A multi-layer depth geological detection equipment for foundation engineering
By designing multi-layer depth geological detection equipment and using components such as boxes, motors, ball screws and limit rings, the problem of low efficiency of existing equipment is solved, efficient sampling and detection of soil at different depths is achieved, and construction efficiency is improved. efficiency.
Patent Information
- Application Number
- CN202210754006.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-06-28
- Publication Date
- 2024-10-18
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing geological testing equipment is inefficient in the process of sampling soil at different depths, causing construction efficiency to be affected.
A multi-layer depth geological inspection equipment is designed, which uses components such as a box, a motor, a ball screw, a universal wheel, a drill bit, a feeding chute, a baffle, a connecting plate, and a limit ring. The motor drives the ball screw and The drill bit rotates, combined with the cylinder and the limit ring to drive the connecting plate and baffle to move, achieving stable and efficient movement of the drill bit and the access chute, and reducing repeated operations.
It improves the efficiency of soil sampling at different depths, reduces the time required for workers to collect soil, improves detection efficiency, and ensures the stability of the drill bit and the convenient movement of the equipment by adjusting the height and position of the device.
Smart Images

Figure CN115127861B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of geological detection, in particular to a multi-layer deep geological detection device for foundation engineering. Background Art
[0002] The foundation includes strip foundation, rigid foundation, flexible foundation and independent foundation. The function of the foundation is to bear all the loads transmitted from the foundation. It is the most important step in building manufacturing. The foundation project needs to be tested on the geology before construction to ensure the stability of the building structure. At present, in the process of foundation testing, the underground soil is sampled and then the samples are tested to determine its bearing capacity and then ensure the stability of the building structure construction.
[0003] In the process of soil sampling, current geological detection equipment inserts the sampling mechanism deep into the soil to take samples. However, when the sampling mechanism needs to sample soil at different depths, repeated operations are usually required, which leads to inefficiency in the process of repeatedly inserting the sampling mechanism, thereby affecting the efficiency of construction. Summary of the invention
[0004] The purpose of the present invention is to provide a multi-layer depth geological detection equipment for foundation engineering to solve the problems raised in the above background technology.
[0005] In order to solve the above technical problems, the present invention provides the following technical solutions: a multi-layer depth geological detection equipment for foundation engineering, comprising a box body, a first motor, fixedly connected to the top of the box body; and the output end of the first motor is fixedly connected to a first ball screw, a through port, which is opened at the bottom center of the box body, and a universal wheel, which is fixedly connected to the bottom of the box body. The first ball screw is sleeved with a matching screw nut slider on the outside, and the bottom center of the screw nut slider is rotatably connected to a mounting cylinder, a first mounting groove is opened inside the mounting cylinder, a drill bit is fixedly connected to the bottom of the mounting cylinder, a plurality of material taking grooves are equidistantly opened on the outer wall of the mounting cylinder, and the inner walls of the plurality of material taking grooves are all provided with matching baffles, and a plurality of positioning plates matching the material taking grooves are fixedly connected to the inner wall of the mounting cylinder, one end of the positioning plate is symmetrically fixedly connected to two first springs, and the other ends of the two first springs are fixedly connected to the baffle, and a plurality of connecting plates are equidistantly arranged inside the mounting cylinder, and the tops of the connecting plates are all fixedly connected to connecting ropes, and the other ends of the connecting ropes are fixedly connected to the baffles.
[0006] Furthermore, the baffle is slidably connected to the material trough, a limiting rod is fixedly connected inside the box body, the limiting rod passes through the screw nut slider, the screw nut slider is slidably connected to the limiting rod, and the limiting rod can ensure the stability of the screw nut slider during movement.
[0007] Furthermore, a second motor is fixedly installed on the top of the screw nut slider, the output end of the second motor is fixedly connected to the first extension rod, the outer wall of the first extension rod is fixedly connected to a driving gear, the outer wall of the driving gear is meshed with a chain, the outer wall of the mounting tube is fixedly connected to a gear ring, the driving gear is transmission connected to the gear ring through the chain, and through the transmission connection between the driving gear, the chain and the gear ring, when the staff turns on the second motor to drive the driving gear to rotate, the gear ring can also rotate at the same time, thereby causing the drill bit to rotate, thereby facilitating excavation and sampling.
[0008] Furthermore, a cylinder is fixedly connected to the top of the screw nut slider, a second extension rod is fixedly connected to the output end of the cylinder, a plurality of first limit rings are fixedly connected to the outer wall of the second extension rod at equal intervals, and a plurality of second limit rings are fixedly connected to the outer wall of the second extension rod at equal intervals. Through the coordinated use of the first limit ring and the second limit ring, the cylinder can drive the connecting plate to move through the first limit ring and the second limit ring while driving the second extension rod to move, without affecting the rotation of the connecting plate.
[0009] Furthermore, the inner wall of the installation tube is equidistantly provided with a plurality of first sliding grooves adapted to the connecting plate, and the connecting plate is slidably connected to the installation tube via the first sliding grooves. The sliding connection between the connecting plate and the installation tube via the first sliding grooves can ensure the stability of the connecting plate when it moves.
[0010] Furthermore, the bottom of the second extension rod passes through the mounting tube and extends to the inside of the first mounting groove, a through groove is opened in the center of the connecting plate, the inner wall size of the through groove is larger than the outer wall size of the second extension rod, and the size of the through groove is smaller than the outer wall size of the first limiting ring, and the connecting plate is located between the first limiting ring and the second limiting ring. The second extension rod passes through the through groove, so that during the movement of the second extension rod, the cooperation of the first limiting ring and the second limiting ring can drive multiple groups of connecting plates to move at the same time, thereby facilitating the subsequent sampling of soil at different depths, thereby improving work efficiency.
[0011] Furthermore, a limiting groove is provided at one end of the positioning plate, the limiting groove is U-shaped, and the connecting rope passes through the limiting groove, so that the stability of the connecting rope during movement can be ensured.
[0012] Furthermore, two installation boxes are symmetrically fixedly connected at both ends of the box body, a third motor is fixedly installed on the top of the two installation boxes, a second ball screw is fixedly connected to the output end of the third motor, a matching screw nut support plate is sleeved on the outside of the second ball screw, two groups of plug rods are symmetrically fixedly connected to the bottom of the screw nut support plate, a second installation groove is opened inside the screw nut support plate, and the height of the screw nut support plate can be adjusted by adjusting the third motor, thereby facilitating the staff to fix the box body, thereby ensuring the stability of the drill bit when working.
[0013] Furthermore, two groups of support blocks are symmetrically fixedly connected at both ends of the screw nut support plate, and second sliding grooves compatible with the two groups of support blocks are symmetrically opened inside the installation box. First openings are opened at both ends of the screw nut support plate, and fixed blocks are fixedly connected inside the second installation grooves. Second springs are symmetrically fixedly connected at both ends of the fixed blocks. The second sliding grooves can ensure the stability of the support blocks when moving inside the installation box.
[0014] Furthermore, a plug plate is hinged inside the first opening, the other end of the second spring is fixedly connected to the plug plate, and a second opening is provided on the outer wall of the box body, through which the plug plate can be easily stored, so that when the staff is not using the plug plate, the plug plate can be squeezed by the installation box during the storage process and stored into the second opening, thereby facilitating the staff to move and fix the box.
[0015] Compared with the prior art, the beneficial effects achieved by the present invention are:
[0016] 1. The present invention uses a baffle, a first spring, a connecting plate, a connecting rope, a first limiting ring and a second limiting ring in coordination, so that the staff can block the material taking trough through the baffle when the drill bit is drilling into the ground. When the installation tube drives the drill bit and the material taking trough to move to the specified position, the staff can drive the connecting rope by adjusting the height of the connecting plate, so that the connecting rope can drive the baffle, so that the baffle no longer blocks the material taking trough. At this time, the staff can rotate by adjusting the installation tube, so that the installation tube can squeeze the soil of different depths into the interior of the material taking trough through rotation. When the soil is collected, the staff adjusts the position of the second extension rod again, so that the first spring rebounds and pushes the soil inside the material taking trough, so as to facilitate the staff to collect and detect it, thereby reducing the time required for the staff to collect the soil, thereby improving the efficiency of the detection.
[0017] 2. The present invention uses the screw nut support plate, the plug rod, the second spring and the plug plate in coordination, so that when the box reaches the specified position, the staff can adjust the height of the plug rod and the plug plate by adjusting the height of the screw nut support plate, so that the staff can strengthen the connection between the box and the ground through the plug rod and the plug plate, thereby ensuring the stability of the drill bit when working. At the same time, when the drill bit is finished working, the staff can safely store the plug rod and the plug plate into the installation box, so that the staff can adjust the position of the box through the universal wheel, thereby facilitating the use of the box. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0019] Figure 1 It is a schematic diagram of the overall appearance structure of the present invention;
[0020] Figure 2 It is a schematic diagram of the cross-sectional structure of the present invention when the whole is not positioned;
[0021] Figure 3 It is a schematic diagram of the cross-sectional structure of the present invention when the whole is positioned;
[0022] Figure 4 It is a schematic diagram of the cross-sectional structure of the installation tube of the present invention;
[0023] Figure 5 for Figure 4 A magnified view of the structure at A;
[0024] Figure 6 It is a schematic diagram of the top view cross-sectional structure of the connection plate and the mounting tube of the present invention;
[0025] Figure 7 for Figure 2 A magnified view of the structure at B;
[0026] Figure 8 It is a schematic diagram of the side appearance structure of the connection between the screw nut support plate and the support block of the present invention.
[0027] In the figure: 1, box; 2, first motor; 3, first ball screw; 4, through port; 5, universal wheel; 6, screw nut slider; 7, mounting tube; 8, first mounting slot; 9, drill bit; 10, material trough; 11, baffle; 12, positioning plate; 13, first spring; 14, connecting plate; 15, connecting rope; 16, limit rod; 17, second motor; 18, first extension rod; 19, driving gear; 20, chain; 21, gear ring; 22, Cylinder; 23. Second extension rod; 24. First limiting ring; 25. Second limiting ring; 26. First slide groove; 27. Through groove; 28. Limiting groove; 29. Mounting box; 30. Third motor; 31. Second ball screw; 32. Screw nut support plate; 33. Insert rod; 34. Second mounting groove; 35. Support block; 36. Second slide groove; 37. First opening; 38. Fixed block; 39. Second spring; 40. Insert plate; 41. Second opening. DETAILED DESCRIPTION
[0028] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0029] See also Figure 1 - Figure 6The present invention provides a technical solution: a multi-layer depth geological detection equipment for foundation engineering, including a box body 1, a first motor 2, fixedly connected to the top of the box body 1; and the output end of the first motor 2 is fixedly connected to a first ball screw 3, a through port 4, opened at the bottom center of the box body 1, a universal wheel 5, fixedly connected to the bottom of the box body 1 around, the first ball screw 3 is sleeved with a matching screw nut slider 6 on the outside, the screw nut slider 6 is rotatably connected to a mounting tube 7 at the bottom center, the mounting tube 7 is provided with a first mounting groove 8, the bottom of the mounting tube 7 is fixedly connected to a drill bit 9, and the outer wall of the mounting tube 7 is equidistantly provided with a plurality of material taking grooves 10, and the plurality of taking grooves 10 are equidistantly provided. The inner wall of the material trough 10 is provided with a matching baffle 11, and the inner wall of the mounting tube 7 is fixedly connected with a plurality of positioning plates 12 that are compatible with the material trough 10. One end of the positioning plate 12 is symmetrically fixedly connected with two first springs 13, and the other ends of the two first springs 13 are fixedly connected to the baffle 11. A plurality of connecting plates 14 are equidistantly arranged inside the mounting tube 7, and the tops of the connecting plates 14 are fixedly connected with connecting ropes 15, and the other ends of the connecting ropes 15 are fixedly connected to the baffle 11. The baffle 11 is slidably connected to the material trough 10, and a limiting rod 16 is fixedly connected inside the box body 1, and the limiting rod 16 passes through the screw nut slider 6, and the screw nut slider 6 is slidably connected to the limiting rod 16. The second motor 17 is fixedly installed on the top of the screw nut slider 6, and the output end of the second motor 17 is fixedly connected to the first extension rod 18. The outer wall of the first extension rod 18 is fixedly connected to a driving gear 19, and the outer wall of the driving gear 19 is meshed with a chain 20. The outer wall of the mounting cylinder 7 is fixedly connected to a gear ring 21, and the driving gear 19 is transmission-connected to the gear ring 21 through the chain 20. The top of the screw nut slider 6 is fixedly connected to a cylinder 22, and the output end of the cylinder 22 is fixedly connected to a second extension rod 23. The outer wall of the second extension rod 23 is equidistantly fixedly connected to a plurality of first limiting rings 24, and the outer wall of the second extension rod 23 is equidistantly fixedly connected to a plurality of second limiting rings. The connecting plate 14 is slidably connected to the mounting tube 7 through the first slide grooves 26. The bottom of the second extension rod 23 passes through the mounting tube 7 and extends to the inside of the first mounting groove 8. A through groove 27 is provided in the center of the connecting plate 14. The inner wall size of the through groove 27 is larger than the outer wall size of the second extension rod 23, and the size of the through groove 27 is smaller than the outer wall size of the first limiting ring 24. The connecting plate 14 is located between the first limiting ring 24 and the second limiting ring 25. A limiting groove 28 is provided at one end of the positioning plate 12. The limiting groove 28 is U-shaped, and the connecting rope 15 passes through the limiting groove 28.
[0030] The specific implementation method is as follows: when the staff needs to sample and test the soil in the geology, the staff first moves the box 1 to a suitable position through the universal wheel 5, and then the staff turns on the first motor 2 to drive the first ball screw 3 to rotate clockwise, so that the first ball screw 3 drives the screw nut slider 6 to move downward smoothly through rotation, and at the same time turns on the second motor 17. At this time, the second motor 17 drives the first extension rod 18 and the driving gear 19 to rotate, and during the rotation of the driving gear 19, it drives the chain 20 to rotate, so that the chain 20 drives the gear ring 21 to rotate, so that the gear ring 21 drives the installation cylinder 7 to rotate, and when the installation cylinder 7 rotates, it drives the drill bit 9 to rotate , so that the drill bit 9 rotates during the descent process, so that the drill bit 9 can move downward to dig, and as the screw nut slider 6 continues to move downward, when most of the installation tube 7 is located inside the soil, the staff can open the cylinder 22 to drive the second extension rod 23 to move downward, so that the second extension rod 23 moves inside the first installation groove 8. When the second extension rod 23 moves, it also drives multiple groups of first limiting rings 24 and second limiting rings 25 to move, so that the first limiting ring 24 and the second limiting ring 25 cooperate to squeeze the connecting plate 14, so that the connecting plate 14 moves along the first slide groove 26 inside the first installation groove 8, and through the through groove 2 7 does not affect the rotation of the installation cylinder 7. During the downward movement of the connecting plate 14, the connecting plate 14 pulls the connecting rope 15 to move downward, so that the connecting rope 15 pulls the baffle 11 at the other end, so that the baffle 11 moves along the material taking trough 10 to the center of the installation cylinder 7, so that the baffle 11 no longer blocks the material taking trough 10. At this time, the soil can be collected into the interior of the material taking trough 10 through the continued rotation of the installation cylinder 7, so that the soil of different depths can be collected through multiple groups of material taking troughs 10, thereby reducing the time required for collecting soil of different depths, thereby improving work efficiency. At the same time, the baffle 11 will squeeze the first spring 13 during the movement. The first spring 13 is made of spring steel. At this time, the first spring 13 contracts. When the material taking trough 10 is inside When the upper and lower parts are full of soil, the staff turns off the second motor 17, so that the installation cylinder 7 no longer rotates, and then the staff drives the first ball screw 3 to rotate counterclockwise by adjusting the first motor 2, so that the screw nut slider 6 drives the installation cylinder 7 to move upward smoothly. When the installation cylinder 7 moves into the box body 1, the staff adjusts the cylinder 22 so that the cylinder 22 drives the second extension rod 23 to rise, thereby causing the connecting plate 14 to rise. At this time, the baffle 11 is no longer subjected to the tension of the connecting rope 15. At this time, the first spring 13 begins to rebound due to the reduction in pressure, thereby driving the baffle 11 to squeeze the soil inside the material trough 10, thereby facilitating the staff to take out the soil inside the material trough 10, thereby improving work efficiency.
[0031] See also Figure 1 , Figure 2 , Figure 3 , Figure 7 and Figure 8 The present invention provides a technical solution: a multi-layer depth geological detection equipment for foundation engineering, in addition, two installation boxes 29 are symmetrically fixedly connected at both ends of the box body 1, and a third motor 30 is fixedly installed on the top of the two installation boxes 29. The output end of the third motor 30 is fixedly connected to a second ball screw 31, and the second ball screw 31 is externally sleeved with a matching screw nut support plate 32. The bottom of the screw nut support plate 32 is symmetrically fixedly connected with two groups of plug rods 33, and the screw nut support plate 32 is internally provided with a second installation groove 3 4. Two groups of support blocks 35 are symmetrically fixedly connected at both ends of the screw nut support plate 32. Second slide grooves 36 adapted to the two groups of support blocks 35 are symmetrically opened inside the installation box 29. First openings 37 are opened at both ends of the screw nut support plate 32. A fixing block 38 is fixedly connected inside the second installation groove 34. Second springs 39 are symmetrically fixedly connected at both ends of the fixing block 38. A plug plate 40 is hinged inside the first opening 37. The other end of the second spring 39 is fixedly connected to the plug plate 40. A second opening 41 is opened on the outer wall of the box body 1.
[0032] The specific implementation method is as follows: when the staff needs to take samples of soil at different depths, when the staff moves the box 1 to the designated location through the universal wheels 5, in order to ensure the stability of the box 1 during operation, the staff can adjust the third motor 30 according to the slope of the ground. However, when the staff turns on the third motor 30, the third motor 30 drives the second ball screw 31 to rotate, so that the screw nut support plate 32 moves downward smoothly outside the second ball screw 31. As the screw nut support plate 32 moves downward, when one end of the plug plate 40 no longer contacts the installation box 29, the fixed block 38 slowly drives the plug plate 40 to rebound, so that the plug plate 40 pops out from the inside of the first opening 37, and at the same time, when the screw nut support plate 32 descends During the process, the screw nut support plate 32 drives the insertion rod 33 to squeeze the ground, so that the insertion rod 33 is inserted into the ground, thereby stabilizing the box body 1. At the same time, the insertion plate 40 can strengthen the connection between the box body 1 and the ground again, thereby ensuring the stability of the box body 1 during operation. When the box body 1 is finished working, the staff can adjust the third motor 30 to drive the screw nut support plate 32 to rise. As the screw nut support plate 32 continues to rise, the two ends of the insertion plate 40 are squeezed by the installation box 29. At this time, the insertion plate 40 squeezes the second spring 39, so that the second spring 39 contracts again, so that the insertion plate 40 is retracted into the first opening 37, so that the staff can move the box body 1 through the universal wheel 5, thereby facilitating the use of the box body 1.
[0033] Working principle of the present invention:
[0034] Reference Figure 1 - Figure 6 , through the coordinated use of the baffle plate 11, the first spring 13, the connecting plate 14, the connecting rope 15, the first limiting ring 24 and the second limiting ring 25, the staff can block the material trough 10 through the baffle plate 11 in the process of drilling the drill bit 9 into the ground. When the installation tube 7 drives the drill bit 9 and the material trough 10 to move to the specified position, the staff can drive the connecting rope 15 by adjusting the height of the connecting plate 14, so that the connecting rope 15 can drive the baffle plate 11, so that the baffle plate 11 no longer blocks the material trough 10. At this time, the staff can rotate by adjusting the installation tube 7, so that the installation tube 7 can squeeze the soil of different depths into the interior of the material trough 10 by rotation. When the soil is collected, the staff adjusts the position of the second extension rod 23 again, so that the first spring 13 rebounds and pushes the soil inside the material trough 10, so as to facilitate the staff to collect and detect it, thereby reducing the time required for the staff to collect the soil, thereby improving the efficiency of the detection.
[0035] For further information, please refer to the attached manual. Figure 1 , Figure 2 , Figure 3 , Figure 7 and Figure 8 , through the coordinated use of the screw nut support plate 32, the plug rod 33, the second spring 39 and the plug plate 40, when the box 1 reaches the specified position, the staff can adjust the height of the plug rod 33 and the plug plate 40 by adjusting the height of the screw nut support plate 32, so that the staff can strengthen the connection between the box 1 and the ground through the plug rod 33 and the plug plate 40, thereby ensuring the stability of the drill bit 9 when working. At the same time, when the drill bit 9 has finished working, the staff can safely store the plug rod 33 and the plug plate 40 into the installation box 29, so that the staff can adjust the position of the box 1 through the universal wheel 5, thereby facilitating the use of the box 1.
[0036] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A multi-layer depth geological detection device for foundation engineering, comprising a housing (1); A first motor (2) is fixedly connected to the top of the box (1); and a first ball screw (3) is fixedly connected to the output end of the first motor (2); A through opening (4) is provided at the center of the bottom of the box body (1); Universal wheels (5) are fixedly connected to the bottom of the box (1) on all sides; Features: The first ball screw (3) is sleeved with a matching screw nut slider (6) on the outside, the screw nut slider (6) is rotatably connected to a mounting tube (7) at the bottom center, a first mounting groove (8) is provided inside the mounting tube (7), a drill bit (9) is fixedly connected to the bottom of the mounting tube (7), a plurality of material taking grooves (10) are equidistantly provided on the outer wall of the mounting tube (7), the inner walls of the plurality of material taking grooves (10) are all provided with matching baffles (11), and a plurality of positioning holes (11) matching the material taking grooves (10) are fixedly connected to the inner wall of the mounting tube (7). The positioning plate (12) has two first springs (13) symmetrically fixedly connected to one end of the positioning plate (12), and the other ends of the two first springs (13) are fixedly connected to the baffle plate (11); a plurality of connecting plates (14) are equidistantly arranged inside the mounting tube (7), and the tops of the connecting plates (14) are all fixedly connected to connecting ropes (15), and the other ends of the connecting ropes (15) are fixedly connected to the baffle plate (11); a second motor (17) is fixedly installed on the top of the screw nut slider (6), and the output end of the second motor (17) is fixedly connected to the first extension rod. (18), the outer wall of the first extension rod (18) is fixedly connected to a driving gear (19), the outer wall of the driving gear (19) is meshed with a chain (20), the outer wall of the mounting cylinder (7) is fixedly connected to a gear ring (21), the driving gear (19) is transmission-connected to the gear ring (21) via the chain (20); the top of the screw nut slider (6) is fixedly connected to a cylinder (22), the output end of the cylinder (22) is fixedly connected to a second extension rod (23), and the outer wall of the second extension rod (23) is fixedly connected to a plurality of first A limiting ring (24), the outer wall of the second extension rod (23) is equidistantly and fixedly connected with a plurality of second limiting rings (25); the bottom of the second extension rod (23) passes through the mounting tube (7) and extends into the first mounting groove (8); a through groove (27) is provided at the center of the connecting plate (14); the inner wall size of the through groove (27) is larger than the outer wall size of the second extension rod (23); the size of the through groove (27) is smaller than the outer wall size of the first limiting ring (24); the connecting plate (14) is located between the first limiting ring (24) and the second limiting ring (25).
2. The multi-layer depth geological detection equipment for foundation engineering according to claim 1 is characterized by: The baffle plate (11) is slidably connected to the material taking trough (10), a limit rod (16) is fixedly connected inside the box body (1), the limit rod (16) passes through the screw nut slider (6), and the screw nut slider (6) is slidably connected to the limit rod (16).
3. The multi-layer depth geological detection equipment for foundation engineering according to claim 1 is characterized by: The inner wall of the installation cylinder (7) is provided with a plurality of first sliding grooves (26) adapted to the connection plate (14) at equal intervals, and the connection plate (14) is slidably connected to the installation cylinder (7) via the first sliding grooves (26).
4. The multi-layer depth geological detection equipment for foundation engineering according to claim 1 is characterized by: A limiting groove (28) is provided at one end of the positioning plate (12), the limiting groove (28) is U-shaped, and the connecting rope (15) passes through the limiting groove (28).
5. The multi-layer depth geological detection equipment for foundation engineering according to claim 1 is characterized by: Two mounting boxes (29) are symmetrically fixedly connected at both ends of the box body (1), a third motor (30) is fixedly installed on the top of each of the two mounting boxes (29), a second ball screw (31) is fixedly connected to the output end of the third motor (30), a matching screw nut support plate (32) is sleeved on the outside of the second ball screw (31), two groups of plug rods (33) are symmetrically fixedly connected at the bottom of the screw nut support plate (32), and a second mounting groove (34) is provided inside the screw nut support plate (32).
6. The multi-layer depth geological detection equipment for foundation engineering according to claim 5, characterized in that: Two groups of support blocks (35) are symmetrically fixedly connected at both ends of the screw nut support plate (32), second slide grooves (36) adapted to the two groups of support blocks (35) are symmetrically opened inside the installation box (29), first openings (37) are opened at both ends of the screw nut support plate (32), a fixing block (38) is fixedly connected inside the second installation groove (34), and second springs (39) are symmetrically fixedly connected at both ends of the fixing block (38).
7. The multi-layer depth geological detection equipment for foundation engineering according to claim 6 is characterized by: A plug plate (40) is hingedly connected inside the first opening (37), the other end of the second spring (39) is fixedly connected to the plug plate (40), and a second opening (41) is formed on the outer wall of the box body (1).
Citation Information
Patent Citations
Building engineering pile foundation quality detection sampling device and detection method thereof
CN114428036A
Geological engineering soil sampling device
CN214373521U
Rock-soil detection device for geological exploration
CN216594228U