A fully automatic intelligent tunnel wet spraying vehicle with machine vision and spraying method
By integrating the machine vision system and path planning system on the tunnel wet spraying vehicle, automatic unmanned spraying of the tunnel wet spraying is realized, which solves the problems of cumbersome and non-real-time reconstruction process in the existing technology, and improves the construction speed and safety. .
Patent Information
- Application Number
- CN202210657536.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-06-10
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2042-06-10
AI Technical Summary
There are high risks and harsh environments in tunnel construction. The reconstruction process of existing automated wet spray truck equipment is cumbersome and not real-time, and cannot meet the current engineering requirements for wet spray truck automation.
A fully automatic intelligent tunnel wet spray vehicle with machine vision is used to realize real-time detection of shotcrete thickness and path optimization through a real-time detection system of shotcrete thickness and a real-time nozzle path planning system, simplifying the data processing cycle and reducing worker labor intensity.
It realizes automated unmanned spraying of tunnel wet spraying, improves construction speed and efficiency, ensures workers' personal safety, simplifies the data processing cycle, and reduces workers' labor intensity.
Smart Images

Figure CN115217491B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of tunnel engineering wet spraying vehicle automation, and in particular to a fully automatic intelligent tunnel wet spraying vehicle with machine vision and a spraying method. Background Art
[0002] With the continuous expansion of the scale of underground space development in my country and the continuous increase in the speed of coal mine tunnel excavation, the support speed of underground spaces such as tunnels and tunnels is required to be continuously improved, so the requirements for the development of concrete spraying support technology and equipment are becoming more and more urgent. However, tunnel construction has the characteristics of high risk factor and harsh working environment. The use of automated construction equipment and methods is the general trend. Large-scale mechanical arm wet spraying machines are commonly used for spraying concrete in tunnel construction. During the spraying process, workers not only need to hold remote controls to operate the mechanical arms, but also need to observe the spraying thickness and quality at close range near the spraying area. This method undoubtedly greatly increases the workload of workers, the working environment is harsh, visibility is low, and the technical requirements for spraying hands are high; and especially the personal safety of workers cannot be effectively guaranteed.
[0003] At present, in addition to the wet spraying vehicle controlled by a large robotic arm with a manual handheld remote control, there is also an intelligent wet spraying vehicle based on a three-dimensional laser radar. This equipment must first calibrate the sensor equipment, use the three-dimensional laser radar to collect the surface point cloud information of the tunnel under construction, pre-process the collected data, and finally establish a wet spraying thickness detection model for the tunnel rock surface, and calculate the wet spraying depth of each point on the tunnel surface to guide the equipment spraying. Although this method can realize the entire spraying process without human intervention, its reconstruction process is cumbersome and requires precise calibration preparation of sensors and other equipment in advance. In addition, the point cloud data processing cycle is very long and does not have real-time performance.
[0004] There is also an arch-type artificial wet spraying machine, which is mainly composed of a circular guide rail concentric with the tunnel. The spray head can spray along the circular guide rail through the spraying operator's handheld remote control, and can maintain a stable spraying distance and angle. Compared with the traditional wet spraying machine with a large multi-degree-of-freedom robotic arm controlled by manual remote control, this equipment greatly reduces the technical requirements for the sprayer. However, the disadvantage is that the whole process requires manual participation, which cannot meet the current engineering requirements for wet spraying machine automation. Summary of the invention
[0005] According to the technical problems raised above, a fully automatic intelligent tunnel wet spraying vehicle and spraying method with machine vision are provided. The present invention can not only realize automatic unmanned spraying, but also can realize real-time detection of spraying thickness without three-dimensional reconstruction of tunnel surface contour, with fast construction speed and high efficiency, and greatly reduce the labor intensity of workers while ensuring the personal safety of workers.
[0006] The technical means adopted by the present invention are as follows:
[0007] A fully automatic intelligent tunnel wet spraying vehicle with machine vision, comprising: a real-time detection system for spraying thickness, a real-time planning system for nozzle path, and a wet spraying execution component; wherein:
[0008] The machine vision system for real-time detection of shotcrete thickness is used to detect the concrete thickness value of the shotcrete area in real time;
[0009] The real-time nozzle path planning system is connected to the real-time detection machine vision system for shotcrete thickness. It is used to control the wet shotcrete actuator to perform "S"-shaped path shotcrete. At the same time, it receives the concrete thickness value of the current shotcrete area transmitted by the real-time detection machine vision system for shotcrete thickness in real time, and optimizes the shotcrete path of the wet shotcrete actuator in the next shotcrete cycle according to the thickness value signal.
[0010] The wet spraying execution component is connected to the nozzle path real-time planning system and is used to execute the spraying path optimized by the nozzle path real-time planning system.
[0011] Furthermore, the real-time detection machine vision system for shotcrete thickness includes an industrial camera, a laser, an image acquisition system, and an image processing system; the industrial camera and the laser are both arranged on a wet spraying mobile device; the image acquisition system is used to control the industrial camera to collect laser bar information and transmit it to the image processing system in real time; the image processing system is used to receive the laser bar information transmitted by the image acquisition system in real time, process the laser bar information, and analyze in real time whether the concrete thickness value of the shotcrete area meets the standard.
[0012] Furthermore, the wet spraying execution component includes an industrial trolley, an arch-type guide rail arranged on the industrial trolley, a travel guide rail, a wet spraying moving device, a spray head assembly, and an arch propulsion device; wherein:
[0013] The arch-type guide rail is hinged on the travel guide rail, which is horizontally arranged on both sides of the industrial trolley and welded and fixed to the trolley body;
[0014] The wet spraying mobile device is provided with a wet spraying telescopic arm, a wet spraying rotating support, a camera protection device, a camera support and a laser support from top to bottom, wherein the upper part of the wet spraying rotating support carries the wet spraying telescopic arm, and the lower lead screw runs through it. The first motor and the second motor are also provided at both ends of the wet spraying mobile device, which are firmly connected to the lead screw through a coupling to provide power for the lateral movement of the wet spraying rotating support and the nozzle within the length of the lead screw; the camera protection device is arranged on the industrial camera to prevent the concrete slag rebounding during the spraying process from contaminating the camera.
[0015] The nozzle assembly comprises a nozzle fixing bracket and a nozzle arranged on the nozzle fixing bracket. The nozzle fixing bracket is arranged at the front end of the wet spraying telescopic arm bracket, and the telescopic arm can move closer to or away from the tunnel wall through the telescopic movement. The nozzle located on the nozzle fixing bracket can adjust the spraying angle of the nozzle by adjusting the knob on the bracket.
[0016] The arch propulsion device includes a third motor, a fourth motor, a hydraulic pump station, a lifting cylinder and an oil pipe. The hydraulic pump station provides power for the hydraulic system. The lifting cylinder is connected to the arch guide rail. Under the telescopic action of the lifting cylinder, the arch guide rail is pushed along the travel guide rail to push the arch guide rail under the surface to be sprayed.
[0017] Furthermore, the industrial camera and laser are respectively arranged on a camera support and a laser support, and both the laser support and the camera support are provided with knobs, so as to adjust the angle between the light plane projected by the laser and the optical axis of the camera, and the laser bar emitted by the laser is simultaneously projected onto the two steel arches and the middle spraying area between the two steel arches.
[0018] Furthermore, the travel guide rails are two straight steel structure guide rails, and the two straight steel structure guide rails are provided with track grooves, and the arch frame type guide rails are connected by a sliding hinge support.
[0019] Furthermore, the arch-type guide rail is three arch-shaped steel structure guide rails, namely the first arch-shaped guide rail, the second arch-shaped guide rail and the third arch-shaped guide rail; the three arch-shaped steel structure guide rails are respectively hinged on the travel guide rail through 6 sets of sliding hinge supports; wherein:
[0020] A third motor and a fourth motor are provided at the sliding hinge support connected to the second arch guide rail. When the third motor and the fourth motor are working, they directly drive the pulley on the sliding hinge support to realize the movement of the second arch frame guide rail between the first arch frame guide rail and the third arch frame guide rail.
[0021] Furthermore, the wet spraying moving device is connected to the arch-type guide rail through a gear device, and under the action of the fifth motor and the sixth motor, the gears in the gear device move longitudinally along the guide rail; the fifth motor and the sixth motor are connected to the two ends of the wet spraying moving device by bolts, and a reducer is provided at the output shaft of the fifth motor and the sixth motor as a power protection device.
[0022] Furthermore, the industrial trolley is divided into two areas, the front of the vehicle is the shotcrete working area, and the rear of the vehicle is the main equipment area; during the shotcrete working, the arch-type guide rail and the equipment structure thereon are located in the shotcrete working area in front of the vehicle body, and other main equipment are located in the main equipment area behind the vehicle body, so as to prevent rebound concrete from falling on the main equipment.
[0023] The fully automatic intelligent tunnel wet spraying vehicle based on line structured light provided by the present invention has the following working principle:
[0024] When the nozzle performs reciprocating spraying along the predetermined "S"-shaped route, the laser projects line structured light onto the spraying area just completed by the nozzle and the tunnel steel arches on both sides. The industrial camera collects the laser bar information of the area illuminated by the structured light. The image processing system processes the laser bar information in real time and extracts the center point of all laser bars, and then fits it into a straight line. The fitting root mean square error is used to reflect the degree of deflection of the laser bar, that is, the thickness information of the spraying area at this time. Furthermore, this thickness information will be fed back to the nozzle path planning system in real time to guide the robot arm to complete the next spraying work until the spraying is completed.
[0025] The present invention also provides a grouting method based on the above-mentioned fully automatic intelligent tunnel wet spraying vehicle, comprising the following steps:
[0026] S1, after the real-time planning system for the spraying path issues a spraying instruction, the first motor and the second motor start working to realize the lateral movement of the spray head along the direction of the lead screw for spraying; at this time, the laser line projected by the laser is located below the lateral movement spraying area just completed;
[0027] S2, after the lateral spraying is completed based on step S1, the fifth motor and the sixth motor start to work, so as to realize the longitudinal movement of the wet spraying moving device as a whole along the direction of the arch guide rail. Since both the industrial camera and the laser are located on the wet spraying moving device, the laser line projected by the laser is located in the lateral spraying area just completed at this time;
[0028] S3, after the longitudinal movement of the entire shotcrete moving device is completed based on step S2, the shotcrete path real-time planning system sends a stop command to the motor, at which time the first motor, the second motor, the fifth motor and the sixth motor are all in a stopped state, and the stop state lasts for 1 second; during this stopped state, the image acquisition system controls the industrial camera to take pictures of the shotcrete area with the laser bar, that is, the lateral shotcrete area just completed in step S1;
[0029] S4, the image acquisition system transmits the shotcrete area image with laser stripe information to the image processing system, and processes and analyzes the image information; extracts the stripe center point of the laser stripe by Steger algorithm, and then fits the center point to a straight line by least square method, and uses the fitting root mean square error (RMSE) as the representative value of the shotcrete thickness;
[0030] S5, the image processing system feeds back the processing results to the shotcrete path real-time planning system in real time, and the shotcrete path real-time planning system sets a threshold value a of the root mean square error. When the fitting root mean square error R transmitted by the image processing system i When ≤a, it is determined that the shotcrete thickness in this area has reached the requirement;
[0031] S6, after completing step S3, i.e., the photographing and drawing in the stop state is finished, and steps S1-S5 are continued to be repeated. During the repetition, the nozzle sprays from one side of the tunnel arch surface to the other side of the arch surface along an "S"-shaped path to complete one shot of the entire arch surface; the repetition process is manual teaching spraying, and when the nozzle completes the spraying on the other side of the arch surface, the worker manually stops the spraying;
[0032] S7, after the nozzle completes the grouting of the tunnel arch surface once, the nozzle path real-time planning system will record the total number of lateral movement grouting performed by the nozzle during the repetition process c, that is, indirectly divide the entire tunnel working wall surface into c equal parts based on the lateral movement grouting area;
[0033] S8, after the nozzle repeats steps S1-S5 several times, when the thickness of a certain lateral shotcrete area reaches the standard, the RMS value of the fitting error R obtained in this lateral shotcrete area i ≤a, the real-time planning system for the shotcrete path records the position of the completed area as "Horizontal i" and records the number of completed lateral shotcrete areas, which is b; when steps S1-S5 are repeated for the next time, after the lateral shotcrete of the previous lateral shotcrete area of this lateral shotcrete area is completed, the nozzle will not perform the lateral shotcrete of this area, and will directly move longitudinally along the arch guide rail to the next R after this lateral shotcrete area. i >a's lateral shotcrete area;
[0034] S9. With the repeated cycles of the shotcrete process, the b value will become larger and larger, that is, the number of transverse shotcrete areas with shotcrete thickness meeting the standard will increase, but the number of transverse shotcrete areas with shotcrete thickness meeting the standard will not be greater than c; when b / c>d, d is the set shotcrete completion progress value, that is, the entire tunnel is considered to be shotcrete-completed, and the shotcrete path real-time planning system issues a stop command to the four motors and the nozzle.
[0035] Compared with the prior art, the present invention has the following advantages:
[0036] 1. The fully automatic intelligent tunnel wet spraying vehicle with machine vision provided by the present invention directly uses image processing technology to realize real-time detection of tunnel wet spraying thickness. During the detection process, there is no need to perform three-dimensional scanning and reconstruction of the tunnel contour, thereby greatly simplifying the data processing cycle, with high efficiency and extremely high stability.
[0037] 2. The fully automatic intelligent tunnel wet spraying vehicle with machine vision provided by the present invention innovatively adopts an "S"-shaped spraying path real-time planning system, which is well combined with the above-mentioned spraying thickness detection machine vision system, realizing intelligent unmanned tunnel spraying, greatly reducing the workload of workers and ensuring the personal safety of workers.
[0038] Based on the above reasons, the present invention can be widely promoted in the fields of intelligent wet spraying vehicles in tunnel engineering, etc. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0040] Figure 1 It is a schematic diagram of the structure of the wet spraying vehicle system of the present invention;
[0041] Figure 2 It is a top view of the wet spraying vehicle system structure of the present invention;
[0042] Figure 3 This is a schematic diagram of the structure of the tunnel wet spraying mobile device of the present invention;
[0043] Figure 4 This is a flow chart of the real-time planning system for the shotcrete path of the present invention;
[0044] Figure 5 This is a schematic diagram of the spraying thickness detection principle of the present invention.
[0045] In the figure: 1, arch guide rail; 1a, first arch guide rail; 1b, second arch guide rail; 1c, third arch guide rail; 2, travel guide rail; 3, wet spray moving device; 4, hydraulic jacking device; 5, propulsion motor; 5a, third motor; 5b, fourth motor; 6, wheel belt type wheel; 7, transverse motor; 7a, first motor; 7b, second motor; 8, longitudinal motor; 8a, fifth motor; 8b, sixth motor; 9, Screw; 10. Wet spraying rotating support; 11. Camera support; 12. Laser support; 13. Laser; 14. Industrial camera; 15. Wet spraying telescopic arm; 16. Nozzle fixed support; 17. Nozzle; 18. Accelerator adding system; 19. Hopper; 20. Air compressor system; 21. Pumping system; 22. Lighting equipment; 23. Car head; 24. Camera protection device; 25. Sliding hinge support; 26. Gear device. DETAILED DESCRIPTION
[0046] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments can be combined with each other. The present invention will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0047] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. The following description of at least one exemplary embodiment is actually only illustrative and is by no means intended to limit the present invention and its application or use. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0048] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit exemplary embodiments according to the present invention. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "comprising" and / or "including" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof.
[0049] Unless otherwise specifically stated, the relative arrangement of the parts and steps described in these embodiments, the numerical expressions and numerical values do not limit the scope of the present invention. At the same time, it should be clear that, for ease of description, the sizes of the various parts shown in the drawings are not drawn according to the actual proportional relationship. The technology, methods and equipment known to ordinary technicians in the relevant field may not be discussed in detail, but in appropriate cases, the technology, methods and equipment should be regarded as part of the authorization specification. In all examples shown and discussed here, any specific value should be interpreted as merely exemplary, rather than as a limitation. Therefore, other examples of exemplary embodiments may have different values. It should be noted that similar numbers and letters represent similar items in the following drawings, so once an item is defined in one drawing, it does not need to be further discussed in subsequent drawings.
[0050] In the description of the present invention, it is necessary to understand that the directions or positional relationships indicated by directional words such as "front, back, up, down, left, right", "lateral, vertical, perpendicular, horizontal" and "top, bottom" are usually based on the directions or positional relationships shown in the drawings. They are only for the convenience of describing the present invention and simplifying the description. Unless otherwise specified, these directional words do not indicate or imply that the device or element referred to must have a specific direction or be constructed and operated in a specific direction. Therefore, they cannot be understood as limiting the scope of protection of the present invention: the directional words "inside and outside" refer to the inside and outside relative to the contours of each component itself.
[0051] For ease of description, spatially relative terms such as "above", "above", "on the upper surface of", "above", etc. may be used here to describe the spatial positional relationship between a device or feature and other devices or features as shown in the figure. It should be understood that spatially relative terms are intended to include different orientations of the device in use or operation in addition to the orientation described in the figure. For example, if the device in the accompanying drawings is inverted, the device described as "above other devices or structures" or "above other devices or structures" will be positioned as "below other devices or structures" or "below their position devices or structures". Thus, the exemplary term "above" can include both "above" and "below". The device can also be positioned in other different ways (rotated 90 degrees or in other orientations), and the spatially relative descriptions used here are interpreted accordingly.
[0052] In addition, it should be noted that the use of terms such as "first" and "second" to limit components is only for the convenience of distinguishing the corresponding components. If not otherwise stated, the above terms have no special meaning and therefore cannot be understood as limiting the scope of protection of the present invention.
[0053] like Figure 1 , 2 As shown, the present invention provides a fully automatic intelligent tunnel wet spraying vehicle with machine vision, including: a real-time detection machine vision system for spraying thickness, a real-time planning system for the nozzle path, and a wet spraying execution component; wherein:
[0054] The machine vision system for real-time detection of shotcrete thickness is used to detect the concrete thickness value of the shotcrete area in real time;
[0055] The real-time planning system for the nozzle path is connected to the real-time detection machine vision system for the spraying thickness, and is used to control the wet spraying actuator to perform "S"-shaped path spraying. At the same time, it receives the concrete thickness value of the current spraying area transmitted by the real-time detection machine vision system for the spraying thickness in real time, and optimizes the spraying path of the wet spraying actuator during the next spraying cycle according to the thickness value signal. The real-time planning system for the spraying path mainly includes electrical equipment such as motors, controllers, and signal lights, and mainly has functions such as power supply, start and stop control of each motor, path planning, and signal display. The wet spraying actuator is connected to the real-time planning system for the nozzle path, and is used to execute the spraying path optimized by the real-time planning system for the nozzle path.
[0056] In specific implementation, as a preferred embodiment of the present invention, the real-time detection machine vision system for the shotcrete thickness includes an industrial camera 14, a laser 13, an image acquisition system, and an image processing system; the industrial camera 14 and the laser 13 are both arranged on the wet spraying mobile device 3; the image acquisition system is used to control the industrial camera 14 to collect laser bar information and transmit it to the image processing system in real time; the image processing system is used to receive the laser bar information transmitted by the image acquisition system in real time, and process the laser bar information, and analyze in real time whether the concrete thickness value of the shotcrete area meets the standard. In this embodiment, the industrial camera 14 is a CMOS camera. The image processing system implements the analysis of whether the concrete thickness of the shotcrete area meets the standard, and the specific steps are:
[0057] The laser bars at the steel arch and the laser bars in the shotcrete area are compared, and the center points of the stripes are extracted by the Steger algorithm. The center points are then fitted into a straight line using the least squares method, and the fitting root mean square error (RMSE) is used as the representative value of the shotcrete thickness. Furthermore, this representative value is compared with the set RMSE threshold to determine whether the shotcrete thickness meets the standard.
[0058] In specific implementation, as a preferred embodiment of the present invention, the wet spraying execution component includes an industrial trolley, an arch-type guide rail 1 arranged on the industrial trolley, a travel guide rail 2, a wet spraying moving device 3, a nozzle assembly, and an arch propulsion device; wherein:
[0059] The arch-type guide rail 1 is hinged on the travel guide rail 2, which is horizontally arranged on both sides of the industrial trolley and welded and fixed to the vehicle body; the travel guide rail 2 is two straight steel structure guide rails, and the two straight steel structure guide rails are provided with track grooves, and the arch-type guide rail 1 is connected by a sliding hinge support 25. The arch frame guide rail 1 is composed of three arch frame steel structure guide rails, namely the first arch frame guide rail 1a, the second arch frame guide rail 1b and the third arch frame guide rail 1c; the three arch frame steel structure guide rails are respectively hinged on the travel guide rail 2 through 6 groups of sliding hinge supports 25; wherein: the sliding hinge support 25 connected to the second arch frame guide rail 1b is provided with a third motor 5a and a fourth motor 5b, and when the third motor 5a and the fourth motor 5b are working, they directly drive the pulley on the sliding hinge support 25 to realize the movement of the second arch frame guide rail 1b between the first arch frame guide rail 1a and the third arch frame guide rail 1c.
[0060] like Figure 3 As shown, the wet spraying mobile device 3 is provided with a wet spraying telescopic arm 15, a wet spraying rotating support 10, a camera protection device 24, a camera support 11 and a laser support 12 from top to bottom, wherein the upper part of the wet spraying rotating support 10 carries the wet spraying telescopic arm 15, and the lower lead screw 9 runs through it. The first motor 7a and the second motor 7b are also provided at both ends of the wet spraying mobile device 3, which are firmly connected to the lead screw 9 through a coupling to provide power for the lateral movement of the wet spraying rotating support 10 and the spray head within the length range of the lead screw 9; the camera protection device 24 is arranged on the industrial camera 14, and is used to prevent the concrete slag rebounding during the spraying process from contaminating the camera. The wet spraying moving device 3 is connected to the arch-type guide rail 1 through a gear device 26, and under the action of the fifth motor 8a and the sixth motor 8b, the gears in the gear device 26 move longitudinally along the guide rail; the fifth motor 8a and the sixth motor 8b are connected to the two ends of the wet spraying moving device 3 by bolts, and a reducer is provided at the output shaft of the fifth motor 8a and the sixth motor 8b as a power protection device.
[0061] The nozzle assembly includes a nozzle fixing bracket 16 and a nozzle 17 arranged on the nozzle fixing bracket 16. The nozzle fixing bracket 16 is arranged at the front end of the wet spraying telescopic arm bracket 15, and can move close to or away from the tunnel wall through the telescopic movement of the telescopic arm; the nozzle 17 located on the nozzle fixing bracket 16 can adjust the spraying angle of the nozzle 17 by adjusting the knob on the bracket;
[0062] The arch propulsion device includes a third motor 5a, a fourth motor 5b, a hydraulic pump station, a lifting cylinder 4 and an oil pipe. The hydraulic pump station provides power for the hydraulic system. The lifting cylinder 4 is connected to the arch guide rail 1. Under the telescopic action of the lifting cylinder 4, the arch guide rail 1 is pushed along the traveling guide rail 2 to push the arch guide rail 1 into the spraying working area of the industrial trolley, that is, under the wall of the tunnel to be sprayed, and the main part of the industrial trolley is in a safe position outside the surface to be sprayed.
[0063] In specific implementation, as a preferred embodiment of the present invention, the industrial camera 14 and the laser 13 are respectively arranged on the camera support 11 and the laser support 12, and the laser support 12 and the camera support 11 are provided with knobs, so that the angle between the light plane projected by the laser 13 and the optical axis of the camera 14 can be adjusted, and the spraying area is located between the two steel arches, and the laser bar emitted by the laser 13 is simultaneously projected on the two steel arches and the spraying area between the two steel arches.
[0064] During specific implementation, as a preferred embodiment of the present invention, the industrial trolley is divided into two areas, the area before the head 23 is the spraying work area, and the area after the head 23 is the main equipment area; during the spraying work, the arch-type guide rail 1 and the equipment structure thereon are located in the spraying work area before the vehicle body, and other main equipment are located in the main equipment area after the vehicle body to prevent rebound concrete from falling on the main equipment. The industrial trolley mainly includes a head cab 23, a walking device 6 (the walking device in the present invention is a crawler type, and can also be a tire type), an air compressor system 20, a pumping system 21, and an accelerator adding system 18. The air compressor system 20 is composed of an air compressor, a cooler, a pipeline, a switch valve, etc., and mainly provides a continuous jet airflow, and uses compressed air to pressurize a certain mix ratio of concrete mixture through a nozzle 17 to spray at high speed onto the sprayed surface. The pumping system is composed of a pumping main oil cylinder, a central pump, a hopper, a swing oil cylinder, etc., and its function is to continuously transport concrete to the nozzle 17 along the conveying pipeline. The accelerating agent adding system 18 is mainly responsible for the delivery of accelerating agent and other admixtures, and completes the spraying of concrete together with the pumping system, and is mainly composed of hydraulic motors, hose pumps, valves and other components. The industrial trolley, and the pumping system 21, air compression system 20, accelerating agent adding system 18 and the like contained therein are all prior art and can be purchased on the market, so the specific structural details are not described in detail.
[0065] Example
[0066] like Figure 4 , 5 As shown, in the specific implementation process, the present invention includes the following implementation steps:
[0067] 1. Positioning of wet spraying vehicle: After the tunnel completes the steel arch support, the tunnel intelligent wet spraying vehicle provided by the present invention is driven into the tunnel spraying position, and the vehicle body and the tunnel are kept on the same central axis as much as possible, and the working area of the wet spraying vehicle is located below the tunnel spraying surface.
[0068] 2. Arch rail positioning: The driver in the cab operates the arch propulsion system and controls the hydraulic device 4 to push the arch rail 1 along the travel rail 2 into the vehicle body spraying work area, that is, at this time, the arch rail 1 is located below the tunnel surface to be sprayed. Then the arch propulsion system drives the third motor 5a and the fourth motor 5b, and adjusts the distance between the first arch rail 1a and the second arch rail 1b according to the width of the area to be sprayed.
[0069] 3. Positioning of the wet spraying mobile device: At this time, the real-time planning system for the spraying path drives the fifth motor 8a and the sixth motor 8b to move the wet spraying mobile device 3 to the lowest spraying area of the tunnel wall, and ensure that the spray head 17 is facing the spraying area. After completion, adjust the wet spraying rotating support 10 and the wet spraying telescopic arm to achieve a good spraying angle and spraying distance between the spray head 17 and the tunnel wall.
[0070] 4. Positioning of the industrial camera 14 and the laser 13: After completing the above steps, adjust the knobs of the camera support 11 and the laser support so that the optical axis of the industrial camera 14 and the line structured light projected by the laser 13 are located about 10 cm below the spraying area facing the above-mentioned nozzle 17, and the laser bar can simultaneously cover the tunnel steel arch frame and the spraying area between the steel arch frames. This distance is related to the caliber and injection rate of the nozzle 17, that is, the width value of the effective area of the tunnel wall sprayed by the nozzle 17 each time the nozzle 17 moves horizontally for spraying.
[0071] 5. Manual teaching of spraying: The purpose of manual teaching of spraying is to enable the real-time planning system of the spraying path to record the total number of longitudinal movements performed by the wet spraying mobile device 3 from the lowest spraying area on one side of the tunnel to the lowest spraying area on the other side of the tunnel during the "S" type one-cycle spraying, as well as the telescopic distance and angle information of the wet spraying telescopic boom 15 and the nozzle 17 in each small spraying area. When workers operate the wet spraying telescopic boom 15 to spray from one side of the tunnel to the other side, they need to manually adjust the telescopic distance of the boom 15 and the rotation angle of the nozzle 17 in each small spraying area. At this time, the path and planning system will record the distance and angle information of each small spraying area, so that the wet spraying telescopic boom 15 and the nozzle 17 will still maintain this position in the next spraying. After completing the manual teaching shotcrete, the shotcrete path real-time planning system will calculate the c value, c = the number of longitudinal movements performed by the wet shotcrete moving device 3 + 1, that is, the total number of transverse shotcrete areas included in the entire tunnel shotcrete work, and indirectly divide the entire tunnel working wall into c equal parts based on the transverse shotcrete area.
[0072] 6. Automatic spraying of wet spraying vehicle: After completing one manual teaching spraying, the wet spraying moving device 3 has moved to the other side relative to the initial positioning side. The wet spraying vehicle starts automatic spraying: including the following steps:
[0073] S1, after the real-time planning system for the spraying path issues a spraying instruction, the first motor 7a and the second motor 7b start working to realize the lateral movement spraying of the spray head 17 along the direction of the lead screw 9; at this time, the laser line projected by the laser 13 is located below the lateral movement spraying area just completed;
[0074] S2, after the lateral spraying is completed based on step S1, the fifth motor 8a and the sixth motor 8b start to work, so as to realize the longitudinal movement of the wet spraying moving device 3 as a whole along the direction of the arch guide rail 1. Since both the industrial camera 14 and the laser 13 are located on the wet spraying moving device 3, the laser line projected by the laser 13 is located in the lateral spraying area just completed at this time;
[0075] S3, after the longitudinal movement of the entire spraying mobile device 3 is completed based on step S2, the spraying path real-time planning system sends a stop command to the motor, at which time the first motor 7a, the second motor 7b, the fifth motor 8a and the sixth motor 8b are all in a stopped state, and the stop state lasts for 1 second; during this stopped state, the image acquisition system controls the industrial camera 14 to take pictures of the spraying area with the laser bar, that is, the lateral movement spraying area just completed in step S1;
[0076] S4, the image acquisition system transmits the shotcrete area image with laser stripe information to the image processing system, and processes and analyzes the image information; extracts the stripe center point of the laser stripe by Steger algorithm, and then fits the center point to a straight line by least square method, and uses the fitting root mean square error (RMSE) as the representative value of the shotcrete thickness;
[0077] S5, the image processing system feeds back the processing results to the shotcrete path real-time planning system in real time, and the shotcrete path real-time planning system sets a threshold value a of the root mean square error. When the fitting root mean square error R transmitted by the image processing system i When ≤a, it is determined that the shotcrete thickness in this area has reached the requirement;
[0078] S6, after completing step S3, i.e., the photographing and drawing in the stop state is finished, and steps S1-S5 are continued to be repeated. During the repetition, the nozzle sprays from one side of the tunnel arch surface to the other side of the arch surface along an "S"-shaped path to complete one shot of the entire arch surface; the repetition process is manual teaching spraying, and when the nozzle 17 completes the spraying on the other side of the arch surface, the worker manually stops the spraying;
[0079] S7, after the nozzle 17 completes the spraying of the tunnel arch surface once, the nozzle path real-time planning system will record the total number of lateral spraying times c performed by the nozzle 17 during the repetition process, that is, indirectly divide the entire tunnel working wall surface into c equal parts based on the lateral spraying area;
[0080] S8, after the nozzle 17 repeats steps S1-S5 several times, when the thickness of a certain lateral movement spraying area reaches the standard, the RMS value of the fitting error R obtained in this lateral movement spraying area i ≤a, the real-time planning system for the shotcrete path records the position of the completed area as "Horizontal i" and records the number of completed lateral shotcrete areas, which is b; when the steps S1-S5 are repeated for the next time, after the lateral shotcrete of the previous lateral shotcrete area of this lateral shotcrete area is completed, the nozzle 17 will not perform the lateral shotcrete of this area, and will directly move longitudinally along the arch guide rail 1 to the next R after this lateral shotcrete area. i >a's lateral shotcrete area;
[0081] S9. With the repeated cycles of the shotcrete process, the b value will become larger and larger, that is, the number of transverse shotcrete areas with shotcrete thickness meeting the standard will increase, but the number of transverse shotcrete areas with shotcrete thickness meeting the standard will not be greater than c; when b / c>d, d is the set shotcrete completion progress value, that is, the entire tunnel is considered to be shotcrete-completed, and the shotcrete path real-time planning system issues a stop command to the four motors and the nozzle.
[0082] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.
Claims
1. A grouting method of a fully automatic intelligent tunnel wet spraying vehicle with machine vision, which is used to realize automatic unmanned grouting and detect the grouting thickness in real time, characterized in that: The fully automatic intelligent tunnel wet spraying vehicle with machine vision includes: a real-time detection machine vision system for spraying thickness, a real-time planning system for the nozzle path, and a wet spraying execution component; wherein: The machine vision system for real-time detection of shotcrete thickness is used to detect the concrete thickness value of the shotcrete area in real time; The real-time planning system for the nozzle path is connected to the real-time detection machine vision system for the shotcrete thickness to control the wet shotcrete actuator to perform "S"-shaped path shotcrete. At the same time, it receives the concrete thickness value of the current shotcrete area transmitted by the real-time detection machine vision system for the shotcrete thickness in real time, and optimizes the shotcrete path of the wet shotcrete actuator in the next cycle of shotcrete according to the thickness value signal. The wet spraying execution component is connected to the nozzle path real-time planning system and is used to execute the spraying path optimized by the nozzle path real-time planning system; The real-time detection machine vision system for the shotcrete thickness comprises an industrial camera (14), a laser (13), an image acquisition system, and an image processing system; the industrial camera (14) and the laser (13) are both arranged on the wet shotcrete mobile device (3); the image acquisition system is used to control the industrial camera (14) to acquire laser bar information and transmit it to the image processing system in real time; the image processing system is used to receive the laser bar information transmitted by the image acquisition system in real time, process the laser bar information, and analyze in real time whether the concrete thickness value of the shotcrete area meets the standard; The wet spraying execution component comprises an industrial trolley, an arch-type guide rail (1) arranged on the industrial trolley, a travel guide rail (2), a wet spraying moving device (3), a spray head assembly, and an arch propulsion device; wherein: The arch-type guide rail (1) is hinged on the travel guide rail (2), and the travel guide rail (2) is horizontally arranged on both sides of the industrial trolley and is welded and fixed to the trolley body; The wet spraying moving device (3) is provided with a wet spraying telescopic arm (15), a wet spraying rotating support (10), a camera protection device (24), a camera support (11) and a laser support (12) from top to bottom, wherein the upper part of the wet spraying rotating support (10) carries the wet spraying telescopic arm (15), and the lower lead screw (9) runs through it. The wet spraying moving device (3) is also provided with a first motor (7a) and a second motor (7b) at both ends, which are firmly connected to the lead screw (9) through a coupling to provide power for the lateral movement of the wet spraying rotating support (10) and the spray head within the length range of the lead screw (9); the camera protection device (24) is provided with a camera support (11) and a laser support (12) from top to bottom, wherein the upper part of the wet spraying rotating support (10) carries the wet spraying telescopic arm (15), and the lower lead screw (9) runs through it. A protective device (24) is arranged on the industrial camera (14) to prevent the rebounded concrete slag from contaminating the camera during the spraying process; the wet spraying moving device (3) is connected to the arch-type guide rail (1) through a gear device (26), and moves longitudinally along the guide rail through the gears in the gear device (26) under the action of the fifth motor (8a) and the sixth motor (8b); the fifth motor (8a) and the sixth motor (8b) are connected to the two ends of the wet spraying moving device (3) through bolts, and a reducer is arranged at the output shaft of the fifth motor (8a) and the sixth motor (8b) as a power protection device; The nozzle assembly comprises a nozzle fixing bracket (16) and a nozzle (17) arranged on the nozzle fixing bracket (16); the nozzle fixing bracket (16) is arranged at the front end of the wet spray telescopic arm bracket (15); the telescopic arm can move closer to or away from the tunnel wall through the telescopic movement; the nozzle (17) located on the nozzle fixing bracket (16) can adjust the spraying angle of the nozzle (17) by adjusting the knob on the bracket; The arch propulsion device comprises a third motor (5a), a fourth motor (5b), a hydraulic pump station, a lifting cylinder (4) and an oil pipe. The hydraulic pump station provides power for the hydraulic system. The lifting cylinder (4) is connected to the arch guide rail (1). Under the telescopic action of the lifting cylinder (4), the arch guide rail (1) is pushed along the travel guide rail (2) to push the arch guide rail (1) under the surface to be sprayed. The spraying method of the fully automatic intelligent tunnel wet spraying vehicle with machine vision comprises the following steps: S1, after the real-time planning system for the spraying path issues a spraying instruction, the first motor (7a) and the second motor (7b) start to work, so that the spray head (17) moves horizontally along the direction of the lead screw (9) to spray; at this time, the laser line projected by the laser (13) is located below the area of the horizontal movement spraying that has just been completed; S2, after the lateral spraying is completed based on step S1, the fifth motor (8a) and the sixth motor (8b) start to work, so as to realize the longitudinal movement of the wet spraying moving device (3) as a whole along the direction of the arch-type guide rail (1). Since both the industrial camera (14) and the laser (13) are located on the wet spraying moving device (3), the laser line projected by the laser (13) is located in the lateral spraying area just completed at this time; S3, after the overall longitudinal movement of the spraying moving device (3) is completed based on step S2, the spraying path real-time planning system sends a stop command to the motor, at which time the first motor (7a), the second motor (7b), the fifth motor (8a) and the sixth motor (8b) are all in a stopped state, and the stopped state lasts for 1 second; during this stopped state, the image acquisition system controls the industrial camera (14) to take pictures of the spraying area with the laser strip, that is, the lateral movement spraying area just completed in step S1; S4, the image acquisition system transmits the shotcrete area image with laser stripe information to the image processing system, and processes and analyzes the image information; the center point of the laser stripe is extracted by Steger algorithm, and then the center point is fitted with a straight line by the least square method, and the fitting root mean square error is used as the representative value of the shotcrete thickness; S5, the image processing system feeds back the processing results to the real-time planning system of the shotcrete path in real time. At this time, the real-time planning system of the shotcrete path sets the threshold a of the root mean square error. When the fitting root mean square error R transmitted by the image processing system i When ≤a, it is determined that the shotcrete thickness in this area has reached the requirement; S6, after completing step S3, i.e., the photographing and taking of images in the stop state is completed, and steps S1-S5 are continued to be repeated. During the repetition, the nozzle sprays grout from one side of the tunnel arch surface to the other side of the arch surface along an "S"-shaped path, completing one round of spraying of the entire arch surface; the repetition process is manual teaching spraying, and when the nozzle (17) completes the spraying of the other side of the arch surface, the worker manually stops the spraying; S7, after the nozzle (17) completes the grouting of the tunnel arch surface once, the nozzle path real-time planning system will record the total number of lateral grouting times c performed by the nozzle (17) during the repeated process, that is, indirectly divide the entire tunnel working wall surface into c equal parts based on the lateral grouting area; S8, after the nozzle (17) repeats steps S1-S5 several times, when a lateral movement spraying area has a spraying thickness value that meets the standard, the RMS value of the fitting error obtained in this lateral movement spraying area is R i When ≤a, the real-time planning system of the shotcrete path records the position of the completed area as "Horizontal i" and records the number of the completed horizontal movement shotcrete areas, which is b; when the steps S1-S5 are repeated for the next time, after the horizontal movement shotcrete area before this horizontal movement shotcrete area is completed, the nozzle (17) will not perform the horizontal movement shotcrete of this area, but will directly move longitudinally along the arch guide rail (1) to the next R after this horizontal movement shotcrete area. i >a's lateral shotcrete area; S9. With the repeated cycles of the shotcrete process, the b value will become larger and larger, that is, the number of transverse shotcrete areas with shotcrete thickness meeting the standard will increase, but the number of transverse shotcrete areas with shotcrete thickness meeting the standard will not be greater than c; when b / c>d, d is the set shotcrete completion progress value, that is, the entire tunnel is considered to be shotcrete-completed, and the shotcrete path real-time planning system issues a stop command to the four motors and the sprinkler.
2. The grouting method of a fully automatic intelligent tunnel wet spraying vehicle with machine vision according to claim 1 is characterized in that: The industrial camera (14) and the laser (13) are respectively arranged on a camera support (11) and a laser support (12), and the laser support (12) and the camera support (11) are both provided with knobs, so that the angle between the light plane projected by the laser (13) and the optical axis of the camera (14) can be adjusted, and the laser bar emitted by the laser (13) is simultaneously projected onto the two steel arches and the intermediate grouting area between the two steel arches.
3. The grouting method of a fully automatic intelligent tunnel wet spraying vehicle with machine vision according to claim 1 is characterized in that: The travel guide rails (2) are two straight steel structure guide rails, on which track grooves are arranged, and the arch-type guide rails (1) are connected via a sliding hinge support (25).
4. The grouting method of a fully automatic intelligent tunnel wet spraying vehicle with machine vision according to claim 1 is characterized in that: The arch-type guide rail (1) is composed of three arch-shaped steel structure guide rails, namely a first arch-shaped guide rail (1a), a second arch-shaped guide rail (1b) and a third arch-shaped guide rail (1c); the three arch-shaped steel structure guide rails are respectively hinged to the travel guide rail (2) through six sets of sliding hinge supports (25); wherein: A third motor (5a) and a fourth motor (5b) are provided at the sliding hinge support (25) connected to the second arched guide rail (1b). When the third motor (5a) and the fourth motor (5b) are in operation, they directly drive the pulley on the sliding hinge support (25) to achieve the movement of the second arched guide rail (1b) between the first arched guide rail (1a) and the third arched guide rail (1c).
5. The grouting method of a fully automatic intelligent tunnel wet spraying vehicle with machine vision according to claim 1, characterized in that: The industrial trolley is divided into two areas, the area before the front of the vehicle (23) is the spraying work area, and the area after the front of the vehicle (23) is the main equipment area; during the spraying operation, the arch-type guide rail (1) and the equipment structure thereon are located in the spraying work area in front of the vehicle body, and other main equipment is located in the main equipment area behind the vehicle body, so as to prevent rebound concrete from falling onto the main equipment.