Automatic adjustment and optimization method of distribution transformer load and power supply partition based on envelope method

Through the envelope method, screening and evaluating the load in the station area, the problems of non-systematic and non-automation of load adjustment management in the existing technology of middle-end station area are solved, and the intelligent management of load in the station area and the precise adjustment of the power supply range are realized, and the improvement of the power supply range is improved. The operation efficiency and user experience of the low-voltage distribution network.

CN115063018BActive Publication Date: 2024-11-01GUANGZHOU POWER SUPPLY BUREAU GUANGDONG POWER GRID CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210789054.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-07-06
Publication Date
2024-11-01
Estimated Expiration
2042-07-06

AI Technical Summary

Technical Problem

The existing technology lacks systematization and automation in the load regulation management in the Taiwan area, and relies on manual experience, resulting in poor load regulation effect, frequent power outages and low-voltage user complaints, and lacks comprehensive consideration of the three-phase imbalance problem, resulting in low-voltage platform distribution Account accuracy deteriorates.

Method used

Using the envelope method, automation and power supply range is achieved by screening heavy overload table areas, calculating the shortest distance of the power supply partition, evaluating the recommended load adjustment score, selecting feasible transfer into table areas, calculating the set of adjustable power meters and adjusting the power supply range, and optimization.

Benefits of technology

It realizes rapid identification and intelligent load regulation, improves the accuracy of low-voltage distribution network load and power supply partition adjustment, reduces the dependence of manual inspections and processing, reduces the problem of frequent tripping and power outages, and enhances the refinement of station area management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115063018B_ABST
    Figure CN115063018B_ABST
Patent Text Reader

Abstract

The present invention discloses an automatic adjustment and optimization method for distribution transformer load and power supply partition based on envelope method, comprising the following steps: S1, screening out the heavy overload problem substations according to the load rate of each substation and the heavy overload substation standard; S2, obtaining the shortest distance between the power supply partition of the transferred-in substation and the heavy overload problem substation; S3, finding out the qualified transferred-in substations according to the load rate of each substation and the shortest distance between the power supply partition of the transferred-in substation and the heavy overload problem substation, and forming a transferred-in substation set A; S4, obtaining the load adjustment recommendation evaluation score β of each transferred-in substation in the transferred-in substation set A, and ranking the transferred-in substations in the transferred-in substation set A according to the load adjustment recommendation evaluation score β, selecting the transferred-in substations with the highest ranking as feasible transferred-in substations, and the feasible transferred-in substations obtained by the selection form a feasible transferred-in substation set B.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of load regulation management in distribution areas, and in particular to an automatic regulation and optimization method for distribution transformer load and power supply partition based on an envelope method. Background Art

[0002] At present, the load adjustment work of power grid enterprises is carried out based on the experience of operators, based on the manual query of the load rate of the distribution transformer of the metering automation system, combined with the operator's own familiarity with the direction of the low-voltage line in the distribution area, and a rough load adjustment plan is determined through on-site investigation, and the maintenance unit is organized to implement it. The whole process does not query and use meter data to check the size of the load adjustment, nor does it use the low-voltage topology and layout of GIS to guide the preparation of the low-voltage line connection plan. There is a lack of comprehensive consideration of the three-phase imbalance problem in the distribution area, and the location of the low-voltage line in the distribution area and the connection is only determined based on experience. Therefore, the traditional experience method often leads to poor load adjustment effect. It takes multiple "trial and error" repeated adjustments to achieve the result of subjective judgment that it is neither over-adjustment nor under-adjustment. In addition, this process consumes a lot of manpower and material resources on the one hand, and more importantly, it will cause frequent power outages, which will affect the power consumption experience of terminal low-voltage users and cause complaints. At the same time, the whole process is carried out offline, there is no archived information, and the electronic transfer is not timely. As time goes by, the accuracy of the distribution transformer low-voltage ledger and the relationship between households and transformers will gradually deteriorate. Summary of the invention

[0003] The technical problem to be solved by the present invention is to provide a method for automatic adjustment and optimization of distribution transformer load and power supply partition based on envelope method.

[0004] In order to solve the above technical problems, the present invention provides a method for automatic adjustment and optimization of distribution transformer load and power supply partition based on envelope method, comprising the following steps:

[0005] S1. Screen out the areas with heavy overload problems based on the load rate of each area and the standards for heavy overload areas;

[0006] S2. Find the shortest distance between the power supply partition of the transferred-in substation and the substation with heavy overload problem;

[0007] S3, according to the load rate of each substation, the shortest distance between the substation to be transferred in and the substation with a serious overload problem, find out the substations that meet the conditions, and form a set of transferred substations A;

[0008] S4, obtaining the load adjustment recommendation evaluation score β of each transfer-in area in the transfer-in area set A, and ranking the transfer-in areas in the transfer-in area set A according to the load adjustment recommendation evaluation score β, selecting the transfer-in areas with the highest ranking as feasible transfer-in areas, and the feasible transfer-in areas obtained by the selection constitute the feasible transfer-in area set B;

[0009] S5. Calculate the recommended set of available outgoing meters based on the feasible incoming area set B;

[0010] S6. Adjust the power supply range according to the recommended adjustable power meter set.

[0011] Furthermore, the calculation process of the shortest distance between the power supply partition of the transferred-in substation and the heavily overloaded substation includes:

[0012] A1. Draw an envelope diagram of the substations including those with heavy overload problems and those transferred in;

[0013] A2. Calculate the shortest distance between the closed curve of the heavily overloaded area and the curve of each incoming area based on the area envelope diagram.

[0014] Furthermore, the step A1 comprises:

[0015] According to the trend of the low-voltage topology, countless circles of set radius are drawn with any point of the trend curve as the center, and a closed curve is found to be tangent to any circle to form a closed envelope figure to wrap the low-voltage topology lines including the substations with heavy overload problems and the transferred-in substations, thereby forming an area envelope diagram including the substations with heavy overload problems and the transferred-in substations.

[0016] Furthermore, the step A2 comprises:

[0017] According to the spatial algorithm, the envelope diagram of the station area is projected into the Cartesian coordinate system to form multiple closed curves with the station area as the unit. The set of the incoming station area curves is recorded as set D, and the heavy overload problem station area curve is recorded as b. The shortest distance between the closed curve of the heavy overload problem station area and each incoming station area curve is calculated one by one. The process includes:

[0018] (1) Randomly select a transfer-in area curve d1 from the set D;

[0019] (2) Using the principle of permutation and combination, take a coordinate from the heavy overload problem area curve b and a coordinate from the transferred area curve d1 to form a group, and so on, combine all the coordinate combinations of the two curves;

[0020] (3) Calculate the distance of all combinations. The distance calculation formula is as follows:

[0021] Assume that one of the coordinates in the heavy overload problem area curve b is (X1, Y1), and one of the coordinates in the transferred area curve d1 is (X2, Y2), then the distance between the two points is:

[0022] (4) Compare all distances and find the minimum value, which is recorded as the shortest distance between the heavy overload problem area curve b and the incoming area curve d1;

[0023] (5) By analogy, the shortest distance between the closed curve of the heavy overload problem area and the curves of each incoming area is calculated.

[0024] Furthermore, the step S3 takes the heavy overload problem area as the center and searches for a transfer-in area that meets the conditions according to the spatial analysis algorithm. The conditions include:

[0025] 1) The area after the transfer will not be overloaded, that is, the load rate of the area after the transfer is less than 80%;

[0026] 2) The shortest distance between the power supply partition of the transferred-in substation and the substation with heavy overload problem is less than the set distance;

[0027] 3) The average load rate of the transferred-in substations and the substations with heavy overload problems is <80%.

[0028] Furthermore, before obtaining the load adjustment recommendation evaluation score β of each transferred-in area in the transferred-in area set A, it also includes obtaining the area power supply radius of each transferred-in area in the transferred-in area set A; obtaining the area power supply radius of each transferred-in area in the transferred-in area set A includes:

[0029] Suppose one of the transferred areas in the transferred area set A is f1, and the set of all fire points under the transferred area f1 is E. Calculate the straight-line distance between the transferred area f1 and each fire point in the fire point set E, and take the longest straight-line distance as d max , then d max As the power supply radius of the transferred-in substation f1.

[0030] Further, obtaining the load adjustment recommendation evaluation score β of each incoming area in the incoming area set A includes:

[0031] The three characteristic values ​​of the power supply radius, load rate, and shortest distance between the power supply partition of each transferred-in substation in the transferred-in substation set A and the heavily overloaded substation are converted into quantifiable and evaluable values, and the following calculations are performed in conjunction with the configurable parameter coefficient table:

[0032] β=λ11*α11+λ22*α2+λ3*α3

[0033] Among them, α1 is the load rate of the substation, α2 is the shortest distance between the power supply partition of the substation and the substation with severe overload problem, α3 is the power supply radius of the substation, λ1 is the load rate coefficient of the substation, λ2 is the shortest distance coefficient between the power supply partition of the substation and the substation with severe overload problem, and λ3 is the power supply radius coefficient of the substation.

[0034] Furthermore, the step S5 comprises:

[0035] S5-1. Calculate the adjustable capacity y of each transfer-in area in the set of feasible transfer-in areas:

[0036]

[0037] Among them, m is the arithmetic mean of the load rate of the transferred-in area and the load rate of the area with severe overload problem, n is the load rate of the transferred-in area, and z is the rated capacity of the transferred-in area;

[0038] S5-2. According to the shortest access distance, find the branch end of the heavy overload problem area closest to the envelope of the transfer-in area through spatial calculation. Based on the highest load of each meter in the heavy overload problem area the day before and the low-voltage topology structure, use a recursive algorithm to calculate the set of meters that can be transferred out:

[0039] Assume the load of the meter is X n , the adjustable capacity of the input area is y, if Then record X1, X2...X n is the set of adjustable electricity meters, and n is the number of adjustable electricity meters.

[0040] Furthermore, the step S6 comprises:

[0041] S6-1. According to the recommendation, the meter connection position is adjusted, and based on the low-voltage topology of the substation, the load fire point is obtained; the load fire point is the new branch end of the substation with heavy overload problem, thereby forming a new power supply range for the substation with heavy overload problem;

[0042] S6-2. Connect the load distribution point with the branch end of the incoming substation to form a new power supply range of the incoming substation.

[0043] The beneficial effects of implementing the present invention are:

[0044] 1. The present invention can quickly retrieve the substations with heavy overload problems, quickly locate the substations with heavy overload problems, and timely carry out intelligent load adjustment for the substations with heavy overload problems. Compared with the traditional approach, the system intelligently discovers problems instead of manual inspections, and the system predicts problems instead of traditional passive processing after the problems are discovered. With the help of modern information means such as big data analysis and two-dimensional space analysis, intelligent load adjustment between substations is realized, which improves the accuracy of load adjustment and power supply zoning adjustment of low-voltage distribution networks. Information technology is used to assist the power management work in substations, and operation load adjustment suggestions are provided for the problems of heavy overload and frequent tripping and power outages in low-voltage distribution networks, replacing traditional empirical management and strengthening the refined management of substations.

[0045] 2. Realize the rendering of the power supply range of the substation based on the branch line. Compared with the method of rendering the power supply range of the substation based on the set of fire points in the substation, this method can more clearly show the direction of the low-voltage power supply in the substation and more accurately draw the power supply branch range. BRIEF DESCRIPTION OF THE DRAWINGS

[0046] Figure 1It is a principle flow chart of the automatic adjustment and optimization method of distribution transformer load and power supply partition based on the envelope method of the present invention;

[0047] Figure 2 Schematic diagram for power supply range adjustment. DETAILED DESCRIPTION

[0048] In order to make the purpose, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below with reference to the accompanying drawings. It is hereby stated that the directional terms such as up, down, left, right, front, back, inside, outside, etc. that appear or will appear in the text of the present invention are only based on the accompanying drawings of the present invention, and are not specific limitations of the present invention.

[0049] like Figure 1 As shown, the present invention provides a method for automatic adjustment and optimization of distribution transformer load and power supply partition based on envelope method, comprising the following steps:

[0050] S1. Screen out the areas with heavy overload problems based on the load rate of each area and the standards for heavy overload areas;

[0051] S2. Find the shortest distance between the power supply partition of the transferred-in area and the area with heavy overload problem. The calculation process includes:

[0052] A1. Draw an envelope diagram of the area including the area with heavy overload problems and the area transferred in:

[0053] According to the trend of the low-voltage topology, countless circles of set radius are drawn with any point of the trend curve as the center, and a closed curve is found to be tangent to any circle to form a closed envelope figure to wrap the low-voltage topology lines including the substations with heavy overload problems and the transferred-in substations, thereby forming an area envelope diagram including the substations with heavy overload problems and the transferred-in substations.

[0054] A2. Calculate the shortest distance between the closed curve of the heavily overloaded area and the curve of each incoming area based on the area envelope diagram.

[0055] This step specifically includes:

[0056] (1) Randomly select a transfer-in area curve d1 from the set D;

[0057] (2) Using the principle of permutation and combination, take a coordinate from the heavy overload problem area curve b and a coordinate from the transferred area curve d1 to form a group, and so on, combine all the coordinate combinations of the two curves;

[0058] (3) Calculate the distance of all combinations. The distance calculation formula is as follows:

[0059] Assume that one of the coordinates in the heavy overload problem area curve b is (X1, Y1), and one of the coordinates in the transferred area curve d1 is (X2, Y2), then the distance between the two points is:

[0060] (4) Compare all distances and find the minimum value, which is recorded as the shortest distance between the heavy overload problem area curve b and the incoming area curve d1;

[0061] (5) By analogy, the shortest distance between the closed curve of the heavy overload problem area and the curves of each incoming area is calculated.

[0062] S3, according to the load rate of each substation, the shortest distance between the substation to be transferred in and the substation with a serious overload problem, find out the substations that meet the conditions, and form a set of transferred substations A;

[0063] This step takes the heavy overload problem area as the center and uses the spatial analysis algorithm to find the transfer-in area that meets the conditions. The conditions include:

[0064] 1) The area after the transfer will not be overloaded, that is, the load rate of the area after the transfer is less than 80%;

[0065] 2) The shortest distance between the power supply partition of the transferred-in substation and the substation with heavy overload problem is less than the set distance;

[0066] 3) The average load rate of the transferred-in substations and the substations with heavy overload problems is <80%.

[0067] S4, obtaining the area power supply radius of each incoming area in the incoming area set A, the process includes:

[0068] Suppose one of the transferred areas in the transferred area set A is f1, and the set of all fire points under the transferred area f1 is E. Calculate the straight-line distance between the transferred area f1 and each fire point in the fire point set E, and take the longest straight-line distance as d max , then d max As the power supply radius of the transferred-in substation f1.

[0069] Next, the load adjustment recommendation evaluation score β of each incoming area in the incoming area set A is calculated, and the incoming areas in the incoming area set A are ranked according to the load adjustment recommendation evaluation score β, and the incoming areas with the highest ranking are selected as feasible incoming areas. The feasible incoming areas obtained by the selection constitute the feasible incoming area set B;

[0070] Obtaining the load transfer recommendation evaluation score β for each incoming area in the incoming area set A includes:

[0071] The three characteristic values ​​of the power supply radius, load rate, and shortest distance between the power supply partition of each transferred-in substation in the transferred-in substation set A and the heavily overloaded substation are converted into quantifiable and evaluable values, and the following calculations are performed in conjunction with the configurable parameter coefficient table:

[0072] β=λ1*α1+λ2*α2+λ3*α3

[0073] Among them, α1 is the load rate of the substation, α2 is the shortest distance between the power supply partition of the substation and the substation with severe overload problem, α3 is the power supply radius of the substation, λ1 is the load rate coefficient of the substation, λ2 is the shortest distance coefficient between the power supply partition of the substation and the substation with severe overload problem, and λ3 is the power supply radius coefficient of the substation.

[0074] S5. Calculate the recommended set of adjustable outgoing meters based on the feasible incoming area set B:

[0075] S5-1. Calculate the adjustable capacity y of each transfer-in area in the set of feasible transfer-in areas:

[0076]

[0077] Among them, m is the arithmetic mean of the load rate of the transferred-in area and the load rate of the area with severe overload problem, n is the load rate of the transferred-in area, and z is the rated capacity of the transferred-in area;

[0078] S5-2. According to the shortest access distance, find the branch end of the heavy overload problem area closest to the envelope of the transfer-in area through spatial calculation. Based on the highest load of each meter in the heavy overload problem area the day before and the low-voltage topology structure, use a recursive algorithm to calculate the set of meters that can be transferred out:

[0079] Assume the load of the meter is X n , the adjustable capacity of the input area is y, if Then record X1, X2...X n is the set of adjustable electricity meters, and n is the number of adjustable electricity meters.

[0080] S6. Adjust the power supply range according to the recommended adjustable power meter set:

[0081] S6-1. According to the recommendation, the meter connection position is adjusted, and based on the low-voltage topology of the substation, the load fire point is obtained; the load fire point is the new branch end of the substation with heavy overload problem, thereby forming a new power supply range for the substation with heavy overload problem;

[0082] S6-2. Connect the load distribution point with the branch end of the incoming substation to form a new power supply range of the incoming substation.

[0083] For specific adjustments, please refer to Figure 2 .

[0084] Although the description of the present disclosure has been quite detailed and specifically describes several described embodiments, it is not intended to be limited to any of these details or embodiments or any particular embodiment, but should be regarded as providing a broad possible interpretation of these claims by reference to the appended claims in view of the prior art, thereby effectively covering the intended scope of the present disclosure. In addition, the above description of the present disclosure is based on the embodiments foreseeable by the inventors, and its purpose is to provide a useful description, and those non-substantial changes to the present disclosure that have not yet been foreseen may still represent equivalent changes to the present disclosure.

Claims

1. The automatic adjustment and optimization method of distribution transformer load and power supply partition based on envelope method is characterized by: The following steps are involved: S1. Screen out the areas with heavy overload problems based on the load rate of each area and the standards for heavy overload areas; S2. Find the shortest distance between the power supply partition of the transferred-in substation and the substation with heavy overload problem; S3, according to the load rate of each substation, the shortest distance between the power supply partition of the transfer-in substation and the substation with heavy overload problem, find the transfer-in substation that meets the conditions, and form a transfer-in substation set A; S4, obtaining the load adjustment recommendation evaluation score β of each transfer-in area in the transfer-in area set A, and ranking the transfer-in areas in the transfer-in area set A according to the load adjustment recommendation evaluation score β, selecting the transfer-in areas with the highest ranking as feasible transfer-in areas, and the feasible transfer-in areas obtained by the selection constitute the feasible transfer-in area set B; S5. Calculate the recommended set of available outgoing meters based on the feasible incoming area set B; S6. Adjust the power supply range according to the recommended adjustable power meter set; The calculation process of the shortest distance between the power supply partition of the transferred-in substation and the heavily overloaded substation includes: A1. Draw an envelope diagram of the substations including those with heavy overload problems and those transferred in; A2. Calculate the shortest distance between the closed curve of the heavy overload problem area and the curve of each incoming area one by one according to the area envelope diagram; The step A1 comprises: According to the low-voltage topology trend, with any point of the trend curve as the center, draw countless circles of set radius, and find a closed curve tangent to any circle to form a closed envelope figure to wrap the low-voltage topology line including the heavy overload problem area and the transfer-in area, thereby forming an area envelope diagram including the heavy overload problem area and the transfer-in area; The step A2 comprises: According to the spatial algorithm, the envelope diagram of the station area is projected into the Cartesian coordinate system to form multiple closed curves with the station area as the unit. The set of the incoming station area curves is recorded as set D, and the heavy overload problem station area curve is recorded as b. The shortest distance between the closed curve of the heavy overload problem station area and each incoming station area curve is calculated one by one. The process includes: (1) Randomly select a transfer-in area curve d1 from the set D; (2) Using the principle of permutation and combination, take a coordinate from the heavy overload problem area curve b and a coordinate from the transferred area curve d1 to form a group, and so on, combine all the coordinate combinations of the two curves; (3) Calculate the distance of all combinations. The distance calculation formula is as follows: Assume that one of the coordinates in the heavy overload problem area curve b is (X1, Y1), and one of the coordinates in the transferred area curve d1 is (X2, Y2), then the distance between the two points is: (4) Compare all distances and find the minimum value, which is recorded as the shortest distance between the heavy overload problem area curve b and the incoming area curve d1; (5) By analogy, the shortest distance between the closed curve of the heavy overload problem area and the curves of each incoming area is calculated.

2. The method for automatic adjustment and optimization of distribution transformer load and power supply partition based on envelope method according to claim 1 is characterized in that: The step S3 takes the heavy overload problem area as the center and searches for a transfer-in area that meets the conditions according to the spatial analysis algorithm. The conditions include: 1) The area after the transfer will not be overloaded, that is, the load rate of the area after the transfer is less than 80%; 2) The shortest distance between the power supply partition of the transferred-in substation and the substation with heavy overload problem is less than the set distance; 3) The average load rate of the transferred-in substations and the substations with heavy overload problems is <80%.

3. The method for automatic adjustment and optimization of distribution transformer load and power supply partition based on envelope method according to claim 1 is characterized in that: Before obtaining the load adjustment recommendation evaluation score β of each incoming area in the incoming area set A, it also includes obtaining the area power supply radius of each incoming area in the incoming area set A; obtaining the area power supply radius of each incoming area in the incoming area set A includes: Suppose one of the transferred areas in the transferred area set A is f1, and the set of all fire points under the transferred area f1 is E. Calculate the straight-line distance between the transferred area f1 and each fire point in the fire point set E, and take the longest straight-line distance as d max , then d max As the power supply radius of the transferred-in substation f1.

4. The method for automatic adjustment and optimization of distribution transformer load and power supply partition based on envelope method according to claim 3 is characterized in that: Obtaining the load transfer recommendation evaluation score β for each incoming area in the incoming area set A includes: The three characteristic values ​​of the power supply radius, load rate, and shortest distance between the power supply partition of each transferred-in substation in the transferred-in substation set A and the heavily overloaded substation are converted into quantifiable and evaluable values, and the following calculations are performed in conjunction with the configurable parameter coefficient table: β=λ1*α1+λ2*α2+λ3*α3 Among them, α1 is the load rate of the substation, α2 is the shortest distance between the power supply partition of the substation and the substation with severe overload problem, α3 is the power supply radius of the substation, λ1 is the load rate coefficient of the substation, λ2 is the shortest distance coefficient between the power supply partition of the substation and the substation with severe overload problem, and λ3 is the power supply radius coefficient of the substation.

5. The method for automatic adjustment and optimization of distribution transformer load and power supply partition based on envelope method according to claim 1 is characterized in that: The step S5 comprises: S5-1. Calculate the adjustable capacity y of each transfer-in area in the set of feasible transfer-in areas: Among them, m is the arithmetic mean of the load rate of the transferred-in area and the load rate of the area with severe overload problem, n is the load rate of the transferred-in area, and z is the rated capacity of the transferred-in area; S5-2. According to the shortest access distance, find the branch end of the heavy overload problem area closest to the envelope of the transfer-in area through spatial calculation. Based on the highest load of each meter in the heavy overload problem area the day before and the low-voltage topology structure, use a recursive algorithm to calculate the set of meters that can be transferred out: Assume the load of the meter is X n , the adjustable capacity of the input area is y, if Then record X1, X2...X n is the set of adjustable electricity meters, and n is the number of adjustable electricity meters.

6. The method for automatic adjustment and optimization of distribution transformer load and power supply partition based on envelope method according to claim 1 is characterized in that: The step S6 comprises: S6-1. According to the recommendation, the meter connection position is adjusted, and based on the low-voltage topology of the substation, the load fire point is obtained; the load fire point is the new branch end of the substation with heavy overload problem, thereby forming a new power supply range for the substation with heavy overload problem; S6-2. Connect the load distribution point with the branch end of the incoming substation to form a new power supply range of the incoming substation.