monitoring system, characterized in that: It includes a temperature measurement unit, an image acquisition unit, a fire extinguisher nozzle, a processor, and a controller arranged in different chambers of a high-voltage switch cabinet; the temperature measurement unit, the image acquisition unit, and the processor are all connected to the controller in communication; the processor is equipped with the fire extinguishing agent dosage prediction model in claim 1; the controller determines the current fault development stage based on the current temperature information and image information sent by the temperature measurement unit, if an open fire has occurred, uses the fire extinguishing agent dosage prediction model to predict the fire extinguishing agent dosage, and starts the fire extinguishing system to execute the fire extinguishing action.

Citation Information

Patent Citations

  • Efficient simulation device for partial discharge modes under various faults in high-voltage switch cabinet

    CN103245926A

  • High voltage switch cabinet cable partial discharge monitoring simulation system

    CN106646162A

  • A fire dynamic emergency decision system based on accident evolution and an implementation method thereof

    CN109543919A

  • Safety supervision and artificial intelligence style vocal warning apparatus and two-dimensional temperature the singh system which counts switchboard, MCC, cabinet panel

    KR101064867B1