A method for optimal dispatching of distribution networks with distributed generation.
Patent Information
- Authority / Receiving Office
- CN Β· China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- STATE GRID SHANDONG ELECTRIC POWER CO
- Filing Date
- 2022-07-15
- Publication Date
- 2026-05-26
AI Technical Summary
Traditional particle swarm optimization algorithms cannot take into account multiple objectives in the optimal scheduling of distribution networks, making it difficult to simultaneously optimize distribution network operating costs and load power outage rates.
A multi-objective improved particle swarm optimization algorithm is adopted to construct an objective function that takes into account both the operating cost of the distribution network and the load failure rate. The search process of the particle swarm is optimized by updating the particle velocity and position, and the particle position is updated by combining the geometric distance comparison method of the ideal optimal point.
It effectively reduced the operational optimization of the distribution network, optimized the operating cost and load loss rate of the distribution network, optimized the scheduling of the distribution network, improved search efficiency, and improved the operational efficiency and scheduling of the distribution network.
Smart Images

Figure CN115333082B_ABST