A configurable accounting core automatic batch running method, device and storage medium

By adopting a configurable automatic batch running method in bank account testing, combining the full probability formula and Bayesian formula to intelligently adjust the weight, the problems of manual trigger batch running task are solved, and the system is highly complex and deep coupling is achieved, and efficient Automatic batch execution improves the efficiency and maintainability of bank account testing.

CN115131130BActive Publication Date: 2024-11-26JIANGSU SUNING BANK CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210773238.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-07-01
Publication Date
2024-11-26
Estimated Expiration
2042-07-01

AI Technical Summary

Technical Problem

In the existing technology, the batch running task of bank account tests relies on manual triggering, with high complexity and low timeliness, and the idle time cannot be fully utilized. Some solutions are deeply coupled with the business logic of the bank transaction system, resulting in high system complexity and poor maintenance. .

Method used

Using a configurable accounting core automatic batch running method, the group decision-making results are realized and batch running tasks are performed by determining the batch running interface, configuring timing tasks based on prior information, and combining the full probability formula and Bayesian formula to intelligently adjust the weights. , reduce manual intervention.

Benefits of technology

It improves the accuracy and efficiency of the execution sequence of batch tasks, reduces manual intervention, can be automatically run at night or on holidays, reduces operation and maintenance costs, and improves the efficiency of business testing.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115131130B_ABST
    Figure CN115131130B_ABST
Patent Text Reader

Abstract

The present invention proposes a configurable accounting core automatic batch running method, device and storage medium, the method includes the following steps: S1, determine the batch running interface related to the batch running task; S2, obtain the prior weight based on the prior information, and configure the batch running task into the timed task system framework according to the prior weight, the prior information includes the execution success rate of the batch running task in different time periods; S3, combine the total probability formula and the Bayesian formula to intelligently adjust the prior weight, obtain the posterior weight, and calculate the group decision result according to the posterior weight; S4, execute the batch running task according to the group decision result, obtain the execution result, and re-weight the posterior weight according to the execution result; S5, judge whether the batch running task is completed. The present invention can intelligently analyze the results and update the execution strategy in combination with historical data. It can speed up the batch running efficiency, reduce the difficulty of operation, and automatically judge the operation without human intervention in the case of unattended operation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of software system development, and in particular to a configurable accounting core automatic batch running method, device and storage medium. Background Art

[0002] As banking business continues to grow, system requirements continue to increase, version iterations are frequent, and delivery quality needs to be guaranteed while delivery cycles are short.

[0003] At present, most versions of account testing in most banks rely on batch tasks in various systems. In the test environment, due to testing needs, scheduled batch running cannot be set, and testing is mainly carried out by manually triggering batch tasks. However, manually triggering batch tasks is restricted by system rules, project costs and delivery cycles, and has the problems of high complexity, low timeliness and inability to fully utilize idle time.

[0004] To solve this problem, it is necessary to build automated batch running capabilities to ensure that during the version testing process, the efficiency of idle time can be effectively utilized, the batch running efficiency can be accelerated, manual intervention can be reduced, and labor costs can be reduced.

[0005] Due to differences in accounting business rules, there is no universal and mature similar solution in the market, and integration requires a long period of time and additional learning costs, which cannot be well adapted to the bank's account batching rules. Other banks of the same type also have similar solutions, but these solutions are deeply coupled with the business logic of the bank's transaction system and cannot be adjusted according to actual conditions. As the business develops more and more, the system complexity becomes higher and higher, and the maintainability becomes worse and worse, which brings great risks and cost investment to the overall account testing. Summary of the invention

[0006] The purpose of the present invention is to provide a configurable accounting core automatic batch running method, device and storage medium, which solves the problems of high complexity, low time efficiency and inability to fully utilize idle time in the manual triggering batch running task in the prior art, as well as the problem that some solutions are deeply coupled with the business logic of the bank transaction system, resulting in increasing system complexity and increasingly poor maintainability.

[0007] To solve the above technical problems, the technical solution adopted by the present invention is: a configurable accounting core automatic batch running method, comprising the following steps: S1, determining the batch running interface related to the batch running task; S2, obtaining the prior weight based on the prior information, and configuring the batch running task to the scheduled task system framework according to the prior weight, wherein the prior information includes the execution success rate of the batch running task in different time periods; S3, combining the total probability formula and the Bayesian formula, intelligently adjusting the prior weight to obtain the posterior weight, and calculating the group decision result according to the posterior weight; S4, executing the batch running task according to the group decision result, obtaining the execution result, and re-assigning the posterior weight according to the execution result; S5, judging whether all the batch running tasks are completed, if so, ending, if not, returning to step S2.

[0008] As a preferred solution, the approval tasks include loan approval tasks, deposit approval tasks and accounting approval tasks.

[0009] As a preferred solution, the scheduled task system framework includes a scheduled task module, a message queue, a data calculation module and a data storage module connected in sequence, the data storage module is connected with an API interface, and the API interface includes a policy generation interface, a data center interface, a scheduled task interface and a historical task interface; the scheduled task module is used to perform timing management, execution engine, historical task management and task policy management on batch tasks; the message queue is used to decouple, asynchronous and peak shaving batch tasks; the data calculation module is used to process data on batch tasks, and after cleaning and filtering, calculate the group decision results based on the strategy of the policy generator; the data storage module is used to store the group decision results and access the corresponding API interface according to the data type.

[0010] As a preferred solution, in step S3, the total probability formula is as follows: Assume events A1, A2, A3, KA n Constitute a complete event group, namely A1, A2, A3, KA n are incompatible, and P(A i )>0,i=1,2,3,K n, then for any event B, we have

[0011]

[0012] In the above formula, P(B) is the probability of event B, P(A i ) is event A i The probability of i ) is the event A i The probability of event B occurring under the condition that

[0013] As a preferred solution, in step S3, the Bayesian formula is as follows: Let A1, A2, A3, KA n Constitute a complete event group, probability P(A i )>0,i=1,2,3,K n, and for any event B, if P(B)>0, then:

[0014]

[0015] In the above formula, P(A i ) is before event A gets the information about event B. i The probability, that is, the prior probability, P(A i / B) is event A under the condition that event B has occurred after testing. i The probability of , that is, the posterior probability.

[0016] As a preferred solution, in step S3, the prior weights are intelligently adjusted to obtain the posterior weights, including: assuming n administrators J1, J2, J3, KJ n For m time periods a1, a2, a3, Ka n To make a decision, the administrator assigns the prior weights P(J1), P(J2), KP(J n ), the feature vector of administrator J1 (i = 1, 2, 3, K n) is recorded as J1(P(a1 / J i ),P(a2 / J i )KP(a n / J i )), and satisfies P(a j / J i )>0,j=1,2,3,K m and The calculation formula for the preliminary group decision result is:

[0017]

[0018] In the above formula, P(a j ) is the solution a preliminarily calculated using the administrator's prior weights j The group evaluation value, P(J i ) is the administrator J i The prior weight assigned, P(a j / J i ) is the administrator J i For time period a j Weight assessment of

[0019] The Bayesian formula is used to adjust the prior weights and preliminary group strategy results given by the administrator to obtain the posterior weights:

[0020] In the above formula, P(J i / a j ) is in time period a j When evaluating the weight of i The posterior weight of .

[0021] As a preferred solution, the group decision result P'(a j ) is calculated as follows:

[0022]

[0023] In the above formula, P(J i / a j ) is in time period a j When evaluating the weight of i The posterior weight, P(a j / J i ) is the administrator J i For time period a j weight assessment.

[0024] The present invention also proposes a configurable accounting core automatic batch running device, including: an interface module, used to determine a batch running interface related to a batch running task; a priori weight module, used to obtain a priori weight based on priori information, and configure the batch running task to the scheduled task system framework according to the priori weight, wherein the priori information includes the execution success rate of the batch running task in different time periods; a group decision result module, used to combine the total probability formula and the Bayesian formula, intelligently adjust the priori weight, obtain the posterior weight, and calculate the group decision result according to the posterior weight; an execution module, used to execute the batch running task according to the group decision result, obtain the execution result, and re-assign the posterior weight according to the execution result; a final state judgment module, used to judge whether all the batch running tasks are completed, if so, end it, if not, return to the priori weight module.

[0025] The present invention also proposes a storage medium on which a computer program is stored, wherein the storage medium stores at least one executable instruction, and the executable instruction enables a processor to execute operations corresponding to the configurable accounting core automatic batch running method as described in any of the above items.

[0026] Compared with the prior art, the beneficial effects of the present invention include: using the total probability formula combined with the Bayesian formula method to intelligently adjust the administrator's evaluation of the time period weight and the group strategy results, organically combining the administrator's subjectivity and objectivity, so that the administrator's weight configuration can be more reasonable, and the batch task execution order is more accurate. The publishing and updating interface of the scheduled task system framework is consistent with traditional tools, which reduces the difficulty of operation, automatically judges the operation, and does not require human intervention. It can intelligently analyze the results and update the execution strategy in combination with historical data. It can speed up the batch running efficiency and reach the accounting batch point of business testing faster when there is no one on duty at night or holidays. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] The disclosure of the present invention is described with reference to the accompanying drawings. It should be understood that the drawings are for illustrative purposes only and are not intended to limit the scope of protection of the present invention. In the accompanying drawings, the same reference numerals are used to refer to the same components. Among them:

[0028] Figure 1 A flowchart of an automatic batch running method of an accounting core that can be configured in an embodiment of the present invention;

[0029] Figure 2 It is another form of a flow chart of the method for automatically running batches of accounting cores that can be configured in an embodiment of the present invention;

[0030] Figure 3 A schematic diagram of the structure of the timing task system framework according to an embodiment of the present invention;

[0031] Figure 4 The present invention is a schematic diagram of the structure of an automatic batch processing device for the accounting core that can be configured in accordance with an embodiment of the present invention. DETAILED DESCRIPTION

[0032] It is easy to understand that according to the technical solution of the present invention, without changing the essential spirit of the present invention, a person skilled in the art can propose a variety of interchangeable structural modes and implementation modes. Therefore, the following specific implementation modes and drawings are only exemplary descriptions of the technical solution of the present invention, and should not be regarded as the whole of the present invention or as a limitation or restriction to the technical solution of the present invention.

[0033] According to one embodiment of the present invention, Figure 1 and 2 A configurable accounting core automatic batch running method runs on a batch running system platform, which is developed based on the open source SpringBoot+Bootstrap high-speed background development framework.

[0034] The main features of the batch processing system platform include: (1) fully responsive layout (based on BootStrap+Thymeleaf front-end framework); (2) support for multiple data sources (based on Alibaba Druid), which can be switched with simple configuration; (3) support for buttons and data permissions, and customizable department data permissions (based on Apache Shiro).

[0035] The technical selection of the batch processing system platform includes: (1) The system environment adopts Java EE 8+Servlet 3.0+Apache Maven 3.8.x; (2) The main framework (backend) adopts Spring Boot 2.2.x+Spring Framework5.2.x+Apache Shiro 1.7; (3) The persistence layer (backend) adopts Apache MyBatis 3.5.x+HibernateValidation 6.0.x+Alibaba Druid 1.2.x; (4) The view layer (frontend) adopts Bootstrap 3.3.7+Thymeleaf 3.0.x.

[0036] A configurable accounting core automatic batch running method includes the following steps:

[0037] S1, interface sorting and collection: determine the batching interfaces related to the batching tasks. Manually sort and collect all business batching tasks, which mainly include loan batching tasks, deposit batching tasks, and accounting batching tasks; the collection and sorting content includes but is not limited to historical operation status, duration, operation start / end time period, etc.

[0038] S2, interface orchestration: Obtain prior weights based on prior information, and configure batch tasks into the scheduled task system framework according to the prior weights. Prior information includes the execution success rate of batch tasks in different time periods. The weight configuration here is derived by the administrator based on prior information (such as historical data such as execution success rate), which is a comprehensive quantitative representation of the administrator's knowledge, experience, ability, expectations, etc.

[0039] See also Figure 3 The above-mentioned scheduled task system framework includes a scheduled task module, a message queue, a data calculation module and a data storage module connected in sequence. The data storage module is connected with an API interface, and the API interface includes a strategy generation interface, a data center interface, a scheduled task interface and a historical task interface.

[0040] The scheduled task module is used to perform timing management, execution engine, historical task management and task strategy management for batch tasks; the message queue is used to decouple, asynchronous and peak-cut batch tasks; the data calculation module is used to process the data of batch tasks, and after cleaning and filtering, calculate the group decision results based on the strategy of the strategy generator; the data storage module is used to store the group decision results and access the corresponding API interface according to the data type.

[0041] The scheduled task system framework is based on the non-intrusive secondary development of the bank's batch processing system platform, and is shallowly coupled with the business logic of the bank's transaction system. It can complete complex batch processing tasks and has good maintainability.

[0042] S3, execution strategy: Combine the total probability formula and the Bayesian formula to intelligently adjust the prior weights, obtain the posterior weights, and calculate the group decision results based on the posterior weights.

[0043] In step S3, the full probability formula of the probability model is as follows:

[0044] Suppose events A1, A2, A3, KA n Constitute a complete event group, namely A1, A2, A3, KA n are incompatible, and Ω is the event horizon, P(A i )>0,i=1,2,3,K n then for any event B, we have:

[0045]

[0046] In the above formula, P(B) is the probability of event B, P(A i ) is event A i The probability of i ) is the event A i The probability of event B occurring under the condition that

[0047] It should be understood that the key to using the total probability formula is to find a complete set of events A1, A2, A3, KA associated with the occurrence of the event n , P(B / A i ) is in A i The probability of event B occurring under the condition that event B occurs. From the formula proof, we can see that A1, A2, A3, KA n It is not a necessary condition for the total probability formula to form a complete set of events. In fact, as long as A i The sum includes B, and A1B, A2B, A3B, KA n B is mutually incompatible or weaker conditions can use the total probability formula.

[0048] The Bayesian formula for the probability model is as follows:

[0049] Let A1, A2, A3, KA n Constitute a complete event group, probability P(A i )>0,i=1,2,3,K nFor any event B, if P(B)>0, then:

[0050]

[0051] In the above formula, P(A i ) is before event A gets the information about event B. i The probability, that is, the prior probability, P(A i / B) is event A under the condition that event B has occurred after testing. i The probability of , that is, the posterior probability.

[0052] The occurrence of event B in the test helps to analyze the probability of various factors leading to event B. The formula gives P(A i / B) is the probability of event A under the condition that event B has occurred after testing. This is called the posterior probability. The posterior probability depends on the new information obtained in the test (the probability of event B) to adjust the prior probability. Therefore, the Bayesian formula is also called the posterior probability formula or the inverse probability formula.

[0053] In step S3, the prior weights are intelligently adjusted to obtain the posterior weights, including:

[0054] Suppose there are n administrators J1, J2, J3, KJ n For m time periods a1, a2, a3, Ka n To make a decision, the eigenvector has been calculated based on the judgment matrix given by each character administrator and has passed the consistency test. The eigenvector of administrator J1 (i = 1, 2, 3, K n) is recorded as: J1 (P (a1 / J i ),P(a2 / J i )KP(a n / J i )). The element P(a m / J i ) represents the administrator J i For time period a m The feature vector reflects the administrator's quantitative evaluation results of the weights of m time periods at different degrees and satisfies P(a j / J i )>0,j=1,2,3,K m and If the prior weights assigned to the administrator according to a certain weighting method are: P(J1), P(J2), KP(Jn ), then the calculation formula for the preliminary group decision result is:

[0055]

[0056] In the above formula, P(a j ) is the solution a preliminarily calculated using the administrator's prior weights j The group evaluation value, P(J i ) is the administrator J i The prior weight assigned, P(a j / J i ) is the administrator J i For time period a j The weight evaluation also satisfies the property: P(a j )>0,j=1,2,3,K m and

[0057] We establish the corresponding relationship between the problem in the above group strategy and the total probability formula as follows: n administrators J1, J2, J3, KJ n , corresponding to tasks A1, A2, A3, KA n ; The prior weight of each administrator P(J i )>0 corresponds to the prior probability P(J i )>0,j=1,2,3,K n, it is obvious that these n administrators can be regarded as a complete event group. j Corresponding to task B, administrator J i Each element P(a j / J i )>0,j=1,2,3,K m corresponds to the conditional probability P(B j / A i ), then the calculation formula of the above group strategy result is: That is the total probability formula

[0058] Then, the Bayesian formula is used to intelligently adjust the weights given by the administrator and the preliminary group strategy results. According to the above-mentioned related issues, the correspondence is established. According to the Bayesian formula, the administrator weights are adjusted as follows to obtain the posterior weights:

[0059]

[0060] In the above formula, P(J i / a j ) is in time period a j When evaluating the weight of i The posterior weight of time period a jThe initial group assessment weight is P(a j ) information, the prior weight P(J i ) is adjusted. From the calculation formula, we can see that: each administrator J i There are m different posterior weights P(J i / a j )>0,j=1,2,3,K m corresponds to m different time periods a respectively j .

[0061] Finally, the group decision result is recalculated using the adjusted posterior weights:

[0062]

[0063] In the above formula, P(J i / a j ) is in time period a j When evaluating the weight of i The posterior weight, P(a j / J i ) is the administrator J i For time period a j weight assessment.

[0064] For example, four batch task managers J1, J2, J3, and J4 compare the four time period plans a1, a2, a3, and a4 respectively, and give their own judgment matrices. The eigenvectors calculated by the judgment matrices all pass the consistency test. The eigenvectors are:

[0065] J1(0.2,0.2,0.3,0.3),J2(0.1,0.3,0.2,0.4),

[0066] J3(0.1,0.2,0.3,0.4),J4(0.1,0.2,0.2,0.5)

[0067] The administrator’s prior weights are: P(J1) = 0.2, P(J2) = 0.1, P(J3) = 0.4, P(J4) = 0.3

[0068] The process of using the Bayesian method to adjust administrator weights and gather group opinions is as follows:

[0069] 1) Calculate the group strategy result by formula (1):

[0070] P(a1)=0.13, P(a2)=0.2, P(a3)=0.28, P(a4)=0.39

[0071] 2) Adjust the prior weight P(J) by formula (2) i), and obtain the posterior weight P(J i / a j ):

[0072] P(J1 / a1)=0.308; P(J2 / a1)=0.285; P(J3 / a1)=0.23; P(J4 / a1)=0.177;

[0073] P(J1 / a2)=0.2; P(J2 / a2)=0.15; P(J3 / a2)=0.3; P(J4 / a2)=0.35;

[0074] P(J1 / a3)=0.214; P(J2 / a3)=0.285; P(J3 / a3)=0.321; P(J4 / a3)=0.179;

[0075] P(J1 / a4)=0.154; P(J2 / a4)=0.103; P(J3 / a4)=0.308; P(J4 / a4)=0.435;

[0076] 3) According to formula (3), use the posterior weight to recalculate the group strategy result:

[0077] P'(a1)=0.147, P'(a2)=0.21, P'(a3)=0.306, P'(a4)=0.412

[0078] Summary: Using Bayesian theory to intelligently adjust the administrator's evaluation of time period weights and group strategy results is actually an organic combination of subjectivity and objectivity, so that the administrator's weight configuration can be more reasonable and the intelligent adjustment can be more precise.

[0079] S4, scheduled task execution: execute the batch task according to the group decision result, obtain the execution result, and re-weight the a posteriori weight according to the execution result. The execution result is a probability statistics from three dimensions (execution time, execution success rate and server environment) to obtain the success probability of the batch task or subtask at different execution times and cycles and environmental factors. When the execution success rate of the execution result is lower than the set threshold, the a posteriori weight is re-weighted to rearrange the execution order of the batch task.

[0080] S5, task final status judgment: judge whether all batch tasks are completed, if so, end, if not, return to step S2.

[0081] See also Figure 4The present invention also proposes a configurable accounting core automatic batch running device, including: an interface module 1, used to determine the batch running interface related to the batch running task; a priori weight module 2, used to obtain a priori weight based on priori information, and configure the batch running task to the scheduled task system framework according to the priori weight, the priori information includes the execution success rate of the batch running task in different time periods; a group decision result module 3, used to combine the total probability formula and the Bayesian formula, intelligently adjust the priori weight, obtain the posterior weight, and calculate the group decision result according to the posterior weight; an execution module 4, used to execute the batch running task according to the group decision result, obtain the execution result, and re-assign the posterior weight according to the execution result; a final state judgment module 5, used to judge whether the batch running task is completed, if so, it ends, if not, it returns to the priori weight module.

[0082] The present invention also proposes a storage medium on which a computer program is stored, wherein the storage medium stores at least one executable instruction, and the executable instruction enables a processor to execute operations corresponding to the configurable accounting core automatic batch running method as described in any of the above items.

[0083] In summary, the beneficial effects of the present invention include: using the total probability formula combined with the Bayesian formula method to intelligently adjust the administrator's evaluation of the time period weight and the group strategy results, organically combining the administrator's subjectivity and objectivity, so that the administrator's weight configuration can be more reasonable, and the batch task execution order is more accurate. The publishing and updating interface of the scheduled task system framework is consistent with traditional tools, which reduces the difficulty of operation, automatically judges the operation, and does not require human intervention. It can intelligently analyze the results and update the execution strategy in combination with historical data. It can speed up the batch running efficiency and reach the accounting batch point of business testing faster when there is no one on duty at night or holidays.

[0084] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the systems, devices and units described above can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.

[0085] It should be understood that if the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention is essentially or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk and other media that can store program codes.

[0086] The technical scope of the present invention is not limited to the contents in the above description. Those skilled in the art can make various deformations and modifications to the above embodiments without departing from the technical idea of ​​the present invention, and these deformations and modifications should all fall within the protection scope of the present invention.

Claims

1. A configurable automatic batch running method for accounting core. It is characterized in that The steps include: S1, determine the batch running interface related to the batch running task; S2, obtaining a priori weights based on prior information, and configuring the batch running tasks into the scheduled task system framework according to the priori weights, wherein the priori information includes the execution success rates of the batch running tasks in different time periods; S3, combining the total probability formula and the Bayesian formula, intelligently adjusting the prior weights to obtain the posterior weights, and calculating the group decision result according to the posterior weights; S4, executing the batch task according to the group decision result, obtaining the execution result, and re-assigning the a posteriori weight according to the execution result; the execution result is subjected to probability statistics from three dimensions of execution time, execution success rate and server environment, and the success probability of the batch task or subtask at different execution times and cycles and environmental factors is obtained. When the execution success rate of the execution result is lower than the set threshold, the a posteriori weight is re-assigned to rearrange the execution order of the batch task; S5, determine whether all batch tasks are completed, if yes, then end, if not, then return to step S2; Among them, the scheduled task system framework includes a scheduled task module, a message queue, a data calculation module and a data storage module connected in sequence, the data storage module is connected with an API interface, and the API interface includes a strategy generation interface, a data center interface, a scheduled task interface and a historical task interface; the scheduled task module is used to perform timing management, execution engine, historical task management and task strategy management on batch tasks; the message queue is used to decouple, asynchronous and peak-cut batch tasks; the data calculation module is used to process data on batch tasks, and after cleaning and filtering, calculate the group decision results based on the strategy of the strategy generator; the data storage module is used to store the group decision results and access the corresponding API interface according to the data type; In step S3, the prior weights are intelligently adjusted to obtain the posterior weights, including: assuming n administrators For m time periods To make a decision, the prior weights assigned by the administrator are ,administrator The eigenvector of , and satisfies and ; The calculation formula for the preliminary group decision result is: ; In the above formula, It is a solution preliminarily calculated using the administrator's prior weights The group evaluation value of Is an administrator The prior weight assigned, Is an administrator For time period Weight assessment of The Bayesian formula is used to adjust the prior weights and preliminary group strategy results given by the administrator to obtain the posterior weights: ; In the above formula, It is in the time period When evaluating the weight of The posterior weight of The group decision result The calculation formula is as follows: ; In the above formula, It is in the time period When evaluating the weight of The posterior weight of Is an administrator For time period weight assessment.

2. The configurable accounting core automatic batch running method according to claim 1, It is characterized in that The approval tasks include loan approval tasks, deposit approval tasks and accounting approval tasks.

3. The configurable accounting core automatic batch running method according to claim 1, It is characterized in that In step S3, the total probability formula is as follows: Set event Constitute a complete event group, that is, are incompatible, and , , then for any event B, we have ; In the above formula, P(B) is the probability of event B, For events The probability of For the event The probability of event B occurring under the condition that 4. The configurable accounting core automatic batch running method according to claim 1, It is characterized in that In step S3, the Bayesian formula is as follows: set up Constitute a complete set of events, probability , and for any event B, if , then: ; In the above formula, is the event before obtaining information about event B The probability of , that is, the prior probability, It is an event that is tested under the condition that event B has occurred. The probability of , that is, the posterior probability.

5. A configurable accounting core automatic batch running device, It is characterized in that include: Interface module, used to determine the batch interface related to the batch task; A priori weight module, used to obtain a priori weights based on prior information, and configure the batch running tasks into the scheduled task system framework according to the priori weights, wherein the priori information includes the execution success rate of the batch running tasks in different time periods; A group decision result module is used to combine the total probability formula and the Bayesian formula to intelligently adjust the prior weights, obtain the posterior weights, and calculate the group decision result according to the posterior weights; An execution module is used to execute the batch task according to the group decision result, obtain the execution result, and re-weight the a posteriori weight according to the execution result; the execution result is subjected to probability statistics from three dimensions of execution time, execution success rate and server environment, and the success probability of the batch task or subtask at different execution times and cycles and environmental factors is obtained; when the execution success rate of the execution result is lower than a set threshold, the a posteriori weight is re-weighted to rearrange the execution order of the batch task; The final state judgment module is used to judge whether all batch running tasks are completed. If so, it ends; if not, it returns to the prior weight module; Among them, the scheduled task system framework includes a scheduled task module, a message queue, a data calculation module and a data storage module connected in sequence, the data storage module is connected with an API interface, and the API interface includes a strategy generation interface, a data center interface, a scheduled task interface and a historical task interface; the scheduled task module is used to perform timing management, execution engine, historical task management and task strategy management on batch tasks; the message queue is used to decouple, asynchronous and peak-cut batch tasks; the data calculation module is used to process data on batch tasks, and after cleaning and filtering, calculate the group decision results based on the strategy of the strategy generator; the data storage module is used to store the group decision results and access the corresponding API interface according to the data type; The intelligent adjustment of the prior weight to obtain the posterior weight includes: assuming n administrators For m time periods To make a decision, the prior weights assigned by the administrator are ,administrator The eigenvector of , and satisfies and ; The calculation formula for the preliminary group decision result is: ; In the above formula, It is a solution preliminarily calculated using the administrator's prior weights The group evaluation value of Is an administrator The prior weight assigned, Is an administrator For time period Weight assessment of The Bayesian formula is used to adjust the prior weights and preliminary group strategy results given by the administrator to obtain the posterior weights: ; In the above formula, It is in the time period When evaluating the weight of The posterior weight of The group decision result The calculation formula is as follows: ; In the above formula, It is in the time period When evaluating the weight of The posterior weight of Is an administrator For time period weight assessment.

6. A storage medium having a computer program stored thereon, wherein the storage medium has at least one executable instruction stored therein, wherein the executable instruction enables a processor to execute operations corresponding to the configurable accounting core automatic batch running method as described in any one of claims 1-4.