Installation construction method of annular elastic support before excavation in surrounding rock of large tunnel
By building a construction platform in the tunnel and using specific drilling equipment, the installation of annular elastic supports in the surrounding rock of large tunnels without digging has been realized, which solves the high cost and complicated process problems of traditional support technology, improves construction efficiency and Security.
Patent Information
- Application Number
- CN202210821956.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-07-12
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2042-07-12
AI Technical Summary
Under soft rock conditions, traditional tunnel surrounding rock support technology has high costs, complicated procedures, long construction time, high labor intensity, and lack of construction facilities for supporting first and then tunneling, making it impossible to realize the engineering practice of annular elastic supports.
Provides an installation and construction method of annular elastic supports that are not excavated in the surrounding rock of large tunnels, including building a construction platform during the tunnel excavation preparation stage, using prefabricated segment drilling rig cabins, mud cabins and platform ramps, and installing drilling rigs and connecting drills. The drilling rig performs pilot drilling and bracket installation, using hydraulic thrusters and six-axis robotic arms to grab drill pipes and drill bits to install and disassemble the annular bracket.
It achieves the economical and effective laying of annular elastic supports in the tunnel, reduces the volume and quality of the drilling rig, simplifies construction operations, avoids the complex transmission system of traditional drilling rigs, adapts to the limitations of tunnel space, and improves construction efficiency and safety.
Smart Images

Figure CN115199308B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of tunnel support, and more particularly to an elastic support construction machine suitable for supporting the surrounding rock of a large tunnel before excavation in soft rock or seabed areas. Background Art
[0002] Under soft rock conditions, tunnel surrounding rock is not easy to support. The traditional technical method and experience are to adopt high-density, high-rigidity combined support technical solutions, but this type of support method has problems such as high cost, complicated support procedures, long construction time, and high support labor intensity. In addition, traditional support is a construction method of first construction and then support. According to the support technology and construction method of annular elastic supports arranged in the rock body, which are newly proposed in recent years, the technology cannot be used in engineering practice due to the lack of corresponding construction facilities.
[0003] In view of the technical problems of this engineering equipment, on the basis of analyzing the construction layout process of large-scale tunnel boring equipment (shield machine), it is urgent to propose a ring-shaped elastic support installation drilling rig and its supporting equipment with mature technology, simple structure, simple construction operation and low manufacturing cost. The purpose is to economically and effectively lay the ring-shaped elastic support in the tunnel rock body by installing the drilling rig and its supporting equipment, so as to meet the demand for surrounding rock control in large-scale soft rock tunnel boring construction. Summary of the invention
[0004] In view of this, the present invention provides a method for installing and constructing an annular elastic support before excavation inside the surrounding rock of a large tunnel, aiming to solve the above technical problems.
[0005] In order to achieve the above object, the present invention adopts the following technical solution:
[0006] A method for installing and constructing an annular elastic support before excavation in the surrounding rock of a large tunnel comprises the following steps:
[0007] S1. During the tunnel excavation preparation stage, a prefabricated segment drilling cabin, prefabricated segment mud cabin and platform ramp are used to build a drilling rig installation platform directly behind the tunneling equipment. The drilling rig and drill rod automatic storage and retrieval machine are transported and arranged on the drilling rig installation platform, and the drill bit and drill rod are installed to carry out pilot drilling construction.
[0008] S2. After the drilling construction, the tunneling equipment starts to work. For example, the shield machine construction process is to lay the pipe segments while excavating, and general pipe segments can be used. When it reaches the drilling position, special pipe segments are needed for support. Prefabricated semicircular pipe segments are used here. At the same time, the prefabricated pipe segment drilling rig cabin, prefabricated pipe segment mud cabin and platform ramp are used to build the drilling rig construction platform.
[0009] S3. After the excavation equipment has passed the drill bit exit point for a certain distance, the drill bit is guided out of the tunnel bottom, and the drill rig and the drill rod automatic storage and retrieval machine are transported and arranged on the construction platform of the drill rig. The drill bit or drill rod is grabbed by the six-axis mechanical arm of the drill rig, and the drill bit of the drill rod of the exported prefabricated segment mud tank is replaced, the hole expansion operation of the drill rod is connected, and the elastic ring bracket is installed.
[0010] S4. After the elastic ring support is installed, the drilling rig, the automatic drill pipe storage and retrieval machine and the drill rig are transferred and installed, the prefabricated segment drilling rig cabin, the prefabricated segment mud cabin and the platform ramp are dismantled, the steel bars are laid on the tunnel segment structure, and cement is poured.
[0011] It should be noted that the construction platform generally adopts the form of front mud bin and rear drilling rig cabin. However, for actual long-distance construction, due to the insufficient capacity of one mud bin, the construction form of front and rear mud bins and middle drilling rig cabin will be adaptively chosen.
[0012] Preferably, in the above-mentioned annular elastic support installation and construction method for supporting the surrounding rock of a large tunnel before excavation, the installation drilling rig and the receiving drilling rig both include two sets of walking tracks, and a track base is fixed between the two sets of walking tracks; two hydraulic cylinders are hinged front and rear on the track base of the installation drilling rig, and the top ends of the telescopic rods of the two hydraulic cylinders are hinged with a slide rail sliding base, and a slide rail fixed base is fixed at the front end of the slide rail sliding base, and a hydraulic caliper, a six-axis mechanical arm, an operating cabin and a hydraulic thruster are installed in sequence from front to back; a drill rod stabilizing base is fixed at the front end of the slide rail fixed base, and a drill rod auxiliary telescopic rod mechanism is installed at the front end of the drill rod stabilizing base; a six-axis mechanical arm and an operating cabin are installed in sequence from front to back on the track base of the receiving drilling rig.
[0013] Preferably, in the above-mentioned method for installing and constructing an annular elastic support supported before excavation inside the surrounding rock of a large tunnel, the number of the hydraulic calipers is two, and the clamping is achieved through hydraulic telescopic drive control, and the rotation control of the angle of the clamping part of the hydraulic caliper is achieved through the rising and pushing of the jack structure, thereby realizing the unscrewing of the drill rod joint part.
[0014] Preferably, in the above-mentioned method for installing and constructing an annular elastic support inside the surrounding rock of a large tunnel before excavation, the manipulator of the six-axis manipulator is a claw-like structure, and the inner side of the claw-like structure is rotatably connected with four long circular rods that can clamp drill rods.
[0015] Preferably, in the above-mentioned method for installing and constructing an annular elastic support supported before excavation inside the surrounding rock of a large tunnel, the hydraulic thruster includes a two-level hydraulic telescopic structure arranged in an upper and lower stack, and a power head is installed at the terminal end of the upper structure of the two-level hydraulic telescopic structure.
[0016] Preferably, in the above-mentioned method for installing and constructing an annular elastic support that is supported before excavation inside the surrounding rock of a large tunnel, the front end of the slide rail sliding base is hinged to the drill rod stable base. Specifically: the lower part of the secondary hydraulic telescopic structure is connected to the slide rail sliding base through a slide groove, and a rectangular parallelepiped is connected to the lower part of the front end of the slide rail sliding base. The lower part of the rectangular parallelepiped has a large-diameter bolt hole, which is connected to the slide rail fixed base through a movable shaft, and the movable shaft is connected by a large bolt connection.
[0017] The slide rail fixed base is a flat rectangular structure with two vertical rectangular structures in the middle and a hole-shaped structure in the middle. The slide rail fixed base is connected to the slide rail sliding base by a movable shaft; the front end of the drill rod stabilizing base is connected to a support arm that can move up and down through a hydraulic drive structure, and a retractable drill rod auxiliary rod connected to the support arm and perpendicular to the forward direction of the installation drilling rig. The function of the drill rod stabilizing base is to provide a fulcrum for the drill rod to prevent the drill rod from rotating and swinging under force.
[0018] Preferably, in the above-mentioned method for installing and constructing an annular elastic support that is supported before excavation inside the surrounding rock of a large tunnel, the drill rod automatic storage and retrieval machine is a hollow steel frame structure, and has a slope structure for guiding the guide rod inside, the slope structure controls the slope angle through a jack structure, the steel frame structure has a drill port, the drill port corresponds to the bottom end of the slope structure, and an L-shaped hydraulic telescopic short arm for receiving the drill rod is installed at the drill port. By controlling the size of the slope structure and the drill port angle, the size of the drill port is controlled to determine whether the drill rod can slide smoothly into the L-shaped hydraulic telescopic short arm, and by controlling the length of the L-shaped hydraulic telescopic short arm, the number of drill rods that slide out is controlled, which is convenient for transportation and construction.
[0019] Preferably, in the above-mentioned annular elastic support installation construction method for supporting the surrounding rock of a large tunnel before excavation, the prefabricated segment drilling rig cabin and the prefabricated segment mud cabin are both composed of a plurality of segment structures with bottom openings and bolt holes or bolts on all sides, with a flat top surface, a curved bottom surface, and a flat side surface, and are adapted to the supporting cabin structure of the tunnel.
[0020] Preferably, in the above-mentioned annular elastic support installation construction method for supporting the surrounding rock of a large tunnel before excavation, the prefabricated segment drilling rig cabin and the prefabricated segment mud cabin have openings.
[0021] Preferably, in the above-mentioned method for installing and constructing an annular elastic support supported before excavation inside the surrounding rock of a large tunnel, the platform ramp is composed of a slope transition structure through hollow steel plates, load-bearing steel beams and cross beams.
[0022] It can be seen from the above technical solutions that, compared with the prior art, the present invention discloses a method for installing and constructing an annular elastic support before excavation in the surrounding rock of a large tunnel, which has the following beneficial effects:
[0023] 1. The drilling rig can be installed and connected directly using the hydraulic power system in the tunnel engineering system without the need for additional power devices, which can greatly reduce the size and weight of the drilling rig.
[0024] 2. The hydraulic thruster installed on the drilling rig is compact, simple, reliable, and economical and convenient to obtain. It avoids the shortcomings of the traditional drilling rig steel chain-hydraulic rod-pulley group transmission system, such as complexity, labor, and large size, and can fully adapt to the limitations of small tunnel space.
[0025] 3. The installation drill rig, the connection drill rig and the six-axis robotic arm are driven by a servo motor or hydraulics. The specific execution unit of the servo motor six-axis robotic arm is a graspable claw-shaped structure. The grasping device is a circular long rod structure with 4 axially rolling structures. This structure can cooperate with the drill retrieval steps of the automatic drill rod storage and retrieval machine to accurately grasp the drill rod and drill bit. The drill rod and drill bit can rotate freely when grasped by the gripper, and the installation and disassembly process of the drill rod and drill bit can be completed.
[0026] 4. The components of the automatic drill rod storage and retrieval machine are easy to obtain and manufacture, economical, simple in structure, and reasonably designed. The size of the automatic drill rod storage and retrieval machine can be designed and manufactured according to the actual situation of the tunnel site and the size of the drilling rig. There is no need to change the structure of the automatic drill rod storage and retrieval machine, and it has strong applicability.
[0027] 5. The prefabricated segment drilling cabin, prefabricated segment mud cabin and platform ramp make full use of the segmented tunnel structure laid by the tunneling equipment (shield machine). In the tunnel, by fixing the ground with bolts to prefabricate special arc segments, semicircular segments, rectangular platform segments, mud cabin platform segments, mud cabin segments and platform ramps, the drilling rig construction platform can be quickly and conveniently built in the tunnel. It is convenient and fast, with a reasonable layout. No additional tunnel excavation construction is required, and it will not hinder the transportation and other process steps in the tunnel. After the drilling rig construction is completed, the disassembly and transportation of the prefabricated segment platform, prefabricated segment mud cabin and platform ramp are also simple and convenient, and can be reused; the platform ramp is composed of a hollow steel structure, which is easy to obtain materials, simple in structure, economical and durable, and can be disassembled and reused. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying creative work.
[0029] Figure 1 A structural perspective view of a ring-shaped support installation drilling rig and its supporting equipment arranged inside the surrounding rock of a large tunnel according to the present invention;
[0030] Figure 2 It is a structural side view of a ring-shaped support installation drilling rig and its supporting equipment arranged inside the surrounding rock of a large tunnel according to the present invention;
[0031] Figure 3 It is a structural front view of a ring-shaped support installation drilling rig and its supporting equipment arranged inside the surrounding rock of a large tunnel according to the present invention;
[0032] Figure 4 A structural top view of a ring-shaped support installed in the surrounding rock of a large tunnel and its supporting equipment according to the present invention;
[0033] Figure 5 A perspective view of the drilling rig structure of a ring-shaped support installed in the surrounding rock of a large tunnel and its supporting equipment according to the present invention;
[0034] Figure 6 A side view of the drilling rig structure of a ring-shaped support installed in the surrounding rock of a large tunnel and its supporting equipment according to the present invention;
[0035] Figure 7 It is a front view of the installation drilling rig structure of a ring-shaped support installation drilling rig and its supporting equipment arranged inside the surrounding rock of a large tunnel according to the present invention;
[0036] Figure 8 A top view of the drilling rig structure of a ring-shaped support installed in the surrounding rock of a large tunnel and its supporting equipment according to the present invention;
[0037] Fig. 9 A perspective view of the drilling rig structure of a ring-shaped support installed inside the surrounding rock of a large tunnel and its supporting equipment;
[0038] Fig.10 A side view of a drill rig structure for connecting a drill rig and its supporting equipment arranged in a ring support inside the surrounding rock of a large tunnel according to the present invention;
[0039] Fig.11 It is a front view of a drilling rig structure for connecting a drill rig and its supporting equipment arranged in a ring support inside the surrounding rock of a large tunnel according to the present invention;
[0040] Fig.12 A top view of a drilling rig structure for connecting a drill rig and its supporting equipment arranged in a ring support inside the surrounding rock of a large tunnel according to the present invention;
[0041] Fig.13 A structural perspective view of an automatic drill rod storage and retrieval machine for mounting a drilling rig and its supporting equipment arranged in the surrounding rock of a large tunnel according to the present invention;
[0042] Fig.14 It is a structural side view of an automatic drill rod storage and retrieval machine for mounting a drilling rig and its supporting equipment arranged in a ring support inside the surrounding rock of a large tunnel according to the present invention;
[0043] Fig.15 It is a front view of the structure of an automatic drill rod storage and retrieval machine for mounting a drilling rig and its supporting equipment arranged in the surrounding rock of a large tunnel according to the present invention;
[0044] Fig.16 A top view of the structure of an automatic drill rod storage and retrieval machine for mounting a drilling rig and its supporting equipment arranged in the surrounding rock of a large tunnel according to the present invention;
[0045] Fig.17 A perspective view of a six-axis mechanical arm gripper structure of a drilling rig installed with a ring support arranged inside the surrounding rock of a large tunnel and its supporting equipment of the drilling rig of the present invention;
[0046] Fig.18 It is a side view of a six-axis mechanical arm gripper structure of a drilling rig installed with a ring support arranged inside the surrounding rock of a large tunnel and its supporting equipment of the drilling rig of the present invention;
[0047] Fig.19 It is a front view of a six-axis mechanical arm gripper structure of a drilling rig installed with a ring support arranged inside the surrounding rock of a large tunnel and its supporting equipment of the drilling rig of the present invention;
[0048] Fig. 20 For the present invention Figure 1 A top view of the six-axis mechanical arm gripper structure of the drilling rig installed on a ring support arranged inside the surrounding rock of a large tunnel and its supporting equipment;
[0049] Fig.21 A structural perspective view of a hydraulic thruster for installing a drilling rig and its supporting equipment arranged in a ring support inside the surrounding rock of a large tunnel according to the present invention;
[0050] Fig. 22 It is a side view of the structure of a hydraulic thruster for installing a drilling rig and its supporting equipment arranged in the surrounding rock of a large tunnel according to the present invention;
[0051] Fig.23 It is a front view of the structure of the hydraulic thruster for installing a drilling rig and its supporting equipment arranged in the surrounding rock of a large tunnel according to the present invention;
[0052] Fig.24It is a top view of the structure of the hydraulic thruster for installing a drilling rig and its supporting equipment arranged in the surrounding rock of a large tunnel according to the present invention;
[0053] Fig.25 A perspective view of a drilling rig hydraulic caliper structure for installing a drilling rig and its supporting equipment arranged inside the surrounding rock of a large tunnel according to the present invention;
[0054] Fig.26 It is a side view of the hydraulic caliper structure of the drilling rig installed by a ring support installed drilling rig and its supporting equipment arranged inside the surrounding rock of a large tunnel according to the present invention;
[0055] Fig. 27 It is a front view of a hydraulic caliper structure of a drilling rig installed with an annular support arranged inside the surrounding rock of a large tunnel and its supporting equipment according to the present invention;
[0056] Fig.28 A top view of a hydraulic caliper structure of a drilling rig installed with an annular support arranged inside the surrounding rock of a large tunnel and its supporting equipment according to the present invention;
[0057] Fig.29 A perspective view of a slide rail fixing base for installing a drilling rig and its supporting equipment on a ring support arranged inside the surrounding rock of a large tunnel according to the present invention;
[0058] Fig.30 A side view of a slide rail fixing base for installing a drilling rig and its supporting equipment on a ring support arranged inside the surrounding rock of a large tunnel according to the present invention;
[0059] Fig.31 It is a front view of a slide rail fixing base for installing a drilling rig and its supporting equipment on a ring support arranged inside the surrounding rock of a large tunnel according to the present invention;
[0060] Fig.32 A top view of a slide rail fixing base for installing a drilling rig and its supporting equipment on a ring support arranged inside the surrounding rock of a large tunnel according to the present invention;
[0061] Fig.33 A perspective view of the structure of the prefabricated segment mud chamber of the drilling rig for installing a ring-shaped support arranged inside the surrounding rock of a large tunnel and its supporting equipment;
[0062] Fig.34 A side view of a prefabricated segment mud chamber structure of a drilling rig for installing a ring-shaped support arranged inside the surrounding rock of a large tunnel and its supporting equipment;
[0063] Fig.35It is a front view of the prefabricated segment mud chamber structure of the drilling rig installed with a ring support arranged inside the surrounding rock of a large tunnel and its supporting equipment;
[0064] Fig.36 A top view of a prefabricated segment mud chamber structure of a drilling rig installed with a ring support arranged inside the surrounding rock of a large tunnel and its supporting equipment;
[0065] Fig.37 A perspective view of a segment structure of a drilling rig prefabricated segment mud chamber platform of a ring support installation drilling rig and its supporting equipment arranged inside the surrounding rock of a large tunnel according to the present invention;
[0066] Fig.38 A side view of a segment structure of a drilling rig prefabricated segment mud chamber platform of a ring support installation drilling rig and its supporting equipment arranged inside the surrounding rock of a large tunnel according to the present invention;
[0067] Fig.39 It is a front view of a segment structure of a drilling rig prefabricated segment mud chamber platform of a ring support installation drilling rig and its supporting equipment arranged inside the surrounding rock of a large tunnel according to the present invention;
[0068] Fig.40 A top view of a segment structure of a drilling rig prefabricated segment mud chamber platform of a ring-shaped support installation drilling rig and its supporting equipment arranged inside the surrounding rock of a large tunnel according to the present invention;
[0069] Fig.41 A perspective view of an arc-shaped segment structure of a drilling rig mud chamber of a ring-shaped support installation drilling rig and its supporting equipment arranged inside the surrounding rock of a large tunnel according to the present invention;
[0070] Fig.42 A side view of a mud chamber arc segment structure of a ring-shaped support installed in the surrounding rock of a large tunnel and its supporting equipment according to the present invention;
[0071] Fig.43 It is a front view of a mud chamber arc segment structure of a ring support installed in the surrounding rock of a large tunnel and its supporting equipment according to the present invention;
[0072] Fig.44 A top view of a mud chamber arc segment structure of a ring-shaped bracket installed in a large tunnel surrounding rock according to the present invention for mounting a drilling rig and its supporting equipment;
[0073] Fig.45 A perspective view of a prefabricated semicircular segment structure of a drilling rig for installing a ring-shaped support and its supporting equipment arranged inside the surrounding rock of a large tunnel according to the present invention;
[0074] Fig.46A side view of a prefabricated semicircular segment structure of a drilling rig for installing a ring-shaped support and its supporting equipment arranged inside the surrounding rock of a large tunnel according to the present invention;
[0075] Fig.47 It is a front view of a prefabricated semicircular segment structure of a drilling rig for installing a ring-shaped support arranged inside the surrounding rock of a large tunnel and its supporting equipment;
[0076] Fig.48 A top view of a prefabricated semicircular segment structure of a drilling rig and its supporting equipment installed on a ring support installed inside the surrounding rock of a large tunnel according to the present invention;
[0077] Fig.49 A perspective view of the structure of a prefabricated segment drilling rig cabin of a ring-shaped support installed inside the surrounding rock of a large tunnel and its supporting equipment according to the present invention;
[0078] Fig.50 A side view of a prefabricated segment drilling rig cabin structure of a ring-shaped support installed inside the surrounding rock of a large tunnel and its supporting equipment according to the present invention;
[0079] Fig.51 It is a front view of a prefabricated segment drilling rig cabin structure of a ring-shaped support installed in the surrounding rock of a large tunnel and its supporting equipment according to the present invention;
[0080] Fig.52 A top view of a prefabricated segment drilling rig cabin structure of a ring-shaped support installed inside the surrounding rock of a large tunnel and its supporting equipment according to the present invention;
[0081] Fig.53 A perspective view of a drilling cabin platform segment structure of a drilling rig and its supporting equipment installed on a ring support arranged inside the surrounding rock of a large tunnel according to the present invention;
[0082] Fig.54 A side view of a drilling cabin platform segment structure of a ring-shaped support arranged inside the surrounding rock of a large tunnel according to the present invention for installing a drilling rig and its supporting equipment;
[0083] Fig.55 It is a front view of a drilling cabin platform segment structure of a ring-shaped support arranged inside the surrounding rock of a large tunnel according to the present invention for installing a drilling rig and its supporting equipment;
[0084] Fig.56 A top view of a drilling cabin platform segment structure of a ring-shaped support for installing a drilling rig and its supporting equipment arranged inside the surrounding rock of a large tunnel according to the present invention;
[0085] Fig.57A perspective view of an arc-shaped segment structure of a drilling cabin of the present invention, which is arranged in a ring support inside the surrounding rock of a large tunnel and installs a drilling rig and its supporting equipment;
[0086] Fig.58 A side view of an arc-shaped segment structure of a drilling rig cabin of the present invention, in which a drilling rig and its supporting equipment are installed on an annular support arranged inside the surrounding rock of a large tunnel;
[0087] Fig.59 It is a front view of the arc-shaped segment structure of a drilling cabin of the present invention, which is arranged in a ring support inside the surrounding rock of a large tunnel and installs a drilling rig and its supporting equipment;
[0088] Fig.60 A top view of an arc-shaped segment structure of a drilling rig cabin of the present invention, in which a drilling rig and its supporting equipment are installed on an annular support arranged inside the surrounding rock of a large tunnel;
[0089] Fig.61 A perspective view of a platform ramp structure for installing a drilling rig and its supporting equipment on a ring support arranged inside the surrounding rock of a large tunnel according to the present invention;
[0090] Fig.62 A side view of a platform ramp structure for installing a drilling rig and its supporting equipment on a ring support arranged inside the surrounding rock of a large tunnel according to the present invention;
[0091] Fig.63 It is a front view of a platform ramp structure for installing a drilling rig and its supporting equipment on a ring support arranged inside the surrounding rock of a large tunnel according to the present invention;
[0092] Fig.64 A top view of a platform ramp structure for installing a drilling rig and its supporting equipment on an annular support arranged inside the surrounding rock of a large tunnel according to the present invention.
[0093] in:
[0094] 1-install the drilling rig; 2-connect the drilling rig; 3-tunnel; 4-automatic drill pipe storage and retrieval machine; 5-prefabricated segment drilling rig cabin; 6-prefabricated segment mud cabin; 7-elastic annular bracket; 8-walking crawler; 9-crawler base; 10-slide rail sliding base; 11-hydraulic thruster; 12-power head; 13-operating cabin; 14-six-axis mechanical arm; 15-hydraulic caliper; 16-slide rail fixed base; 17-drill pipe stable base; 18-hydraulic rod; 19-steel hollow frame; 20-automatic drilling rig movable shaft; 21-tilted slide rail; 22-drilling port; 23-short arm of L-type hydraulic telescopic arm; 24-jack; 25-steel telescopic plate; 26-hydraulic pipe interface; 27-claw structure; 28-round long rod; 29-rolling shaft; 30- Movable shaft; 31-hydraulic slide rod; 32-cylindrical slide rod; 33-cylindrical slide rod base; 34-square base; 35-movable bolt; 36-L-shaped steel part; 37-movable caliper; 38-hydraulic telescopic steel structure; 39-movable shaft of caliper; 40-fixed screw; 41-movable rod; 42-movable rod fixed shaft; 43-retractable drill rod auxiliary rod; 44-movable shaft of hydraulic rod; 45-prefabricated semicircular segment; 46-drilling opening; 47-segment connection hole; 48-mud tank platform segment; 49-mud tank arc segment; 50-drilling rig cabin arc segment; 51-drilling rig cabin platform segment; 52-load-bearing steel beam; 53-cross beam; 54-hollow steel plate; 55-four-hole screw hole; 56-platform ramp; 57-slide rail fixed base fixing hole. DETAILED DESCRIPTION
[0095] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0096] In this embodiment, if Figure 1-4 As shown, the present invention provides a ring support installation drilling rig and its supporting equipment arranged inside the surrounding rock of a large tunnel, including: an installation drilling rig 1, a drill receiving drilling rig 2, an automatic drill rod storage and retrieval machine 4, a prefabricated segment drilling rig cabin 5, a prefabricated segment mud cabin 6 and a platform ramp 56.
[0097] like Figure 5-8 As shown, the installation drilling rig 1 is composed of a walking crawler 8, a crawler base 9, a slide rail sliding base 10, a hydraulic thruster 11, a power head 12, an operation cabin 13, a six-axis mechanical arm 14, a hydraulic caliper 15, a slide rail fixed base 16 and a drill rod stable base 17. The walking crawler 8 is 2m to 3m wide and 5m to 8m long. The middle part of the walking crawler 8 is connected to the crawler base 9, as shown in FIG. Figures 29 to 32As shown, the upper part of the crawler base 9 is connected to the slide rail sliding base 10 by two large hydraulic rods 18. The lower front end of the slide rail sliding base 10 is connected to a rectangular parallelepiped, and there is a large diameter bolt hole in the middle and lower part of the rectangular parallelepiped, which is connected to the slide rail fixed base 16 through a movable shaft 30, and the connection method of the movable shaft 30 is a large bolt connection. The slide rail fixed base 16 is a flat rectangular parallelepiped structure, with two vertical rectangular parallelepiped structures in the middle, and a hole-shaped structure in the middle. The slide rail fixed base 16 is connected to the slide rail sliding base 10 by a movable shaft; the front end of one side of the slide rail fixed base 16 is connected to the drill rod stabilizing base 17 through a hydraulic rod 18 and a movable rod 41. The drill rod stabilizing base 17 is a retractable rod as a retractable drill rod auxiliary rod 43, with a length of 2m to 3m.
[0098] like Figure 21-24 As shown, the upper part of the slide rail sliding base 10 is connected to the hydraulic thruster 11 through a slot. The hydraulic thruster 11 is formed by overlapping two hydraulic slide bars 31. The hydraulic slide bar 31 is composed of two retractable rectangular steel bodies. A hydraulic rod 18 is arranged inside the rectangular rigid body. The two ends of the hydraulic rod 18 are respectively connected to the two ends of the rectangular steel body. In order to reduce the friction of the rigid body, a plurality of cylindrical slide bars 32 can be arranged between the two rectangular steel bodies to reduce the wear between the rectangular steel bodies. The front end of the hydraulic slide bar 31 at the top of the hydraulic thruster 11 is arranged with a power head 12, and the power head 12 provides the power for the drill pipe to rotate.
[0099] like Figure 17-20 As shown, the crawler base 9 is connected to the six-axis robot arm 14 on one side through a steel member. The six-axis robot arm 14 is driven by a servo motor or hydraulics. The arm gripper of the six-axis robot arm 14 is a claw-shaped structure that can rotate along the movable axis. A small hydraulic rod is above the movable axis 30. The hydraulic rod 18 provides gripping force for the claw-shaped structure 27. The gripping device is a round long rod 28 structure that can roll axially on four rolling axes. A small operating cabin 13 is arranged at the rear of the six-axis robot arm 14 on one side of the crawler base 9, which can be used for manual operation of the equipment.
[0100] like Figure 25-28 As shown, two hydraulic calipers 15 are arranged at the front end of the slide rail sliding base 10, and the lower part of the hydraulic caliper 15 is a square base 34. The square base 34 is connected to a jack of a vertical base through a movable bolt 35, and the top of the jack is fixed by a movable bolt 35. The movable shaft 39 of the caliper is connected to the L-shaped steel part, and the other end of the L-shaped steel part is connected to the jack 24 through a movable bolt 35, and then connected to the square base 34. An active caliper 37 is arranged on the L-shaped steel part base, and the fixed end of the caliper is fixed to the L-shaped steel part. The bottom of the active caliper 37 is a hydraulic telescopic steel structure 38, and the hydraulic caliper 15 is used for automatic disassembly of the drill rod; the front end of the slide rail sliding base 10 is connected to the slide rail fixed base 16 through a large bolt, and there is a slide rail fixed base fixing hole 57 on both sides for bolt or anchor fixing.
[0101] like Figure 9-12 As shown, the drilling rig 2 is composed of a walking crawler 8, a drill rod stabilizing base 17, a six-axis mechanical arm 14, a crawler base 9, and an operating cabin 13. The walking crawler 8 has a width of 2m to 3m and a length of 5m to 8m. The middle of the walking crawler 8 is connected to the crawler base 9. The front end of the crawler base 9 is arranged with a drill rod stabilizing base 17 through a hydraulic rod 18 and a movable rod 41. The drill rod stabilizing base 17 is composed of a telescopic rod with a length of 2m to 3m; the upper part of the crawler base 9 is connected to the six-axis mechanical arm base, and the six-axis mechanical arm base is arranged with a six-axis mechanical arm 14. The six-axis mechanical arm 14 is driven by a servo motor or hydraulics. The arm gripper of the six-axis mechanical arm 14 is a graspable claw-shaped structure 27, and the grasping device is 4 axially rollable round long rods 28. A small operating cabin 13 is arranged at the rear of the six-axis mechanical arm 14 base, which can be used to manually modify the automation parameters of the drilling rig or manually operate the equipment.
[0102] like Figure 13-16 As shown, the automatic drill rod storage and retrieval machine 4 is composed of a hollow frame made of a hollow steel plate 54, a steel telescopic plate 25, an inclined slide rail 21, an automatic drill rig movable shaft 20 and an L-shaped hydraulic telescopic short arm 23. The automatic drill rod storage and retrieval machine 4 has a length of 4.2m to 9.2m, a width of 1m to 3m, and a height of 1m to 3m. The frame of the eight sides of the length, width and height is connected by steel parts, and the top is a steel telescopic plate 25. The hydraulic rod 18 is arranged inside the steel telescopic plate 25; 2 to 4 automatic drill rig movable shafts 20 are arranged in the middle position of the bottom surface of the automatic drill rod storage and retrieval machine 4. The automatic drill rig movable shaft 20 is connected to the inclined slide rail 21, and the inclined slide rail 21 can rotate along the automatic drill rig movable shaft 20. A jack 24 is arranged at the rear of the automatic drill rig movable shaft 20, and the movable shaft 20 is moved by the movable The bottom of the jack 24 is connected to the hollow steel step of the drill rod automatic storage and retrieval machine 4, and the top of the jack 24 is connected to the inclined slide rail 21; a drill rod retrieval port 22 is opened on the front of the drill rod automatic storage and retrieval machine 4, with a length of 4.2m~9.2m, which is the length of the drill rod according to the actual situation, and a width of 0.08m~0.13m, which is the diameter of the drill rod according to the actual situation; the inclined slide rail 21 is arranged inside the drill rod automatic storage and retrieval machine 4, and the inclination direction is inclined to the front of the drill rod automatic storage and retrieval machine 4; an L-shaped hydraulic telescopic short arm 23 is arranged inside the drill rod automatic storage and retrieval machine 4 just below the drill rod retrieval port 22, and the short arm 23 of the L-shaped hydraulic telescopic arm is arranged on the outside of the drill rod retrieval port 22 of the drill rod automatic storage and retrieval machine 4, and the long arm is arranged on the lower side of the drill rod retrieval port 22 of the drill rod automatic storage and retrieval machine 4.
[0103] like Figures 49-60As shown, the prefabricated segment drilling cabin 5 is composed of two special tunnel prefabricated drilling cabin arc segments 49 with fixing screws 40 on both sides of the bottom as the bottom surface, and the fixing screws 40 at the front and rear ends are inserted into the prefabricated semicircular segments 45. The vertical bottom semicircular arc has segment connection holes 47, and the four corners and the middle top of the top are provided with fixing screws 40. The straight edge of the top side has a ramp fixing screw 40 for installing a temporary driving ramp 56. The fixing screw 40 on the top of the semicircular segment is inserted into the prefabricated drilling cabin platform segment 51, which has segment connection holes 47 at the four corners and the middle, and is installed and fixed by fixing bolts 40.
[0104] like Figure 33-48 As shown, the prefabricated segment mud chamber 6 is composed of two pieces of special tunnel prefabricated mud chamber arc-shaped segments 49 with fixing screws 40 on both sides of the bottom, and a preset rectangular drilling opening 46 fixed by fixing bolts 40 and detachable in the middle of the bottom surface as the bottom surface, and the fixing screws 40 at the front and rear ends are inserted into the prefabricated semicircular segments 45, the bottom semicircular arc of the semicircular segment 45 has a pipe hole connecting hole 47, the four corners and the middle of the top are provided with fixing screws 40, and the top side is provided with a ramp fixing screw 40 for installing a temporary driving ramp 56, and the fixing screw 40 at the top of the prefabricated semicircular segment 45 is inserted into the prefabricated mud chamber platform segment 48, which has segment connecting holes 47 at the four corners and the middle, and is installed and fixed by fixing bolts 40. One side of the mud compartment platform segment 48 is provided with a circular drilling opening 46 and is arranged on one side of the drilling rig in the tunnel. The side of the mud compartment platform segment without the drilling opening 46 is arranged on the other side of the drilling rig in the tunnel. The left and right sides can be swapped according to actual conditions, because the part without the opening needs to be installed on one side for vehicles and pedestrians.
[0105] like Figures 61-64 As shown, the platform ramp 56 is composed of a hollow steel plate 54, a load-bearing steel beam 52, and a cross beam 53. Its width is half the width of the tunnel prefabricated segment drilling rig cabin or the mud cabin 5, 6. Its left and right sides are respectively composed of a straight and curved load-bearing steel beam 52, and the middle part is connected by a steel cross beam 53. There is a group of four-hole screw holes 55 on the left and right sides of the upper end of the load-bearing steel beam 52, and a group of four-hole screw holes 55 on the inner side of the bottom. A hollow steel plate 54 is laid on the top for vehicles and pedestrians.
[0106] In the preparation stage of tunnel excavation, ordinary arc segments are used in combination with special prefabricated segments to build a prefabricated segment drilling rig cabin 5 and a prefabricated segment mud cabin 6, and a platform ramp 56 is installed at the designated positions of the prefabricated segment drilling rig cabin 5 and the prefabricated segment mud cabin 6. The installation drilling rig 1 is transported to the designated position. It does not have a power device itself. It is transported to the predetermined position of the tunnel by a crane and other transportation devices. After connecting the hydraulic pipe hanging on the tunnel wall, the installation drilling rig 1 can be moved to the construction position of the prefabricated segment drilling rig cabin 5 through the walking device of the installation drilling rig 1. First, adjust the sliding bottom of the slide rail The angle of the seat 10 is adjusted, and the slide rail fixing base 16 is fixed by bolts or anchor rods, and the drill rod stabilizing base 17 is extended, and the retractable drill rod auxiliary rod 43 of the drill rod stabilizing base 17 is extended to prevent the drill rod from sinking during the drilling process and damaging the segment platform. At the same time, the drill rod automatic storage and retrieval machine 4 is arranged outside the installation drilling rig 1, and the drill rod is grabbed by the six-axis mechanical arm 14 of the installation drilling rig 1. After the navigation drill bit is manually installed, the drill rod is drilled into the tunnel surrounding rock through the segment drilling opening 46 reserved in the prefabricated segment mud chamber 6 to carry out drilling construction. When the drill bit exceeds the tunneling equipment After the head of the shield machine has moved a certain distance, the shield machine is started and normal construction work is carried out. After the tunneling equipment (shield machine) has constructed a certain distance, the prefabricated segment mud chamber 6 and the prefabricated segment drilling machine chamber 5 and the platform ramp 56 are laid at the predetermined rock exit position of the drill bit. After the tunneling equipment (shield machine) has constructed a certain distance to this segment, the installation drill rig 1 is used to guide the drill bit out of the mud chamber into the drilling opening 46, and the connecting drill rig 2 is transported to this place by the transportation equipment. After the hydraulic pipe hanging on the tunnel wall is connected, the connecting drill rig 2 is moved to the prefabricated segment through the walking device of the connecting drill rig 2. At the construction position of the segment drilling rig cabin 5, the drill rod stabilizing base 17 is extended, and the retractable drill rod auxiliary rod 43 of the drill rod stabilizing base 17 is extended to prevent the drill rod from sinking during the drilling process and damaging the segment platform. At the same time, the drill rod automatic storage and retrieval machine 4 is arranged on the outside of the drilling rig 2. The drill bit or drill rod is grabbed by the six-axis mechanical arm 14 of the drilling rig 2, and the drill bit of the drill rod of the exported prefabricated segment mud chamber 6 is replaced, the drill rod is connected to expand the hole, or the elastic annular bracket 7 is installed to meet the needs of installation and construction of the elastic annular bracket 7 inside the surrounding rock of the large tunnel 3.
[0107] The present invention provides a method for installing and constructing a ring-shaped elastic support provided before excavation in the surrounding rock of a large tunnel as follows:
[0108] A. Select the reasonable size according to the cross-sectional size of the tunnel: installation drilling rig 1, connecting drilling rig 2, automatic drill rod storage and retrieval machine 4, prefabricated segment drilling rig cabin 5, prefabricated segment mud cabin 6, platform ramp 56;
[0109] B. In the tunnel excavation preparation stage, the construction platform of the drilling rig is arranged behind the tunneling equipment (shield machine) using the drill cabin arc segment 50, the mud cabin arc segment 49, the prefabricated semicircular segment 45, the mud cabin platform segment 48, the drill cabin platform segment 51, and the platform ramp 56;
[0110] C. Transport the installation drilling rig 1 and the drill rod automatic storage and retrieval machine 4 to the designated location, install the drill bit and drill rod, and perform drilling construction;
[0111] D. After drilling to a certain distance, the shield machine starts construction;
[0112] E. When the shield machine reaches the drill bit exit point, ordinary arc segments and mud chamber arc segments 49 are laid in the tunnel for support, and the drilling rig cabin arc segments 50, mud chamber arc segments 49, prefabricated semicircular segments 45, mud chamber platform segments 48, drilling rig cabin platform segments 51, and platform ramps 56 are used to arrange the construction platform of the drilling rig;
[0113] F. After the shield machine has passed the drill bit exit point for a certain distance, the drill bit is guided out to the bottom of the tunnel, and the drill rig 2 is transported and arranged on the construction platform;
[0114] G. Grab the drill bit or drill rod by the six-axis mechanical arm 14 of the drilling rig 2, replace the drill bit, connect the drill rod to expand the hole, or install the elastic annular bracket 7 on the drill rod of the exported prefabricated segment mud tank 6;
[0115] H. After the installation of the elastic annular support 7 is completed, the drilling rig 1 and the connecting drilling rig 2 are transferred and installed, and the prefabricated semicircular segments 45, the mud bin platform segments 48 and the drilling rig platform segments 51 of the prefabricated segment drilling rig cabin 5 and the prefabricated segment mud tank 6, as well as the platform ramp 56 are removed. The drilling rig cabin arc segment 50 and the mud bin arc segment 49 do not need to be removed and can be used directly as support. Then, the tunnel segment structure is reinforced with steel bars and cement is poured, etc., and the next construction process is carried out.
[0116] In this specification, each embodiment is described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the embodiments can be referred to each other. For the device disclosed in the embodiment, since it corresponds to the method disclosed in the embodiment, the description is relatively simple, and the relevant parts can be referred to the method part.
[0117] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A method for installing and constructing an annular elastic support before excavation in the surrounding rock of a large tunnel, characterized in that: The following steps are involved: S1. During the tunnel excavation preparation stage, a drilling rig installation platform is built behind the tunneling equipment using a prefabricated segment drilling rig cabin, a prefabricated segment mud cabin and a platform ramp. The drilling rig installation platform and the drill rod automatic storage and retrieval machine are transported and arranged on the drilling rig installation platform, and the drill bit and drill rod are installed to carry out drilling construction. S2. After the drilling, the tunneling equipment starts working. When the tunneling equipment reaches the drill bit exit point, the pipe segments are laid in the tunnel for support. At the same time, the prefabricated pipe segment drilling rig cabin, prefabricated pipe segment mud cabin and platform ramp are used to build the drilling rig construction platform. S3. After the excavation equipment has passed the drill bit exit point for a certain distance, the drill bit is guided out of the tunnel bottom, and the drill rig and the drill rod automatic storage and retrieval machine are transported and arranged on the construction platform of the drill rig. The drill bit or drill rod is grabbed by the six-axis mechanical arm of the drill rig, and the drill bit of the drill rod of the exported prefabricated segment mud tank is replaced, the hole expansion operation of the drill rod is connected, and the elastic ring bracket is installed. S4. After the elastic ring support is installed, the drilling rig, the automatic drill pipe storage and retrieval machine and the drill rig are transferred and installed, the prefabricated segment drilling rig cabin, the prefabricated segment mud cabin and the platform ramp are dismantled, the steel bars are laid on the tunnel segment structure, and cement is poured.
2. The method for installing and constructing a ring-shaped elastic support before excavation in the surrounding rock of a large tunnel according to claim 1 is characterized in that: The installation drilling rig and the receiving drilling rig both include two groups of walking crawlers, and a crawler base is fixed between the two groups of walking crawlers; two hydraulic cylinders are hinged front and rear on the crawler base of the installation drilling rig, and the top ends of the telescopic rods of the two hydraulic cylinders are hinged with a slide rail sliding base, a slide rail fixed base is fixed at the front end of the slide rail sliding base, and a hydraulic caliper, a six-axis mechanical arm, an operating cabin and a hydraulic thruster are installed in sequence from front to back; a drill rod stabilizing base is fixed at the front end of the slide rail fixed base, and a drill rod auxiliary telescopic rod mechanism is installed at the front end of the drill rod stabilizing base; a six-axis mechanical arm and an operating cabin are installed in sequence from front to back on the crawler base of the receiving drilling rig.
3. The method for installing and constructing a ring-shaped elastic support before excavation in the surrounding rock of a large tunnel according to claim 2 is characterized in that: The number of the hydraulic calipers is two, and the clamping is achieved through hydraulic telescopic drive control, and the rotation control of the angle of the clamping part of the hydraulic caliper is achieved through the rising and pushing of the jack structure.
4. The method for installing and constructing a ring-shaped elastic support before excavation in the surrounding rock of a large tunnel according to claim 2 is characterized in that: The manipulator of the six-axis manipulator arm is a claw-shaped structure, and the inner side of the claw-shaped structure is rotatably connected with four round long rods that can clamp the drill rod.
5. The method for installing and constructing a ring-shaped elastic support before excavation in the surrounding rock of a large tunnel according to claim 2, characterized in that: The hydraulic thruster comprises a two-stage hydraulic telescopic structure which is stacked up and down, and a power head is installed at the power output terminal end of the upper structure of the two-stage hydraulic telescopic structure.
6. The method for installing and constructing a ring-shaped elastic support before excavation in the surrounding rock of a large tunnel according to claim 2, characterized in that: The front end of the slide rail sliding base is hinged to the drill rod stable base.
7. A method for installing and constructing an annular elastic support before excavation in the surrounding rock of a large tunnel according to any one of claims 1 to 6, characterized in that: The drill rod automatic storage and retrieval machine is a hollow steel frame structure, and has a slope structure inside for guiding the guide rod. The slope structure controls the slope angle through a jack structure. The steel frame structure has a drill retrieval port, which corresponds to the bottom end of the slope structure, and an L-shaped hydraulic telescopic short arm for receiving the drill rod is installed at the drill retrieval port.
8. The method for installing and constructing a ring-shaped elastic support before excavation in the surrounding rock of a large tunnel according to claim 1 is characterized in that: The prefabricated segment drilling rig cabin and the prefabricated segment mud cabin are both composed of multiple segment structures, with a flat top surface, a curved bottom surface, and a flat side surface, and are adapted to the supporting cabin structure of the tunnel.
9. The method for installing and constructing a ring-shaped elastic support before excavation in the surrounding rock of a large tunnel according to claim 8, characterized in that: The prefabricated pipe segment drilling rig cabin and the prefabricated pipe segment mud tank have openings at the bottom; fixing bolts or screw holes are arranged around the pipe segments of the prefabricated pipe segment drilling rig cabin and the prefabricated pipe segment mud tank.
10. A method for installing and constructing an annular elastic support before excavation in the surrounding rock of a large tunnel according to any one of claims 1-6 and 8-9, characterized in that: The platform ramp is composed of a slope transition structure through hollow steel plates, load-bearing steel beams and cross beams.