Cap beam hoisting installation device and use method thereof

By using auxiliary casting mechanism and filling cavity in the hoisting and installation device of the cover beam and pier column, the problem of unstable fixation of steel bars and steel bar holes is solved, and higher installation stability is achieved and the operation difficulty of concrete filling is reduced.

CN115491998BActive Publication Date: 2025-04-18CHINA RAILWAY NO 3 GRP CO LTD +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202211259288.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-10-14
Publication Date
2025-04-18
Estimated Expiration
2042-10-14

AI Technical Summary

Technical Problem

After the assembly of the cover beam and pier column at this stage, the fixing process of steel bars and steel bar holes is difficult and the fixing method is unstable.

Method used

A cover beam hoisting installation device is provided, including pier columns and preset steel bars, and an auxiliary pouring mechanism is installed on the top of the pier column for concrete pouring. There is a filling cavity at the abutment between the cover beam and the pier column. The auxiliary casting mechanism is installed in the filling cavity. The cover beam and pier column are fixed by concrete pouring.

Benefits of technology

The installation stability between the steel bar and the steel bar hole is improved, and the operation difficulty of concrete filling in the steel bar hole is reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115491998B_ABST
    Figure CN115491998B_ABST
Patent Text Reader

Abstract

The present application relates to a cap beam hoisting and installation device and a method for using the same, and relates to the field of bridge construction, which includes a pier column, the pier column is fixedly installed on the construction ground, a number of uniformly arranged preset steel bars are fixedly installed on the top of the pier column, and several of the preset steel bars are installed with auxiliary pouring mechanisms, and the auxiliary pouring mechanisms are used to pour concrete on the installed preset steel bars; the pier column is abutted with a cap beam, and a number of uniformly distributed pouring cavities are opened at the abutment between the cap beam and the pier column, and several of the auxiliary pouring mechanisms are respectively installed in the several pouring cavities. The present application has the effect of improving the installation stability between the steel bar and the steel bar hole and reducing the difficulty of concrete pouring in the steel bar hole.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of bridge construction, and in particular to a cap beam hoisting and installation device and a method for using the same. Background Art

[0002] At present, prefabricated cap beams are used more and more widely, especially piers or piles with concrete column structures will be assembled with prefabricated cap beams. The assembly of prefabricated cap beams mainly refers to the process of inserting the exposed steel bars reserved in advance on the pier into the steel bar holes of the prefabricated cap beam.

[0003] The assembly of prefabricated cap beams is mainly completed by crane and manual use of total station. After the assembly of prefabricated cap beams and piers is completed, the steel bars and steel bar holes need to be fixed by welding or concrete pouring.

[0004] With respect to the above-mentioned related technologies, the inventors believe that at present, after the assembly of the cap beam and the pier is completed, the process of fixing the steel bars and the steel bar holes is difficult to operate and the fixing method is unstable. Summary of the invention

[0005] In order to improve the installation stability between the steel bars and the steel bar holes and reduce the difficulty of pouring concrete into the steel bar holes, the present application provides a cap beam hoisting and installation device and a use method thereof.

[0006] The present application provides a cap beam hoisting and installation device and a method for using the same, which adopts the following technical solutions:

[0007] In a first aspect, the present application provides a cap beam hoisting and installation device, which adopts the following technical solution:

[0008] A cap beam hoisting and installation device comprises a pier column, wherein the pier column is fixedly installed on a construction ground, a plurality of uniformly arranged preset steel bars are fixedly installed on the top of the pier column, and an auxiliary pouring mechanism is installed on the plurality of preset steel bars, and the auxiliary pouring mechanism is used to pour concrete on the installed preset steel bars;

[0009] The pier column is butted with a cap beam, and a plurality of evenly distributed pouring cavities are provided at the butt joint between the cap beam and the pier column, and a plurality of the auxiliary pouring mechanisms are respectively installed in the plurality of pouring cavities.

[0010] By adopting the above technical solution, after the cap beam is installed on the pier column, the auxiliary pouring mechanism starts to work, pouring the concrete poured in the pier column into the cap beam, and further fixing the cap beam and the pier column by concrete, thereby improving the installation stability between the steel bars and the steel bar holes and reducing the operational difficulty of pouring concrete in the steel bar holes.

[0011] Optionally, the auxiliary pouring mechanism includes a steel sleeve, the steel sleeve is slidably sleeved on the preset steel bar, an abutment block is fixedly installed on the top of the steel sleeve, and the abutment block abuts against the top wall of the pouring cavity;

[0012] The steel bar sleeve is slidably inserted into the guide sleeve, the guide sleeve is fixedly installed in the pier, a sleeve cavity is opened in the wall of the guide sleeve, and an array of pouring holes is connected to the sleeve cavity, the array of pouring holes is opened on the outer wall of the guide sleeve, and the array of pouring holes includes a plurality of pouring holes evenly distributed on the outer wall of the guide sleeve;

[0013] The sleeve cavity is also connected with an array of guide holes, and the array of guide holes is opened on the inner wall of the guide sleeve, and the array of guide holes includes a plurality of guide holes evenly distributed on the inner wall of the guide sleeve;

[0014] The plurality of guide holes and the plurality of injection holes are arranged on the same axis in a one-to-one correspondence.

[0015] By adopting the above technical solution, after the concrete enters the sleeve cavity, the concrete enters the cap beam through the pouring hole to realize the concrete pouring work on the cap beam.

[0016] Optionally, a connecting rod is slidably inserted into the guide hole and the injection hole correspondingly arranged on the same axis, a baffle is fixedly sleeved on the connecting rod, the baffle is arranged in the sleeve cavity, and the baffle abuts against the guide hole;

[0017] A slider is fixedly mounted on one end of the connecting rod away from the baffle, the slider is arranged in the injection cavity, one end of the slider abuts against the injection hole, and the end of the slider away from the injection hole is slidably connected in the injection cavity.

[0018] By adopting the above technical solution, the slider is slidably connected in the pouring cavity. During the installation of the cap beam, the slider slides in the pouring cavity, thereby driving the baffle away from the pouring hole, ensuring that concrete enters the pouring cavity through the pouring hole.

[0019] Optionally, a fixing ring is fixedly sleeved on the steel sleeve, a buffer spring is fixedly connected to the fixing ring, the buffer spring is sleeved on the steel sleeve, and one end of the buffer spring away from the fixing ring is fixedly connected to the inner wall at the top of the guide sleeve.

[0020] By adopting the above technical solution, during the installation of the cap beam, the buffer spring plays a buffering role in the contact between the abutment block and the cap beam, thereby preventing the internal structure of the auxiliary pouring device from being damaged.

[0021] Optionally, a plurality of evenly distributed guide rails (12) are provided on the inner wall of the perfusion cavity;

[0022] One end of the slide block away from the injection hole is slidably connected in the guide rail (12);

[0023] An air guide hole is provided in the cap beam, and the plurality of the injection cavities are all connected to the air guide hole.

[0024] By adopting the above technical solution, air guide holes are opened on the cap beam, and the air guide holes are connected to the pouring cavity to ensure that when concrete is poured into the pouring cavity, the air in the pouring cavity can be discharged normally, avoiding excessive air pressure in the pouring cavity, which causes the concrete to be unable to be poured normally.

[0025] Optionally, a plurality of evenly distributed gas cavities are opened on the top of the pier column, and the preset steel bars are fixedly installed in the gas cavities;

[0026] A gas generator is installed in the gas cavity, and the gas generator is used to generate gas.

[0027] By adopting the above technical solution, a gas generator is set up, which generates air, thereby increasing the air pressure in the gas cavity. By increasing the air pressure in the gas cavity, the concrete in the concrete cavity is introduced into the sleeve cavity, ensuring that the concrete cavity can be normally poured into the pouring cavity.

[0028] Optionally, a partition is fixedly installed at the bottom of the plurality of gas cavities, the partition is fixedly installed on the inner wall of the gas cavity, a concrete cavity is arranged below the partition, the concrete cavity is opened in the pier column, and two adjacent concrete cavities are connected to each other through a concrete connecting pipe;

[0029] A plurality of the concrete cavities are connected to concrete conduits, wherein a plurality of the concrete cavities are connected to concrete conduits, and the concrete conduits are used to introduce concrete into the concrete cavities;

[0030] The partition is fixedly sleeved on the bottom of the guide sleeve;

[0031] The sleeve cavity is communicated with the concrete cavity.

[0032] By adopting the above technical solution, a concrete conduit is set to ensure that concrete can enter the concrete cavity, and then the concrete is filled into all concrete cavities through the concrete connecting pipe.

[0033] Optionally, a plurality of air outlet holes are evenly arranged on the partition, one end of the plurality of air outlet holes is connected to the concrete cavity, and one end of the plurality of air outlet holes away from the concrete cavity is connected to the gas cavity.

[0034] By adopting the above technical solution, an air outlet is opened on the partition to ensure that the air generated in the gas cavity can enter the concrete cavity through the air outlet and apply pressure to the concrete cavity to ensure that the concrete cavity can be normally poured into the pouring cavity.

[0035] Optionally, an embedding groove is provided at the top of the guide sleeve, a control switch is provided in the embedding groove, and the control switch is electrically connected to the gas generator.

[0036] By adopting the above technical solution, it is ensured that concrete pouring can start immediately after the cap beam is installed, thereby improving work efficiency and reducing construction risks.

[0037] In a second aspect, the present application provides a method for using a cap beam hoisting and installation device, comprising the following working steps:

[0038] S1. Preparation work: determine the construction site, erect piers at the construction site, prepare cap beams that meet the process requirements and open a pouring cavity on the cap beam;

[0039] S2. Open a concrete cavity and a gas cavity on the pier column, and fix a plurality of preset steel bars in the concrete cavity and the gas cavity;

[0040] S3. Install auxiliary pouring mechanisms on several preset steel bars to ensure that the auxiliary pouring mechanisms and the corresponding preset steel bars are on the same axis;

[0041] S4, installing the cap beam cap on the pier column, installing the auxiliary pouring mechanism in the pouring cavity, and pouring concrete into the concrete cavity through the concrete conduit;

[0042] S5. After the cap beam is installed, the cap beam abuts against the auxiliary pouring mechanism and drives the auxiliary pouring mechanism to work, pouring the concrete in the concrete cavity into the pouring cavity;

[0043] S6. Observe the concrete pouring situation in the pouring cavity through the air guide holes. When the concrete fills the air guide holes, stop pouring concrete into the concrete cavity. Meanwhile, regularly maintain the poured concrete to complete the construction.

[0044] By adopting the above technical scheme, piers are erected at the construction site and concrete cavities and gas cavities are opened on the piers, and precast steel bars are installed at the same time. Then, an auxiliary pouring mechanism is installed on the precast steel bars. After the installation of the auxiliary pouring mechanism is completed, the cap beam is installed on the piers, and at the same time, the auxiliary pouring mechanism is ensured to be installed in the cap beam to complete the installation of the cap beam and the piers. At the same time, concrete is poured between the cap beam and the piers to ensure a stable connection between the cap beam and the piers.

[0045] In summary, the present application includes at least one of the following beneficial technical effects:

[0046] 1. After the cap beam is installed on the pier column, the auxiliary pouring mechanism starts to work, pouring the concrete poured in the pier column into the cap beam, and further fixes the cap beam and the pier column through the concrete, improving the installation stability between the steel bars and the steel bar holes, and reducing the difficulty of pouring concrete in the steel bar holes;

[0047] 2. The slider is connected in the pouring cavity through sliding. During the installation of the cap beam, the slider slides in the pouring cavity, thereby driving the baffle away from the pouring hole to ensure that the concrete enters the pouring cavity through the pouring hole;

[0048] 3. Open air guide holes on the cap beam, which are connected to the pouring cavity to ensure that the air in the pouring cavity can be discharged normally when the concrete is poured into the pouring cavity, so as to avoid excessive air pressure in the pouring cavity, which may cause the concrete to be unable to be poured normally. BRIEF DESCRIPTION OF THE DRAWINGS

[0049] Figure 1 It is a schematic diagram of the structure of an embodiment of the present application;

[0050] Figure 2 It is a schematic diagram of the installation structure of the preset steel bars in the embodiment of the present application;

[0051] Figure 3 This is a schematic diagram of the installation structure of the auxiliary pouring device of the embodiment of the present application;

[0052] Figure 4 It is a schematic diagram of the internal structure of the auxiliary pouring device of an embodiment of the present application;

[0053] Figure 5 It is an enlarged view of point A of the embodiment of the present application.

[0054] Explanation of the reference numerals: 1. Cap beam; 11. Pouring cavity; 12. Guide rail; 13. Air guide hole; 2. Pre-set steel bars; 3. Pier; 31. Concrete cavity; 32. Concrete conduit; 33. Concrete connecting pipe; 34. Gas cavity; 35. Gas generator; 36. Control switch; 37. Air outlet; 38. Partition; 4. Auxiliary pouring device; 41. Guide sleeve; 411. Embedding groove; 412. Sleeve cavity; 413. Pouring hole; 414. Guide hole; 415. Slider; 416. Baffle; 417. Connecting rod; 42. Steel sleeve; 43. Abutment block; 44. Fixing ring; 45. Buffer spring. DETAILED DESCRIPTION

[0055] The following is combined with Figure 1-5 This application is described in further detail.

[0056] An embodiment of the present application discloses a cap beam hoisting and installation device.

[0057] Reference Figure 1 , Figure 2 and Figure 3 The cap beam 1 hoisting and installation device includes a pier column 3, which is fixedly installed on the construction site. Several uniformly arranged preset steel bars 2 are fixedly installed on the pier column 3. Several preset steel bars 2 are arranged in a circular shape on the pier column 3. Several preset steel bars 2 are correspondingly installed with auxiliary pouring mechanisms. Several auxiliary pouring mechanisms are installed in the cap beam 1. After the installation is completed, the cap beam 1 and the pier column 3 are fixedly connected in cooperation with concrete.

[0058] When the cap beam 1 lifting and installation device is used, firstly, the pier 3 is erected at the construction site, and prefabricated steel bars are installed on the pier 3. Then, the auxiliary casting mechanism is installed on the prefabricated steel bars. After the installation of the auxiliary casting mechanism is completed, the cap beam 1 is installed on the pier 3. At the same time, it is ensured that the auxiliary casting mechanism is installed in the cap beam 1 to complete the installation of the cap beam 1 and the pier 3. At the same time, concrete is poured between the cap beam 1 and the pier 3 to ensure the stable connection between the cap beam 1 and the pier 3.

[0059] Reference Figure 4 and Figure 5 The cap beam 1 includes several evenly arranged pouring cavities 11, which are opened at the connection between the cap beam 1 and the pier 3. The pouring cavity 11 is truncated cone-shaped, and the inner diameter of the pouring cavity 11 close to the pier 3 is larger than the inner diameter of the pouring cavity 11 away from the pier 3. Several evenly distributed guide rails 12 are arranged on the inner wall of the pouring cavity 11. The number of guide rails 12 is four, and the guiding direction of the guide rails 12 is the same as the busbar of the truncated cone-shaped pouring cavity 11. The guide rails 12 are connected to the auxiliary pouring device 4. An air guide hole 13 is opened on the end of the cap beam 1 away from the pouring cavity 11, and several pouring cavities 11 are connected to the air guide hole 13.

[0060] When the cap beam 1 is installed on the pier 3, the auxiliary pouring device 4 installed on the preset steel bar 2 is installed in the pouring cavity 11 accordingly, and concrete is poured into the pouring cavity 11 through the auxiliary pouring device 4. While pouring concrete into the pouring cavity 11, the air in the pouring cavity 11 is discharged through the air guide hole 13. When the pouring cavity 11 is full of concrete, the concrete is filled into the air guide hole 13. By observing the concrete liquid level in the air guide hole 13, the filling amount of concrete poured into the pouring cavity 11 is observed. When the air guide hole 13 is full of concrete, the concrete pouring is stopped.

[0061] Reference Figure 4 and Figure 5The pier 3 includes a plurality of uniformly arranged gas cavities 34, each of which is provided at one end of the pier 3 in contact with the cap beam 1, each of which is provided with an auxiliary pouring device 4, and a partition 38 is fixedly installed at the bottom of the gas cavity 34, and a concrete cavity 31 is provided at one end of the partition 38 away from the gas cavity 34, and the concrete cavity 31 is provided in the pier 3. The partition 38 is provided with a plurality of uniformly distributed gas outlet holes 37, one end of which is connected to the gas cavity 34, and the other end of which is connected to the concrete cavity 31.

[0062] A gas generator 35 is installed in the gas cavity 34. The gas generator 35 can generate gas. The gas generator 35 is a prior art and will not be described in detail here. The gas generator 35 is electrically connected to the control switch 36. The trigger quick switch is installed on the auxiliary pouring device 4. The control switch 36 is used to control the gas generator 35 to work and generate gas.

[0063] Several concrete cavities 31 are evenly opened in the pier 3, and two adjacent concrete cavities 31 are connected to each other through concrete connecting pipes 33. Among the several concrete cavities 31, two concrete cavities 31 are connected to one end of a concrete conduit 32, and the two concrete cavities 31 connected to the concrete conduit 32 are symmetrically opened in the pier 3, and concrete enters the concrete conduit 32 through the other end of the concrete conduit 32 and flows into the concrete cavity 31.

[0064] The preset steel bars 2 fixedly installed on the pier 3 are correspondingly penetrated in the gas cavity 34 and the concrete cavity 31. The end of the preset steel bar 2 away from the concrete cavity 31 is arranged above the top of the pier 3. The preset steel bar 2 is fixedly penetrated on the partition 38. The preset steel bar 2 and the partition 38, the concrete cavity 31 and the gas cavity 34 are all on the same axis.

[0065] When the cap beam 1 is installed, the preset steel bars 2 with the auxiliary pouring device 4 installed are installed in the pouring cavity 11, and the bottom wall of the cap beam 1 is in contact with the top of the pier 3. After the cap beam 1 and the pier 3 are installed, the cap beam 1 drives the auxiliary pouring device 4 to work, and the auxiliary pouring device 4 works to trigger the control switch 36. The control switch 36 transmits a signal to the gas generator 35 through an electrical connection, and the gas generator 35 starts to generate gas, and at the same time, concrete is filled into two concrete cavities 31 connected to the concrete conduit 32 through the concrete conduit 32, and at the same time, concrete is filled into other concrete cavities 31 through the concrete connecting pipe 33. The gas generator 35 generates gas, and the gas pressurizes the concrete cavity 31 through the gas outlet 37. The concrete in the concrete cavity 31 flows into the auxiliary pouring device 4 under pressure, and the concrete is filled into the pouring cavity 11 through the auxiliary pouring device 4, completing the installation of the cap beam 1.

[0066] Reference Figure 4 and Figure 5 The auxiliary pouring device 4 includes several guide sleeves 41, one end of each guide sleeve 41 is correspondingly sleeved on several baffles 416, a sleeve cavity 412 is provided on the inner wall of the guide sleeve 41, and the bottom of the sleeve cavity 412 is connected to the concrete cavity 31. An embedding groove 411 is provided on the end of the guide sleeve 41 away from the concrete cavity 31, and a control switch 36 is installed in the embedding groove 411. A steel sleeve 42 is slidably penetrated in the guide sleeve 41, and the steel sleeve 42 is fixedly sleeved on the preset steel bar 2. The steel sleeve 42 is adaptively adjusted and replaced according to the diameter of the preset steel bar 2 to ensure that the steel sleeve 42 is tightly sleeved with the preset steel bar 2. An abutment block 43 is fixedly connected to one end of the steel sleeve 42, and the abutment block 43 can be correspondingly and tightly embedded in the embedding groove 411. When the abutment block 43 is embedded in the embedding groove 411, the abutment block 43 triggers the control switch 36.

[0067] A fixing ring 44 is fixedly sleeved on the steel sleeve 42 , and one end of a buffer spring 45 is fixedly connected to the fixing ring 44 . One end of the buffer spring 45 away from the fixing ring 44 is fixedly connected to the top of the inner wall of the guide sleeve 41 . The buffer spring 45 is sleeved on the steel sleeve 42 .

[0068] Two groups of perfusion holes 413 are provided on the outer wall of the guide sleeve 41. Each group of perfusion holes 413 includes four perfusion holes 413 evenly provided on the wall of the guide sleeve 41. One end of the perfusion hole 413 is connected to the perfusion cavity 11, and the other end of the perfusion hole 413 is connected to the sleeve cavity 412. Each group of perfusion holes 413 is coaxially provided with a corresponding guide hole 414. The guide hole 414 is provided on the inner wall of the guide sleeve 41 on the side away from the perfusion hole 413. The aperture of the perfusion hole 413 is larger than the aperture of the guide hole 414. A connecting rod 417 is inserted into the guide hole 414. The connecting rod 417 fits tightly with the guide hole 414. The end of the connecting rod 417 away from the guide hole 414 is correspondingly inserted into the perfusion hole 413. The end of the connecting rod 417 away from the guide hole 414 is fixedly sleeved on the slider 415. The slider 415 is slidably connected in the guide rail 12. A baffle plate 416 is also fixedly sleeved on the connecting rod 417 . The baffle plate 416 is disposed in the sleeve cavity 412 . The baffle plate 416 fits tightly with the injection hole 413 .

[0069] When the cap beam 1 is installed on the pier 3, the auxiliary pouring device 4 starts to work, and the slider 415 is slidably installed in the guide rail 12. As the inner diameter of the pouring cavity 11 gradually changes, the slider 415 moves horizontally toward the guide sleeve 41, and at the same time, the baffle 416 moves away from the pouring hole 413. The sleeve cavity 412 is connected to the pouring cavity 11 through the pouring hole 413. When the abutment block 43 abuts against the top of the pouring cavity 11, under the action of the gravity of the cap beam 1, the abutment block 43 drives the steel sleeve 42 to move toward the pier 3. When the steel sleeve 42 moves, the buffer spring 45 is stretched, which plays a buffering role on the steel sleeve 42 and the guide sleeve 41. When the cap beam 1 abuts against the pier 3, the abutment block 43 is nested in the embedding groove 411 and the control switch 36 is triggered at the same time. The control switch 36 controls the gas generator 35 to start generating air. Under the action of air pressure, the concrete poured in the concrete cavity 31 enters the sleeve cavity 412 through the bottom of the sleeve cavity 412, and flows into the pouring cavity 11 through the pouring hole 413, thereby realizing the concrete pouring work of the pouring cavity 11.

[0070] The implementation principle of a cap beam 1 hoisting and installation device and a method for using the same in an embodiment of the present application is as follows: first, a pier column 3 is erected at the construction site, and a concrete cavity 31 and a gas cavity 34 are opened on the pier column 3, and precast steel bars are installed at the same time. Then, an auxiliary pouring mechanism is installed on the precast steel bars. After the auxiliary pouring mechanism is installed, the cap beam 1 is installed on the pier column 3, and at the same time, the auxiliary pouring mechanism is ensured to be installed in the cap beam 1, and the installation of the cap beam 1 and the pier column 3 is completed. At the same time, concrete is poured between the cap beam 1 and the pier column 3 to ensure a stable connection between the cap beam 1 and the pier column 3.

[0071] The embodiment of the present application also discloses a method for using a device for hoisting and installing the cap beam 1 .

[0072] Reference Figure 1 and Figure 2 A method for using a cap beam 1 hoisting and installation device includes the following steps:

[0073] S1. Preparation work: determine the construction site, erect piers 3 at the construction site, prepare a cap beam 1 that meets the process requirements and open a pouring cavity 11 on the cap beam 1.

[0074] S2. A concrete cavity 31 and a gas cavity 34 are opened on the pier 3, and a plurality of preset steel bars 2 are fixedly installed in the concrete cavity 31 and the gas cavity 34. The plurality of preset steel bars 2 are arranged in a circular pattern.

[0075] S3. Install an auxiliary pouring mechanism on several preset steel bars 2 to ensure that the auxiliary pouring mechanism and the corresponding preset steel bars 2 are on the same axis.

[0076] S4. Install the cap beam 1 on the pier 3, install the auxiliary pouring mechanism in the pouring cavity 11, and pour concrete into the concrete cavity 31 through the concrete conduit 32.

[0077] S5. After the cap beam 1 is installed, the cap beam 1 abuts against the auxiliary pouring mechanism and drives the auxiliary pouring mechanism to work, pouring the concrete in the concrete cavity 31 into the pouring cavity 11.

[0078] S6. Observe the concrete pouring condition in the pouring cavity 11 through the air guide holes 13. When the concrete fills the air guide holes 13, stop pouring concrete into the concrete cavity 31. Meanwhile, regularly maintain the poured concrete to complete the construction.

[0079] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A cap beam hoisting and installation device, characterized in that: It comprises a pier column (3), the pier column (3) is fixedly installed on the construction ground, a plurality of uniformly arranged preset steel bars (2) are fixedly installed on the top of the pier column (3), and an auxiliary pouring mechanism is installed on each of the plurality of preset steel bars (2), and the auxiliary pouring mechanism is used to pour concrete on the installed preset steel bars (2); The pier column (3) is butted against a cap beam (1), and a plurality of evenly distributed pouring cavities (11) are provided at the butt joint between the cap beam (1) and the pier column (3), the pouring cavities (11) are truncated cone-shaped, the inner diameter of the pouring cavity (11) at one end close to the pier column (3) is larger than the inner diameter of the pouring cavity (11) at one end away from the pier column (3), and the plurality of auxiliary pouring mechanisms are respectively installed in the plurality of pouring cavities (11); The auxiliary pouring mechanism comprises a steel sleeve (42), the steel sleeve (42) is slidably sleeved on the preset steel bars (2), an abutment block (43) is fixedly mounted on the top of the steel sleeve (42), and the abutment block (43) abuts against the top wall of the pouring cavity (11); The steel bar sleeve (42) is slidably inserted into the guide sleeve (41), the guide sleeve (41) is fixedly installed in the pier (3), a sleeve cavity (412) is provided in the sleeve wall of the guide sleeve (41), and an array of pouring holes (413) are connected to the sleeve cavity (412), the array of pouring holes (413) are all provided on the outer wall of the guide sleeve (41), and the array of pouring holes (413) includes a plurality of pouring holes (413) evenly distributed on the outer wall of the guide sleeve (41); The sleeve cavity (412) is also connected to an array of guide holes (414), and the array of guide holes (414) are all opened on the inner wall of the guide sleeve (41), and the array of guide holes (414) includes a plurality of guide holes (414) evenly distributed on the inner wall of the guide sleeve (41); The plurality of guide holes (414) and the plurality of injection holes (413) are arranged on the same axis in a one-to-one correspondence; A connecting rod (417) is slidably inserted into the guide hole (414) and the injection hole (413) correspondingly arranged on the same axis, a baffle (416) is fixedly sleeved on the connecting rod (417), the baffle (416) is arranged in the sleeve cavity (412), and the baffle (416) abuts against the guide hole (414); A slider (415) is fixedly mounted on one end of the connecting rod (417) away from the baffle (416); the slider (415) is arranged in the perfusion cavity (11); one end of the slider (415) abuts against the perfusion hole (413); and the end of the slider (415) away from the perfusion hole (413) is slidably connected in the perfusion cavity (11); A plurality of evenly distributed guide rails (12) are provided on the inner wall of the perfusion cavity (11); One end of the slider (415) away from the injection hole (413) is slidably connected in the guide rail (12); An air guide hole (13) is provided in the cap beam (1), and the plurality of the injection cavities (11) are all connected to the air guide hole (13); The top of the pier column (3) is provided with a plurality of evenly distributed gas cavities (34), and the preset steel bars (2) are fixedly installed in the gas cavities (34); A gas generator (35) is installed in the gas cavity (34), and the gas generator (35) is used to generate gas; A partition plate (38) is fixedly installed at the bottom of the plurality of gas cavities (34), and the partition plate (38) is fixedly installed on the inner wall of the gas cavity (34). A concrete cavity (31) is arranged below the partition plate (38), and the concrete cavity (31) is opened in the pier (3). Two adjacent concrete cavities (31) are connected to each other through a concrete connecting pipe (33); A plurality of the concrete cavities (31) are connected to a concrete conduit (32), wherein a plurality of the concrete cavities (31) are connected to a concrete conduit (32), and the concrete conduit (32) is used to introduce concrete into the concrete cavities (31); The partition plate (38) is fixedly sleeved on the bottom of the guide sleeve (41); The sleeve cavity (412) is in communication with the concrete cavity (31); A plurality of air outlet holes (37) are evenly arranged on the partition plate (38), one end of each of the air outlet holes (37) is connected to the concrete cavity (31), and one end of each of the air outlet holes (37) away from the concrete cavity (31) is connected to the gas cavity (34).

2. The cap beam hoisting and installation device according to claim 1 is characterized in that: A fixing ring (44) is fixedly sleeved on the steel sleeve (42), and a buffer spring (45) is fixedly connected to the fixing ring (44). The buffer spring (45) is sleeved on the steel sleeve (42), and one end of the buffer spring (45) away from the fixing ring (44) is fixedly connected to the inner wall of the top of the guide sleeve (41).

3. The cap beam hoisting and installation device according to claim 1 is characterized in that: The top of the guide sleeve (41) is provided with an embedding groove (411), a control switch (36) is arranged in the embedding groove (411), and the control switch (36) is electrically connected to the gas generator (35).

4. The method for using the cap beam hoisting and installation device according to any one of claims 1 to 3, characterized in that: The following steps are included: S1, preparation work, determining the construction site, erecting piers (3) at the construction site, preparing a cap beam (1) that meets the process requirements and opening a pouring cavity (11) on the cap beam (1); S2, opening a concrete cavity (31) and a gas cavity (34) on the pier column (3), and fixing a plurality of preset steel bars (2) in the concrete cavity (31) and the gas cavity (34); S3, installing an auxiliary pouring mechanism on a plurality of preset steel bars (2), ensuring that the auxiliary pouring mechanism and the corresponding preset steel bars (2) are on the same axis; S4, installing the cap beam (1) on the pier column (3), installing the auxiliary pouring mechanism in the pouring cavity (11), and pouring concrete into the concrete cavity (31) through the concrete conduit (32); S5. After the cap beam (1) is installed, the cap beam (1) abuts against the auxiliary pouring mechanism and drives the auxiliary pouring mechanism to work, pouring the concrete in the concrete cavity (31) into the pouring cavity (11); S6. Observe the concrete pouring condition in the pouring cavity (11) through the air guide hole (13). When the concrete fills the air guide hole (13), stop pouring concrete into the concrete cavity (31). Meanwhile, regularly maintain the poured concrete to complete the construction.

Citation Information

Patent Citations

  • Positioning device and construction method of capping beam of prefabricated bridge

    CN105484157A

  • Reinforcing steel bar grouting sleeve used for fabricated building and construction method thereof

    CN110905125A