A simulation modeling method for offshore wind power grid connection based on self-starting system

By building a self-start system model on the Matlab/Simulink platform, combining submarine cable and fan auxiliary system, pre-debugging and grid-connected simulation of offshore wind power, the problem of long offshore wind power construction cycle in the existing technology is solved, and the fan is realized Early grid connection and fast grid connection for clean energy.

CN114899868BActive Publication Date: 2024-11-22JIANGSU FRONTIER ELECTRIC TECH
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202210496398.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-05-09
Publication Date
2024-11-22
Estimated Expiration
2042-05-09

AI Technical Summary

Technical Problem

The existing technology has failed to effectively use the self-start system to perform pre-debugging and grid-connected simulation modeling of offshore wind power, resulting in a long period of offshore wind power construction.

Method used

Based on the Matlab/Simulink platform, a self-starting system model is built, including diesel generator sets, variable loads and transformer models, combined with submarine cable and fan auxiliary system models, the pressure construction process is simulated to realize the pre-debugging and incorporation of the fan.

Benefits of technology

Through simulation modeling, the offshore wind power construction cycle is shortened, the wind turbine is pre-debug and grid connection are realized, the offshore wind power infrastructure cycle is reduced, and the clean energy grid connection is accelerated.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114899868B_ABST
    Figure CN114899868B_ABST
Patent Text Reader

Abstract

The invention discloses an offshore wind power grid-connected simulation modeling method based on a self-starting system, comprising: calculating capacity parameters according to specific wind farm engineering data; building a self-starting system model based on a Matlab / Simulink platform according to the capacity parameters, and building a submarine cable model taking into account charging capacitors by using typical electrical parameters acquired in advance; building a wind turbine model, a box-type transformer model and a wind turbine auxiliary machine system model based on the Matlab / Simulink platform; using the self-starting system to simulate the pressure building process of a system composed of the submarine cable model, the box-type transformer model and the wind turbine auxiliary machine system model; using the self-starting system to simulate the system composed of the wind turbine model, so as to realize the connection of the wind turbine to the self-starting system. The invention is based on a Matlab / Simulink simulation system platform and realizes the stable grid connection of the wind turbine by using the self-starting system. The invention proposes an offshore wind power grid-connected simulation modeling method for the self-starting system, so as to greatly shorten the offshore wind power grid-connected cycle.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to an offshore wind power grid-connected simulation modeling method based on a self-starting system, and belongs to the technical field of wind power grid-connected. Background Art

[0002] Wind energy is a renewable and clean energy. In recent years, Jiangsu's offshore wind power has developed rapidly. It is estimated that by the end of the 14th Five-Year Plan, the total scale of Jiangsu's offshore wind power will reach about 13 million kilowatts, and the power generation capacity will be equivalent to the maximum power load of Nanjing in 2019. The development momentum of offshore wind power is rapid and the future market is broad. Such a large-scale access to offshore wind power resources will inevitably replace a large amount of traditional fossil energy power generation, thereby reducing carbon emissions.

[0003] At present, the construction mode of offshore wind power is to complete the construction of the offshore booster station first, and then the wind turbine can be powered on and debugged after the official power is delivered to the offshore booster station. However, due to the period of laying the onshore booster station and submarine cable, the time when the official power is delivered to the offshore booster station is uncertain. If new technologies can be used to complete the wind turbine debugging before the official power is delivered to the offshore booster station, the construction period of offshore wind power will be greatly shortened.

[0004] There is an existing self-starting system, which mainly includes a diesel generator module, a variable load module and two transformer modules. The various parts are connected by cables. By building a self-starting system, the wind turbine is powered on and debugged, so as to complete the pre-debugging work of the wind turbine in advance. After the formal power supply is delivered, the wind turbine is directly connected to the grid, which greatly shortens the offshore wind power infrastructure period. However, there is no proposed offshore wind power grid-connected simulation modeling method for the self-starting system. Summary of the invention

[0005] The purpose of the present invention is to overcome the deficiencies in the prior art and provide an offshore wind power grid-connected simulation modeling method based on a self-starting system. A self-starting system model is built based on the Matlab / Simulink platform, and the simulation of the pre-debugging and fault elimination and grid-connected process of the wind turbine is realized by using the self-starting system.

[0006] To achieve the above object, the present invention is implemented by adopting the following technical solutions:

[0007] The present invention provides an offshore wind power grid-connected simulation modeling method based on a self-starting system, comprising:

[0008] Calculate the capacity parameters of the self-starting system diesel generator set, variable load and transformer based on the specific wind farm project data;

[0009] According to the capacity parameters, a self-starting system model is built based on the Matlab / Simulink platform, and a submarine cable model taking into account the charging capacitor is established using typical electrical parameters obtained in advance;

[0010] Aiming at the squirrel cage asynchronous wind turbines, which are the mainstream of offshore wind power, the wind turbine model, box transformer model and wind turbine auxiliary system model are built based on Matlab / Simulink platform;

[0011] A system consisting of a self-starting system and the submarine cable model is used to simulate a pressure building process;

[0012] The self-starting system is used to simulate the voltage building process of the system consisting of the submarine cable model and the box-type transformer model;

[0013] The self-starting system is used to simulate the pressure building process of the system consisting of the submarine cable model, box-type transformer model and wind turbine auxiliary system model;

[0014] The self-starting system is used to simulate the system composed of the fan model to integrate the fan into the self-starting system.

[0015] Furthermore, the capacity parameter calculation method of the self-starting system diesel generator set, variable load and transformer is as follows:

[0016] The variable load capacity parameter selection method includes: selecting a variable load capacity that can fully offset reactive capacity and leave a certain margin for flexible adjustment; and selecting a variable load resistive capacity that can offset the active power generated by the wind turbine when the wind turbine is connected to the grid to maintain the active power balance of the system and leave a certain margin for flexible adjustment;

[0017] The method for selecting the capacity parameters of a diesel generator set includes: selecting the capacity parameters of a diesel generator set with a large capacity as much as possible to ensure the success rate of wind power commissioning;

[0018] The method for selecting transformer capacity parameters includes: the capacity of the transformer on the outlet side of the diesel generator set is selected to be greater than the capacity parameter of the diesel generator set and a certain margin is left, and the capacity of the transformer on the outlet side of the variable load is configured according to the capacity of the variable load.

[0019] Furthermore, the steps of establishing a submarine cable model taking into account charging capacitance using typical electrical parameters are as follows:

[0020] First, evaluate the positive-sequence and zero-sequence parameters of the submarine cable as follows:

[0021]

[0022] Among them, R 1 , L 1 With C 1 are the positive sequence resistance, inductance and capacitance of the submarine cable respectively; R 0 , L 0 With C 0 are the zero-sequence resistance, inductance and capacitance of the submarine cable respectively; r1 , r 0 is the positive sequence resistance and zero sequence resistance per unit length (Ω / km); l 1 , l 0 is the positive and zero sequence inductance per unit length (H / km); c 1 , c 0 is the positive and zero sequence capacitance per unit length (F / km); l sec is the cable length; k r1 , k l1 , k c1 , k r0 , k l0 , k c0 are the positive-sequence and zero-sequence hyperbolic correction coefficients;

[0023] After calculating the typical electrical parameters of the submarine cable, the three-phase π segmented line module provided by Simulink was selected to build the submarine cable model.

[0024] Furthermore, the wind turbine model is built based on the Matlab / Simulink platform for the squirrel cage asynchronous wind turbine, which is the mainstream of offshore wind power, including:

[0025] The fifth-order model is used to simulate the electrical part of the synchronous generator, and its voltage equation is as follows:

[0026]

[0027] Where: u is the terminal voltage of each winding; i is the current of each winding; R is the resistance of each phase winding of the stator; subscripts d and q represent the vertical axis and horizontal axis in the dq0 coordinate system; subscript f represents the excitation winding; subscript h represents the damping winding;

[0028] Its magnetic flux equation is:

[0029]

[0030] Where L d , L q is the synchronous inductance of the stator winding longitudinal and transverse axes; L fd Indicates the reflected inductance between the longitudinal axis armature windings; L md , L mq is the component of the generator excitation inductance on the vertical and horizontal axes; L kd , L kq are the components of the generator damping winding inductance on the vertical and horizontal axes.

[0031] Furthermore, the pressure building process simulation using the system composed of the self-starting system and the submarine cable model includes:

[0032] According to the pre-calculated submarine cable charging capacitance, a corresponding inductive reactive load is set in the self-starting system for balancing;

[0033] Set appropriate resistive loads in the self-starting system to keep the power factor of the entire system within a preset reasonable level range;

[0034] During the boosting process, the diesel generator gradually boosts the voltage of the entire system from 0 to the rated voltage.

[0035] Furthermore, the method of simulating the system composed of the fan model by using the self-starting system to integrate the fan into the self-starting system includes:

[0036] After realizing the process of supplying power to the wind turbine using the self-starting system, one or more parameters including wind speed, pitch angle, and wind turbine grid-connected power are input into the wind turbine model for simulation, and the wind turbine is successfully integrated into the self-starting system to obtain the real-time voltage and power curves of the system during the entire process of wind turbine grid connection.

[0037] Furthermore, the method of simulating the system composed of the fan model by using the self-starting system to integrate the fan into the self-starting system also includes:

[0038] The variable load resistive capacity of the self-starting system is set according to the maximum grid-connected active power of the wind turbine. Before the wind turbine is connected to the grid for power generation, the diesel generator supplies power to the variable load.

[0039] After the system voltage and current parameters stabilize, the wind turbine is started and connected to the grid. During the grid-connected process, the power generated by the wind turbine is absorbed in real time by the self-starting system. The diesel generator maintains the system frequency stability by generating more or less active power, and maintains the system voltage stability by generating more or less reactive power.

[0040] Compared with the prior art, the present invention has the following beneficial effects:

[0041] The present invention provides an offshore wind power grid-connected simulation modeling method based on a self-starting system. Through this method, the self-starting system can be used to help the wind turbine to perform pre-debugging, eliminate faults and connect to the grid in advance. After the official power supply is delivered, the wind turbine does not need to be debugged and directly connected to the grid for power generation, which greatly shortens the offshore wind power construction period, accelerates the clean energy grid connection, and has great economic and social benefits. BRIEF DESCRIPTION OF THE DRAWINGS

[0042] Figure 1 Schematic diagram of the simulation model for using the self-starting system to supply power to the wind turbine and connect it to the grid.

[0043] Figure 2 This is a simplified schematic diagram of the self-starting system, submarine cable and wind turbine system.

[0044] Figure 3Schematic diagram of the electrical model of the self-starting system with submarine cable boosting.

[0045] Figure 4 This is the voltage and active power curve of the diesel generator set terminal during the self-starting system with submarine cable boosting process.

[0046] Figure 5 This is a schematic diagram of the electrical model of the self-starting system with submarine cable and wind turbine box transformer booster.

[0047] Figure 6 This is the electrical parameter curve diagram of the diesel generator set and fan unit in the self-starting system with fan grid-connected process. DETAILED DESCRIPTION

[0048] The present invention will be further described below in conjunction with the accompanying drawings. The following embodiments are only used to more clearly illustrate the technical solution of the present invention, and cannot be used to limit the protection scope of the present invention.

[0049] Example 1

[0050] This embodiment introduces an offshore wind power grid connection simulation modeling method based on a self-starting system, including:

[0051] Calculate the capacity parameters of the self-starting system diesel generator set, variable load and transformer based on the specific wind farm project data;

[0052] According to the capacity parameters, a self-starting system model is built based on the Matlab / Simulink platform, and a submarine cable model taking into account the charging capacitor is established using typical electrical parameters obtained in advance;

[0053] Aiming at the squirrel cage asynchronous wind turbines, which are the mainstream of offshore wind power, the wind turbine model, box transformer model and wind turbine auxiliary system model are built based on Matlab / Simulink platform;

[0054] A system consisting of a self-starting system and the submarine cable model is used to simulate a pressure building process;

[0055] The self-starting system is used to simulate the voltage building process of the system consisting of the submarine cable model and the box-type transformer model;

[0056] The self-starting system is used to simulate the pressure building process of the system consisting of the submarine cable model, box-type transformer model and wind turbine auxiliary system model;

[0057] The self-starting system is used to simulate the system composed of the fan model to integrate the fan into the self-starting system.

[0058] The application process of the offshore wind power grid-connected simulation modeling method based on the self-starting system provided in this embodiment specifically involves the following steps:

[0059] Step 1: Calculate the capacity parameters of the diesel generator set, variable load and transformer of the self-starting system according to the specific wind farm project data;

[0060] Step 2: Based on the capacity parameters calculated in step 1, a self-starting system model is built based on the Matlab / Simulink platform; a submarine cable electrical model taking into account the charging capacitor is established using typical electrical parameters;

[0061] Step 3: For the squirrel cage asynchronous wind turbine, which is the mainstream of offshore wind power, a 5th-order model is built based on the Matlab / Simulink platform to simulate the synchronous generator model;

[0062] Step 4: After the modules of the self-starting system model are built, the pressure building process of the system consisting of the self-starting system and the submarine cable model established in step 2 is simulated;

[0063] Step 5: Simulate the pressure building process of the system composed of the self-starting system, the submarine cable and the wind turbine box transformer;

[0064] Step 6: Simulate the pressure building process of the system consisting of the self-starting system pre-submarine cable, wind turbine box transformer and wind turbine auxiliary equipment;

[0065] Step 7: Use the self-starting system to simulate the wind turbine grid-connected process. The wind turbine model has been built in step 3 to realize the connection of the wind turbine to the self-starting system.

[0066] As attached Figure 1 The figure shows the schematic diagram of the wind turbine power supply and grid-connected simulation model of the self-starting system. The self-starting system mainly includes a diesel generator module, a variable load module and two transformer modules, and each part is connected by a cable. The 400V voltage on the outlet side of the diesel generator set and the variable load is boosted to 35kV by a transformer, and then sent to the high-voltage side of the offshore wind turbine box via a submarine cable. After that, it is stepped down to 690V by a transformer and connected to the wind turbine auxiliary system and unit.

[0067] As attached Figure 2 The figure shows a schematic diagram of the self-starting system and the offshore booster station system. The self-starting system is connected to the 35kV busbar of the booster station and supplies power to the wind turbine through the collector submarine cable.

[0068] As attached Figure 3 The figure shows the schematic diagram of the electrical model of the self-starting system with submarine cable boost. Figure 4The terminal voltage and active power curve of the diesel generator set in this process are given. It can be seen from the figure that at the moment when the circuit is boosted from zero, the voltage of the diesel generator can reach about 660V, and as the simulation runs, the voltage of the diesel generator is finally stabilized at about 400V; at the moment when the circuit is boosted from zero, the active power of the diesel generator increases from zero to about 300kW, and as the simulation runs, the active power of the diesel generator gradually increases. When the system model runs to 1 second, the active power of the diesel generator increases to about 320kW. After that, the active power of the diesel generator gradually decreases with time until it stabilizes at 316.2kW. It can be seen that the system can achieve stable boosting.

[0069] As attached Figure 5 The figure shows the schematic diagram of the electrical model of the self-starting system with submarine cable and wind turbine box transformer. Figure 6The voltage and power curves of the diesel generator set and wind turbine set in the process are given. At the moment when the circuit starts to boost voltage from zero, the voltage of the diesel generator can reach about 580V. When the system model runs for 2 seconds, the voltage of the diesel generator stabilizes at about 400V. At this time, the wind turbine is started and connected to the grid, and the voltage of the diesel generator suddenly drops to about 290V. After oscillating at 340V for 0.1s, the voltage of the diesel generator continues to increase. At 2.9 seconds, the voltage of the diesel generator increases to about 410V. Finally, with the operation of the simulation, the voltage of the diesel generator stabilizes at about 400V again. At the moment when the circuit starts to boost voltage from zero, the active power of the diesel generator increases from zero to about 340kW, and as the simulation runs, the active power of the diesel generator gradually increases. When the system model runs for 2 seconds, the active power of the diesel generator stabilizes at about 350kW. At this time, the wind turbine is started and connected to the grid, and the active power of the diesel generator suddenly increases to about 550kW, and then suddenly decreases to 0kW. From 2.1 seconds to 2.5 seconds, the active power of the diesel generator gradually decreases to about -160kW, and from 2.5 seconds to 2.8 seconds, the active power of the diesel generator gradually increases to about 240kW. Finally, with the running of the simulation, the active power of the diesel generator stabilizes at 239.6kW. At the moment of zero-start voltage rise of the circuit, the reactive power of the diesel generator increases from zero to about 160kVar, and then remains stable at about 160kVar. At 2 seconds, the wind turbine is started and connected to the grid, and the reactive power of the diesel generator suddenly increases to about 950kVar. From 2.1 seconds to 2.8 seconds, the reactive power of the diesel generator gradually decreases to about 115kVar. Finally, with the running of the simulation, the reactive power of the diesel generator stabilizes at 111.7kVar. When the system model runs for 2 seconds, the wind turbine is started and connected to the grid, and the voltage of the wind turbine suddenly increases to about 680V. After oscillating around 560V for 0.05 seconds, the voltage of the wind turbine continues to increase, and increases to about 695V at 2.9 seconds. Finally, with the running of the simulation, the voltage of the wind turbine stabilizes at about 670V again. From 2.0 seconds to 2.5 seconds, the active power of the fan gradually decreases to about -500kW, from 2.5 seconds to 2.8 seconds, the active power of the fan gradually increases to about -120kW, and finally, as the simulation runs, the active power of the fan stabilizes at -123.3kW. When the system model runs to 2 seconds, the fan is started and connected to the grid. At the moment of startup, the reactive power of the fan suddenly increases to about 880kVar, from 2.1 seconds to 2.8 seconds, the reactive power of the fan gradually decreases to about -50kVar, and finally, as the simulation runs, the reactive power of the fan stabilizes at -56.58kVar.

[0070] In summary, the established self-starting model can realize the stable grid connection of wind turbines.

[0071] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A simulation modeling method for offshore wind power grid connection based on a self-starting system, characterized in that: include: Calculate the capacity parameters of the self-starting system diesel generator set, variable load and transformer based on the specific wind farm project data; According to the capacity parameters, a self-starting system model is built based on the Matlab / Simulink platform, and a submarine cable model taking into account the charging capacitor is established using typical electrical parameters obtained in advance; Aiming at the squirrel cage asynchronous wind turbines, which are the mainstream of offshore wind power, the wind turbine model, box transformer model and wind turbine auxiliary system model are built based on Matlab / Simulink platform; A system consisting of a self-starting system and the submarine cable model is used to simulate a pressure building process; The self-starting system is used to simulate the voltage building process of the system consisting of the submarine cable model and the box-type transformer model; The self-starting system is used to simulate the pressure building process of the system consisting of the submarine cable model, box-type transformer model and wind turbine auxiliary system model; Use the self-starting system to simulate the system composed of the fan model and integrate the fan into the self-starting system; The steps of establishing a submarine cable model taking into account charging capacitance using typical electrical parameters are as follows: First, evaluate the positive-sequence and zero-sequence parameters of the submarine cable as follows: ; Wherein, R1, L1 and C1 are the positive sequence resistance, inductance and capacitance of the submarine cable respectively; R0, L0 and C0 are the zero sequence resistance, inductance and capacitance of the submarine cable respectively; r1, r0 are the positive sequence resistance and zero sequence resistance per unit length (Ω / km); l1, l0 are the positive sequence and zero sequence inductance per unit length (H / km); c1, c0 are the positive sequence and zero sequence capacitance per unit length (F / km); l sec is the cable length; k r1 , k l1 , k c1 , k r0 , k l0 , k c0 are the positive-sequence and zero-sequence hyperbolic correction coefficients; After calculating the typical electrical parameters of the submarine cable, the three-phase π segmented line module provided by Simulink was selected to build the submarine cable model; The wind turbine model is built based on the Matlab / Simulink platform for the squirrel cage asynchronous wind turbine, which is the mainstream of offshore wind power, including: The fifth-order model is used to simulate the electrical part of the synchronous generator, and its voltage equation is as follows: ; Where: u is the terminal voltage of each winding; i is the current of each winding; R is the resistance of each phase winding of the stator; subscripts d and q represent the vertical axis and horizontal axis in the dq0 coordinate system; subscript f represents the excitation winding; subscript h represents the damping winding; Its magnetic flux equation is: ; Where L d , L q L is the synchronous inductance of the stator winding longitudinal and transverse axes; fd Indicates the reflected inductance between the longitudinal axis armature windings; L md , L mq is the component of the generator excitation inductance on the vertical and horizontal axes; L kd , L kq are the components of the generator damping winding inductance on the vertical and horizontal axes.

2. The offshore wind power grid-connected simulation modeling method based on the self-starting system according to claim 1 is characterized in that: The method for calculating the capacity parameters of the self-starting system diesel generator set, variable load and transformer is as follows: The variable load capacity parameter selection method includes: selecting a variable load capacity that can fully offset reactive capacity and leave a certain margin for flexible adjustment; and selecting a variable load resistive capacity that can offset the active power generated by the wind turbine when the wind turbine is connected to the grid to maintain the active power balance of the system and leave a certain margin for flexible adjustment; The method for selecting the capacity parameters of a diesel generator set includes: selecting the capacity parameters of a diesel generator set with a large capacity as much as possible to ensure the success rate of wind power commissioning; The method for selecting transformer capacity parameters includes: the capacity of the transformer on the outlet side of the diesel generator set is selected to be greater than the capacity parameter of the diesel generator set and a certain margin is left, and the capacity of the transformer on the outlet side of the variable load is configured according to the capacity of the variable load.

3. The offshore wind power grid-connected simulation modeling method based on the self-starting system according to claim 1 is characterized in that: The pressure building process simulation using the system composed of the self-starting system and the submarine cable model includes: According to the pre-calculated submarine cable charging capacitance, a corresponding inductive reactive load is set in the self-starting system for balancing; Set appropriate resistive loads in the self-starting system to keep the power factor of the entire system within a preset reasonable level range; The boost process is carried out by the diesel generator, which gradually increases the voltage of the entire system from 0 to the rated voltage.

4. The offshore wind power grid connection simulation modeling method based on the self-starting system according to claim 1 is characterized in that: The method of simulating the system composed of the fan model by using the self-starting system to realize the incorporation of the fan into the self-starting system includes: After realizing the process of supplying power to the wind turbine using the self-starting system, one or more parameters including wind speed, pitch angle, and wind turbine grid-connected power are input into the wind turbine model for simulation, and the wind turbine is successfully integrated into the self-starting system to obtain the real-time voltage and power curves of the system during the entire process of wind turbine grid connection.

5. The offshore wind power grid connection simulation modeling method based on the self-starting system according to claim 4 is characterized in that: The method of simulating the system composed of the fan model by using the self-starting system to realize the incorporation of the fan into the self-starting system also includes: The variable load resistive capacity of the self-starting system is set according to the maximum grid-connected active power of the wind turbine. Before the wind turbine is connected to the grid for power generation, the diesel generator supplies power to the variable load. After the system voltage and current parameters stabilize, the wind turbine is started and connected to the grid. During the grid-connected process, the power generated by the wind turbine is absorbed in real time by the self-starting system. The diesel generator maintains the system frequency stability by generating more or less active power, and maintains the system voltage stability by generating more or less reactive power.

Citation Information

Patent Citations

  • Frequency convertor

    CN102224671A

  • Offshore wind farm large island operation mode configuration optimization and starting method and system

    CN111900760A

  • Submarine cable power transmission system analysis model and reactive power configuration method

    CN112886641A

  • Offshore wind power debugging method based on black start

    CN114188969A

  • Wind farm layout optimization method and optimization system, and computer-readable storage medium

    WO2021253291A1