Nuclear power plant emergency water supply pipeline replacement simulation method and mobile water supply equipment system

Through fluid system simulation analysis and experimental verification, a mobile pipeline replacement that meets the requirements of nuclear power plant regulations was determined, and the problem of difficulty in transporting RTP pipelines in nuclear power plants was solved, and a MILEFLEX polyurethane flat hose that meets the design requirements was found as a replacement.

CN114647988BActive Publication Date: 2024-11-26GUANGXI FANGCHENGGANG NUCLEAR POWER +1
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202210105201.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-01-28
Publication Date
2024-11-26
Estimated Expiration
2042-01-28

AI Technical Summary

Technical Problem

The RTP pipeline used in the mobile water replenishment equipment system of existing nuclear power plants consumes a lot of manpower and material resources during the handling process and is inconvenient for transportation, and its substitutes fail to fully comply with the regulatory requirements of nuclear power plants equipment.

Method used

The pipeline model is established using fluid system simulation analysis software, and through simulation and calculation, whether the preset pipeline can meet the emergency water replenishment flow requirements, and an experimental pipeline system is built to verify the actual performance parameters to ensure that the substitutes meet the requirements of laws and regulations.

Benefits of technology

It effectively explores and verifies whether the alternatives to mobile pipes comply with regulatory requirements, solves the problem of time and effort consumed during the handling of RTP pipes, and finds alternatives that meet design requirements, such as MILEFLEX polyurethane flat hoses.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114647988B_ABST
    Figure CN114647988B_ABST
Patent Text Reader

Abstract

The invention relates to a nuclear power plant emergency water replenishment pipeline replacement simulation method and a mobile water replenishment equipment system, wherein the nuclear power plant emergency water replenishment pipeline replacement simulation method comprises the following steps: according to the actual pipeline arrangement and on-site equipment of the mobile water replenishment equipment system, a corresponding first pipeline model is established in a fluid system simulation analysis software; parameters of on-site equipment in the mobile water replenishment equipment system are obtained, and input into the fluid system simulation analysis software to obtain a limited first pipeline model; pressure boundaries of an inlet end and an outlet end of the limited first pipeline model are set, and a first spent fuel pool emergency water replenishment flow rate is calculated through the fluid system simulation analysis software; it is judged whether the first spent fuel pool emergency water replenishment flow rate is greater than a preset design requirement, and if so, it indicates that the preset pipe can be used as a mobile pipeline in the mobile water replenishment equipment system; and it can be used to explore whether a substitute for a mobile pipeline in the mobile water replenishment equipment system of a nuclear power plant meets regulatory requirements.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of nuclear power accident emergency response, and in particular to a nuclear power plant emergency water supply pipeline replacement simulation method and a mobile water supply equipment system. Background Art

[0002] When a nuclear power plant encounters an accident, it needs to take water from a water source outside the plant and transport it to the spent fuel pool through a mobile water supply system (SKA).

[0003] The mobile water replenishment equipment system includes a mobile pipeline, which is carried out from the warehouse by the staff when encountering an accident condition and connected through joints to form a mobile water replenishment equipment system; the mobile pipeline is generally a pipeline with a quick joint, which needs to ensure the integrity of the internal liquid, and at the same time needs to prevent crushing, resist internal pressure, and also needs to have sealing and protective functions.

[0004] In the related technology, the mobile pipeline is made of DN100 black rubber reinforced thermoplastic (RTP) material, including a three-layer structure. The inner layer keeps the internal liquid intact, the middle layer is a reinforcement layer, which is formed by ribbon weaving or winding to resist internal pressure, and the outer layer has a sealing and protective function.

[0005] Although this type of RTP pipe meets the performance requirements of the water pipeline, the water pipeline that needs to be laid in the accident condition is very long. However, the RTP pipe is not only heavy, but also a long hard pipe, which consumes a lot of manpower and material resources and takes up a lot of time during transportation.

[0006] For the above-mentioned RTP tubes, nuclear power plants currently do not have a relatively good solution to solve the technical defects; even if there is, it is not certain whether it meets the regulatory requirements for nuclear power plant equipment. Summary of the invention

[0007] The technical problem to be solved by the present invention is that the RTP pipe used in the mobile pipeline in the related art is not only heavy, but also extremely labor-intensive, material-intensive and time-consuming during transportation; a nuclear power plant emergency water supply pipeline replacement simulation method and a mobile water supply equipment system are provided.

[0008] The technical solution adopted by the present invention to solve the technical problem is: constructing a nuclear power plant emergency water supply pipeline replacement simulation method, which is characterized by comprising the following steps:

[0009] S10: establishing a corresponding first pipeline model in the fluid system simulation analysis software according to the actual pipeline arrangement and on-site equipment of the mobile water replenishment equipment system;

[0010] The first pipeline model includes a pumping pipeline for extracting water from an external water source of the nuclear power plant, a fixed pipeline fixed in the nuclear power plant and leading to the spent fuel pool, and a mobile pipeline for connecting the pumping pipeline and the fixed pipeline; wherein the mobile pipeline includes a mobile pipe for connection, and the mobile pipe is formed by connecting a plurality of preset pipes;

[0011] S20: Obtain parameters of the field equipment in the mobile water replenishment equipment system, input them into the fluid system simulation analysis software, and obtain a defined first pipeline model;

[0012] The on-site equipment includes a water replenishment pump, a plurality of delivery pipelines for delivering water, a plurality of joints for connecting the delivery pipelines, and a plurality of valves for switching fluids; the delivery pipeline includes the pipelines in the water pumping pipeline, the fixed pipeline, and the mobile pipeline;

[0013] The on-site equipment parameters include the rated operating parameters of the mobile water replenishment equipment system, and the specification parameters of the water replenishment pump, delivery pipeline, joint and valve;

[0014] S30: setting the pressure boundaries of the inlet and outlet of the defined first pipeline model, and calculating the emergency water replenishment flow rate of the first spent fuel pool through the fluid system simulation analysis software;

[0015] S40: Determine whether the emergency water replenishment flow rate of the first spent fuel pool is greater than the preset design requirement. If so, it means that the preset pipe can be used as the mobile pipeline in the mobile water replenishment equipment system, otherwise it cannot be replaced.

[0016] Preferably, step S30 includes the following sub-steps:

[0017] S31: setting pressure boundaries at the inlet and outlet of the mobile water replenishment equipment system, and calculating a first inlet pressure and a first outlet pressure of the mobile pipeline in the defined first pipeline model through the fluid system simulation analysis software;

[0018] S32: Calculating a first pressure loss along the moving pipeline according to a first inlet pressure and a first outlet pressure of the moving pipeline;

[0019] S33: According to the first along-the-way pressure loss, the fluid system simulation analysis software calculates the emergency water replenishment flow rate of the first spent fuel pool.

[0020] Preferably, the following verification step is also included:

[0021] S50: constructing an experimental pipeline system including the preset pipe, testing and calculating to obtain actual performance parameters of the preset pipe;

[0022] The actual performance parameters include the second inlet pressure, the second outlet pressure, the second along-the-way pressure loss of the preset pipe, its flow rate and its flow characteristic relationship.

[0023] S51: Inputting the second along-the-line pressure loss and flow characteristic relationship of the preset pipe into the fluid system simulation analysis software to correct the defined first pipeline model and obtain the corrected first pipeline model.

[0024] S52: Based on the modified first pipeline model, the emergency water replenishment flow rate of the second spent fuel pool is calculated by the fluid system simulation analysis software;

[0025] S53: Determine whether the emergency water replenishment flow rate of the second spent fuel pool is greater than the preset design requirement. If so, it means that the preset pipe can be used as the mobile pipeline in the mobile water replenishment equipment system, otherwise it is irreplaceable.

[0026] Preferably, the experimental pipeline system includes a first pumping main circuit for extracting water source, a water tank connected to the first pumping main circuit to store water source, a second pumping main circuit connected to the water tank to extract tank water, the preset pipe connected to the second pumping main circuit, and a regulating valve arranged at the outlet of the preset pipe.

[0027] Preferably, the first main water pumping circuit includes a third water pumping pipe, and a first hand-lift pump arranged in the third water pumping pipe to provide water delivery power, and the third water pumping pipe is respectively connected to a water source and the water tank.

[0028] Preferably, the second main pumping circuit includes a second hand-lift pump for providing water delivery power, and a fourth pumping pipeline;

[0029] The fourth water pumping pipeline is respectively connected to one end of the second hand pump and the water tank, and the other end of the second hand pump is connected to the preset pipe.

[0030] Preferably, the experimental pipeline system also includes a first flow meter and a first pressure gauge arranged at the inlet of the preset pipe, and a second pressure gauge arranged at the outlet of the preset pipe.

[0031] Preferably, the fluid system simulation analysis software adopts Flowmaster software.

[0032] Preferably, the preset pipe adopts MILEFLEX polyurethane flat hose.

[0033] The present invention also constructs a mobile water replenishment equipment system, including a pumping pipeline for extracting water from an external water source of a nuclear power plant, a fixed pipeline fixed in the nuclear power plant and leading to a spent fuel pool, and a mobile pipeline for connecting the pumping pipeline and the fixed pipeline; the mobile pipeline includes a mobile pipe for connection, characterized in that the mobile pipe is formed by connecting a plurality of MILEFLEX polyurethane flat hoses.

[0034] The implementation of the present invention has the following beneficial effects: it can be used to explore whether alternatives to mobile pipes in mobile water replenishment equipment systems of nuclear power plants meet regulatory requirements; at the same time, compared with related technologies, it solves the problems of large mass, inconvenient transportation, and time-consuming and labor-intensive mobile pipes. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] The present invention will be further described below with reference to the accompanying drawings and embodiments, in which:

[0036] Figure 1 It is a program flow chart of the nuclear power plant emergency water supply pipeline replacement simulation method of the present invention;

[0037] Figure 2 , Figure 3 and Figure 4 is a structural schematic diagram of the first pipeline model in the present invention;

[0038] Figure 5 It is a structural schematic diagram of the experimental pipeline system in the present invention. DETAILED DESCRIPTION

[0039] In order to have a clearer understanding of the technical features, purposes and effects of the present invention, the specific embodiments of the present invention are now described in detail with reference to the accompanying drawings. In the following description, it should be understood that the directions or positional relationships indicated by "front", "back", "up", "down", "left", "right", "longitudinal", "horizontal", "vertical", "horizontal", "top", "bottom", "inside", "outside", "head", "tail", etc. are based on the directions or positional relationships shown in the accompanying drawings, are constructed and operated in a specific direction, and are only for the convenience of describing the present technical solution, rather than indicating that the device or element referred to must have a specific direction, and therefore cannot be understood as a limitation to the present invention.

[0040] It should also be noted that, unless otherwise clearly specified and limited, the terms such as "installed", "connected", "connected", "fixed", "set" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection or an electrical connection; it can be directly connected or indirectly connected through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. When an element is referred to as being "on" or "under" another element, the element can be "directly" or "indirectly" located on the other element, or there may be one or more intermediate elements. The terms "first", "second", "third", etc. are only for the convenience of describing the present technical solution, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first", "second", "third", etc. can explicitly or implicitly include one or more of the features. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to the specific circumstances.

[0041] In the following description, specific details such as specific system structures, technologies, etc. are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present invention. However, it should be clear to those skilled in the art that the present invention may be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to prevent unnecessary details from obstructing the description of the present invention.

[0042] The present invention constructs a simulation method for replacing an emergency water supply pipeline in a nuclear power plant, which can be used as a verification method when selecting a preset pipe 56 as a water supply pipeline in a mobile water supply equipment system (SKA) to test whether the preset pipe 56 meets the corresponding regulatory requirements in the field of nuclear power equipment. It should be noted that the preset pipe 56 refers to a mobile pipe 21 used for a water supply pipeline in a mobile water supply equipment system (SKA). In the relevant embodiment, the mobile pipe 21 adopts a DN100 RTP pipe, so the preset pipe 56 can be regarded as a pipe used to replace the RTP pipe.

[0043] like Figure 1 As shown, the nuclear power plant emergency water supply pipeline replacement simulation method includes the following steps:

[0044] S10: establishing a corresponding first pipeline model in the fluid system simulation analysis software according to the actual pipeline arrangement and on-site equipment of the mobile water replenishment equipment system;

[0045] like Figure 2-Figure 5As shown, the first pipeline model includes a pumping pipeline 1 for extracting water from an external source of the nuclear power plant, a fixed pipeline 4 fixed in the nuclear power plant and leading to the spent fuel pool, and a mobile pipeline 2 for connecting the pumping pipeline 1 and the fixed pipeline 4; wherein the mobile pipeline 2 includes a mobile pipeline 21 for connection, and the mobile pipeline 21 is formed by connecting a plurality of preset pipes 56. The specific number of preset pipes used depends on the actual pipeline arrangement of the mobile water replenishment equipment system.

[0046] It can be understood that the combination of on-site equipment constitutes a mobile water replenishment equipment system, and the first pipeline model is a microcosm of the mobile water replenishment equipment system in the fluid system simulation analysis software. The fluid system simulation analysis software is used to simulate the equipment actually operating on site, and the simulation is performed according to the actual operating parameters on site. The water pump performance curve is balanced with the pressure curve of the pipeline to obtain the flow rate, pressure of the pipeline and the actual operating conditions of the water pump. The fluid system simulation analysis software can use Flowmaster software, which can take the fluid pipeline system as the research object and model and analyze the system as a whole.

[0047] The entire mobile water supply equipment system includes a water supply pump, several delivery pipelines for water delivery, several joints for connecting the delivery pipelines, and several valves for switching fluids; the water supply pump is connected to the water source outside the nuclear power plant, and the water supply pump provides pumping power, and the delivery pipeline is used as a way to transport water resources. The delivery pipeline can start from a water storage tank outside the nuclear power plant, pass through the outdoor operation box and the fuel plant, and finally reach the spent fuel pool tens of meters above the ground. According to the on-site pipeline arrangement, several different types of joints are used to connect different types of delivery pipelines, and valves are set between the delivery pipelines to control the flow of fluids. Preferably, the first pipeline model also includes a pressure loss compensation element 22 for pressure loss compensation; the pressure loss compensation element 22 is set at the rear end of the preset pipe 56, that is, the end away from the water supply pump.

[0048] In some embodiments, the on-site equipment of a nuclear power plant includes a number of mobile water supply pumps, a number of mobile pipes 21, a number of hard pipes, a number of soft pipes, a number of ball valves, a number of transition joints, a number of pressure loss compensation elements 22, a number of elbows and a number of tees; based on this, the above-mentioned water supply pump includes a mobile water supply pump, the delivery pipe includes a hard pipe, a soft pipe and a mobile pipe 21, the valve includes a ball valve, and the joint includes a transition joint, an elbow and a tee. Preferably, the hard pipe is a hard pipe with a circular cross section, the soft pipe is a soft pipe with a circular cross section, and the transition joint is a concentric transition pipe joint.

[0049] Furthermore, the entire mobile water replenishment equipment system includes a water pumping pipeline 1, a mobile pipeline 2 and a fixed pipeline 4.

[0050] Furthermore, the pumping pipeline 1 includes a pumping branch 11 and a first pumping pipe 12 connecting all the pumping branches 11 to the mobile pipeline 2; preferably, two pumping branches 11 are provided, one of which is used as a main branch and the other as a backup branch.

[0051] The single pumping branch 11 includes a first water supply pump 111 and a first hard pipe 112 respectively connected to the first water supply pump 111 and the first pumping pipeline 12; the first water supply pump 111 may be a mobile hand-lifted water supply pump, the input end of which is connected to a water source outside the nuclear power plant, and the first water supply pump 111 provides pumping power, and sequentially passes through the first hard pipe 112 and the first pumping pipeline 12 to transport water resources to the mobile pipeline 2. In some embodiments, the pumping branch 11 also includes a first ball valve 113, which is arranged between the first hard pipe 112 and the first pumping pipeline 12, and is used to control the rapid opening and closing of the pumping branch 11.

[0052] Furthermore, the first water pumping pipeline 12 includes a plurality of second hard pipes 121 connected to the water pumping branch 11, and a first soft pipe 122 having one end connected to the mobile pipeline 2. In some embodiments, the first water pumping pipeline 12 also includes a first transition joint 123, and the first soft pipe 122 can be connected to the mobile pipeline 2 through the first transition joint 123.

[0053] Further, the mobile pipeline 2 includes a mobile pipeline 21 and a pressure loss compensation element 22 connected to the mobile pipeline 21; one end of the mobile pipeline 21 is connected to the pumping pipeline 1 through a first transition joint 123, and the other end is connected to the fixed pipeline 4. In some embodiments, the mobile pipeline 2 also includes a second transition joint 23, and the mobile pipeline 21 is connected to the fixed pipeline 4 through the second transition joint 23. The pressure loss compensation element 22 is provided between the mobile pipeline 21 and the fixed pipeline 4, and is used to compensate for the pressure loss of the mobile pipeline 21.

[0054] In the related art, the mobile pipeline 21 is laid by manually carrying multiple DN100 RTP pipes, with a length of 700M. In order to solve the technical problem that the RTP pipe is heavy and is a long hard pipe, which consumes a lot of manpower, material resources and transportation time during the transportation process, the present invention needs to find a substitute for the RTP pipe and explore whether the substitute meets the relevant regulatory requirements of nuclear power plants.

[0055] Furthermore, a connecting pipeline 3 is provided between the mobile pipeline 2 and the fixed pipeline 4. The connecting pipeline 3 includes a second soft pipe and a third transition joint; one end of the second soft pipe is connected to the second transition joint 23, and the other end thereof is connected to the fixed pipeline 4 through the third transition joint.

[0056] Specifically, the first soft pipe 122 and the second soft pipe are fire hoses, the length of which can be 3 meters, and the nominal diameter of the pipe is DN80.

[0057] Furthermore, the fixed pipeline 4 includes a first fixed pipeline part 41, a second fixed pipeline part 42 and a third fixed pipeline part 43 fixed inside the nuclear power plant. One end of the first fixed pipeline part 41 is connected to the mobile pipeline 2, and the other end thereof is a first water outlet 416 for discharging water. A first three-way joint 415 is provided between the first fixed pipeline parts 41 for connecting one end of the second fixed pipeline part 42. The other end of the second fixed pipeline part 42 is a second water outlet 423 for discharging water, and the second water outlet 423 is provided in the spent fuel pool; a second three-way joint 422 is provided between the second fixed pipeline parts 42 for connecting one end of the third fixed pipeline part 43. The other end of the third fixed pipeline part 43 is a third water outlet 433 for discharging water.

[0058] Specifically, the first fixed pipeline part 41 includes a plurality of third hard pipes 411, a plurality of fourth transition joints 412 and a plurality of first elbows 413 for connecting the plurality of third hard pipes 411, a second ball valve 414 for switching fluid, and a first three-way joint 415. The second fixed pipeline part 42 includes a plurality of fourth hard pipes 421 and a second three-way joint 422. The third fixed pipeline part 43 includes a plurality of fourth hard pipes 421 and a third ball valve 432 for switching fluid. The specific connection relationship of the fixed pipeline 4 can be referred to Figure 2-Figure 4 shown.

[0059] S20: Obtain parameters of on-site equipment in the mobile water replenishment equipment system, input them into the fluid system simulation analysis software, and obtain a first pipeline model after definition.

[0060] The on-site equipment includes a water supply pump, a plurality of delivery pipelines for delivering water, a plurality of joints for connecting the delivery pipelines, and a plurality of valves for switching fluids; the delivery pipeline includes a water pumping pipeline 1, a fixed pipeline 4, and pipelines in a mobile pipeline 2;

[0061] The on-site equipment parameters include the flow characteristic curve of the water supply pump and its rated operating parameters, and the specification parameters of the delivery pipeline, joints and valves.

[0062] It can be understood that the rated operating parameters of the mobile water replenishment equipment system are determined according to the on-site working conditions, including rated flow, rated pressure, rated speed, and rated head. The specification parameters of the water replenishment pump include its flow characteristic curve, which is determined according to the model and specifications of the selected water replenishment pump. The specification parameters of the delivery pipeline include its roughness, diameter and length, among which the roughness can be referred to in relevant literature or provided by the manufacturer, and the diameter and length can be measured by tools such as rulers. The specification parameters of the joint include its angle and the diameter of the pipe connected to its end, among which the angle and diameter can be measured by tools such as rulers. The specification parameters of the valve include its opening and flow coefficient, among which the opening and flow coefficient can be referred to in relevant literature or provided by the manufacturer.

[0063] S30: setting the defined pressure boundaries of the inlet and outlet of the first pipeline model, and calculating the emergency water replenishment flow rate of the first spent fuel pool through fluid system simulation analysis software.

[0064] It can be understood that the calculation condition range is set according to the pressure boundaries of the inlet and outlet of the first pipeline model after the definition, and the emergency water replenishment flow rate of the first spent fuel pool can be obtained by simulation calculation through the fluid system simulation analysis software. Among them, the pressure boundaries of the inlet and outlet of the mobile water replenishment equipment system can be based on the experience of the staff or assumed through previous working conditions, and can also be set according to the following method steps S311-S315.

[0065] In step S30, the following sub-steps are included:

[0066] S31: setting the defined pressure boundaries of the inlet and outlet of the first pipeline model, and calculating the first inlet pressure and the first outlet pressure of the mobile pipeline 21 in the first pipeline model by means of fluid system simulation analysis software;

[0067] S32: Calculating a first pressure loss along the moving pipeline 21 according to a first inlet pressure and a first outlet pressure of the moving pipeline 21;

[0068] S33: According to the first along-the-line pressure loss of the mobile pipeline 21, the emergency water replenishment flow rate of the first spent fuel pool is calculated by the fluid system simulation analysis software.

[0069] It can be understood that, first, the pressure boundaries of the mobile water replenishment equipment system at its inlet and outlet ends are set, and the pressure boundary data is combined with the defined first pipeline model, and the pipeline fluid flow is simulated by the fluid system simulation analysis software, and the first inlet pressure and the first outlet pressure of the mobile pipeline 21 are calculated; and the first along-the-way pressure loss of the mobile pipeline 21 can be obtained by subtracting the first inlet pressure and the first outlet pressure of the mobile pipeline 21; and the emergency water replenishment flow rate of the first spent fuel pool can be obtained by substituting the first along-the-way pressure loss of the mobile pipeline 21 into the relevant pipeline pressure loss calculation formula; wherein, the Flowmaster software contains the calculation formula for this part of the pipeline pressure loss, and the emergency water replenishment flow rate of the first spent fuel pool can be directly obtained by substituting the corresponding data.

[0070] Furthermore, in step S31, the method for setting the pressure boundaries of the inlet and outlet of the mobile water replenishment equipment system includes the following sub-steps:

[0071] S311: Use the incompressible steady-state model in the fluid system simulation analysis software to simulate the fluid flow based on the first pipeline model, and obtain the static pressure at the inlet end through the Bernoulli equation;

[0072] S312: The dynamic pressure is corrected according to the flow velocity result obtained by simulation;

[0073] S313: Select a reference surface and obtain the position pressure head according to the static pressure at the inlet end;

[0074] S314: Calculate the outlet total pressure according to the inlet static pressure, dynamic pressure and position pressure head;

[0075] S315: According to the static pressure at the inlet and the total pressure at the outlet, the pressure boundaries of the inlet and outlet of the first pipeline model are set.

[0076] It can be understood that the fluid flow is simulated on the first pipeline model using fluid system simulation analysis software to obtain the static pressure, dynamic pressure and position pressure head at the inlet end; since the total pressure is equal to the sum of the static pressure, dynamic pressure and position pressure head at the inlet end, the total pressure at the outlet can be calculated based on the static pressure, dynamic pressure and position pressure head at the inlet end. The pressure boundaries of the inlet and outlet ends of the first pipeline model are the static pressure at the inlet end and the total pressure at the outlet, respectively.

[0077] For example: the static pressure at the inlet is set to 1.01 bar, the dynamic pressure is corrected to 0.0235 bar according to the simulated flow rate result, the position pressure head is 1.96 bar, and the total pressure at the outlet is 3.0 bar; therefore, the pressure boundary at the inlet of the first pipeline model is 1.01 bar, and the pressure boundary at its outlet is 3.0 bar.

[0078] S40: Determine whether the emergency water replenishment flow rate of the first spent fuel pool is greater than the preset design requirement. If so, it means that the preset pipe 56 can be used as the mobile pipeline 21 in the mobile water replenishment equipment system, otherwise it cannot be replaced.

[0079] Understandably, the pre-set design requirements vary from one nuclear power plant to another.

[0080] In the first embodiment, the preset tube 56 adopts MILEFLEX polyurethane flat hose, which adopts the core one-time co-extrusion technology. The one-time extrusion technology is a technology that uses special processes and equipment to thermoform the inner and outer layers of polymer materials at the same time on the woven belt blank (reinforcement layer). The inner and outer layers of the hose produced by this technology have no glue adhesion, and there are no vents on the surface for rubber lining. The polymer layer and the belt also form a "concrete" type mixed structure, which greatly enhances the peeling strength and durability of the hose. There will be no delamination or degumming after long-term use. At the same time, the middle pressure-bearing fiber is preserved in a vacuum state, which greatly guarantees the service life of the hose.

[0081] MILEFLEX hose consists of a three-layer structure, namely an inner rubber layer, an outer rubber layer, and a reinforcing layer. The inner and outer rubber layers are made of polyurethane, nitrile rubber, or modified nitrile rubber, and the middle reinforcing layer is woven from polyester or aramid.

[0082] The specification parameters of the MILEFLEX hose are substituted into the software, wherein the roughness of the MILEFLEX hose is obtained according to the technical manual provided by the manufacturer, the diameter is DN100, and the total length is 700m; the pressure boundary of the inlet end is set to 1.01bar and the pressure boundary of the outlet end is set to 3.0bar. After calculation by the fluid system simulation analysis software, the first inlet pressure of the mobile pipeline 21 is 10.22bar, and the first outlet pressure is 2.37bar. It can be seen that the first pressure loss along the way is 7.8bar; according to the pipeline pressure loss calculation formula or directly calculated by the fluid system simulation analysis software, the emergency water replenishment flow rate of the first spent fuel pool is 80.2m3 / h; in this embodiment, the preset design requirement is set to 50m 3 / h; it can be seen that the design requirements are met.

[0083] Furthermore, the nuclear power plant emergency water supply pipeline replacement simulation method also includes a verification step, as follows:

[0084] S50: constructing an experimental pipeline system 5 including a preset pipe 56, and testing and calculating to obtain actual performance parameters of the preset pipe 56;

[0085] The experimental pipeline system 5 includes a first main pumping line for extracting water, a water tank 53 connected to the first main pumping line to store water, a second main pumping line connected to the water tank 53 to extract water from the water tank, a preset pipe 56 connected to the second main pumping line, and a regulating valve 57 provided at the outlet of the preset pipe 56;

[0086] The actual performance parameters include the second inlet pressure, the second outlet pressure, the second pressure loss along the preset pipe 56, its flow rate and its flow characteristic relationship.

[0087] S51: Input the second along-the-line pressure loss of the preset pipe 56 into the fluid system simulation analysis software to correct the defined first pipeline model and obtain the corrected first pipeline model.

[0088] S52: Based on the modified first pipeline model, the emergency water replenishment flow rate of the second spent fuel pool is calculated by fluid system simulation analysis software.

[0089] S53: Determine whether the emergency water replenishment flow rate of the second spent fuel pool is greater than the preset design requirement. If so, it means that the preset pipe 56 can be used as the mobile pipeline 21 in the mobile water replenishment equipment system, otherwise it cannot be replaced.

[0090] It can be understood that the experimental pipeline system 5 can be regarded as a small mobile water replenishment equipment system. The actual pressure loss and flow characteristic relationship along the preset pipe 56 can be obtained through the experimental pipeline system 5. Substituting the actual performance parameters into the first pipeline model can play a correction role.

[0091] like Figure 5 As shown, in some embodiments, the experimental pipeline system 5 includes a first water pumping main line, a water tank 53, a second water pumping main line, a preset pipe 56 and a regulating valve 57;

[0092] It can be understood that storing the water source in the water tank 53 through the first pumping main line can reduce errors and avoid the impact of water source shock; and then transporting water to the preset pipe 56 through the second pumping main line to measure the actual performance parameters of the preset pipe 56.

[0093] The first main pumping line includes a first hand-lift pump 52 and a third pumping pipe 51, wherein the third pumping pipe 51 is respectively connected to a water source and a water tank 53, and the first hand-lift pump 52 is arranged in the third pumping pipe 51 to provide power for drawing water from the water source to the water tank 53. In some embodiments, the water source may be a fire hydrant.

[0094] The second main pumping circuit includes a second hand-lift pump 54 and a fourth pumping pipe 55. The fourth pumping pipe 55 is connected to the water tank 53 and one end of the second hand-lift pump 54 respectively. The other end of the second hand-lift pump 54 is connected to the preset pipe 56. The second hand-lift pump 54 provides power to draw water from the water tank 53 to the preset pipe 56. In some embodiments, the second main pumping circuit also includes a water distribution pipe, a first flow meter 58 and a first pressure gauge 59; the second hand-lift pump 54 is connected to the preset pipe 56 through the water distribution pipe, and the first flow meter 58 and the first pressure gauge 59 are arranged at the outlet of the second hand-lift pump 54, and are used to measure the flow rate and pressure at the water outlet of the second hand-lift pump 54, that is, to measure the flow rate and pressure at the inlet of the preset pipe 56.

[0095] The experimental pipeline system 5 also includes an adapter and a second pressure gauge 60. The outlet of the preset pipe 56 is connected to the regulating valve 57 through the adapter. The outlet of the regulating valve 57 can be connected to the drain to discharge water. The second pressure gauge 60 is arranged at the outlet of the preset pipe 56 to measure the pressure at the outlet of the preset pipe 56.

[0096] Furthermore, the third water pumping pipe 51 may be a fire hose.

[0097] Furthermore, the water distribution pipe is an F-type water distribution pipe, a first end of which is connected to the second hand-lift pump 54 , a second end of which is connected to the preset pipe 56 , and a third end of which is connected to the first flow meter 58 and the first pressure gauge 59 .

[0098] The working process of the experimental pipeline system 5 is:

[0099] First, complete the connection relationship of each component in the experimental pipeline system 5;

[0100] Start the first hand-lift pump 52 to fill the water tank 53 to more than 80%, and note that the water level of the water tank 53 must not be lower than the water level of the water outlet of the water tank 53;

[0101] Start the second hand-lift pump 54 and open the regulating valve 57, adjust the throttle of the second hand-lift pump 54, and the water in the water tank 53 flows into the drainage ditch through the fourth pumping pipe 55 and the preset pipe 56. Observe each pressure gauge and flow meter, and record the outlet pressure and outlet flow of the second hand-lift pump 54, as well as the pressure at the outlet of the preset pipe 56.

[0102] Optionally, the throttle of the second hand lift pump 54 is adjusted to its rated power.

[0103] By subtracting the outlet pressure of the second hand-lift pump 54 from the pressure at the outlet of the preset pipe 56 , the second along-the-way pressure loss of the preset pipe 56 can be obtained; the flow rate of the preset pipe 56 can be calculated based on the second along-the-way pressure loss and the outlet flow rate of the second hand-lift pump 54 .

[0104] In the first embodiment, based on the modified first pipeline model, after calculation by the fluid system simulation analysis software, the second inlet pressure of the mobile pipeline 21 is 11.08 bar, and the second outlet pressure is 2.27 bar. It can be seen that the second pressure loss along the way is 8.81 bar. According to the pipeline pressure loss calculation formula or directly calculated by the fluid system simulation analysis software, the emergency water replenishment flow rate of the second spent fuel pool is 67.78 m3 / h, which still meets the design requirements.

[0105] Therefore, the MILEFLEX hose can replace the RTP pipe used in the related art and be applied to the mobile pipeline 21 of the mobile water replenishment equipment system. Based on this, the present invention also constructs a mobile water replenishment equipment system, including a pumping pipeline 1 for extracting water from the external water source of the nuclear power plant, a fixed pipeline 4 fixed in the nuclear power plant and leading to the spent fuel pool, and a mobile pipeline 2 for connecting the pumping pipeline 1 and the fixed pipeline 4; the mobile pipeline 2 includes a mobile pipeline 21 for connection, and the mobile pipeline 21 is formed by connecting multiple MILEFLEX polyurethane flat hoses.

[0106] It can be understood that the above embodiments only express the preferred implementation modes of the present invention, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the patent scope of the present invention. It should be pointed out that, for ordinary technicians in this field, the above technical features can be freely combined without departing from the concept of the present invention, and several deformations and improvements can be made, which all belong to the protection scope of the present invention. Therefore, all equivalent changes and modifications made to the scope of the claims of the present invention should belong to the coverage of the claims of the present invention.

Claims

1. A nuclear power plant emergency water supply pipeline replacement simulation method, characterized in that: The following steps are included: S10: establishing a corresponding first pipeline model in the fluid system simulation analysis software according to the actual pipeline arrangement and on-site equipment of the mobile water replenishment equipment system; The first pipeline model comprises a water extraction pipeline (1) for extracting water from an external water source of the nuclear power plant, a fixed pipeline (4) fixed in the nuclear power plant and leading to the spent fuel pool, and a mobile pipeline (2) for connecting the water extraction pipeline (1) and the fixed pipeline (4); wherein the mobile pipeline (2) comprises a mobile pipeline (21) for connection, and the mobile pipeline (21) is formed by connecting a plurality of preset pipes (56); S20: Obtain parameters of the field equipment in the mobile water replenishment equipment system, input them into the fluid system simulation analysis software, and obtain a defined first pipeline model; The on-site equipment includes a water replenishment pump, a plurality of delivery pipelines for delivering water, a plurality of joints for connecting the delivery pipelines, and a plurality of valves for switching fluids; the delivery pipeline includes the pipelines in the water pumping pipeline (1), the fixed pipeline (4), and the mobile pipeline (2); The on-site equipment parameters include the rated operating parameters of the mobile water replenishment equipment system, and the specification parameters of the water replenishment pump, delivery pipeline, joint and valve; S30: setting the pressure boundaries of the inlet and outlet of the defined first pipeline model, and calculating the emergency water replenishment flow rate of the first spent fuel pool through the fluid system simulation analysis software; S40: Determine whether the emergency water replenishment flow rate of the first spent fuel pool is greater than a preset design requirement; if so, it means that the preset pipe (56) can be used as the mobile pipeline (21) in the mobile water replenishment equipment system; otherwise, it cannot be replaced.

2. The nuclear power plant emergency water supply pipeline replacement simulation method according to claim 1 is characterized in that: In step S30, the following sub-steps are included: S31: setting pressure boundaries at the inlet and outlet of the mobile water replenishment equipment system, and calculating the first inlet pressure and the first outlet pressure of the mobile pipeline (21) in the defined first pipeline model through the fluid system simulation analysis software; S32: Calculating a first pressure loss along the moving pipeline (21) according to a first inlet pressure and a first outlet pressure of the moving pipeline (21); S33: According to the first along-the-way pressure loss, the fluid system simulation analysis software calculates the emergency water replenishment flow rate of the first spent fuel pool.

3. The nuclear power plant emergency water supply pipeline replacement simulation method according to claim 1 is characterized in that: The following verification steps are also included: S50: constructing an experimental pipeline system (5) including the preset pipe (56), testing and calculating to obtain actual performance parameters of the preset pipe (56); the actual performance parameters include a second inlet pressure, a second outlet pressure, a second pressure loss along the preset pipe (56), a flow rate, and a flow rate characteristic relationship; S51: inputting the second along-the-line pressure loss and flow characteristic relationship of the preset pipe (56) into the fluid system simulation analysis software to correct the defined first pipeline model, thereby obtaining a corrected first pipeline model; S52: Based on the modified first pipeline model, the emergency water replenishment flow rate of the second spent fuel pool is calculated by the fluid system simulation analysis software; S53: Determine whether the emergency water replenishment flow rate of the second spent fuel pool is greater than the preset design requirement; if so, it means that the preset pipe (56) can be used as the mobile pipeline (21) in the mobile water replenishment equipment system; otherwise, it cannot be replaced.

4. The nuclear power plant emergency water supply pipeline replacement simulation method according to claim 3 is characterized in that: The experimental pipeline system (5) includes a first main pumping circuit for extracting water from a water source, a water tank (53) connected to the first main pumping circuit for storing the water source, a second main pumping circuit connected to the water tank (53) for extracting water from the water tank (53), the preset pipe (56) connected to the second main pumping circuit, and a regulating valve (57) provided at the outlet of the preset pipe (56).

5. The nuclear power plant emergency water supply pipeline replacement simulation method according to claim 4 is characterized in that: The first main water pumping circuit comprises a third water pumping pipeline (51), and a first hand-lift pump (52) arranged in the third water pumping pipeline (51) to provide water delivery power, and the third water pumping pipeline (51) is respectively connected to a water source and the water tank (53).

6. The nuclear power plant emergency water supply pipeline replacement simulation method according to claim 4 is characterized in that: The second water pumping main circuit comprises a second hand-lift pump (54) for providing water delivery power, and a fourth water pumping pipeline (55); The fourth water pumping pipeline (55) is respectively connected to one end of the second hand pump (54) and the water tank (53), and the other end of the second hand pump (54) is connected to the preset pipe (56).

7. The nuclear power plant emergency water supply pipeline replacement simulation method according to claim 4 is characterized in that: The experimental pipeline system (5) also includes a first flow meter (58) and a first pressure gauge (59) arranged at the inlet of the preset pipe (56), and a second pressure gauge (60) arranged at the outlet of the preset pipe (56).

8. The nuclear power plant emergency water supply pipeline replacement simulation method according to any one of claims 1 to 7, characterized in that: The fluid system simulation analysis software adopts Flowmaster software.

9. The nuclear power plant emergency water supply pipeline replacement simulation method according to any one of claims 1 to 7, characterized in that: The preset pipe (56) is made of MILEFLEX polyurethane flat hose.

Citation Information

Patent Citations

  • Emergency water supplement system for spent fuel pool of nuclear power station

    CN103680646A

  • Chemical dosing and liquid replenishment device and method for nuclear power plant containment filtration and discharge system

    CN110379533A

  • Mobile emergency cooling apparatus for spent fuel pool of nuclear power plant

    WO2019184432A1