An online government information project performance evaluation system
Through the online government information project performance evaluation system, multi-functional terminal equipment and graphical display, the problem of incomplete data collection in the existing technology is solved, efficient and accurate performance evaluation and document management are achieved, and evaluation is improved. Scientific and transparent.
Patent Information
- Application Number
- CN202210269046.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-03-18
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2042-03-18
AI Technical Summary
The existing performance evaluation system collects incomplete and incomplete employee work information data, resulting in deviations or errors in performance evaluation.
An online government information project performance evaluation system was designed, including data synthesis and graphical push module, indicator automation generation and verification module, terminal electronic collection module, file status management control system, resource matching system, information and data The control system realizes complete data collection, correction and management through portable terminal devices with multiple functions and graphical display.
It improves the accuracy and scientificity of performance evaluation, realizes efficient management and transparent display of project documents and materials, and ensures the visibility and basis of evaluation.
Smart Images

Figure CN114757488B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of project performance evaluation, and in particular to an online government affairs informationization project performance evaluation system. Background Art
[0002] Performance evaluation refers to the use of certain evaluation methods, quantitative indicators and evaluation standards to conduct a comprehensive evaluation of the degree of achievement of the performance goals set by the central departments to realize their functions, as well as the execution results of the budget arranged to achieve this goal. The process of performance evaluation is the process of comparing the collected work performance of employees with the work performance standards required of them. However, the existing performance evaluation system does not collect complete and comprehensive information data on employee work, which leads to deviations or errors in performance evaluation. The most effective way to solve this problem is to improve the data on employee work. For this reason, an online government information project performance evaluation system with a more comprehensive project information collection effect is proposed. Summary of the invention
[0003] The purpose of the present invention is to provide an online government information project performance evaluation system to solve the above-mentioned deficiencies in the technology.
[0004] In order to achieve the above-mentioned purpose, the present invention provides the following technical solutions: an online government information project performance evaluation system, including a data synthesis and graphical push module, an indicator automatic generation and verification module, a terminal electronic collection module, a file status management and control system, a resource matching system, an information and data control system, and a project performance evaluation system;
[0005] The data synthesis and graphical push module integrates the project work data, synthesizes the data graphically and pushes it to the system terminal;
[0006] The indicator automated electronic generation and verification module presents the project data in electronic form and calibrates and verifies it with the project standard data;
[0007] The terminal electronic collection module realizes data collection, uploading, recording and transmission of work flow through a portable terminal device with multiple functions such as telephone, data collection, calculation, storage, positioning, communication, photography, Bluetooth, network, etc., and usually integrates barcode reading, QR code recognition, barcode scanning, data collection, QR code scanning and other functions closely related to information processing, thereby completing paperless operation and digital management;
[0008] The document status management and control system includes a document writing module, a document review module, a document approval module, a document issuance module, a document use module, a document modification module, a document finalization module, a document identification module, a document recovery module and a document cancellation module;
[0009] The resource matching system uniformly matches the files generated by the contractor's workflow system and the construction review and inspection online system;
[0010] The information and data flow control system is responsible for sending a "no more receiving" signal when the data and information buffer of the receiving end is full and cannot process the data and information, and the sending end stops sending until the sending end receives a "can continue sending" signal and then sends data.
[0011] As a preferred solution of the present invention, the graphics in the data synthesis and graphical push module are any one or more of a bar chart, a pie chart, a line chart, a box chart, a scatter plot or a radar chart.
[0012] As a preferred solution of the present invention, the electronic terminal in the terminal electronic collection module has GPS function, WLAN function, integrated NFC function, identity recognition function, and supports 4G / 5G function.
[0013] As a preferred solution of the present invention, the automatic indicator generation and verification module has the ability to extract system resources, and realizes indicator automation by comparing the project standard data entered into the extraction system with the collected data.
[0014] As a preferred solution of the present invention, the file writing module refers to a platform that can be edited by project designers; the file review module refers to the review of the edited file after it is uploaded to the file review module; and the file approval module refers to the review of the file through stamping after the review; the file issuance module refers to the right to use the file after the file obtains the qualification of passing the review; the file use module means that the file can be officially put into use.
[0015] As a preferred solution of the present invention, the file change module means that the files in use can be changed and edited; the file finalization module means that the file is officially finalized after the file is edited and modified; the file identification module means marking the specified project on the file; the file recycling module means that after the project is completed, the files used in the project will be recycled to protect the files; and the file cancellation module is to cancel the files after the files are recycled.
[0016] As a preferred solution of the present invention, the following steps and processes are also included:
[0017] Step 1: First, the terminal electronic collection module uses the electronic terminal to collect data from the work points in the project, realizes data collection, uploading, recording and transmission of the workflow, and thus completes paperless operation and digital management. At the same time, the indicator automatic electronic generation and verification module calibrates and verifies the data collected by the electronic terminal with the project standard data;
[0018] Step 2: The corrected and verified project data is synthesized into a graph through the data synthesis and graphical push module, and the graphical project data is presented on a large screen as a bar graph, ..., scatter graph or radar graph, which is convenient for viewing the data;
[0019] Step 3: The project data and documents generated above will be summarized into the resource matching system, and the resource matching system will compare and verify the documents and data with the actual situation, so as to manage the data;
[0020] Step 4: In the document status management and control system, the entire process from document generation to document cancellation is managed, and each link of document editing, document review, document approval, document issuance, document use, document change, document finalization, document identification, document recovery and document cancellation is monitored;
[0021] Step 5: When the evaluation system retrieves various files and materials in the project, and the data and information buffer of the receiving end is full and cannot process more data and information, a "no more receiving" signal is sent to the system, and the sending end stops sending data until the sending end receives a "can continue sending" signal and then sends data;
[0022] Step 6: The system reviews the documents and materials in each link of the project to determine the degree of completion and quality of the work in the project and conduct performance evaluation of the project.
[0023] In the above technical solution, the technical effects and advantages provided by the present invention are:
[0024] The project performance evaluation system in the present invention is based on the electronic main body system of the national e-government performance evaluation method. It technically improves the traditional qualitative evaluation model, and realizes efficient, accurate, scientific, transparent and visual performance evaluation of e-government. It summarizes and integrates the documents and materials generated in the project, which not only facilitates the viewing of project documents and materials, but also improves the accuracy of performance evaluation, thereby making the performance evaluation more scientific and more based on evidence. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present invention. For ordinary technicians in this field, other drawings can also be obtained based on these drawings.
[0026] Figure 1 This is a schematic diagram of the framework structure of an online government information project performance evaluation system proposed by the present invention. DETAILED DESCRIPTION
[0027] In order to more clearly explain and illustrate the technical solution and implementation of the present invention, several preferred specific embodiments for implementing the technical solution of the present invention are introduced below.
[0028] The following description is merely exemplary in nature and is not intended to limit the present disclosure, application, and use. It should be understood that in all of these figures, the same or similar figure numbers indicate the same or similar parts and features. The various figures only schematically represent the concepts and principles of the embodiments of the present disclosure, and do not necessarily show the specific dimensions and proportions of the various embodiments of the present disclosure. Specific parts in specific drawings may use exaggerated methods to illustrate the relevant details or structures of the embodiments of the present disclosure. The various publications, patents, and published patent specifications cited herein are incorporated herein by reference in their entirety. The technical solutions of the present invention will be clearly and completely described below in conjunction with the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention.
[0029] In the description of the present invention, unless otherwise clearly specified and limited, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance; unless otherwise specified or explained, the term "plurality" refers to two or more; the terms "connected" and "fixed" should be understood in a broad sense, for example, "connected" can be a fixed connection or a detachable connection; it can be directly connected or indirectly connected through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0030] In the description of this specification, it should be understood that the directional words such as "upper", "lower", "left", and "right" described in the embodiments of the present application are described at the angles shown in the accompanying drawings and should not be understood as limitations on the embodiments of the present application. In addition, in the context, it should also be understood that when it is mentioned that an element is connected to another element "upper" or "lower", it can not only be directly connected to another element "upper" or "lower", but also indirectly connected to another element "upper" or "lower" through an intermediate element.
[0031] Embodiment 1
[0032] An online government information project performance evaluation system, see the attached manual Figure 1 , with the following complete operation process:
[0033] The terminal electronic collection module collects data from the work points in the project with the help of electronic terminals. It uses portable terminal devices with multiple functions such as telephone, data collection, calculation, storage, positioning, communication, photography, Bluetooth, and network. It usually also integrates barcode reading, QR code recognition, barcode scanning, data collection, QR code scanning and other functions closely related to information processing to realize data collection, uploading, recording and transmission of the workflow, thereby completing paperless operation and digital management, and realizing data collection, uploading, recording and transmission of the workflow. At the same time, the indicator automatic electronic generation and verification module corrects and verifies the data collected by the electronic terminal with the project standard data. The corrected and verified project data is synthesized into graphics through the data synthesis and graphical push module, and the graphical project data is presented on the large screen as a bar chart, scatter plot or radar chart, etc., which is convenient for viewing the data. The project information and files generated above will be uniformly summarized into the resource matching system, and the files and information will be compared and verified with the actual situation through the resource matching system, so as to manage the information;
[0034] In the process of generating files, the file writing module provides a platform for project designers to edit. After uploading the edited files to the file review module, the files are reviewed. The file approval module means that after the review, the rationality of the file is determined by stamping. The file issuance module is that after the file is qualified for review, the file obtains the right to use and can be officially put into use. The file change module means that the files in use can be changed and edited. At the same time, the file finalization module makes the modified files formally determined, and the logo of the specified project is marked on the file. After the project is completed, the file recovery module recovers all the files generated and used in the project. On the one hand, it protects the files, and on the other hand, it indicates that the project involved in the files has been completed. The file cancellation module is to cancel the files after the files are recovered.
[0035] When the evaluation system retrieves various files and materials in the project, and the data and information buffer at the receiving end is full and cannot process more data and information, the system will send a "no longer receiving" signal, and the sending end will stop sending until the sending end receives a "can continue sending" signal and then sends data. The system checks the files and materials in each link of the project to determine the degree of completion and quality of the work in the engineering project and conduct performance evaluation of the project.
[0036] Embodiment 2
[0037] Based on the first embodiment, an online government information project performance evaluation system is provided. Figure 1 , has the following operation process:
[0038] The terminal electronic collection module collects data from the work points in the project with the help of electronic terminals. It uses portable terminal devices with multiple functions such as telephone, data collection, calculation, storage, positioning, communication, photography, Bluetooth, and network. It usually also integrates barcode reading, QR code recognition, barcode scanning, data collection, QR code scanning and other functions closely related to information processing to realize data collection, uploading, recording and transmission of the workflow, thereby completing paperless operation and digital management, and realizing data collection, uploading, recording and transmission of the workflow. At the same time, the indicator automatic electronic generation and verification module corrects and verifies the data collected by the electronic terminal with the project standard data. The corrected and verified project data is synthesized into graphics through the data synthesis and graphical push module, and the graphical project data is presented on the large screen as a bar chart, scatter plot or radar chart, etc., which is convenient for viewing the data. The project information and files generated above will be uniformly summarized into the resource matching system, and the files and information will be compared and verified with the actual situation through the resource matching system, so as to manage the information;
[0039] In the management of project data, data on safety management, investment control, progress control, quality control, contract management, information management, organization and coordination in the project are entered into the system data section. All documents and data generated during the project construction will be collected in an orderly manner by the resource matching system, and the documents and data will be uniformly stored in the server. The resource matching system will compare and verify the documents and data with the actual situation, so as to manage the data. When personnel need to view and retrieve documents and data, the information and data control flow system that receives the document data sets a data and information buffer. When the buffer is full and cannot process more data and information, the information and data control flow system sends a "no longer receiving" signal to the system server. At this time, the sender stops sending until the sender receives the "can continue sending" signal and then sends the data. The system checks the documents and data in each link of the project to determine the degree of completion and quality of the work in the project and conducts performance evaluation on the project.
[0040] The above description is only by way of illustration of certain exemplary embodiments of the present invention. It is undoubted that those skilled in the art can modify the described embodiments in various ways without departing from the spirit and scope of the present invention. Therefore, the above drawings and descriptions are illustrative in nature and should not be construed as limiting the scope of protection of the claims of the present invention.
Claims
1. An online government information project performance evaluation system, characterized by: It includes data synthesis and graphical push module, indicator automatic generation and verification module, terminal electronic collection module, file status management and control system, resource matching system, information and data control system and project performance evaluation system; The data synthesis and graphical push module integrates the project work data, synthesizes the data graphically and pushes it to the system terminal; The indicator automated electronic generation and verification module presents the project data in electronic form and calibrates and verifies it with the project standard data; The terminal electronic collection module realizes data collection, uploading, recording and transmission of work flow through a portable terminal device with multiple functions such as telephone, data collection, calculation, storage, positioning, communication, photography, Bluetooth and network, and usually integrates barcode reading, QR code recognition, barcode scanning, data collection, QR code scanning and information processing, so as to complete paperless operation and digital management; The document status management and control system includes a document writing module, a document review module, a document approval module, a document issuance module, a document use module, a document modification module, a document finalization module, a document identification module, a document recovery module and a document cancellation module; The resource matching system uniformly matches the files generated by the contractor's workflow system and the construction review and inspection online system; The information and data flow control system is responsible for sending a "no more receiving" signal when the data and information buffer of the receiving end is full and cannot process the data and information, and the sending end stops sending data until the sending end receives a "can continue sending" signal and then sends data; The indicator automatic generation and verification module has the ability to extract system resources, and realizes indicator automation by comparing the project standard data entered into the extraction system with the collected data; The document writing module refers to a platform that can be edited by project designers; the document review module refers to the review of the edited document after it is uploaded to the document review module; the document approval module refers to the review of the document by stamping after the review; the document issuance module refers to the right to use the document after the document is qualified for review; the document use module refers to the formal use of the document; The file change module means that files in use can be changed and edited; the file finalization module means that the file is officially finalized after editing and modification; the file identification module means marking the specified project on the file; the file recycling module means that after the project is completed, the files used in the project will be recycled to protect the files; and the file cancellation module is to cancel the files after the files are recycled.
2. According to claim 1, an online government information project performance evaluation system is characterized by: The graphics in the data synthesis and graphical push module are any one or more of a bar chart, a pie chart, a line chart, a box chart, a scatter plot or a radar chart.
3. According to claim 1, an online government information project performance evaluation system is characterized by: The electronic terminal in the terminal electronic collection module has GPS function, WLAN function, integrated NFC function, identity recognition function, and supports 4G / 5G function.
4. An online government information project performance evaluation system according to any one of claims 1 to 3, characterized in that: It also includes the following steps and processes: Step 1: First, the terminal electronic collection module uses the electronic terminal to collect data from the work points in the project, realizes data collection, uploading, recording and transmission of the workflow, and thus completes paperless operation and digital management. At the same time, the indicator automatic electronic generation and verification module calibrates and verifies the data collected by the electronic terminal with the project standard data; Step 2: The corrected and verified project data is synthesized into a graph through the data synthesis and graphical push module, and the graphical project data is presented on a large screen as a bar graph, ..., scatter graph or radar graph, which is convenient for viewing the data; Step 3: The project data and documents generated above will be summarized into the resource matching system, and the resource matching system will compare and verify the documents and data with the actual situation, so as to manage the data; Step 4: In the document status management and control system, the entire process from document generation to document cancellation is managed, and each link of document editing, document review, document approval, document issuance, document use, document change, document finalization, document identification, document recovery and document cancellation is monitored; Step 5: When the evaluation system retrieves various files and materials in the project, and the data and information buffer of the receiving end is full and cannot process more data and information, a "no longer receiving" signal is sent to the system, and the sending end stops sending data until the sending end receives a "can continue sending" signal and then sends data; Step 6: The system reviews the documents and materials in each link of the project to determine the degree of completion and quality of the work in the project and conduct performance evaluation of the project.