An automatic construction method and application of risk analysis model for shield construction
Through the automatic construction of shield construction risk analysis models and probabilistic safety assessment, combined with random fields and Monte-Carlo theory, the problems of soil uncertainty and insufficient interactivity in the existing technology are solved, and the high efficiency of shield construction risks is achieved. , accurate analysis.
Patent Information
- Application Number
- CN202210801380.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-07-07
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2042-07-07
AI Technical Summary
Existing shield construction risk analysis methods cannot effectively consider soil uncertainty, resulting in risk underestimation, and lack of interactivity, making it impossible to quickly and timely analyze high-risk intervals.
Using the automatic construction method of shield construction risk analysis model, through the integrated process of parametric modeling and probabilistic safety assessment, two-dimensional and three-dimensional shield construction risk analysis models are generated, and the soil parameters are realized by combining random fields and Monte-Carlo theory. Probabilistic analysis of uncertainty.
It has significantly improved the efficiency and accuracy of shield construction risk analysis, can more comprehensively reflect the risks that may be faced during construction, meet different needs in engineering practice, and provide efficient and intuitive risk analysis results.
Smart Images

Figure CN115344915B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field related to risk prediction of shield construction, and more specifically, relates to an automatic construction method and application of a shield construction risk analysis model. Background Art
[0002] With the progress of urbanization, urban ground space is becoming increasingly scarce, and limited ground transportation can no longer meet people's growing demand for rapid transportation. In this context, the demand for urban rail transit continues to grow. Shield construction technology has become the main construction technology for urban rail transit construction due to its advantages such as fast construction, high degree of mechanization and low environmental disturbance. Shield projects are mainly located in densely populated areas of cities, with complex surrounding environments, strong uncertainty in geological conditions, many risks and hidden dangers, and large losses caused by engineering accidents. Among them, the strong uncertainty of geological conditions brings greater uncertainty and danger to shield construction. Therefore, it is crucial to achieve safety assessment of the shield construction process taking into account soil uncertainty through technical and theoretical means.
[0003] At present, with the continuous improvement of computing performance, numerical simulation methods have become an important method for safety assessment of shield construction process, and their application in shield tunnel engineering has become relatively mature and extensive. However, numerical simulation requires engineers to perform three-dimensional numerical modeling of shield tunnel engineering, which is complicated, cumbersome and time-consuming, limiting the rapid and efficient safety assessment of shield tunnel construction. With the development of object-oriented parametric modeling technology, the design of shield tunnel engineering has ushered in technological innovation. The parametric model of shield tunnel engineering can replace the traditional two-dimensional drawing design to guide the engineering construction process in the form of parametric expression of engineering objects. The parametric expression of shield tunnel engineering can provide all the necessary input parameters for numerical simulation, so the automatic generation of numerical simulation models can be achieved through the parametric model of shield tunnel engineering, which can avoid engineers from manually performing tedious numerical simulation modeling and greatly improve the safety assessment efficiency of shield tunnel engineering. The direct realization of shield construction safety assessment through the parametric model of shield tunnel engineering can be referred to as the integrated technology of parametric modeling and numerical analysis of shield construction, and there are relatively mature solutions internationally.
[0004] However, all existing solutions are deterministic analyses, that is, the soil parameters are set as deterministic during the numerical analysis process, and the output of the numerical analysis is also a deterministic value, completely ignoring the uncertainty of the soil. These solutions that ignore the uncertainty of the soil cannot comprehensively consider various influencing factors and will underestimate the risk of shield construction. By systematically considering the uncertainty of the soil and integrating it into the integrated technology of parametric modeling and numerical analysis of shield construction, the risks that may be faced in shield construction can be more comprehensively reflected, which has better guiding significance for actual projects. On the other hand, the existing solutions have obvious shortcomings in terms of interaction. It is impossible to define the analysis interval according to the needs, and it is impossible to effectively analyze the shield interval with higher risks in a timely manner. Therefore, shield tunnel engineering urgently needs a new type of automatic construction method for shield construction risk analysis model that is highly interactive and considers soil uncertainty. Summary of the invention
[0005] In response to the above defects or improvement needs of the prior art, the present invention provides a method and application for automatically constructing a risk analysis model for shield construction, which realizes the integrated process of parametric modeling and probabilistic safety assessment analysis of shield construction, simplifies the processing flow of safety assessment, and improves the processing efficiency of the safety assessment process. At the same time, a probabilistic expression method and application of safety assessment for parametric models of shield construction are provided.
[0006] To achieve the above object, according to one aspect of the present invention, a method for automatically constructing a shield construction risk analysis model is provided, and the method mainly comprises the following steps:
[0007] (1) Obtain the upper and lower limit coordinates of each soil layer through drilling data and generate the corresponding soil layer. At the same time, configure the corresponding soil parameters and random field parameters for each soil layer to generate a parameterized geological model;
[0008] (2) The tunnel segmentation model and the geological segmentation model are generated by combining the parameterized tunnel model and the parameterized geological model with the geometric operation algorithm based on interface segmentation. The spatial position and outer diameter of all shield segments are obtained by the OBB bounding box algorithm and the tunnel segmentation model. The corresponding geological geometric model is generated by the Delaunay triangulation algorithm and the geological segmentation model.
[0009] (3) The tunnel geometry model is reconstructed based on the spatial position and outer diameter of the shield segments, and a construction risk analysis model is constructed together with the geological geometry model.
[0010] Furthermore, the width of the corresponding shield segment is obtained through the shield segment and the tunnel design axis, and the segments are arranged according to the design axis to generate a geometric model of the parametric tunnel; then, the parametric segment is used as a carrier and the naming convention of the parametric attribute is set, and the corresponding material parameters and construction parameters of the segment are set to complete the parametric configuration of the parametric tunnel.
[0011] Furthermore, the shield construction risk analysis model includes a two-dimensional shield construction risk analysis model and a three-dimensional shield construction risk analysis model. The two-dimensional shield construction risk analysis model is obtained by generating a single cross-section plane perpendicular to the shield construction direction and simultaneously dividing the parameterized tunnel model and the parameterized geological model through Boolean operations.
[0012] Furthermore, the three-dimensional model for risk analysis of shield construction is composed of the selected tunnel analysis interval and the geological analysis interval obtained by dividing the parameterized geological model by four section planes generated from the tunnel analysis interval.
[0013] Furthermore, the construction of the two-dimensional model for risk analysis of shield construction specifically includes the following steps:
[0014] (a) Generate a single cross-section plane perpendicular to the shield construction direction, divide the parameterized tunnel model through Boolean operations, and obtain the spatial position and outer diameter of the shield segment through the OBB bounding box algorithm and the divided model;
[0015] (b) parameterizing the geological model by using a single cutting plane and Boolean operations, and generating a corresponding geological two-dimensional geometric model by using a Delaunay triangulation algorithm and the geological triangulation model;
[0016] (c) The two-dimensional tunnel geometry model is reconstructed through the spatial position and outer diameter of the shield segments, and together with the geological geometry model, it constitutes a two-dimensional model for shield construction risk analysis.
[0017] Furthermore, the construction of the three-dimensional model for risk analysis of shield construction specifically includes the following steps:
[0018] (a) Select the shield section to be analyzed to generate four risk analysis section planes; the four section planes determine the boundary conditions of shield construction risks, and the spatial position and outer diameter of all shield segments in the section are obtained through the OBB bounding box algorithm;
[0019] (b) the parameterized geological model is divided by four cutting planes and Boolean operations, and the corresponding geological three-dimensional geometric model is generated by the Delaunay triangulation algorithm and the geological division model;
[0020] (c) The three-dimensional tunnel geometry model is reconstructed through the spatial position and outer diameter of all shield segments, and together with the geological geometry model, it constitutes a three-dimensional model for shield construction risk analysis.
[0021] Furthermore, the material parameters, construction parameters and random field parameters of each engineering object in the shield construction risk analysis model are retrieved from the database through its universal unique identification code.
[0022] According to another aspect of the present invention, there is provided an application of a shield construction risk analysis model constructed by the automatic construction method of the shield construction risk analysis model as described above in shield construction risk analysis; when applied, first, all grid points of the model are obtained through the geological geometric model, and the soil layers to which all grid points belong are obtained by combining the original parameterized geological model and the Point in Polyhedron algorithm, and the soil layers are classified and numbered according to the strata; then, based on the shield construction risk analysis geometric model and the specific ID of the engineering object, the segment material parameters and construction parameters as well as the soil parameters and random field parameters of the soil layer are obtained, and a soil layer random field is generated for each construction simulation through the shield construction automatic simulation algorithm and the random field algorithm and assigned to the corresponding numbered grid points, and then the shield construction risk analysis is carried out to obtain the analysis results of the surface settlement, segment shrinkage and horizontal deformation of the soil body of the shield construction risk analysis, and the automatic shield construction risk probability analysis is realized through the probability evaluation algorithm, Monte-Carlo theory and corresponding control indicators.
[0023] Furthermore, the calculation formula of the two-dimensional soil random field is:
[0024]
[0025] The calculation formula of the three-dimensional soil random field is:
[0026]
[0027] Among them, τ x , τ y and τ z are the absolute distances between two points in space in the x, y and z directions, δ x ,δ y and δ z are the autocorrelation distances in the x, y and z directions of the soil layer, respectively.
[0028] Furthermore, the failure probability P of the shield construction risk probability analysis is f Given by:
[0029]
[0030] Among them, n is the number of all samples in Monte-Carlo, that is, the number of probability evaluation analyses N MCS ; I is the objective function, if δ is greater than or equal to δ lim When , the return value is 1, if δ is less than δ lim , the return value is 0.
[0031] In general, compared with the prior art, the above technical solution conceived by the present invention, the automatic construction method and application of the shield construction risk analysis model provided by the present invention mainly have the following beneficial effects:
[0032] 1. The present invention realizes the automatic construction of the shield construction risk analysis model through the parametric tunnel model and the parametric geological model, breaking through the limitation of the traditional shield construction risk analysis requiring manual modeling, making full use of the advantages of object-oriented parametric modeling, and automatically converting the geometric information and non-geometric information in the parametric model into the input parameters required for the shield construction risk analysis, which significantly improves the efficiency of risk analysis.
[0033] 2. The present invention provides a method for automatically constructing a two-dimensional model and a three-dimensional model for shield construction risk analysis based on a parametric model. The two-dimensional analysis model has a faster analysis speed, and the three-dimensional analysis model can more accurately describe the actual project. The automatic construction method of the multi-dimensional risk analysis model provided in the present invention can meet different needs in engineering practice.
[0034] 3. The two-dimensional model of risk analysis of shield construction in the present invention is generated by intercepting the parameterized model with a single cutting plane perpendicular to the shield construction direction, and the three-dimensional model is generated by intercepting the parameterized model with four risk analysis interval cutting planes, which can automatically analyze the actual geological conditions and generate a risk analysis model; at the same time, the Point in Polyhedron algorithm can realize the assignment and precise matching of random fields, which is efficient, intuitive and fast;
[0035] 4. The shield construction risk analysis in the present invention takes into account the uncertainty of soil parameters, and combines random fields, probability evaluation algorithms and Monte-Carlo theory to realize the shield construction risk probability analysis. Compared with traditional deterministic analysis, it can more comprehensively consider the risks that may be encountered in the project. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] Figure 1 It is a schematic diagram of a process of automatically constructing a shield construction risk analysis model and a model application provided by the present invention;
[0037] Figure 2 It is a schematic diagram of the generation process of the two-dimensional model of risk analysis of shield construction of the present invention;
[0038] Figure 3 It is a schematic diagram of the generation process of the three-dimensional model of risk analysis of shield construction of the present invention;
[0039] Figure 4It is a schematic diagram of the shield construction risk analysis three-dimensional model of the present invention combined with the Point in Polyhedron algorithm to classify all random field grid points according to the soil layers to which they belong;
[0040] Figure 5 It is a flow chart of the automatic simulation algorithm for shield construction;
[0041] Figure 6 (a) and (b) are schematic diagrams of the results of automatic probabilistic safety assessment of the two-dimensional model for risk analysis of shield construction in accordance with an embodiment of the present invention;
[0042] Figure 7 (a) and (b) are schematic diagrams of the results of automatic probabilistic safety assessment of the three-dimensional model for risk analysis of shield construction in accordance with an embodiment of the present invention;
[0043] Figure 8 It is a data structure diagram adopted by the present invention for soil unit data interaction in shield construction risk analysis. DETAILED DESCRIPTION
[0044] In order to make the purpose, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention. In addition, the technical features involved in the various embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.
[0045] The present invention provides a method for automatically constructing a shield construction risk analysis model, and the automatic construction method mainly comprises the following steps:
[0046] S1, obtain the width of the corresponding shield segment through the shield segment and the tunnel design axis, and arrange the segments according to the design axis to generate a parametric tunnel geometry model.
[0047] S2, using the parametric segment as a carrier and setting the naming conventions of the parametric attributes, sets the corresponding material parameters and construction parameters of the segment to complete the parametric configuration of the parametric tunnel.
[0048] S3, obtain the upper and lower limit coordinates of each soil layer through drilling data and generate the corresponding soil layer, and configure the corresponding soil parameters and random field parameters for each soil layer to generate a parameterized geological model.
[0049] S4, through the parameterized tunnel model and parameterized geological model, combined with the geometric operation algorithm based on interface segmentation, the tunnel segmentation model and geological segmentation model are generated, the spatial position and outer diameter of all shield segments are obtained through the OBB bounding box algorithm and the tunnel segmentation model, and the corresponding geological geometric model is generated through the Delaunay triangulation algorithm and the geological segmentation model. The tunnel geometric model is reconstructed through the spatial position and outer diameter of the shield segment, and the construction risk analysis model is jointly constructed with the geological geometric model.
[0050] The present invention also provides an application of a shield construction risk analysis model constructed by the automatic construction method of the shield construction risk analysis model as described above in shield construction risk analysis, which specifically includes the following steps:
[0051] S5, based on the geological geometry model, all grid points are obtained, and the soil layers to which all grid points belong are obtained by combining the parameterized geological model and the Point in Polyhedron algorithm, and the soil layers are classified and numbered according to the strata.
[0052] S6, based on the shield construction risk analysis model and the specific ID of the engineering object, obtain the segment material parameters and construction parameters as well as the soil parameters and random field parameters of the soil layer. Through the shield construction automatic simulation algorithm and random field algorithm, a soil layer random field is generated for each construction simulation and assigned to the corresponding numbered grid points, and then the shield construction risk analysis is performed.
[0053] S7, obtains the analysis results of surface settlement, segment shrinkage and soil water deformation for shield construction risk analysis, and realizes automatic shield construction risk probability analysis through probability evaluation algorithm, Monte-Carlo theory and corresponding control indicators.
[0054] The present invention is further described in detail below with reference to specific embodiments.
[0055] See also Figure 1 and Figure 8 This embodiment provides a shield construction risk analysis method, which specifically includes an automatic construction method and application of a shield construction risk analysis model, and the specific steps are:
[0056] S1. Obtain the corresponding segment width through the shield segment family of multiple levels of detail (LOD) and the tunnel design axis, arrange the segments according to the segment width and the design axis, and generate a parametric tunnel geometry model.
[0057] In step S1, the parametric tunnel model is quickly constructed by using the shield segment family of multiple levels of detail (LOD), the tunnel design axis and the shield segment parametric information. The shield segment family of multiple levels of detail (LOD) includes LOD 100, LOD 200 and LOD 300. The segment family contains material parameters, construction parameters and geometric information obtained by analysis. The standardized parameter attributes are shown in Table 1:
[0058] Table 1 Segment family parameters
[0059] Parameterized name meaning type constitutive_model Name of constitutive model Material parameters poisson Poisson's ratio Material parameters density density Material parameters young_modulus Young's modulus Material parameters ring_number Number of rings Construction parameters grout_pressure_distribution Grouting pressure distribution type Construction parameters grout_pressure_sign_inc Grouting pressure increment Construction parameters grout_pressure_sign_ref Grouting pressure reference point Construction parameters surface_contraction Surface shrinkage Construction parameters face_pressure Shield machine thrust Construction parameters outside_diameter outer diameter Geometry Information width width Geometry Information thick thickness Geometry Information
[0060] S2. Use the parametric segment as a carrier and agree on the naming conventions of the parametric attributes, define the corresponding material parameters and construction parameters of the segment, and complete the parametric configuration of the parametric tunnel.
[0061] S3. Normalize the drilling data, generate the corresponding soil layer through the upper and lower limit coordinates of each soil layer, and configure the corresponding soil parameters and random field parameters for each soil layer to generate a parametric geological model.
[0062] S4. Generate a geometric model for shield construction risk analysis through parameterized tunnel model and parameterized geological model.
[0063] There are two types of risk analysis models for shield construction: two-dimensional models and three-dimensional models. The two-dimensional model for risk analysis of shield construction is obtained by generating a single cross-section plane perpendicular to the shield construction direction and simultaneously dividing the parameterized tunnel model and the parameterized geological model through geometric operations such as Boolean operations. The three-dimensional model for risk analysis of shield construction is composed of the selected tunnel analysis interval and the geological analysis interval obtained by dividing the parameterized geological model with four cross-section planes generated from the tunnel analysis interval.
[0064] See also Figure 2 The construction of the two-dimensional model for risk analysis of shield construction specifically includes the following steps:
[0065] (a) Generate a single cross-section plane perpendicular to the shield construction direction, divide the parameterized tunnel model through Boolean operations, and obtain the spatial position and outer diameter of the shield segment through the OBB bounding box algorithm and the divided model;
[0066] (b) parameterizing the geological model by using a single cutting plane and Boolean operations, and generating a corresponding geological two-dimensional geometric model by using a Delaunay triangulation algorithm and the geological triangulation model;
[0067] (c) The two-dimensional tunnel geometry model is reconstructed through the spatial position and outer diameter of the shield segments, and together with the geological geometry model, it constitutes a two-dimensional model for shield construction risk analysis.
[0068] See also Figure 3 and Figure 4 The construction of the three-dimensional model for risk analysis of shield construction specifically includes the following steps:
[0069] (a) Select the shield section to be analyzed to generate four risk analysis section planes; the four section planes determine the boundary conditions of shield construction risks, and the spatial position and outer diameter of all shield segments in the section are obtained through the OBB bounding box algorithm;
[0070] (b) the parameterized geological model is divided by four cutting planes and Boolean operations, and the corresponding geological three-dimensional geometric model is generated by the Delaunay triangulation algorithm and the geological division model;
[0071] (c) The three-dimensional tunnel geometry model is reconstructed through the spatial position and outer diameter of all shield segments, and together with the geological geometry model, it constitutes a three-dimensional model for shield construction risk analysis.
[0072] Among them, the material parameters, construction parameters and random field parameters of each engineering object (such as tunnel segments and soil layers) in the shield construction risk analysis model (two-dimensional and three-dimensional) are retrieved from the database through its universally unique identifier (UUID).
[0073] S5. Obtain all grid points of the model through the geological geometric model described in S4, combine the original parameterized geological model and the Point in Polyhedron algorithm to obtain the soil layers to which all grid points belong, and classify and number them according to the strata.
[0074] S6. Based on the geometric model of shield construction risk analysis and the specific ID of the engineering object, the material parameters and construction parameters of the segment as well as the soil parameters and random field parameters of the soil layer are obtained. The soil layer random field is generated for each construction simulation through the shield construction automatic simulation algorithm and the random field algorithm and assigned to the corresponding numbered grid points, and then the shield construction risk analysis is carried out.
[0075] See also Figure 5 , the automatic simulation of shield construction specifically includes the following steps:
[0076] (a) Obtain the number of probability assessment analyses N MCS , design the probability analysis counter n equal to 1;
[0077] (b) generating a random field for the classified and numbered grid points through a random field generator;
[0078] (c) Initialization of risk analysis, generating initial geostress, and obtaining construction parameters and material parameters in the model;
[0079] (d) Execute the shield tunneling step simulation, activate the plate unit model representing the shield machine, apply grouting pressure, activate the surface contraction to simulate the formation loss, and activate the shield segment;
[0080] (e) storing the simulation analysis results and adding 1 to the value of the design probability analysis counter;
[0081] (f) Repeat steps (b) to (e) until the value of the design probability analysis counter is greater than the number of probability evaluation analyses N. MCS , the analysis ends.
[0082] The random field in the automatic simulation of shield construction is generated by the following method:
[0083] The relevant equation for the two-dimensional soil random field is calculated by the following formula:
[0084]
[0085] The relevant equation of the three-dimensional soil random field is calculated by the following formula:
[0086]
[0087] Among them, τ x , τ y and τ z are the absolute distances between two points in space in the x, y and z directions, δ x ,δ y and δ z are the autocorrelation distances in the x, y and z directions of the soil layer, respectively.
[0088] S7. Obtain the analysis results of ground settlement, segment shrinkage and soil horizontal deformation for shield construction risk analysis, and realize automatic shield construction risk probability analysis through probability evaluation algorithm, Monte-Carlo theory and corresponding control indicators. Failure probability P of shield construction risk probability analysis f Given by:
[0089]
[0090] Among them, n is the number of all samples in Monte-Carlo, that is, the number of probability evaluation analyses N MCS ; I is the objective function, if δ is greater than or equal to δ lim When , the return value is 1, if δ is less than δ lim , the return value is 0.
[0091] See also Figure 6 and Figure 7 Taking the shield construction risk two-dimensional analysis model as an example, the number of probability assessment analysis N is predefined MCS The number of times of the probability assessment method is 1000, and through steps S1 to S6, the statistical values of the surface settlement and vertical segment shrinkage caused by shield construction are obtained, and their mean values are -33.75 mm and 60.15 mm, respectively. In order to verify the advantages of the probabilistic assessment method over the traditional deterministic safety assessment (DSA), the analysis results of the two are compared and analyzed here. The input value of the traditional deterministic safety assessment is the expected value of the input value of the probability assessment method, and the maximum values of the surface settlement and vertical segment shrinkage caused by shield construction are -33.77 mm and 60.17 mm, respectively. According to the results of the probabilistic safety assessment, if the traditional deterministic safety assessment is followed, there will be a probability of 41.1% and 45.3% exceeding the deterministic assessment of the risk of shield construction by the engineer.
[0092] Taking the shield construction risk three-dimensional analysis model as an example, the number of probability assessment analysis N is predefined. MCS The number of times of the experiment is 1000. Through steps S1 to S6, the surface settlement and soil horizontal displacement caused by shield construction are selected as indicators. It is found that in the summarized analysis results, the maximum surface settlement and soil horizontal displacement are -35.88mm and 12.71mm, respectively, and the mean values of surface settlement and soil horizontal displacement are -33.95mm and 11.05mm, respectively. The control values of surface settlement and soil horizontal displacement are set to -35.0mm and 12.5mm, respectively. In this case, with these two indicators as reference, the failure probability of shield construction is 3.6% and 0.3%, respectively.
[0093] It will be easily understood by those skilled in the art that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A method for automatically constructing a risk analysis model for shield construction, characterized in that: The method comprises the following steps: (1) Obtain the upper and lower limit coordinates of each soil layer through drilling data and generate the corresponding soil layer. At the same time, configure the corresponding soil parameters and random field parameters for each soil layer to generate a parameterized geological model; (2) The tunnel segmentation model and the geological segmentation model are generated by combining the parameterized tunnel model and the parameterized geological model with the geometric operation algorithm based on interface segmentation. The spatial position and outer diameter of all shield segments are obtained by the OBB bounding box algorithm and the tunnel segmentation model. The corresponding geological geometric model is generated by the Delaunay triangulation algorithm and the geological segmentation model. (3) The tunnel geometry model is reconstructed based on the spatial position and outer diameter of the shield segments, and a construction risk analysis model is constructed together with the geological geometry model.
2. The automatic construction method of the shield construction risk analysis model according to claim 1, characterized in that: The width of the corresponding shield segment is obtained through the shield segment and the tunnel design axis, and the segments are arranged according to the design axis to generate the geometric model of the parametric tunnel; then, the parametric segment is used as a carrier and the naming convention of the parametric attribute is set, and the corresponding material parameters and construction parameters of the segment are set to complete the parametric configuration of the parametric tunnel.
3. The automatic construction method of the shield construction risk analysis model according to claim 1, characterized in that: The shield construction risk analysis model includes a two-dimensional shield construction risk analysis model and a three-dimensional shield construction risk analysis model. The two-dimensional shield construction risk analysis model is obtained by generating a single cross-section plane perpendicular to the shield construction direction and simultaneously dividing the parameterized tunnel model and the parameterized geological model through Boolean operations.
4. The method for automatically constructing a shield construction risk analysis model according to claim 3, characterized in that: The three-dimensional model for risk analysis of shield construction is composed of the selected tunnel analysis interval and the geological analysis interval obtained by dividing the parameterized geological model into four cross-section planes generated by the tunnel analysis interval.
5. The method for automatically constructing a shield construction risk analysis model according to claim 4, characterized in that: The construction of the two-dimensional model for risk analysis of shield construction includes the following steps: (a) Generate a single cross-section plane perpendicular to the shield construction direction, divide the parameterized tunnel model through Boolean operations, and obtain the spatial position and outer diameter of the shield segment through the OBB bounding box algorithm and the divided model; (b) parameterizing the geological model by a single cutting plane and Boolean operations, and generating a corresponding geological two-dimensional geometric model by a Delaunay triangulation algorithm and the geological triangulation model; (c) The two-dimensional tunnel geometry model is reconstructed through the spatial position and outer diameter of the shield segments, and together with the geological geometry model, it constitutes a two-dimensional model for shield construction risk analysis.
6. The method for automatically constructing a shield construction risk analysis model according to claim 4, characterized in that: The construction of the three-dimensional model for risk analysis of shield construction includes the following steps: (a) Select the shield section to be analyzed to generate four risk analysis section planes; the four section planes determine the boundary conditions of shield construction risks, and the spatial position and outer diameter of all shield segments in the section are obtained through the OBB bounding box algorithm; (b) the parameterized geological model is divided by four cutting planes and Boolean operations, and the corresponding geological three-dimensional geometric model is generated by the Delaunay triangulation algorithm and the geological division model; (c) The three-dimensional tunnel geometry model is reconstructed through the spatial position and outer diameter of all shield segments, and together with the geological geometry model, it constitutes a three-dimensional model for shield construction risk analysis.
7. The method for automatically constructing a shield construction risk analysis model according to any one of claims 1 to 6, characterized in that: The material parameters, construction parameters and random field parameters of each engineering object in the shield construction risk analysis model are retrieved from the database through its universal unique identification code.
8. An application of a shield construction risk analysis model constructed by the automatic construction method of a shield construction risk analysis model according to any one of claims 1 to 7 in shield construction risk analysis, characterized in that: When applied, first, all grid points of the model are obtained through the geological geometric model, and the soil layers to which all grid points belong are obtained by combining the original parameterized geological model and the Point in Polyhedron algorithm, and the soil layers are classified and numbered according to the strata; then, based on the shield construction risk analysis geometric model and the specific ID of the engineering object, the segment material parameters and construction parameters as well as the soil parameters and random field parameters of the soil layer are obtained, and the soil layer random field is generated for each construction simulation through the shield construction automatic simulation algorithm and the random field algorithm and assigned to the corresponding numbered grid points, and then the shield construction risk analysis is carried out to obtain the analysis results of the surface settlement, segment shrinkage and horizontal deformation of the soil body of the shield construction risk analysis, and the automatic shield construction risk probability analysis is realized through the probability evaluation algorithm, Monte-Carlo theory and corresponding control indicators.
9. The application of the shield construction risk analysis model as claimed in claim 8 in shield construction risk analysis, characterized in that: The calculation formula of the two-dimensional soil random field is: The calculation formula of the three-dimensional soil random field is: Among them, τ x , τ y and τ z are the absolute distances between two points in space in the x, y and z directions, δ x , δ y and δ z are the autocorrelation distances in the x, y and z directions of the soil layer, respectively.
10. The application of the shield construction risk analysis model according to claim 8 in shield construction risk analysis is characterized in that: Failure probability P of risk probability analysis of shield construction f Given by: Among them, n is the number of all samples in Monte-Carlo, that is, the number of probability evaluation analyses N MCS ; I is the objective function, if δ is greater than or equal to δ lim When δ is less than δ, the return value is 1. lim , the return value is 0.
Citation Information
Patent Citations
Foundation pit engineering design and dynamic risk analysis method and system based on BIM technology
CN112199758A
Rapid modeling risk pre-assessment method for shield to pass through dense building group
CN112906111A