By arranging U-shaped anchoring steel bars and corrugated keyways between the piers and the cap, combined with the post-cast layer of ultra-high-performance cement-based composite materials, the existing technology's problem of insufficient seismic performance of the bridge pier connections in medium and high seismic areas is solved, achieving This improves the overall performance of the bridge pier and facilitates construction.

CN115262371BActive Publication Date: 2024-10-25CHONGQING UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210959666.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-08-11
Publication Date
2024-10-25
Estimated Expiration
2042-08-11

AI Technical Summary

Technical Problem

The existing prefabricated assembled bridge pier connection form cannot effectively guarantee the seismic performance of the bridge in medium and high seismic areas. In particular, the connection between the prefabricated pier columns and the cap is insufficient in seismic resistance.

Method used

The prefabricated concrete pier-cap connection structure is adopted. U-shaped anchoring steel bars and corrugated keyways are set between the prefabricated pier columns and the cap, combined with the post-cast layer of ultra-high-performance cement-based composite materials to enhance the connection performance and Through formwork fixing and vibration pouring in the construction method, the materials are dense and the connections are tight.

Benefits of technology

Without increasing construction accuracy requirements, it significantly improves the overall performance and seismic performance of the bridge pier, ensuring the connection performance between the prefabricated pier columns and the cap. It has a simple structure and convenient construction, and is suitable for applications in medium and high seismic areas.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115262371B_ABST
    Figure CN115262371B_ABST
Patent Text Reader

Abstract

The present invention discloses a prefabricated assembled concrete pier-cap connection structure, which belongs to the technical field of bridge engineering, and comprises: a prefabricated pier column, a prefabricated cap and a corrugated keyway; the prefabricated cap is provided with a slot hole, the inner wall of the slot hole is provided with a corrugated keyway, the lower part of the prefabricated pier column is provided with the corrugated keyway, the lower end of the prefabricated pier column is inserted and installed in the slot hole, and the U-shaped anchor steel bar is arranged at the lower part of the prefabricated pier column; the slot hole of the prefabricated cap is provided with a tooth groove matched with the U-shaped anchor steel bar. The present invention can enhance the connection performance between the prefabricated pier column and the prefabricated cap without increasing the construction accuracy requirement, has a simple structure and is convenient to construct, so that the overall performance of the pier is good and the seismic performance is excellent.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of bridge engineering, and more specifically relates to a prefabricated assembled concrete bridge pier socket connection structure. Background Art

[0002] With the rapid economic development, the demand for road traffic is increasing. The on-site cast-in-place bridge construction method not only hinders traffic for a long time, but also causes great environmental pollution, high labor costs, and difficult to control construction quality. Prefabrication technology has fast construction speed and low urban pollution, and has been highly valued by the engineering and academic circles in recent years.

[0003] Due to the limitation of seismic performance requirements, prefabrication and assembly technology is mainly used in superstructures in bridge engineering, and is rarely used in substructures. For bridge piers in the substructure, the connection between nodes, especially the connection between prefabricated pier columns and caps, is the key to ensuring the seismic performance of bridges. The existing prefabricated pier connection form is suitable for low-seismic areas. When used in medium- and high-seismic areas, the seismic performance of the structure cannot be effectively guaranteed.

[0004] Ultra-high performance cement-based composites are a common name for ultra-high performance concrete, high ductility cement-based composites and other materials. They have the advantages of high tensile strength, good ductility, and excellent fatigue resistance. Ultra-high performance cement-based composites have strain hardening characteristics after the tensile cracking process, and they do not stop working after cracking. Under the action of seismic loads, this characteristic can ensure that the surrounding of the main steel bars will not peel off, and then the protector itself will not fail under compressive buckling.

[0005] In view of the above-mentioned problems, it is necessary to develop a prefabricated assembled concrete pier socket connection structure that uses ultra-high performance cement-based composite materials for assembly and lifting. Summary of the invention

[0006] In view of this, the present invention provides a prefabricated assembled concrete pier-capping platform connection structure, which has the advantages of simple structure and convenient construction, so that the overall performance of the pier is good and the seismic performance is excellent. It can enhance the connection performance between the prefabricated pier column and the prefabricated capping platform without increasing the construction accuracy requirements.

[0007] In order to achieve the above object, the present invention adopts the following technical solution:

[0008] A prefabricated assembled concrete bridge pier-cap connection structure, comprising: a prefabricated pier column, a prefabricated cap and a U-shaped anchoring steel bar; the prefabricated cap is provided with a slot hole, the inner wall of the slot hole is provided with a corrugated keyway, the lower part of the prefabricated pier column is provided with the corrugated keyway, the lower end of the prefabricated pier column is inserted and installed in the slot hole, and the U-shaped anchoring steel bar is arranged at the lower part of the prefabricated pier column; the slot hole of the prefabricated cap is provided with a tooth groove matching the U-shaped anchoring steel bar.

[0009] Furthermore, the gap between the slot and the prefabricated pier and the corrugated keyway at the lower part of the prefabricated pier are filled with ultra-high performance cement-based composite materials to form an ultra-high performance cement-based composite material post-casting layer.

[0010] Furthermore, the ultra-high performance cement-based composite material post-cast layer is formed by fixing and casting the ultra-high performance cement-based composite material at the corrugated keyway at the lower part of the prefabricated pier column through a post-cast layer template.

[0011] Furthermore, the number of teeth of the tooth groove is the same as the number of rows of the U-shaped anchor steel bars.

[0012] Furthermore, the construction method comprises the following steps:

[0013] a. When tying the prefabricated pier column reinforcement cage, tie the U-shaped anchor reinforcement to the prefabricated pier column reinforcement cage. The number of U-shaped anchor reinforcement can be adjusted according to the actual project;

[0014] b. Install and position the prefabricated pier column formwork, where the inner diameter of the corrugated keyway formwork at the bottom of the prefabricated pier column is smaller than the inner diameter of the formwork at the top of the prefabricated pier column, and the outer diameter of the part with the corrugated keyway after pouring is slightly smaller than the top of the prefabricated pier column;

[0015] c. Fabrication of prefabricated caps, tying of prefabricated cap reinforcement cages, installation of inner toothed formwork that matches the U-shaped anchor reinforcement, installation of outer formwork, positioning, pouring of concrete, and curing;

[0016] d. Transport the cured prefabricated caps and prefabricated piers to the site. Prevent debris from falling into the slots during the process. After arriving at the site, insert the prefabricated piers into the slots first, ensuring that the U-shaped anchor steel bars are in the middle of the slots and do not touch the inner wall of the slots;

[0017] e. Pour the mixed ultra-high performance cement-based composite material into the slots and the pores of the prefabricated piers. After the pouring is completed, install the post-casting layer template of the prefabricated piers, and continue to pour the ultra-high performance cement-based composite material from the pouring port reserved between the prefabricated piers and the post-casting layer template. After the pouring is completed, remove the post-casting layer template after the ultra-high performance cement-based composite material solidifies, and the construction is completed.

[0018] Furthermore, the ultra-high performance cement-based composite material is continuously poured from the pouring port reserved between the prefabricated pier column and the post-casting layer formwork. During the process, the post-casting layer formwork is vibrated to make the pouring material compact and ensure that the pouring material is tightly combined with the prefabricated bridge pier.

[0019] Beneficial effects of the present invention:

[0020] Based on the stress characteristics of precast piers that energy is mainly dissipated in the plastic hinge zone under earthquake action, the high-performance concrete grouting material used to connect the precast piers and precast caps is extended upward and covered to the plastic hinge zone of the precast pier body, so that the overall performance of the pier is good and the seismic performance is excellent; the U-shaped anchor steel bars at the bottom of the precast pier and the teeth in the slot can enhance the connection performance between the precast pier and the precast cap without increasing the construction accuracy requirements, with a simple structure and convenient construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying creative work.

[0022] Figure 1 It is a schematic diagram of the connection structure of the socket-and-spigot type prefabricated assembled bridge piers of the present invention.

[0023] Figure 2 This is a schematic diagram of the prefabricated pier column of the present invention entering the prefabricated cap.

[0024] Figure 3 It is a schematic diagram of filling the ultra-high performance cement-based composite material in the gap between the corrugated keyway and the prefabricated pier column of the present invention.

[0025] Figure 4 It is a schematic diagram of setting up the post-casting layer formwork according to the present invention.

[0026] Figure 5 It is a schematic diagram of the filling completion of the present invention.

[0027] Figure 6 This is the AA cross-sectional view of the socket-and-spigot prefabricated assembled bridge pier of the present invention.

[0028] Among them, in the figure:

[0029] 1- Prefabricated pier; 2- Prefabricated cap; 3- U-shaped anchor steel bar; 4- Corrugated keyway; 5- Ultra-high performance cement-based composite material post-casting layer; 6- Tooth groove; 7- Post-casting layer formwork; 8- Slot hole. DETAILED DESCRIPTION

[0030] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0031] Please refer to the attached Figure 1-6 The present invention provides a prefabricated assembled concrete bridge pier-cap connection structure, including: a prefabricated pier column 1, a prefabricated cap 2, a U-shaped anchor steel bar 3, a corrugated keyway 4, an ultra-high performance cement-based composite material post-casting layer 5, a tooth groove 6, a post-casting layer template 7, and a slot 8.

[0032] The prefabricated cap 2 is provided with a slot 8, and the surface of the slot 8 is provided with a corrugated keyway 4. The lower part of the prefabricated pier 1 is provided with the corrugated keyway 4, and the corrugated keyway 4 can increase the interface strength between the prefabricated pier 1 and the prefabricated cap 2 and the post-cast layer 5 of the ultra-high performance cement-based composite material, and improve the pull-out resistance and connection performance of the connection node. The lower end of the prefabricated pier 1 is inserted and installed in the slot 8, and the U-shaped anchor steel bar 3 is arranged at the lower part of the prefabricated pier 1; the slot 8 of the prefabricated cap 2 is provided with a tooth groove 6 that cooperates with the U-shaped anchor steel bar 3, and the number of teeth in the tooth groove 6 is the same as the number of rows of the U-shaped anchor steel bar 3. The design of the tooth groove 6 and the U-shaped anchor steel bar 3 at the lower part of the prefabricated pier 1 can improve the connection performance between the prefabricated bridge pier 1 and the prefabricated cap 2 without significantly increasing the amount of on-site casting, and the structure is safer and more reliable. Ultra-high performance cement-based composite materials are poured into the gaps between the prefabricated piers 1 and the corrugated key grooves 4 at the bottom of the prefabricated piers 1 to form an ultra-high performance cement-based composite material post-casting layer 5. The ultra-high performance cement-based composite material post-casting layer 5 is formed by fixing and casting the ultra-high performance cement-based composite material at the corrugated key grooves 4 at the bottom of the prefabricated piers 1 through a post-casting layer template 7. The ultra-high performance cement-based composite material post-casting layer 5 is used for both the connection node between the prefabricated pier 1 and the prefabricated cap 2 and the plastic hinge area of ​​the prefabricated pier 1. The high-performance concrete grouting material post-casting layers in the two areas are connected as a whole, thereby improving the integrity of the prefabricated assembled piers. The outer edge of the ultra-high performance cement-based composite material post-casting layer 5 can be flush with the upper surface of the prefabricated pier 1, making the appearance beautiful. It can also wrap the upper part of the prefabricated pier 1, so that the interface performance between the prefabricated pier 1 and the ultra-high performance cement-based composite material post-casting layer 5 is better, and casting is more convenient.

[0033] The construction method includes the following steps:

[0034] a. While tying the prefabricated pier 1 steel cage, tie the U-shaped anchor steel bar 3 to the prefabricated pier 1 steel cage to ensure a reliable connection between the U-shaped anchor steel bar 3 and the prefabricated pier 1. The number of U-shaped anchor steel bars 3 can be adjusted according to the actual project;

[0035] b. Install and position the template of the prefabricated pier 1, wherein the inner diameter of the template of the corrugated keyway 4 at the bottom of the prefabricated pier 1 is smaller than the inner diameter of the template at the top of the prefabricated pier 1. After the pouring is completed, the outer diameter of the part with the corrugated keyway 4 is slightly smaller than the top of the prefabricated pier 1, so as to facilitate the subsequent pouring of the ultra-high performance cement-based composite material post-casting layer 5;

[0036] c. Production of prefabricated cap 2, tying prefabricated cap 2 steel cage, installing the inner template of the tooth groove 6 that cooperates with the U-shaped anchor steel bar, the number of teeth in the inner template of the tooth groove 6 is adjusted according to the actual project and is consistent with the number of columns of the U-shaped anchor steel bar 3, and the outer template is installed and positioned, and then the concrete is poured and cured;

[0037] d. Transport the cured prefabricated cap 2 and prefabricated pier 1 to the site, and prevent debris from falling into the slot 8 during the process. After arriving at the site, first insert the prefabricated pier 1 into the slot 8, and ensure that the U-shaped anchor steel bar 3 is in the middle of the slot 8 and does not contact the inner wall of the slot 8;

[0038] e. Pour the mixed ultra-high performance cement-based composite material into the slot 8 and the pores of the prefabricated pier 1. After the pouring is completed, install the post-casting layer template 7 of the prefabricated pier 1, and continue to pour the ultra-high performance cement-based composite material from the pouring port reserved between the prefabricated pier 1 and the post-casting layer template 7. During the process, vibrate the post-casting layer template 7 to make the pouring material dense and ensure that the pouring material is tightly combined with the prefabricated pier 1, and the construction is completed.

[0039] The invention has a simple structure and is easy to use. Based on the stress characteristic that the prefabricated pier column 1 mainly dissipates energy in the plastic hinge zone under the action of an earthquake, the high-performance concrete coated on the plastic hinge zone of the prefabricated pier column 1 and the high-performance concrete between the prefabricated pier column 1 and the prefabricated cap 2 are poured simultaneously, and the high-performance concrete grouting material used for connecting the prefabricated pier column 1 and the prefabricated cap 2 is extended upward and coated on the plastic hinge zone of the prefabricated pier column 1, thereby increasing the overall performance of the prefabricated assembled pier column structure and improving the energy dissipation capacity of the prefabricated assembled pier column structure, so that the overall performance of the bridge pier is good and the seismic performance is excellent; by The U-shaped steel bars 3 and the tooth grooves 6 in the precast pedestal 2 are arranged to enhance the connection performance between the precast pier 1 and the precast pedestal 2 without increasing the construction accuracy requirements. The structure is simple and the construction is convenient. The ultra-high performance cement-based composite material is used to pour the slots 8, and the post-casting area is extended upward to cover the plastic hinge area of ​​the precast pier 1. The advantages of high tensile strength, good ductility and strain hardening after cracking are used to improve the seismic performance of the plastic hinge area of ​​the precast pier 1. At the same time, both prefabrication and assembly and improved seismic performance are taken into account to solve the problem that the current prefabricated bridge piers are not suitable for use in high-seismic areas.

[0040] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to the above embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A prefabricated concrete pier-cap connection structure, characterized in that: include: Prefabricated pier column (1), prefabricated cap (2) and U-shaped anchor steel bar (3); The prefabricated cap (2) is provided with a slot hole (8), the inner wall of the slot hole (8) is provided with a corrugated keyway (4), the lower part of the prefabricated pier (1) is provided with the corrugated keyway (4), the lower end of the prefabricated pier (1) is inserted and installed in the slot hole (8), and the U-shaped anchoring steel bar (3) is arranged at the lower part of the prefabricated pier (1); the slot hole (8) of the prefabricated cap (2) is provided with a tooth groove (6) matching the U-shaped anchoring steel bar; The gap between the slot (8) and the prefabricated pier (1) and the corrugated keyway (4) at the bottom of the prefabricated pier (1) are filled with ultra-high performance cement-based composite material to form an ultra-high performance cement-based composite material post-casting layer (5); The ultra-high performance cement-based composite material post-casting layer (5) is located at the ultra-high performance cement-based composite material at the corrugated keyway (4) at the lower part of the prefabricated pier column (1) and is fixedly cast through a post-casting layer template (7); The number of teeth of the tooth groove (6) is the same as the number of rows of the U-shaped anchoring steel bars (3).

2. The prefabricated assembled concrete pier-cap connection structure according to claim 1, characterized in that: The construction method includes the following steps: a. While tying the prefabricated pier (1) steel cage, the U-shaped anchor steel (3) is tied to the prefabricated pier (1) steel cage. The number of U-shaped anchor steel (3) can be adjusted according to the actual project; b. Install and position the prefabricated pier (1) template, wherein the inner diameter of the corrugated keyway (4) template at the bottom of the prefabricated pier (1) is smaller than the inner diameter of the template at the top of the prefabricated pier (1), and after pouring, the outer diameter of the portion with the corrugated keyway (4) is slightly smaller than the top of the prefabricated pier (1); c. Production of prefabricated cap (2), tying prefabricated cap (2) steel cage, installing the inner formwork of the tooth groove (6) with the U-shaped anchor steel bar (3), installing the outer formwork and positioning the concrete after pouring and curing; d. The prefabricated cap (2) and prefabricated pier (1) are transported to the site after curing. During the process, debris is prevented from falling into the slot (8). After arriving at the site, the prefabricated pier (1) is first inserted into the slot (8), ensuring that the U-shaped anchor steel bar (3) is in the middle of the slot (8) and does not contact the inner wall of the slot (8); e. Pour the stirred ultra-high performance cement-based composite material into the slot (8) and the pores of the prefabricated pier (1). After the pouring is completed, install the post-casting layer template (7) of the prefabricated pier (1), and continue to pour the ultra-high performance cement-based composite material from the pouring port reserved between the prefabricated pier (1) and the post-casting layer template (7). After the pouring is completed, remove the post-casting layer template (7) after the ultra-high performance cement-based composite material solidifies, and the construction is completed.

3. The prefabricated and assembled concrete pier-cap connection structure according to claim 2, characterized in that: In step e: The ultra-high performance cement-based composite material is continuously poured from the pouring port reserved between the prefabricated pier column (1) and the post-casting layer template (7), and during the process, the post-casting layer template (7) is vibrated to make the poured material compact and ensure that the poured material is tightly combined with the prefabricated pier column (1).