Control system reliability redundancy allocation method, device and system

By improving the marginal analysis method and the active parallel redundancy strategy, the problem of early termination of iterations in the reliability redundancy allocation of the crane control system in the traditional method is solved, more efficient redundancy allocation and reliability improvement are achieved, and cost utilization is ensured. improvement.

CN115268254BActive Publication Date: 2024-10-18SPECIAL EQUIP SAFETY SUPERVISION INSPECTION INST OF JIANGSU PROVINCE +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202210932344.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-08-04
Publication Date
2024-10-18
Estimated Expiration
2042-08-04

AI Technical Summary

Technical Problem

The traditional marginal analysis method is prone to terminate the iteration early due to excess of constraint conditions when allocating reliability redundancy in the crane control system, and is unable to output the optimal redundancy allocation plan, resulting in the system not reaching the expected reliability level.

Method used

Using the improved marginal analysis method, by constructing a control system reliability redundancy allocation model, using an active parallel redundancy strategy, iterative calculations are carried out based on the marginal effects of each functional execution module to ensure that the optimal redundancy unit is selected within cost constraints and to avoid premature Terminate iteration.

Benefits of technology

It effectively improves the reliability and safe operation level of the crane control system, ensures the optimization and cost utilization of the redundant allocation scheme, avoids the defects of traditional methods, and achieves a more efficient iterative convergence process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115268254B_ABST
    Figure CN115268254B_ABST
Patent Text Reader

Abstract

The present invention discloses a control system reliability redundancy allocation method, device and system, the method includes calculating the reliability of the control system under a specified service time based on a reliability analysis model of the control system and failure rate data of each functional execution module; wherein the reliability analysis model is constructed by converting the control system into a series system composed of a number of functional execution modules in series, and for the series system; based on the reliability of the control system, a parallel active redundancy strategy is adopted to construct a control system reliability redundancy allocation model; the control system reliability redundancy allocation model is solved and calculated using an improved marginal analysis method to obtain a control system reliability redundancy allocation scheme. The present invention adopts an active redundancy strategy to perform a trade-off analysis on the reliability-cost of the control system, and can efficiently and accurately allocate reliability redundancy to the control system, effectively improving the reliability and safety operation level.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of reliability analysis and optimization design of lifting machinery, and specifically relates to a control system reliability redundancy allocation method, device and system, and in particular to a crane control system reliability redundancy allocation method, device and system based on an improved marginal analysis method. Background Art

[0002] As lifting machinery gradually develops towards large-scale, high-speed and intelligent directions, the load conditions of cranes are becoming more and more demanding, the system complexity is becoming higher and higher, and the operating speed is also greatly improved. High load, high frequency and high-speed operation will inevitably bring considerable challenges to the reliable operation and safety supervision of cranes. The crane control system is a core large and complex system that controls the normal operation of the crane. It has the functions of providing electrical energy for the power output of the entire crane, providing safety protection for the operation of the entire equipment, controlling the various working mechanisms of the crane including lifting, operation, lowering and returning to the original position, and other equipment and devices. Therefore, it is very necessary to carry out reliability optimization design of the crane control system to improve the reliability and safe operation level of the crane.

[0003] The reliability redundancy allocation problem (RRAP) is a classic problem in modern industrial reliability optimization design. When derating, simplification and replacement of components with higher reliability cannot effectively improve the reliability of the system or the desired reliability level cannot be achieved through the inherent design of the components, redundancy allocation becomes the only way to improve the reliability of the system. At present, the relevant research on the reliability redundancy allocation method of crane control systems in China is relatively limited, and redundancy allocation often generates additional redundancy costs and increases in system complexity, weight, size, maintenance items and preventive maintenance items. Therefore, when allocating redundancy to crane control systems, it is necessary to perform a trade-off analysis on the reliability-constraint conditions of the control system to determine the optimal combination of the selected units and redundancy levels.

[0004] Marginal analysis is a common method for allocating system reliability redundancy to hot reserve units. This method mainly weighs the system reliability-constraint conditions by calculating the marginal effect of each unit. However, the traditional marginal analysis method has the defect of terminating the iteration early when solving the reliability redundancy allocation problem. Based on the principle of maximum marginal effect priority, the marginal analysis method uses the unit with the maximum marginal effect as the redundant unit of the iteration. When the system parameters exceed the constraints, the calculation will be terminated immediately, and the result of the previous iteration will be output as the redundant allocation plan. This defect causes the system to terminate the iterative calculation early before reaching the constraint boundary, making it impossible to output the optimal redundant allocation plan. Summary of the invention

[0005] In view of the above problems, the present invention proposes a control system reliability redundancy allocation method, device and system, which adopts an active redundancy strategy to perform a reliability-cost trade-off analysis on the control system, and can efficiently and accurately allocate reliability redundancy to control systems (such as the control systems of large lifting machinery), effectively improving the reliability and safe operation level of the control system.

[0006] In order to achieve the above technical objectives and the above technical effects, the present invention is implemented through the following technical solutions:

[0007] In a first aspect, the present invention provides a control system reliability redundancy allocation method, comprising:

[0008] Based on the reliability analysis model of the control system and the failure rate data of each functional execution module, the reliability of the control system under the specified service time is calculated; wherein the reliability analysis model is constructed by converting the control system into a series system composed of a plurality of functional execution modules connected in series and targeting the series system;

[0009] Based on the reliability of the control system, a parallel active redundancy strategy is adopted to construct a control system reliability redundancy allocation model;

[0010] The control system reliability redundancy allocation model is solved and calculated using an improved marginal analysis method to obtain a control system reliability redundancy allocation scheme.

[0011] Optionally, the conversion method of the series system includes:

[0012] The control system is analyzed for its functional principles and divided into structural levels, and the control system is converted into a series system consisting of multiple functional execution modules. The normal operation of the control system requires the joint cooperation and coordination of each functional execution module. If any functional execution module fails, the control system will not be able to complete the established function.

[0013] Optionally, the method for calculating the reliability of the control system includes:

[0014] Obtain failure rate data of each electronic component in the control system;

[0015] Using stress analysis method, the estimated failure rate of each electronic component is calculated by correcting the historical statistical data and expert opinions;

[0016] The reliability, failure rate and mean time between failures of the control system under the specified service time are calculated using the exponential distribution system reliability analysis method.

[0017] Optionally, the calculation formula of the reliability is:

[0018]

[0019] The calculation formula of the failure rate is:

[0020]

[0021] The calculation formula of the mean time between failures is:

[0022]

[0023] Among them, R s (t) is the reliability of the control system; R s (t s ) is the control system at t s Reliability of time; R i (t i ) is the i-th function execution module at t i Reliability of the moment; i is the failure rate of the ith function execution module; t s ,t i are the working time of the control system and the i-th function execution module respectively; λ is the failure rate of the control system; MTBF is the mean time between failures of the control system.

[0024] Optionally, the method for constructing the control system reliability redundancy allocation model includes:

[0025] Taking the control system reliability as input, adopting the active parallel redundancy strategy, taking the maximization of control system reliability as the optimization goal and the available cost budget as the constraint condition, a control system reliability redundancy allocation model is constructed.

[0026] Optionally, the control system reliability redundancy allocation model is expressed as:

[0027]

[0028]

[0029] Where B is the available budget cost; c i is the unit cost of the i-th function execution module; n i is the redundant decision variable of the i-th function execution module, R i (t i ) is the i-th function execution module at t i Reliability at all times.

[0030] Optionally, the calculation method of the control system reliability redundancy allocation scheme includes:

[0031] Input the reliability R of each functional execution module in the control system into the control system reliability redundancy allocation model i (t i ), cost c i , available budget cost B;

[0032] Calculate the marginal effect Δ of each functional execution module i , and the reliability-cost trade-off analysis of the control system is carried out to obtain the reliability redundancy allocation scheme of the control system. The marginal effect Δ i It represents the logarithmic growth value of reliability caused by the unit cost investment in the i-th functional execution module.

[0033] Optionally, the method for obtaining the control system reliability redundancy allocation scheme includes:

[0034] (1) Calculate the marginal effect Δ of each functional execution module i , i = 1, 2, ..., m; the marginal effect Δ i The calculation formula is:

[0035] In the formula, c i R is the unit cost of the i-th function execution module; i (t i ) is the reliability of the i-th function execution module when the service time is t; n i is the number of primary and standby redundancy of the i-th function execution module; the initial number of each function execution module is n i =0, i=1,2,...,m,m k is the iteration termination judgment parameter, set its initial value to 0, c is the cumulative cost, set its initial value to 0;

[0036] (2) Find the function module k with the largest marginal effect in the current iteration. The marginal effect of this function module is Δ k , the parallel redundant quantity of this module is n k The cost is c k ;

[0037] (3) Calculate the cumulative cost c, which is equal to the sum of the cumulative cost of the previous iteration and the cost of the redundant unit selected in the current iteration, that is, c = c + c k ;

[0038] (4) If the cost meets the available budget cost B of the redundant allocation, the parallel redundant quantity of the functional module is increased by 1, and the maximum marginal effect Δ is recalculated. k , and return to step (2), otherwise execute steps (5) to (6);

[0039] (5) Let the original maximum marginal effect value Δ k =0, and find the new maximum marginal effect value, let Δ k =max{Δ1,Δ2,…,Δ k-1 ,0,Δ k+1 ,…,Δ m}, iterative termination judgment parameter m k =m k +1;

[0040] (6) If mm k ≥1, return to step (4); if mm k <1, terminate the iteration and output the redundancy allocation scheme, which is the number of primary and standby redundancies of each function execution module n1, n2, ..., n m .

[0041] In a second aspect, the present invention provides a control system reliability redundancy allocation device, comprising:

[0042] A calculation module, used for calculating the reliability of the control system under a specified service time based on the reliability analysis model of the control system and the failure rate data of each functional execution module; wherein the reliability analysis model is constructed by converting the control system into a series system composed of a plurality of functional execution modules connected in series and targeting the series system;

[0043] A construction module is used to construct a control system reliability redundancy allocation model based on the control system reliability by adopting a parallel active redundancy strategy;

[0044] The solution module is used to solve and calculate the control system reliability redundancy allocation model by using an improved marginal analysis method to obtain a control system reliability redundancy allocation plan.

[0045] In a third aspect, the present invention provides a control system reliability redundancy allocation system, characterized in that: it includes a storage medium and a processor;

[0046] The storage medium is used to store instructions;

[0047] The processor is configured to operate according to the instructions to execute the steps of the method according to any one of the first aspects.

[0048] Compared with the prior art, the present invention has the following beneficial effects:

[0049] The present invention provides a control system reliability optimization method, device and system based on the improved marginal analysis method. During the iterative calculation process, when the function execution module with the maximum marginal effect value is selected as the redundant unit and the constraint condition is not satisfied, the improved marginal analysis method can still complete the iterative calculation according to the maximum marginal effect priority principle and select the redundant unit that satisfies the constraint condition, which effectively avoids the defect of the traditional marginal analysis method in solving the reliability redundancy allocation problem, that is, the budget is not fully utilized and the iteration is terminated in advance, thereby failing to output the optimal solution. After comparative analysis of the method performance, it is known that when solving the reliability redundancy allocation problem, the improved marginal analysis method proposed by the present invention has a better iterative convergence process than the traditional marginal analysis method, and successfully avoids the above-mentioned defects of the traditional marginal analysis method, which can provide scientific guidance for the design of control system redundancy schemes and reliability growth. BRIEF DESCRIPTION OF THE DRAWINGS

[0050] In order to make the content of the present invention more clearly understood, the present invention is further described in detail below based on specific embodiments and in conjunction with the accompanying drawings, wherein:

[0051] Figure 1 A flow chart of a control system reliability redundancy optimization allocation method provided by an embodiment of the present invention;

[0052] Figure 2 A reliability block diagram of a certain type of metallurgical bridge crane control system provided by an embodiment of the present invention;

[0053] Figure 3 An RRAP model based on an active parallel redundancy strategy provided by an embodiment of the present invention;

[0054] Figure 4 A flow chart of an improved marginal analysis method provided for one embodiment of the present invention;

[0055] Figure 5 An improved marginal analysis method iterative convergence curve provided by an embodiment of the present invention;

[0056] Figure 6 A comparison and analysis curve of reliability parameters of a redundant system provided by an embodiment of the present invention;

[0057] Figure 7 A budget cost utilization comparison analysis curve provided for an embodiment of the present invention. DETAILED DESCRIPTION

[0058] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the scope of protection of the present invention.

[0059] The application principle of the present invention is described in detail below in conjunction with the accompanying drawings.

[0060] Example 1

[0061] The present invention provides a control system reliability redundancy allocation method, which specifically comprises the following steps:

[0062] Step (1) based on the reliability analysis model of the control system and the failure rate data of each functional execution module, the reliability of the control system under the specified service time is calculated; wherein the reliability analysis model is constructed by converting the control system into a series system composed of a plurality of functional execution modules connected in series and targeting the series system;

[0063] Step (ii) based on the reliability of the control system, adopting a parallel active redundancy strategy to construct a control system reliability redundancy allocation model;

[0064] Step (iii) using an improved marginal analysis method to solve and calculate the control system reliability redundancy allocation model to obtain a control system reliability redundancy allocation scheme;

[0065] Step (iv) outputs the control system reliability redundancy allocation scheme to control the control system. The specific output parameters include: the number of primary and standby redundancy of each functional execution module n1, n2, ..., n i , control system optimization reliability Mean time between failures (MTBF) and the cost (c), where: c i is the unit cost of the i-th function execution module, and the initial number of each function execution module is n i =0, i=1,2,...,m.

[0066] For example, in the embodiment of the present invention, a control system of a large domestic metallurgical bridge crane is taken as a research object, an active parallel redundancy strategy is adopted, and system reliability redundancy is allocated based on the improved marginal analysis method.

[0067] The reliability redundancy allocation method for a control system applicable to a crane provided in an embodiment of the present invention has a process as follows: Figure 1 As shown, the specific steps include:

[0068] S10: Analyze the functional principles and structural levels of the crane control system, build a reliability analysis model for the control system, and calculate the reliability of the control system within the specified service time by using the exponential distribution system reliability analysis method and combining the failure rate data of each functional execution module.

[0069] In the specific implementation process, the functional principle analysis and structural hierarchy division of the control system are specifically: the control system is regarded as a series system composed of multiple subsystems or functional execution modules, that is, the normal operation of the control system requires the joint cooperation and coordination of each functional execution module (or subsystem). If any functional execution module fails, the control system will not be able to complete the established function.

[0070] For example, the control system of a certain type of metallurgical bridge crane is divided into 8 subsystems (auxiliary electrical control subsystem, power supply control subsystem, 180t lifting mechanism control subsystem, 32t lifting mechanism control subsystem, 10t lifting mechanism control subsystem, car running mechanism control subsystem, main trolley running mechanism control subsystem and auxiliary trolley running mechanism control subsystem), including 15 functional execution modules (auxiliary electrical control subsystem, power supply system, power supply control system, main circuit, contact relay control circuit, main circuit, contact relay control circuit, main circuit, contact relay control circuit, main circuit, PLC control circuit, main circuit, PLC control circuit, main circuit, PLC control circuit). Based on the above analysis, the reliability block diagram of the control system is constructed as follows: Figure 2 shown.

[0071] Combined with the failure rate data of each functional execution module, the reliability quantitative analysis of the control system includes: referring to the failure rate data of each electronic component in the electronic equipment reliability prediction manual, using the stress analysis method, and calculating the expected failure rate of each electronic component through historical statistical data and expert opinions, and using the exponential distribution system reliability analysis method to calculate the reliability R of the control system under the specified service time. s (t s ), failure rate λ and mean time between failures MTBF. The mathematical model of exponential distribution series system reliability is as follows:

[0072]

[0073]

[0074]

[0075] In the formula, λ i is the failure rate of the ith function execution module; R s (t s ) is the reliability of the control system at time ts; R i (t i ) is the unit i at t i Reliability at time; t s ,t iare the working time of the control system and the i-th function execution module respectively.

[0076] The reliability parameters of each function execution module and control system of a certain type of metallurgical bridge crane control system are obtained by analyzing the exponential distribution series system reliability mathematical model as shown in Table 1:

[0077] Table 1 Reliability parameters of crane control system function execution module

[0078]

[0079] S20: Based on the above reliability analysis results of the crane control system, an active parallel redundancy strategy is adopted to establish a control system reliability redundancy allocation model;

[0080] When establishing the crane control system redundancy allocation model, the present invention first makes the following assumptions about the control system:

[0081] (1) When a function execution module in the control system fails, its redundant spare part will replace it to complete the specified function, and the switching time is not counted;

[0082] (2) The functional execution modules in the control system are independent of each other, common cause failure modes are not considered, and their lifespans all obey exponential distribution;

[0083] (3) Assuming that the initial control system has no redundant allocation link, all functional execution modules are in series structure, and failure of any link will lead to system failure;

[0084] (4) The redundancy mode in the control system adopts active redundancy (hot reserve), that is, the spare parts have the same working status as the working unit.

[0085] (5) Simplify the functional execution module into an overall redundant unit without considering the impact of local redundancy and maintenance on system reliability.

[0086] (6) The working time of the control system is equal to the working time of each functional execution module, that is, t s =t i .

[0087] In the embodiment of the present invention, the reliability maximization of the control system is taken as the optimization goal, the budget cost is taken as the constraint condition, and the active parallel redundancy strategy is adopted to construct the control system reliability redundancy allocation model as follows:

[0088]

[0089]

[0090] Where B is the available budget cost; c iis the unit cost of the i-th function execution module; n i is the redundant decision variable of the i-th function execution module.

[0091] Redundancy allocation of crane control system is to find redundant decision variables n of each functional execution module that meets the cost constraint. i The optimal solution of .

[0092] The present invention adopts active parallel redundancy, which belongs to the hot standby redundancy strategy. In the active parallel redundancy system, the working unit and the standby unit are in the same working state. The RRAP model of the active parallel redundancy strategy is as follows: Figure 3 shown.

[0093] S30: In the embodiment of the present invention, the traditional marginal analysis method is improved to address the defect of terminating iteration prematurely before reaching the constraint boundary. When the redundant unit selected according to the maximum marginal effect priority principle does not meet the constraint conditions, the improved marginal analysis method can still perform subsequent iterative calculations according to the maximum marginal effect priority principle, and select redundant units with larger marginal effect values ​​and meeting the constraint conditions, thereby ensuring that the output solution is the optimal redundant allocation plan.

[0094] The reliability R of each functional execution module of the crane control system under the specified service time is known i (t s ), single machine cost c i And the available budget cost B. The specific parameters are shown in Table 2:

[0095] Table 2 Reliability redundancy allocation input parameters of crane control system

[0096]

[0097] The improved marginal analysis method is used to solve and calculate the control system reliability redundancy allocation model. The improved marginal analysis method process is as follows: Figure 4 As shown, the specific steps include:

[0098] S301: Assume that the initial number of each function execution module in the control system is n i =0, i=1,2,...,m,m k =0, let: initial cost c = 0;

[0099] S302: Calculate the marginal effect Δ of each function execution module i , i=1,2,...,m;

[0100] The improved marginal analysis method requires that the design variables are separable. In order to ensure that the optimal redundancy allocation scheme can be solved using the improved marginal analysis method, the objective function is logarithmically transformed. The transformed objective function is as follows:

[0101]

[0102] Using marginal effect Δ i It represents the logarithmic growth value of reliability caused by the unit cost investment in the i-th function execution module, and its calculation formula is as follows:

[0103]

[0104] In the formula, c i The cost of executing the module for the i-th function; R i (t i ) is the reliability of the i-th function execution module when the service time is t; n i is the number of active and standby redundancy of the i-th function execution module.

[0105] (2) Find the function module k with the largest marginal effect in the current iteration. The marginal effect of this function module is Δ k , max{Δ1,Δ2,...,Δ m}, the parallel redundancy quantity of this module is n k The cost is c k ;

[0106] (3) Calculate the cumulative cost c, which is equal to the sum of the cumulative cost of the previous iteration and the cost of the redundant unit selected in the current iteration, c = c + c k ;

[0107] (4) If the cost meets the available budget cost B of the redundant allocation, the parallel redundant quantity of the functional module is increased by 1, and the maximum marginal effect Δ is recalculated. k , and return to step (2), otherwise execute steps (5) to (6);

[0108] (5) Let the original maximum marginal effect value Δ k =0, and find the new maximum marginal effect value, let Δ k =max{Δ1,Δ2,…,Δ k-1 ,0,Δ k+1 ,…,Δ m}, iterative termination judgment parameter m k =m k +1;

[0109] (6) If mm k ≥1, return to step (4); if mm k<1, terminate the iteration and output the redundancy allocation scheme, which is the number of primary and standby redundancies of each function execution module n1, n2, ..., n m .

[0110] In the embodiment of the present invention, the reliability maximization of the control system is taken as the optimization goal, the budget cost is taken as the constraint condition, and the reliability redundancy allocation model of the crane control system is solved based on the above improved marginal analysis method. When the budget cost is 1,000,000 yuan, the number of primary and standby redundancies and the required cost of each functional execution module are shown in Table 3:

[0111] Table 3 Reliability redundancy allocation scheme for crane control system

[0112]

[0113]

[0114] Figure 5 Iteration curves are proposed to improve the marginal analysis method for solving the redundant allocation model.

[0115] S40: The number of active and standby redundancy n1, n2, ..., n based on the function execution modules of the crane control system i And its reliability data, using the reliability analysis method of series-parallel system to calculate the reliability of the control system after redundancy distribution Failure rate λ * , mean time between failures MTBF and other reliability parameters. Table 4 is a comparison of the reliability parameters of the control system after redundancy allocation based on the improved marginal analysis method and the initial system.

[0116] Table 4 Reliability parameters of crane electrical redundancy system

[0117]

[0118] After redundancy allocation, the reliability of the crane control system is Compared with the initial reliability of the system of 0.83758, it has increased by 19.337%. The required cost is 994577.1 yuan, which meets the budget cost.

[0119] The reliability parameters of the crane electrical redundancy system under different constraint costs are calculated, and compared with the solution results based on the traditional marginal analysis method. It is found that when the same redundant design cost is invested, the redundant allocation scheme solved by the improved marginal analysis method has a higher reliability level than that solved by the traditional marginal analysis method. Figure 6 This is a comparative analysis curve of redundant system reliability / mean time between failures (MTBF)-constraint cost based on the improved marginal analysis method and the traditional marginal analysis method.

[0120] The comparative analysis of the cost utilization of the improved marginal analysis method and the traditional marginal analysis method under different constraints shows that the budget cost utilization rate of the improved marginal analysis method in solving the control system redundancy allocation problem is significantly higher than that of the traditional method. The comparative analysis curve is shown in Figure 7 shown.

[0121] In the embodiment of the present invention, a crane control system is taken as the research object, a reliability redundancy allocation model is established with the control system reliability maximization as the optimization goal and the budget cost as the constraint condition, and a control system reliability redundancy allocation method based on the improved marginal analysis method is proposed. Through case calculation and comparative analysis, it is known that the proposed method realizes the reliability growth of the control system and avoids the defect of early termination of iteration in the traditional marginal analysis method when solving the redundancy allocation problem, thereby effectively improving the cost utilization rate of the redundancy allocation.

[0122] Example 2

[0123] Based on the same inventive concept as that of Embodiment 1, a control system reliability redundancy allocation device is provided in an embodiment of the present invention, comprising:

[0124] A calculation module, used for calculating the reliability of the control system under a specified service time based on the reliability analysis model of the control system and the failure rate data of each functional execution module; wherein the reliability analysis model is constructed by converting the control system into a series system composed of a plurality of functional execution modules connected in series and targeting the series system;

[0125] A construction module is used to construct a control system reliability redundancy allocation model based on the control system reliability by adopting a parallel active redundancy strategy;

[0126] The solution module is used to solve and calculate the control system reliability redundancy allocation model by using an improved marginal analysis method to obtain a control system reliability redundancy allocation plan.

[0127] The rest are the same as in Example 1.

[0128] Example 3

[0129] Based on the same inventive concept as that of embodiment 1, a control system reliability redundancy allocation system is provided in an embodiment of the present invention, characterized in that: it includes a storage medium and a processor;

[0130] The storage medium is used to store instructions;

[0131] The processor is used to operate according to the instructions to execute the steps of the method according to any one of Embodiment 1.

[0132] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.

[0133] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0134] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0135] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 A step that specifies a function in one or more boxes.

[0136] The embodiments of the present invention are described above in conjunction with the accompanying drawings, but the present invention is not limited to the above-mentioned specific implementation methods. The above-mentioned specific implementation methods are merely illustrative and not restrictive. Under the enlightenment of the present invention, ordinary technicians in this field can also make many forms without departing from the scope of protection of the purpose of the present invention and the claims, which all fall within the protection of the present invention.

[0137] The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention to be protected. The scope of protection of the present invention is defined by the attached claims and their equivalents.

Claims

1. A control system reliability redundancy allocation method, characterized in that: include: Based on the reliability analysis model of the control system and the failure rate data of each functional execution module, the reliability of the control system under the specified service time is calculated; wherein the reliability analysis model is constructed by converting the control system into a series system composed of a plurality of functional execution modules connected in series and targeting the series system; Based on the reliability of the control system, a parallel active redundancy strategy is adopted to construct a control system reliability redundancy allocation model; The control system reliability redundancy allocation model is solved and calculated by using an improved marginal analysis method to obtain a control system reliability redundancy allocation scheme; The calculation method of the control system reliability redundancy allocation scheme includes: Input the reliability R of each functional execution module in the control system into the control system reliability redundancy allocation model i (t i ), fees i , available budget cost B; Calculate the marginal effect Δ of each functional execution module i , and the reliability-cost trade-off analysis of the control system is carried out to obtain the reliability redundancy allocation scheme of the control system. The marginal effect Δ i It represents the logarithmic growth value of reliability caused by the unit cost investment in the i-th function execution module; The method for obtaining the control system reliability redundancy allocation scheme includes: (1) Calculate the marginal effect Δ of each functional execution module i , i = 1, 2, ..., m; the marginal effect Δ i The calculation formula is: In the formula, c i R is the unit cost of the i-th function execution module; i (t i ) is the reliability of the i-th function execution module when the service time is t; n i is the number of primary and standby redundancy of the i-th function execution module; the initial number of each function execution module is n i =0, i=1,2,...,m,m k is the iteration termination judgment parameter, set its initial value to 0, c is the cumulative cost, set its initial value to 0; (2) Find the function module k with the maximum marginal effect in the current iteration. The marginal effect of this function module is Δ k , the parallel redundant quantity of this module is n k The cost is c k ; (3) calculating a cumulative cost c, where the cumulative cost c is equal to the sum of the cumulative cost of the previous iteration and the cost of the redundant unit selected in the current iteration; (4) If the cost meets the available budget cost B of the redundant allocation, the parallel redundant quantity of the functional module is increased by 1, and the maximum marginal effect Δ is recalculated. k , and return to step (2), otherwise execute steps (5) to (6); (5) Let the original maximum marginal effect value Δ k =0, and find the new maximum marginal effect value, let Δ k =max{Δ1,Δ2,…,Δ k-1 ,0,Δ k+1 ,…,Δ m }, iterative termination judgment parameter m k =m k +1; (6) If mm k ≥1, return to step (4); if mm k <1, terminate the iteration and output the redundancy allocation scheme, which is the number of primary and standby redundancies n1, n2, ..., n of each functional execution module. m .

2. A control system reliability redundancy allocation method according to claim 1, characterized in that: The conversion method of the series system comprises: The control system is analyzed for its functional principles and divided into structural levels, and the control system is converted into a series system consisting of multiple functional execution modules. The normal operation of the control system requires the joint cooperation and coordination of each functional execution module. If any functional execution module fails, the control system will not be able to complete the established function.

3. A control system reliability redundancy allocation method according to claim 1, characterized in that: The calculation method of the control system reliability includes: Obtain failure rate data of each electronic component in the control system; Using stress analysis method, the estimated failure rate of each electronic component is calculated by correcting the historical statistical data and expert opinions; The reliability, failure rate and mean time between failures of the control system under the specified service time are calculated using the exponential distribution system reliability analysis method.

4. A control system reliability redundancy allocation method according to claim 3, characterized in that: The calculation formula of the reliability is: The calculation formula of the failure rate is: The calculation formula of the mean time between failures is: Among them, R s (t s ) is the control system at t s Reliability of time; R i (t i ) is the i-th function execution module at t i Reliability of the moment; i is the failure rate of the ith function execution module; t s ,t i are the working time of the control system and the i-th function execution module respectively; λ is the failure rate of the control system; MTBF is the mean time between failures of the control system.

5. A control system reliability redundancy allocation method according to claim 1, characterized in that: The method for constructing the control system reliability redundancy allocation model includes: Taking the control system reliability as input, adopting the active parallel redundancy strategy, taking the maximization of control system reliability as the optimization goal and the available cost budget as the constraint condition, a control system reliability redundancy allocation model is constructed.

6. A control system reliability redundancy allocation method according to claim 5, characterized in that: The expression of the control system reliability redundancy allocation model is: Where B is the available budget cost; c i is the unit cost of the i-th function execution module; n i is the redundant decision variable of the i-th function execution module, R i (t i ) is the i-th function execution module at t i Reliability at all times.

7. A control system reliability redundancy allocation device, characterized in that: include: A calculation module, used for calculating the reliability of the control system under a specified service time based on the reliability analysis model of the control system and the failure rate data of each functional execution module; wherein the reliability analysis model is constructed by converting the control system into a series system composed of a plurality of functional execution modules connected in series and targeting the series system; A construction module is used to construct a control system reliability redundancy allocation model based on the control system reliability by adopting a parallel active redundancy strategy; A solution module, used for solving and calculating the control system reliability redundancy allocation model by using an improved marginal analysis method to obtain a control system reliability redundancy allocation scheme; The calculation method of the control system reliability redundancy allocation scheme includes: Input the reliability R of each functional execution module in the control system into the control system reliability redundancy allocation model i (t i ), cost c i , available budget cost B; Calculate the marginal effect Δ of each functional execution module i , and the reliability-cost trade-off analysis of the control system is carried out to obtain the reliability redundancy allocation scheme of the control system. The marginal effect Δ i It represents the logarithmic growth value of reliability caused by the unit cost investment in the i-th function execution module; The method for obtaining the control system reliability redundancy allocation scheme includes: (1) Calculate the marginal effect Δ of each functional execution module i , i = 1, 2, ..., m; the marginal effect Δ i The calculation formula is: In the formula, c i R is the unit cost of the i-th function execution module; i (t i ) is the reliability of the i-th function execution module when the service time is t; n i is the number of primary and standby redundancy of the i-th function execution module; the initial number of each function execution module is n i =0, i=1,2,...,m,m k is the iteration termination judgment parameter, set its initial value to 0, c is the cumulative cost, set its initial value to 0; (2) Find the function module k with the maximum marginal effect in the current iteration. The marginal effect of this function module is Δ k , the parallel redundant quantity of this module is n k The cost is c k ; (3) calculating a cumulative cost c, where the cumulative cost c is equal to the sum of the cumulative cost of the previous iteration and the cost of the redundant unit selected in the current iteration; (4) If the cost meets the available budget cost B of the redundant allocation, the parallel redundant quantity of the functional module is increased by 1, and the maximum marginal effect Δ is recalculated. k , and return to step (2), otherwise execute steps (5) to (6); (5) Let the original maximum marginal effect value Δ k =0, and find the new maximum marginal effect value, let Δ k =max{Δ1,Δ2,…,Δ k-1 ,0,Δ k+1 ,…,Δ m }, iterative termination judgment parameter m k =m k +1; (6) If mm k ≥1, return to step (4); if mm k <1, terminate the iteration and output the redundancy allocation scheme, which is the number of primary and standby redundancies n1, n2, ..., n of each functional execution module. m .

8. A control system reliability redundancy distribution system, characterized by: including storage media and processors; The storage medium is used to store instructions; The processor is configured to operate according to the instructions to execute the steps of the method according to any one of claims 1-6.

Citation Information

Patent Citations

  • High-reliability quantitative FMECA analysis method and system of electronic equipment based on redundant design

    CN110531608A

  • Programmable logic controller (PLC) redundant system for nuclear power station circular crane control system

    CN202744217U