A multi-layer steel-concrete frame bridge for co-construction of mountainous urban traffic and squares and its construction method

By designing a multi-layer steel-concrete frame bridge, combined with a supporting pile system and prefabricated steel-concrete composite beams, the problems of long design cycle and low land use efficiency of traditional urban roads have been solved, and rapid construction and integration of multi-layer functional spaces have been achieved. Improved urban land efficiency and safety.

CN115369735BActive Publication Date: 2024-10-29CHONGQING UNIV
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202210826868.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-07-14
Publication Date
2024-10-29
Estimated Expiration
2042-07-14

AI Technical Summary

Technical Problem

Traditional urban roads have a long design cycle, affect the environment, have low utilization efficiency, and are difficult to meet the needs of multi-dimensional three-dimensional space, especially when land is tight in mountainous cities.

Method used

Design a multi-layer steel-concrete frame bridge, including a supporting pile system, a support structure that can adapt to spatial deformation, top and middle-layer assembled steel-concrete composite beams, steel tube frame columns, beam-column joint areas, reinforced concrete cast-in-place piles and fall prevention The beam adopts a prefabricated structure and uses embedded bolts and chemical anchors to achieve rapid construction and integration of multi-layer functional spaces.

Benefits of technology

It achieves rapid construction, saves construction period, meets the needs of three-dimensional multi-layer functional space, improves urban land use efficiency, reduces project investment, and monitors structural deformation through displacement observers to ensure safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115369735B_ABST
    Figure CN115369735B_ABST
Patent Text Reader

Abstract

The present invention discloses a multi-layer steel-concrete frame bridge for co-construction of mountainous urban traffic and squares and a construction method thereof. The frame bridge comprises a plurality of support pile systems (1), a plurality of supporting structures (2) that can adapt to spatial deformation, a plurality of top-layer assembled steel-concrete composite beams (3), a plurality of middle-layer assembled steel-concrete composite beams (4), a plurality of steel pipe frame columns (5), a plurality of beam-column node areas (6), a plurality of reinforced concrete cast-in-place piles (7), and a plurality of anti-fall beams (8); the construction method comprises the steps of on-site layered hoisting positioning and installation of a top-layer longitudinal distribution steel beam (34) and a middle-layer top-layer longitudinal distribution steel beam (44); after installation, a top-layer cast-in-place reinforced concrete panel (33) and a middle-layer top-layer cast-in-place reinforced concrete panel (43) are arranged on the top. The present invention adopts a steel-concrete composite beam, which can be constructed quickly and save construction period. The shear connection between the steel and the concrete can ensure that the steel-concrete composite beam system is subjected to stress as a whole.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the comprehensive technical field of bridge structures and geotechnical engineering, and in particular to a multi-layer steel-concrete frame bridge used for co-construction of mountainous urban traffic and squares and a construction method thereof. Background Art

[0002] Public space is the main outdoor activity space for residents. As people's desire for a better life increases, engineering construction pays more attention to ecology, greenness and environmental protection. It has become a consensus to transform the road design with motor vehicle traffic as the main function to the urban slow-moving system and livable ecological environment improvement. The traditional engineering construction period is long, the impact on the surrounding environment is large, and the utilization efficiency of urban land space is low. It is urgent to optimize and upgrade the traditional urban road plane design scheme in a multi-dimensional and three-dimensional direction. Summary of the invention

[0003] The purpose of the present invention is to provide a multi-story steel-concrete frame bridge for co-construction of mountain city traffic and squares, including a plurality of supporting pile systems, a plurality of supporting structures that can adapt to spatial deformation, a plurality of top-layer assembled steel-concrete composite beams, a plurality of middle-layer assembled steel-concrete composite beams, a plurality of steel pipe frame columns, a plurality of beam-column node areas, a plurality of reinforced concrete cast-in-place piles, and a plurality of anti-fall beams.

[0004] The supporting structure capable of adapting to spatial deformation is cast on the supporting pile system.

[0005] The top-level assembled steel-concrete composite beam is connected to the steel tube frame column through the beam-column node area.

[0006] The middle-layer assembled steel-concrete composite beam is connected to the steel pipe frame column through the beam-column node area.

[0007] The reinforced concrete cast-in-place piles connect adjacent steel pipe frame columns.

[0008] The anti-fall beam is connected to the supporting pile system.

[0009] Furthermore, the supporting pile system includes a supporting pile body, a crown beam on the top of the supporting pile, and a retaining back wall.

[0010] The crown beam at the top of the supporting pile is connected to the supporting pile body through internal steel bars.

[0011] The retaining back wall is connected to the supporting pile body through internal steel bars.

[0012] Furthermore, the support structure capable of adapting to spatial deformation includes a support base capable of adapting to spatial deformation and a rubber support.

[0013] The supporting base capable of adapting to spatial deformation is cast together with the crown beam on the top of the supporting pile through embedded bolts.

[0014] The rubber support is arranged on a support base which can adapt to spatial deformation.

[0015] Furthermore, the top-level assembled steel-concrete composite beam includes a top-level longitudinal steel beam, a top-level transverse steel beam, a top-level cast-in-place reinforced concrete panel, a top-level longitudinal distribution steel beam, a top-level triangular rigid axil plate, and a top-level shear-resistant connecting bolt.

[0016] The top longitudinal steel beam is connected with the steel pipe frame column.

[0017] The top-level transverse steel beams are connected with the steel pipe frame columns.

[0018] Top-level longitudinal distribution steel beams are arranged between adjacent top-level transverse steel beams.

[0019] A top layer of shear-resistant connecting bolts is arranged on the top surface of the flange plate of the top layer of longitudinal distribution steel beam.

[0020] The top triangular rigid axil angle plate is arranged below the flange plate of the top transverse steel beam and is connected to the steel pipe frame column by welding to form a whole.

[0021] The top cast-in-place reinforced concrete panel is cast together with the top longitudinal steel beam and the top transverse steel beam through the top shear connection bolts to form a top steel-concrete composite beam system.

[0022] The middle-layer assembled steel-concrete composite beam comprises a middle-layer longitudinal steel beam, a middle-layer transverse steel beam, a middle-layer cast-in-place reinforced concrete panel, a middle-layer longitudinal distribution steel beam, a middle-layer triangular rigid axil plate, and a middle-layer shear-resistant connecting bolt.

[0023] The middle-layer longitudinal steel beams are connected with the steel pipe frame columns.

[0024] The middle-layer transverse steel beams are connected with the steel pipe frame columns.

[0025] A middle-layer longitudinal distribution steel beam is arranged between adjacent middle-layer transverse steel beams.

[0026] The middle layer shear-resistant connecting bolts are arranged on the top surface of the flange plate of the middle layer longitudinal distribution steel beam.

[0027] The middle-layer triangular rigid axil angle plate is arranged below the flange plate of the middle-layer transverse steel beam and is connected to the steel pipe frame column by welding to form a whole.

[0028] The middle-layer cast-in-place reinforced concrete panel is cast together with the middle-layer longitudinal steel beam and the middle-layer transverse steel beam through the middle-layer shear-resistant connecting bolts to form a middle-layer steel-concrete composite beam system.

[0029] Furthermore, the steel tube frame column includes a rectangular steel tube column, a partition inside the column, and concrete poured inside the column.

[0030] An inner column partition is arranged inside the steel pipe column.

[0031] The column inner partition is welded to the rectangular steel pipe column.

[0032] The column inner partition is provided with a concrete pouring hole and a concrete pouring observation hole on the top cover plate of the steel pipe frame column.

[0033] The concrete pouring observation hole is used to observe the fullness of the concrete poured inside the column.

[0034] The concrete poured inside the column is poured into the interior of the rectangular steel pipe column through the concrete pouring hole.

[0035] Furthermore, the beam-column node area includes a high-strength bolt connection area of ​​the web at the joint, a top plate weld connection area at the joint, a bottom plate weld connection area at the joint, and a triangular rigid axil angle plate at the joint.

[0036] The high-strength bolt connection area of ​​the web at the splicing location is arranged on the side walls of the top-layer longitudinal steel beam and the middle-layer longitudinal steel beam.

[0037] When the high-strength bolt connection area of ​​the web at the splicing is set on the top longitudinal steel beam, it is connected to the top plate of the top transverse steel beam through the top plate weld connection area at the splicing, and is connected to the bottom plate of the top transverse steel beam through the bottom plate weld connection area at the splicing.

[0038] When the high-strength bolt connection area of ​​the web at the splicing is set on the middle-layer longitudinal steel beam, it is connected to the top plate of the middle-layer transverse steel beam through the top plate weld connection area at the splicing, and is connected to the bottom plate of the middle-layer transverse steel beam through the bottom plate weld connection area at the splicing.

[0039] The triangular rigid axil angle plate at the joint is arranged below the flange plates of the top-layer transverse steel beam and the middle-layer transverse steel beam, and is connected to the rectangular steel pipe column of the steel pipe frame column into a whole through welding.

[0040] Furthermore, the reinforced concrete cast-in-place pile includes a pile body and a pile-column connector.

[0041] The pile body comprises a reinforced concrete cast-in-place pile.

[0042] The pile body is pre-embedded with steel pipe column footings and pile-column connectors.

[0043] The pile body is connected to the steel pipe frame column through a steel pipe column foot and a pile-column connector.

[0044] The pile-column connecting piece comprises a shear-resistant connecting steel plate, a shear-resistant connecting bolt and a shear-resistant connecting steel bar.

[0045] Furthermore, the anti-fall beam is used to carry a displacement observation meter. The displacement observation meter is used to observe the deformation of the supporting pile system.

[0046] The anti-drop beam comprises bolts, a rigid stiffening plate and a spring washer.

[0047] The rigid stiffening plate is connected to the top crown beam of the supporting pile of the supporting pile system through bolts and spring washers.

[0048] The rigid stiffening plate is equipped with a displacement observation meter.

[0049] The bolts are embedded in the top crown beam of the supporting pile.

[0050] Furthermore, it also includes a plurality of longitudinal concrete connecting beams between the supporting piles.

[0051] The longitudinal concrete connecting beam between the supporting piles comprises pre-buried connecting bolts, implanted chemical anchor bolts and a longitudinal concrete connecting beam.

[0052] When the spacing between the supporting pile systems is consistent with the spacing between the top transverse steel beams of the top prefabricated steel-concrete composite beams, the supporting pile system is connected to the top transverse steel beams by implanting chemical anchor bolts.

[0053] When the spacing between the supporting pile systems is inconsistent with the spacing between the top transverse steel beams of the top prefabricated steel-concrete composite beams, the supporting pile system is connected to the top transverse steel beams through longitudinal concrete connecting beams and embedded connecting bolts.

[0054] When the spacing between the supporting pile systems is consistent with the spacing between the middle-layer transverse steel beams of the middle-layer assembled steel-concrete composite beams, the supporting pile system is connected to the middle-layer transverse steel beams by implanting chemical anchor bolts.

[0055] When the spacing between the supporting pile systems is inconsistent with the spacing between the middle-layer transverse steel beams of the middle-layer assembled steel-concrete composite beams, the supporting pile system is connected to the middle-layer transverse steel beams through longitudinal concrete connecting beams and embedded connecting bolts.

[0056] A construction method for a multi-layer steel-concrete frame bridge for co-construction of mountainous urban traffic and squares comprises the following steps:

[0057] 1) Construction of supporting pile body, construction of cap beam on top of supporting pile body and retaining wall.

[0058] 2) Process and manufacture top-layer longitudinal steel beams, middle-layer top-layer longitudinal steel beams, top-layer transverse steel beams, middle-layer top-layer transverse steel beams, top-layer longitudinal distribution steel beams and middle-layer top-layer longitudinal distribution steel beams, and set shear-resistant connecting bolts on the top of the steel beams.

[0059] 3) Excavate earth and stone in front of the supporting piles.

[0060] 4) Construct frame structure piles and pre-embed the steel pipe column bases and pile-column connectors.

[0061] 5) The steel tube frame columns are hoisted on site and installed in place, and the top longitudinal steel beams, middle top longitudinal steel beams, top transverse steel beams and middle top transverse steel beams of the prefabricated steel-concrete composite beams are connected according to the reserved joints on the column body.

[0062] 6) The top-layer longitudinal distribution steel beams and the middle-layer top-layer longitudinal distribution steel beams are positioned and installed on site in layers. After the installation is completed, the top layer cast-in-place reinforced concrete panels and the middle-layer top-layer cast-in-place reinforced concrete panels are set on the top.

[0063] 7) Complete the construction of the paving layer above each layer of panels.

[0064] It is worth noting that the present invention is a multi-layer steel-concrete frame bridge and its construction method for co-construction of mountain city traffic and square. The frame bridge includes a support pile system, a supporting structure that can adapt to spatial deformation, a top-layer assembled steel-concrete composite beam, a middle-layer assembled steel-concrete composite beam, a steel pipe frame column, a beam-column node area, a reinforced concrete cast-in-place pile, an anti-fall beam and a displacement observation meter, and a longitudinal concrete connecting beam between the support piles. On the one hand, the support pile can withstand the horizontal soil pressure behind the pile, and on the other hand, it can be used as a vertical force-bearing member of the top and middle-layer assembled steel-concrete composite beams. After the present invention is completed, it can meet the needs of three-dimensional multi-layer functional space. The top layer is an urban leisure square, the middle layer is an urban public parking space, and the bottom layer is an urban traffic space. The present invention is convenient to construct, and the use of an assembled structure can greatly save the construction period. At the same time, the multi-layer frame bridge can save urban land, and the land is comprehensively utilized when the mountainous urban land is relatively tight, thereby improving the efficiency of urban land use and saving engineering investment.

[0065] The technical effects of the present invention are undoubted, and the beneficial effects of the present invention include:

[0066] 1) The present invention adopts steel-concrete composite beams, which can be quickly constructed and save construction time. The shear-resistant connection between steel and concrete can ensure the overall stress of the steel-concrete composite beam system.

[0067] 2) The structure of the present invention has a light weight and high steel strength, which can better meet the functional space requirements under the bridge.

[0068] 3) Under the premise of strictly controlling the displacement of the supporting piles, the present invention makes comprehensive use of the supporting piles, and at the same time sets a displacement observation meter and a beam-falling prevention facility complex on the top of the supporting piles, which can effectively monitor the displacement and other indicators of the structure during the construction period and the subsequent operation period.

[0069] 4) The present invention comprehensively utilizes urban public space, proposes the function of multi-dimensional three-dimensional use of urban space, meets the people-oriented demand for urban public space, and increases urban leisure space. BRIEF DESCRIPTION OF THE DRAWINGS

[0070] Figure 1It is a three-dimensional structural diagram of a multi-layer steel-concrete frame bridge used for mountainous urban transportation and square construction;

[0071] Figure 2 It is a schematic diagram of a multi-layer steel-concrete frame bridge used for mountainous urban transportation and square construction;

[0072] Figure 3 It is the plan layout of the top-level assembled steel-concrete composite beam;

[0073] Figure 4 It is the plan layout of the middle-level assembled steel-concrete composite beam;

[0074] Figure 5 It is the large sample of the beam-column joint area;

[0075] Figure 6 yes Figure 4 Plane projection of the position (top projection of the steel beam flange plate);

[0076] Figure 7 yes Figure 4 Plane projection of the location (reflecting the projection inside the steel column);

[0077] Figure 8 It is the installation point map of the anti-falling beam and displacement observation meter;

[0078] Fig. 9 It is a schematic diagram of the arrangement of pile-column connections for a multi-story frame bridge;

[0079] In the figure: support pile system 1, support structure adaptable to spatial deformation 2, top-layer assembled steel-concrete composite beam 3, middle-layer assembled steel-concrete composite beam 4, steel pipe frame column 5, beam-column node area 6, reinforced concrete cast-in-place pile 7, anti-fall beam 8, support pile body 11, top crown beam of support pile 12, retaining back wall 13, support base adaptable to spatial deformation 21, rubber support 22, top-layer longitudinal steel beam 31, top-layer transverse steel beam 32, top-layer cast-in-place reinforced concrete panel 33, top-layer longitudinal distribution steel beam 34, top-layer triangular rigid axil angle plate 35, top-layer shear connection bolt 36, middle-layer longitudinal steel beam 41, middle-layer transverse steel beam 42. middle layer cast-in-place reinforced concrete panel 43. middle layer longitudinal distribution steel beam 44. middle layer triangular rigid axil plate 45. middle layer shear connection bolts 46. rectangular steel pipe column 51. column inner partition 52. column internal poured concrete 53. web high-strength bolt connection area 61. top plate weld connection area 62. bottom plate weld connection area 63. triangular rigid axil plate 64. pile body 71. pile-column connection 72. bolt 81. rigid stiffening plate 82. displacement observation meter 83. spring washer 84. embedded connection bolt 91. implanted chemical anchor 92. longitudinal concrete connection beam 93. DETAILED DESCRIPTION

[0080] The present invention is further described below in conjunction with the embodiments, but it should not be understood that the above subject matter of the present invention is limited to the following embodiments. Without departing from the above technical ideas of the present invention, various substitutions and changes are made according to the common technical knowledge and customary means in the art, which should all be included in the protection scope of the present invention.

[0081] Embodiment 1:

[0082] See also Figures 1 to 9 A multi-layer steel-concrete frame bridge for co-construction of mountain city traffic and squares includes a plurality of supporting pile systems 1, a plurality of supporting structures that can adapt to spatial deformation 2, a plurality of top-layer assembled steel-concrete composite beams 3, a plurality of middle-layer assembled steel-concrete composite beams 4, a plurality of steel pipe frame columns 5, a plurality of beam-column node areas 6, a plurality of reinforced concrete cast-in-place piles 7, and a plurality of anti-fall beams 8.

[0083] The supporting structure 2 capable of adapting to spatial deformation is cast on the supporting pile system 1 .

[0084] The top-level assembled steel-concrete composite beam 3 is connected to the steel pipe frame column 5 through the beam-column node area 6 .

[0085] The middle-layer assembled steel-concrete composite beam 4 is connected to the steel pipe frame column 5 through the beam-column node area 6.

[0086] The reinforced concrete cast-in-place piles 7 connect adjacent steel pipe frame columns 5 .

[0087] The anti-fall beam 8 is connected to the supporting pile system 1 .

[0088] The supporting pile system 1 includes a supporting pile body 11 , a supporting pile top cap beam 12 , and a retaining back wall 13 .

[0089] The crown beam 12 at the top of the supporting pile is connected to the supporting pile body 11 through internal steel bars.

[0090] The retaining back wall 13 is connected to the supporting pile body 11 through internal steel bars.

[0091] The support structure 2 capable of adapting to spatial deformation includes a support base 21 capable of adapting to spatial deformation and a rubber support 22 .

[0092] The support base 21 that can adapt to spatial deformation is cast together with the top beam 12 of the supporting pile through embedded bolts.

[0093] The rubber support 22 is disposed on a support base 21 that can adapt to spatial deformation.

[0094] The top-level assembled steel-concrete composite beam 3 includes a top-level longitudinal steel beam 31 , a top-level transverse steel beam 32 , a top-level cast-in-place reinforced concrete panel 33 , a top-level longitudinal distribution steel beam 34 , a top-level triangular rigid axil angle plate 35 , and a top-level shear-resistant connecting bolt 36 .

[0095] The top longitudinal steel beam 31 is connected to the steel pipe frame column 5 .

[0096] The top-level transverse steel beam 32 is connected to the steel pipe frame column 5 .

[0097] Top-level longitudinal distribution steel beams 34 are arranged between adjacent top-level transverse steel beams 32 .

[0098] A top-level shear-resistant connecting stud 36 is provided on the top surface of the flange plate of the top-level longitudinal distribution steel beam 34 .

[0099] The top triangular rigid corner plate 35 is arranged below the flange plate of the top transverse steel beam 32 and is connected to the steel pipe frame column 5 by welding to form a whole.

[0100] The top cast-in-place reinforced concrete panel 33 is cast together with the top longitudinal steel beam 31 and the top transverse steel beam 32 through the top shear-resistant connecting bolts 36 to form a top steel-concrete composite beam system.

[0101] The middle-layer assembled steel-concrete composite beam 4 includes a middle-layer longitudinal steel beam 41, a middle-layer transverse steel beam 42, a middle-layer cast-in-place reinforced concrete panel 43, a middle-layer longitudinal distribution steel beam 44, a middle-layer triangular rigid axil plate 45, and a middle-layer shear-resistant connecting bolt 46.

[0102] The middle-layer longitudinal steel beam 41 is connected to the steel pipe frame column 5 .

[0103] The middle-layer transverse steel beam 42 is connected to the steel pipe frame column 5 .

[0104] A middle-layer longitudinal distribution steel beam 44 is arranged between adjacent middle-layer transverse steel beams 42 .

[0105] A middle-layer shear-resistant connecting bolt 46 is arranged on the top surface of the flange plate of the middle-layer longitudinal distribution steel beam 44 .

[0106] The middle-layer triangular rigid axil angle plate 45 is arranged below the flange plate of the middle-layer transverse steel beam 42 and is connected to the steel pipe frame column 5 by welding to form a whole.

[0107] The middle layer cast-in-situ reinforced concrete panel 43 is cast together with the middle layer longitudinal steel beam 41 and the middle layer transverse steel beam 42 through the middle layer shear-resistant connecting bolts 46 to form a middle layer steel-concrete composite beam system.

[0108] The steel tube frame column 5 comprises a rectangular steel tube column 51 , a column inner partition 52 , and concrete 53 poured inside the column.

[0109] An inner column partition 52 is disposed inside the steel pipe column 51 .

[0110] The inner column partition 52 is welded to the rectangular steel pipe column 51 .

[0111] The column inner partition plate 52 is provided with a concrete pouring hole 54 and a concrete pouring observation hole 55 on the top cover plate of the steel pipe frame column.

[0112] The concrete pouring observation hole 55 is used to observe the fullness of the concrete 53 poured into the column.

[0113] The column interior pouring concrete 53 is poured into the interior of the rectangular steel tube column 51 through the concrete pouring hole 54 .

[0114] The beam-column node area 6 includes a high-strength bolt connection area 61 of the web at the joint, a top plate weld connection area 62 at the joint, a bottom plate weld connection area 63 at the joint, and a triangular rigid axillary angle plate 64 at the joint.

[0115] The web high-strength bolt connection area 61 at the joint is arranged on the side walls of the top longitudinal steel beam 31 and the middle longitudinal steel beam 41 .

[0116] When the high-strength bolt connection area 61 of the web at the splicing point is set at the top longitudinal steel beam 31, it is connected to the top plate of the top transverse steel beam 32 through the top plate weld connection area 62 at the splicing point, and is connected to the bottom plate of the top transverse steel beam 32 through the bottom plate weld connection area 63 at the splicing point.

[0117] When the high-strength bolt connection area 61 of the web at the joint is set at the middle-layer longitudinal steel beam 41, it is connected to the top plate of the middle-layer transverse steel beam 42 through the top plate weld connection area 62 at the joint, and is connected to the bottom plate of the middle-layer transverse steel beam 42 through the bottom plate weld connection area 63 at the joint.

[0118] The triangular rigid armpit angle plate 64 at the joint is arranged below the flange plates of the top transverse steel beam 32 and the middle transverse steel beam 42, and is connected to the rectangular steel pipe column 51 of the steel pipe frame column 5 by welding to form a whole.

[0119] The reinforced concrete cast-in-place pile 7 includes a pile body 71 and a pile-column connector 72 .

[0120] The pile body 71 includes a reinforced concrete cast-in-place pile.

[0121] The pile body 71 is pre-embedded with a steel pipe column foot and a pile-column connector 72 .

[0122] The pile body 71 is connected to the steel pipe frame column 5 through the steel pipe column foot and the pile column connector 72 .

[0123] The pile-column connector 72 includes a shear-resistant connecting steel plate 721 , a shear-resistant connecting bolt 722 , and a shear-resistant connecting steel bar 723 .

[0124] The anti-fall beam 8 is used to carry a displacement observation meter 83. The displacement observation meter 83 is used to observe the deformation of the supporting pile system.

[0125] The anti-drop beam 8 includes a bolt 81 , a rigid stiffening plate 82 , and a spring washer 84 .

[0126] The rigid stiffening plate 82 is connected to the top crown beam 12 of the supporting pile of the supporting pile system 1 through bolts 81 and spring washers 84 .

[0127] The rigid stiffening plate 82 is provided with a displacement observation meter 83 .

[0128] The bolts 81 are pre-buried in the crown beam 12 at the top of the supporting pile.

[0129] It also includes a plurality of longitudinal concrete connecting beams 9 between the supporting piles.

[0130] The longitudinal concrete connecting beam 9 between the supporting piles includes pre-buried connecting bolts 91 , implanted chemical anchor bolts 92 , and a longitudinal concrete connecting beam 93 .

[0131] When the spacing between the supporting pile systems 1 is consistent with the spacing between the top transverse steel beams 32 of the top prefabricated steel-concrete composite beams 3 , the supporting pile system 1 is connected to the top transverse steel beams 32 by implanting chemical anchor bolts 92 .

[0132] When the spacing between the supporting pile systems 1 is inconsistent with the spacing between the top transverse steel beams 32 of the top prefabricated steel-concrete composite beams 3, the supporting pile system 1 is connected to the top transverse steel beams 32 through the longitudinal concrete connecting beams 93 and the embedded connecting bolts 91.

[0133] When the spacing between the supporting pile systems 1 is consistent with the spacing between the middle-layer transverse steel beams 42 of the middle-layer assembled steel-concrete composite beams 4 , the supporting pile systems 1 are connected to the middle-layer transverse steel beams 42 by implanting chemical anchor bolts 92 .

[0134] When the spacing between the supporting pile systems 1 is inconsistent with the spacing between the middle-layer transverse steel beams 42 of the middle-layer assembled steel-concrete composite beams 4, the supporting pile system 1 is connected to the middle-layer transverse steel beams 42 through the longitudinal concrete connecting beams 93 and the embedded connecting bolts 91.

[0135] A construction method for a multi-layer steel-concrete frame bridge for co-construction of mountainous urban traffic and squares comprises the following steps:

[0136] 1) Construction of the supporting pile body 11, the top cap beam 12 of the supporting pile body, and the retaining back wall 13.

[0137] 2) Process and manufacture the top-layer longitudinal steel beam 31, the middle-layer top-layer longitudinal steel beam 41, the top-layer transverse steel beam 32, the middle-layer top-layer transverse steel beam 42, the top-layer longitudinal distribution steel beam 34 and the middle-layer top-layer longitudinal distribution steel beam 44, and set shear-resistant connecting bolts on the top of the steel beams.

[0138] 3) Excavate earth and stone in front of the supporting piles.

[0139] 4) Construct frame structure piles and pre-embed the steel pipe column footings and pile-column connectors 72.

[0140] 5) The steel tube frame column 5 is hoisted on site and installed in place, and the top longitudinal steel beam 31, the middle top longitudinal steel beam 41, the top transverse steel beam 32 and the middle top transverse steel beam 42 in the assembled steel-concrete composite beam are connected according to the reserved joints on the column body.

[0141] 6) The top longitudinal distribution steel beam 34 and the middle top longitudinal distribution steel beam 44 are positioned and installed on site in layers. After installation, the top cast-in-place reinforced concrete panel 33 and the middle top cast-in-place reinforced concrete panel 43 are set on the top.

[0142] 7) Complete the construction of the paving layer above each layer of panels.

[0143] Embodiment 2:

[0144] A multi-layer steel-concrete frame bridge for co-construction of mountain city traffic and squares, mainly see embodiment 1, the frame bridge mainly includes a support pile system 1, a supporting structure 2 that can adapt to spatial deformation, a top-layer assembled steel-concrete composite beam 3, a middle-layer assembled steel-concrete composite beam 4, a steel pipe frame column 5, a beam-column node area 6, reinforced concrete cast-in-place piles 7, an anti-fall beam and a displacement observation meter 8, and a longitudinal concrete connecting beam 9 between the support piles.

[0145] A construction method for a multi-layer steel-concrete frame bridge for co-construction of mountainous urban traffic and squares, comprising the following steps:

[0146] 1) See Figure 1 After the construction preparation work is completed, the support piles 11 are constructed first, and then the top crown beam 12 of the support pile body and the retaining back wall 13 are constructed. All components should be pre-buried with steel bars for overlap anchoring.

[0147] 2) Observe the deformation of the support pile structure and monitor it. At the same time, the top longitudinal steel beam 31 and the middle top longitudinal steel beam 41, the top transverse steel beam 32 and the middle top transverse steel beam 42, the top longitudinal distribution steel beam 34 and the middle top longitudinal distribution steel beam 44 of the assembled steel-concrete composite beam are processed and manufactured in the factory, and shear connection bolts are set at the corresponding positions on the top of the steel beam.

[0148] 3) Excavate the earth and stone in front of the supporting piles, and construct the longitudinal concrete connecting beams 9 between the supporting piles at the corresponding positions of the retaining plates between the piles and the middle-layer assembled steel-concrete composite beams 4 according to the reverse construction method. Install the supporting structure 2 on the top of the crown beam that can adapt to the spatial deformation when the deformation is confirmed to be within the limit.

[0149] 4) Construct the frame structure piles, and pay attention to pre-embed the steel pipe column foot and pile-column connectors 72.

[0150] 5) The steel pipe columns are hoisted on site and installed in place, and the top longitudinal steel beam 31 and the middle top longitudinal steel beam 41, the top transverse steel beam 32 and the middle top transverse steel beam 42 in the assembled steel-concrete composite beam are connected according to the reserved joints on the column body.

[0151] 6) The top longitudinal distribution steel beam 34 and the middle top longitudinal distribution steel beam 44 are positioned and installed on site in layers. After installation, the top cast-in-place reinforced concrete panel 33 and the middle top cast-in-place reinforced concrete panel 43 are set on the top.

[0152] 7) Complete the construction of the paving layer above each layer of panels.

[0153] Embodiment 3:

[0154] A multi-layer steel-concrete frame bridge for mountainous urban transportation and square co-construction as described in Example 1, the main contents are as follows:

[0155] A multi-layer steel-concrete frame bridge for co-construction of mountain city traffic and squares is characterized by: mainly including a support pile system 1, a supporting structure that can adapt to spatial deformation 2, a top-layer assembled steel-concrete composite beam 3, a middle-layer assembled steel-concrete composite beam 4, a steel pipe frame column 5, a beam-column node area 6, reinforced concrete cast-in-place piles 7, an anti-fall beam and a displacement observation meter 8, and a longitudinal concrete connecting beam 9 between the support piles.

[0156] The support pile system 1 includes a support pile body 11, a top beam 12 on the top of the support pile, and a retaining back wall 13. The top beam 12 and the retaining back wall 13 are tightly connected to the support pile through internal steel bars.

[0157] The support structure 2 capable of adapting to spatial deformation comprises a support base 21 capable of adapting to spatial deformation and a rubber support 22. The support base 21 capable of adapting to spatial deformation is cast together with the top surface of the crown beam through embedded bolts, and the rubber support 22 is arranged on the support base 21 capable of adapting to spatial deformation.

[0158] The top-level assembled steel-concrete composite beam 3 includes a longitudinal steel beam 31, a transverse steel beam 32, a cast-in-place reinforced concrete panel 33, a longitudinal distribution steel beam 34, a triangular rigid axil plate 35, and a shear connection stud 36. The longitudinal steel beam 31 and the transverse steel beam 32 are connected to the steel pipe frame column 5 by welding or bolting. The longitudinal distribution steel beam 34 is arranged between the transverse steel beams 32, and the shear connection stud 36 is arranged on the top surface of the flange plate of the longitudinal distribution steel beam 34. The cast-in-place reinforced concrete panel 33 is cast together with the longitudinal steel beam 31 and the transverse steel beam 32 through the shear connection stud 36 to form a steel-concrete composite beam system.

[0159] The middle-layer assembled steel-concrete composite beam 4 includes a longitudinal steel beam 41, a transverse steel beam 42, a cast-in-place reinforced concrete panel 43, a longitudinal distribution steel beam 44, a triangular rigid axil plate 45, and a shear connection stud 46. The longitudinal steel beam 41 and the transverse steel beam 42 are connected to the steel pipe frame column 5 by welding or bolting. The longitudinal distribution steel beam 44 is arranged between the transverse steel beams 42, and the shear connection stud 46 is arranged on the top surface of the flange plate of the longitudinal distribution steel beam 44. The cast-in-place reinforced concrete panel 43 is cast together with the longitudinal steel beam 41 and the transverse steel beam 42 through the shear connection stud 46 to form a steel-concrete composite beam system.

[0160] The steel tube frame column 5 comprises a rectangular steel tube column 51, a column inner partition 52, concrete 53 poured inside the column, a concrete pouring hole 54 on the top cover of the steel tube frame column, and a concrete pouring observation hole 55. The steel tube column 51 is provided with a column inner partition 52 at a corresponding position inside the intersection with the beam body. The column inner partition 52 is connected to the rectangular steel tube column 51 by welding to form a whole. At the same time, in order to enhance the compressive capacity of the steel tube frame column, concrete 53 is poured inside the column. The poured concrete can be micro-expansion concrete to resist certain shrinkage and deformation of the concrete. The concrete is poured through the pouring hole, and the fullness of the pouring is observed through the observation hole.

[0161] The beam-column node area 6 includes a high-strength bolt connection 61 of the web at the splicing, a top plate weld connection 62 of the splicing, a bottom plate weld connection 63 of the splicing, and a triangular rigid axillary angle plate 64. The beam-column node area 6 is set at the intersection of the steel tube frame column and the beam body, the top plate weld connection 62 and the bottom plate weld connection 63 of the splicing at the beam body flange plate, and the web high-strength bolt connection 61 of the splicing is set at the beam body web. In order to strengthen the rigid connection of the node area, a triangular rigid axillary angle plate 64 is set below the beam flange plate in the node area, and the triangular rigid axillary angle plate 64 is connected to the column as a whole by welding.

[0162] The reinforced concrete pile 7 includes a pile body 71 and a pile-column connector 72. The pile body 71 is a reinforced concrete pile. During the construction of the pile body, it is important to pre-embed the steel pipe column foot and the pile-column connector 72. The pile-column connector 72 uses three types of connectors, namely, a shear connection steel plate 721, a shear connection stud 722, and a shear connection steel bar 723.

[0163] The anti-fall beam and displacement observation meter 8 include bolts 81, rigid stiffening plates 82, displacement observation meters 83, and spring washers 84. Bolts 81 are embedded in the crown beam concrete of the supporting pile system, spring washers 84 are arranged around the bolts, rigid stiffening plates 82 are arranged at the bolt nut positions, and displacement observation meters 83 are arranged on the rigid stiffening plates 82 to observe the deformation of the supporting pile system. The longitudinal concrete connecting beam 9 between the supporting piles includes embedded connecting bolts 91, implanted chemical anchors 92, and longitudinal concrete connecting beams 93. Due to the difference in the modulus between the supporting pile spacing and the beam spacing of the assembled steel-concrete composite beam, a longitudinal concrete connecting beam 93 is arranged between the supporting pile systems. When the beam end contact part of the assembled steel-concrete composite beam is the supporting pile, an implanted chemical anchor 92 is used; when the beam end contact part of the assembled steel-concrete composite beam is the longitudinal concrete connecting beam 93, an embedded connecting bolt 91 is used.

Claims

1. A multi-layer steel-concrete frame bridge for mountainous urban traffic and square construction, characterized by: It comprises a plurality of supporting pile systems (1), a plurality of supporting structures (2) that can adapt to spatial deformation, a plurality of top-layer assembled steel-concrete composite beams (3), a plurality of middle-layer assembled steel-concrete composite beams (4), a plurality of steel pipe frame columns (5), a plurality of beam-column node areas (6), a plurality of reinforced concrete cast-in-place piles (7), and a plurality of anti-fall beams (8); The supporting structure (2) capable of adapting to spatial deformation is cast on the supporting pile system (1); The top-level assembled steel-concrete composite beam (3) is connected to the steel tube frame column (5) via a beam-column node area (6); The middle-layer assembled steel-concrete composite beam (4) is connected to the steel tube frame column (5) via the beam-column node area (6); The reinforced concrete cast-in-place piles (7) are connected to adjacent steel pipe frame columns (5); The anti-fall beam (8) is connected to the support pile system (1); The support pile system (1) comprises a support pile body (11), a top beam (12) on the top of the support pile, and a retaining back wall (13); The top crown beam (12) of the supporting pile is connected to the supporting pile body (11) via internal steel bars; The retaining back wall (13) is connected to the supporting pile body (11) via internal steel bars; The support structure (2) capable of adapting to spatial deformation comprises a support base (21) capable of adapting to spatial deformation and a rubber support (22); The support base (21) capable of adapting to spatial deformation is cast together with the crown beam (12) at the top of the support pile by means of pre-embedded bolts; The rubber support (22) is arranged on a support base (21) that can adapt to spatial deformation; The top-level assembled steel-concrete composite beam (3) comprises a top-level longitudinal steel beam (31), a top-level transverse steel beam (32), a top-level cast-in-place reinforced concrete panel (33), a top-level longitudinal distribution steel beam (34), a top-level triangular rigid axil angle plate (35), and a top-level shear-resistant connection bolt (36); The top longitudinal steel beam (31) is connected to the steel tube frame column (5); The top transverse steel beam (32) is connected to the steel tube frame column (5); A top-level longitudinal distribution steel beam (34) is arranged between adjacent top-level transverse steel beams (32); A top layer of shear-resistant connecting bolts (36) are provided on the top surface of the flange plate of the top layer of longitudinal distribution steel beam (34); The top triangular rigid axil angle plate (35) is arranged below the flange plate of the top transverse steel beam (32) and is connected to the steel pipe frame column (5) by welding to form a whole; The top cast-in-place reinforced concrete panel (33) is cast together with the top longitudinal steel beam (31) and the top transverse steel beam (32) through the top shear-resistant connecting bolts (36) to form a top steel-concrete composite beam system; The middle-layer assembled steel-concrete composite beam (4) comprises a middle-layer longitudinal steel beam (41), a middle-layer transverse steel beam (42), a middle-layer cast-in-place reinforced concrete panel (43), a middle-layer longitudinal distribution steel beam (44), a middle-layer triangular rigid axil plate (45), and a middle-layer shear-resistant connecting bolt (46); The middle-layer longitudinal steel beam (41) is connected to the steel tube frame column (5); The middle-layer transverse steel beam (42) is connected to the steel tube frame column (5); A middle-layer longitudinal distribution steel beam (44) is arranged between adjacent middle-layer transverse steel beams (42); A middle-layer shear-resistant connecting bolt (46) is arranged on the top surface of the flange plate of the middle-layer longitudinal distribution steel beam (44); The middle-layer triangular rigid axil angle plate (45) is arranged below the flange plate of the middle-layer transverse steel beam (42) and is connected to the steel pipe frame column (5) by welding to form a whole; The middle layer cast-in-place reinforced concrete panel (43) is cast together with the middle layer longitudinal steel beam (41) and the middle layer transverse steel beam (42) through the middle layer shear-resistant connecting bolts (46) to form a middle layer steel-concrete composite beam system; The steel tube frame column (5) comprises a rectangular steel tube column (51), a column inner partition (52), and concrete poured inside the column (53); A column inner partition (52) is arranged inside the steel tube column (51); The column inner partition (52) is welded to the rectangular steel tube column (51); The column inner partition plate (52) is provided with a concrete pouring hole (54) on the top cover plate of the steel pipe frame column and a concrete pouring observation hole (55); The concrete pouring observation hole (55) is used to observe the fullness of the concrete (53) poured inside the column; The column interior pouring concrete (53) is poured into the interior of the rectangular steel tube column (51) through the concrete pouring hole (54).

2. A multi-layer steel-concrete frame bridge for mountainous urban traffic and square construction according to claim 1, characterized in that: The beam-column node area (6) comprises a high-strength bolt connection area (61) of the web at the joint, a top plate weld connection area (62) at the joint, a bottom plate weld connection area (63) at the joint, and a triangular rigid axil angle plate (64) at the joint; The web high-strength bolt connection area (61) at the joint is arranged on the side walls of the top longitudinal steel beam (31) and the middle longitudinal steel beam (41); When the high-strength bolt connection area (61) of the web at the splicing location is arranged on the top longitudinal steel beam (31), it is connected to the top plate of the top transverse steel beam (32) through the top plate weld connection area (62) at the splicing location, and is connected to the bottom plate of the top transverse steel beam (32) through the bottom plate weld connection area (63) at the splicing location; When the high-strength bolt connection area (61) of the web at the joint is arranged on the middle longitudinal steel beam (41), it is connected to the top plate of the middle transverse steel beam (42) through the top plate weld connection area (62) at the joint, and is connected to the bottom plate of the middle transverse steel beam (42) through the bottom plate weld connection area (63) at the joint; The triangular rigid axil angle plate (64) at the joint is arranged below the flange plates of the top transverse steel beam (32) and the middle transverse steel beam (42), and is connected to the rectangular steel tube column (51) of the steel tube frame column (5) by welding to form a whole.

3. The multi-layer steel-concrete frame bridge for mountainous urban traffic and square construction according to claim 1 is characterized by: The reinforced concrete cast-in-place pile (7) comprises a pile body (71) and a pile-column connecting piece (72); The pile body (71) comprises a reinforced concrete cast-in-place pile; The pile body (71) is pre-embedded with a steel pipe column foot and a pile-column connector (72); The pile body (71) is connected to the steel pipe frame column (5) via a steel pipe column foot and a pile-column connector (72); The pile-column connecting member (72) comprises a shear-resistant connecting steel plate (721), a shear-resistant connecting bolt (722), and a shear-resistant connecting steel bar (723).

4. The multi-layer steel-concrete frame bridge for mountainous urban traffic and square construction according to claim 1 is characterized by: The anti-fall beam (8) is used to carry a displacement observation meter (83); the displacement observation meter (83) is used to observe the deformation of the support pile system; The anti-fall beam (8) comprises a bolt (81), a rigid stiffening plate (82), and a spring washer (84); The rigid stiffening plate (82) is connected to the top crown beam (12) of the supporting pile of the supporting pile system (1) via bolts (81) and spring washers (84); The rigid stiffening plate (82) is equipped with a displacement observation meter (83); The bolts (81) are pre-buried in the crown beam (12) at the top of the supporting pile.

5. The multi-layer steel-concrete frame bridge for mountainous urban traffic and square construction according to claim 1 is characterized by: Also included are a plurality of longitudinal concrete connecting beams (9) between the supporting piles; The longitudinal concrete connecting beam (9) between the supporting piles comprises pre-buried connecting bolts (91), implanted chemical anchor bolts (92), and a longitudinal concrete connecting beam (93); When the spacing between the support pile systems (1) is consistent with the spacing between the top transverse steel beams (32) of the top assembled steel-concrete composite beams (3), the support pile system (1) is connected to the top transverse steel beams (32) by implanting chemical anchor bolts (92); When the spacing between the support pile systems (1) is inconsistent with the spacing between the top transverse steel beams (32) of the top assembled steel-concrete composite beams (3), the support pile system (1) is connected to the top transverse steel beams (32) via the longitudinal concrete connecting beams (93) and the embedded connecting bolts (91); When the spacing between the support pile systems (1) is consistent with the spacing between the middle-layer transverse steel beams (42) of the middle-layer assembled steel-concrete composite beams (4), the support pile system (1) is connected to the middle-layer transverse steel beams (42) by implanting chemical anchor bolts (92); When the spacing between the support pile systems (1) is inconsistent with the spacing between the middle-layer transverse steel beams (42) of the middle-layer assembled steel-concrete composite beams (4), the support pile system (1) is connected to the middle-layer transverse steel beams (42) via longitudinal concrete connecting beams (93) and embedded connecting bolts (91).

6. A construction method for a multi-layer steel-concrete frame bridge for mountainous urban traffic and square construction as claimed in any one of claims 1 to 5, characterized in that: The following steps are involved: 1) A pile body (11) of the construction support pile, a crown beam (12) on the top of the pile body, and a retaining wall (13); 2) Processing and manufacturing top-layer longitudinal steel beams (31), middle-layer longitudinal steel beams (41), top-layer transverse steel beams (32), middle-layer transverse steel beams (42), top-layer longitudinal distribution steel beams (34) and middle-layer longitudinal distribution steel beams (44), and providing shear-resistant connecting bolts on the tops of the steel beams; 3) Excavation of earth and rock in front of the supporting piles; 4) Construct the frame structure piles and embed the steel pipe column footings and pile-column connectors (72); 5) hoisting the steel tube frame column (5) on site and installing it in place, and connecting the top longitudinal steel beam (31), the middle longitudinal steel beam (41), the top transverse steel beam (32) and the middle transverse steel beam (42) in the assembled steel-concrete composite beam according to the reserved joints on the column body; 6) Position and install the top longitudinal distribution steel beam (34) and the middle longitudinal distribution steel beam (44) on site in layers, and after installation, set the top cast-in-place reinforced concrete panel (33) and the middle cast-in-place reinforced concrete panel (43); 7) Complete the construction of the paving layer above each layer of panels.

Citation Information

Patent Citations

  • Two-layer / multi-layer road network of hollow steel structure in intersection, parking lot and square

    CN105544329A

  • Embedded elastic device for preventing beam from dropping

    CN106758785A

  • Steel and concrete composite door -shaped structure

    CN208415111U