A method for identifying and predicting adverse geological conditions based on TBM operation data

By acquiring and preprocessing TBM operation data, combined with geological survey data, an adverse geological condition identification model based on genetic programming is established, which solves the problem of low scientificity and low reliability of geological condition identification in TBM construction and achieves high efficiency of TBM operation data. Processing and online identification provide safety guarantee for TBM construction.

CN115034446BActive Publication Date: 2024-10-15TONGJI UNIV
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202210573395.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-05-25
Publication Date
2024-10-15
Estimated Expiration
2042-05-25

AI Technical Summary

Technical Problem

The existing technology has low scientificity and reliability in identifying adverse geological conditions in TBM construction, relies on non-destructive testing methods and is costly, lacks standardized processes and methods, and has poor interpretability of machine learning models, making it difficult to apply in actual construction.

Method used

By obtaining TBM operation data and geological survey data, preprocessing and feature variable design are performed, and an adverse geological condition identification model based on genetic programming is established. Genetic programming is used to generate the partition function H(X) to judge the geological conditions, and data mining and machine learning methods are combined. , providing standardized processes and methods.

Benefits of technology

It achieves efficient processing of TBM operation data and online geological condition identification, overcomes the high uncertainty, high delay and high cost problems of traditional methods, and provides guarantee for safe TBM construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115034446B_ABST
    Figure CN115034446B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for identifying and predicting adverse geological conditions based on TBM operation data, which has the following characteristics and includes the following steps: step 1, obtaining TBM operation data and geological survey data; step 2, preprocessing the TBM operation data and geological survey data to obtain preprocessed data; step 3, designing characteristic variables based on the preprocessed data to screen out variables related to the target; step 4, establishing an adverse geological condition identification model based on genetic programming based on the variables related to the target, and obtaining a partition function H(X) of good geology and adverse geology; step 5, judging the geological conditions at the current position of the TBM according to H(X). The present invention can efficiently process a large amount of operation data and perform online identification of the geological conditions at the current position of the TBM, overcoming the problems of high uncertainty, high latency, high cost, etc. of traditional identification and detection methods, and adding protection for the safe construction of the TBM.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of tunnel engineering TBM construction, and in particular to a method for identifying and predicting adverse geological conditions based on TBM operation data. Background Art

[0002] Tunnel boring machines (TBMs) are increasingly being used in long tunnel construction due to their high efficiency, low construction impact, and long-distance construction economy. However, TBMs are sensitive to geological conditions and are prone to landslides, jams, and other accidents in rock formations with developed joints or large areas of fractured zones. Therefore, identifying adverse geological conditions is crucial to ensuring safe TBM excavation.

[0003] At present, the identification of adverse geological conditions relies on geological survey data and the experience of TBM operators, so it is not scientific and reliable; on the other hand, it relies on non-destructive testing methods, such as microseismic method and geological radar method, but these methods can only be carried out after the TBM is shut down, so data acquisition is discontinuous, and the cost is high, making it difficult to carry out full-line.

[0004] The TBM operation data is obtained by sensors distributed around the tunnel boring machine, which can return more than 100 monitoring parameters per second. The specific values ​​reflect the interaction between man, machine and rock. Therefore, through data mining, machine learning and other technologies, a method for identifying adverse geological conditions based on TBM operation data can be established. However, related research is still in its early stages, lacking a set of standardized processes and methods suitable for TBM operation data processing; and the identification model based on machine learning often has poor interpretability, which is not conducive to its use in actual construction. Summary of the invention

[0005] The present invention is made to solve the above-mentioned problems, and aims to provide a method for identifying and predicting adverse geological conditions of TBM operation data.

[0006] The present invention provides a method for identifying and predicting adverse geological conditions based on TBM operation data, which has the following characteristics and comprises the following steps: step 1, acquiring TBM operation data and geological survey data; step 2, preprocessing the TBM operation data and the geological survey data to obtain preprocessed data; step 3, designing characteristic variables based on the preprocessed data, and screening out variables related to a target; step 4, establishing an adverse geological condition identification model based on genetic programming based on the variables related to the target, and obtaining a partition function H(X) between good geology and adverse geology; and step 5, judging the geological conditions of the current position of the TBM according to H(X).

[0007] In the method for identifying and predicting adverse geological conditions based on TBM operation data provided by the present invention, it can also have the following characteristics: wherein, the specific process of step 1 is: all sensor data on the TBM is collected at a fixed frequency through a programmable logic controller to obtain TBM operation data, the TBM operation data at least includes total thrust, cutter head torque, cutter head speed, penetration and excavation speed, and geological survey data is obtained based on geological exploration data before construction, and the geological survey data at least includes lithology and surrounding rock classification.

[0008] In the method for identifying and predicting adverse geological conditions based on TBM operation data provided by the present invention, it can also have the following characteristics: wherein, in step 2, the specific steps of preprocessing are: step 2-1, using the mean of the data column where the missing values ​​are located to fill in the missing TBM operation data; step 2-2, using the 3σ criterion and the cap method to delete the outliers in the TBM operation data; step 2-3, dividing the TBM excavation into different stages, and taking the mean of each variable in the stable segment to form a TBM operation parameter data set; step 2-4, using the nearest neighbor interpolation method to process the geological survey data and expand the TBM operation parameter data set; step 2-5, using 0-1 standardization and one-hot encoding to process continuous variables and discrete variables respectively.

[0009] The method for identifying and predicting adverse geological conditions based on TBM operation data provided by the present invention may also have the following features: wherein the specific process of step 2-1 is: assuming that the input data is The matrix satisfies:

[0010]

[0011] In the formula, x ij represents the element in the i-th row and j-th column of the matrix. If x ij elements are missing data, and there are , elements missing data in the jth column (p<m), then The specific process of step 2-2 is: verify the skewness S and kurtosis K of the continuous variable:

[0012]

[0013] In the formula, μ j is the mean of the jth variable, σ j is the standard deviation of the jth variable. For variables that satisfy -3≤S≤3, -7≤K≤7, the 3σ criterion is used to delete variables with values ​​between (μ j -3σ j , μ j +3σ j ) outliers outside the interval. For other cases, the cap method is used to delete the data points above 99% and below 1% in the data frame. The specific process of steps 2-4 is: if x is knowni-1 , x i+1 The corresponding geological survey data are f(x i-1 ), f(x i+1 ), and there exists x i satisfy Then let f(x i )=f(x i+1 ). The specific process of steps 2-5 is: use 0-1 standardization to scale the continuous variable to the interval [0, 1]: One-hot encoding creates a binary representation for each state of a discrete variable.

[0014] In the method for identifying and predicting adverse geological conditions based on TBM operation data provided by the present invention, the following features can also be provided: the specific process of step 2-3 is as follows: step 2-3-1, dividing the TBM excavation cycle into an excavation section and a shutdown section, and dividing the excavation section into an ascending section and a stable section according to the overall trend of the data; step 2-3-2, defining G(X)=g(thrust)g(torque)g(excavation speed), when G(X)=0, it is considered that the excavation is in the shutdown section, and the corresponding data row is deleted from the data set; step 2-3-3, using the cumulative and change point recognition method to identify the dividing point between the ascending section and the stable section: S kj The corresponding x when reaching the maximum value ij It is the dividing point between the rising segment and the stable segment; Step 2-3-4, take the mean value of each variable in the stable segment to form the TBM operation parameter data set D.

[0015] The method for identifying and predicting adverse geological conditions based on TBM operation data provided by the present invention may also have the following features: wherein the specific steps of step 3 are as follows: step 3-1, filtering out variables that are relevant to the target but not redundant according to the Pearson correlation:

[0016]

[0017] In the formula, cov(X, Y) represents the covariance of X and Y, σ X and σ Y Represent the standard deviation of X and Y respectively; Step 3-2, further screen the variables related to the target based on the importance of the sorted features. This step depends on the selection of the machine learning algorithm. The machine learning algorithms that can be used include at least support vector machine, k nearest neighbor method, and random forest.

[0018] The method for identifying and predicting adverse geological conditions based on TBM operation data provided by the present invention may also have the following features: The specific process of step 3-2 is as follows: Step 3-2-1, using h to represent the selected machine learning algorithm, calculate the classification error rate e of h on the data set D orig, is the feature importance of the j-th variable in the test data set D, and a random small perturbation ∈ is added to each element in the j-th variable. The test data set at this time is recorded as D * ; Step 3-2-2, calculate h in data set D * The classification error rate e on perm,j , then the feature importance of the jth variable is |e perm,j -e orig |, we can get |e perm,j -e orig The larger the |, the greater the influence of the variable on the prediction result, and the higher the importance of the corresponding variable; Step 3-2-3, delete the variables with low feature importance ranking from the data set D.

[0019] In the method for identifying and predicting adverse geological conditions based on TBM operation data provided by the present invention, it can also have the following characteristics: wherein, the specific process of step 4 is: genetic programming first generates a number of initial semantic trees based on prior knowledge or randomly, and the initial semantic trees generate the next generation population through replication, crossover, and mutation. The evolution of the population depends on the calculation of the individual fitness function F(X). When F(X) exceeds the preset value, the current semantic tree expression H(X) is output, which is the division function H(X) of good geology and poor geology.

[0020] The method for identifying and predicting adverse geological conditions based on TBM operation data provided by the present invention may also have the following characteristics: wherein genetic programming expresses the symbolic operation result in the form of a semantic tree, wherein the internal nodes of the tree represent the operation symbols, the leaf nodes represent the variables or constant values, and F(X) is taken as a function of optimizing the objective function f(X). Assuming that f(X) is an optimization problem for finding the maximum value of the objective function, in order to meet the requirement that F(X) takes a non-negative value:

[0021]

[0022] In the formula, C min is a relatively small number specified in advance. The size of F(X) is used to determine the probability of different individuals being inherited to the next generation. The larger the value of F(X), the greater the probability of the corresponding individual being inherited to the next generation. Conversely, the smaller the value of F(X), the smaller the probability of the individual being inherited to the next generation. If the F(X) value of the current semantic tree exceeds the preset value, the expression H(X) corresponding to the semantic tree is output, which is the division of good geology and bad geology to be obtained:

[0023]

[0024] The method for identifying and predicting adverse geological conditions based on TBM operation data provided by the present invention may also have the following features: wherein the specific process of step 5 is: bringing the newly acquired TBM operation data and geological data into H(X) to determine whether the current TBM is in an adverse geological body.

[0025] Functions and Effects of the Invention

[0026] According to the method for identifying and predicting adverse geological conditions based on TBM operation data involved in the present invention, the specific process is as follows: Step 1, obtaining TBM operation data and geological survey data; Step 2, preprocessing the TBM operation data and geological survey data to obtain preprocessed data; Step 3, designing characteristic variables based on the preprocessed data, and screening out variables related to the target; Step 4, based on the variables related to the target, establishing an adverse geological condition identification model based on genetic programming, and obtaining a partition function H(X) between good geology and poor geology; Step 5, judging the geological conditions of the current position of the TBM according to H(X).

[0027] Therefore, the present invention provides a method for identifying adverse geological conditions based on TBM operation data, which can efficiently process a large amount of operation data and perform online identification of the geological conditions at the current location of the TBM.

[0028] The present invention adopts data mining and machine learning methods based on engineering cases, provides a set of standardized processes and methods from TBM operation data acquisition to geological diagnosis, and finally establishes an adverse geological condition identification model based on TBM operation data, overcoming the problems of high uncertainty, high latency, and high cost of traditional identification and detection methods, and adding protection for TBM safe construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 is a flow chart of a method for identifying and predicting adverse geological conditions based on TBM operation data in an embodiment of the present invention;

[0030] Figure 2 is a schematic diagram of outlier identification in an embodiment of the present invention;

[0031] Figure 3 Schematic diagram of the TBM excavation cycle composition in an embodiment of the present invention;

[0032] Figure 4 is a schematic diagram of a nearest neighbor interpolation method in an embodiment of the present invention;

[0033] Figure 5 is a flow chart of a genetic programming algorithm in an embodiment of the present invention;

[0034] Figure 6is a schematic diagram of the operation mode of the genetic operator in the embodiment of the present invention;

[0035] Figure 7 Schematic diagram of a semantic tree and its corresponding mathematical expression in an embodiment of the present invention. DETAILED DESCRIPTION

[0036] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the following embodiments and the accompanying drawings specifically illustrate a method for identifying and predicting adverse geological conditions based on TBM operation data of the present invention.

[0037] In this embodiment, a method for identifying and predicting adverse geological conditions based on TBM operation data is provided.

[0038] Figure 1 It is a flow chart of a method for identifying and predicting adverse geological conditions based on TBM operation data in an embodiment of the present invention.

[0039] like Figure 1 As shown, the method for identifying and predicting adverse geological conditions based on TBM operation data involved in this embodiment includes the following steps:

[0040] Step S1, obtaining TBM operation data and geological survey data.

[0041] In this embodiment, all sensor data on the TBM, i.e., TBM operation data, are collected every ten seconds through a programmable logic controller (PLC), including total thrust, cutterhead torque, cutterhead speed, penetration, excavation speed, etc. Lithology, surrounding rock classification, etc. are obtained based on geological exploration data before construction.

[0042] Step S2, preprocessing the TBM operation data and geological survey data, the specific steps are:

[0043] Step S2-1, use the mean of the data column where the missing value is located to fill the missing TBM operation data. Assume that the input data is The matrix satisfies:

[0044]

[0045] In the formula, x ij represents the element in the i-th row and j-th column of the matrix. If x ij If there are missing data for each element, and there are p missing data for the jth column (p<m), then

[0046]

[0047] Step S2-2, use the 3σ criterion and cap method to delete outliers in TBM operation data. Verify the skewness S and kurtosis K of continuous variables:

[0048]

[0049]

[0050] In the formula, μ j is the mean of the jth variable, σ j is the standard deviation of the jth variable. For variables that satisfy -3≤S≤3, -7≤K≤7, the 3σ criterion is used to delete variables with values ​​between (μ j -3σ j , μ j +3σ j ) outliers outside the range.

[0051] Figure 2 Schematic diagram of outlier identification in an embodiment of the present invention.

[0052] like Figure 2 As shown, for other cases, the cap method is used to delete the data points above 99% and below 1% in the data frame.

[0053] Step S2-3, the TBM excavation is divided into different stages, and the mean value of each variable in the stable segment is taken to form the TBM operation parameter data set.

[0054] Figure 3 It is a schematic diagram of the composition of the TBM excavation cycle in an embodiment of the present invention.

[0055] Step S2-3-1, such as Figure 3 As shown in the figure, the TBM excavation cycle is divided into an excavation section and a shutdown section, and the excavation section is divided into an ascending section and a stable section according to the overall trend of the data.

[0056] Step S2-3-2, define G(X)=g(thrust)g(torque)g(excavation speed). When G(X)=0, it is considered that the excavation is in the shutdown stage and the corresponding data row is deleted from the data set.

[0057] Step S2-3-3, use the cumulative sum change point identification method to identify the dividing point between the rising segment and the stable segment:

[0058]

[0059] S kj The corresponding x when reaching the maximum value ij It is the dividing point between the rising segment and the stable segment.

[0060] Step S2-3-4, taking the mean of each variable in the stable segment to form the TBM operation parameter data set D.

[0061] Step S2-4, use the nearest neighbor interpolation method to process the geological survey data and expand the TBM operation parameter data set. Since the geological survey data is obtained by engineers at regular intervals along the tunnel axis, and the TBM operation data is divided according to the excavation cycle after processing, the recording intervals of the two are different. The nearest neighbor interpolation method is used to supplement the geological survey data according to the excavation cycle and expand the data set D.

[0062] Figure 4 Schematic diagram of the nearest neighbor interpolation method in an embodiment of the present invention.

[0063] like Figure 4 As shown, if x is known i-1 , x i+1 The corresponding geological survey data are f(x i-1 ), f(x i+1 ), and there exists x i satisfy Then let f(x i )=f(x i+1 ).

[0064] Step S2-5, use 0-1 standardization and one-hot encoding to process continuous variables and discrete variables respectively. Use 0-1 standardization to scale continuous variables to the interval [0, 1]:

[0065]

[0066] Using one-hot encoding, a binary representation is created for each state of a discrete variable. For example, if the lithology variable = {limestone, granite, shale}, the corresponding one-hot encoding is:

[0067]

[0068] Step S3, designing feature variables based on the preprocessed data to screen out variables related to the target, the specific steps are:

[0069] Step S3-1, filter out variables that are relevant to the target but not redundant based on Pearson correlation:

[0070]

[0071] In the formula, cov(X, Y) represents the covariance of X and Y, σ X and σ Y represent the standard deviation of X and Y respectively.

[0072] Step S3-2, further screening variables related to the target based on the importance of the ranking feature, the specific process is: the calculation method of the ranking feature importance depends on the selection of the machine learning algorithm, and the machine learning algorithms that can be used include but are not limited to support vector machine (SVM), k nearest neighbor method (KNN), random forest (RF). Use h to represent the selected machine learning algorithm and explain the calculation method of the ranking feature importance.

[0073] Step S3-2-1, calculate the classification error rate e of h on the data set D orig , is the feature importance of the j-th variable in the test data set D, and a random small perturbation ∈ is added to each element in the j-th variable. The test data set at this time is recorded as D * .

[0074] Step S3-2-2, calculate h in data set D * The classification error rate e on perm,j , then the feature importance of the jth variable is |e perm,j -e orig |, we can get |e perm,j -e orig The larger the |, the greater the influence of the variable on the prediction result, and the higher the importance of the corresponding variable.

[0075] Step S3-2-3, delete the variables with low feature importance ranking from the data set D.

[0076] Step S4, based on the variables related to the target, establish a bad geological condition identification model based on genetic programming, and obtain the partition function H(X) between good geology and bad geology.

[0077] Figure 5 It is a flow chart of a genetic programming algorithm in an embodiment of the present invention.

[0078] Figure 6 It is a schematic diagram of the operation mode of the genetic operator in the embodiment of the present invention.

[0079] like Figure 5 , Figure 6 As shown in the figure, genetic programming first generates several initial semantic trees based on prior knowledge or randomly. The initial semantic trees generate the next generation population through replication, crossover, and mutation. The evolution of the population depends on the calculation of the individual fitness function F(X). When F(X) exceeds the preset value, the current semantic tree expression H(X) is output, which is the division function H(X) between good geology and bad geology.

[0080] Figure 7 Schematic diagram of a semantic tree and its corresponding mathematical expression in an embodiment of the present invention.

[0081] like Figure 7As shown in Figure 1, genetic programming expresses symbolic operation results in the form of a semantic tree, where the internal nodes of the tree represent operation symbols and the leaf nodes represent variables or constant values.

[0082] F(X) is taken as the function of optimizing the objective function f(X). Without loss of generality, f(X) is the optimization problem for finding the maximum value of the objective function. Then, to satisfy the requirement that F(X) takes a non-negative value:

[0083]

[0084] In the formula, C min is a relatively small number specified in advance. The size of F(X) is used to determine the probability of different individuals being inherited to the next generation. The larger the value of F(X), the greater the probability of the corresponding individual being inherited to the next generation. Conversely, the smaller the value of F(X), the smaller the probability of the individual being inherited to the next generation. If the F(X) value of the current semantic tree exceeds the preset value, the expression H(X) corresponding to the semantic tree is output, which is the division of good geology and bad geology to be obtained: without loss of generality,

[0085]

[0086] Step S5, judging the geological conditions of the current location of the TBM according to H(X). The newly acquired TBM operation data and geological data are brought into H(X) to judge whether the current TBM is in a bad geological body.

[0087] Functions and Effects of the Embodiments

[0088] According to the method for identifying and predicting adverse geological conditions based on TBM operation data involved in this embodiment, the specific process is as follows: Step 1, obtaining TBM operation data and geological survey data; Step 2, preprocessing the TBM operation data and geological survey data to obtain preprocessed data; Step 3, designing characteristic variables based on the preprocessed data, and screening out variables related to the target; Step 4, based on the variables related to the target, establishing an adverse geological condition identification model based on genetic programming, and obtaining a partition function H(X) between good geology and poor geology; Step 5, judging the geological conditions at the current location of the TBM according to H(X).

[0089] Therefore, the above embodiment provides a method for identifying adverse geological conditions based on TBM operation data, which can efficiently process a large amount of operation data and perform online identification of the geological conditions at the current location of the TBM.

[0090] The above-mentioned embodiment adopts data mining and machine learning methods based on engineering cases, provides a set of standardized processes and methods from TBM operation data acquisition to geological diagnosis, and finally establishes a model for identifying adverse geological conditions based on TBM operation data, overcoming the problems of high uncertainty, high latency, and high cost of traditional identification and detection methods, and adding protection for TBM safe construction.

[0091] The above-mentioned embodiments are preferred examples of the present invention and are not intended to limit the protection scope of the present invention.

Claims

1. A method for identifying and predicting adverse geological conditions based on TBM operation data, characterized in that: The following steps are involved: Step 1: Obtain TBM operation data and geological survey data; Step 2, preprocessing the TBM operation data and the geological survey data to obtain preprocessed data; Step 3, performing feature variable design based on the preprocessed data to screen out variables related to the target; Step 4: Based on the variables related to the target, a genetic programming-based identification model for adverse geological conditions is established, and the partition function H(X) between good geology and adverse geology is obtained; Step 5: determine the geological conditions of the current location of the TBM based on H(X). The specific steps of step 3 are: Step 3-1, filter out variables that are relevant to the target but not redundant based on Pearson correlation: In the formula, cov(X,Y) represents the covariance of X and Y, σ X and σ Y represent the standard deviation of X and Y respectively; Step 3-2, further screening variables related to the target based on the importance of the sorted features, this step depends on the choice of machine learning algorithms, which can be used at least include support vector machines, k nearest neighbor method, random forest, The specific process of step 3-2 is as follows: Step 3-2-1, use h to represent the selected machine learning algorithm and calculate the classification error rate e of h on the data set D orig , is the feature importance of the j-th variable in the test data set D, and a random small perturbation ∈ is added to each element in the j-th variable. The test data set at this time is recorded as D * ; Step 3-2-2, calculate h in the data set D * The classification error rate e on perm,j , then the feature importance of the jth variable is |e perm,j -e orig |, we can get |e perm,j -e orig The larger the |, the greater the influence of the variable on the prediction result, and the higher the importance of the corresponding variable; Step 3-2-3, delete the variables with low feature importance ranking from the entire column of data set D, The specific process of step 4 is as follows: genetic programming first generates several initial semantic trees based on prior knowledge or randomly. The initial semantic trees generate the next generation population through replication, crossover, and mutation. The evolution of the population depends on the calculation of the individual fitness function F(X). When F(X) exceeds the preset value, the current semantic tree expression H(X) is output, which is the division function H(X) between good geology and bad geology. Genetic programming expresses symbolic operation results in the form of a semantic tree, where the internal nodes of the tree represent operation symbols and the leaf nodes represent variables or constant values. F(X) is taken as the function of optimizing the objective function f(X). Assuming f(X) is an optimization problem for finding the maximum value of the objective function, in order to meet the requirement that F(X) takes a non-negative value: In the formula, C min F(X) is a relatively small number specified in advance. The size of F(X) is used to determine the probability of different individuals being inherited to the next generation. The larger the value of F(X), the greater the probability of the corresponding individual being inherited to the next generation. Conversely, the smaller the value of F(X), the smaller the probability of the individual being inherited to the next generation. If the F(X) value of the current semantic tree exceeds the preset value, the expression H(X) corresponding to the semantic tree is output, which is the division of good geology and bad geology to be obtained: The specific process of step 5 is: bringing the newly acquired TBM operation data and geological data into the H(X) to determine whether the current TBM is in a bad geological body.

2. The method for identifying and predicting adverse geological conditions based on TBM operation data according to claim 1, characterized in that: in, The specific process of step 1 is: collect all sensor data on the TBM at a fixed frequency through a programmable logic controller to obtain the TBM operation data, The TBM operation data includes at least total thrust, cutter head torque, cutter head speed, penetration and excavation speed. The geological survey data is obtained based on the geological survey data before construction, The geological survey data at least include lithology and surrounding rock classification.

3. The method for identifying and predicting adverse geological conditions based on TBM operation data according to claim 1, characterized in that: in, In step 2, the specific steps of the pretreatment are: Step 2-1, using the mean of the data column where the missing value is located to fill the missing TBM operation data; Step 2-2, using the 3σ criterion and cap method to delete outliers in the TBM operation data; Step 2-3, the TBM excavation is divided into different stages, and the mean value of each variable in the stable segment is taken to form the TBM operation parameter data set; Step 2-4, using the nearest neighbor interpolation method to process the geological survey data and expand the TBM operation parameter data set; In steps 2-5, 0-1 standardization and one-hot encoding are used to process continuous variables and discrete variables respectively.

4. The method for identifying and predicting adverse geological conditions based on TBM operation data according to claim 3 is characterized in that: in, The specific process of step 2-1 is as follows: Assume the input data is The matrix satisfies: where x ij represents the element in the i-th row and j-th column of the matrix. If the data of the x ij element is missing, and there are p missing data elements in the j-th column in total (p < m), then The specific process of step 2-2 is: Verify the skewness S and kurtosis K of continuous variables: In the formula, μ j is the mean of the jth variable, σ j is the standard deviation of the jth variable, For variables that satisfy -3≤S≤3, -7≤K≤7, use the 3σ criterion to delete variables with values ​​between (μ j -3σ j , μ j +3σ j ) For outliers outside the interval, for other cases, the cap method is used to delete the data points above 99% and below 1% in the data frame. The specific process of steps 2-4 is as follows: If x is known i-1 , x i-1 The corresponding geological survey data are f(x i-1 ), f(x i-1 ), and there exists x i satisfy Then let f(x i )=f(x i-1 ), The specific process of steps 2-5 is as follows: Use 0-1 standardization to scale continuous variables to the interval [0,1]: With one-hot encoding, a binary representation is created for each state of a discrete variable.

5. The method for identifying and predicting adverse geological conditions based on TBM operation data according to claim 3 is characterized in that: in, The specific process of steps 2-3 is as follows: Step 2-3-1, dividing the TBM excavation cycle into an excavation section and a shutdown section, and dividing the excavation section into an ascending section and a stable section according to the overall trend of the data; Step 2-3-2, define G(X)=g(thrust)g(torque)g(tunneling speed), when G(X)=0, it is considered that the tunneling is in the said stop section, and the corresponding data row is deleted from the data set; Step 2-3-3, use the cumulative change point identification method to identify the dividing point between the rising segment and the stable segment: S kj The corresponding x when reaching the maximum value ij That is, the dividing point between the rising section and the stable section; Step 2-3-4, take the mean value of each variable in the stable segment to form the TBM operation parameter data set D.

Citation Information

Patent Citations

  • TBM bad geological identification method based on intelligent driving model

    CN110020694A

  • TBM carrying type advanced geological forecasting system and method based on lithologic character and unfavorable geological precursor feature recognition

    CN110043267A

  • TBM tunneling parameter prediction method based on multi-target learning

    CN110110419A

  • TBM-mounted rock alteration characteristic recognition and geological prediction system and method

    CN111220567A