Rail transit power supply selective grounding leakage protection control device and control method

By using a selective ground leakage protection control device in the rail transit power supply system to detect the size and direction of the leakage current, determine the location of the leakage and cut off the corresponding power supply, the problem of simultaneous tripping of multiple stations in the existing technology is solved and the efficiency of fault handling is improved. and security.

CN114744587BActive Publication Date: 2024-10-18HUNAN HENGXIN ELECTRIC CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202210188466.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-02-28
Publication Date
2024-10-18
Estimated Expiration
2042-02-28

AI Technical Summary

Technical Problem

When a leakage fault occurs in the existing rail transit power supply grounding leakage protection device, it is easy to cause multiple stations to trip simultaneously, causing operational accidents. It is also difficult to accurately distinguish small leakage currents, has a complex structure and is low in safety.

Method used

Design a rail transit power supply selective ground leakage protection control device, including a main controller, a ground leakage protection device and a bidirectional DC current sensor. By detecting the size and direction of the leakage current, the location of the leakage is determined, and only the corresponding signal is cut off when a fault occurs. Station or section power supply to avoid tripping of the entire line.

Benefits of technology

It achieves selective protection of rail transit power supply lines, reduces troubleshooting time and personnel labor intensity, and ensures the safety of train passengers and equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114744587B_ABST
    Figure CN114744587B_ABST
Patent Text Reader

Abstract

The present invention discloses a selective grounding leakage protection control method for rail transit power supply, the steps of which are: numbering traction substations; setting alarm current setting values ​​and fault trip voltage and current setting values; judging whether there is a grounding leakage protection device that detects leakage voltage and leakage current reaching the fault trip setting value; judging in sequence whether there is a traction substation that has a positive pole to ground leakage fault in the station and a positive pole contact rail to ground leakage fault in the section; judging whether there is a grounding leakage protection device that detects leakage voltage and leakage current reaching the alarm current setting value, and judging whether there is a station or section that reaches the alarm or trip condition in combination with the contact rail ground wire current. The present invention can judge whether there is leakage in the contact rail of the up and down positive rails, and only selectively alarm or trip the faulty station or the adjacent station of the faulty section, and the other stations do not alarm or trip, which saves troubleshooting time and reduces the labor intensity of maintenance personnel.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a selective grounding leakage protection control device and a control method for rail transit power supply. Background Art

[0002] Straddle-type monorail trains and maglev trains are powered by positive and negative contact rails. The positive and negative contact rails are insulated from the ground. When the insulation of the positive contact rail is damaged, leakage current will flow from the contact rail ground wire through the ground leakage protection device (64D) installed in the substation and flow back to the negative pole. Most of the existing ground leakage protection devices are voltage-type protection devices. A ground leakage protection device is installed between the negative busbar and the ground of each traction substation. The voltage sensor SV1 will alarm when the voltage reaches 170V. Alarm, when the SV1 voltage reaches 200v, it will trip, which is equivalent to the unidirectional current sensor SA1 alarming when the current reaches 34A. When the current on the unidirectional current sensor SA1 reaches 40A, it will trip. Since the negative busbars of each station are connected, the grounding resistance and line resistance of each station are not much different, so the ground potential of each station is not much different. Therefore, when a leakage fault occurs, many stations will trip, and even cause the entire line to trip, causing major operational accidents. Afterwards, the fault investigation has a wide range, the maintenance workload is heavy, and the impact is large.

[0003] The existing ground leakage protection device also has a positive and negative current difference comparison method, which requires the installation of four large-difference current sensors of several thousand amperes at the feeder switch and negative pole disconnector of each station. It is difficult to accurately distinguish small leakage currents, has a complex structure, low safety, and is prone to misjudgment. Summary of the invention

[0004] In order to solve the above technical problems, the present invention provides a rail transit power supply selective grounding leakage protection control device with simple structure, safety and reliability, and provides a rail transit power supply selective grounding leakage protection control method with easy operation.

[0005] The technical solution of the present invention to solve the above problems is: a selective grounding and leakage protection control device for rail transit power supply, including a main controller and multiple traction substations, a grounding and leakage protection device is installed between the negative busbar of each traction substation and the grounding grid in the station, the grounding and leakage protection device includes a grounding resistor, a unidirectional diode, a voltage sensor, a unidirectional DC current sensor, a controller, and a host computer, one end of the grounding resistor is connected to the negative busbar of the traction substation, and the other end of the grounding resistor is connected to the grounding grid in the station after passing through a unidirectional diode and a unidirectional DC current sensor, the voltage sensor is connected across the negative busbar of the traction substation and the grounding grid in the station, the non-charged metal part of the supporting insulator of the positive contact rail is connected to the contact rail ground wire, and the contact rail of the down track of each traction substation is called The downlink contact rail is a downlink contact rail. The first bidirectional DC current sensor and the second bidirectional DC current sensor are installed at the left and right ends of the grounding busbar position in the downlink contact rail ground wire of each traction substation. The contact rail of the uplink track of each traction substation is called the uplink contact rail. The third bidirectional DC current sensor and the fourth bidirectional DC current sensor are installed at the left and right ends of the grounding busbar position in the uplink contact rail ground wire of each traction substation. The signal output ends of the voltage sensor, the unidirectional DC current sensor, the first bidirectional DC current sensor, the second bidirectional DC current sensor, the third bidirectional DC current sensor, and the fourth bidirectional DC current sensor are connected to the controller, the controller is connected to the corresponding host computer, and the main controller is connected to the controller in each ground leakage protection device via Ethernet.

[0006] The above-mentioned rail transit power supply selective grounding leakage protection control device, the controller includes a DSP chip, a network and communication module, an analog detection module, a switch input module, and a control output module. The network and communication module includes an Ethernet interface and an RS-485 communication interface. The switch input module includes switch state detection. The control output module includes trip control and an audible and visual alarm. The analog detection module includes leakage voltage detection and leakage current detection.

[0007] A rail transit power supply selective grounding leakage protection control method, comprising the following steps:

[0008] Step 1: Number each traction substation from the first station to the last station, 1, 2, 3...s, where s is the total number of substations;

[0009] Step 2: Set the current direction of the first bidirectional DC current sensor, the second bidirectional DC current sensor, the third bidirectional DC current sensor, and the fourth bidirectional DC current sensor from the upstream contact rail ground wire and the downstream contact rail ground wire to be positive, and the outflow direction to be negative, set the alarm current setting value and the fault tripping setting value of the leakage current, and the alarm current setting value is smaller than the fault tripping setting value;

[0010] Step 3: The main controller reads the leakage current values ​​detected by the unidirectional DC current sensor, the first bidirectional DC current sensor, the second bidirectional DC current sensor, the third bidirectional DC current sensor, and the fourth bidirectional DC current sensor in each traction substation through Ethernet, first compares the four leakage current values ​​in each traction substation, finds the traction substation with the largest leakage current value, and determines whether the leakage current value reaches the fault tripping condition. If so, proceed to step 4; if not, proceed to step 6;

[0011] Step 4: Determine whether there is a positive contact rail leakage fault to the ground in the station. If so, and after the fault holding time reaches 100ms, the traction substation will trip and cut off the power supply of the adjacent traction substation to the traction substation; if there is a train stopping at the faulty station, manually check whether there is a positive contact rail leakage fault to the ground through the car body in the station. If so, the ground leakage protection device in the train will be activated at the same time, the train with the faulty car body will lower the pantograph, and the car body will be repaired; if not, the ground leakage protection device will be activated at the same time, and the power will continue to be cut off to check the positive contact rail; if the fault holding time does not reach 100ms, go to step 5; if there is no positive contact rail leakage fault to the ground in the station, go to step 5;

[0012] Step 5: Determine whether there is a traction substation with a positive contact rail to ground leakage fault. If yes, and the fault holding time reaches 100ms, the traction substations on both sides of the corresponding section will trip, and the adjacent traction substations will be cut off from supplying power to the fault section. If the fault holding time does not reach 100ms, go to step 6; if not, go to step 7;

[0013] Step 6: Determine whether there is a ground leakage protection device that detects that the leakage current has reached the alarm current setting value, and then determine whether there is a station that has reached the alarm condition based on the direction of the current. If so, the corresponding station or section will alarm without tripping; if not, the alarm will automatically reset and return to step 1 for a cyclic detection.

[0014] In the above-mentioned rail transit power supply selective grounding leakage protection control method, in the step 4, the method of judging whether the positive pole to ground leakage fault occurs in the down track of the traction substation is:

[0015] Assume that there are s substations in total on the line, the traction substation with the largest contact rail ground wire current in the entire line is numbered n, and it is detected that the current measured by the second bidirectional DC current sensor reaches (sn)*fault trip setting value, and the direction is negative, and the current measured by the first bidirectional DC current sensor reaches (n-1)*fault trip setting value, and the direction is negative, then the positive pole to ground leakage fault occurs in the down track of the current traction substation.

[0016] In the above-mentioned rail transit power supply selective grounding leakage protection control method, in the step 4, the method of judging whether the positive pole to ground leakage fault occurs in the up track of the traction substation is:

[0017] Assuming that the traction substation with the largest contact rail ground wire current in the entire line is numbered n, it is detected that the current measured by the fourth bidirectional DC current sensor reaches (sn)*fault trip setting value, and the direction is negative, and the current measured by the third bidirectional DC current sensor reaches (n-1)*fault trip setting value, and the direction is negative, then a positive pole-to-ground leakage fault occurs in the upstream track of the current traction substation.

[0018] In the above-mentioned rail transit power supply selective grounding leakage protection control method, in the step 4, if the train stops at the station at this time, the grounding brush of the train car will contact the platform grounding plate. If the grounding leakage protection device on the train is activated, the vehicle current granting device fast circuit breaker will be tripped, and the positive electrode in the car will be manually found to leak the shell; if the grounding leakage protection device on the train does not work, the leakage position is located on the positive contact rail outside the car body.

[0019] In the above-mentioned rail transit power supply selective grounding leakage protection control method, in the step 5, the method of judging the occurrence of a downlink positive contact rail to ground leakage fault in the traction substation is:

[0020] Assuming that the current section is the section between traction substations numbered n and (n+1), if it is detected that the current measured by the second bidirectional DC current sensor of the traction substation numbered n reaches n*fault tripping setting value, and the direction is positive, and the current measured by the first bidirectional DC current sensor of the traction substation numbered (n+1) reaches (sn)*fault tripping setting value, and the direction is also positive, then the section where the positive contact rail to ground leakage fault occurs is the downstream section between the traction substations numbered n and (n+1).

[0021] In the above-mentioned rail transit power supply selective grounding leakage protection control method, in the step 5, the way to judge whether the traction substation has a section up positive contact rail ground leakage fault is:

[0022] Assuming that the current section is the section between traction substations numbered n and (n+1), if it is detected that the current measured by the fourth bidirectional DC current sensor of the traction substation numbered n reaches n*fault tripping setting value, and the direction is positive, and the current measured by the third bidirectional DC current sensor of the traction substation numbered (n+1) reaches (sn)*fault tripping setting value, and the direction is also positive, then the section where the positive contact rail to ground leakage fault occurs is the upstream section between the traction substations numbered n and (n+1).

[0023] The beneficial effects of the present invention are as follows: a ground leakage protection device is installed between the negative busbar of each traction substation and the grounding grid in the station. When there is a leakage fault in the straddle-type light rail and the maglev power supply line, the ground leakage protection device can determine whether there is positive ground leakage in the respective stations. The ground leakage protection device can determine which track contact rail of the station has leakage according to the respective numbers, the grounding grid to the negative leakage current and voltage, and the magnitude and direction of the return current between the contact rail ground wire of the up track and the down track and the grounding grid in the station. The device has selective protection. As long as the adjacent station trips, the other stations do not trip at the same time, and the tripping event is uploaded to the main controller, which saves the troubleshooting time, reduces the labor intensity of personnel, and ensures the safety of train passengers and equipment. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a structural schematic diagram of the rail transit power supply selective grounding leakage protection control device of the present invention.

[0025] Figure 2 for Figure 1 Circuit diagram of leakage protection device 64D.

[0026] Figure 3 This is a current loop diagram of stations B1-B6 where positive electrode to ground leakage occurs in station B5 in the embodiment.

[0027] Figure 4 for Figure 3 Current loop diagram of stations B4, B5, and B6.

[0028] Figure 5 for Figure 3 Current loop diagram of station B5.

[0029] Figure 6 It is a current loop diagram of the positive electrode in the station leaking to the ground through the vehicle body in the embodiment.

[0030] Figure 7 This is a current loop diagram of the B1-B6 station where leakage of the positive contact rail to the ground occurs in the B2 and B3 sections in the embodiment.

[0031] Figure 8 for Figure 7 Current loop diagram of stations B1, B2, and B3.

[0032] Fig. 9 for Figure 7 Current loop diagram of stations B3, B4, B5, and B6. DETAILED DESCRIPTION

[0033] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0034] like Figure 1 , Figure 2 As shown, a selective grounding and leakage protection control device for rail transit power supply includes a main controller and multiple traction substations. A grounding and leakage protection device is installed between the negative busbar of each traction substation and the grounding grid in the station. The grounding and leakage protection device includes a grounding resistor, a unidirectional diode, a voltage sensor, a unidirectional current sensor, a controller, and a host computer. One end of the grounding resistor is connected to the negative busbar of the traction substation, and the other end of the grounding resistor is bridged between the negative busbar of the traction substation and the grounding grid in the station through a unidirectional diode and a voltage sensor. The power supply rails of the down track of each traction substation are called down positive contact rails and down negative contact rails. The non-charged metal part of the supporting insulator of the down positive contact rail is connected to the down contact rail ground wire. The down contact rail ground wire of each traction substation is connected to the ground busbar position in the station and is installed at the left and right ends. A first bidirectional DC current sensor SAn1 and a second bidirectional DC current sensor SAn2 are installed. The power supply rails of the up-track of each traction substation are called up-track positive contact rails and up-track negative contact rails. The non-charged metal parts of the supporting insulators of the up-track positive contact rails are connected to the up-track contact rail ground wires. The up-track contact rail ground wires of each traction substation are connected to the grounding busbar in the station. A third bidirectional DC current sensor SAn3 and a fourth bidirectional DC current sensor SAn4 are installed at the left and right ends. The signal output ends of the voltage sensor, the unidirectional current sensor, the first bidirectional DC current sensor, the second bidirectional DC current sensor, the third bidirectional DC current sensor and the fourth bidirectional DC current sensor are connected to the controller. The controller is connected to the corresponding host computer. The main controller is connected to the controller in each ground leakage protection device via Ethernet.

[0035] The controller includes a DSP chip, a network and communication module, an analog detection module, a switch input module, and a control output module. The network and communication module includes an Ethernet interface and an RS-485 communication interface. The switch input module includes switch state detection. The control output module includes trip control and an audible and visual alarm. The analog detection module includes leakage voltage detection and leakage current detection.

[0036] A rail transit power supply selective grounding leakage protection control method, comprising the following steps:

[0037] Step 1: Number each traction substation from the first station to the last station, 1, 2, 3...S, where S is the total number of substations;

[0038] Step 2: Set the current direction of the first bidirectional DC current sensor, the second bidirectional DC current sensor, the third bidirectional DC current sensor, and the fourth bidirectional DC current sensor flowing into the grounding busbar in the station through the upstream contact rail ground wire and the downstream contact rail ground wire to be positive, and the outflow direction to be negative, set the alarm current setting value and the fault tripping setting value of the leakage current, and the alarm current setting value is less than the fault tripping setting value.

[0039] Step three: The main controller reads the leakage current values ​​detected by the unidirectional current sensor, the first bidirectional DC current sensor, the second bidirectional DC current sensor, the third bidirectional DC current sensor, and the fourth bidirectional DC current sensor in each traction substation through Ethernet, first compares these four leakage current values ​​in each traction substation, finds the traction substation with the largest leakage current value, and determines whether the leakage current value detected by its ground leakage protection device reaches the fault tripping condition. If so, proceed to step four; if not, proceed to step six.

[0040] Step 4: Determine whether there is a positive contact rail to ground leakage fault in the station. If so, and the fault holding time reaches 100ms, the traction substation will trip and cut off the power supply to the traction substation from the adjacent traction substation; if there is a train stopping at the faulty station, manually check whether there is a positive contact rail to ground leakage fault through the car body in the station. If so, the ground leakage protection device GR in the train will be activated at the same time, the train with the faulty car body will lower the pantograph, and the car body will be inspected; if not, the ground leakage protection device GR will be activated at the same time, and the power will continue to be cut off to check the positive contact rail; if the fault holding time does not reach 100ms, go to step 5; if there is no positive contact rail to ground leakage fault in the station, go to step 5.

[0041] The method for judging the positive pole to ground leakage fault in the down track of the traction substation is:

[0042] Assume that there are s substations in total on the line, and the traction substation with the largest contact rail ground wire current in the entire line is numbered n. It is detected that the current measured by the second bidirectional DC current sensor on its right end reaches (sn)*fault trip setting value, and the direction is negative, and the current measured by the first bidirectional DC current sensor on its left end reaches (n-1)*fault trip setting value, and the direction is negative. In this case, a positive pole-to-ground leakage fault occurs on the down track of the current traction substation.

[0043] The method for judging whether a positive-to-ground leakage fault occurs on the up track of a traction substation is as follows:

[0044] Assume that the traction substation with the largest contact rail ground wire current in the entire line is numbered n, and it is detected that the current measured by the fourth bidirectional DC current sensor on its right end reaches (sn)*fault trip setting value, and the direction is negative, and the current measured by the third bidirectional DC current sensor on its left end reaches (n-1)*fault trip setting value, and the direction is negative, then the positive pole to ground leakage fault occurs in the up track of the current traction substation.

[0045] If the train stops at this time, the grounding brush of the train car will contact the platform grounding plate. If the ground leakage protection device on the train is activated, the vehicle current transmitter fast circuit breaker will be tripped and the leakage point from the positive pole to the shell in the car will be manually found; if the ground leakage protection device on the train does not work, the leakage location is located on the positive contact rail outside the car body.

[0046] Step 5: Determine whether there is a traction substation with a positive contact rail to ground leakage fault. If so, and the fault retention time reaches 100ms, the traction substations on both sides of the corresponding section will trip, and at the same time cut off the power supply to the faulty section from the adjacent traction substation. If the fault retention time does not reach 100ms, go to step 6; if not, go to step 7.

[0047] The method for judging the leakage fault of positive contact rail to ground in the traction substation is as follows:

[0048] First, find the interval where the direction of the ground current of the contact rails on both sides is positive. Assuming that the current interval is the traction substation interval numbered n and n+1, it is detected that the second bidirectional DC current sensor of the traction substation numbered n measures a current reaching n*fault tripping setting value, and the direction is positive, and the first bidirectional DC current sensor of the traction substation numbered n+1 measures a current reaching (sn)*fault tripping setting value, and the direction is also positive, then the interval where the positive contact rail to ground leakage fault occurs is the traction substation interval numbered n and n+1.

[0049] Step 6: Determine whether there is a ground leakage protection device that detects that the leakage current reaches the alarm current setting value. If yes, determine whether it is an internal leakage alarm or a section leakage alarm. The corresponding traction substation or section leakage alarm will not trip; if no, all traction substations have no ground leakage fault. Return to step 1 and repeat the detection. Example

[0050] Each traction substation is numbered from the first station B1 to the last station B6; according to the "120km / h Contact Rail Design Specifications and Construction Acceptance Standards", the contact rail system should have an independent grounding wire, all non-electrical metal parts are connected to the contact rail ground wire, and the contact rail ground wire is connected to the grounding grid in the traction station.

[0051] Bidirectional DC current sensors A11, A12, A13, A14, A21, A22, A23, A24...A61, A62, A63, A64 are installed at the position where the contact rail ground wire of the down track of each station is connected to the grounding busbar in the station. A11 and A12 are installed at both ends of the down track of B1 station, A13 and A14 are installed at both ends of the up track of B1 station, A21 and A22 are installed at both ends of the down track of B2 station, A23 and A24 are installed at both ends of the up track of B2 station, and A3 A31 and A32 are installed at both ends of the track under the station, A33 and A34 are installed at both ends of the up track of B3 station, ... A61 and A62 are installed at both ends of the track under B6 station, and A63 and A64 are installed at both ends of the up track of B6 station. By checking the magnitude and direction of the current of the contact rail ground wire, the ground leakage fault in the station or the interval ground leakage fault can be determined. The following takes the down track as an example. The bidirectional DC current sensor takes the current direction of the contact rail ground wire flowing into the ground busbar in the station as positive, and the current flowing out as negative.

[0052] Several situations of positive pole leakage to ground:

[0053] 1. The positive pole in the station is leaking to the ground:

[0054] like Figure 3 As shown, when the downstream positive leakage point is in the B5 station, the leakage current path of the B5 station rectifier output is: B5 station 1500V rectifier positive pole-downstream positive pole contact rail-leakage point-B5 station grounding busbar-64D-B5 station rectifier cabinet negative pole, 64D grounding resistance is 5Ω, leakage current is I5=1500V / (insulation resistance+contact rail DC resistance+contact rail grounding wire resistance+5), contact rail grounding wire resistance is generally 0.008Ω / ㎞, 2km station distance is 0.016Ω, ignoring the contact rail DC resistance and contact rail grounding wire resistance I5=1500V / (insulation resistance+5);

[0055] At this time, the leakage current path of the rectifier output of station B4 is: positive pole of 1500V rectifier of station B4 - positive contact rail of downstream - leakage point - grounding busbar in station B5 - current sensor A51 - grounding wire of downstream contact rail - current sensor A42 of downstream contact rail ground wire - No. 4 64D - negative pole of rectifier cabinet of station B4, I4=1500V / (insulation resistance+5);

[0056] The leakage current path of the rectifier output of station B3 is: positive pole of 1500V rectifier of station B3 - positive contact rail of downstream - feeder cabinet of station B4 - positive contact rail of downstream - leakage point - grounding busbar in station B5 - ground current sensor A51 of downstream contact rail - ground wire of downstream contact rail - ground current sensor A42 of downstream contact rail - feeder cabinet of station B4 - ground current sensor A41 of downstream contact rail - ground wire of contact rail - ground busbar in station B3 - No. 3 64D - negative pole of rectifier cabinet of station B3, I3=1500V / (insulation resistance+5);

[0057] The leakage current path of the rectifier output of station B2 is the positive pole of the 1500v rectifier of station B2 - the positive contact rail of the downstream - the feeder cabinet of station B3 - the positive contact rail of the downstream - the feeder cabinet of station B4 - to the fault point in station B5 - the grounding busbar in the station - the ground current sensor A51 of the downstream contact rail - the ground wire of the downstream contact rail - the ground current sensor A42 of the downstream contact rail - the ground busbar in the station - the ground current sensor A41 of the downstream contact rail - the ground current sensor A32 of the downstream contact rail - the ground busbar in the station - the ground current sensor A31 of the downstream contact rail - the ground wire of the downstream contact rail - the ground current sensor A22 of the downstream contact rail - the ground busbar in the station - the ground busbar in station B2 - No. 2 64D - the negative pole of the rectifier of station B2, I2 = 1500V / (insulation resistance +5);

[0058] The leakage current path of the rectifier output of station B1 is the positive pole of the 1500v rectifier of station B1 - the positive contact rail of the downstream - the feeder cabinet of station B2 - the positive contact rail of the downstream - the feeder cabinet of station B3 - the positive contact rail of the downstream - the feeder cabinet of station B4 - to the fault point in station B5 - the grounding busbar in station B5 - the ground current sensor A51 of the downstream contact rail - the ground wire of the downstream contact rail - the ground current sensor A42 of the downstream contact rail - the grounding busbar in station B4 - the ground current sensor A41 of the downstream contact rail - the ground wire of the downstream contact rail Contact rail grounding wire - downlink contact rail grounding wire current sensor A32 - station grounding busbar - downlink contact rail grounding wire current sensor A31 - downlink contact rail grounding wire - downlink contact rail grounding wire current sensor A22 - B2 station grounding busbar - downlink contact rail grounding wire current sensor A21 - downlink contact rail grounding wire - downlink contact rail grounding wire current sensor A12 - B1 station grounding busbar - No. 1 64D - B1 station rectifier negative pole, I1 = 1500V / (insulation resistance + 5);

[0059] The leakage current path of the rectifier output of B6 station is the positive pole of 1500v rectifier of B6 station - the positive contact rail of downstream - the feeder cabinet of B5 station - the fault point in B5 station - the grounding busbar in the station - the ground current sensor A52 of the downstream contact rail - the ground wire of the downstream contact rail - the ground current sensor A61 of the downstream contact rail - the ground busbar in B6 station - No. 6 64D - the negative pole of the rectifier of B6 station, I6 = 1500V / (insulation resistance + 5);

[0060] Ignoring the influence of contact rail resistance and contact rail grounding wire resistance, the leakage current I1=I2=I3=I4=I5=I6=1500V / (insulation resistance+5), the alarm current is set to 34A, and the fault tripping current setting value is set to 40A.

[0061] It can be seen that the current flowing out of the rectifiers of the substations on both sides of the faulty site passes through the fault point and then returns to the negative pole of the rectifier from 64D respectively. The contact rail grounding wire currents on both sides of the site flow out of the station. The values of sensors A51 and A52 are detected to be negative, and the current value is the number of stations on both sides * 40A. The number of the B5 station is 5, and there is only one station B6 on the right, and the direction is negative, so IA52 = -40A. There are only four stations B1, B2, B3, and B4 on the left of the B5 station, and the direction is negative, so IA51 = -40A * 4 = -160A.

[0062] Similarly, if the fault point is at the B1 station with the set number 1, the contact rail grounding wire current of this station flows out from the positive poles of the 5 stations on the right, passes through the fault point, the in-station grounding busbar, and the downlink contact rail grounding wire current sensor A12, and then returns to their respective negative poles. The direction is negative, and the value of IA12 is 40 * 5 = -200A.

[0063] If the fault point is at the B2 station with the set number 2, the contact rail grounding wire current on the right side of this station flows out from the positive poles of the 4 stations on the right, passes through the fault point, the in-station grounding busbar, and the current sensor IA22, and then returns to their respective negative poles. The value of IA22 is 40 * 4 = -160A. There is one station B1 on the left. The contact rail grounding wire current on the left side of this station flows out from the positive pole of 1 station on the left, passes through the fault point, the in-station grounding busbar, and the current sensor IA21, and then returns to the negative pole of the B1 station. IA21 is 40 * 1 = -40A.

[0064] And so on. When a fault occurs at the station with the station number n, the 64D detects that the leakage current reaches 40A, and the measured current of the contact rail grounding wire current IAn2 on the right reaches (6 - n) * 40A, and the direction is negative; the measured current of the contact rail grounding wire current sensor IAn1 on the left reaches (n - 1) * 40A, and the direction is negative. Trip the circuit breaker of this station to trip the feeder to the fast circuit breaker and report to the PSCADA; at the same time, cut off the power supply to this station from the adjacent stations. Repair the downlink track contact rail in this station. For the leakage of the uplink contact rail, the judgment method is the same.

[0065] When an uplink or downlink positive pole leakage fault occurs at the nth station, the contact rail grounding wire current sensors at the first and last stations B1 and B6 will detect that the leakage current reaches 40A, and the contact rail grounding wire current sensors at other stations will detect that the leakage current exceeds 40A. The measured current of the leakage current IAm2 at the m (m < n) stations on the left of the faulty station is m * 40A, and the direction is positive, and the IAm1 current reaches (m - 1) * 40A, and the direction is negative. The IAm1 current at the m (m > n) stations on the right of the faulty station is (m - n) * 40A, and the direction is positive; the IAm2 current is (m - n - 1) * 40A, and the direction is negative. For normal stations, there is current flowing in and out on both sides of the station, and the station does not trip.

[0066] If the leakage current reaches the alarm value of 34A, the contact rail grounding wire current judgment method is the same. Select the station that meets the conditions to alarm without tripping.

[0067] 2. Leakage of positive contact rail to ground in the interval:

[0068] like Figure 7 , Figure 8 , Fig. 9 As shown, when the downstream positive leakage point is between the positive contact rail and the ground between stations B2 and B3, the leakage current path of station B1 is 1500v positive feeder cabinet of station B1-downstream positive contact rail-1500v positive feeder cabinet of station B2-leakage point-downstream contact rail ground wire-downstream contact rail ground wire current sensor A22-grounding grid in station B2-downstream contact rail ground wire current sensor A21-downstream contact rail ground wire-downstream contact rail ground wire current sensor A12-64D of station B1-negative pole of rectifier cabinet of station B1, the leakage current is IA12=40A; direction is positive; IA21=40A; direction is negative;

[0069] The leakage current path of B2 station is 1500v positive feeder cabinet of B2 station - positive contact rail of downstream - leakage point - ground wire of downstream contact rail - current sensor A22 of ground wire of downstream contact rail - ground grid in B2 station - 64D of B2 station - negative pole of rectifier cabinet of B2 station. The leakage current is I2=1500V / (DC resistance of contact rail Rx3+ ground resistance of contact rail Rj3+ insulation resistance+5)=40A; IA22=I1+I2=80A, and the direction is positive.

[0070] The leakage current path of B3 station is 1500v positive feeder cabinet of B3 station - downlink positive contact rail - leakage point - downlink contact rail ground wire - downlink contact rail ground wire current sensor A31 - grounding network in B3 station - 64D of B3 station - negative pole of rectifier cabinet of B3 station, the leakage current is I3=1500V / (contact rail DC resistance Rx3+contact rail ground wire resistance Rj3+insulation resistance+5)=40A;

[0071] The leakage current path of B4 station is 1500v positive feeder cabinet of B4 station - downlink positive contact rail - 1500v positive feeder cabinet of B3 station - leakage point - downlink contact rail ground wire - downlink contact rail ground wire current sensor A31 - grounding grid in B3 station - downlink contact rail ground wire current sensor A32 - downlink contact rail ground wire - current sensor A41 - downlink contact rail ground wire - 64D of B4 station - negative pole of rectifier cabinet of B4 station, the leakage current is I4=40A;

[0072] Similarly, I5=I6=40A;

[0073] IA31=I3+I4+I5+I6=160A, direction is positive; IA32=I4+I5+I6=120A, direction is negative; IA41=I4+I5+I6=120A, direction is positive; IA42=I5+I6=80A, direction is negative; IA51=I5+I6=80A, direction is positive; IA52=I6=40A, direction is negative; IA61=I6=40A, direction is positive;

[0074] When the positive leakage point is between B2 and B3 stations, the ground wire currents IA22 and IA31 of the downlink contact rails on both sides of the section are both positive; between B1 and B2 stations, the leakage currents on both sides of the section are both positive and negative, with the left side positive and the right side negative; between B3 and B4 stations, the leakage currents on both sides of the section are both positive and negative, with the left side negative and the right side positive;

[0075] The main controller reads the leakage current of each station through the network and finds that the leakage current on both sides of the section is positive, and the ground wire current of the downstream contact rails on both sides exceeds 40A and is a multiple of the number of stations on both sides. After the fault holding time reaches 100ms, the feeder fast circuit breakers of the stations on both sides will be tripped and the power supply to the section from the neighboring station will be cut off.

[0076] The main controller monitors in real time whether the leakage current between the grounding grid and the negative pole detected by the grounding leakage protection device of each traction substation reaches 34A or 40A, as well as the current between the contact rail ground wire on both sides of each station and the grounding grid in the station detected by the grounding leakage protection device. According to the size and direction, it determines whether the faulty station or section, and whether the leakage occurs on the up track or the down track, and sends an alarm or tripping command to the circuit breaker tripping of the two stations adjacent to the faulty station or section, and sounds and alarms at the same time. The alarm signal can be automatically reset. After the fault trips, it needs to be manually reset after eliminating the fault.

Claims

1. A rail transit power supply selective grounding leakage protection control method is implemented based on a rail transit power supply selective grounding leakage protection control device. The rail transit power supply selective grounding leakage protection control device includes a main controller and multiple traction substations. A grounding leakage protection device is installed between the negative busbar of each traction substation and the grounding grid in the station. The grounding leakage protection device includes a grounding resistor, a unidirectional diode, a voltage sensor, a unidirectional DC current sensor, a controller, and a host computer. One end of the grounding resistor is connected to the negative busbar of the traction substation, and the other end of the grounding resistor is connected to the grounding grid in the station after passing through a unidirectional diode and a unidirectional DC current sensor. The voltage sensor is connected across the negative busbar of the traction substation and the grounding grid in the station. The non-charged metal part of the supporting insulator of the positive contact rail is connected to the contact rail ground wire. Each The contact rail of the down track of the traction substation is called the down track contact rail. The first bidirectional DC current sensor and the second bidirectional DC current sensor are installed at the left and right ends of the ground busbar position in the down track contact rail of each traction substation. The contact rail of the up track of each traction substation is called the up track contact rail. The third bidirectional DC current sensor and the fourth bidirectional DC current sensor are installed at the left and right ends of the ground busbar position in the up track contact rail of each traction substation. The signal output ends of the voltage sensor, the unidirectional DC current sensor, the first bidirectional DC current sensor, the second bidirectional DC current sensor, the third bidirectional DC current sensor and the fourth bidirectional DC current sensor are connected to the controller, the controller is connected to the corresponding host computer, and the main controller is connected to the controller in each ground leakage protection device via Ethernet; The rail transit power supply selective grounding leakage protection control method comprises the following steps: Step 1: Number each traction substation from the first station to the last station, 1, 2, 3...s, where s is the total number of substations; Step 2: Set the current direction of the first bidirectional DC current sensor, the second bidirectional DC current sensor, the third bidirectional DC current sensor, and the fourth bidirectional DC current sensor from the upstream contact rail ground wire and the downstream contact rail ground wire to be positive, and the outflow direction to be negative, set the alarm current setting value and the fault tripping setting value of the leakage current, and the alarm current setting value is smaller than the fault tripping setting value; Step 3: The main controller reads the leakage current values ​​detected by the unidirectional DC current sensor, the first bidirectional DC current sensor, the second bidirectional DC current sensor, the third bidirectional DC current sensor, and the fourth bidirectional DC current sensor in each traction substation through Ethernet, first compares the four leakage current values ​​in each traction substation, finds the traction substation with the largest leakage current value, and determines whether the leakage current value reaches the fault tripping condition. If so, proceed to step 4; if not, proceed to step 6; Step 4: Determine whether there is a positive contact rail leakage fault to the ground in the station. If so, after the fault holding time reaches 100ms, the traction substation will trip and the adjacent traction substation will cut off the power supply to the traction substation; if there is a train stopping at the fault station, manually check whether there is a positive contact rail leakage fault to the ground through the car body in the station. If so, the ground leakage protection device in the train will be activated at the same time, the train with the faulty car body will lower the pantograph, and the car body will be repaired; if not, the ground leakage protection device will be activated at the same time, and the power will continue to be cut off to check the positive contact rail; if the fault holding time does not reach 100ms, go to step 5; if there is no positive contact rail leakage fault to the ground in the station, go to step 5; Step 5: Determine whether there is a traction substation with a positive contact rail to ground leakage fault. If yes, and the fault holding time reaches 100ms, the traction substations on both sides of the corresponding section will trip, and the adjacent traction substations will be cut off from supplying power to the fault section. If the fault holding time does not reach 100ms, go to step 6; if not, go to step 7; Step 6: Determine whether there is a ground leakage protection device that detects that the leakage current has reached the alarm current setting value, and then determine whether there is a station that has reached the alarm condition based on the size and direction of the contact rail ground wire current. If so, the corresponding station or section will alarm without tripping; if not, the alarm will automatically reset and return to step 1 for a cyclic detection.

2. The rail transit power supply selective grounding leakage protection control method according to claim 1 is characterized in that: The controller includes a DSP chip, a network and communication module, an analog detection module, a switch input module, and a control output module. The network and communication module includes an Ethernet interface and an RS-485 communication interface. The switch input module includes switch state detection. The control output module includes trip control and an audible and visual alarm. The analog detection module includes leakage voltage detection and leakage current detection.

3. The rail transit power supply selective grounding leakage protection control method according to claim 1 is characterized in that: In step 4, the method for determining whether a positive-to-ground leakage fault occurs in the down track of the traction substation is: Assuming that there are a total of s substations on the line, the traction substation with the largest contact rail ground wire current in the entire line is numbered n. It is detected that the current measured by the second bidirectional DC current sensor reaches (sn)*fault trip setting value, and the direction is negative, and the current measured by the first bidirectional DC current sensor reaches (n-1)*fault trip setting value, and the direction is negative. Then, a positive pole-to-ground leakage fault occurs in the down track of the current traction substation.

4. The rail transit power supply selective grounding leakage protection control method according to claim 3 is characterized in that: In step 4, the method for determining whether a positive-to-ground leakage fault occurs in the up track of the traction substation is: Assuming that the traction substation with the largest contact rail ground wire current in the entire line is numbered n, it is detected that the current measured by the fourth bidirectional DC current sensor reaches (sn)*fault trip setting value, and the direction is negative, and the current measured by the third bidirectional DC current sensor reaches (n-1)*fault trip setting value, and the direction is negative, then the positive pole to ground leakage fault occurs in the up track of the current traction substation.

5. The rail transit power supply selective grounding leakage protection control method according to claim 1 is characterized in that: In step 4, if the train stops at the station, the grounding brush of the train car will contact the platform grounding plate. If the ground leakage protection device on the train is activated, the vehicle current granting device fast circuit breaker will be tripped, and the leakage point of the positive pole to the shell in the car will be manually found; if the ground leakage protection device on the train does not work, the leakage position is located at the positive contact rail outside the car body.

6. The rail transit power supply selective grounding leakage protection control method according to claim 1 is characterized in that: In step 5, the method for determining whether a positive contact rail to ground leakage fault occurs in the downlink section of the traction substation is: Assuming that the current section is the traction substation section numbered n and (n+1), if the current directions on both sides of the section are both positive, it is detected that the second bidirectional DC current sensor of the traction substation numbered n measures a current reaching n*fault tripping setting value, and the direction is positive, and the first bidirectional DC current sensor of the traction substation numbered (n+1) measures a current reaching (sn)*fault tripping setting value, and the direction is also positive, then the section where the positive contact rail to ground leakage fault occurs is the downstream section between the traction substations numbered n and (n+1).

7. The rail transit power supply selective grounding leakage protection control method according to claim 1 is characterized in that: In step 5, the method for determining the occurrence of an uplink positive contact rail to ground leakage fault in the traction substation is: Assuming that the current section is the traction substation section numbered n and (n+1), if the current directions on both sides of the section are both positive, it is detected that the fourth bidirectional DC current sensor of the traction substation numbered n measures a current reaching n*fault tripping setting value, and the direction is positive, and the third bidirectional DC current sensor of the traction substation numbered (n+1) measures a current reaching (sn)*fault tripping setting value, and the direction is also positive, then the section where the positive contact rail to ground leakage fault occurs is the upstream section between the traction substations numbered n and (n+1).

Citation Information

Patent Citations

  • Earth leakage protection system for train's power supply system

    CN106992503A

  • Train power supply system, power leakage detection and positioning device, method and train

    CN109228872A