A control and optimization method and system for black start of wind power storage system
Through droop control and doubly-fed asynchronous wind turbine grid connection technology, combined with mathematical models to optimize the starting sequence of the wind farm, the problem of self-starting capability and system stability of the wind farm during the black start process has been solved, and the wind storage system has been realized. Fast and stable power supply.
Patent Information
- Application Number
- CN202210262419.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-03-16
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2042-03-16
AI Technical Summary
Wind farms lack self-starting capabilities during black start, and microgrid systems are prone to voltage and frequency instability because they contain a large number of power electronic equipment. Existing technologies cannot be directly applied to wind storage systems, and the space of wind farms is not fully considered. Distribution effects on black starts.
The droop control strategy is used to start the energy storage power station to the rated voltage with zero boost. The doubly-fed asynchronous wind turbine connects the rotor to the grid under the support of external voltage, performs voltage tracking on the stator winding, and switches the converter mode to capture the maximum wind energy. Establish a mathematical model to optimize the starting sequence of the wind farm, determine the starting sequence through electrical distance, simulate the synchronous generator process to adjust power and suppress excitation inrush current.
It achieves fast self-starting of the wind farm, optimizes the transient response during the black start process, reduces the impact when wind turbines are connected to the grid, maintains the stability of the wind storage system, and reduces the impact on the energy storage power station by optimizing the startup sequence. impact.
Smart Images

Figure CN114744747B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the field of new energy power grid control, and in particular relates to a control and optimization method and system for black start of a wind energy storage system. Background Art
[0002] Wind farms are an important part of the new power system. In traditional power systems, relying on thermal power units with self-starting capabilities, power supply can be restored without external help after the system fails and shuts down, thus achieving black start. However, wind turbines do not have self-starting capabilities, and microgrids composed of a high proportion of wind power contain a large number of power electronic equipment with small inertia and poor overload capacity, which is very different from the situation in traditional power systems dominated by rotating power sources. The current more mature black start strategy of traditional power systems cannot be directly applied to microgrid systems. Secondly, due to the inclusion of renewable energy sources with large volatility and randomness such as photovoltaics and wind turbines, microgrid systems are relatively fragile, and it is easy to cause voltage and frequency instability during the black start process. The introduction of energy storage systems will make it possible for wind farms to be used as black start power sources. When the power grid is operating normally, energy storage can improve system stability; after a major power outage in the power grid, the application of energy storage technology can speed up the restoration of power supply in the power grid. For example, during the restoration of the major power outage in the UK, the UK power grid reduced power outage losses by starting energy storage power stations.
[0003] At present, the research on black start with wind power / photovoltaic as the main grid has just started and has not yet been put into practical engineering application. In the existing technology, most wind storage system black start technologies are committed to using wind storage systems as black start power sources to start thermal power units to achieve power supply recovery, rather than relying solely on wind storage systems and local loads to form a stable microgrid. The two are very different in time scale and stability during the startup process. At the same time, the excitation inrush current problem, wind turbine starting problem and wind storage system stability problem in the black start process still need to be solved. In the absence of traditional rotating power sources, the treatment methods of these problems will be different. The wind farms studied in the existing technology are generally concentrated, and the impact of the spatial distribution of wind farms on black start is rarely considered. In fact, optimizing the starting order of each wind farm can improve the performance of black start. Therefore, it is necessary to combine and consider the characteristics of microgrids and conduct a more in-depth analysis of the black start problem of microgrids. Summary of the invention
[0004] In view of the defects of the prior art, the purpose of the present invention is to provide a control and optimization method and system for the black start of a wind storage system, which is suitable for a microgrid containing a high proportion of wind power. When the microgrid system unexpectedly loses power, the wind farm can be started quickly to restore power supply to the load.
[0005] To achieve the above object, the present invention provides a control method for a wind-storage system black start process, comprising the following steps:
[0006] (1) Each energy storage power station adopts a droop control strategy and starts from zero voltage to the rated voltage U n , establish stable frequency and voltage for the system, and charge the unloaded lines and transformers in the system;
[0007] (2) The auxiliary equipment of the wind farm is put into operation. The external voltage U of the double-fed asynchronous wind turbine generator in step (1) is n The rotor is connected to the grid under the support of the double-fed asynchronous wind turbine generator, and the rotor current i rd 、i rq Control is performed so that the no-load electromotive force E0 of the stator winding is equal to the bus voltage U n Exactly the same, i.e. voltage tracking, to achieve smooth grid connection of subsequent wind turbines;
[0008] (3) The stator of the doubly-fed asynchronous wind turbine generator is connected to the grid, and the rotor-side converter is switched from the no-load grid-connected mode in step (2) to the MPPT control mode to capture the maximum wind energy. The stator-side converter stabilizes the DC side capacitor voltage U C and the grid-connected reactive power Q wind , so that the wind farm can complete self-starting and output constant power;
[0009] (4) After the wind farm completes self-startup, the corresponding load is put into use to form a stable wind storage island system to supply power to the local load;
[0010] (5) Establish a mathematical model of the power supply network to be studied, calculate the equivalent electrical distance from each wind farm to the energy storage power station, and use it to optimize the black start sequence of each wind farm;
[0011] (6) Execute steps (2) to (4) for each wind farm in sequence according to the black start order determined in step (5) to complete the black start process.
[0012] Furthermore, the droop control in step (1) is used to simulate the primary frequency modulation process of a traditional synchronous generator, and the reactive power and active power output by the inverter are adjusted according to the system voltage and frequency changes, and the voltage and frequency adjustment process is realized through the following target equation:
[0013] P ref =P e -D p (ω n -ω)
[0014] Q ref =Q e -D q (U n -U)
[0015] After obtaining the power command through the voltage and frequency error, the internal potential reference value of the energy storage system is obtained through the voltage and current double closed loop, where P ref , Q ref is the set active and reactive reference value, P e , Q e is the actual output power of the inverter; ω n , ω is the rated frequency and actual frequency of the system, U n , U is the rated output voltage and the actual output voltage, D p , D q is the P-ω and QV droop coefficient;
[0016] The inverter output voltage command is linearly increased from 0 to the system rated voltage U n , in order to suppress the excitation surge current generated when the no-load transformer is closed, and prevent the excitation surge current from causing subsequent wind farm self-starting failure.
[0017] Furthermore, in step (2), the no-load electromotive force of the stator winding is expressed by the rotor current as:
[0018]
[0019] Where L m is the equivalent mutual inductance of the stator and rotor windings, u ds 、u qs are the dq components of the stator winding voltage respectively. If the stator voltage vector is oriented, then u ds =U s ,u qs =0;i qr 、i dr is the dq component of the rotor current in the same coordinate system, ω1 is the synchronous speed of the motor, the derivative term in the steady-state formula is 0, and the current command of the rotor winding is obtained by combining the grid-connected requirements for the stator potential:
[0020]
[0021] Where U s The current error is obtained by the voltage loop PI regulator to obtain the voltage command of the rotor-side converter, thereby executing the no-load starting of the doubly-fed asynchronous wind turbine.
[0022] Furthermore, the MPPT control mode in step (3) is specifically:
[0023] The power feedback method is used to control the mechanical power P of the fan. mech Running on the fan's optimal power-speed curve P opt (ω), the control object is the stator output active power P1;
[0024] The transmission mechanism is approximately regarded as a rigid body, and the power balance of the system in steady state is:
[0025] P mech -ωT f =P1+P Cu +P Fe
[0026] Where: P1 is the active power output of DFIG stator; J and T f are the inertia time constant and friction torque of the transmission mechanism respectively; P Fe and P Cu are the iron loss and stator and rotor copper loss of the doubly-fed asynchronous wind turbine generator respectively; the stator power command P of the wind turbine is continuously changed within a certain wind speed range. * 1(ω), so that P mech According to P opt (ω) changes regularly to achieve maximum power tracking.
[0027] Furthermore, in step (5), a mathematical model of the power supply network to be studied is established, and the start-up sequence of the wind farm is optimized using the electrical distance, which specifically includes:
[0028] The impedance network in the system is transformed into a network with only direct impedance between the wind farm and the energy storage station to determine the n-order node impedance matrix Z of the system. net , that is, the node admittance matrix Y net The inverse matrix of , where n is the number of nodes in the network; each electrical component in the network is equivalent to the following model:
[0029] The transformer is connected with reactance X T Equivalent, ignoring its excitation branch R m +jX m and winding resistance R;
[0030] Transmission line impedance Z L Equivalent, ignoring the capacitance to ground;
[0031] The energy storage power station adopts the vf control strategy and uses an infinite voltage source in series with an equivalent reactance model. In the per-unit value system, the potential E of the equivalent voltage source is esi and impedance x esi Respectively expressed as:
[0032] E esi =1
[0033]
[0034] Where S B is the base capacity of the system, S esi is the capacity of the energy storage power station connected to node i;
[0035] The wind farm adopts the PQ control strategy. Assuming that the grid voltage is constant, an infinite current source parallel equivalent reactance model is used for equivalent impedance expression:
[0036]
[0037] Where S wi is the capacity of the wind farm connected to node i.
[0038] Furthermore, in step (5), the equivalent electrical distance from each wind farm to the energy storage power station is calculated, which specifically includes:
[0039] Calculate the transfer impedance between the wind farm and the energy storage power station at node i. The specific calculation formula is:
[0040]
[0041] A is a set of node numbers connected to the energy storage, Z i,j The node impedance matrix Z represents the entire network net The element in row i and column j in esj represents the equivalent impedance of the j-th energy storage power station;
[0042] The voltage of the wind farm grid-connected node at node i is calculated based on the transfer impedance, that is, the equivalent electrical distance. The specific calculation formula is:
[0043]
[0044] Where E esi is the equivalent potential of the i-th energy storage power station, x wi is the equivalent impedance of the i-th wind farm, Z wi is the transfer impedance calculated by the above formula, and the grid-connected node voltage U of the wind farm wi The larger it is, the stronger the reactive power supply capacity of the energy storage station to the wind turbine is, and the closer the reactive electrical distance from the energy storage station to the wind farm is. The earlier it should be started during the black start process, thereby determining the start-up order of each wind farm.
[0045] Furthermore, the wind energy storage system comprises a rotor-side converter and a grid-side converter, wherein:
[0046] The rotor-side converter realizes decoupling control of the stator active power and reactive power of the doubly-fed asynchronous wind generator through stator flux directional vector control;
[0047] The grid-side converter realizes decoupling control of the grid-side output active power of the double-fed asynchronous wind generator and the grid-side converter loop reactive power through grid voltage oriented vector control.
[0048] A control and optimization system for black start of a wind energy storage system, comprising: a computer-readable storage medium and a processor;
[0049] The computer-readable storage medium is used to store executable instructions;
[0050] The processor is used to read the executable instructions stored in the computer-readable storage medium to execute the above-mentioned control and optimization method for the black start of the wind energy storage system.
[0051] Compared with the prior art, the above technical solution conceived by the present invention can achieve the following beneficial effects:
[0052] (1) The present invention takes into account the impact on the energy storage power station when the wind farm is connected to the grid, and simulates the grid-connected process of the synchronous generator. Before the DFIG outputs power to the outside, the output current of the rotor-side converter is controlled to achieve the tracking of the stator no-load potential to the grid voltage, thereby avoiding the circulation between the wind turbine and the energy storage. When the wind farm is connected to the grid, the rotor-side converter switches to MPPT control in a steady state to achieve maximum power tracking. This solution can minimize the impact on the system when the wind turbine is connected to the grid without introducing other compensation equipment, optimize the transient response of the power during the startup process, and effectively maintain the stability of the wind storage system;
[0053] (2) The present invention uses the concept of electrical distance to provide a method for determining the start-up order of each wind farm during a black start process. For a general wind power-energy storage network, a node impedance matrix of the network can be established to obtain the transfer impedance from each wind farm to all energy storage power stations, and then the voltage U of the wind farm grid-connected node can be calculated. wi , which is used to measure the power supply capacity of the energy storage power station to the wind farm at that point: the shorter the electrical distance, the more conducive it is to the start-up of the wind farm. This solution has a wide range of applications and is simple to operate. It does not require partitioning of each unit and complex calculations. It can effectively optimize the transient process of black start in conjunction with the solution in (1). BRIEF DESCRIPTION OF THE DRAWINGS
[0054] Figure 1 It is a flow chart of an embodiment of a wind-storage microgrid black start control method of the present invention;
[0055] Figure 2 It is a schematic diagram of the topological structure of a distributed wind-storage isolated grid system provided by an embodiment of the present invention;
[0056] Figure 3 It is a distributed wind-storage network equivalent model provided by an embodiment of the present invention;
[0057] Figure 4 is a schematic diagram of a vector control strategy for a doubly-fed wind turbine generator provided by an embodiment of the present invention;
[0058] Figure 5 is a schematic diagram of the topological structure of an energy storage system provided by an embodiment of the present invention;
[0059] Figure 6 is a schematic diagram of an energy storage system control method provided by an embodiment of the present invention;
[0060] Figure 7 and Figure 8 They are respectively simulation diagrams of the output power of the energy storage device when the wind farm is started from far to near and from near to far according to the electrical distance in the embodiment of the present invention;
[0061] Fig. 9 , Fig.10 and Fig.11 They are respectively the total power of each wind farm matching the corresponding load, the output power of each energy storage power station and the bus voltage simulation diagram when the optimal solution provided by the embodiment of the present invention is started according to the electrical distance from near to far and combined with the droop control. DETAILED DESCRIPTION
[0062] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0063] The embodiment of the present invention provides a control and optimization method for a wind power storage system black start, comprising:
[0064] (1) The underlying control of the distributed wind energy storage system includes: directional vector control of the doubly-fed asynchronous wind turbine (DFIG) and dual closed-loop control of voltage and current of the energy storage system (ESS). At the beginning of the black start, the voltage command of the energy storage system is increased from zero to the rated voltage of the system to suppress the excitation inrush current generated by the closed no-load transformer.
[0065] (2) DFIG stator voltage tracking control: The given rotor converter current command is: i dr =-U s / ω1L m ,i dr =0, thereby controlling the stator no-load potential to track the grid voltage.
[0066] (3) Droop control of distributed energy storage system: The energy storage power station outputs active power and reactive power according to the droop coefficient to achieve proportional power distribution.
[0067] (4) Optimize the startup sequence of wind farms: Start each wind farm in order from near to far in terms of electrical distance to reduce the impact of wind farms on energy storage power stations during the black start period. After determining the startup sequence, each wind farm can be started one by one to complete the black start process.
[0068] like Figure 1 As shown, it is a flow chart of the whole process of black start of the wind storage system determined by the present invention.
[0069] like Figure 2 As shown, the topological structure of the distributed wind storage system provided by the present invention includes three sub-parts: a double-fed asynchronous wind turbine generator DFIG, an energy storage system ESS, and a comprehensive load.
[0070] like Figure 3 As shown in the figure, the equivalent circuit model of the 11 independent node wind energy storage network determined by the present invention is used to measure the electrical distance from the top of the wind farm to the energy storage power station, including: the wind farm uses a current source I w Shunt Reactance X w To be equivalent; the energy storage power station uses a voltage source E es Series Reactance X es To be equivalent; transformer reactance X T ; Transmission line impedance Z L To express.
[0071] Establish the node impedance matrix Z for the equivalent circuit model net , the transfer impedance from each wind farm to the energy storage power station can be further calculated:
[0072]
[0073] Grid-connected node voltage:
[0074]
[0075] By comparing the voltages of the grid-connected nodes of each wind farm, the order of black starts of each wind farm can be determined.
[0076] like Figure 4 As shown, DFIG directional vector control includes:
[0077] (1.1) The stator-side converter controls the stator output active power and reactive power, and obtains the reference rotor dq axis voltage through the stator flux oriented vector control method, thereby realizing the DFIG stator active power P s and reactive power Q s Decoupling control of
[0078] (1.2) The grid-side converter controls the grid-connected active power and the grid-side converter loop reactive power. The grid-side converter obtains the dq axis reference voltage through grid voltage directional vector control, thereby realizing the DFIG grid-side output active power P net and the grid-side converter loop reactive power Q sr decoupling control.
[0079] Energy storage system topology Figure 5As shown in Figure 1, the underlying ESS control method includes: controlling the energy storage system through double closed-loop control to stabilize the DC side voltage V dc , the inverter can easily realize bidirectional exchange of power.
[0080] like Figure 6 As shown in the figure, the energy storage droop control strategy includes a phase-locked loop module, active droop control and reactive droop control. After coordinate transformation, active frequency droop control is added to the d-axis control, and reactive voltage droop control is added to the q-axis control. By analogy with the primary frequency regulation process of the power grid, a primary voltage regulation process is established to obtain the reference values of active and reactive power, and the internal potential reference value e of dq decoupling is obtained through the power and current regulator. d , e q , and then the dq inverse transformation and SVPWM are used to control the switch tube.
[0081] Example:
[0082] The system parameter values are shown in Table 1:
[0083] Table 1
[0084]
[0085]
[0086] The droop coefficient of the energy storage power station is shown in Table 2:
[0087] Table 2
[0088] Energy storage power station Busbar Reactive power droop coefficient Active power droop coefficient Energy storage power station 1 5 8 4 Energy storage power station 2 10 12 6 Energy storage power station 3 11 5 2.5 Energy storage power station 4 1 1 0.5
[0089] Through the modeling and calculation of the above process, the grid-connected node voltage U of the four wind farms is finally obtained. w2 , U w3 , U w6 , U w7 The voltage amplitude is sorted by size, and the size relationship is:
[0090] U w6 >U w7 >U w3 >U w2
[0091] Therefore, the black start sequence determined by the above method is 6-7-3-2, namely Lianhua Village-Niuji Mountain-Yingzi Village-Baolin Scenery. The electrical distance quantification performed by this method fully considers the impact of the lines, transformers, and the capacity of wind farms and energy storage power stations in the system on the difficulty of starting. Figure 7 As shown in Figure 2, each wind farm is connected to the grid at t=2s, 4s, 6s, and 8s respectively. Figure 7 , Figure 8In the simulation results corresponding to the starting method shown, the waveforms of active power and reactive power obviously have smaller overshoot, which means that when the wind turbine is connected to the grid, the impact on the grid is minimal. Therefore, starting from near to far according to the electrical distance can make the system have a better transient process.
[0092] like Fig. 9 As shown in Figure 1, the total power of each wind farm and load responds according to the startup sequence. The impact generated during the startup process does not cause the collapse of the system's active and reactive levels. The control strategy used is effective. Fig.10 As shown, after adding the droop control according to the coefficients in Table 2, the energy storage power station outputs active power and reactive power according to the droop coefficients, achieving proportional power distribution. Fig.11 The waveforms of bus voltage and frequency during black start are shown. According to the National Standard of the People's Republic of China: "Power Quality - Power System Frequency Amplitude Deviation", the grid voltage frequency change is not more than 1%, and the amplitude change is not more than 5%. It can be seen that this starting method meets the fluctuation limit of voltage and amplitude in the dynamic process and ensures the power quality during the starting process.
[0093] Overall:
[0094] (1) Based on the circuit equivalent model of the wind-storage network, the present invention proposes a method for determining the order of grid connection of spatially distributed wind farms during the black start process to ensure that the impact on the energy storage power station during the black start process is minimized; at the same time, the zero-boost start of the energy storage power station and the DFIG smooth grid connection technology are used to improve the stability of the wind-storage system during the black start process. In this way, the present invention can use the optimal start-up sequence when the wind speed is appropriate to smoothly start each wind farm to form a stable wind-storage isolated grid system
[0095] (2) The present invention takes into account the differences in the capacity of energy storage power stations and uses a droop control strategy to allocate power to each energy storage power station in proportion to its capacity, so that the capacity of the energy storage unit can be fully utilized. At the same time, the droop control simulates the primary frequency and voltage regulation process of the power grid, and adjusts the reactive power and active power output by the inverter according to the changes in system voltage and frequency, thereby enhancing the stability of the system.
[0096] In addition, it will be appreciated by those skilled in the art that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0097] The present invention is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of the processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0098] The above-mentioned computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce a manufactured product including an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0099] The embodiment of the present invention also provides a control and optimization system for black start of a wind power storage system, comprising: a computer-readable storage medium and a processor;
[0100] The computer-readable storage medium is used to store executable instructions;
[0101] The processor is used to read the executable instructions stored in the computer-readable storage medium and execute the aforementioned control and optimization method for black start of the wind energy storage system.
[0102] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0103] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents. Any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.
Claims
1. A control and optimization method for black start of a wind power storage system, characterized in that: The following steps are involved: (1) Each energy storage power station adopts a droop control strategy and starts from zero voltage to the rated voltage U n , establish stable frequency and voltage for the system, and charge the unloaded lines and transformers in the system; (2) The auxiliary equipment of the wind farm is put into operation. The external voltage U of the double-fed asynchronous wind turbine generator in step (1) is n The rotor is connected to the grid under the support of the double-fed asynchronous wind turbine generator, and the rotor current i rd 、i rq Control is performed so that the no-load electromotive force E0 of the stator winding is equal to the bus voltage U n Exactly the same, i.e. voltage tracking, to achieve smooth grid connection of subsequent wind turbines; (3) The stator of the doubly-fed asynchronous wind turbine generator is connected to the grid, and the rotor-side converter is switched from the no-load grid-connected mode in step (2) to the MPPT control mode to capture the maximum wind energy. The stator-side converter stabilizes the DC side capacitor voltage U C and the grid-connected reactive power Q wind , so that the wind farm can complete self-starting and output constant power; (4) After the wind farm completes self-startup, the corresponding load is put into use to form a stable wind storage island system to supply power to the local load; (5) Establish a mathematical model of the power supply network to be studied, calculate the equivalent electrical distance from each wind farm to the energy storage power station, and use it to optimize the black start sequence of each wind farm; (6) performing steps (2) to (4) on each wind farm in sequence according to the black start order determined in step (5) to complete the black start process; The MPPT control mode in step (3) is specifically: The power feedback method is used to control the mechanical power P of the fan. mech Running on the fan's optimal power-speed curve P opt (ω), the control object is the stator output active power P1; The transmission mechanism is approximately regarded as a rigid body, and the power balance of the system in steady state is: P mech -ωT f =P1+P Cu +P Fe Where: P1 is the active power output of DFIG stator; J and T f are the inertia time constant and friction torque of the transmission mechanism respectively; P Fe and P Cu are the iron loss and stator and rotor copper loss of the doubly-fed asynchronous wind turbine generator respectively; the stator power command P of the wind turbine is continuously changed within a certain wind speed range. * 1(ω), so that P mech According to P opt (ω) changes regularly to achieve maximum power tracking; In step (5), a mathematical model of the power supply network to be studied is established, and the electrical distance is used to optimize the start-up sequence of the wind farm, which specifically includes: The impedance network in the system is transformed into a network with only direct impedance between the wind farm and the energy storage station to determine the n-order node impedance matrix Z of the system. net , that is, the node admittance matrix Y net The inverse matrix of , where n is the number of nodes in the network; each electrical component in the network is equivalent to the following model: The transformer is connected with reactance X T Equivalent, ignoring its excitation branch R m +jX m and winding resistance R; Transmission line impedance Z L Equivalent, ignoring the capacitance to ground; The energy storage power station adopts the vf control strategy and uses an infinite voltage source in series with an equivalent reactance model. In the per-unit value system, the potential E of the equivalent voltage source is esi and impedance x esi Respectively expressed as: E esi =1 Where S B is the base capacity of the system, S esi is the capacity of the energy storage power station connected to node i; The wind farm adopts the PQ control strategy. Assuming that the grid voltage is constant, an infinite current source parallel equivalent reactance model is used for equivalent impedance expression: Where S wi is the capacity of the wind farm connected to node i; In step (5), the equivalent electrical distance from each wind farm to the energy storage power station is calculated, which specifically includes: Calculate the transfer impedance between the wind farm and the energy storage power station at node i. The specific calculation formula is: A is a set of node numbers connected to the energy storage, Z i,j The node impedance matrix Z represents the entire network net The element in row i and column j in esj represents the equivalent impedance of the j-th energy storage power station; The voltage of the wind farm grid-connected node at node i is calculated based on the transfer impedance, that is, the equivalent electrical distance. The specific calculation formula is: Where E esi is the equivalent potential of the i-th energy storage power station, x wi is the equivalent impedance of the i-th wind farm, Z wi is the transfer impedance calculated by the above formula, and the grid-connected node voltage U of the wind farm wi The larger it is, the stronger the reactive power supply capacity of the energy storage station to the wind turbine is, and the closer the reactive electrical distance from the energy storage station to the wind farm is. The earlier it should be started during the black start process, thereby determining the start-up order of each wind farm.
2. The method according to claim 1, characterized in that The droop control in step (1) is used to simulate the primary frequency modulation process of a traditional synchronous generator. The reactive power and active power output by the inverter are adjusted according to the system voltage and frequency changes. The voltage and frequency adjustment process is achieved through the following target equation: P ref =P e -D p (oh n -oh) Q ref =Q e -D q (U n -U) After obtaining the power command through the voltage and frequency error, the internal potential reference value of the energy storage system is obtained through the voltage and current double closed loop, where P ref , Q ref is the set active and reactive reference value, P e , Q e is the actual output power of the inverter; ω n , ω is the rated frequency and actual frequency of the system, U n , U is the rated output voltage and the actual output voltage, D p , D q is the P-ω and QV droop coefficient; The inverter output voltage command is linearly increased from 0 to the system rated voltage U n , in order to suppress the excitation surge current generated when the no-load transformer is closed, and prevent the excitation surge current from causing subsequent wind farm self-starting failure.
3. The method according to claim 1, characterized in that In step (2), the no-load electromotive force of the stator winding is expressed by the rotor current as: Where L m is the equivalent mutual inductance of the stator and rotor windings, u ds 、u qs are the dq components of the stator winding voltage respectively. If the stator voltage vector is oriented, then u ds =U s ,u qs =0;i qr 、i dr is the dq component of the rotor current in the same coordinate system, ω1 is the synchronous speed of the motor, the derivative term in the steady-state formula is 0, and the current command of the rotor winding is obtained by combining the grid-connected requirements for the stator potential: Where U s The current error is obtained by the voltage loop PI regulator to obtain the voltage command of the rotor-side converter, thereby executing the no-load starting of the doubly-fed asynchronous wind turbine.
4. The method according to any one of claims 1 to 3, characterized in that The wind storage system includes a rotor-side converter and a grid-side converter, wherein: The rotor-side converter realizes decoupling control of the stator active power and reactive power of the doubly-fed asynchronous wind generator through stator flux directional vector control; The grid-side converter realizes decoupling control of the grid-side output active power of the double-fed asynchronous wind generator and the grid-side converter loop reactive power through grid voltage oriented vector control.
5. A control and optimization system for black start of wind power storage system, characterized in that: include: A computer readable storage medium and a processor; The computer-readable storage medium is used to store executable instructions; The processor is used to read the executable instructions stored in the computer-readable storage medium and execute the control and optimization method for black start of a wind energy storage system according to any one of claims 1 to 3.
Citation Information
Patent Citations
Virtual synchronous control method and device for island double-fed wind power plant high-voltage direct current grid connection
CN108110799A
Doubly-fed wind farm black start method using improved virtual synchronous control
CN110690725A
Control method and system for primary frequency modulation of wind storage system
CN112600225A
Frequency control method and system during using wind farm as black-start power source by means of optimal configuration of energy storage
WO2021164112A1