Communication switching system and method for low-orbit satellite

The over-top satellite tracking and switching channels against low-orbit satellites through two antenna arrays solves the problem of servo system switching delay in low-orbit satellite communication systems, and improves user experience and network performance.

CN115278794BActive Publication Date: 2024-11-08BEIJING COMMSAT TECH DEV CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210824226.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-07-13
Publication Date
2024-11-08
Estimated Expiration
2042-07-13

AI Technical Summary

Technical Problem

In low-orbit satellite communication system, the user network experience is affected because the servo system switches the antenna array tracking satellite for a long time.

Method used

Two antenna arrays are used to track overhead satellites and switch channels through electronic switches to avoid network delay caused by the servo system. The specific plan includes the main control equipment monitoring signal strength parameters, determining candidate over-top satellites, and switching channels when the signal quality meets preset conditions, ensuring that the second antenna array tracks to the new satellite in advance.

Benefits of technology

It effectively avoids network delay caused by servo system switching, improves users' experience of using the network, and reduces network communication delay.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115278794B_ABST
    Figure CN115278794B_ABST
Patent Text Reader

Abstract

The present application discloses a communication switching system and method for a low-orbit satellite, which relates to the field of satellite communication technology and can avoid network delays caused by the servo system switching the satellite tracked by the antenna array. The system includes at least a main control device, an electronic switch, a first antenna array and a second antenna array; the main control device is configured to: when the current channel is the channel of the first antenna array, monitor the first signal strength parameter between the first antenna array and the first overhead satellite tracked by the first antenna array; in the process of monitoring the first signal strength parameter, determine the second overhead satellite from the current candidate overhead satellites according to the relative position parameter of the position of the current candidate overhead satellite and the current geographical location, and control the second antenna array to track the second overhead satellite; when it is determined that the first signal strength parameter meets the first preset condition, switch the current channel to the channel of the second antenna array by controlling the electronic switch.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of satellite communication technology, and in particular to a communication switching system and method for a low-orbit satellite. Background Art

[0002] Currently, in low-orbit satellite communication systems, network communication can be achieved by continuously tracking satellites through parabolic antennas. Since low-orbit satellites are satellites orbiting the earth and their positions are constantly changing, when the parabolic antenna is tracking the satellite, if the low-orbit satellite moves below the ground level (that is, the parabolic antenna cannot track the satellite), it needs to switch to tracking another satellite to ensure normal network communication.

[0003] However, in low-orbit satellite communication systems, the servo system generally switches the satellites tracked by the parabolic antenna, and the switching delay is long, which affects the user experience of using the network. Summary of the invention

[0004] The present application provides a communication switching system and method for a low-orbit satellite, which tracks overhead satellites through two antenna arrays, thereby avoiding network delays caused by the servo system switching the satellites tracked by the antenna arrays.

[0005] In order to achieve the above objectives, this application adopts the following technical solutions:

[0006] In a first aspect, the present application provides a communication switching system for a low-orbit satellite, the system comprising at least a main control device, an electronic switch, a first antenna array face and a second antenna array face; wherein the main control device is configured to: when the current channel is the channel of the first antenna array face, monitor a first signal strength parameter between the first antenna array face and a first overhead satellite tracked by the first antenna array face; in the process of monitoring the first signal strength parameter, determine a second overhead satellite from the current candidate overhead satellites based on a relative position parameter between the position of the current candidate overhead satellite and the current geographical location, and control the second antenna array face to track the second overhead satellite; thereafter, when it is determined that the first signal strength parameter satisfies a first preset condition, switch the current channel to the channel of the second antenna array face by controlling the electronic switch.

[0007] In the technical solution provided by the present application, the communication switching system of the low-orbit satellite may include a first antenna array, a second antenna array, an electronic switch and a main control device. When the first antenna array tracks the first overhead satellite and the current channel is the channel of the first antenna array, the main control device can monitor the signal quality (i.e., the first signal strength parameter) of the current channel, and during the monitoring process, the second overhead satellite can be determined from the current candidate overhead satellites, and the second antenna array can be controlled to track the second overhead satellite. In the process of the first antenna array tracking the first overhead satellite, the signal quality of the channel of the first antenna array will gradually weaken until it disappears. The main control device can switch the current channel to the channel of the second antenna array by controlling the electronic switch before the signal quality disappears (i.e., when the first signal strength parameter meets the first preset condition). Since the second antenna array has tracked the second overhead satellite in advance before switching the channel, the network delay caused by the servo system switching the satellite tracked by the second antenna array can be avoided. It can be seen that in the technical solution provided by the present application, by tracking overhead satellites through two antenna arrays and switching the channels of the two antenna arrays through electronic switches, the network delay caused by the servo system switching the satellites tracked by the antenna arrays can be avoided, thereby improving the user experience of using the network.

[0008] Optionally, in a possible design, the relative position parameter is the off-axis angle of the position of the current candidate over-the-top satellite relative to the current geographical location; the off-axis angle is the angle between the first line segment and the first coordinate axis in the preset three-dimensional coordinate system; the first line segment is the line connecting the position of the current candidate over-the-top satellite and the current geographical location; the coordinate origin of the preset three-dimensional coordinate system is the current geographical location, the positive direction of the first coordinate axis is perpendicular to the ground plane and upward, the positive direction of the second coordinate axis in the preset three-dimensional coordinate system is the geographical south direction, and the positive direction of the third coordinate axis in the preset three-dimensional coordinate system is the geographical east direction;

[0009] The main control device is specifically configured as follows:

[0010] In the process of monitoring the first signal strength parameter, the satellite that has the smallest off-axis angle relative to the current geographical location among the current candidate satellites that pass by is determined as the second satellite that passes by.

[0011] Optionally, in another possible design, the main control device is further configured as:

[0012] According to the off-axis angle of each satellite in the low-orbit satellite constellation relative to the current geographical location, the candidate over-the-top satellites are updated once at every preset time interval.

[0013] Optionally, in another possible design, the main control device is specifically configured as:

[0014] When it is determined that the off-axis angle of the target satellite relative to the current geographical location is greater than a preset angle, the target satellite is determined as a candidate over-the-top satellite; the target satellite is any satellite in the low-orbit satellite constellation.

[0015] Optionally, in another possible design, the first preset condition is that the parameter value is less than or equal to the first preset parameter value; and the main control device is specifically configured as:

[0016] Before determining a second overhead satellite from the current candidate overhead satellites based on the relative position parameters of the current candidate overhead satellite and the current geographical location, determine that the parameter value of the first signal strength parameter is less than or equal to the second preset parameter value; the second preset parameter value is greater than the first preset parameter value.

[0017] Optionally, in another possible design, the main control device is further configured as:

[0018] After the current channel is switched to the channel of the second antenna array by controlling the electronic switch, a second signal strength parameter between the second antenna array and the second overhead satellite is monitored;

[0019] In the process of monitoring the second signal strength parameter, a third overhead satellite is determined from the current candidate overhead satellites based on the relative position parameters of the current candidate overhead satellite and the current geographical location, and the first antenna array is controlled to track the third overhead satellite; thereafter, when it is determined that the second signal strength parameter meets the first preset condition, the current channel is switched to the channel of the first antenna array by controlling the electronic switch.

[0020] Optionally, in another possible design, the communication switching system for a low-orbit satellite provided by the present application further includes: a first servo motor, a first servo controller, a second servo motor, and a second servo controller; the first servo motor is respectively connected to the first antenna array surface and the first servo controller, and the second servo motor is respectively connected to the second antenna array surface and the second servo controller; the first servo controller is respectively connected to the main control device and the electronic switch through the first external interface, and the second servo controller is respectively connected to the main control device and the electronic switch through the second external interface;

[0021] The main control device is further configured to: before monitoring the first signal strength parameter between the first antenna array and the first overhead satellite tracked by the first antenna array, determine the first overhead satellite from the current candidate overhead satellites, and send a first control signal to the first servo controller through the first external interface; the first control signal is used to instruct the first servo controller to control the first servo motor to start, so that the first servo motor drives the first antenna array to rotate until the first overhead satellite is tracked;

[0022] The main control device is specifically configured to: after determining the second overhead satellite from the current candidate overhead satellites, send a second control signal to the second servo controller through the second external interface; the second control signal is used to instruct the second servo controller to control the second servo motor to start, so that the second servo motor drives the second antenna array to rotate until the second overhead satellite is tracked.

[0023] Optionally, in another possible design, the communication switching system for low-orbit satellites provided in the present application also includes: a first tracker and a second tracker; the first tracker is used to obtain signal strength parameters between the first antenna array and an overhead satellite tracked by the first antenna array; the second tracker is used to obtain signal strength parameters between the second antenna array and an overhead satellite tracked by the second antenna array.

[0024] In a second aspect, the present application provides a communication switching method for a low-orbit satellite, which is applied to the communication switching system for the low-orbit satellite as described in the first aspect, and the method includes:

[0025] The main control device monitors a first signal strength parameter between the first antenna array face and a first overhead satellite tracked by the first antenna array face when the current channel is the channel of the first antenna array face;

[0026] During the process of monitoring the first signal strength parameter, the main control device determines the second overhead satellite from the current candidate overhead satellites based on the relative position parameters of the current candidate overhead satellite and the current geographical location, and controls the second antenna array surface to track the second overhead satellite; thereafter, when it is determined that the first signal strength parameter meets the first preset condition, the current channel is switched to the channel of the second antenna array surface by controlling the electronic switch.

[0027] Optionally, in a possible design, the relative position parameter is the off-axis angle of the position of the current candidate over-the-top satellite relative to the current geographical location; the off-axis angle is the angle between the first line segment and the first coordinate axis in the preset three-dimensional coordinate system; the first line segment is the line connecting the position of the current candidate over-the-top satellite and the current geographical location; the coordinate origin of the preset three-dimensional coordinate system is the current geographical location, the positive direction of the first coordinate axis is perpendicular to the ground plane and upward, the positive direction of the second coordinate axis in the preset three-dimensional coordinate system is the geographical south direction, and the positive direction of the third coordinate axis in the preset three-dimensional coordinate system is the geographical east direction;

[0028] The above-mentioned “determining a second overhead satellite from the current candidate overhead satellites according to the relative position parameters between the position of the current candidate overhead satellite and the current geographical location” may include:

[0029] The satellite that has the smallest off-axis angle relative to the current geographical location among the current candidate satellites that pass by is determined as the second satellite that passes by.

[0030] Optionally, in another possible design, the communication switching method for a low-orbit satellite provided in the present application may further include:

[0031] According to the off-axis angle of each satellite in the low-orbit satellite constellation relative to the current geographical location, the candidate over-the-top satellites are updated once at every preset time interval.

[0032] Optionally, in another possible design, the above-mentioned “updating the candidate over-the-top satellites once at a preset time interval according to the off-axis angle of the position of each satellite in the low-orbit satellite constellation relative to the current geographical location” may include:

[0033] When it is determined that the off-axis angle of the target satellite relative to the current geographical location is greater than a preset angle, the target satellite is determined as a candidate over-the-top satellite; the target satellite is any satellite in the low-orbit satellite constellation.

[0034] Optionally, in another possible design, the first preset condition is that the parameter value is less than or equal to the first preset parameter value; and the above-mentioned “determining a second overhead satellite from the current candidate overhead satellites according to the relative position parameter between the position of the current candidate overhead satellite and the current geographical location” may include:

[0035] When it is determined that the parameter value of the first signal strength parameter is less than or equal to the second preset parameter value, a second overhead satellite is determined from the current candidate overhead satellites based on the relative position parameters of the position of the current candidate overhead satellite and the current geographical location; the second preset parameter value is greater than the first preset parameter value.

[0036] Optionally, in another possible design, after the above “switching the current channel to the channel of the second antenna array surface by controlling the electronic switch”, the following may also be included:

[0037] monitoring a second signal strength parameter between the second antenna array and a second overhead satellite;

[0038] In the process of monitoring the second signal strength parameter, a third overhead satellite is determined from the current candidate overhead satellites based on the relative position parameters of the current candidate overhead satellite and the current geographical location, and the first antenna array is controlled to track the third overhead satellite; thereafter, when it is determined that the second signal strength parameter meets the first preset condition, the current channel is switched to the channel of the first antenna array by controlling the electronic switch.

[0039] Optionally, in another possible design, before the above-mentioned “monitoring the first signal strength parameter between the first antenna array face and the first overhead satellite tracked by the first antenna array face”, the following may also be included:

[0040] A first overhead satellite is determined from the current candidate overhead satellites, and a first control signal is sent to a first servo controller through a first external interface; the first control signal is used to instruct the first servo controller to control the first servo motor to start, so that the first servo motor drives the first antenna array to rotate until the first overhead satellite is tracked;

[0041] After the above-mentioned "determining the second overhead satellite from the current candidate overhead satellites", it may also include: sending a second control signal to the second servo controller through the second external interface; the second control signal is used to instruct the second servo controller to control the second servo motor to start, so that the second servo motor drives the second antenna array to rotate until the second overhead satellite is tracked.

[0042] The description of the second aspect in this application can refer to the detailed description of the first aspect; and the beneficial effects of the description of the second aspect can refer to the analysis of the beneficial effects of the first aspect, which will not be repeated here.

[0043] In this application, the names of the above-mentioned devices or functional modules do not constitute limitations. In actual implementation, these devices or functional modules may appear with other names. As long as the functions of each device or functional module are similar to those of this application, they are within the scope of the claims of this application and their equivalent technologies.

[0044] These and other aspects of the present application will become more apparent from the following description. BRIEF DESCRIPTION OF THE DRAWINGS

[0045] Figure 1 A schematic diagram of the structure of a communication switching system for a low-orbit satellite provided in an embodiment of the present application;

[0046] Figure 2 A schematic diagram of coordinates of a preset three-dimensional coordinate system provided in an embodiment of the present application;

[0047] Figure 3 A schematic diagram of the structure of another communication switching system for a low-orbit satellite provided in an embodiment of the present application;

[0048] Figure 4 A schematic diagram of the structure of another communication switching system for a low-orbit satellite provided in an embodiment of the present application;

[0049] Figure 5 A schematic flow chart of a communication switching method for a low-orbit satellite provided in an embodiment of the present application. DETAILED DESCRIPTION

[0050] The communication switching system and method for a low-orbit satellite provided in an embodiment of the present application are described in detail below in conjunction with the accompanying drawings.

[0051] The terms "first" and "second" and the like in the specification and drawings of this application are used to distinguish different objects, or to distinguish different processing of the same object, rather than to describe a specific order of objects.

[0052] In addition, the terms "including" and "having" and any variations thereof mentioned in the description of the present application are intended to cover non-exclusive inclusions. For example, a process, method, system, product or device that includes a series of steps or units is not limited to the listed steps or units, but may optionally include other steps or units that are not listed, or may optionally include other steps or units that are inherent to these processes, methods, products or devices.

[0053] It should be noted that, in the embodiments of the present application, words such as "exemplary" or "for example" are used to indicate examples, illustrations or descriptions. Any embodiment or design described as "exemplary" or "for example" in the embodiments of the present application should not be interpreted as being more preferred or more advantageous than other embodiments or designs. Specifically, the use of words such as "exemplary" or "for example" is intended to present related concepts in a specific way.

[0054] In the description of the present application, unless otherwise specified, “plurality” means two or more.

[0055] In addition, the acquisition, storage, use, and processing of data in the technical solution of this application comply with the relevant provisions of national laws and regulations.

[0056] Currently, in low-orbit satellite communication systems, network communication can be achieved by continuously tracking satellites through parabolic antennas. Since low-orbit satellites are satellites that move around the earth and their positions are constantly changing, when the low-orbit satellite moves below the ground level (that is, the parabolic antenna cannot track the satellite), the parabolic antenna needs to switch to tracking another satellite to ensure normal network communication. However, in low-orbit satellite communication systems, the servo system generally switches the satellite tracked by the parabolic antenna, and the switching delay is long, which affects the user's experience of using the network.

[0057] In response to the problems existing in the above-mentioned prior art, an embodiment of the present application provides a communication switching system for low-orbit satellites. The system tracks overhead satellites through two antenna arrays and switches the channels of the two antenna arrays through electronic switches. This can avoid network delays caused by the servo system switching the satellites tracked by the antenna arrays, thereby improving the user experience of using the network.

[0058] Reference Figure 1 , the present application embodiment provides a possible structural diagram of a communication switching system for a low-orbit satellite. Figure 1As shown, the communication switching system of the low-orbit satellite may include: a main control device 01, an electronic switch 02, a first antenna array face 03 and a second antenna array face 04.

[0059] The main control device 01 is configured to: when the current channel is the channel of the first antenna array face 03, monitor the first signal strength parameter between the first antenna array face 03 and the first overhead satellite tracked by the first antenna array face 03; in the process of monitoring the first signal strength parameter, determine the second overhead satellite from the current candidate overhead satellites based on the relative position parameters of the position of the current candidate overhead satellite and the current geographical location, and control the second antenna array face 04 to track the second overhead satellite; thereafter, when it is determined that the first signal strength parameter meets the first preset condition, switch the current channel to the channel of the second antenna array face 04 by controlling the electronic switch 02.

[0060] The first signal strength parameter may represent the network quality of the channel of the first antenna array face 03 when the first antenna array face 03 tracks the first overhead satellite. Exemplarily, the signal strength parameter in the embodiment of the present application may be an automatic gain control (AGC) value, and when the antenna array face is tracking an overhead satellite, if the tracking overhead satellite is not switched, the AGC value will gradually decrease until it reaches 0.

[0061] In addition, the antenna array surface involved in the embodiments of the present application may be a parabolic antenna.

[0062] The current geographical location may be the geographical location where the first antenna array face 03 and the second antenna array face 04 are located. The current candidate over-the-top satellite is a low-orbit satellite that is within the visible range of the current geographical location at the current moment, that is, a low-orbit satellite that can be tracked by the antenna array face at the current moment. The communication switching system for a low-orbit satellite provided in the embodiment of the present application can be applied to a low-orbit satellite constellation. There are a large number of low-orbit satellites in orbit in the low-orbit satellite constellation, and among the multiple low-orbit satellites in orbit, most of the multiple low-orbit satellites are not within the visible range of the current geographical location, that is, the antenna array face cannot track these low-orbit satellites. Therefore, in the embodiment of the present application, when determining the second over-the-top satellite to be tracked by the second antenna array face 04, the second over-the-top satellite can be determined from the current candidate over-the-top satellites. For example, the low-orbit satellite constellation may include 864 low-orbit satellites, and 20 of the 864 low-orbit satellites are within the visible range of the current geographical location at the current moment, then the main control device 01 can determine the second over-the-top satellite from these 20.

[0063] The first preset condition may be a condition that the communication network characterizing the current channel is about to be disconnected, that is, a condition that the first signal strength parameter is about to disappear. Exemplarily, when the main control device 01 determines that the first signal strength parameter satisfies the first preset condition, a switching instruction may be sent to the electronic switch 02, and the electronic switch 02 may switch the current channel (the channel of the first antenna array surface 03) to the channel of the second antenna array surface 04 according to the switching instruction.

[0064] Optionally, the first preset condition may be that the parameter value of the first signal strength parameter is less than or equal to the first preset parameter value; the main control device 01 is specifically configured to: before determining the second overhead satellite from the current candidate overhead satellites based on the relative position parameters of the position of the current candidate overhead satellite and the current geographical location, determine that the parameter value of the first signal strength parameter is less than or equal to the second preset parameter value; the second preset parameter value is greater than the first preset parameter value.

[0065] The first preset parameter value and the second preset parameter value may be parameter values ​​determined in advance. For example, the first preset parameter value may be AGC value=5, and the second preset parameter value may be AGC value=7.

[0066] In the embodiment of the present application, since the position of the current candidate satellite passing overhead is also constantly updated, if the main control device 01 determines the second satellite passing overhead from the current candidate satellite passing overhead too early, the following situation may occur: after the channel of the first antenna array surface 03 is switched to the channel of the second antenna array surface 04, the network quality of the channel of the second antenna array surface 04 will soon deteriorate, so that frequent channel switching is required. Therefore, in order to minimize the number of channel switching times, in the embodiment of the present application, the main control device 01 can determine the second satellite passing overhead from the current candidate satellite passing overhead after determining that the parameter value of the first signal strength parameter is less than or equal to the second preset parameter value. As long as the parameter value of the first signal strength parameter decreases from the second preset parameter value to the first preset parameter value, the second antenna array surface 04 successfully tracks the second satellite passing overhead, and the servo system will not switch the satellite tracked by the second antenna array surface 04 to cause network delay.

[0067] Optionally, in a possible implementation, the relative position parameter may be the off-axis angle of the position of the current candidate overhead satellite relative to the current geographic location; the off-axis angle is the angle between the first line segment and the first coordinate axis in the preset three-dimensional coordinate system; the first line segment is the line connecting the position of the current candidate overhead satellite and the current geographic location; the coordinate origin of the preset three-dimensional coordinate system is the current geographic location, the positive direction of the first coordinate axis is perpendicular to the ground plane and upward, the positive direction of the second coordinate axis in the preset three-dimensional coordinate system is the geographic south direction, and the positive direction of the third coordinate axis in the preset three-dimensional coordinate system is the geographic east direction; the main control device 01 is specifically configured as: in the process of monitoring the first signal strength parameter, the overhead satellite with the smallest off-axis angle relative to the current geographic location among the current candidate overhead satellites is determined as the second overhead satellite.

[0068] For example, refer to Figure 2 , provides a coordinate diagram of a preset three-dimensional coordinate system. Figure 2 As shown in the figure, the z-axis is the first coordinate axis, and the positive direction of the first coordinate axis is perpendicular to the ground plane and upward; the x-axis is the second coordinate axis, and the positive direction of the second coordinate axis is the geographic south direction; the y-axis is the third coordinate axis, and the positive direction of the third coordinate axis is the geographic east direction. Point O represents the current geographic location, point M represents the position of the current candidate over-the-top satellite, and OM represents the first line segment. Then, the off-axis angle of the position of the current candidate over-the-top satellite relative to the current geographic location is Figure 2 ∠α in .

[0069] In the embodiment of the present application, any current candidate over-the-top satellite is determined as the second over-the-top satellite, which can avoid the network delay caused by the servo system switching the satellite tracked by the antenna array. However, different candidate over-the-top satellites have different connection times with the second antenna array surface 04, and the smaller the off-axis angle, the longer the connection time. Therefore, in order to further reduce the number of channel switching times, the over-the-top satellite with the smallest off-axis angle relative to the current geographical location among the current candidate over-the-top satellites can be determined as the second over-the-top satellite, thereby maximizing the connection time between the second over-the-top satellite and the second antenna array surface 04.

[0070] Optionally, the main control device 01 is further configured to update the candidate over-the-top satellites once at a preset time interval according to the off-axis angle of each satellite in the low-orbit satellite constellation relative to the current geographical location.

[0071] The preset time length may be a time length determined in advance, for example, the preset time length may be 0.2 seconds.

[0072] Since the positions of low-orbit satellites are constantly changing, the low-orbit satellites within the visible range of the current geographic location at different times are different. Therefore, in an embodiment of the present application, the candidate over-the-top satellites can be periodically updated to ensure that the second over-the-top satellite ultimately determined is within the visible range of the current geographic location.

[0073] Optionally, the main control device 01 is specifically configured to: when it is determined that the off-axis angle of the target satellite relative to the current geographical location is greater than a preset angle, determine the target satellite as a candidate over-the-top satellite; the target satellite is any satellite in the low-orbit satellite constellation.

[0074] The preset angle may be a predetermined angle. For example, the preset angle may be 53°, that is, when the off-axis angle of the target satellite relative to the current geographic location is greater than 53°, the target satellite is within the visible range of the current geographic location.

[0075] Optionally, the main control device 01 is also configured to: after switching the current channel to the channel of the second antenna array surface 04 by controlling the electronic switch 02, monitor the second signal strength parameter between the second antenna array surface 04 and the second overhead satellite; in the process of monitoring the second signal strength parameter, determine the third overhead satellite from the current candidate overhead satellites according to the relative position parameters of the position of the current candidate overhead satellite and the current geographical location, and control the first antenna array surface 03 to track the third overhead satellite; thereafter, when it is determined that the second signal strength parameter meets the first preset condition, switch the current channel to the channel of the first antenna array surface 03 by controlling the electronic switch 02.

[0076] In the embodiment of the present application, the channels of the first antenna face 03 and the second antenna face 04 can be switched alternately by the electronic switch 02. When the channel of the first antenna face 03 is used, the satellite passing overhead tracked by the second antenna face 04 can be switched by the servo system. Since the channel used at this time is the channel of the first antenna face 03, the switching of the satellite passing overhead tracked by the second antenna face 04 by the servo system will not cause network delay. When the network quality of the channel of the first antenna face 03 deteriorates, the channel of the first antenna face 03 is switched to the channel of the second antenna face 04, and then the satellite passing overhead tracked by the first antenna face 03 is switched by the servo system. The channel used at this time is the channel of the second antenna face 04, and the switching of the satellite passing overhead tracked by the first antenna face 03 by the servo system will not cause network delay. Therefore, the technical solution provided in the embodiment of the present application can avoid the network delay caused by the servo system switching the satellite tracked by the antenna face.

[0077] Optionally, the servo system can be composed of a servo motor and a servo controller. Figure 3 As shown, Figure 1 The communication switching system for the low-orbit satellite provided in the invention may also include: a first servo motor 05, a first servo controller 07, a second servo motor 06 and a second servo controller 08; the first servo motor 05 is respectively connected to the first antenna array surface 03 and the first servo controller 07, and the second servo motor 06 is respectively connected to the second antenna array surface 04 and the second servo controller 08; the first servo controller 07 is respectively connected to the main control device 01 and the electronic switch 02 through the first external interface 09, and the second servo controller 08 is respectively connected to the main control device 01 and the electronic switch 02 through the second external interface 10.

[0078] The main control device 01 is further configured to: before monitoring the first signal strength parameter between the first antenna array face 03 and the first overhead satellite tracked by the first antenna array face 03, determine the first overhead satellite from the current candidate overhead satellites, and send a first control signal to the first servo controller 07 through the first external interface 09; the first control signal is used to instruct the first servo controller 07 to control the first servo motor 05 to start, so that the first servo motor 05 drives the first antenna array face 03 to rotate until the first overhead satellite is tracked;

[0079] The main control device 01 is specifically configured to: after determining the second overhead satellite from the current candidate overhead satellites, send a second control signal to the second servo controller 08 through the second external interface 10; the second control signal is used to instruct the second servo controller 08 to control the second servo motor 06 to start, so that the second servo motor 06 drives the second antenna array 04 to rotate until the second overhead satellite is tracked.

[0080] Optionally, the communication switching system for low-orbit satellites provided in the embodiment of the present application may also include: a first tracking machine and a second tracking machine; the first tracking machine is used to obtain signal strength parameters between the first antenna array surface 03 and the overhead satellite tracked by the first antenna array surface 03; the second tracking machine is used to obtain signal strength parameters between the second antenna array surface 04 and the overhead satellite tracked by the second antenna array surface 04.

[0081] In the actual application of the embodiment of the present application, the first tracking machine and the second tracking machine do not directly obtain the signal strength parameters, but indirectly obtain them through the receiving channel and power divider and other devices in the communication switching system of the low-orbit satellite. Figure 4 , provides a possible structural diagram of a communication switching system for a low-orbit satellite. Figure 4As shown, the communication switching system of the low-orbit satellite includes a first outdoor unit, a second outdoor unit and an indoor unit. Among them, the first indoor unit includes a main control device 01, an electronic switch 02, a baseband, a switch and a router, and the main control device 01 can transmit signals with the baseband. The internal devices of the first outdoor unit and the second outdoor unit are consistent. The first outdoor unit includes a first antenna array 03, a first transmitting channel, a first receiving channel, a first power divider, a first tracking machine 11, a first servo motor 05 and a first servo controller 07. The first transmitting channel, the first power divider, the first tracking machine 11 and the first servo controller 07 can transmit signals with the equipment in the indoor unit through the first external interface 09. The second outdoor unit includes a second antenna array 04, a second transmitting channel, a second receiving channel, a second power divider, a second tracking machine 12, a second servo motor 06 and a second servo controller 08. The second transmitting channel, the second power divider, the second tracking machine 12 and the second servo controller 08 can transmit signals with the equipment in the indoor unit through the second external interface 10.

[0082] Among them, after the power amplifier of the first transmitting channel receives the intermediate frequency signal of the baseband through the first external interface 09, it can filter and amplify the intermediate frequency signal multiple times, and then mix it with the local oscillator to output the required frequency for transmission, and then filter and drive amplification, and then power amplify it through the final K-band power amplifier, and finally output the transmission signal to the first antenna array 03. After the channel low noise amplifier of the first receiving channel receives the input signal from the first antenna array 03, it undergoes low noise amplification and filtering, and then mixes it with the local oscillator to output the required intermediate frequency for reception, and then after multiple filtering and amplification by the first power divider, it is provided to the baseband through the first external interface 09 to realize signal demodulation. The first tracking machine 11 can obtain the signal strength parameter from the first power divider, and filter and differentially process the signal strength parameter, and then use the zero intermediate frequency technology to convert the radio frequency signal into bit stream data, and at the same time, the signal amplitude information is converted into a voltage signal via a digital-to-analog converter, and then provided to the indoor unit through the first external interface 09. Similarly, the working principle of each device in the second outdoor unit can refer to the working principle of each device in the first outdoor unit, and the embodiment of the present application will not be repeated here.

[0083] In addition, the baseband can not only realize signal switching and modulation and demodulation, but also complete the connection with user routers and other devices through switches to provide network to users.

[0084] In summary of the above description, the communication switching system for a low-orbit satellite provided in an embodiment of the present application may include a first antenna array, a second antenna array, an electronic switch, and a main control device. When the first antenna array tracks the first overhead satellite and the current channel is the channel of the first antenna array, the main control device may monitor the signal quality (i.e., the first signal strength parameter) of the current channel, and during the monitoring process, the second overhead satellite may be determined from the current candidate overhead satellites, and the second antenna array may be controlled to track the second overhead satellite. In the process of the first antenna array tracking the first overhead satellite, the signal quality of the channel of the first antenna array will gradually weaken until it disappears. The main control device may switch the current channel to the channel of the second antenna array by controlling the electronic switch before the signal quality disappears (i.e., when the first signal strength parameter meets the first preset condition). Since the second antenna array has tracked the second overhead satellite in advance before switching the channel, the delay caused by switching the satellite tracked by the second antenna array through the servo system can be avoided. It can be seen that in the technical solution provided by the present application, by tracking overhead satellites through two antenna arrays and switching the channels of the two antenna arrays through electronic switches, the network delay caused by the servo system switching the satellites tracked by the antenna arrays can be avoided, thereby improving the user experience of using the network.

[0085] It should be noted that the network communication delay in the embodiment of the present application is only caused by the switching delay of the electronic switch, and the switching delay of the electronic switch is very small compared to the switching delay of the servo system. Therefore, the embodiment of the present application can reduce the network communication delay in low-orbit communication applications, thereby improving the user experience of using the network.

[0086] The communication switching method for a low-orbit satellite provided in the embodiment of the present application can be applied to a communication switching system for a low-orbit satellite. The communication switching method for a low-orbit satellite provided in the embodiment of the present application is described in detail below.

[0087] Reference Figure 5 The communication switching method of the low-orbit satellite provided in the embodiment of the present application includes S501-S502:

[0088] S501: When the current channel is the channel of the first antenna array face, the main control device monitors a first signal strength parameter between the first antenna array face and a first overhead satellite tracked by the first antenna array face.

[0089] S502. During the process of monitoring the first signal strength parameter, the main control device determines a second overhead satellite from the current candidate overhead satellites according to the relative position parameters of the current candidate overhead satellite and the current geographical location, and controls the second antenna array surface to track the second overhead satellite; thereafter, when it is determined that the first signal strength parameter satisfies the first preset condition, the current channel is switched to the channel of the second antenna array surface by controlling the electronic switch.

[0090] Optionally, in a possible implementation, the relative position parameter is the off-axis angle of the position of the current candidate overhead satellite relative to the current geographic location; the off-axis angle is the angle between the first line segment and the first coordinate axis in the preset three-dimensional coordinate system; the first line segment is the line connecting the position of the current candidate overhead satellite and the current geographic location; the coordinate origin of the preset three-dimensional coordinate system is the current geographic location, the positive direction of the first coordinate axis is perpendicular to the ground plane and upward, the positive direction of the second coordinate axis in the preset three-dimensional coordinate system is the geographic south direction, and the positive direction of the third coordinate axis in the preset three-dimensional coordinate system is the geographic east direction; the above-mentioned "determining the second overhead satellite from the current candidate overhead satellites based on the relative position parameters of the position of the current candidate overhead satellite and the current geographic location" may include: determining the overhead satellite with the smallest off-axis angle relative to the current geographic location among the current candidate overhead satellites as the second overhead satellite.

[0091] Optionally, in another possible implementation, the communication switching method for low-orbit satellites provided in the present application may also include: updating candidate over-the-top satellites once at a preset time interval based on the off-axis angle of each satellite in the low-orbit satellite constellation relative to the current geographical location.

[0092] Optionally, in another possible implementation, the above-mentioned “updating the candidate over-the-top satellites once at a preset time interval based on the off-axis angle of the position of each satellite in the low-orbit satellite constellation relative to the current geographical location” may include: when it is determined that the off-axis angle of the target satellite's position relative to the current geographical location is greater than a preset angle, determining the target satellite as a candidate over-the-top satellite; the target satellite is any satellite in the low-orbit satellite constellation.

[0093] Optionally, in another possible design method, the first preset condition is that the parameter value is less than or equal to the first preset parameter value; the above-mentioned "determining a second overhead satellite from the current candidate overhead satellites based on the relative position parameters of the position of the current candidate overhead satellite and the current geographical location" may include: when it is determined that the parameter value of the first signal strength parameter is less than or equal to the second preset parameter value, determining the second overhead satellite from the current candidate overhead satellites based on the relative position parameters of the position of the current candidate overhead satellite and the current geographical location; the second preset parameter value is greater than the first preset parameter value.

[0094] Optionally, in another possible design, after the above-mentioned "switching the current channel to the channel of the second antenna array surface by controlling the electronic switch", it may also include: monitoring the second signal strength parameter between the second antenna array surface and the second overhead satellite; in the process of monitoring the second signal strength parameter, determining a third overhead satellite from the current candidate overhead satellites based on the relative position parameters of the position of the current candidate overhead satellite and the current geographical location, and controlling the first antenna array surface to track the third overhead satellite; thereafter, when it is determined that the second signal strength parameter meets the first preset condition, switching the current channel to the channel of the first antenna array surface by controlling the electronic switch.

[0095] Optionally, in another possible design, before the above-mentioned “monitoring the first signal strength parameter between the first antenna array and the first overhead satellite tracked by the first antenna array”, the following may also be included: determining the first overhead satellite from the current candidate overhead satellites, and sending a first control signal to the first servo controller through the first external interface; the first control signal is used to instruct the first servo controller to control the first servo motor to start, so that the first servo motor drives the first antenna array to rotate until the first overhead satellite is tracked;

[0096] After the above-mentioned "determining the second overhead satellite from the current candidate overhead satellites", it may also include: sending a second control signal to the second servo controller through the second external interface; the second control signal is used to instruct the second servo controller to control the second servo motor to start, so that the second servo motor drives the second antenna array to rotate until the second overhead satellite is tracked.

[0097] The explanation of the relevant contents in this embodiment can refer to the above-mentioned embodiment of the communication switching system for low-orbit satellites, which will not be repeated here.

[0098] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any changes or substitutions within the technical scope disclosed in the present application should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

Claims

1. A communication switching system for a low-orbit satellite, characterized in that: At least comprises a main control device, an electronic switch, a first antenna array surface and a second antenna array surface; The main control device is configured to: when the current channel is the channel of the first antenna array, monitor a first signal strength parameter between the first antenna array and a first overhead satellite tracked by the first antenna array; wherein the first signal strength parameter is an automatic gain control value; In the process of monitoring the first signal strength parameter, a second overhead satellite is determined from the current candidate overhead satellites according to the relative position parameter between the position of the current candidate overhead satellite and the current geographical location, and the second antenna array is controlled to track the second overhead satellite; thereafter, when it is determined that the first signal strength parameter satisfies a first preset condition, the current channel is switched to the channel of the second antenna array by controlling the electronic switch; wherein the first preset condition is a condition that the first signal strength parameter is about to disappear; wherein the relative position parameter is an off-axis angle of the position of the current candidate overhead satellite relative to the current geographical location; the off-axis angle is an angle between a first line segment and a first coordinate axis in a preset three-dimensional coordinate system; the first line segment is a line connecting the position of the current candidate overhead satellite and the current geographical location; the coordinate origin of the preset three-dimensional coordinate system is the current geographical location, the positive direction of the first coordinate axis is perpendicular to the ground plane and upward, the positive direction of the second coordinate axis in the preset three-dimensional coordinate system is the geographical south direction, and the positive direction of the third coordinate axis in the preset three-dimensional coordinate system is the geographical east direction; The main control device is specifically configured as follows: In the process of monitoring the first signal strength parameter, the satellite passing overhead with the smallest off-axis angle relative to the current geographical location among the current candidate passing overhead satellites is determined as the second passing overhead satellite.

2. The communication switching system for a low-orbit satellite according to claim 1, characterized in that: The main control device is also configured to: The candidate over-the-top satellites are updated once at preset time intervals according to the off-axis angle of the position of each satellite in the low-orbit satellite constellation relative to the current geographical location.

3. The communication switching system for a low-orbit satellite according to claim 2, characterized in that: The main control device is specifically configured as follows: In the case where it is determined that the off-axis angle of the position of the target satellite relative to the current geographical location is greater than a preset angle, determining the target satellite as the candidate over-the-top satellite; The target satellite is any satellite in the low-orbit satellite constellation.

4. The communication switching system for a low-orbit satellite according to claim 1, characterized in that: The first preset condition is that the parameter value is less than or equal to the first preset parameter value; the main control device is specifically configured as: Before determining the second overhead satellite from the current candidate overhead satellites according to the relative position parameters of the position of the current candidate overhead satellite and the current geographical location, determining that the parameter value of the first signal strength parameter is less than or equal to a second preset parameter value; The second preset parameter value is greater than the first preset parameter value.

5. The communication switching system for a low-orbit satellite according to claim 1, characterized in that: The main control device is also configured to: After switching the current channel to the channel of the second antenna array face by controlling the electronic switch, monitoring a second signal strength parameter between the second antenna array face and the second overhead satellite; During the process of monitoring the second signal strength parameter, a third overhead satellite is determined from the current candidate overhead satellites based on the relative position parameter between the position of the current candidate overhead satellite and the current geographic location, and the first antenna array is controlled to track the third overhead satellite; thereafter, when it is determined that the second signal strength parameter satisfies the first preset condition, the current channel is switched to the channel of the first antenna array by controlling the electronic switch.

6. The communication switching system for a low-orbit satellite according to claim 1, characterized in that: The system further comprises: a first servo motor, a first servo controller, a second servo motor and a second servo controller; the first servo motor is connected to the first antenna array and the first servo controller respectively, and the second servo motor is connected to the second antenna array and the second servo controller respectively; the first servo controller is connected to the main control device and the electronic switch respectively through a first external interface, and the second servo controller is connected to the main control device and the electronic switch respectively through a second external interface; The main control device is further configured to: before monitoring the first signal strength parameter between the first antenna array and the first overhead satellite tracked by the first antenna array, determine the first overhead satellite from the current candidate overhead satellites, and send a first control signal to the first servo controller through the first external interface; the first control signal is used to instruct the first servo controller to control the first servo motor to start, so that the first servo motor drives the first antenna array to rotate until the first overhead satellite is tracked; The main control device is specifically configured to: after determining the second overhead satellite from the current candidate overhead satellites, send a second control signal to the second servo controller through the second external interface; the second control signal is used to instruct the second servo controller to control the second servo motor to start, so that the second servo motor drives the second antenna array to rotate until the second overhead satellite is tracked.

7. The communication switching system for a low-orbit satellite according to claim 1, characterized in that: The system also includes: a first tracking machine and a second tracking machine; the first tracking machine is used to obtain signal strength parameters between the first antenna array and the overhead satellite tracked by the first antenna array; the second tracking machine is used to obtain signal strength parameters between the second antenna array and the overhead satellite tracked by the second antenna array.

8. A communication switching method for a low-orbit satellite, characterized in that: A communication switching system for a low-orbit satellite according to any one of claims 1 to 7, comprising: The main control device monitors a first signal strength parameter between the first antenna array face and a first overhead satellite tracked by the first antenna array face when the current channel is the channel of the first antenna array face; wherein the first signal strength parameter is an automatic gain control value; In the process of monitoring the first signal strength parameter, the main control device determines a second overhead satellite from the current candidate overhead satellites according to the relative position parameter between the position of the current candidate overhead satellite and the current geographical location, and controls the second antenna array surface to track the second overhead satellite; then, when it is determined that the first signal strength parameter satisfies a first preset condition, the current channel is switched to the channel of the second antenna array surface by controlling the electronic switch; wherein the first preset condition is a condition that the first signal strength parameter is about to disappear; The relative position parameter is an off-axis angle of the position of the current candidate satellite passing overhead relative to the current geographical location; the off-axis angle is an angle between a first line segment and a first coordinate axis in a preset three-dimensional coordinate system; the first line segment is a line connecting the position of the current candidate satellite passing overhead and the current geographical location; the coordinate origin of the preset three-dimensional coordinate system is the current geographical location, the positive direction of the first coordinate axis is perpendicular to the ground plane and upward, the positive direction of the second coordinate axis in the preset three-dimensional coordinate system is the geographical south direction, and the positive direction of the third coordinate axis in the preset three-dimensional coordinate system is the geographical east direction; the method of determining a second satellite passing overhead from the current candidate satellites passing overhead according to the relative position parameter of the position of the current candidate satellite passing overhead and the current geographical location includes: The satellite that has the smallest off-axis angle relative to the current geographical location among the current candidate satellites that pass by is determined as the second satellite that passes by.