A deep pit type stereo garage construction method

By using soil-retaining and water-retaining double composite cement-soil walls and prefabricated internal partition structures in deep pit construction, the problems of long construction time and difficult environmental protection in existing construction methods are solved, and a more efficient construction progress is achieved. and resistance to lateral earth pressure.

CN115288189BActive Publication Date: 2024-10-11ZHEJIANG SCI-TECH UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210026241.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-01-11
Publication Date
2024-10-11
Estimated Expiration
2042-01-11

AI Technical Summary

Technical Problem

Among the existing deep pit construction methods, underground diaphragm wall construction involves a large amount of waste gas emissions from the mud retaining wall, complex construction procedures, long construction time, large disturbance to the foundation, difficulty in quality control of underwater concrete pouring, and the inability of the waterproof wall to withstand lateral earth pressure. and other problems, leading to high pressure on environmental protection and low construction efficiency.

Method used

The double composite cement-soil wall structure that retains soil and water is used, which is constructed before excavation. It has built-in prefabricated panels and cast-in-situ support columns, and is constructed alternately through prefabricated inner partition walls from top to bottom to reduce on-site pouring and solidification time. Improve construction efficiency.

Benefits of technology

It simplifies the retaining support structure in the deep pit, shortens the construction time, improves the project progress, reduces environmental impact, and enhances the ability of the waterproof wall to resist lateral earth pressure, avoiding weather effects and foundation disturbance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115288189B_ABST
    Figure CN115288189B_ABST
Patent Text Reader

Abstract

The present invention relates to a deep pit type three-dimensional garage construction method, including soil-retaining and water-retaining double composite cement-soil wall construction, cast-in-place reinforced concrete support columns, excavating earth to a set elevation, then placing prefabricated inner partition walls, continuing to excavate earth to a set elevation, then prefabricating the inner partition walls below, until excavating earth to the base elevation, completing the installation of the last prefabricated inner partition wall; completing the casting of the inner lining wall from bottom to top, and finally completing the construction of the deep pit bottom plate. Prefabricated panels and prefabricated inner partition walls allow the entire construction process to be mostly prefabricated in the factory, reducing on-site casting, saving on-site casting and solidification time, avoiding weather influences, shortening construction time, and improving project progress.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of deep pit construction, and in particular relates to a deep pit well-type stereoscopic garage construction method. Background Art

[0002] The increase in urban population and urban buildings has led to a shortage of land resources in densely populated urban areas. Therefore, more underground space is used, resulting in deeper and deeper excavation depths of foundation pits. The existing subway stations in the city, a large number of municipal pipelines buried underground, and structures adjacent to the foundation pits, the foundation pit support methods in these areas mostly use a combination of ultra-deep underground continuous walls and internal supports. However, with the development of the green and low-carbon concept, underground continuous walls have exposed some problems: 1. A large amount of mud wall protection is required during the trenching process, and it is difficult to discharge waste gas and mud, which creates a great pressure on environmental protection; 2. The on-site construction process is complicated and the construction time is long; 3. The wall construction process has a certain disturbance to the adjacent foundation. The longer the trenching time, the deeper the wall, and the thicker the wall, the greater the difficulty of environmental protection; the quality control of underwater concrete pouring is difficult, and improper handling can easily form the hidden danger of joint leakage.

[0003] Therefore, the designer proposed a cement-soil continuous wall structure to form a continuous waterproof wall. However, this cement-soil continuous wall has a weak ability to resist lateral soil pressure. It is necessary to construct a continuous wall on the inside of the continuous waterproof wall as a retaining wall, and to construct an inner lining wall on the inside of the continuous wall. At the same time, an inner partition wall is made in the deep pit for support. The entire construction volume is relatively large, and the on-site construction and pouring require a long solidification time. At the same time, there is a gap between the continuous wall on the inside of the waterproof wall and the waterproof wall, which makes the anti-water wall lack sufficient lateral support, causing the waterproof wall to be unable to withstand the lateral soil pressure, and tilting and cracking, which reduces the waterproof effect of the waterproof wall. The inner lining wall and the inner partition wall must also be poured on the inside of the continuous wall to play a role in lateral support, which prolongs the entire construction process. Summary of the invention

[0004] The present invention provides a deep pit type three-dimensional carport construction method, which comprises the following steps: before excavating earth, firstly making a soil retaining and water retaining double composite cement soil wall, then casting an integrated support column on the inner side of the cement soil wall, and then excavating earth and installing a prefabricated inner partition wall in an alternating manner from top to bottom until the bottom of the deep pit. The soil retaining and water retaining double composite cement soil wall, the cast-in-place integrated support column, and the installation of the prefabricated inner partition wall enable the entire construction process to adopt the form of factory prefabrication, reduce on-site pouring, save on-site pouring and solidification time, avoid being affected by weather, shorten the construction time, and improve the project progress.

[0005] The specific technical scheme of the present invention is: a method for constructing a deep pit type three-dimensional parking garage, comprising the following steps: the first step is to construct a double composite cement soil wall for retaining soil and water, milling a groove with a groove milling machine, and then inserting a prefabricated panel into the groove, wherein the prefabricated panel is divided into a prefabricated cross wall panel corresponding to the corner of the deep pit, a prefabricated wall panel corresponding to the edge of the deep pit, and a prefabricated connection panel buckled with a mortise and tenon joint, wherein the width of the prefabricated wall panel is adapted to the width of the inner partition wall spacing in the deep pit;

[0006] The second step is to cast reinforced concrete support columns on the inner side of the cement soil wall. One side of the support column is in contact with the inner side of the cement soil wall, and the support column goes deep into the bottom of the pit;

[0007] The third step is to dig the earth to the set elevation, then put in the prefabricated inner partition wall, butt the end of the prefabricated inner partition wall with the surface of the corresponding support column, and then grout the position between the support column and the end of the prefabricated inner partition wall to form a cast-in-place tenon column;

[0008] The fourth step is to continue to dig the earth to the set elevation, then lower the prefabricated interior partition wall so that the end of the prefabricated interior partition wall is butted against the surface of the corresponding support column, and the upper and lower prefabricated interior partition walls are aligned with the same vertical plane, and then grouting is performed between the support column and the end of the prefabricated interior partition wall to form a cast-in-place tenon column, and grouting is performed through the grouting pipe of the prefabricated interior partition wall to fill the position between the upper and lower prefabricated interior partition walls;

[0009] Step 5: Repeat step 4 until the excavation reaches the base elevation and the installation of the last prefabricated interior partition wall is completed;

[0010] The sixth step is to complete the casting of the inner lining wall from bottom to top. The inner lining wall is made in blocks, separated by support columns and connected to the support columns. The inner lining wall is attached to the inner side of the cement soil wall, and finally the construction of the deep pit bottom plate is completed.

[0011] Prefabricated panels are inserted into the cement-soil wall to form a double composite cement-soil wall structure of soil retaining and water retaining. In addition to the water retaining function, it also has the function of soil retaining. The width of the prefabricated wall panels is large, which is adapted to the distance between the inner partition walls in the deep pit. This enables the cement-soil wall to withstand a large lateral earth pressure, thereby simplifying the structure and construction requirements of the retaining support in the deep pit. After the cast-in-place support columns, the prefabricated inner partition walls are lowered for lateral support, shortening the time waiting for the cast-in-place to solidify, thereby speeding up the construction progress of the entire project. After the earthwork is excavated, the inner lining wall is cast-in-place on the inside of the cement-soil wall. The inner lining wall is connected to the support columns and can be constructed in sections. The inner lining wall can also play an auxiliary supporting role for the cement-soil wall. The prefabricated panels and prefabricated inner partition walls make the entire construction process mostly adopt the form of factory prefabrication, reduce on-site pouring, save on-site pouring and solidification time, avoid weather influences, shorten construction time, and improve project progress.

[0012] For further optimization, drainage should be carried out before earth excavation, and the pipe well drainage method is adopted. The diameter of the pipe well drilling hole is controlled at 800mm, and the well pipe is a corrugated pipe, and the outer wall of the corrugated pipe has circular holes evenly distributed along the length of the pipe.

[0013] Further preferably, before the support column is cast in situ, a pipe hole is first made, and a steel cage is placed in the pipe hole. The three outer sides of the steel cage are covered with concrete formwork, and one side is attached to the inner side of the cement soil wall.

[0014] It is further preferred that the earthwork is excavated in blocks simultaneously and each block is excavated in layers, with the thickness of each layer not exceeding 1.5m and the width of each excavation section not exceeding 20m.

[0015] It is further preferred that when lowering the prefabricated interior partition wall, it is lowered from the side of the prefabricated interior partition wall that has been installed above, and then the prefabricated interior partition wall is moved to the bottom of the prefabricated interior partition wall above by translation, and grouting is poured between the two ends of the prefabricated interior partition wall to form tenon columns to connect the prefabricated interior partition wall and the supporting columns.

[0016] Further preferably, the lining wall is divided into plane and groove-shaped. The plane lining wall is located at the vertical inner partition wall at the edge of the deep pit, and the two sides of the plane lining wall are connected to the supporting columns; the groove-shaped lining wall is located at the short side of the deep pit, and the two ends of the groove-shaped lining wall are connected to the adjacent supporting columns. The groove-shaped lining wall is attached to the inner side of the cement soil wall at the short side of the deep pit, and overlaps with the cement soil wall at the corner of the deep pit.

[0017] Further preferably, the prefabricated panels are vertically plugged in from top to bottom, the prefabricated cross wall panels are first inserted into the corners of the deep pit, and then the prefabricated connecting panels are vertically inserted, the prefabricated connecting panels are tongue-and-groove engaged with the prefabricated cross wall panels, and then the prefabricated wall panels and prefabricated connecting panels are inserted from both sides to the middle, and the prefabricated wall panels are tongue-and-groove engaged with the prefabricated connecting panels.

[0018] Further preferably, the vertical edges of two adjacent sides of the prefabricated cross wall panel adopt a tenon structure, the vertical edges on both sides of the prefabricated wall panel adopt a tenon structure, and snap-fits are arranged on both sides of the root of the tenon. The two vertical edges of the prefabricated connecting plate adopt a C-shaped groove that matches the tenon structure, and the notch of the C-shaped groove extends toward the middle to form a buckle edge, which matches the snap-fit.

[0019] Further preferably, the length of the prefabricated connecting plate is greater than the length of the prefabricated wall panel, the length of the prefabricated connecting plate is greater than the length of the prefabricated cross wall panel, the lower surface of the prefabricated wall panel is provided with protruding pins, the upper surface of the prefabricated wall panel is provided with concave slots, the lower surface of the prefabricated cross wall panel is provided with protruding pins, the upper surface of the prefabricated cross wall panel is provided with a concave slot, the shape of the pins is matched with the shape of the slots, and the positions of the pins correspond one by one to the positions of the slots in the vertical direction.

[0020] Further preferably, grooves along the length direction are provided on three sides of the supporting column, and grooves are provided at the ends of the prefabricated inner partition walls. When the ends of the prefabricated inner partition walls are connected to the surfaces of the supporting columns, the two grooves form matching column holes, and the tenon columns are formed by grouting in the matching column holes.

[0021] The beneficial effects of the present invention are as follows: prefabricated panels and prefabricated internal partition walls enable the entire construction process to be mostly prefabricated in the factory, reducing on-site pouring at the construction site, saving the time for on-site pouring and solidification, avoiding the influence of weather, shortening the construction time, and improving the progress of the project; prefabricated panels are placed in the cement soil wall to form a double composite cement soil wall structure for retaining soil and water, which not only has the function of retaining water, but also has the function of retaining soil, and the width of the prefabricated wall panels is relatively large, which is adapted to the distance between the internal partition walls in the deep pit, which enables the cement soil wall to withstand a large lateral soil pressure, thereby simplifying the structure and construction requirements of the retaining soil support in the deep pit, and the prefabricated internal partition walls are lowered after the cast-in-place support columns for lateral support, shortening the time waiting for the cast-in-place solidification, thereby speeding up the construction progress of the entire project. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a schematic diagram of a deep pit structure of the present invention;

[0023] Figure 2 It is a schematic diagram of a prefabricated panel tongue-and-groove joint structure of the present invention;

[0024] Figure 3 It is a schematic diagram of a supporting column structure of the present invention;

[0025] Figure 4 It is a connection schematic diagram of a prefabricated interior partition wall of the present invention;

[0026] Figure 5 It is a construction schematic diagram of the cement soil wall of the present invention;

[0027] Figure 6 It is a construction schematic diagram of the support column of the present invention;

[0028] Figure 7 It is a schematic diagram of the installation of prefabricated interior partition walls by excavating earth in the present invention;

[0029] Figure 8 It is a schematic diagram of the deep pit bottom plate after construction of the present invention;

[0030] In the figure: 1. cement soil wall, 2. prefabricated wall panel, 3. prefabricated connecting plate, 4. supporting column, 5. flat lining wall, 6. prefabricated cross wall panel, 7. groove-shaped lining wall, 8. prefabricated inner partition wall, 9. slot, 10. tenon, 11. C-shaped slot, 12. pin, 13. groove, 14. steel bar, 15. pipe well, 16. bottom plate. DETAILED DESCRIPTION

[0031] The present invention will be further described below through specific embodiments in conjunction with the accompanying drawings. Example

[0032] like Figure 1 Figure 2 Figure 3 Figure 4 As shown, a deep pit type three-dimensional car park includes a double composite cement soil wall 1 structure with built-in prefabricated panels for retaining soil and water, cast-in-place integrated support columns 4 on the inner side of the cement soil wall, and prefabricated inner partition walls 8 laterally connected between the opposite support columns, and an inner lining wall cast adjacent to the inner side of the cement soil wall.

[0033] The pit is rectangular in shape, with four sides and four corners. The sides are flat, and the corners form a cross structure. Figure 2As shown, the cement soil wall is connected by a prefabricated wall panel 2 and a prefabricated connecting plate 3 at the corresponding edge position by a tongue-and-groove buckle connection method, and the prefabricated cross wall panel 6 and the prefabricated connecting plate 3 are connected by a tongue-and-groove buckle connection method at the corresponding corner position, and the prefabricated connecting plate is connected to the prefabricated wall panel. The length of the prefabricated wall panel coincides with the distance between the prefabricated internal partition walls, the position of the prefabricated connecting plate corresponds to the position of the internal partition wall, and the height of the prefabricated connecting plate is greater than the height of the prefabricated wall panel. The prefabricated wall panel 2 is planar, and the cross section of the prefabricated cross wall panel 6 is cross-shaped. The vertical vertical edges on both sides of the prefabricated wall panel adopt a tenon 10 structure, and the two adjacent vertical vertical edges of the prefabricated cross wall panel adopt a tenon structure. The vertical end face of the tenon has an inclined portion so that the widths of the two sides of the tenon are different, that is, the width of the side facing the deep pit is smaller than the width of the side on the other side, and the two sides of the root of the tenon are provided with a bayonet. The two vertical edges of the prefabricated connecting plate adopt a C-shaped groove 11 that matches the tenon structure. The notch of the C-shaped groove extends toward the middle to form a buckle edge, and the buckle edge matches the bayonet. The bayonet can prevent the C-shaped groove from detaching laterally. The middle of the prefabricated connecting plate is an inner plate, and the two side surfaces of the inner plate have a shape that matches the vertical end surface of the tenon. The tenon extends along the vertical edge of the prefabricated plate, and the C-shaped groove extends along the vertical edge of the prefabricated connecting plate. When the prefabricated plate is placed, it is also placed in a vertical manner. The prefabricated connecting plate can be connected to the C-shaped groove and the tenon in a vertical insertion manner. The height of the prefabricated wall panel and the prefabricated cross wall panel is 2.7-3m, which generally corresponds to the height of one layer of a deep pit building. The height of the prefabricated connecting plate is greater than the height of the prefabricated wall panel, so that a prefabricated connecting plate can connect at least two prefabricated wall panels. The thickness of the tenon is less than the thickness of the prefabricated wallboard. After the prefabricated connecting plate is plugged into the prefabricated wallboard, the outer surface of the prefabricated board is flush, and the inner surface of the prefabricated board is also flush, so that the cement soil layer on the surface of the prefabricated board has sufficient thickness. The prefabricated wallboard is a stacked plug-in structure. The lower surface of the prefabricated wallboard is provided with a protruding pin 12, and the upper surface of the prefabricated wallboard is provided with a concave slot 9. The shape of the pin matches the shape of the slot, and the position of the pin corresponds to the position of the slot in the vertical direction. The lower surface of the prefabricated cross wallboard is provided with a protruding pin, and the upper surface of the prefabricated cross wallboard is provided with a concave slot. The shape of the pin matches the shape of the slot, and the position of the pin corresponds to the position of the slot in the vertical direction. In this way, when the prefabricated wallboard is placed, the pin is inserted into the slot, and the upper and lower prefabricated panels establish a stable plug-in structure. The cross section of the pin is divided into two parts, including a rectangular part and a trapezoidal part, the short side length of the trapezoidal part is equal to the length of the rectangular part. The inclined surface of the trapezoidal part is equivalent to the guide structure of the pin, which can guide the pin to smoothly cooperate with the slot.

[0034] like Figure 3As shown, the support column is square in shape, the width of the support column is greater than the width of the prefabricated connection plate, one side of the support column is a plane, which is consolidated with the inner surface of the cement soil wall, and the other three sides are provided with trapezoidal grooves 13. A steel bar 14 extends from the bottom of the groove on the surface of the support column, and the length of the steel bar is less than the depth of the groove. A steel bar extends from the bottom of the groove at the end of the prefabricated inner partition wall, and the length of the steel bar is less than the depth of the groove. A vertical groove is provided at the end of the prefabricated inner partition wall. When the end of the prefabricated inner partition wall is connected to the surface of the support column, the two grooves form a matching column hole, and grouting is performed in the matching column hole to form a cast-in-place tenon column.

[0035] like Figure 4 As shown, a grouting pipe is embedded in the prefabricated interior partition wall, and the upper and lower sides of the prefabricated interior partition wall are provided with a concave filling groove extending along the length of the prefabricated interior partition wall, the filling groove is connected to the grouting pipe, and the filling grooves of the upper and lower prefabricated interior partition walls are aligned. After grouting, a connecting crossbeam of the upper and lower prefabricated interior partition walls is formed in the filling groove. A connecting screw pipe for connecting a hook is provided in the prefabricated interior partition wall, and the screw hole opening of the connecting screw pipe faces the side of the prefabricated interior partition wall. There are at least four connecting screw pipes, and the screw hole openings are evenly distributed on the two sides of the prefabricated interior partition wall, and the end of the connecting screw pipe is flush with the side of the prefabricated interior partition wall. Considering the convenience of cast-in-place of the support column, a notch is provided at the end position of the prefabricated interior partition wall, and the notch is just connected to the groove at the end of the prefabricated interior partition wall, and grouting can be poured into the aligned column hole through the notch.

[0036] The lining wall is divided into a flat lining wall 5 and a grooved lining wall 7. The flat lining wall is located at the vertical inner partition wall at the edge of the deep pit, and both sides of the flat lining wall are connected to the supporting columns. The grooved lining wall is located at the short side of the deep pit, and both ends of the grooved lining wall are connected to the adjacent supporting columns. The grooved lining wall is attached to the inner side of the cement soil wall at the short side of the deep pit, and overlaps with the cement soil wall at the corner of the deep pit.

[0037] like Figures 5 to 8 As shown, a construction method of a deep pit type stereoscopic parking garage includes the following steps:

[0038] The first step is to construct a double composite cement-soil wall for retaining soil and water. Use a slot milling machine to mill slots, then insert prefabricated panels into the slots, and vertically plug the prefabricated panels from top to bottom. First, insert the prefabricated cross wall panels at the corners of the deep pit, then vertically insert the prefabricated connecting panels, and the prefabricated connecting panels are mortise-and-tenon-joined with the prefabricated cross wall panels. Then, insert the prefabricated wall panels and prefabricated connecting panels from both sides to the middle, and the prefabricated wall panels are mortise-and-tenon-joined with the prefabricated connecting panels.

[0039] The second step is to make a drainage pipe well 15. The diameter of the pipe well drilling hole is controlled at 800mm. The well pipe adopts a corrugated pipe. The outer wall of the corrugated pipe is evenly distributed with circular holes along the pipe length. The drainage depth is controlled at a position of 500-1000mm below the excavation surface, and a water level observation hole is set. At the same time, controlled drainage is carried out outside the pit, and the position is not lower than 6.0m below the bottom surface. The buried pipe well adopts mud wall protection;

[0040] The third step is to cast reinforced concrete support columns on the inner side of the cement soil wall. First, make a pipe hole, put a steel cage in the pipe hole, and cover the three sides of the outer steel cage with concrete formwork. One side of the support column is in contact with the inner side of the cement soil wall, and the support column goes deep into the bottom of the pit;

[0041] The fourth step is to dig the earth in five blocks in a synchronous manner, with each layer not exceeding 1.5m in thickness and each section not exceeding 20m in width.

[0042] The fifth step is to dig the earth to the set elevation, then put in the prefabricated inner partition wall, the end of the prefabricated inner partition wall is butted against the surface of the corresponding support column, the groove on the side of the support column and the groove at the end of the prefabricated inner partition wall form a matching column hole, and then grouting is poured into the matching column hole to form a cast-in-place tenon column;

[0043] Step 6: Continue to dig the earth to the set elevation, then lower the prefabricated interior partition wall so that the end of the prefabricated interior partition wall is butted against the surface of the corresponding support column, and the upper and lower prefabricated interior partition walls are aligned with the same vertical plane. Then, grouting is performed between the support column and the end of the prefabricated interior partition wall to form a cast-in-place tenon column, and grouting is performed through the grouting pipe of the prefabricated interior partition wall to fill the position between the upper and lower prefabricated interior partition walls.

[0044] Step 7: Repeat step 6 until the excavation reaches the base elevation and the installation of the last prefabricated interior partition wall is completed;

[0045] The eighth step is to complete the casting of the inner lining wall from bottom to top. The inner lining wall is made in blocks, separated by support columns and connected to the support columns. The inner lining wall is attached to the inner side of the cement soil wall, and finally the deep pit bottom plate construction is completed.

[0046] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any way. Any simple modification, change and equivalent transformation made to the above embodiment based on the technical essence of the present invention still falls within the protection scope of the technical solution of the present invention.

Claims

1. A deep pit type stereo garage construction method, characterized in that: The method comprises the following steps: first, construction of a double composite cement soil wall for retaining soil and water, milling a groove with a groove milling machine, and then inserting a prefabricated panel into the groove, wherein the prefabricated panel is divided into a prefabricated cross wall panel corresponding to the corner of the deep pit, a prefabricated wall panel corresponding to the edge of the deep pit, and a prefabricated connection panel buckled with a mortise and tenon joint, wherein the width of the prefabricated wall panel is adapted to the width of the inner partition wall spacing in the deep pit; The second step is to cast reinforced concrete support columns on the inner side of the cement soil wall. One side of the support column is in contact with the inner side of the cement soil wall. The support column goes deep into the bottom of the pit, and grooves are set along the length direction on the three sides of the support column. The third step is to dig the earth to the set elevation, then put in the prefabricated inner partition wall, set a groove at the end of the prefabricated inner partition wall, and connect the end of the prefabricated inner partition wall with the surface of the corresponding support column. The groove on the side of the support column and the groove at the end of the prefabricated inner partition wall form a matching column hole, and then grouting is poured into the matching column hole to form a cast-in-place tenon column; The fourth step is to continue to dig the earth to the set elevation, then lower the prefabricated interior partition wall so that the end of the prefabricated interior partition wall is butted against the surface of the corresponding support column, and the upper and lower prefabricated interior partition walls are aligned with the same vertical plane, and then grouting is performed between the support column and the end of the prefabricated interior partition wall to form a cast-in-place tenon column, and grouting is performed through the grouting pipe of the prefabricated interior partition wall to fill the position between the upper and lower prefabricated interior partition walls; Step 5: Repeat step 4 until the excavation reaches the base elevation and the installation of the last prefabricated interior partition wall is completed; The sixth step is to complete the casting of the inner lining wall from bottom to top. The inner lining wall is made in blocks, separated by support columns and connected to the support columns. The inner lining wall is attached to the inner side of the cement soil wall, and finally the construction of the deep pit bottom plate is completed.

2. A deep pit type stereoscopic carport construction method according to claim 1, characterized in that: Before excavation, drainage must be carried out using the pipe well drainage method. The diameter of the pipe well drilling hole is controlled at 800mm, and the well pipe is a corrugated pipe with circular holes evenly distributed on the outer wall of the corrugated pipe along the length of the pipe.

3. A deep pit type stereoscopic carport construction method according to claim 1, characterized in that: Before the supporting columns are cast in situ, pipe holes are made first, and steel cages are placed inside the pipe holes. The three sides of the steel cage are covered with concrete formwork, and one side is attached to the inner side of the cement soil wall.

4. A deep pit type stereoscopic carport construction method according to claim 1, 2 or 3, characterized in that: The excavation of earthwork is carried out in blocks and layers simultaneously, with the thickness of each layer not exceeding 1.5m and the width of each section not exceeding 20m.

5. The method for constructing a deep pit type stereoscopic car park according to claim 1, characterized in that: When lowering the prefabricated interior partition wall, it is lowered from the side of the prefabricated interior partition wall that has been installed above, and then the prefabricated interior partition wall is moved to the bottom of the prefabricated interior partition wall above by translation. Grouting is poured between the two ends of the prefabricated interior partition wall to form mortise columns to connect the prefabricated interior partition wall and the supporting columns.

6. A deep pit type stereoscopic carport construction method according to claim 1, characterized in that: The lining wall is divided into flat and grooved shapes. The flat lining wall is located at the vertical inner partition wall at the edge of the deep pit, and the two sides of the flat lining wall are connected to the supporting columns; the grooved lining wall is located at the short side of the deep pit, and the two ends of the grooved lining wall are connected to the nearby supporting columns. The grooved lining wall is attached to the inner side of the cement soil wall at the short side of the deep pit, and overlaps with the cement soil wall at the corner of the deep pit.

7. A deep pit type stereoscopic carport construction method according to claim 1, 2 or 3, characterized in that: The prefabricated panels are plugged vertically from top to bottom. First, the prefabricated cross wall panels are inserted into the corners of the deep pit, and then the prefabricated connecting panels are vertically inserted. The prefabricated connecting panels are mortise-and-tenon-joined with the prefabricated cross wall panels. Then, the prefabricated wall panels and prefabricated connecting panels are inserted from both sides to the middle. The prefabricated wall panels are mortise-and-tenon-joined with the prefabricated connecting panels.

8. A method for constructing a deep pit type stereoscopic parking garage according to claim 1 or 2 or 3 or 5 or 6, characterized in that: The vertical edges of the two adjacent sides of the prefabricated cross wall panel adopt a tenon structure, the vertical edges on both sides of the prefabricated wall panel adopt a tenon structure, and snap-fits are arranged on both sides of the root of the tenon. The two vertical edges of the prefabricated connecting plate adopt a C-shaped groove that matches the tenon structure, and the notch of the C-shaped groove extends toward the middle to form a buckle edge, which matches the snap-fit.

9. A deep pit type stereoscopic car park construction method according to claim 8, characterized in that: The length of the prefabricated connecting plate is greater than that of the prefabricated wall panel, which is greater than that of the prefabricated cross wall panel. The lower surface of the prefabricated wall panel is provided with protruding pins, and the upper surface of the prefabricated wall panel is provided with concave slots. The lower surface of the prefabricated cross wall panel is provided with protruding pins, and the upper surface of the prefabricated cross wall panel is provided with concave slots. The shape of the pins matches the shape of the slots, and the positions of the pins correspond one by one to the positions of the slots in the vertical direction.