A warehouse artificial board building material sorting system and method

By designing the warehouse artificial board building materials sorting system, using the warehouse management server and sorting equipment to automatically process order information, generate material preparation plans and perform sorting operations, the problem of cumbersome manual picking and preparation is solved, and efficient and accurate material sorting and preparation are achieved.

CN115303696BActive Publication Date: 2025-05-16GUANGDONG YAODONG FURNITURE BOARD +1
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202211122294.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-09-15
Publication Date
2025-05-16
Estimated Expiration
2042-09-15

AI Technical Summary

Technical Problem

In the prior art, manual selection and preparation of artificial board building materials is complicated, wastes manpower and material resources and is prone to errors.

Method used

A warehouse artificial board building materials sorting system is designed, including a warehouse management server, controller, stacker, first sorting equipment and second sorting equipment. Through automated material preparation plan generation and execution, the automatic order arrangement and sorting of materials are realized.

Benefits of technology

It realizes automatic sorting of materials, saves a lot of time, reduces error rate, and improves production efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115303696B_ABST
    Figure CN115303696B_ABST
Patent Text Reader

Abstract

The present invention discloses a warehouse artificial board building material sorting system and method. The warehouse artificial board building material sorting system comprises a warehouse management server, a controller, a stacker, a first sorting device and a second sorting device, wherein the warehouse management server can generate a material preparation plan according to pre-acquired order information, and control the stacker to remove materials according to the material preparation plan, wherein the material preparation plan can be sorted and combined according to various types of materials in the order information; further, after the controller controls the first sorting device to receive the materials removed from the stacker, the materials are transported to the sorting station, and a sorting instruction is generated and sent to the second sorting device, and the second sorting device sorts and shapes the materials according to the sorting instruction, and after obtaining at least one material pile, a sorting completion instruction is sent to the warehouse manager, thereby realizing automatic sequential arrangement and sorting of the materials, thereby saving a lot of time, reducing the error rate and improving production efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of decorative building materials, and in particular to a warehouse artificial board building material sorting system and method. Background Art

[0002] In the current building materials market, due to the differences in base materials and impregnated papers, customer orders for artificial boards involve a wide variety of combinations of different base materials and impregnated papers. It is a big problem to prepare materials and produce them according to customer orders. The existing technology uses manual picking, preparation and storage, which not only wastes a lot of manpower and material resources, but is also prone to errors. Summary of the invention

[0003] Therefore, in order to solve the deficiencies of the prior art, an embodiment of the present invention provides a warehouse artificial board building material sorting system and method.

[0004] According to a first aspect, an embodiment of the present invention discloses a warehouse artificial board building material sorting system, including a warehouse management server, a controller, a stacker, a first sorting device, and a second sorting device;

[0005] The warehouse management server is used to generate a material preparation plan based on the pre-acquired order information and control the stacker to remove materials according to the material preparation plan;

[0006] A controller, used to control the first sorting device to receive the materials unloaded from the stacker, transport the materials to a preset sorting station, and generate a sorting instruction to send to the second sorting device;

[0007] The second sorting device sorts and shapes the materials according to the sorting instruction, and after obtaining at least one material pile, sends a sorting completion instruction to the warehouse management server.

[0008] Optionally, the warehouse management server includes a management service system and a control service system;

[0009] The management service system is used to generate a material preparation plan according to the pre-acquired order information, generate a material preparation instruction according to the material preparation plan, and send the material preparation instruction to the control service system, wherein the material preparation instruction carries the material preparation plan;

[0010] The control service system is used to control the stacker to remove materials according to the material preparation plan.

[0011] Optionally, the warehouse artificial board building material sorting system also includes labeling equipment;

[0012] The control service system is also used to receive a sorting completion instruction sent by the sorting device, which is an instruction sent to the control service system after the sorting device sorts and shapes the materials according to the sorting instruction to obtain at least one material pile, and the sorting completion instruction includes label information corresponding to each material pile; and forward the sorting completion instruction to the management service system;

[0013] The management service system is also used to generate a label printing instruction according to the label information in the sorting completion instruction, and send the label printing instruction to the labeling device;

[0014] A labeling device, used for generating a label corresponding to each material pile according to a label printing instruction;

[0015] After the label is affixed to the corresponding material pile, a labeling completion instruction is sent to the management service system.

[0016] Optionally, the control service system is further used to forward the sorting completion instruction to the controller;

[0017] The controller is also used to control the first sorting device to receive the sorting residue according to the sorting completion instruction; after receiving the sorting residue, the controller sends the indication information of the completion of sorting the residue to the control service system, so that the control service system generates a label printing instruction according to the indication information and the label information in the sorting completion instruction.

[0018] Optionally, the management service system is also used to:

[0019] After receiving the labeling completion instruction, a label scanning instruction is sent to the control service system;

[0020] The control service system is also used to instruct the controller to complete the label scanning operation according to the label scanning instruction;

[0021] The controller is also used to control the first sorting device to complete the warehousing operation of at least one material pile.

[0022] Optionally, the management service system is also used to update the warehouse inventory after detecting that the warehousing operation of at least one material pile is completed.

[0023] According to a second aspect, an embodiment of the present invention further discloses a warehouse artificial board building material sorting method, which is applied to a warehouse artificial board building material sorting system as in the first aspect or any optional implementation manner of the first aspect, wherein the warehouse artificial board building material sorting system comprises a warehouse management server, a controller, a stacker, a first sorting device, and a second sorting device, and the method comprises:

[0024] After obtaining the order information, the warehouse management server generates a material preparation plan based on the order information and controls the stacker to remove materials according to the material preparation plan;

[0025] After controlling the first sorting device to receive the materials unloaded from the stacker, the controller transports the materials to the sorting station and generates a sorting instruction to be sent to the second sorting device;

[0026] According to the sorting instruction, the materials are sorted and shaped to obtain at least one material pile, and then the second sorting device sends a sorting completion instruction to the warehouse management server.

[0027] Optionally, after obtaining the order information, the warehouse management server generates a material preparation plan according to the order information, and controls the stacker to remove the materials according to the material preparation plan, specifically including:

[0028] Generate a material preparation plan based on the pre-acquired order information, and generate a material preparation instruction based on the material preparation plan. The material preparation instruction carries the material preparation plan.

[0029] Control the stacker to remove materials according to the material preparation plan.

[0030] Optionally, the method further comprises:

[0031] receiving a sorting completion instruction sent by a sorting device, wherein the sorting completion instruction is an instruction sent to the control service system after the sorting device sorts and shapes the materials according to the sorting instruction to obtain at least one material pile, and the sorting completion instruction includes label information corresponding to each material pile;

[0032] Generate a label printing instruction according to the label information in the sorting completion instruction, and send the label printing instruction to the labeling equipment;

[0033] Generate labels corresponding to each material pile according to label printing instructions;

[0034] After the label is affixed to the corresponding material pile, a labeling completion instruction is sent to the management service system.

[0035] Optionally, the method further comprises:

[0036] According to the sorting completion instruction, the first sorting device is controlled to receive the sorting residue; after receiving the sorting residue, an indication message indicating that the sorting residue is completed is sent to the control service system, so that the control service system generates a label printing instruction according to the indication message and the label information in the sorting completion instruction.

[0037] The technical solution of the present invention has the following advantages:

[0038] The present invention provides a warehouse artificial board building material sorting system and method, the warehouse artificial board building material sorting system includes a warehouse management server, a controller, a stacker, a first sorting device and a second sorting device, wherein the warehouse management server can generate a material preparation plan according to pre-acquired order information, and control the stacker to take down materials according to the material preparation plan, wherein the material preparation plan can be sorted and combined according to various types of materials in the order information; further, the controller controls the first sorting device to receive the materials taken down by the stacker, and after the materials are transported to the sorting station, a sorting instruction is generated and sent to the second sorting device, the second sorting device shapes the materials according to the sorting instruction, and after obtaining at least one material pile, a sorting completion instruction is sent to the warehouse manager, thereby realizing automatic sequential arrangement and sorting of materials, thereby saving a lot of time, reducing the error rate and improving production efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0039] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0040] Figure 1 It is a principle block diagram of a specific example of a warehouse artificial board building material sorting system in an embodiment of the present invention;

[0041] Figure 2 It is a schematic diagram of a specific example of a warehouse artificial board building material sorting system in an embodiment of the present invention;

[0042] Figure 3 It is a schematic diagram of a specific example of a warehouse artificial board building material sorting system in an embodiment of the present invention;

[0043] Figure 4 The flowchart is a specific example of the method for sorting artificial board building materials in a warehouse according to an embodiment of the present invention. DETAILED DESCRIPTION

[0044] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0045] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

[0046] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, it can also be the internal connection of two components, it can be a wireless connection, or it can be a wired connection. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0047] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.

[0048] Artificial boards are made of two raw materials, base material and impregnated paper, which are pressed together. There are many kinds of raw material base materials, and the common types are particleboard base material, medium fiberboard base material, plywood base material, etc. The base material thickness specifications are commonly used in more than ten types such as 3mm, 5mm, 9mm, 12mm, 15mm, 16mm, 18mm, 22mm, 25mm, etc., and there are more than 100 kinds of impregnated paper patterns.

[0049] For the above-mentioned types of substrates and impregnated paper patterns, the generated customer orders will include various types of combinations. Therefore, when preparing materials for production according to customer orders, a large amount of manpower and material resources are required to complete.

[0050] In view of the technical problems mentioned in the background technology, the embodiment of the present application provides a warehouse artificial board building material sorting system, see Figure 1 As shown, the system includes a warehouse management server 101, a controller 102, a stacker 103, a first sorting device 104, and a second sorting device 105. The functions of each of the above components are introduced below.

[0051] The warehouse management server is used to generate a material preparation plan based on the pre-acquired order information, and control the stacker to remove materials according to the material preparation plan.

[0052] For example, the warehouse management server may be a warehouse material management system, specifically a computer with a built-in warehouse management method / system, etc. Order information may be obtained from the sales platform corresponding to the warehouse or the sales record corresponding to the merchant, wherein the order information includes data on the finished board materials purchased by the customer, classified into base materials, impregnated paper, and other types. Figure 2 Shows the details of the materials used in the customer's order, including the thickness of the substrate, the type of substrate, and the impregnation color.

[0053] The warehouse management server generates a corresponding material preparation plan according to the type and quantity of materials used in the order information, and controls the stacker corresponding to the materials in the material preparation plan to unload the materials according to the material preparation plan.

[0054] In an optional embodiment, considering that the warehouse generates corresponding instructions and controls the corresponding stacker to perform unloading operations, etc., the warehouse management server can be divided into a management server and a control server.

[0055] The management service system is used to generate a material preparation plan according to the pre-acquired order information, generate a material preparation instruction according to the material preparation plan, and send the material preparation instruction to the control service system, wherein the material preparation instruction carries the material preparation plan.

[0056] The control service system is used to control the stacker to remove materials according to the material preparation plan.

[0057] For example, the management service system can be used in the warehouse management server to analyze order information and generate decision instructions. The control service system can be used in the warehouse management server to send the instructions of the management service system to the sorting equipment or controller corresponding to the instructions. The specific service management system can be WMS (Warehouse Management System, warehouse management system, referred to as WMS), and the control service system can be WCS (Warehouse Control System, warehouse management system, referred to as WCS).

[0058] The controller is used to control the first sorting device to receive the materials unloaded from the stacker, transport the materials to a preset sorting station, and generate a sorting instruction to send to the second sorting device.

[0059] Exemplarily, the controller can be a device in a warehouse artificial board building material sorting system that is used to execute instructions issued by a warehouse management server, and control the corresponding execution device according to the instructions to complete the sorting of materials. Specifically, it can be a PLC (Programmable logic Controller, PLC for short), wherein the first sorting device is controlled by the controller, and the first sorting device can be an RGV (Rail Guided Vehicle, RGV for short) trolley.

[0060] Each sorting station is pre-set to place substrate plates with different specifications and parameters. After receiving the sorting data from the upstream system, the robot grabs the substrate plates from different stations respectively.

[0061] After the warehouse management server controls the stacker to unload the materials, the first sorting device RGV vehicle moves to the corresponding stacker to receive the materials and delivers the received materials to the sorting station, where the position of the sorting station is pre-built into the RGV vehicle and does not need to be set again. After the RGV delivers the materials to the sorting station, it sends a sorting instruction to the second sorting device. Each sorting station will place the substrate board with corresponding specification parameters according to the pre-defined specifications, and after the placement is completed, it will send a sorting instruction to the second sorting device.

[0062] The second sorting device sorts and shapes the materials according to the sorting instruction, and after obtaining at least one material pile, sends a sorting completion instruction to the warehouse management server.

[0063] Exemplarily, the second sorting device may be a corresponding robot, which is used to sort materials, and the robot may include a manipulator that can sort materials. The second sorting device will grab the corresponding sorting station substrate board according to the specification parameters of each sorting station, and shape it to obtain at least one material pile, wherein the volume data range of the material pile can be 1220mm (length) * 2440mm (width) * 10mm ~ 130mm (height), 1220mm (length) * 2880mm (width) * 10mm ~ 130mm (height), and the maximum weight is 2.5 tons.

[0064] After receiving the sorting instruction, the second sorting device sorts the materials according to the sorting instruction, wherein the sorting instruction includes the quantity corresponding to each material. The sorting process can be sorted according to the type and type of the materials to obtain a material pile based on the material type, wherein the material pile can be one or more. When the material pile is one, in this case, the type of material is used as a basis, and materials of the same type are formed into a material pile. When the total quantity is not large, all materials can be classified into one material pile (that is, all materials are put together in sequence), or when there is only one material, it is also a material pile; when there are multiple material piles, in this case, each type of material is divided into a material pile based on the type of material, and the number of materials included in each material pile is the number corresponding to the type.

[0065] After completing the sorting of the materials, the second sorting device sends a sorting completion instruction to the warehouse management server so that the warehouse management server can continue subsequent operations.

[0066] On the basis of the above-mentioned embodiments, the embodiments of the present invention also provide another warehouse artificial board building material sorting system. In this embodiment, the contents already introduced in the above-mentioned embodiments will not be repeated. Considering that after the materials are sorted, each material pile needs to be identified in the subsequent production process, the corresponding warehouse artificial board building material sorting system should also include labeling equipment to label the sorted material pairs, so as to achieve the subsequent efficient utilization of the material piles.

[0067] The control service system is also used to receive a sorting completion instruction sent by the sorting device. The sorting completion instruction is an instruction sent to the control service system by the second sorting device after sorting and shaping the materials according to the sorting instruction to obtain at least one material pile. The sorting completion instruction includes label information corresponding to each material pile; and the sorting completion instruction is forwarded to the management service system.

[0068] The management service system is also used to generate label printing instructions according to the label information in the sorting completion instruction, and send the label printing instructions to the labeling equipment.

[0069] Exemplarily, after obtaining the sorting completion instruction sent by the second sorting device after sorting is completed, the control service system forwards the sorting completion instruction to the management service system. After receiving the sorting completion instruction, the service management system generates a label printing instruction according to the sorting completion instruction, and prints a corresponding label for each material pile, wherein the sorting completion instruction includes information about each material pile after the second sorting device completes sorting, and therefore generates a label printing instruction according to the label information of these material piles, and then sends the label printing instruction to the labeling device.

[0070] The labeling device is used to generate a label corresponding to each material pile according to the label printing instruction.

[0071] After the label is affixed to the corresponding material pile, a labeling completion instruction is sent to the management service system.

[0072] For example, after receiving the label printing instruction sent by the management server, the label device prints the label according to the information in the printing instruction, and the printed label corresponds to the information of the material pile one by one. After printing, the label is pasted on the corresponding material pair, so that when the material pile is used for production or storage in the future, it can be directly identified according to the label information, realizing the automated management of the warehouse and reducing the error rate.

[0073] On the basis of the above embodiment, the embodiment of the present invention further provides another warehouse artificial board building material sorting system. In this embodiment, the contents already introduced in the above embodiment will not be repeated. The above embodiment introduces the implementation method of directly printing labels after sorting is completed. Considering that after the second sorting device completes the sorting, if there are still excess materials, in this case, the excess materials need to be put back. Therefore, the control service system needs to control the first sorting device to complete the replay of the excess materials.

[0074] The controller is also used to control the first sorting device to receive the sorting residue according to the sorting completion instruction; after receiving the sorting residue, the controller sends the indication information of the completion of sorting the residue to the control service system, so that the control service system generates a label printing instruction according to the indication information and the label information in the sorting completion instruction.

[0075] Exemplarily, the controller controls the RGV trolley to put back the remaining materials according to the sorting completion instruction, and after completion, sends the completion instruction to the control service system so that the subsequent management service system can issue label instructions according to the completion instruction.

[0076] After completing the label printing instruction, the material pile needs to be put into storage and wait for the production workshop to call for the material. When storing in the warehouse, it needs to be stored according to the information in the label, so the management service system is also used to send a label scanning instruction to the control service system after receiving the labeling completion instruction; the control service system is also used to instruct the controller to complete the label scanning operation according to the label scanning instruction; the controller is also used to control the first sorting device to complete the storage operation of at least one material pile.

[0077] Exemplarily, after receiving the labeling completion instruction, the management service system sends a label scanning instruction to the control service system. After receiving the label scanning instruction, the control service system instructs the controller to complete the label scanning operation. After the label scanning is completed, the corresponding material pile is stored into the warehouse using the RGV cart according to the label information. After the warehousing is completed, the management service system updates the inventory information according to the information of the material pile.

[0078] like Figure 3 As shown in FIG. 1 , a specific example of the warehouse artificial board building material sorting system is shown, in which MES (manufacturing execution system, referred to as MES), that is, the control system of the production workshop, Figure 3 The control process in corresponds to the control process of the above system.

[0079] By running this system, the warehouse artificial board building material sorting system includes a warehouse management server, a controller, a stacker, a first sorting device and a second sorting device, wherein the warehouse management server can generate a material preparation plan according to the pre-acquired order information, and control the stacker to take down the materials according to the material preparation plan, wherein the material preparation plan can be sorted and combined according to the various types of materials in the order information; further, the controller controls the first sorting device to receive the materials taken down by the stacker, and after transporting the materials to the sorting station, generates a sorting instruction and sends it to the second sorting device, the second sorting device shapes the materials according to the sorting instruction, and after obtaining at least one material pile, sends a sorting completion instruction to the warehouse manager, thereby realizing automatic sequential arrangement and sorting of materials, thereby saving a lot of time, reducing the error rate and improving production efficiency.

[0080] The above are embodiments of the warehouse artificial board building material sorting system provided by the present application. The following describes other embodiments of the warehouse artificial board building material sorting system provided by the present application. Please refer to the following for details.

[0081] The embodiment of the present invention also discloses a method for sorting artificial board building materials in a warehouse, such as Figure 4 As shown, the warehouse artificial board building material sorting system applied to the above embodiment includes a warehouse management server, a controller, a stacker, a first sorting device, and a second sorting device, and the method includes:

[0082] Step 401, after obtaining the order information, the warehouse management server generates a material preparation plan according to the order information, and controls the stacker to remove the materials according to the material preparation plan;

[0083] Step 402, after controlling the first sorting device to receive the materials unloaded from the stacker, the controller transports the materials to a preset sorting station and generates a sorting instruction to be sent to the second sorting device;

[0084] Step 403, sorting and shaping the materials according to the sorting instruction, and after obtaining at least one material pile, the second sorting device sends a sorting completion instruction to the warehouse management server.

[0085] In an optional implementation, after obtaining the order information, the warehouse management server generates a material preparation plan according to the order information, and controls the stacker to remove materials according to the material preparation plan, specifically including:

[0086] Generate a material preparation plan based on the pre-acquired order information, and generate a material preparation instruction based on the material preparation plan. The material preparation instruction carries the material preparation plan.

[0087] Control the stacker to remove materials according to the material preparation plan.

[0088] In an optional embodiment, the method further comprises:

[0089] receiving a sorting completion instruction sent by a sorting device, wherein the sorting completion instruction is an instruction sent to the control service system after the sorting device sorts and shapes the materials according to the sorting instruction to obtain at least one material pile, and the sorting completion instruction includes label information corresponding to each material pile;

[0090] Generate a label printing instruction according to the label information in the sorting completion instruction, and send the label printing instruction to the labeling equipment;

[0091] Generate labels corresponding to each material pile according to label printing instructions;

[0092] After the label is affixed to the corresponding material pile, a labeling completion instruction is sent to the management service system.

[0093] In an optional embodiment, the method further comprises:

[0094] According to the sorting completion instruction, the first sorting device is controlled to receive the sorting residue; after receiving the sorting residue, an indication message indicating that the sorting residue is completed is sent to the control service system, so that the control service system generates a label printing instruction according to the indication message and the label information in the sorting completion instruction.

[0095] The implementation methods of each step in the warehouse artificial board building material sorting method provided by the embodiment of the present invention have been described in detail in any of the above system embodiments, so they will not be repeated here.

[0096] By executing this method, the warehouse artificial board building material sorting system includes a warehouse management server, a controller, a stacker, a first sorting device and a second sorting device, wherein the warehouse management server can generate a material preparation plan according to the pre-acquired order information, and control the stacker to take down the materials according to the material preparation plan, wherein the material preparation plan can be sorted and combined according to the various types of materials in the order information; further, the controller controls the first sorting device to receive the materials taken down by the stacker, and after transporting the materials to the sorting station, generates a sorting instruction and sends it to the second sorting device, the second sorting device shapes the materials according to the sorting instruction, and after obtaining at least one material pile, sends a sorting completion instruction to the warehouse manager, thereby realizing automatic sequential arrangement and sorting of the materials, thereby saving a lot of time, reducing the error rate and improving production efficiency.

Claims

1. A warehouse artificial board building material sorting system, characterized in that: It includes a warehouse management server, a controller, a stacker, a first sorting device, and a second sorting device, wherein the warehouse management server includes a management service system and a control service system; The warehouse management server is used to generate a material preparation plan according to the pre-acquired order information, and control the stacker to remove materials according to the material preparation plan; The material preparation plan is sorted and combined according to various types of materials in the order information; The controller is used to control the first sorting device to receive the materials unloaded by the stacker, transport the materials to a preset sorting station, and generate a sorting instruction to send to the second sorting device; wherein each sorting station is pre-set with a substrate sheet of corresponding specification parameters; The second sorting device, according to the sorting instruction, respectively grabs the materials of the corresponding sorting stations for sorting and shaping, and after obtaining at least one material pile, sends a sorting completion instruction to the warehouse management server to realize automatic sequential arrangement and sorting of the materials; The warehouse artificial board building material sorting system also includes labeling equipment; The control service system is used to receive a sorting completion instruction sent by the second sorting device, wherein the sorting completion instruction is an instruction sent to the control service system by the second sorting device after sorting and shaping the materials according to the sorting instruction to obtain at least one material pile, and the sorting completion instruction includes label information corresponding to each of the material piles; and forward the sorting completion instruction to the management service system; the label information is used to update inventory information; The management service system is used to generate a label printing instruction according to the label information in the sorting completion instruction, and send the label printing instruction to the labeling device; The labeling device is used to generate a label corresponding to each of the material piles according to the label printing instruction; After the label is attached to the corresponding material pile, a labeling completion instruction is sent to the management service system; The control service system is further used to forward the sorting completion instruction to the controller; The controller is further configured to control the first sorting device to receive sorting residues according to the sorting completion instruction; after receiving the sorting residues, the controller sends indication information indicating that the sorting residues are completed to the control service system, so that the control service system generates the label printing instruction according to the indication information and the label information in the sorting completion instruction.

2. The warehouse artificial board building material sorting system according to claim 1 is characterized in that: The management service system is further used to generate a material preparation plan according to the pre-acquired order information, generate a material preparation instruction according to the material preparation plan, and send the material preparation instruction to the control service system, wherein the material preparation instruction carries the material preparation plan; The control service system is also used to control the stacker to remove materials according to the material preparation plan.

3. The warehouse artificial board building material sorting system according to claim 1 is characterized in that: The management service system is also used to send a label scanning instruction to the control service system after receiving the labeling completion instruction; The control service system is also used to instruct the controller to complete the label scanning operation according to the label scanning instruction; The controller is also used to control the first sorting device to complete the warehousing operation of at least one of the material piles.

4. The warehouse artificial board building material sorting system according to claim 3 is characterized in that: The management service system is also used to update the warehouse inventory after detecting that the warehousing operation of at least one of the material piles is completed.

5. A method for sorting artificial board building materials in a warehouse, characterized in that: Applied to the warehouse artificial board building material sorting system as claimed in any one of claims 1 to 4, the warehouse artificial board building material sorting system comprises a warehouse management server, a controller, a stacker, a first sorting device, and a second sorting device, and the warehouse artificial board building material sorting method comprises: After obtaining the order information, the warehouse management server generates a material preparation plan according to the order information, and controls the stacker to remove materials according to the material preparation plan; the material preparation plan is sorted and combined according to the various types of materials in the order information; After controlling the first sorting device to receive the materials unloaded from the stacker, the controller transports the materials to a preset sorting station, and generates a sorting instruction and sends it to the second sorting device; wherein each sorting station is pre-set with a substrate sheet of corresponding specification parameters; According to the sorting instruction, the materials at the corresponding sorting stations are respectively grabbed to sort and shape the materials, and after obtaining at least one material pile, the second sorting device sends a sorting completion instruction to the warehouse management server to realize automatic sequential arrangement and sorting of the materials; The warehouse artificial board building material sorting method also includes: receiving a sorting completion instruction sent by the sorting device, wherein the sorting completion instruction is an instruction sent to the control service system by the sorting device after sorting and shaping the materials according to the sorting instruction to obtain at least one material pile, and the sorting completion instruction includes label information corresponding to each of the material piles; the label information is used to update inventory information; Generate a label printing instruction according to the label information in the sorting completion instruction, and send the label printing instruction to the labeling device; Generate a label corresponding to each of the material piles according to the label printing instruction; After the label is attached to the corresponding material pile, a labeling completion instruction is sent to the management service system; The warehouse artificial board building material sorting method also includes: According to the sorting completion instruction, the first sorting device is controlled to receive the sorting residues; after receiving the sorting residues, an indication message indicating that the sorting residues are completed is sent to the control service system, so that the control service system generates the label printing instruction according to the indication message and the label information in the sorting completion instruction.

6. The method for sorting artificial board building materials in a warehouse according to claim 5, characterized in that: After obtaining the order information, the warehouse management server generates a material preparation plan according to the order information, and controls the stacker to remove materials according to the material preparation plan, specifically including: Generate a material preparation plan according to the pre-acquired order information, and generate a material preparation instruction according to the material preparation plan, wherein the material preparation instruction carries the material preparation plan; The stacker is controlled to remove materials according to the material preparation plan.

Citation Information

Patent Citations

  • Sorting method and system

    CN107215606A

  • Intelligent electric power warehouse automatic sorting system and method

    CN112246676A

  • Cargo picking device and method and cargo packing device and method

    CN113753471A