Method for quickly determining theoretical power generation of wind farm

By acquiring and verifying the basic parameters of the wind farm, dividing the wind speed range, fitting the wind energy frequency and power curves, and calculating the wind farm's power generation, the problem of high computational resource and time consumption in existing technologies is solved. This achieves rapid and accurate determination of wind farm power generation, making it suitable for rapid investment decisions.

CN115344994BActive Publication Date: 2026-11-10CEEC JIANGSU ELECTRIC POWER DESIGN INST CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202210894916.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-07-28
Publication Date
2026-11-10
Estimated Expiration
2042-07-28

AI Technical Summary

Technical Problem

Existing technologies require significant computational resources and time to calculate wind farm power generation, and lack a rapid method for determination, thus impacting the efficiency of investment decisions.

Method used

By obtaining the basic parameters of the wind farm, verifying their rationality, dividing the wind speed range, fitting the wind energy frequency and power curves, calculating the power generation of each wind speed range, and finally summing them up to obtain the theoretical power generation of the wind farm, the calculation process is simplified and efficiency is improved.

Benefits of technology

It enables rapid and accurate determination of the theoretical power generation of wind farms, reducing calculation requirements and time, and is suitable for rapid investment decisions for wind farms lacking basic data.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115344994B_ABST
    Figure CN115344994B_ABST
Patent Text Reader

Abstract

The application discloses a kind of wind farm theoretical power generation fast determination method, comprising: obtaining wind farm power generation basic parameter checking wind farm power generation basic parameter rationality, if unreasonable, then newly obtain wind farm power generation basic parameter until reasonable;Divide wind speed section;According to Weibull distribution shape parameter and scale parameter fitting each wind speed section wind energy frequency;According to each wind speed section wind energy frequency, calculate wind energy utilization hours;According to wind farm power generation basic parameter, calculate power curve fitting curve equation parameter;According to power curve fitting curve equation parameter, construct power curve fitting equation;According to wind speed section wind energy frequency and power curve fitting equation, calculate each wind speed section power generation;According to each wind speed section power generation, obtain wind farm theoretical power generation, the present application can quickly determine the theoretical power generation of wind farm.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of wind energy resource prediction technology, and in particular relates to a method for rapidly determining the theoretical power generation of a wind farm. Background Technology

[0002] Under the backdrop of "carbon peaking and carbon neutrality," wind power, as an indispensable energy supply method for building a new power system based on clean energy, will be more widely used. With the energy transition, a large number of traditional energy construction companies are entering the wind power sector, leading to unprecedentedly fierce industry competition. Quickly acquiring regional wind power investment value allows wind power construction companies to make rapid investment decisions and seize opportunities.

[0003] As a key input parameter for calculating the rate of return on investment, the calculation of wind farm power generation in traditional wind farm wind resource assessment usually relies on software simulation calculation. For example, in the field of engineering construction, software such as WAsP and WT are usually used to calculate wind farm power generation, while in the field of scientific research, commercial numerical simulation software such as FLUENT is often used for academic research.

[0004] These wind farm energy resource calculation methods are typically based on mature numerical model frameworks. They require processing and inputting complete parameters such as meteorological tower data, geographic information, and wind turbine output characteristics. Models are then built in commercial software for numerical simulation calculations to derive the theoretical power generation, which is then reduced by a factor to obtain the grid-connected power. Completing the entire process consumes significant computational resources and time, with most of the time spent on the theoretical power generation calculation stage. Summary of the Invention

[0005] To address the problems existing in the prior art, this invention provides a method for rapidly determining the theoretical power generation of a wind farm, which can quickly determine the theoretical power generation of a wind farm.

[0006] The technical problem to be solved by the present invention is achieved through the following technical solution:

[0007] A method for rapidly determining the theoretical power generation of a wind farm is provided, comprising: obtaining basic parameters of wind farm power generation, wherein the basic parameters include the cut-in wind speed V of the wind turbine to be selected for the wind farm. ci Rated wind speed V r Cut-out wind speed V co The shape and scale parameters of the Weibull distribution in the proposed wind farm area;

[0008] Verify the rationality of the basic power generation parameters of the wind farm. If they are not reasonable, obtain the basic power generation parameters of the wind farm again until they are reasonable.

[0009] Divide wind speed into sections;

[0010] The wind energy frequency for each wind speed range is fitted based on the shape and scale parameters of the Weibull distribution.

[0011] Calculate the number of hours of wind energy utilization based on the wind energy frequency of each wind speed range;

[0012] Calculate the parameters of the power curve fitting curve equation based on the basic parameters of wind farm power generation;

[0013] Construct the power curve fitting equation based on the parameters of the power curve fitting equation;

[0014] The power generation of each wind speed segment is calculated based on the fitting equation of wind energy frequency and power curve of each wind speed segment.

[0015] The theoretical power generation of the wind farm is obtained based on the power generation at each wind speed range.

[0016] Furthermore, the verification of the rationality of the basic parameters for wind farm power generation includes:

[0017] The basic parameters for wind farm power generation should conform to the following formula:

[0018] 2m / s≤V ci <4m / s;

[0019] 6m / s≤V r <13m / s;

[0020] 18m / s≤V co ≤25m / s;

[0021] 1.3≤k≤3.0;

[0022] 4.5 m / s ≤ c ≤ 8.0 m / s

[0023] Where k is the shape parameter of the Weibull distribution, and c is the scale parameter of the Weibull distribution.

[0024] Furthermore, the division of wind speed segments includes:

[0025] Let the 0th wind speed segment interval Δv0 be [0m / s, 0.25m / s). Starting from the 1st wind speed segment, divide the wind speed segments at intervals of 0.5m / s, and define the ith wind speed segment interval Δv0. i Represented as [v i -0.25,v i +0.25), where v i For the midpoint value of each interval, v i =0.5i, i∈N.

[0026] Furthermore, the frequency of the 0th wind speed segment is obtained through equation (1).

[0027]

[0028] Furthermore, the wind energy frequency for each wind speed segment other than the 0th wind speed segment is obtained through equation (2).

[0029]

[0030] Furthermore, the wind energy utilization hours for each wind speed range are obtained using equation (3).

[0031] h i =8760·F(Δv) i (3)

[0032] Among them, h i Let be the number of hours of wind energy utilization for the i-th wind speed segment.

[0033] Furthermore, the parameters of the power curve fitting curve equation are obtained through equation (4).

[0034]

[0035] Where p, q, and r are the parameters of the power curve fitting curve equation.

[0036] Furthermore, the power curve fitting equation is constructed using equation (5).

[0037]

[0038] Among them, P wt P is the output power of the wind turbine, v is the wind speed, and P is the wind turbine output power. r That is the rated power.

[0039] Furthermore, the power generation at each wind speed range is obtained using equation (6).

[0040] E i =ρ·(h i ·P wt (v i (6)

[0041] Among them, E i Let ρ represent the power generation in the i-th wind speed segment, and ρ be the air density.

[0042] The beneficial effects of this invention are as follows: Based on the available Weibull distribution shape and scale parameters of wind farms, this invention fits and calculates the distribution frequency of each wind speed segment within the measurement year, and then sums the results after superimposing each wind speed segment with the optimized simplified power curve to obtain the theoretical power generation of the wind farm. The theoretical power generation of wind farms calculated using this invention requires less raw data, has a simple calculation process, and significantly reduces the calculation time compared to traditional methods, while maintaining high accuracy. The overall implementation process is simple and highly operable, making it suitable for the rapid investment decision-making stage of wind farms where basic data is lacking. Attached Figure Description

[0043] Figure 1 This is a flowchart of the method for rapidly determining the theoretical power generation of a wind farm according to the present invention. Detailed Implementation

[0044] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0045] To better understand this invention, the relevant technologies in the technical solution of this invention are described below.

[0046] like Figure 1 As shown, this invention discloses a method for rapidly determining the theoretical power generation of a wind farm, comprising the following steps:

[0047] 1) Obtain basic parameters for wind farm power generation

[0048] Collect basic power generation parameters related to the theoretical power generation of the wind farm, mainly including the cut-in wind speed V of the wind turbine to be selected for the wind farm. ci Rated wind speed V r Cut-out wind speed V co The shape parameter k and scale parameter c of the Weibull distribution in the proposed wind farm area are determined.

[0049] 2) Verify the rationality of the collected basic power generation parameters.

[0050] In the rationality test, each parameter must meet the following conditions:

[0051] 2m / s≤V ci <4m / s;

[0052] 6m / s≤V r <13m / s;

[0053] 18m / s≤V co ≤25m / s;

[0054] 1.3≤k≤3.0;

[0055] 4.5m / s≤c≤8.0m / s.

[0056] If the results are satisfactory, the test is complete, and the next step is initiated. Otherwise, the basic power generation parameters for the failed test are re-acquired until the test is passed.

[0057] 3) Divide wind speed into sections

[0058] Let the 0th wind speed segment interval Δv0 be [0m / s, 0.25m / s). Starting from the 1st wind speed segment, divide the wind speed segments at intervals of 0.5m / s, and define the ith wind speed segment interval Δv0. i Represented as [v i -0.25,v i +0.25), where v i For the midpoint value of each interval, v i =0.5i, i∈N, that is, the first wind speed interval Δv1 is [0.25m / s, 0.75m / s), the second wind speed interval Δv2 is [0.75m / s, 1.25m / s), and so on.

[0059] 4) Fitting wind energy frequencies for each wind speed range

[0060] First, the frequency of the 0th wind speed band is obtained using formula (1).

[0061]

[0062] The wind energy frequency for each wind speed segment except the 0th wind speed segment is obtained through equation (2).

[0063]

[0064] 5) Calculate the number of wind energy utilization hours based on the wind energy frequency of each wind speed range.

[0065] The number of wind energy utilization hours for each wind speed range is obtained using equation (3).

[0066] h i =8760·F(Δv) i (3)

[0067] Among them, h i Let be the number of hours of wind energy utilization for the i-th wind speed segment.

[0068] 6) Calculate the parameters of the power curve fitting curve equation.

[0069] Calculate wind speed V∈[V ci V r When ), the parameters p, q, r of the power curve fitting curve equation are...

[0070] We obtain the result from equation (4).

[0071]

[0072] 7) Calculate the parameters of the power curve fitting curve equation based on the basic parameters of wind farm power generation.

[0073] When wind speed V∈[V ci V rWhen ), construct the power curve fitting curve based on the parameters p, q, r of the power curve fitting curve equation.

[0074] The equation of the line is given by the following formula:

[0075]

[0076] Among them, P wt P is the output power of the wind turbine, v is the wind speed, and P is the wind turbine output power. r That is the rated power.

[0077] 8) Calculate power generation

[0078] First, the power generation of each wind speed segment is calculated using equation (6).

[0079] E i =ρ·(h i ·P wt (v i (6)

[0080] Among them, E i Let ρ represent the power generation in the i-th wind speed segment, and ρ be the air density.

[0081] Then, by summing the power generation of each wind speed segment using equation (7), the final theoretical power generation of the wind farm is obtained:

[0082]

[0083] Among them, E th This represents the theoretical power generation of the wind farm.

[0084] Those skilled in the art will understand that embodiments of the present invention can be provided as methods, systems, or computer program products. Therefore, this application can take the form of a completely hardware embodiment, a completely software embodiment, or an embodiment combining software and hardware aspects. Furthermore, this application can take the form of a computer program product embodied on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0085] This application is described with reference to flowchart illustrations and / or block diagrams of methods, apparatus (systems), and computer program products according to embodiments of this application. It will be understood that each block of the flowchart illustrations and / or block diagrams, and combinations of blocks in the flowchart illustrations and / or block diagrams, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, special-purpose computer, embedded processor, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, generate instructions for implementing the flowchart... Figure 1One or more processes and / or boxes Figure 1 A device that provides the functions specified in one or more boxes.

[0086] These computer program instructions may also be stored in a computer-readable storage medium that can direct a computer or other programmable data processing device to function in a particular manner, such that the instructions stored in the computer-readable storage medium produce an article of manufacture including instruction means, which are implemented in a process Figure 1 One or more processes and / or boxes Figure 1 The function specified in one or more boxes.

[0087] These computer program instructions may also be loaded onto a computer or other programmable data processing equipment to cause a series of operational steps to be performed on the computer or other programmable equipment to produce a computer-implemented process, thereby providing instructions that execute on the computer or other programmable equipment for implementing the process. Figure 1 One or more processes and / or boxes Figure 1 The steps of the function specified in one or more boxes.

[0088] The above description is only a preferred embodiment of the present invention. It should be noted that for those skilled in the art, several improvements and modifications can be made without departing from the technical principles of the present invention, and these improvements and modifications should also be considered within the scope of protection of the present invention.

Claims

1. A method for rapidly determining the theoretical power generation of a wind farm, characterized in that, include: Obtain the basic parameters of wind farm power generation, including the cut-in wind speed of the wind turbines to be selected for the wind farm. Rated wind speed Cut-off wind speed The shape and scale parameters of the Weibull distribution in the proposed wind farm area; Verify the rationality of the basic power generation parameters of the wind farm. If they are not reasonable, obtain the basic power generation parameters of the wind farm again until they are reasonable. Divide wind speed into sections; The wind energy frequency for each wind speed range is fitted based on the shape and scale parameters of the Weibull distribution. Calculate the number of hours of wind energy utilization based on the wind energy frequency of each wind speed range; Calculate the parameters of the power curve fitting curve equation based on the basic parameters of wind farm power generation; Construct the power curve fitting equation based on the parameters of the power curve fitting equation; The power generation of each wind speed segment is calculated based on the fitting equation of wind energy frequency and power curve of each wind speed segment. The theoretical power generation of the wind farm is obtained based on the power generation at each wind speed range. The division of wind speed segments includes: The 0th wind speed segment Set as Starting from the first wind speed segment, the wind speed is divided into segments at intervals of 0.5 m / s. wind speed range Represented as ,in For the midpoint value of each interval, , ; The wind energy frequency for each wind speed segment other than the 0th wind speed segment is obtained by equation (2): (2); The number of wind energy utilization hours for each wind speed range is obtained through equation (3): (3); in, For the first Wind energy utilization hours for each wind speed range; The parameters of the power curve fitting equation are obtained through equation (4): (4); in, , , The parameters are the equation parameters for fitting the power curve. The power curve fitting equation is constructed using equation (5): (5); in, It is the output power of the wind turbine. It's wind speed. It is the rated power; The power generation for each wind speed range is obtained using equation (6): (6); in, Indicates the first Power generation at each wind speed range air density; The verification of the rationality of the basic parameters for wind farm power generation includes: The basic parameters for wind farm power generation should conform to the following formula: in, Let be the shape parameter of the Weibull distribution. The scaling parameter of the Weibull distribution; The frequency of the 0th wind speed segment is obtained through equation (1). (1)。