Applicable to the inclined wall geomembrane earth-rock cofferdam structure with water head greater than 35 meters

By setting up horse paths and protective structures in the sloping wall geomembrane earth-rock cofferdam, combined with shotcrete and cushion materials, the problem of inconvenient geomembrane laying and expansion joint installation under high water retaining heads is solved, and the construction quality and anti-seepage performance are improved. , ensuring the stability of the cofferdam slope.

CN114960707BActive Publication Date: 2024-10-22ZHEJIANG HUADONG ENG CONSTR MANAGEMENT CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210574172.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-05-24
Publication Date
2024-10-22
Estimated Expiration
2042-05-24

AI Technical Summary

Technical Problem

In the inclined wall geomembrane earth-rock cofferdam with a water retaining head greater than 35 meters, the geomembrane laying and welding is more difficult, the expansion joints are inconvenient to set up, which affects the anti-seepage performance and stability, and the geomembrane deforms and interlayers under high water retaining head Insufficient stability may lead to instability of the geomembrane and surrounding rock slopes.

Method used

A structural type including the cofferdam body, anti-seepage wall, protective structure and horse track was designed. Double anchoring trenches of geomembrane were set up on the horse track. The geomembrane was arranged in a zigzag shape and combined with shotcrete and cushion material to form a closed anti-barrier The seepage system is connected to the anti-seepage wall through concrete slabs and curtain grouting to improve the slope stability and expansion performance.

Benefits of technology

It reduces the difficulty of geomembrane construction, improves welding quality and anti-seepage performance, enhances the stability of the cofferdam slope, adapts to the deformation of the geomembrane, reduces the possibility of damage, and ensures the stability of the geomembrane and surrounding rock slopes. .

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114960707B_ABST
    Figure CN114960707B_ABST
Patent Text Reader

Abstract

The invention discloses a sloping wall geomembrane earth-rock cofferdam structure suitable for geomembrane with high water retaining head, comprising a cofferdam body, an anti-seepage wall arranged on the water-facing side of the cofferdam body, and a protective structure with a certain width arranged on the top of the anti-seepage wall; a horseway with a certain width is arranged on the slope between the protective structure and the top of the cofferdam body, and the geomembrane is laid on the slope from top to bottom; anchoring grooves for fixing the geomembrane are arranged on the top of the cofferdam body and the horseway, wherein the horseway is provided with double anchoring grooves. This structural type has the characteristics of low difficulty in geomembrane welding construction, simple construction of transverse expansion joints, and high safety and stability of the cofferdam slope.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of temporary water retaining in the upper reaches of a river for dry land construction of a foundation pit of a hub project in large and medium-sized water conservancy and hydropower projects, and in particular to an inclined wall geomembrane earth-rock cofferdam structure suitable for a water retaining head greater than 35 meters. Background Art

[0002] The inclined wall geomembrane earth-rock cofferdam has the characteristics of fast weir filling and rising speed, convenient geomembrane laying and welding, no interference between weir filling and geomembrane laying, and convenient later maintenance. It has been widely used in water conservancy and hydropower construction projects. The inclined wall geomembrane water retaining head is generally below 35m. With the development and construction of a number of giant hydropower projects in the west, such as the upstream inclined wall geomembrane earth-rock cofferdams of Jinping I and Baihetan hydropower projects, the inclined wall geomembrane water retaining head has reached 43m, which has been greatly improved. When the water head of the inclined wall geomembrane is high (greater than 35m), the single-stage slope of the cofferdam where the geomembrane is laid is relatively high. Due to the lack of a working platform in the middle, the construction and welding of the geomembrane laying are more difficult, which indirectly affects the anti-seepage performance of the geomembrane; secondly, the geomembrane is designed to have a high water retaining head, and the deformation increases accordingly after water retaining, and corresponding expansion joints need to be set. On the higher single-stage cofferdam earth and rock slope slope, the expansion joint installation and construction is very inconvenient, which affects the construction quality of the geomembrane and the anti-seepage performance after water retaining; finally, for the higher (greater than 35m) single-stage cofferdam earth and rock slope, if the interlayer stability between the geomembrane and the cofferdam slope cushion layer does not meet the requirements locally, under the action of gravity, it may affect the stability between the geomembrane and the surrounding rock slope cushion layer of the entire slope above.

[0003] Based on the above situation, the present invention proposes a sloping wall geomembrane earth-rock cofferdam structure suitable for geomembrane with higher water retaining head, which can effectively solve the above problems. Summary of the invention

[0004] To solve the above problems, the main purpose of the present invention is to provide a sloping wall geomembrane cofferdam structure suitable for geomembrane with higher water retaining head (greater than 35m), which has the characteristics of low difficulty in geomembrane welding construction, simple construction of transverse expansion joints, and high safety and stability of cofferdam slopes.

[0005] In order to solve the above technical problems, the present invention is implemented by the following technical solutions:

[0006] The invention is suitable for a sloping wall geomembrane earth-rock cofferdam structure with a water retaining head greater than 35 meters, comprising a cofferdam body, an anti-seepage wall arranged on the water-facing side of the cofferdam body, and a protective structure with a certain width arranged on the top of the anti-seepage wall; a horseway with a certain width is arranged on the slope between the protective structure and the top of the cofferdam body, and a geomembrane is laid on the slope from top to bottom; anchoring trenches for fixing the geomembrane are arranged on the top of the cofferdam body and the horseway, wherein double anchoring trenches are arranged on the horseway, so that the geomembrane is arranged in a "J" shape.

[0007] Preferably, concrete slabs are arranged on the slopes on both sides of the cofferdam body, the geomembrane is connected to the cap concrete on the top of the anti-seepage wall and the concrete slab by embedding or anchoring, and curtain grouting is arranged on the bottom of the anti-seepage wall and the concrete slab to form a closed anti-seepage system.

[0008] Preferably, the cofferdam body includes an anti-seepage section below the elevation of the protective structure and a water retaining section above the elevation, the anti-seepage section includes large stones, second transition materials, fine slag materials, first slag materials, first transition materials, diversion dikes, second slag materials and drainage prisms arranged in sequence along the direction of water flow, and the water retaining section includes compacted slag materials located above the anti-seepage section.

[0009] It is further preferred that the intercepting dike is located on the downstream side of the anti-seepage wall, and the horizontal distance between the water-facing side slope foot of the intercepting dike and the axis of the anti-seepage wall is not less than 15 m.

[0010] Preferably, two geomembrane anchoring trenches are provided on the horseway, and the geomembrane is arranged in a "J" shape and also serves as an expansion joint.

[0011] Preferably, sprayed concrete is provided above the geomembrane, and cushion material and a third transition material are laid below.

[0012] Preferably, a zigzag road is arranged on the backwater side of the cofferdam body to the foundation pit on the backwater side of the cofferdam, and the width of the zigzag road is 5m~10m.

[0013] Preferably, the slope ratio of the side slope above the elevation of the protection structure is 1:2-2.5, the slope ratio of the side slope below the elevation is 1:1.5, and the slope ratio of the backwater side is 1:1.6-1.8.

[0014] Preferably, the protective structure has a width of not less than 20 m, and comprises dry masonry stones, fourth transition materials, cushion materials and crushed stone soil arranged in sequence from top to bottom.

[0015] Preferably, the width of the horseway is 3m~5m.

[0016] Compared with the prior art, the present invention has the following advantages and beneficial effects:

[0017] (1) A horseway is set in the middle of the weir slope below the inclined wall geomembrane, which reduces the working height of the single-level slope, increases the working platform, facilitates the construction and welding of the geomembrane, and is beneficial to improving the welding quality and water-retaining performance of the geomembrane; (2) A first-level horseway is set in the middle of the weir slope where the inclined wall geomembrane is laid, which improves the stability of the water-facing slope of the cofferdam; (3) A double anchor trench for the geomembrane is set on the horseway, so that the geomembrane is in the shape of a "J" and also acts as an expansion joint, which improves the stability of the layer between the geomembrane and the weir slope, and is also beneficial to adapting to the deformation of the geomembrane and reducing the possibility of tearing and damage of the geomembrane. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a schematic diagram of the plan layout structure of the cofferdam of the present invention;

[0019] Figure 2 It is a schematic diagram of a typical cross-sectional structure of a cofferdam of the present invention;

[0020] Figure 3 yes Figure 2 Detailed structural diagram of the protection structure at A in the middle;

[0021] Figure 4 yes Figure 2 Detailed structural diagram of the bridleway at point B in the middle.

[0022] Figure numerals: 1—curtain grouting; 2—concrete slab; 3—horseway; 4—zigzag road; 5—intercepting dike; 601—first transition material; 602—second transition material; 603-third transition material; 604—fourth transition material; 701—first slag material; 702—second slag material; 8—fine slag material; 9—impermeable wall; 901—capping concrete; 10—large stone; 11—drainage prism; 12—rolled slag material; 13—cushion material; 14—geomembrane; 15—sprayed concrete; 16—crushed soil; 17—dry masonry stone; 18—covering layer; 19—bedrock. DETAILED DESCRIPTION

[0023] In order to enable those skilled in the art to better understand the technical solution of the present invention, the preferred implementation scheme of the present invention is described below in conjunction with specific embodiments. However, it should be understood that the drawings are only used for exemplary description and cannot be understood as a limitation on this patent. In order to better illustrate this embodiment, some parts of the drawings may be omitted, enlarged or reduced, and do not represent the size of the actual product. For those skilled in the art, it is understandable that some well-known structures and their descriptions in the drawings may be omitted. The positional relationship described in the drawings is only for exemplary description and cannot be understood as a limitation on this patent.

[0024] The following is combined with Figures 1 to 4 The present invention is further described with reference to the accompanying drawings and embodiments, but they are not intended to limit the present invention.

[0025] like Figures 1 to 4 As shown, this embodiment provides a sloping wall geomembrane earth-rock cofferdam structure suitable for a water head greater than 35 meters, including a cofferdam body, an anti-seepage wall 9 arranged on the water-facing side of the cofferdam body, and a protective structure with a certain width arranged on the top of the anti-seepage wall 9; a certain width of horseway 3 is arranged on the slope between the protective structure and the top of the cofferdam body, and a geomembrane 14 is laid on the slope from top to bottom; double anchoring grooves for fixing the geomembrane 14 are arranged on the top of the cofferdam body and the horseway 3, and the geomembrane 14 on the horseway 3 is combined with the double anchoring grooves to form a "J" shape, and also acts as an expansion joint, and the width of the horseway 3 is 3m~5m. 15cm~20cm of sprayed concrete is arranged above the geomembrane 14, and the sprayed concrete 15 is divided into blocks of 3m×3m, and cushion material 13 and third transition material 603 are laid below.

[0026] In this embodiment, the cofferdam body includes an anti-seepage section below the elevation of the protective structure and a water retaining section above the elevation. The anti-seepage section includes large stones 10, second transition material 602, fine slag material 8, first slag material 701, first transition material 601, interception dike 5, second slag material 702 and drainage prism 11 arranged in sequence along the water flow direction, and the water retaining section includes rolled slag material 12 located above the anti-seepage section. A zigzag road 4 is arranged on the backwater side of the cofferdam body to the foundation pit on the backwater side of the cofferdam, and the width of the zigzag road 4 is 5m~10m.

[0027] In this embodiment, concrete slabs 2 are arranged on the slopes on both sides of the cofferdam body, the geomembrane 14 is connected to the cap concrete 901 on the top of the anti-seepage wall 9 and the concrete slab 2 by embedding or anchoring, and curtain grouting 1 is arranged on the bottom of the anti-seepage wall 9 and the concrete slab 2. The curtain grouting 1 is determined to pass through the covering layer 18 and penetrate a certain depth into the bedrock 19 according to relevant specifications to form a closed anti-seepage system.

[0028] Furthermore, the intercepting dike 5 is located on the downstream side of the anti-seepage wall 9, and the horizontal distance between the water-facing side slope foot of the intercepting dike 5 and the axis of the anti-seepage wall 9 is not less than 15m.

[0029] In this embodiment, the slope ratio of the side slope above the elevation of the protection structure is 1:2~2.5, the slope ratio of the side slope below the elevation is 1:1.5, and the slope ratio of the backwater side is 1:1.6~1.8. The width of the protection structure is not less than 20m, and it includes dry masonry blocks 17, fourth transition materials 604, cushion materials 13 and crushed stone soil 16 arranged in sequence from top to bottom.

[0030] Based on the above structure, this embodiment also provides a construction method of a cofferdam structure, comprising the following steps:

[0031] 1. Filling below the elevation of the protective structure

[0032] Excavate and support the bank slopes on both sides of the cofferdam, pour concrete slabs 2 on both sides of the bank slopes → occupy the intercepting dike 5 and start the curtain grouting 1 construction in the traffic tunnels on both sides → fill the first transition material 601 upstream of the dike → fill the fine stone slag 8 → fill the first slag material 701 and the second transition material 602 → fill the large stone 10 → fill the drainage prism 11 → fill the second slag material 702.

[0033] 2. Filling above the elevation of the protective structure

[0034] The rolled slag material 12 is filled → the third transition material 603 and the cushion material 13 are filled.

[0035] 3. Construction of anti-seepage wall 9

[0036] After the large stone 10 is completed, the construction of the cut-off wall 9 and the curtain grouting 1 at the bottom of the cut-off wall 9 is started while the filling construction in other parts is being carried out.

[0037] 3. Construction of geomembrane 14

[0038] Dig a double anchoring ditch at the middle horseway 3 → lay the geomembrane 14 from top to bottom along the upstream slope of the cofferdam → connect the geomembrane 14 with the capping concrete 901 on the top of the anti-seepage wall 9 and the concrete slabs 2 on both sides of the bank slope by burying or anchoring → fill the geomembrane 14 at the anchoring ditch with cushion material 13.

[0039] 4. Spray concrete 15 construction

[0040] 20cm thick concrete is sprayed on the surface of geomembrane 14, and the sprayed concrete 15 is divided into 3m×3m joints.

[0041] 5. Construction of protective structures

[0042] From bottom to top, crushed stone 16, cushion material 13, fourth transition material 604, and dry masonry stone 17 are filled in sequence.

[0043] According to the description and drawings of the present invention, those skilled in the art can easily manufacture or use the inclined wall geomembrane earth-rock cofferdam structure suitable for geomembrane with higher water retaining head of the present invention, and can produce the positive effects recorded in the present invention.

[0044] Unless otherwise specified, in the present invention, if there are terms such as "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential", etc., the orientation or position relationship indicated is based on the orientation or position relationship shown in the drawings, which is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation. Therefore, the terms describing the orientation or position relationship in the present invention are only used for exemplary description and cannot be understood as a limitation of this patent. For ordinary technicians in this field, the specific meanings of the above terms can be understood in combination with the drawings and according to the specific circumstances. In addition, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated.

[0045] Unless otherwise clearly specified and limited, in the present invention, the terms "disposed", "connected" and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be directly connected, or indirectly connected through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0046] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Any simple modification or equivalent change made to the above embodiment based on the technical essence of the present invention shall fall within the protection scope of the present invention.

Claims

1. Applicable to the inclined wall geomembrane earth-rock cofferdam structure with water head greater than 35 meters, characterized by: The invention comprises a cofferdam body, an anti-seepage wall (9) arranged on the water-facing side of the cofferdam body, and a protective structure with a certain width arranged on the top of the anti-seepage wall (9); a horseway (3) with a certain width is arranged on the slope between the protective structure and the top of the cofferdam body, and a geomembrane (14) is laid on the slope from top to bottom; and anchoring grooves for fixing the geomembrane (14) are arranged on the top of the cofferdam body and the horseway (3); The geomembrane on the horseway (3) is combined with double anchor grooves to form a "J" shape, which also serves as an expansion joint. The width of the horseway (3) is 3m to 5m.

2. The inclined wall geomembrane earth-rock cofferdam structure suitable for a water retaining head greater than 35 meters according to claim 1, characterized in that: Concrete slabs (2) are arranged on the bank slopes on both sides of the cofferdam body, the geomembrane (14) is connected to the cap concrete (901) on the top of the anti-seepage wall (9) and the concrete slab (2) by embedding or anchoring, and curtain grouting (1) is arranged on the bottom of the anti-seepage wall (9) and the concrete slab (2) to form a closed anti-seepage system.

3. The inclined wall geomembrane earth-rock cofferdam structure suitable for a water retaining head greater than 35 meters according to claim 1, characterized in that: The cofferdam body comprises an anti-seepage section below the elevation of the protective structure and a water retaining section above the elevation, the anti-seepage section comprising large stones (10), a second transition material (602), fine slag (8), a first slag (701), a first transition material (601), a diversion dike (5), a second slag (702) and a drainage prism (11) arranged in sequence along the water flow direction, and the water retaining section comprises a rolled slag (12) located above the anti-seepage section.

4. The inclined wall geomembrane earth-rock cofferdam structure suitable for a water retaining head greater than 35 meters according to claim 3, characterized in that: The intercepting dike (5) is located on the downstream side of the anti-seepage wall (9), and the horizontal distance between the water-facing side slope foot of the intercepting dike (5) and the axis of the anti-seepage wall (9) is not less than 15 m.

5. The inclined wall geomembrane earth-rock cofferdam structure suitable for water retaining head greater than 35 meters according to claim 1, characterized in that: Concrete (15) is provided above the geomembrane (14), and cushion material (13) and a third transition material (603) are laid below.

6. The inclined wall geomembrane earth-rock cofferdam structure suitable for water retaining head greater than 35 meters according to claim 1, characterized in that: A zigzag road (4) is arranged on the backwater side of the cofferdam body to the foundation pit on the backwater side of the cofferdam, and the width of the zigzag road (4) is 5m to 10m.

7. The inclined wall geomembrane earth-rock cofferdam structure suitable for water retaining head greater than 35 meters according to claim 1, characterized in that: The slope ratio of the side slope above the elevation of the protection structure is 1:2~2.5, the slope ratio of the side slope below the elevation is 1:1.5, and the slope ratio of the backwater side is 1:1.6~1.

8.

8. The inclined wall geomembrane earth-rock cofferdam structure suitable for water retaining head greater than 35 meters according to claim 1, characterized in that: The protective structure has a width of not less than 20 m and is composed of dry masonry stones (17), fourth transition materials (604), cushion materials (13) and crushed stone soil (16) arranged in sequence from top to bottom.