Pull-out seepage coupling test device and method for anchored specimens under high temperature and high pressure
By designing a pull-out seepage coupling test device for anchored samples under high temperature and high pressure, the problem of easy shedding and corrosion of anchor rods under high temperature and high pressure has been solved, and reliable simulation of the stress and seepage process of anchor rods has been achieved to ensure the safety of tunnel engineering. Security and stability.
Patent Information
- Application Number
- CN202210364229.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-04-08
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2042-04-08
AI Technical Summary
Existing anchor materials are prone to property changes and pyrolysis reactions under high temperatures and pressures, resulting in separation of the structure from the rock and soil, prone to anchor falling off and instability, and groundwater seepage accelerates anchor corrosion, affecting the safety of tunnel projects. Stability, lack of pull-out seepage coupling test device under high temperature and high pressure.
A pullout seepage coupling test device for anchored samples under high temperature and high pressure is designed, including a seepage box, a pullout system, a pressurization system and a temperature system. The side wall of the sample is filled with sealing adhesive to simulate the high temperature and high pressure environment. Use the plunger pump to inject the seepage fluid, record the seepage flow, start the anchor pulling machine, monitor the stress of the anchor, and realize the top-down seepage process.
It enhances the sealing of the experimental device, effectively simulates the high temperature and high pressure environment, ensures the reliability of the experiment, can effectively simulate the seepage process of deep rock mass, monitor the stress of the anchor rod, and improves the accuracy and safety of the test.
Smart Images

Figure CN114813504B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of pull-out seepage test, and in particular to a pull-out seepage coupling test device and method for an anchored sample under high temperature and high pressure. Background Art
[0002] As the scale of my country's infrastructure construction becomes increasingly large, the depth of tunnel construction becomes deeper and deeper, and the geological environment encountered during the construction process becomes increasingly complex. Among them, geological conditions such as high temperature, high pressure, and rock bursts have gradually become difficult problems in the tunnel construction process. As a commonly used support method for tunnel construction, anchor support, with its own high tensile strength and the bonding effect between the grouting body and the soil layer, fully exerts the inherent properties of the rock and soil materials themselves, greatly mobilizes the strength and self-stabilization ability of the rock and soil medium, and makes it widely used in the field of geotechnical engineering. However, the existing anchor materials often undergo property changes and pyrolysis reactions under high temperature and high pressure, which reduces the original mechanical properties of the materials, separates the structure from the rock and soil, and is prone to safety accidents such as anchor falling off and instability. In addition, the seepage of groundwater has an important influence on the mechanical properties of the rock mass, the corrosion of the anchor and the material properties, significantly changes the water chemical environment near the anchor, accelerates the corrosion rate of the anchor steel bars, and deteriorates the cement slurry, resulting in the gradual loss of anchoring force and the deterioration of the anchoring effect, which in turn affects the safety and stability of the reinforced rock mass engineering.
[0003] At present, there have been studies on the pull-out seepage test device for rock mass, but there are few studies on the coupled test device for columnar rock mass that takes into account both the seepage and pull-out effects under high temperature and high pressure environments. Summary of the invention
[0004] In view of this, in order to solve the above problems, an embodiment of the present invention provides a pull-out seepage coupling test device and method for an anchored specimen under high temperature and high pressure.
[0005] An embodiment of the present invention provides a pull-out seepage coupling test device for an anchored specimen under high temperature and high pressure, comprising:
[0006] A seepage box, comprising a lower push plate and an upper push plate, wherein the lower push plate has an inner cavity opening upward and used for placing a rock mass, and the bottom of the upper push plate has an annular plate extending into the inner cavity, and the annular plate is used to be inserted between the inner wall of the lower push plate and the outer wall of the rock mass; the bottom of the lower push plate is provided with a first liquid outlet hole, the first liquid outlet hole is connected to a flow guide tube, and a flow meter is provided on the flow guide tube; the top of the upper push plate is provided with a first liquid inlet hole and a through hole, and the through hole is used for the anchor rod to seal through;
[0007] A seepage system, comprising a plunger pump and a seepage conduit, wherein the plunger pump is connected to the first liquid inlet hole through the seepage conduit, and a seepage fluid is injected into the inner cavity through the first liquid inlet hole, and a pressure gauge is provided on the seepage conduit;
[0008] The pulling system includes an anchor pulling machine, a displacement meter and a pressure sensor. The fixed end of the anchor pulling machine is fixed to the top of the upper push plate. The movable end of the anchor pulling machine is used to connect with the anchor on the rock mass to pull the anchor. The displacement meter is used to measure the moving distance of the anchor, and the pressure sensor is used to measure the force on the anchor.
[0009] a pressurizing system, used for pressurizing the seepage box; and,
[0010] A temperature system is used to heat the seepage box.
[0011] Furthermore, it also includes a sealed box, the sealed box includes a box body and a box cover, the box body is opened upward, and the box cover is detachable and sealedly installed on the box body;
[0012] The bottom of the box body is provided with a sealing hole for the diversion conduit to pass through, the box cover is provided with a sealing hole for the seepage conduit to pass through, the seepage box is located in the sealing box, an annular space is formed between the seepage box and the sealing box, and the heating system is located in the annular space.
[0013] Furthermore, it also includes a temperature sensor, which is arranged in the annular space and is used to monitor the temperature of the seepage box.
[0014] Furthermore, the pressurizing system includes a fluid input mechanism and an air supply conduit, the sealing box is penetrated by an air inlet hole connected to the annular space, and the fluid input mechanism is connected to the air inlet hole through the air supply conduit for inputting fluid into the annular space.
[0015] Further, the sealing box is provided with an air outlet hole communicating with the annular space, the air outlet hole is connected with an air outlet pipe, and the air outlet pipe is provided with a safety valve; and / or,
[0016] The fluid input mechanism is a high-pressure inert gas cylinder; and / or,
[0017] A gas pressure stabilizing valve is arranged on the gas delivery conduit.
[0018] Furthermore, it also includes a squeezing mechanism, which is used to push the upper push plate and the lower push plate to move toward each other.
[0019] Furthermore, the extrusion mechanism includes a bolt, a threaded hole is penetrated through the bottom of the sealing box, one end of the bolt is located outside the sealing box, and the other end is threadedly connected to the threaded hole and abutted against the bottom of the lower push plate, and the bolt is rotated to push the lower push plate upward.
[0020] Furthermore, a cooling box is installed on the guide tube, a storage chamber for storing coolants is provided in the cooling box, and the guide tube passes through the side wall of the cooling box and is located in the storage chamber; and / or,
[0021] It also includes a pad, the bottom wall of the push plate is provided with a groove with the notch upward, the pad is provided with a guide hole, the pad is located in the inner cavity and is used to place the rock mass, and there is a gap between the bottom of the pad and the bottom wall of the inner cavity.
[0022] Furthermore, it also includes a central controller, which is connected to the flow meter, the plunger pump, the pressure gauge, the anchor pulling machine, the displacement meter, the pressure sensor, the pressurization system, and the heating system.
[0023] In addition, the present invention also provides a pull-out seepage coupling test method for anchored columnar rock mass under high temperature and high pressure, based on the pull-out seepage coupling test device for anchored specimens under high temperature and high pressure, comprising the following steps:
[0024] Drill an anchor hole in the center of the rock sample, carve the fracture surface, and fix the anchor rod in the anchor hole;
[0025] Place the rock sample in the middle of the inner cavity of the push-down plate, and pour the sealing adhesive into the cavity between the rock sample and the inner wall of the push-down plate;
[0026] Before the sealing adhesive is cured, the annular plate of the upper push plate is inserted between the inner wall of the lower push plate and the outer wall of the rock mass, and the anchor rod passes through the perforation of the upper push plate to squeeze the upper push plate and the lower push plate to make them displace toward each other, squeeze the sealing adhesive, and make the sealing adhesive fill the cavity between the rock sample and the inner wall of the lower push plate. After the sealing adhesive is cured, the side wall of the rock sample is sealed;
[0027] The upper end of the anchor rod is fixedly connected to the movable end of the anchor rod puller. The seepage box is pressurized and heated by the pressurization system and the heating system respectively. Water is injected into the seepage box by a plunger pump. The fluid pressure of the whole process is recorded by a pressure gauge. The seepage fluid above the sample penetrates through the fracture surface of the sample and flows out from the diversion duct. After the flow meter shows that the flow rate of the seepage fluid is stable, the anchor rod puller is started to pull out the anchor rod upward, and the stress condition of the anchor rod is monitored by a pressure sensor.
[0028] The beneficial effects of the technical solution provided by the embodiment of the present invention are: placing the sample in the middle of the inner cavity of the lower push plate, pouring the sealing adhesive into the cavity between the sample and the inner wall of the lower push plate, and before the sealing adhesive solidifies, inserting the annular plate of the upper push plate between the inner wall of the lower push plate and the outer wall of the sample, and passing the anchor rod through the perforation of the upper push plate to squeeze the upper push plate and the lower push plate to make them displace toward each other, squeeze the sealing adhesive, and make the sealing adhesive fill the cavity between the sample and the inner wall of the lower push plate. After the sealing adhesive solidifies, the side wall of the sample is sealed, the sealing of the experimental device is enhanced, and the sample is placed in a sealed and water-proof space, thereby realizing a top-down seepage process. The pressurization system and heating system are used to pressurize and heat the seepage box respectively, which can effectively simulate the high temperature and high pressure environment; the plunger pump is used to inject the seepage fluid into the inner cavity through the liquid inlet hole, and the seepage fluid seeps from top to bottom and flows out from the liquid outlet hole of the lower push plate. The flow meter is used to record the seepage flow of the seepage fluid, the anchor pulling machine is started to pull the anchor upward, and the pressure sensor is used to monitor the stress condition of the anchor, which can effectively simulate the seepage process of deep rock mass and ensure the reliability of the experiment. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 It is a structural schematic diagram of an embodiment of a pull-out seepage coupling test device for anchored specimens under high temperature and high pressure provided by the present invention;
[0030] Figure 2 yes Figure 1 Schematic diagram of the structure of the sealing box and the seepage box;
[0031] Figure 3 yes Figure 1 Schematic diagram of the structure of the middle pad;
[0032] Figure 4 yes Figure 1 Schematic diagram of the structure of the specimen and anchor rod.
[0033] In the figure: base 1, central controller 2, box body 3, seepage box 4, box cover 5, annular plate 6, flange 7, O-ring 8, upper push plate 9, lower push plate 10, bolt 11, air inlet 12, air outlet 13, perforation 14, liquid inlet 15, liquid outlet 16, sample 17, fracture surface 18, anchor rod 19, air outlet pipe 20, plunger pump 21, stop valve 22, pressure gauge 23, flow meter 24, seepage conduit 25, pad 26, diversion hole 27, groove 28, diversion conduit 29, upper fixing plate 30, lower fixing plate 31, laser rangefinder 32, pressure sensor 33, anchor rod pulling machine 34, annular space 35, high-pressure inert gas cylinder 36, gas pressure stabilizing valve 37, gas transmission conduit 38, safety valve 39, heating system 40, temperature sensor 41, cooling box 42. DETAILED DESCRIPTION
[0034] To make the objectives, technical solutions and advantages of the present invention more clear, the embodiments of the present invention will be further described below with reference to the accompanying drawings.
[0035] See also Figures 1 to 4 An embodiment of the present invention provides a pull-out seepage coupling test device for anchored specimens under high temperature and high pressure, comprising a seepage box 4, a seepage system, a pull-out system, a pressurization system and a temperature system.
[0036] The seepage box 4 includes a lower push plate 10 and an upper push plate 9, wherein the lower push plate 10 has an inner cavity which opens upward and is used to place a sample 17, and the bottom of the upper push plate 9 has an annular plate 6 which extends into the inner cavity, and the annular plate 6 is used to be inserted between the inner wall of the lower push plate 10 and the outer wall of the sample 17; the bottom of the lower push plate 10 is provided with a liquid outlet 16, and the liquid outlet 16 is connected to a flow guide tube 29, and a flow meter 24 is provided on the flow guide tube 29, and the flow meter 24 adopts a high-precision liquid mass flow sensor for calculating the seepage flow. The top of the upper push plate 9 is provided with a liquid inlet 15 and a through hole 14, and the through hole 14 is used for the anchor rod 19 to pass through in a sealed manner.
[0037] The seepage system is used to inject a certain pressure of permeation fluid into the sample 17. The permeation fluid can be water or other fluids, so that the injected permeation fluid seeps along the fracture surface 18 inside the sample 17. The seepage system includes a plunger pump 21 and a seepage conduit. The plunger pump 21 is used for micro-liquid delivery of the permeation fluid. The plunger pump 21 is connected to the liquid inlet 15 through a seepage conduit 25. The permeation fluid is injected into the inner cavity through the liquid inlet 15. The seepage conduit 25 is provided with a stop valve 22. The seepage conduit 25 is connected to a pressure gauge 23. The pressure gauge 23 adopts a high-precision microfluidic pressure sensor 33 to determine the water injection pressure.
[0038] The pulling system includes an anchor puller 34, a displacement meter and a pressure sensor 33. The fixed end of the anchor puller 34 is fixed to the top of the upper push plate 9, and the movable end of the anchor puller 34 is used to connect with the anchor 19 on the sample 17 to pull the anchor 19, simulate the pulling force on the anchor 19, and pull out the anchor 19. The displacement meter is used to measure the moving distance of the anchor rod 19, and the pressure sensor 33 is used to measure the force on the anchor rod 19. In this embodiment, the fixed end and the movable end of the anchor rod pulling machine 34 are respectively connected to the lower fixed plate 31 and the upper fixed plate 30. The displacement meter is a continuous laser rangefinder 32. The moving distance of the anchor rod 19 is obtained by measuring the distance between the lower fixed plate 31 and the upper fixed plate 30 in the upper and lower directions. The displacement meter is fixed to the lower surface of the upper fixed plate 30 and is stationary relative to the upper fixed plate 30. When the anchor rod pulling machine 34 starts to start, the upper fixed plate 30 moves with the anchor rod 19, and the lower fixed plate 31 remains stationary. The laser rangefinder 32 emits a sequence of continuous laser beams to the lower fixed plate 31, and the laser beam reflected by the target is received by the photoelectric element. The timer measures the time from the emission to the reception of the laser beam, and calculates the change between the displacement of the laser rangefinder 32 and the lower fixed plate 31. The pressure sensor 33 is a vibrating wire anchor dynamometer, which is installed between the seepage box 4 and the lower fixing plate 31, and keeps the three coaxial, to measure the total load acting on the anchor rod 19. The pressurization system is used to pressurize the seepage box 4, and the temperature system is used to heat the seepage box 4.
[0039] Place the sample 17 in the middle of the inner cavity of the lower push plate 10, pour the sealing adhesive into the cavity between the sample 17 and the inner wall of the lower push plate 10, and before the sealing adhesive solidifies, insert the annular plate 6 of the upper push plate 9 between the inner wall of the lower push plate 10 and the outer wall of the sample 17, and the anchor rod 19 passes through the through hole 14 of the upper push plate 9 to squeeze the upper push plate 9 and the lower push plate 10 to make them displace toward each other, squeeze the sealing adhesive, and fill the cavity between the sample 17 and the inner wall of the lower push plate 10 with the sealing adhesive. After the sealing adhesive solidifies, the side wall of the sample 17 is sealed, the sealing of the experimental device is enhanced, and the sample 17 is placed in a sealed and waterproof space, thereby realizing a top-down seepage process. The seepage box 4 is pressurized and heated by the pressurizing system and the heating system 40 respectively, which can effectively simulate the high temperature and high pressure environment; the plunger pump 21 is used to inject the permeation fluid into the inner cavity through the liquid inlet hole 15, and the permeation fluid seeps from top to bottom and flows out from the liquid outlet hole 16 of the lower push plate 10. The flow meter 24 is used to record the permeation flow rate of the permeation fluid, and the anchor pulling machine 34 is started to pull the anchor 19 upward. The pressure sensor 33 is used to monitor the stress condition of the anchor 19, which can effectively simulate the seepage process of deep rock mass and ensure the reliability of the experiment.
[0040] The pulling seepage coupling test device for anchored specimens under high temperature and high pressure also includes a central controller 2, which is connected to a flow meter 24, a plunger pump 21, a pressure gauge 23, an anchor pulling machine 34, a displacement meter, a pressure sensor 33, a pressurization system, and a heating system 40.
[0041] The central controller 2 is the main switch of the experimental device, which is used to monitor the operation of each device and process the data collected by each device. The central controller 2 uses a stable computer, which is connected to the infiltration system, the drawing system, the pressurization system and the temperature system to control the operation of the experimental system. The central controller 2 should remain turned on during the experiment to avoid interruption of the experiment and ensure the continuity of the experimental data and the acquisition of key experimental parameters.
[0042] Furthermore, the pull-out seepage coupling test device for anchored specimens under high temperature and high pressure also includes a sealing box, which is fixed on the base 1. The sealing box includes a box body 3 and a box cover 5. The box body 3 is opened upward, and the box cover 5 is detachable and sealed on the box body 3. The box body 3 and the box cover 5 are connected by a flange 7. The connection between the box body 3 and the box cover 5 is combined and sealed by an O-ring and a copper ring. The O-ring is made of high temperature resistant material. The bottom of the box body 3 is provided with a sealing hole for the diversion conduit 29 to pass through, and the box cover 5 is provided with a sealing hole for the seepage conduit 25 to pass through. The seepage box 4 is located in the sealing box, and an annular space 35 is formed between the seepage box 4 and the sealing box. The heating system 40 and the temperature sensor 41 are located in the annular space 35. The temperature sensor 41 uses a high-temperature temperature sensor 41 to monitor the temperature of the seepage box 4, thereby dynamically monitoring the temperature change of the sample 17. The heating system 40 is installed in the annular space 35, and it is convenient to heat the seepage box 4. The heating system 40 heats the gas in the annular space 35 to simulate a high temperature environment. The gas in the annular space 35 fully covers the side wall of the seepage box 4, and can achieve uniform heating of the seepage box 4. In other embodiments, the heating system 40 can be a heating wire, and the heating wire is arranged on the side wall of the seepage box 4.
[0043] A high temperature resistant sealing rubber O-ring 8 is provided on the inner top wall of the upper push plate 9 to ensure that the penetrating fluid does not seep along the side wall of the sample 17. The through hole 14 of the upper push plate 9 and the anchor rod 19 are sealed by the high temperature resistant sealing rubber O-ring 8, and the liquid inlet 15 and the liquid outlet 16 are sealed with high temperature resistant epoxy resin.
[0044] The sealing box and the seepage box 4 are both cylindrically arranged, so that the inner and outer side walls of the annular space 35 are coaxially cylindrical, and the seepage box 4 is evenly pressurized and heated. The seepage box 4 is made of metal or alloy with high compressive strength, high temperature resistance, good water erosion resistance and good thermal conductivity.
[0045] The pressurizing system includes a fluid input mechanism and a gas delivery conduit 38. The sealing box is penetrated with an air inlet 12 connected to the annular space 35. The fluid input mechanism is connected to the air inlet 12 through the gas delivery conduit 38, and is used to input fluid into the annular space 35. The gas delivery conduit 38 is provided with a stop valve. The fluid can be gas or liquid. In this embodiment, gas is input into the annular space 35, and the gas is an inert gas. The fluid input mechanism is a high-pressure inert gas cylinder 36. Since the annular space 35 is provided, the input mechanism is used to input high-pressure gas into the annular space 35, so that the high-pressure gas covers the seepage box 4, the seepage box 4 is uniformly pressurized, and the inert gas is introduced, while preventing the heating system 40 from affecting the heating of the inert gas.
[0046] The sealing box is provided with an air outlet 13 connected to the annular space 35, and the air outlet 13 is connected to an air outlet pipe 20, and a safety valve 39 is provided on the air outlet pipe 20. By adjusting the safety valve 39, the pressure on the seepage box 4 can be adjusted to prevent damage caused by overpressure in the sealing box. When the pressure is slightly higher than the set normal working pressure, the safety valve 39 automatically opens to reduce the pressure. When the pressure is slightly lower than the normal working pressure, the safety valve 39 automatically closes. By providing the safety valve 39, the detection of the pressure in the sealing box can be avoided. The high-pressure inert gas cylinder 36 and the gas pressure-stabilizing valve 37 are both regulated by the central controller 2 to improve the automation of the test process.
[0047] The gas delivery conduit 38 is provided with a gas pressure regulating valve 37, which regulates the output gas pressure to ensure the stability of the injected gas pressure and the stable input of gas into the annular space 35, thereby stably regulating the pressure of the seepage box 4. The air inlet 12 and the air outlet 13 are both sealed with high temperature resistant epoxy resin.
[0048] The pressurizing system injects inert gas into the annular space 35 to make the annular space 35 have a preset air pressure, simulating a high-pressure environment, thereby ensuring that the injected permeable fluid does not vaporize under high temperature, and thus the fracture permeability of the sample 17 can be stably measured.
[0049] Further, it also includes a squeezing mechanism, which is used to push the upper push plate 9 and the lower push plate 10 to move toward each other. In this embodiment, the squeezing mechanism includes a bolt 11, and a threaded hole is provided at the bottom of the sealing box. One end of the bolt 11 is located outside the sealing box, and the other end is threadedly connected to the threaded hole and abuts against the bottom of the lower push plate 10. The bolt 11 is rotated to push the lower push plate 10 upward. By rotating the bolt 11, the lower push plate 10 and the upper push plate 9 can be squeezed, and the lower push plate 10 is gently pressed. The distance between the upper push plate 9 and the lower push plate 10 moves toward each other is adjusted according to the injection amount of the injected sealing adhesive, so as to avoid excessive force so that the sealing adhesive flows to the top of the sample 17 and seals the top of the sample 17. The bolt 11 can also be arranged on the box cover 5, extending into the sealing box, and the bolt 11 is rotated to squeeze the upper push plate 9 to move downward.
[0050] A cooling box 42 is installed on the guide conduit 29, and a storage chamber for storing coolants is provided in the cooling box 42. The guide conduit 29 passes through the side wall of the cooling box 42 and is located in the storage chamber, so that the permeated fluid flowing out of the guide conduit 29 exchanges heat with the coolants, lowers the temperature of the permeated fluid, and keeps the permeated liquid in a normal temperature range without gasification. Furthermore, the cooling box 42 is provided with a water inlet and a water outlet to form a water circulation cooling space in the cooling box 42, so that the temperature of the coolants in the cooling box 42 is always low.
[0051] The bottom wall of the push plate 10 is provided with a groove 28 with the notch upward, and the pad 26 is provided with a guide hole 27. The pad 26 is located in the inner cavity and is used to place the sample 17. There is a gap between the bottom of the pad 26 and the bottom wall of the inner cavity, which facilitates the permeate fluid in the seepage box 4 to flow out from the bottom. The pad 26 is arranged in a circular shape, and the guide holes 27 on the pad 26 are distributed in a cross shape and are opposite to the fracture surface 18 of the sample 17, so that the permeate fluid flows out from the guide holes 27 along the fracture surface 18.
[0052] The present invention also provides a pull-out seepage coupling test method for anchored columnar specimens under high temperature and high pressure, based on the pull-out seepage coupling test device for anchored specimens under high temperature and high pressure, comprising the following steps:
[0053] An anchor hole is drilled in the center of the sample 17, a crack surface 18 is engraved, and an anchor rod 19 is fixed in the anchor hole.
[0054] Specifically, sample 17 was selected to prepare the fracture surface 18. Sample 17 was cylindrical in shape and had a size of 150 mm × 100 mm (height × diameter). Sample 17 was a homogeneous sample. By means of joint carving and cutting technology, two through fractures with a height of 150 mm, a length of 20 mm, and a width of 1 mm were symmetrically carved on both sides of sample 17. Fracture surface 18 was a single fracture surface 18. By means of drilling technology, an anchor hole with a diameter of 5 mm was drilled in the center of sample 17.
[0055] Cast the anchor body, prepare a columnar concrete block with an anchor rod 19, and polish its surface. Clean the anchor hole wall and wet the hole wall with a brush dipped in water to make the grouting body better bonded to the hole wall. The grouting body is stirred and mixed according to the designed ratio and poured into the anchor hole, and a certain mass of water reducer is added to increase the fluidity of the grouting. The cast sample 17 is cured for 24 hours. A steel bar is used to simulate the anchor rod 19 with a length of 75cm. Insert the cleaned steel bar into the center of the hole wall, remove the overflowed slurry, and fix it vertically, and then cure the prepared sample 17 under standard curing conditions for 14 days. Three days before the start of the test, use a brush to dip in waterproof glue and brush the front and back ends of the anchor hole. After the waterproof glue is dry, apply a layer of 5mm thick concrete coating with lower strength on the surface to prevent the waterproof glue from cracking under the action of water pressure, so that the seepage fluid flows out and affects the flow record during the test.
[0056] The sample 17 is placed in the middle of the inner cavity of the push-down plate 10 , and the sealing adhesive is poured into the cavity between the sample 17 and the inner wall of the push-down plate 10 .
[0057] Specifically, the box cover 5 and the upper push plate 9 are removed, and the heating system 40 and the temperature sensor 41 are installed inside the sealed box, and the wiring is connected to the central controller 2. The pad 26 and the sample 17 are placed in the seepage box 4 in sequence, and the sample 17 is placed in the center of the pad 26; high temperature resistant silicone rubber is used as a sealing adhesive, and the waterproof curing rubber is prepared, and the waterproof rubber is poured into the cavity between the sample 17 and the inner wall of the lower push plate 10, so that the waterproof rubber fills the cavity between the sample 17 and the side wall of the lower push plate 10. The injection height of the waterproof rubber is greater than 1 / 2 of the height of the specimen block and less than 2 / 3 of the height of the specimen block.
[0058] Before the sealing adhesive is cured, the annular plate 6 of the upper push plate 9 is inserted between the inner wall of the lower push plate 10 and the outer wall of the sample 17. The anchor rod 19 passes through the through hole 14 of the upper push plate 9, squeezing the upper push plate 9 and the lower push plate 10 to make them displace toward each other, squeezing the sealing adhesive, and filling the cavity between the inner wall of the sample 17 and the lower push plate 10. After the sealing adhesive is cured, the side wall of the sample 17 is sealed.
[0059] Specifically, before the waterproof rubber is cured, the upper push plate 9 and the box cover 5 are covered, and the anchor rod 19 is connected to the movable end of the anchor rod pulling machine 34 through the through hole 14. The box cover 5 is fixed by the mounting flange 7 to form a closed cavity inside the sealed box. At the same time, the bolt 11 is turned to move the lower push plate 10 upward, so that the upper push plate 9 is squeezed by the lower push plate 10 and the box cover 5 and moves downward, squeezing the waterproof rubber, so that the waterproof rubber penetrates into the gap between the upper push plate 9 and the side wall of the sample 17. After the waterproof coating is cured, it fits tightly to the surface of the specimen, and there is no dead space between the upper push plate 9 and the side wall of the sample 17, so that the side wall of the sample 17 is sealed with water.
[0060] The upper end of the anchor rod 19 is fixedly connected to the movable end of the anchor rod puller 34, and the seepage box 4 is pressurized and heated by the pressurizing system and the heating system 40 respectively, and the temperature of the seepage box 4 is monitored by the temperature sensor 41; the seepage box 4 is injected with water by the plunger pump 21, and the fluid pressure of the whole process is recorded by the pressure gauge 23. The infiltration fluid above the sample 17 penetrates through the fracture surface 18 of the sample 17 and flows out from the guide tube 29. After the flow meter 24 shows that the flow rate of the infiltration fluid is stable, the anchor rod puller 34 is started to pull out the anchor rod 19 upward, and the stress condition of the anchor rod 19 is monitored by the pressure sensor 33.
[0061] Specifically, the high-pressure inert gas cylinder 36 is opened to fill the annular space 35 with inert gas, the gas pressure regulating valve 37 is adjusted to keep the pressure in the annular space 35 at the preset pressure, and the safety pressure value of the safety valve 39 is set; the inert gas in the annular space 35 is heated by the heating system 40 according to the set temperature gradient, and the heating is stopped when the temperature reaches the set temperature, and the temperature is kept constant for a period of time, so that the specimen is fully heated in a high-temperature environment. The temperature in the annular space 35 during the heating process can be monitored in real time by the temperature sensor 41. The plunger pump 21 is used to inject water into the seepage box 4, and the fluid pressure of the whole process is recorded. The infiltration fluid above the sample 17 penetrates through the fracture surface 18 of the sample 17 and flows out from the diversion conduit 29. After the infiltration fluid flow displayed by the flow meter 24 is stable, the pulling system is started to work, the anchor rod 19 is pulled out, the concrete is deformed and damaged, and the pressure sensor 33 is used to monitor the stress of the anchor rod 19.
[0062] In this document, the directional words such as front, back, top, and bottom are defined by the positions of the components in the drawings and the positions of the components relative to each other, and are only for the sake of clarity and convenience in expressing the technical solution. It should be understood that the use of the directional words should not limit the scope of protection claimed in this application.
[0063] In the absence of conflict, the above embodiments and features in the embodiments may be combined with each other.
[0064] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A pull-out seepage coupling test method for anchored columnar rock mass under high temperature and high pressure, characterized in that: A pull-out seepage coupling test device suitable for anchored specimens under high temperature and high pressure includes the following steps: Drill an anchor hole in the center of the rock sample, carve the fracture surface, and fix the anchor rod in the anchor hole; Place the rock sample in the middle of the inner cavity of the push-down plate, and pour the sealing adhesive into the cavity between the rock sample and the inner wall of the push-down plate; Before the sealing adhesive is cured, the annular plate of the upper push plate is inserted between the inner wall of the lower push plate and the outer wall of the rock mass, and the anchor rod passes through the perforation of the upper push plate to squeeze the upper push plate and the lower push plate to make them displace toward each other, squeeze the sealing adhesive, and make the sealing adhesive fill the cavity between the rock sample and the inner wall of the lower push plate. After the sealing adhesive is cured, the side wall of the rock sample is sealed; The upper end of the anchor rod is fixedly connected to the movable end of the anchor rod puller, and the seepage box is pressurized and heated by the pressurization system and the heating system respectively. Water is injected into the seepage box by a plunger pump, and the fluid pressure of the whole process is recorded by a pressure gauge. The permeating fluid above the sample penetrates through the fracture surface of the sample and flows out from the diversion conduit. After the flow meter shows that the permeating fluid flow rate is stable, the anchor rod puller is started to pull out the anchor rod upward, and the stress condition of the anchor rod is monitored by a pressure sensor; The pull-out seepage coupling test device for anchored specimens under high temperature and high pressure comprises: A seepage box, comprising a lower push plate and an upper push plate, wherein the lower push plate has an inner cavity opening upward and used for placing a rock mass, and the bottom of the upper push plate has an annular plate extending into the inner cavity, and the annular plate is used to be inserted between the inner wall of the lower push plate and the outer wall of the rock mass; the bottom of the lower push plate is provided with a first liquid outlet hole, the first liquid outlet hole is connected to a flow guide tube, and a flow meter is provided on the flow guide tube; the top of the upper push plate is provided with a first liquid inlet hole and a through hole, and the through hole is used for the anchor rod to seal through; A seepage system, comprising a plunger pump and a seepage conduit, wherein the plunger pump is connected to the first liquid inlet hole through the seepage conduit, and a seepage fluid is injected into the inner cavity through the first liquid inlet hole, and a pressure gauge is provided on the seepage conduit; The pulling system includes an anchor pulling machine, a displacement meter and a pressure sensor. The fixed end of the anchor pulling machine is fixed to the top of the upper push plate. The movable end of the anchor pulling machine is used to connect with the anchor on the rock mass to pull the anchor. The displacement meter is used to measure the moving distance of the anchor, and the pressure sensor is used to measure the force on the anchor. a pressurizing system, used for pressurizing the seepage box; and, A temperature system, used for heating the seepage box; It also includes a sealed box, which includes a box body and a box cover, the box body is open upward, and the box cover is detachable and sealedly installed on the box body; The bottom of the box body is provided with a sealing hole for the diversion conduit to pass through, the box cover is provided with a sealing hole for the seepage conduit to pass through, the seepage box is located in the sealing box, an annular space is formed between the seepage box and the sealing box, and the heating system is located in the annular space; It also includes a squeezing mechanism, which is used to push the upper push plate and the lower push plate to move toward each other; The extrusion mechanism includes a bolt, a threaded hole is penetrated through the bottom of the sealing box, one end of the bolt is located outside the sealing box, and the other end is threadedly connected to the threaded hole and abuts against the bottom of the lower push plate, and the bolt is rotated to push the lower push plate upward.
2. The pull-out seepage coupling test method for anchored columnar rock mass under high temperature and high pressure as claimed in claim 1, characterized in that: It also includes a temperature sensor, which is arranged in the annular space and is used to monitor the temperature of the seepage box.
3. The pull-out seepage coupling test method for anchored columnar rock mass under high temperature and high pressure as claimed in claim 1, characterized in that: The pressurizing system includes a fluid input mechanism and an air supply conduit. The sealing box is penetrated by an air inlet hole connected to the annular space. The fluid input mechanism is connected to the air inlet hole through the air supply conduit for inputting fluid into the annular space.
4. The pull-out seepage coupling test method for anchored columnar rock mass under high temperature and high pressure as claimed in claim 3, characterized in that: The sealing box is provided with an air outlet hole communicating with the annular space, the air outlet hole is connected with an air outlet pipe, and the air outlet pipe is provided with a safety valve; and / or, The fluid input mechanism is a high-pressure inert gas cylinder; and / or, A gas pressure stabilizing valve is arranged on the gas delivery conduit.
5. The pull-out seepage coupling test method for anchored columnar rock mass under high temperature and high pressure as claimed in claim 1, characterized in that: A cooling box is installed on the guide tube, a storage chamber for storing coolants is provided in the cooling box, and the guide tube passes through the side wall of the cooling box and is located in the storage chamber; and / or, It also includes a pad, the bottom wall of the push plate is provided with a groove with the notch upward, the pad is provided with a guide hole, the pad is located in the inner cavity and is used to place the rock mass, and there is a gap between the bottom of the pad and the bottom wall of the inner cavity.
6. The pull-out seepage coupling test method for anchored columnar rock mass under high temperature and high pressure as claimed in claim 1, characterized in that: It also includes a central controller, which is connected with a flow meter, a plunger pump, a pressure gauge, an anchor puller, a displacement meter, a pressure sensor, a pressurization system, and a heating system.