Organizational process management method, device, electronic equipment and storage medium
Automatically obtaining and recording project process information and generating project reports through electronic devices, solving the problem of wasted time and energy caused by handwritten records, and improving the efficiency of project progress management and the accuracy of reporting.
Patent Information
- Application Number
- CN202210175909.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-02-24
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2042-02-24
AI Technical Summary
During the project implementation process, project implementers rely on handwritten records, resulting in wasted time and energy. Paper reports are inconvenient to preserve and manage, making it difficult to effectively record the progress of the project.
Through an organizational process management method, electronic devices use to obtain process request information when the project establishment instructions are detected, project identification information is determined, and process progress nodes and relationship matrix are obtained during the project implementation process, project reports are generated, and handwriting recording steps are reduced. And generate a unified format project report when completing the project.
The electronic equipment is automatically recorded project progress, eliminating the handwritten recording steps of project implementers, improving the convenience of project leaders to understand project progress, and optimizing information acquisition and report generation through urgency weights and relationship matrix.
Smart Images

Figure CN114648206B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of computer technology, and in particular to an organizational process management method, device, electronic device and storage medium. Background Art
[0002] During the project implementation process, in order to facilitate the project leader to timely understand the progress of the project implementation, the project implementers need to report to the project leader when the project implementation progresses to each new stage, and organize the contract, implementation progress and other relevant data into the project establishment report, project implementation report and project completion report.
[0003] In the related art, during the project implementation process, the project implementers rely on handwritten records to keep records of each stage. However, handwritten records consume the time and energy of the project implementers, and paper reports are not easy to preserve, which makes it inconvenient to record the progress of the project. Summary of the invention
[0004] In order to facilitate the recording of project process progress, the present application provides an organizational process management method, device, electronic device and storage medium.
[0005] In the first aspect, the present application provides an organizational process management method, which adopts the following technical solution:
[0006] An organizational process management method, comprising:
[0007] When a project establishment instruction triggered by a user is detected, the process request information of the terminal device is obtained;
[0008] Determining project identification information based on the process request information of the terminal device;
[0009] Based on the project identification information, obtaining process progress node information and a relationship matrix of the process progress node information;
[0010] When a project closing instruction triggered by a user is detected, a project report is generated based on the project identification information, the process progress node information, and a relationship matrix of the process progress node information.
[0011] By adopting the above technical solution, the electronic device can obtain the process request information when the user triggers the project establishment instruction, and determine the identification information such as the project name from it, eliminating the step of project implementation personnel manually recording project establishment matters when establishing the project. During the project implementation process, the electronic device obtains the process progress nodes and the related relationship matrix to obtain the progress of the project implementation, and generates a project report when the user triggers the project completion instruction, so as to record various process matters during the project implementation process, so as to facilitate the project leader to understand the progress of the project implementation.
[0012] In another possible implementation manner, determining the project identification information based on the process request information of the terminal device includes:
[0013] Responding to the process request information of the terminal device, and performing word segmentation processing on the process request information of the terminal device to obtain word segmentation information;
[0014] Inputting the word segmentation information into a feature extraction model to obtain feature information;
[0015] Based on the feature information, project identification information is determined, where the project identification information includes a project name and information corresponding to the project name.
[0016] By adopting the above technical solution, the electronic device first performs word segmentation processing on the process request information to reduce the workload of the electronic device in the data processing process. Then, the features are extracted from the word segmentation information, and the project identification related information is determined from the feature information, so as to save the steps for the project implementers and the person in charge and other relevant personnel to check the implementation reports of each project in turn, so as to facilitate the relevant personnel to obtain the project identification information.
[0017] In another possible implementation, the obtaining of process progress node information includes at least one of the following:
[0018] Obtain process progress node information of the terminal device at preset intervals;
[0019] Perform key point prediction based on the project identification information, and when a project key point appears in the prediction result, obtain process progress node information;
[0020] Get process progress node information in real time.
[0021] By adopting the above technical solution, the electronic device can obtain the process progress node information at preset time intervals, which can reduce power loss; or when a key point of the project appears, the electronic device obtains the process progress node information to flexibly obtain the process progress node information according to the actual situation of the project; or the electronic device obtains the process progress node information in real time to reduce the possibility of missing a certain process progress node information.
[0022] In another possible implementation, when a key point of the project appears, the process progress node information is obtained, and then the following is further included:
[0023] Based on the prediction results, determine the urgency of the process progress node information;
[0024] Based on the urgency of the process progress node information, a weight corresponding to the process progress node information is allocated.
[0025] By adopting the above technical solution, the electronic device can determine the urgency of each process progress node information and assign different weights to process progress node information of different urgency levels, so that project implementers, persons in charge and other relevant personnel can directly understand the more important process progress node information in the process progress node related information.
[0026] In another possible implementation, obtaining the relationship matrix of the process progress node information includes:
[0027] Determine the event information of the process progress node information and related event information;
[0028] Establishing a matching relationship between the event information of the process progress node information and the related event information and features of the relationship matrix;
[0029] The corresponding filter function is configured according to the matching relationship to form a filter function matrix, and then a corresponding relationship matrix is formed.
[0030] By adopting the above technical solution, the electronic device can determine the event information and related event information corresponding to the process progress node, and establish a matching relationship between the event and the feature, so as to obtain the related process progress node information to obtain all the process progress node information.
[0031] In another possible implementation, when a user-triggered project closing instruction is detected, generating a project report based on the project identification information, the process progress node information, and a relationship matrix of the process progress node information includes:
[0032] When a user-triggered project closing instruction is detected, a project report template is obtained;
[0033] Determining a data group based on the process progress node information and a relationship matrix of the process progress node information;
[0034] The data set is imported into the project report template to generate a project report.
[0035] By adopting the above technical solution, the electronic device can obtain the project report template, and determine the process progress node information and the relationship matrix as a data group, so as to obtain a project report template in a unified format, and import the data group into the project report template, so that project implementers and persons in charge can view the project report.
[0036] In another possible implementation manner, before importing the data set into the project report template to generate a project report, the step further includes:
[0037] Send a request for project closing reason to the terminal device, and receive the project closing reason returned by the terminal device;
[0038] Performing anomaly detection on the closing reason returned by the terminal device;
[0039] If the reasons for project closing returned by the terminal device contain abnormal items, the step of generating a project report will not be performed.
[0040] By adopting the above technical solution, the electronic device can receive the project completion reasons returned by the terminal device and perform abnormality detection on the project completion reasons. When there are abnormal items in the project completion reasons, the project report is not generated, so as to reduce the situation where the generated project report is unqualified when the project is closed with abnormal reasons.
[0041] In a second aspect, the present application provides a device for organizing process management, which adopts the following technical solution:
[0042] An organizational process management device, comprising:
[0043] A first acquisition module is used to acquire process request information of a terminal device when a project establishment instruction triggered by a user is detected;
[0044] A first determination module, configured to determine project identification information based on the process request information of the terminal device;
[0045] A second acquisition module is used to acquire process progress node information and a relationship matrix of the process progress node information based on the project identification information;
[0046] A generation module is used to generate a project report based on the project identification information, the process progress node information and the relationship matrix of the process progress node information when a user-triggered project closing instruction is detected.
[0047] By adopting the above technical solution, the first acquisition module can obtain the process request information when the user triggers the project establishment instruction, and the first determination module can determine the project name and other identification information from it, eliminating the step of project implementation personnel manually recording project establishment matters when establishing the project. During the project implementation process, the second acquisition module obtains the process progress nodes and the related relationship matrix to obtain the project implementation progress, and when the user triggers the project completion instruction, the generation module generates a project report to record various process matters during the project implementation process, so as to facilitate the project leader to understand the project implementation progress.
[0048] In another possible implementation, when the first determining module determines the project identification information based on the process request information of the terminal device, it is specifically configured to:
[0049] Responding to the process request information of the terminal device, and performing word segmentation processing on the process request information of the terminal device to obtain word segmentation information;
[0050] Inputting the word segmentation information into a feature extraction model to obtain feature information;
[0051] Based on the feature information, project identification information is determined, where the project identification information includes a project name and information corresponding to the project name.
[0052] In another possible implementation, when the second acquisition module acquires the process progress node information, it is specifically used for at least one of the following:
[0053] Obtain process progress node information of the terminal device at preset intervals;
[0054] Perform key point prediction based on the project identification information, and when a project key point appears in the prediction result, obtain process progress node information;
[0055] Get process progress node information in real time.
[0056] In another possible implementation, the device further includes: a second determining module and an allocating module, wherein:
[0057] A second determination module is used to determine the urgency of the process progress node information based on the prediction result;
[0058] The allocation module is used to allocate the weight corresponding to the process progress node information based on the urgency of the process progress node information.
[0059] In another possible implementation, when the second acquisition module is a relationship matrix of the process progress node information, it is specifically used to:
[0060] Determine the event information of the process progress node information and related event information;
[0061] Establishing a matching relationship between the event information of the process progress node information and the related event information and features of the relationship matrix;
[0062] The corresponding filter function is configured according to the matching relationship to form a filter function matrix, and then a corresponding relationship matrix is formed.
[0063] In another possible implementation, when the generation module detects a user-triggered project closing instruction, when generating a project report based on the project identification information, the process progress node information, and the relationship matrix of the process progress node information, it is specifically used to:
[0064] When a user-triggered project closing instruction is detected, a project report template is obtained;
[0065] Determining a data group based on the process progress node information and a relationship matrix of the process progress node information;
[0066] The data set is imported into the project report template to generate a project report.
[0067] In another possible implementation, the device further includes: a receiving module, a detecting module, and an executing module, wherein:
[0068] A receiving module, used to send a request for project closing reason to the terminal device, and receive the project closing reason returned by the terminal device;
[0069] A detection module, used for performing abnormality detection on the closing reason returned by the terminal device;
[0070] The execution module is used for not executing the step of generating a project report if there are abnormal items in the project closing reasons returned by the terminal device.
[0071] In a third aspect, the present application provides an electronic device, which adopts the following technical solution:
[0072] An electronic device, comprising:
[0073] at least one processor;
[0074] Memory;
[0075] At least one application, wherein the at least one application is stored in the memory and configured to be executed by the at least one processor, and the at least one application is configured to: execute an organizational process management method shown in any possible implementation of the first aspect.
[0076] In a fourth aspect, the present application provides a computer-readable storage medium, which adopts the following technical solution:
[0077] A computer-readable storage medium includes: a computer program that can be loaded and executed by a processor to implement an organizational process management method shown in any possible implementation of the first aspect.
[0078] In summary, the present application includes at least one of the following beneficial technical effects:
[0079] 1. When the user triggers the project establishment instruction, the electronic device can obtain the process request information and determine the project name and other identification information from it, eliminating the need for project implementers to record project establishment matters by hand. During the project implementation process, the electronic device obtains the process progress nodes and related relationship matrices to obtain the project implementation progress, and generates a project report when the user triggers the project completion instruction, so as to record various process matters during the project implementation process, so as to facilitate the project leader to understand the project implementation progress;
[0080] 2. The electronic device can determine the urgency of each process progress node information and assign different weights to process progress node information of different urgency levels, so that project implementers, responsible persons and other relevant personnel can directly understand the more important process progress node information in the process progress node related information. BRIEF DESCRIPTION OF THE DRAWINGS
[0081] Figure 1 It is a flowchart of an organizational process management method according to an embodiment of the present application.
[0082] Figure 2 It is a schematic diagram of the structure of an organization process management device according to an embodiment of the present application.
[0083] Figure 3 It is a structural schematic diagram of an electronic device according to an embodiment of the present application. DETAILED DESCRIPTION
[0084] The following is attached to the instruction manual Figure 1 -Attached Figure 3 The embodiments of the present application are described in further detail.
[0085] This specific embodiment is merely an explanation of the present application and is not a limitation of the present application. After reading this specification, those skilled in the art may make modifications to the present embodiment without any creative contribution as needed, but such modifications are protected by the patent law as long as they are within the scope of the claims of the present application.
[0086] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0087] In addition, the term "and / or" in this article is only a description of the association relationship of associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article, unless otherwise specified, generally means that the associated objects before and after are in an "or" relationship.
[0088] In the embodiments of the present application, the description is mainly based on the scenario of project implementation, but it is not intended to limit the embodiments of the present application.
[0089] In order to better implement the organizational process management method, the following is explained through specific embodiments in conjunction with the accompanying drawings.
[0090] The embodiment of the present application provides an organizational process management method, which is executed by an electronic device, which can be a server or a terminal device, wherein the server can be an independent physical server, or a server cluster or a distributed system composed of multiple physical servers. The terminal device can be a smart phone, a tablet computer, a laptop computer, a desktop computer, etc., but is not limited thereto, and the embodiment of the present application does not limit this.
[0091] The embodiment of the present application provides an organizational process management method that can acquire, collect and store relevant data information, including project-related information such as contract data, and update project progress and generate a completion report.
[0092] Furthermore, the present application embodiment provides a method for managing an organizational process, such as Figure 1 , an example is given to implement an organizational process management method as follows:
[0093] Step S101, when a project establishment instruction triggered by a user is detected, the process request information of the terminal device is obtained.
[0094] For the embodiments of the present application, the user includes any user of the project-related personnel such as the project implementer or the project leader, and the project establishment means that the project has obtained permission and can enter the implementation stage. Project investment is divided into review, approval and filing. Among them, the review and approval includes the project proposal, feasibility report and preliminary design. When the electronic device detects the project establishment instruction triggered by the user, it means that the project has obtained the project proposal or feasibility study report of the approved project, and the process request information of the terminal device is obtained, including the project establishment request.
[0095] Step S102: determining project identification information based on the process request information of the terminal device.
[0096] For the embodiment of the present application, the process request information includes a project establishment process request, a contract process request, and a business order process request, and the project identification information includes relevant information such as the project name, start time, end time, project implementer, project leader, and delivery cycle. The electronic device can parse the process request information of the terminal device and determine the project identification information from the parsing result.
[0097] Step S103: based on the project identification information, obtain process progress node information and a relationship matrix of the process progress node information.
[0098] For the embodiment of the present application, the electronic device obtains the process progress node information corresponding to the current project name based on information such as the project name, and the process progress node information includes: "Not started" and "Completed" node information, etc., and can also include "In progress" and several small node information within "In progress". Obtain the relationship matrix of the process progress node information: Each process progress node information corresponds to a process event, and an orthogonal matrix is constructed based on the influencing factors such as the event type and importance of the process event, as well as the attribute factors such as the department to which the process event belongs and the relevant personnel, to form a relationship matrix of the process progress node information.
[0099] Step S104, when a project closing instruction triggered by a user is detected, a project report is generated based on the project identification information, the process progress node information, and the relationship matrix of the process progress node information.
[0100] For the embodiment of the present application, the completion of a project refers to the final acceptance of the project implementation. When the project is completed, when the electronic device detects the completion instruction triggered by the project implementation user, the project is completed and the superior is requested to conduct acceptance. If there is no problem with the acceptance, it means that the project is completed. The project report includes a project completion report, which generally includes project background, project information, main achievements, and reasons for applying for completion.
[0101] Specifically, in the embodiment of the present application, in step S102, the project identification information is determined based on the process request information of the terminal device, which may specifically include step S1021 (not shown in the figure), step S1022 (not shown in the figure), and step S1023 (not shown in the figure), wherein:
[0102] Step S1021, responding to the process request information of the terminal device, and performing word segmentation processing on the process request information of the terminal device to obtain word segmentation information.
[0103] In the embodiment of the present application, the process request information contains many words. In order to facilitate determining the project-related information from the process request information, the process request information is segmented.
[0104] Specifically, word segmentation includes using a word segmentation algorithm of a dictionary, that is, matching character strings. For example, "About the first signing and version communication of the XXX contract between our company and XXX company" will be divided into "About / our company / and / XXX company / XXX contract / first / signing / version / communication matters". Word segmentation can also be performed based on a statistical word segmentation algorithm, for example, using an HMM (Hidden Markov Model) model and deep learning to perform word segmentation on process request information.
[0105] Step S1022, input the word segmentation information into the feature extraction model to obtain feature information.
[0106] For the embodiment of the present application, the word segmentation information is subjected to feature extraction: the word segmentation method can be processed by principal component analysis, the word segmentation information is subjected to orthogonal transformation to identify variables that may have a correlation, and the variable is determined as the principal component, and the features extracted from the word segmentation information are used to generate a feature matrix. For example, the feature information in "About / our company / and / XXX company / XXX contract / first / signing / version / communication matters" includes "our company / XXX company / XXX contract / first time", which reduces the amount of data processed by electronic equipment.
[0107] Step S1023: determining project identification information based on the feature information, where the project identification information includes the project name and information corresponding to the project name.
[0108] For the embodiment of the present application, the electronic device determines the project name and the related information corresponding to the project name from the feature information. Specifically, the electronic device can traverse the process request information of the terminal device, and perform word segmentation and feature extraction on the process request information in turn.
[0109] Specifically, in the embodiment of the present application, the process node information is obtained in step S103, which may include at least one of step S1031 (not shown in the figure), step S1032 (not shown in the figure), and step S1033 (not shown in the figure), wherein:
[0110] Step S1031, obtaining process progress node information of the terminal device at preset time intervals.
[0111] For the embodiment of the present application, the preset time can be 24 hours or one week according to the complexity and cycle of the project implementation. The electronic device can also obtain the preset time input by the project implementation personnel, obtain the progress process node information every preset time, and when the electronic device does not obtain the process progress node information, the electronic device can be in a dormant state.
[0112] Step S1032, perform key point prediction based on the project identification information, and when the key point prediction result shows a project key point, obtain process progress node information.
[0113] For the embodiment of the present application, the key point of the project refers to the node that has a greater impact on the project duration, that is, the key monitoring object that needs to be monitored during the project implementation. Before obtaining the process progress node information, the process progress node is predicted first. For example, if the project cycle is from January 1 to January 10, then on January 5, the project implementation may have a key point.
[0114] Step S1033, obtaining process progress node information in real time.
[0115] For the embodiment of the present application, the electronic device obtains each process progress node information in real time to obtain more comprehensive process progress node information and reduce the possibility of missing a certain process progress node information.
[0116] In a possible implementation manner of the embodiment of the present application, the method may further include: step S1032a (not shown in the figure) and step S1032b (not shown in the figure), wherein step S1032a (not shown in the figure) and step S1032b (not shown in the figure) may be performed after step S1032 (not shown in the figure), wherein:
[0117] Step S1032a, based on the key point prediction results, determine the urgency of the process progress node information.
[0118] For the embodiments of the present application, the key point prediction results include the key nodes of the project, including nodes such as survey and design, construction preparation, planning and scheduling, engineering construction, production preparation and completion acceptance. The electronic device can use survey and design, engineering construction and completion acceptance as key points, and determine the urgency of survey and design, engineering construction and completion acceptance as the first level, the urgency of construction preparation and planning and scheduling as the second level, and the urgency of production preparation as the third level.
[0119] Step S1032b: allocating weights corresponding to the process progress node information based on the urgency of the process progress node information.
[0120] For the embodiment of the present application, a relatively high weight is assigned to the first-level process progress nodes, the second-highest weight is assigned to the second-level process progress nodes, and the lowest weight is assigned to the third-level process progress node information, so that project implementation personnel can timely understand the more important process progress node information.
[0121] Specifically, in the embodiment of the present application, the relationship matrix of the process progress node information obtained in step S103 may include step S1031 (not shown in the figure), step S1032 (not shown in the figure) and step S1033 (not shown in the figure), wherein:
[0122] Step S1031, determining event information of process progress node information and related event information.
[0123] For the embodiment of the present application, the electronic device can determine the event information corresponding to the process progress node information through the event analysis model. After the electronic device obtains the process progress node information, the process progress node information is preprocessed so that the format of the process progress node information meets the format of the electronic device data processing. The preprocessed process progress node information is then compared with the event library to determine the event information. The electronic device determines the relevant event information through the event association model, can mark the event, determine the classification of the event, and then determine the relevant event information based on the event classification.
[0124] Step S1032: Establishing a matching relationship between event information of the process progress node information and related event information and features of the relationship matrix.
[0125] For the embodiment of the present application, the electronic device can store the event information and the features of the related events and relationship matrix in the form of <event, vector>, and store <event, vector> in the event message queue. The features of the event information include start, planning, execution, monitoring and closing, etc., and a matching relationship between the event information and the features is established to obtain the relevant process progress node information according to the features.
[0126] Step S1033, configuring corresponding filter functions according to the matching relationships to form a filter function matrix, and then forming a corresponding relationship matrix.
[0127] For the embodiment of the present application, the matrix features corresponding to the event information are substituted into the filtering function, and based on the result of the filtering function, the events related to the process progress node information are added to the relationship matrix, and the events unrelated to the process progress node information are filtered out, thereby reducing the interference of irrelevant data.
[0128] Specifically, in the embodiment of the present application, when a user-triggered project closing instruction is detected in step S104, a project report is generated based on the project identification information, the process progress node information, and the relationship matrix of the process progress node information, which may specifically include step S1041 (not shown in the figure), step S1042 (not shown in the figure), and step S1043 (not shown in the figure), wherein:
[0129] Step S1041, when a project closing instruction triggered by a user is detected, a project report template is obtained.
[0130] For the embodiments of the present application, project completion refers to the final acceptance of project implementation. After the project implementation is completed, the electronic device can detect the project completion instruction triggered by the user, which means that the project has been implemented and is waiting for acceptance. If the acceptance is correct, it means that the project can be completed. Obtaining project report templates: The electronic device can obtain project report templates imported by project implementers, and can also obtain project report templates stored in the cloud, and can also automatically generate project report templates based on keywords entered by project implementers.
[0131] Step S1042, determining a data group based on the process progress node information and a relationship matrix of the process progress node information.
[0132] For the embodiment of the present application, the data group refers to the data source required to generate a project report, and the data group stores all the steps and events of the project from project establishment to implementation, and from implementation to completion.
[0133] Step S1043, importing the data group into the project report template to generate a project report.
[0134] For the embodiment of the present application, according to the format of the project report template, the project report is a report format corresponding to the format of the project report template. Specifically, the format of the project report includes but is not limited to any one of the formats of word format document, pdf format document, ppt format and Excel.
[0135] In a possible implementation manner of the embodiment of the present application, the method may further include: step Sa (not shown in the figure), step Sb (not shown in the figure) and step Sc (not shown in the figure), wherein step Sa (not shown in the figure), step Sb (not shown in the figure) and step Sc (not shown in the figure) may be performed before step S1043 (not shown in the figure), wherein,
[0136] Step Sa, sending a request for a reason for project completion to the terminal device, and receiving the reason for project completion returned by the terminal device.
[0137] For the embodiment of the present application, a request for project completion reasons is sent to the terminal device: the electronic device can obtain the list of project-related personnel through the project identification information, and send project completion reason requests to the project-related personnel in turn, and receive the project completion reasons entered by the project-related personnel.
[0138] Step Sb, performing anomaly detection on the closing reason returned by the terminal device.
[0139] For the embodiments of the present application, abnormality detection is performed on the reasons for project completion: the electronic device can input the reasons for project completion returned by the terminal device into a pre-trained neural network model, and use normal reasons for project completion and abnormal reasons for project completion and the corresponding labels "normal" and "abnormal" as training sample sets to train the neural network model to determine whether there are any abnormal items in the reasons for project completion returned by the terminal device.
[0140] In step Sc, if there are abnormal items in the project closing reasons returned by the terminal device, the step of generating a project report will not be executed.
[0141] For the embodiment of the present application, when the electronic device detects that there is an abnormal reason for closing the project, that is, the project cannot be closed normally, no project report is generated.
[0142] The above embodiment introduces an organization process management method by means of a method flow, and the following embodiment introduces an organization process management device from a virtual perspective. For details, please refer to the following embodiment:
[0143] The present application embodiment provides an organization process management device, such as Figure 2 As shown, the organization process management device 20 may specifically include:
[0144] The first acquisition module 201 is used to acquire process request information of the terminal device when a project establishment instruction triggered by a user is detected;
[0145] A first determination module 202, configured to determine project identification information based on process request information of a terminal device;
[0146] The second acquisition module 203 is used to acquire process progress node information and a relationship matrix of the process progress node information based on the project identification information;
[0147] The generating module 204 is used to generate a project report based on the project identification information, the process progress node information and the relationship matrix of the process progress node information when a project closing instruction triggered by a user is detected.
[0148] In another possible implementation of the embodiment of the present application, when the first determination module 202 determines the project identification information based on the process request information of the terminal device, it is specifically used to:
[0149] Responding to the process request information of the terminal device, and performing word segmentation processing on the process request information of the terminal device to obtain word segmentation information;
[0150] Input the word segmentation information into the feature extraction model to obtain feature information;
[0151] Based on the feature information, project identification information is determined, where the project identification information includes a project name and information corresponding to the project name.
[0152] In another possible implementation of the embodiment of the present application, the second acquisition module 203 is specifically used for at least one of the following when acquiring the process progress node information:
[0153] Obtain process progress node information of the terminal device at preset intervals;
[0154] Predict key points based on project identification information, and obtain process progress node information when a project key point appears in the prediction result;
[0155] Get process progress node information in real time.
[0156] In another possible implementation manner of the embodiment of the present application, the device further includes: a second determination module and an allocation module, wherein:
[0157] A second determination module is used to determine the urgency of the process progress node information based on the prediction result;
[0158] The allocation module is used to allocate weights corresponding to the process progress node information based on the urgency of the process progress node information.
[0159] In another possible implementation of the embodiment of the present application, the second acquisition module 203 is specifically used to:
[0160] Determine the event information of the process progress node information and related event information;
[0161] Establish the matching relationship between the event information of the process progress node information and the related event information and the characteristics of the relationship matrix;
[0162] The corresponding filter function is configured according to the matching relationship to form a filter function matrix, and then a corresponding relationship matrix is formed.
[0163] In another possible implementation of the embodiment of the present application, when the generation module detects a project closing instruction triggered by a user, the generation module generates a project report based on the project identification information, the process progress node information, and the relationship matrix of the process progress node information, specifically for:
[0164] When a user-triggered project closing instruction is detected, a project report template is obtained;
[0165] Determine a data group based on process progress node information and a relationship matrix of the process progress node information;
[0166] Import data groups into project report templates to generate project reports.
[0167] In another possible implementation manner of the embodiment of the present application, the device further includes: a receiving module, a detection module and an execution module, wherein:
[0168] A receiving module, used to send a request for project closing reason to the terminal device, and receive the project closing reason returned by the terminal device;
[0169] A detection module is used to detect abnormalities in the reasons for closing items returned by the terminal device;
[0170] The execution module is used for not executing the step of generating a project report if there are abnormal items in the project closing reasons returned by the terminal device.
[0171] The embodiment of the present application provides an organizational process management device. By adopting the above technical solution, the first acquisition module can obtain process request information when the user triggers the project establishment instruction, and the first determination module determines the project name and other identification information from it, eliminating the step of project implementation personnel handwriting records of project establishment matters when establishing the project. During the project implementation process, the second acquisition module obtains the process progress node and the related relationship matrix to obtain the project implementation progress, and when the user triggers the project closing instruction, the generation module generates a project report to facilitate the recording of various process matters in the project implementation process, so as to facilitate the project leader to understand the project implementation progress.
[0172] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working process of the device described above can refer to the corresponding process in the aforementioned method embodiment, and will not be repeated here.
[0173] The present application also provides an electronic device, such as Figure 3 As shown, Figure 3 The electronic device 30 shown includes: a processor 301 and a memory 303. The processor 301 and the memory 303 are connected, such as through a bus 302. Optionally, the electronic device 30 may also include a transceiver 304. It should be noted that in actual applications, the transceiver 304 is not limited to one, and the structure of the electronic device 30 does not constitute a limitation on the embodiments of the present application.
[0174] The processor 301 may be a CPU (Central Processing Unit), a general-purpose processor, a DSP (Digital Signal Processor), an ASIC (Application Specific Integrated Circuit), an FPGA (Field Programmable Gate Array) or other programmable logic devices, transistor logic devices, hardware components or any combination thereof. It may implement or execute various exemplary logic blocks, modules and circuits described in conjunction with the disclosure of this application. The processor 301 may also be a combination that implements computing functions, such as a combination of one or more microprocessors, a combination of a DSP and a microprocessor, etc.
[0175] The bus 302 may include a path to transmit information between the above components. The bus 302 may be a PCI (Peripheral Component Interconnect) bus or an EISA (Extended Industry Standard Architecture) bus. The bus 302 may be divided into an address bus, a data bus, a control bus, etc. For ease of representation, Figure 3 Only one thick line is used in the diagram, but this does not mean that there is only one bus or only one type of bus.
[0176] The memory 303 may be a ROM (Read Only Memory) or other types of static storage devices that can store static information and instructions, a RAM (Random Access Memory) or other types of dynamic storage devices that can store information and instructions, or an EEPROM (Electrically Erasable Programmable Read Only Memory), a CD-ROM (Compact Disc Read Only Memory) or other optical disk storage, optical disk storage (including compressed optical disk, laser disk, optical disk, digital versatile disk, Blu-ray disk, etc.), a magnetic disk storage medium or other magnetic storage device, or any other medium that can be used to carry or store the desired program code in the form of instructions or data structures and can be accessed by a computer, but is not limited thereto.
[0177] The memory 303 is used to store the application code for executing the solution of the present application, and the execution is controlled by the processor 301. The processor 301 is used to execute the application code stored in the memory 303 to implement the contents shown in the above method embodiment.
[0178] The electronic devices include but are not limited to: mobile phones, laptop computers, digital broadcast receivers, PDAs (personal digital assistants), PADs (tablet computers), PMPs (portable multimedia players), vehicle-mounted terminals (such as vehicle-mounted navigation terminals), etc., and fixed terminals such as digital TVs, desktop computers, etc., and can also be servers, etc. Figure 3 The electronic device shown is merely an example and should not bring any limitation to the functions and scope of use of the embodiments of the present application.
[0179] The embodiment of the present application provides a computer-readable storage medium, on which a computer program is stored, and when it is run on a computer, the computer can execute the corresponding content in the aforementioned method embodiment. Compared with the related art, the embodiment of the present application enables the electronic device to obtain process request information when the user triggers the project establishment instruction, and determine the identification information such as the project name, thereby eliminating the step of the project implementation personnel handwriting the project establishment matters when establishing the project. During the project implementation process, the electronic device obtains the process progress node and the related relationship matrix, obtains the progress of the project implementation, and generates a project report when the user triggers the project closing instruction, so as to record the various process matters of the project implementation process, so as to facilitate the project leader to understand the progress of the project implementation.
[0180] It should be understood that, although the steps in the flowchart of the accompanying drawings are displayed in sequence as indicated by the arrows, these steps are not necessarily executed in sequence in the order indicated by the arrows. Unless otherwise specified herein, there is no strict order restriction on the execution of these steps, and they can be executed in other orders. Moreover, at least a part of the steps in the flowchart of the accompanying drawings may include multiple sub-steps or multiple stages, and these sub-steps or stages are not necessarily executed at the same time, but can be executed at different times, and their execution order is not necessarily sequential, but can be executed in turn or alternately with other steps or at least a part of the sub-steps or stages of other steps.
[0181] The above are only some implementation methods of the present application. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present application. These improvements and modifications should also be regarded as the scope of protection of the present application.
Claims
1. A method for managing an organizational process, characterized in that: include: When a project establishment instruction triggered by a user is detected, the process request information of the terminal device is obtained; Determining project identification information based on the process request information of the terminal device; Based on the project identification information, obtaining process progress node information and a relationship matrix of the process progress node information; When a project closing instruction triggered by a user is detected, a project report is generated based on the project identification information, the process progress node information, and a relationship matrix of the process progress node information; The obtaining of process progress node information includes at least one of the following: Obtain process progress node information of the terminal device at preset intervals; Perform key point prediction based on the project identification information, and when a project key point appears in the prediction result, obtain process progress node information; Obtain process progress node information in real time; When the prediction result shows a key point of the project, the process progress node information is obtained, and then the following is also included: Based on the prediction results, determine the urgency of the process progress node information; Based on the urgency of the process progress node information, allocating a weight corresponding to the process progress node information; Obtaining the relationship matrix of the process progress node information includes: Determine the event information of the process progress node information and related event information; Establishing a matching relationship between the event information of the process progress node information and the related event information and features of the relationship matrix; Configure the corresponding filter function according to the matching relationship to form a filter function matrix, and then form a corresponding relationship matrix; When a user-triggered project closing instruction is detected, a project report is generated based on the project identification information, the process progress node information, and a relationship matrix of the process progress node information, including: When a user-triggered project closing instruction is detected, a project report template is obtained; Determining a data group based on the process progress node information and a relationship matrix of the process progress node information; The data set is imported into the project report template to generate a project report.
2. The organizational process management method according to claim 1, characterized in that: The determining of the project identification information based on the process request information of the terminal device includes: Responding to the process request information of the terminal device, and performing word segmentation processing on the process request information of the terminal device to obtain word segmentation information; Inputting the word segmentation information into a feature extraction model to obtain feature information; Based on the feature information, project identification information is determined, where the project identification information includes a project name and information corresponding to the project name.
3. The organizational process management method according to claim 1, characterized in that: The step of importing the data set into the project report template to generate a project report also includes: Send a request for project closing reason to the terminal device, and receive the project closing reason returned by the terminal device; Performing anomaly detection on the closing reason returned by the terminal device; If the reasons for project closing returned by the terminal device contain abnormal items, the step of generating a project report will not be performed.
4. An organizational process management device, characterized in that: include: A first acquisition module is used to acquire process request information of a terminal device when a project establishment instruction triggered by a user is detected; A first determination module, configured to determine project identification information based on the process request information of the terminal device; A second acquisition module is used to acquire process progress node information and a relationship matrix of the process progress node information based on the project identification information; A generating module, configured to generate a project report based on the project identification information, the process progress node information, and a relationship matrix of the process progress node information when a project closing instruction triggered by a user is detected; The obtaining of process progress node information includes at least one of the following: Obtain process progress node information of the terminal device at preset intervals; Perform key point prediction based on the project identification information, and when a project key point appears in the prediction result, obtain process progress node information; Obtain process progress node information in real time; When the prediction result shows a key point of the project, the process progress node information is obtained, and then the following is also included: Based on the prediction results, determine the urgency of the process progress node information; Based on the urgency of the process progress node information, allocating a weight corresponding to the process progress node information; Obtaining the relationship matrix of the process progress node information includes: Determine the event information of the process progress node information and related event information; Establishing a matching relationship between the event information of the process progress node information and the related event information and features of the relationship matrix; Configure the corresponding filter function according to the matching relationship to form a filter function matrix, and then form a corresponding relationship matrix; When a user-triggered project closing instruction is detected, a project report is generated based on the project identification information, the process progress node information, and a relationship matrix of the process progress node information, including: When a user-triggered project closing instruction is detected, a project report template is obtained; Determining a data group based on the process progress node information and a relationship matrix of the process progress node information; The data set is imported into the project report template to generate a project report.
5. An electronic device, characterized in that: include: at least one processor; Memory; At least one application, wherein the at least one application is stored in the memory and configured to be executed by the at least one processor, and the at least one application is configured to: execute an organizational process management method according to any one of claims 1 to 3.
6. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, an organizational process management method as described in any one of claims 1 to 3 is implemented.