A power control method, device, equipment and storage medium
By predetermining the target scanning area and obtaining the preset transmission power correspondence, the target transmission power is directly determined, which solves the complex problem of satellite-end power control in the prior art, simplifies the process and improves efficiency and stability.
Patent Information
- Application Number
- CN202211216755.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-09-30
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2042-09-30
AI Technical Summary
In the prior art, the power control process of the satellite terminal is complex, and it is necessary to continuously adjust the transmission power according to the channel measurement results of different ground terminal equipment, resulting in high requirements for the power control capability of the satellite.
By predetermining the target scanning area and obtaining the correspondence between the preset scanning area and the transmission power, the target transmission power is directly determined, simplifying the power control process and avoiding complex closed-loop power control.
The power control process when satellites transmit signals is simplified, the requirements for satellite power control capabilities are reduced, and the efficiency and stability of transmitted signals are improved.
Smart Images

Figure CN115580338B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of satellite technology, and in particular to a power control method, device, equipment and storage medium. Background Art
[0002] In recent years, low-orbit satellite communications have the characteristics of low communication delay and global coverage. When the satellite scans and transmits electromagnetic wave signals to ground mobile terminals at different transmission angles, power control is required to ensure the communication quality of all users.
[0003] In the prior art, when a satellite transmits a signal, it usually aims to achieve equal power spectrum density at landing, where power spectrum density is the power carried by each unit frequency wave. Based on this goal, a closed-loop power control method is usually used to control the transmission power of the satellite. That is, the satellite transmits an electromagnetic wave signal to the ground with a preset power scan, and the ground terminal equipment receives the electromagnetic wave signal and performs channel measurement to obtain channel measurement results such as power spectrum density and loss value. Then, the channel measurement results are reported to the satellite, and the satellite adjusts the transmission power according to the channel measurement results received from different ground terminal equipment to ensure that the power spectrum density of the electromagnetic wave signal received by each ground terminal equipment in the satellite coverage area is equal, thereby forming a closed-loop control.
[0004] However, this closed-loop power control method is relatively complicated. When the satellite scans and transmits signals at different angles, it needs to continuously adjust the transmission power based on the channel measurement results reported by different ground terminal devices, which places high demands on the satellite's power control capabilities. Summary of the invention
[0005] In view of this, the present application provides a power control method, apparatus, device and storage medium to help solve the problem in the prior art that the process of controlling the satellite transmission power using a closed-loop power control method is relatively complicated.
[0006] In a first aspect, an embodiment of the present application provides a power control method, including:
[0007] Determine the target scanning area;
[0008] Obtaining the corresponding relationship between the preset scanning area and the transmission power;
[0009] According to the target scanning area, in the correspondence relationship between the preset scanning area and the transmission power, determine the target transmission power corresponding to the target scanning area;
[0010] According to the target transmission power, a signal is scanned and transmitted toward the target scanning area.
[0011] Preferably, before determining the target scanning area, the method further includes:
[0012] Acquire a total transmit power of a target beam; the target beam includes a signaling beam or a service beam;
[0013] Acquire a satellite coverage area, and divide the satellite coverage area into at least one scanning area corresponding to the target beam according to a preset scanning area size;
[0014] According to the total transmission power of the target beam, the transmission power corresponding to each scanning area in at least one scanning area corresponding to the target beam is determined, and a corresponding relationship between the at least one scanning area corresponding to the target beam and the transmission power is generated.
[0015] Preferably, the preset scanning area size includes: a preset scanning area size corresponding to a signaling beam or a preset scanning area size corresponding to a service beam.
[0016] Preferably, the step of dividing the satellite coverage area into at least one scanning area corresponding to the target beam according to the preset scanning area size corresponding to the target beam comprises:
[0017] According to a preset wave position size corresponding to the target beam, the satellite coverage area is divided into at least one wave position corresponding to the target beam;
[0018] The determining, according to the total transmit power of the target beam, the transmit power corresponding to each scanning area in at least one scanning area corresponding to the target beam, and generating a corresponding relationship between the at least one scanning area corresponding to the target beam and the transmit power comprises:
[0019] Determine the distance between each of the at least one wave position corresponding to the target beam and the satellite, and the scanning angle of the satellite corresponding to each of the at least one wave position corresponding to the target beam;
[0020] Determine the path loss and scanning loss corresponding to each wave position according to the distance between each wave position and the satellite and the scanning angle of the satellite corresponding to each wave position;
[0021] Obtaining a terminal gain parameter corresponding to each of the wave positions;
[0022] Determine the loss value corresponding to each beam position according to the terminal gain parameter corresponding to each beam position, the path loss corresponding to each beam position, and the scanning loss;
[0023] According to the total transmission power of the target beam and the loss value corresponding to each beam position, the transmission power corresponding to each beam position is determined, and a corresponding relationship between at least one beam position corresponding to the target beam and the transmission power is generated.
[0024] Preferably, the step of dividing the satellite coverage area into at least one scanning area corresponding to the target beam according to the preset scanning area size corresponding to the target beam comprises:
[0025] Dividing the satellite coverage area into at least one concentric ring corresponding to the target beam according to a preset concentric ring size corresponding to the target beam;
[0026] The determining, according to the total transmit power of the target beam, the transmit power corresponding to each scanning area in at least one scanning area corresponding to the target beam, and generating a corresponding relationship between the at least one scanning area corresponding to the target beam and the transmit power comprises:
[0027] Determine a distance between each of at least one concentric ring corresponding to the target beam and a satellite, and a satellite scanning angle corresponding to each of at least one concentric ring corresponding to the target beam;
[0028] Determine the path loss and scanning loss corresponding to each concentric ring according to the distance between each concentric ring and the satellite and the satellite scanning angle corresponding to each concentric ring;
[0029] Determine the loss value corresponding to each concentric ring according to the path loss and scanning loss corresponding to each concentric ring;
[0030] According to the total transmission power of the target beam and the loss value corresponding to each concentric ring, the transmission power corresponding to each concentric ring is determined, and a corresponding relationship between at least one concentric ring corresponding to the target beam and the transmission power is generated.
[0031] Preferably, the step of dividing the satellite coverage area into at least one scanning area corresponding to the target beam according to the preset scanning area size corresponding to the target beam comprises:
[0032] When the target beam includes a service beam, obtaining an area where at least one user terminal within the satellite coverage area is located;
[0033] The determining, according to the total transmit power of the target beam, the transmit power corresponding to each scanning area in at least one scanning area corresponding to the target beam, and generating a corresponding relationship between the at least one scanning area corresponding to the target beam and the transmit power comprises:
[0034] Acquire a user communication parameter corresponding to each user terminal in the at least one user terminal;
[0035] Determine, according to the area information of each user terminal in the at least one user terminal, the distance between each user terminal and the satellite, and the satellite scanning angle corresponding to each user terminal;
[0036] Determine the path loss and scanning loss of each user terminal according to the distance between each user terminal and the satellite and the satellite scanning angle corresponding to each user terminal;
[0037] Determine the loss value corresponding to each user terminal according to the user communication parameter, path loss and scanning loss corresponding to each user terminal;
[0038] According to the total transmission power of the target beam and the loss value corresponding to each user terminal, the service beam transmission power corresponding to the area where each user terminal is located is determined, and a corresponding relationship between the area where at least one user terminal corresponding to the service beam is located and the transmission power is generated.
[0039] Preferably, the user communication parameter of each user terminal includes a terminal gain parameter or a terminal-specific loss parameter corresponding to each user terminal.
[0040] Preferably, the step of dividing the satellite coverage area into at least one scanning area corresponding to the target beam according to the preset scanning area size corresponding to the target beam comprises:
[0041] When the target beam includes a service beam, dividing the satellite coverage area into at least one parallel strip corresponding to the target beam according to a preset parallel strip size corresponding to the target beam;
[0042] The determining, according to the total transmit power of the target beam, the transmit power corresponding to each scanning area in at least one scanning area corresponding to the target beam, and generating a corresponding relationship between the at least one scanning area corresponding to the target beam and the transmit power comprises:
[0043] Determine the distance between each strip in the at least one parallel strip and the satellite, and the satellite scanning angle corresponding to each strip;
[0044] Determine the path loss and scanning loss corresponding to each strip according to the distance between each strip in the at least one parallel strip and the satellite, and the satellite scanning angle corresponding to each strip;
[0045] Determine the loss value corresponding to each strip according to the path loss and scanning loss corresponding to each strip;
[0046] According to the total transmit power of the target beam and the loss value corresponding to each strip, the transmit power of the target beam corresponding to each strip is determined, and a corresponding relationship between at least one strip corresponding to the target beam and the transmit power is generated.
[0047] Preferably, the step of dividing the satellite coverage area into at least one scanning area corresponding to the target beam according to the preset scanning area size corresponding to the target beam comprises:
[0048] When the target beam is a service beam, dividing the satellite coverage area into at least one concentric ring corresponding to the target beam according to the size of the concentric ring corresponding to the target beam;
[0049] The determining, according to the total transmit power of the target beam, the transmit power corresponding to each scanning area in at least one scanning area corresponding to the target beam, and generating a corresponding relationship between the at least one scanning area corresponding to the target beam and the transmit power comprises:
[0050] Acquire a preset power allocation ratio parameter, and determine the preset power allocation ratio parameter as the power allocation ratio parameter of the outermost concentric ring of the at least one concentric ring;
[0051] According to the power allocation ratio parameter of the outermost concentric ring, the power allocation ratio parameter of the concentric rings other than the outermost concentric ring in the at least one concentric ring is determined according to a preset rule; the preset rule includes that among the at least one concentric ring, the smaller the outer ring radius of the concentric ring, the larger the power allocation ratio parameter;
[0052] According to the total transmission power of the target beam and the power ratio allocation parameter of each concentric ring in the at least one concentric ring, the transmission power corresponding to each concentric ring is determined, and a corresponding relationship between at least one concentric ring corresponding to the target beam and the transmission power is generated.
[0053] Preferably, before acquiring the correspondence between the preset scanning area and the transmission power, the method further includes:
[0054] Determine a beam to be used; the beam to be used includes a signaling beam or a service beam;
[0055] The obtaining of the correspondence between the preset scanning area and the transmission power includes:
[0056] Obtaining a correspondence between a preset scanning area and a transmission power corresponding to the beam to be used;
[0057] The determining, according to the target scanning area, in the correspondence relationship between the preset scanning area and the transmit power, the target transmit power corresponding to the target scanning area comprises:
[0058] According to the target scanning area, in the correspondence between the preset scanning area corresponding to the beam to be used and the transmit power, determine the target transmit power corresponding to the target scanning area;
[0059] The scanning and transmitting signals to the target scanning area according to the target transmission power comprises:
[0060] According to the target transmission power, a signal is scanned and transmitted toward the target scanning area by using the beam to be used.
[0061] Preferably, determining the target scanning area includes:
[0062] When the beam to be used is a signaling beam, acquiring at least one scanning area corresponding to the signaling beam;
[0063] Determining a target scanning area in the at least one scanning area corresponding to the signaling beam according to a preset scanning order of the at least one scanning area corresponding to the signaling beam;
[0064] Alternatively, when the beam to be used is a service beam, determining the location information of the target user terminal;
[0065] Acquire at least one scanning area corresponding to the service beam;
[0066] According to the location information of the target user terminal, in the scanning area corresponding to the service beam, a scanning area corresponding to the target user terminal is determined and determined as the target scanning area.
[0067] In a second aspect, an embodiment of the present application provides a power control device, including:
[0068] A processing unit, used for determining a target scanning area;
[0069] An acquisition unit, used to acquire a correspondence between a preset scanning area and a transmission power;
[0070] The processing unit is further configured to determine, according to the target scanning area, a target transmission power corresponding to the target scanning area in the preset correspondence relationship between the scanning area and the transmission power;
[0071] The processing unit is further used to scan and transmit signals to the target scanning area according to the target transmission power.
[0072] Preferably, the acquisition unit is further used to acquire the total transmission power of the target beam; the target beam includes a signaling beam or a service beam;
[0073] Preferably, the acquisition unit is further used to acquire a satellite coverage area, and divide the satellite coverage area into at least one scanning area corresponding to the target beam according to a preset scanning area size;
[0074] Preferably, the processing unit is also used to determine the transmission power corresponding to each scanning area in at least one scanning area corresponding to the target beam according to the total transmission power of the target beam, and generate a corresponding relationship between at least one scanning area corresponding to the target beam and the transmission power.
[0075] Preferably, the acquisition unit is specifically used to divide the satellite coverage area into at least one wave position corresponding to the target beam according to the preset wave position size corresponding to the target beam;
[0076] The processing unit is specifically used to determine the distance between each of the at least one wave position corresponding to the target beam and the satellite, and the scanning angle of the satellite corresponding to each of the at least one wave position corresponding to the target beam;
[0077] The processing unit is further used to determine the path loss and scanning loss corresponding to each wave position according to the distance between each wave position and the satellite and the scanning angle of the satellite corresponding to each wave position;
[0078] The acquisition unit is further used to acquire the terminal gain parameter corresponding to each wave position;
[0079] The processing unit is further used to determine the loss value corresponding to each beam position according to the terminal gain parameter corresponding to each beam position, the path loss corresponding to each beam position, and the scanning loss;
[0080] The processing unit is also used to determine the transmission power corresponding to each beam position according to the total transmission power of the target beam and the loss value corresponding to each beam position, and generate a corresponding relationship between at least one beam position corresponding to the target beam and the transmission power.
[0081] Preferably, the acquisition unit is specifically used to divide the satellite coverage area into at least one concentric ring corresponding to the target beam according to the preset concentric ring size corresponding to the target beam;
[0082] The processing unit is specifically used to determine the distance between each of the at least one concentric ring corresponding to the target beam and the satellite, and the satellite scanning angle corresponding to each of the at least one concentric ring corresponding to the target beam;
[0083] The processing unit is further used to determine the path loss and scanning loss corresponding to each concentric ring according to the distance between each concentric ring and the satellite and the satellite scanning angle corresponding to each concentric ring;
[0084] The processing unit is further used to determine the loss value corresponding to each concentric ring according to the path loss and scanning loss corresponding to each concentric ring;
[0085] The processing unit is also used to determine the transmission power corresponding to each concentric ring according to the total transmission power of the target beam and the loss value corresponding to each concentric ring, and generate a corresponding relationship between at least one concentric ring corresponding to the target beam and the transmission power.
[0086] Preferably, the acquisition unit is specifically configured to acquire a location of at least one user terminal within the satellite coverage area when the target beam includes a service beam;
[0087] The processing unit is specifically configured to obtain a user communication parameter corresponding to each user terminal in the at least one user terminal;
[0088] The processing unit is further used to determine the distance between each user terminal and the satellite and the satellite scanning angle corresponding to each user terminal according to the area information of each user terminal in the at least one user terminal;
[0089] The processing unit is further used to determine the path loss and scanning loss of each user terminal according to the distance between each user terminal and the satellite and the satellite scanning angle corresponding to each user terminal;
[0090] The processing unit is further configured to determine a loss value corresponding to each user terminal according to a user communication parameter, a path loss, and a scanning loss corresponding to each user terminal;
[0091] The processing unit is also used to determine the service beam transmission power corresponding to the area where each user terminal is located based on the total transmission power of the target beam and the loss value corresponding to each user terminal, and generate a corresponding relationship between the area where at least one user terminal corresponding to the service beam is located and the transmission power.
[0092] Preferably, the acquisition unit is specifically configured to divide the satellite coverage area into at least one parallel strip corresponding to the target beam according to a preset parallel strip size corresponding to the target beam when the target beam includes a service beam;
[0093] The processing unit is specifically configured to determine a distance between each of the at least one parallel strip and the satellite, and a satellite scanning angle corresponding to each strip;
[0094] The processing unit is further used to determine the path loss and scanning loss corresponding to each strip according to the distance between each strip in the at least one parallel strip and the satellite, and the satellite scanning angle corresponding to each strip;
[0095] The processing unit is further used to determine the loss value corresponding to each stripe according to the path loss and scanning loss corresponding to each stripe;
[0096] The processing unit is further used to determine the target beam transmit power corresponding to each stripe according to the total transmit power of the target beam and the loss value corresponding to each stripe, and generate a corresponding relationship between at least one stripe corresponding to the target beam and the transmit power.
[0097] Preferably, the acquisition unit is specifically configured to divide the satellite coverage area into at least one concentric ring corresponding to the target beam according to the size of the concentric rings corresponding to the target beam when the target beam is a service beam;
[0098] The processing unit is specifically used to obtain a preset power allocation ratio parameter, and determine the preset power allocation ratio parameter as the power allocation ratio parameter of the outermost concentric ring of the at least one concentric ring;
[0099] The processing unit is further used to determine the power allocation ratio parameters of the concentric rings other than the outermost concentric ring in the at least one concentric ring according to the power allocation ratio parameters of the outermost concentric ring and according to a preset rule; the preset rule includes that among the at least one concentric ring, the smaller the outer ring radius of the concentric ring, the larger the power allocation ratio parameter;
[0100] The processing unit is also used to determine the transmission power corresponding to each concentric ring according to the total transmission power of the target beam and the power ratio allocation parameter of each concentric ring in the at least one concentric ring, and generate a corresponding relationship between at least one concentric ring corresponding to the target beam and the transmission power.
[0101] Preferably, the processing unit is further used to determine a beam to be used; the beam to be used includes a signaling beam or a service beam;
[0102] The acquisition unit is specifically used to acquire the corresponding relationship between the preset scanning area and the transmission power corresponding to the beam to be used;
[0103] The processing unit is specifically configured to determine, according to the target scanning area, a target transmission power corresponding to the target scanning area in a correspondence between a preset scanning area corresponding to the beam to be used and the transmission power;
[0104] The processing unit is specifically configured to scan and transmit signals to the target scanning area through the beam to be used according to the target transmission power.
[0105] Preferably, the processing unit is specifically configured to, when the beam to be used is a signaling beam, obtain at least one scanning area corresponding to the signaling beam; and determine a target scanning area in the at least one scanning area corresponding to the signaling beam according to a preset scanning order of the at least one scanning area corresponding to the signaling beam;
[0106] Alternatively, the processing unit is further used to determine the location information of the target user terminal when the beam to be used is a service beam; obtain at least one scanning area corresponding to the service beam; and determine the scanning area corresponding to the target user terminal in the scanning area corresponding to the service beam according to the location information of the target user terminal, and determine it as the target scanning area.
[0107] In a third aspect, an embodiment of the present application provides an electronic device, including:
[0108] A processor and a memory, wherein the memory stores a computer program, and when the computer program is executed, the electronic device executes the method described in any one of the first aspects above.
[0109] In a fourth aspect, an embodiment of the present application provides a storage medium, wherein the storage medium includes a stored program, wherein when the program is running, the device where the storage medium is located is controlled to execute any method described in the first aspect.
[0110] Using the solution provided by the embodiment of the present application, the method includes: determining a target scanning area; obtaining a correspondence between a preset scanning area and a transmission power; according to the target scanning area, in the correspondence between the preset scanning area and the transmission power, determining a target transmission power corresponding to the target scanning area; according to the target transmission power, scanning and transmitting signals to the target scanning area. That is to say, in the present application, the power control device can pre-set the correspondence between the scanning area and the transmission power. When the satellite needs to transmit a signal, the power control device can first obtain the target scanning area, and then obtain the correspondence between the preset scanning area and the transmission power. According to the target scanning area, in the correspondence between the preset scanning area and the transmission power, determine the transmission power corresponding to the target scanning area, that is, the target transmission power. After determining the target transmission power, the target scanning area can be directly scanned and transmitted with the target transmission power. In this way, when transmitting signals, since the power control device has pre-set the correspondence between the scanning area and the transmission power, the power control device can directly determine the target transmission power corresponding to the target scanning area based on the preset correspondence between the scanning area and the transmission power. There is no need to continuously adjust the satellite's transmission power through complex closed-loop power control, which simplifies the power control process. BRIEF DESCRIPTION OF THE DRAWINGS
[0111] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0112] Figure 1 A schematic diagram of a power control method according to an embodiment of the present application;
[0113] Figure 2 A schematic diagram of a power control method provided in an embodiment of the present application;
[0114] Figure 3 A schematic diagram of a flow chart of another power control method provided in an embodiment of the present application;
[0115] Figure 4 A schematic diagram of a power control method according to an embodiment of the present application;
[0116] Figure 5 A schematic diagram of another power control method provided in an embodiment of the present application;
[0117] Figure 6 A schematic diagram of another power control method provided in an embodiment of the present application;
[0118] Figure 7 A schematic diagram of a flow chart of another power control method provided in an embodiment of the present application;
[0119] Figure 8 A schematic diagram of the structure of a power control device provided in an embodiment of the present application;
[0120] Fig. 9 A schematic diagram of the structure of an electronic device provided in an embodiment of the present application. DETAILED DESCRIPTION
[0121] In order to better understand the technical solution of the present application, the embodiments of the present application are described in detail below with reference to the accompanying drawings.
[0122] It should be clear that the described embodiments are only part of the embodiments of the present application, rather than all the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present application.
[0123] The terms used in the embodiments of the present application are only for the purpose of describing specific embodiments, and are not intended to limit the present application. The singular forms "a", "said" and "the" used in the embodiments of the present application and the appended claims are also intended to include plural forms, unless the context clearly indicates other meanings.
[0124] It should be understood that the term "and / or" used in this article is only a description of the association relationship of associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship.
[0125] Before a detailed introduction to the embodiments of the present application, the terms that are applied or may be applied to the embodiments of the present application are first explained.
[0126] Power Spectral Density (PSD): In physics, signals are usually expressed in the form of waves, such as electromagnetic waves, random vibrations, or sound waves. When the power spectral density of a wave is multiplied by an appropriate coefficient, the power carried by the wave per unit frequency is obtained, which is called the power spectral density of the signal. The unit of power spectral density is usually expressed in watts per hertz (W / Hz).
[0127] Traffic Beam Pattern: A directional pattern with arbitrary beam pointing scanning and high-gain narrow beam within the working angle domain formed by applying specific amplitude and phase excitation to the smart antenna array.
[0128] Phased array antenna: An antenna that changes the shape of its radiation pattern by controlling the feeding phase of the radiating elements in the array antenna. Controlling the phase can change the direction of the maximum value of the antenna radiation pattern to achieve the purpose of beam scanning.
[0129] The sub-satellite point is the intersection of the line connecting the center of the earth and the satellite on the earth's surface, expressed in geographic longitude and latitude. The ground point directly below the satellite is called the sub-satellite point.
[0130] Beam position: The coverage angle of the satellite service beam is divided into multiple beam positions with the satellite as the center. The beam position generally refers to the position covered by the beam at a certain angle in azimuth or pitch.
[0131] Spectral efficiency: The link spectral efficiency of a digital communication system is defined as the net bit rate (useful information rate, excluding error correction codes) or maximum throughput divided by the bandwidth of the communication channel or data link (in Hertz).
[0132] In recent years, low-orbit satellite communications have the characteristics of low communication delay and global coverage. In the process of data communication between ground terminal equipment and satellites, the uplink and downlink electromagnetic wave signal transmission will pass through complex atmospheric channels such as the troposphere, stratosphere and ionosphere, and finally reach the other end. Among them, the uplink electromagnetic wave signal is the signal transmitted by the ground terminal equipment to the satellite, and the downlink electromagnetic wave signal is the signal transmitted by the satellite to the ground terminal equipment. If the satellite scans and transmits electromagnetic wave signals to the ground with a fixed transmission power, then the ground terminal equipment that is closer to the satellite will receive a higher signal strength, and the ground terminal equipment that is farther away from the satellite will receive a lower signal strength, or even no signal can be received, affecting the communication experience of remote users. Therefore, this requires the satellite end to perform transmission power control, and adjust the transmission power in time when scanning and transmitting electromagnetic wave signals at different transmission angles, so that the communication quality of all users is guaranteed.
[0133] In the related art, when a satellite transmits a signal, it usually aims to achieve equal power spectrum density at landing, where the power spectrum density is the power carried by each unit frequency wave. In other words, when the satellite transmits a signal, it must ensure that the power spectrum density of the electromagnetic wave received by each user terminal in its coverage area is equal. Based on this goal, a closed-loop power control method is usually used to control the transmission power of the satellite end. That is, the satellite scans and transmits electromagnetic wave signals to the ground with a preset power, and the ground terminal equipment receives the electromagnetic wave signals and performs channel measurement to obtain channel measurement results such as power spectrum density and loss value. Then, the channel measurement results are reported to the satellite, and the satellite adjusts the transmission power according to the channel measurement results received from different ground terminal equipment to ensure that the power spectrum density of the electromagnetic wave signals received by each ground terminal equipment in the satellite coverage area is equal, thereby forming a closed-loop control. For example, the satellite scans and transmits electromagnetic wave signals at different angles with a preset power, and the ground terminal equipment A receives the electromagnetic wave signals and reports the channel measurement results to the satellite. The satellite receives the channel measurement result from the ground terminal device A. If the channel measurement result reported by the ground terminal device A indicates that the power spectrum density is lower than the reference value, the satellite will increase the transmission power the next time it scans the location of the ground terminal device A to ensure the communication quality of the ground terminal device A. If the channel measurement result reported by the ground terminal device A indicates that the power spectrum density is higher than the reference value, the satellite will reduce the transmission power the next time it scans the location of the ground terminal device A to save the satellite's transmission power. However, this closed-loop power control method is relatively complicated. When the satellite scans and transmits signals at different angles, it needs to continuously adjust the transmission power according to the channel measurement results reported by different ground terminal devices, which requires a high power control capability of the satellite.
[0134] For example, Figure 1As shown, the power adjustment device provided on the satellite includes a power coordination unit 101 and a satellite communication payload unit 102. It is assumed that the satellite communication payload unit 102 is composed of four baseband processing modules 1021, four constant gain frequency conversion modules 1022 and a phased array antenna 1023. The power coordination unit 101 is used to determine the transmission power to be adjusted; the baseband processing module 1021 is used to process the data information to be sent and convert the data information to be sent into a baseband signal; the constant gain frequency conversion module 1022 is used to perform power amplification and frequency conversion processing on the baseband signal and convert it into an intermediate frequency signal; the phased array antenna 1023 is used to transmit the intermediate frequency signal after amplifying the intermediate frequency signal. Since the gain of the constant gain frequency conversion module 1022 is constant, that is, the power amplification factor of the constant gain frequency conversion module 1022 for the baseband signal is certain, after determining the transmission power to be adjusted, the power coordination unit 101 determines the target output power of the baseband processing module 1021 according to the transmission power to be adjusted, the gain of the constant gain frequency conversion module 1022, and the gain of the phased array antenna 1023, and then adjusts the relevant parameters of the baseband processing module 1021 to adjust the output power of the baseband processing module 1021 to the target output power, so that the phased array antenna 1023 transmits a signal to the target scanning area with the transmission power to be adjusted. For example, assuming that the transmission power to be adjusted determined by the power coordination unit 101 in the power adjustment device is 200W, the gain of the constant gain frequency conversion module 1022 is 10dB, the corresponding power amplification factor is 10 times, and the gain of the power amplifier in the phased array antenna 1023 is 3dB, and the corresponding power amplification factor is 2 times, then the power coordination unit 101 can determine that the target output power of the baseband processing module 1021 is 10W, and then control the output power of the baseband signal output by the baseband processing module 1021 to be the target output power of 10W by adjusting the relevant parameters of the baseband processing module. Then, after the power amplification of the constant gain frequency conversion module 1022 and the phased array antenna 1023, the transmission power when the signal is transmitted through the phased array antenna 1023 is the target transmission power of 200W.
[0135] To solve the above problems, the present application provides a power control method, device, equipment and storage medium. The method includes: determining a target scanning area; obtaining a correspondence between a preset scanning area and a transmission power; according to the target scanning area, in the correspondence between the preset scanning area and the transmission power, determining the target transmission power corresponding to the target scanning area; according to the target transmission power, scanning and transmitting signals to the target scanning area. That is, in the present application, the power control device can pre-set the correspondence between the scanning area and the transmission power. When the satellite needs to transmit a signal, the power control device can first obtain the target scanning area, and then obtain the correspondence between the preset scanning area and the transmission power. According to the target scanning area, in the correspondence between the preset scanning area and the transmission power, the transmission power corresponding to the target scanning area is determined, which is the target transmission power. After determining the target transmission power, the target scanning area can be directly scanned and transmitted with the target transmission power. In this way, when transmitting a signal, since the power control device pre-sets the corresponding relationship between the scanning area and the transmission power, the power control device can directly determine the target transmission power corresponding to the target scanning area according to the preset corresponding relationship between the scanning area and the transmission power, without the need to continuously adjust the satellite's transmission power through complex closed-loop power control, thereby simplifying the power control process. The following is a detailed description.
[0136] Normally, a satellite usually periodically scans and transmits signaling signals to its coverage area through a signaling beam, so that the user terminal in its coverage area returns relevant information of the user terminal to the satellite when receiving the signaling signal, so as to access the satellite communication system. The satellite can then provide communication services for the user terminal accessing the satellite communication system. Among them, the signaling signal usually carries the satellite's ephemeris information, that is, the relevant information of the satellite's orbit. After the user terminal accesses the satellite communication system, the satellite and the user terminal can exchange data through the service beam. For example, user terminal A needs to send a service data file to user terminal B. At this time, user terminal A uses the service beam to initiate a data transmission request to the satellite. The data transmission request carries the identification information and service data file information of user terminal B. After receiving the data transmission request initiated by user terminal A, the satellite sends the service data file carried in the data transmission request to user terminal B. When the satellite scans and transmits signaling signals to its coverage area through a signaling beam or sends data files to user terminals through a service beam, a power control device is required to control the transmission power of the satellite end.
[0137] It should be noted that in the embodiments of the present application, the power control device can be set on the satellite or on the ground, and the present application does not limit this. When the power control device is set on the satellite, the power control device can be directly connected to each processing module on the satellite to achieve data interaction; when the power control device is set on the ground, the power control device can achieve data interaction with the satellite through a signaling beam or a service beam. For the convenience of description, in the following embodiments, a detailed description is given by taking the case where the power control device is set on the satellite as an example.
[0138] Figure 2 A power control method is provided in an embodiment of the present application. The method is applied to a power control device and specifically comprises the following steps:
[0139] Step S201: determine the target scanning area.
[0140] In an embodiment of the present application, when it is determined that the satellite needs to transmit a signal, the power control device needs to determine the target transmission power, and the target scanning area can be determined first. Since the satellite may send information such as ephemeris information to its coverage area through a signaling beam, or may transmit data to a user terminal through a service beam, in these two cases, the method for the power control device to determine the target scanning area is different. Assuming that the power control device divides the satellite coverage area into 400 scanning areas, the power control device will pre-set the signaling beam scanning order of each scanning area according to the 400 scanning areas. When the power control device determines to send ephemeris information to its coverage area through a signaling beam, the power control device will determine the next area to be scanned as the target scanning area according to the preset signaling beam scanning order of the 400 scanning areas; or, when it is determined to transmit data to a user terminal through a service beam, the power control device first obtains the location information of the user terminal, and then determines the scanning area where the user terminal is located in the preset 400 scanning areas according to the location information of the user terminal, which is the target scanning area.
[0141] Step S202: Obtain a correspondence between a preset scanning area and a transmission power.
[0142] Specifically, the power control device pre-sets multiple scanning areas according to the satellite coverage area, and sets the transmission power corresponding to each scanning area, establishes and saves the corresponding relationship between the scanning area and the transmission power. In other words, the power control device pre-sets the transmission power to be used when scanning and transmitting signals to each scanning area. Then, after determining the target scanning area, when the power control device needs to further determine the target transmission power, it can first obtain the saved preset corresponding relationship between the scanning area and the transmission power.
[0143] Step S203: According to the target scanning area, in the preset corresponding relationship between the scanning area and the transmission power, determine the target transmission power corresponding to the target scanning area.
[0144] Specifically, after obtaining the correspondence between the preset scanning area and the transmit power, the power control device can determine the transmit power corresponding to the target scanning area according to the target scanning area, that is, the target transmit power. For example, assuming that the target scanning area determined by the power control device is scanning area A, in the preset correspondence between the scanning area and the transmit power, the transmit power corresponding to scanning area A is transmit power B, then the power control device can determine the target transmit power corresponding to the target scanning area as transmit power B.
[0145] Step S204: Scan and transmit signals to the target scanning area according to the target transmission power.
[0146] Specifically, after determining the target transmission power, the power control device can scan and transmit signals to the target scanning area at the target transmission power. For example, assuming that it is necessary to send ephemeris information to its coverage area through a signaling beam, after determining the target transmission power, the power control device adjusts the transmission power to the target transmission power, and transmits a signal to the target scanning area through the signaling beam at the target transmission power, wherein the signal carries satellite ephemeris information so that users in the target scanning area can receive the satellite ephemeris information through the signaling beam; or, when it is determined to transmit data to a user terminal through a service beam, after determining the target transmission power, the power control device adjusts the transmission power to the target transmission power, and transmits a signal to the direction of the user terminal in the target scanning area through the service beam at the target transmission power, wherein the signal carries data to be transmitted so that the user terminal can receive the data to be transmitted through the service beam.
[0147] Figure 3 A power control method is provided in an embodiment of the present application. Since the power control device needs to pre-set the corresponding relationship between the scanning area and the transmission power, the relevant steps of pre-setting the corresponding relationship between the scanning area and the transmission power by the power control device are described in detail in an embodiment of the present application, such as Figure 3 As shown, the details are as follows.
[0148] Step S301: Obtain the total transmit power of the target beam.
[0149] Among them, the target beam includes a signaling beam or a service beam.
[0150] Specifically, the power control device usually sends a signal to the satellite coverage area through a signaling beam, and the signal carries information such as satellite ephemeris information; it also sends a data file with a large amount of data to the user terminal through a service beam according to the needs of the user terminal. That is to say, the signal transmitted through the signaling beam is different from the signal transmitted through the service beam. Therefore, assuming that the target scanning area is the same, the transmission power used to transmit the signal through the signaling beam may be the same as the transmission power used to transmit the signal through the signaling beam, or it may be different. In this way, the power control device needs to set the corresponding scanning area and transmission power for the signaling beam and the service beam respectively. When presetting the corresponding relationship between the scanning area and the transmission power, the total transmission power of the target beam can be obtained first. If the target beam is a signaling beam, the total transmission power of the signaling beam is obtained. Since the power control device can pre-set the total transmission power of the signaling beam, the preset total transmission power of the signaling beam can be directly obtained at this time. If the target beam is a service beam, the total transmission power of the service beam needs to be obtained. Since the total transmission power of the satellite is certain, and the total transmission power of the satellite can be divided into the total transmission power of the signaling beam and the total transmission power of the service beam, when the total transmission power of the signaling beam is determined, the remaining transmission power of the satellite in the total transmission power except the total transmission power of the signaling beam is the total transmission power of the service beam. In other words, when the target beam is a service beam, the power control device can obtain the preset total transmission power of the signaling beam and the preset total satellite transmission power, thereby determining the total transmission power of the service beam.
[0151] It should be noted that the total transmission power of the signaling beam can be set according to actual needs, and this application does not impose any restrictions on this.
[0152] Step S302: Acquire the satellite coverage area, and divide the satellite coverage area into at least one scanning area corresponding to the target beam according to a preset scanning area size.
[0153] Specifically, after determining the total transmission power of the target beam, the power control device can obtain the satellite coverage area, and divide the satellite coverage area into at least one scanning area corresponding to the target beam according to the size of the preset scanning area corresponding to the target beam, with the sub-satellite point as the center. The sub-satellite point is the intersection of the line connecting the center of the earth and the satellite on the surface of the earth, expressed in geographic longitude and latitude. The ground point directly below the satellite is called the sub-satellite point. When the target beam is a signaling beam, the power control device divides the satellite coverage area into at least one scanning area corresponding to the signaling beam according to the preset scanning area size; when the target beam is a service beam, the power control device can divide the satellite coverage area into at least one scanning area corresponding to the signaling beam according to the preset scanning area size.
[0154] As a possible implementation manner, the preset scanning area size includes: a preset scanning area size corresponding to a signaling beam or a preset scanning area size corresponding to a service beam.
[0155] Specifically, the target beam includes a signaling beam or a service beam. According to different target beams, the preset scanning area size corresponding to the signaling beam and the preset scanning area size corresponding to the service beam can be set according to actual needs.
[0156] As a possible implementation manner, the dividing the satellite coverage area into at least one scanning area corresponding to the target beam according to the preset scanning area size corresponding to the target beam includes:
[0157] According to the preset wave position size corresponding to the target beam, the satellite coverage area is divided into at least one wave position corresponding to the target beam.
[0158] Specifically, since the satellite coverage area is large, if the corresponding transmission power is set for each user terminal in the satellite coverage area, the control flexibility of the power control device is high and the design difficulty of the satellite is also relatively large. Therefore, the satellite coverage area can be divided into at least one wave position according to the preset wave position size corresponding to the target beam, and the corresponding transmission power is set for each wave position. In this way, different user terminals in the same wave position use the same transmission power to transmit signals. For example, assuming the satellite coverage area is Figure 4 The square area shown in the figure assumes that the preset scanning area size is a circular wave position with a radius of 5 km. Then, according to the preset scanning area size, the satellite coverage area is divided into 12×12 wave positions. In this way, the power control device only needs to set the corresponding transmission power for each wave position.
[0159] As a possible implementation manner, the dividing the satellite coverage area into at least one scanning area corresponding to the target beam according to the preset scanning area size corresponding to the target beam includes:
[0160] According to the preset concentric ring size corresponding to the target beam, the satellite coverage area is divided into at least one concentric ring corresponding to the target beam.
[0161] Specifically, in order to further simplify the power control process, the power control device can further expand the size of the preset scanning area, divide the satellite coverage area into at least one concentric ring corresponding to the target beam, and then set the corresponding transmission power for each concentric ring. In other words, since the distance between the user terminal and the satellite in the same concentric ring is approximately equal with the sub-satellite point as the center, and the loss in the signal transmission process is also approximately equal, it is possible to consider using the same transmission power to transmit signals to them, then the power control device can only set the corresponding transmission power for each concentric ring. For example, assuming that the satellite coverage area is still Figure 4 The square area shown in the figure, assuming that the preset concentric ring width is 10km, according to the preset concentric ring size, such as Figure 5 As shown in Figure 2, the satellite coverage area is divided into 6 concentric rings, among which Figure 5 The outermost concentric ring is marked with a dotted line, the second outermost concentric ring is marked with a solid line, and so on. The power control device will subsequently set the corresponding transmission power for each concentric ring, that is, based on Figure 4 In the described embodiment, a corresponding transmission power is no longer set for each wave position, but a corresponding transmission power is set for each concentric ring. Then, the transmission powers corresponding to any two different wave positions in the same concentric ring are the same. If a signal is transmitted to two wave positions in the same concentric ring, there is no need to adjust the transmission power.
[0162] It should be noted that when the target beam is a signaling beam, the preset scanning area corresponding to the signaling beam can be a wave position or a concentric ring; when the target beam is a service beam, the preset scanning area corresponding to the service beam can be a wave position or a concentric ring. Furthermore, the size of the preset wave position corresponding to the signaling beam can be the same as or different from the size of the preset wave position corresponding to the service beam, and the size of the preset concentric ring corresponding to the signaling beam can be the same as or different from the size of the preset concentric ring corresponding to the service beam, and this application does not impose any restrictions on this.
[0163] As a possible implementation manner, the dividing the satellite coverage area into at least one scanning area corresponding to the target beam according to the preset scanning area size corresponding to the target beam includes:
[0164] When the target beam includes the service beam, an area where at least one user terminal is located within the satellite coverage area is acquired.
[0165] Specifically, when the target beam is a service beam, since each user terminal has a different configuration and is located in a different location, in order to ensure the communication quality of each user terminal and improve the accuracy of power control, a corresponding transmission power can be set for each user terminal. At this time, the power control device can regard the area where each user terminal is located as a scanning area, and obtain the area where at least one user terminal in the satellite coverage area is located. For example, the power control device can send a broadcast message to the satellite coverage area through a signaling beam, wherein the broadcast message carries the ephemeris information of the satellite, and at least one user terminal in the satellite coverage area returns the relevant information of the respective user terminal to the power control device after receiving the ephemeris information of the satellite, wherein the user terminal information at least includes terminal location information, terminal gain parameter information, etc. The power control device can record the location information of at least one user terminal, and determine the area within the preset range of the location of the user terminal as the area where the user terminal is located. In this way, the power control device can determine the area where at least one user terminal is located.
[0166] As a possible implementation manner, the dividing the satellite coverage area into at least one scanning area corresponding to the target beam according to the preset scanning area size corresponding to the target beam includes:
[0167] When the target beam includes a service beam, the satellite coverage area is divided into at least one parallel strip corresponding to the target beam according to a preset parallel strip size corresponding to the target beam.
[0168] Specifically, when the target beam includes a service beam, the satellite coverage area may be divided into at least one parallel strip corresponding to the service beam according to the preset parallel strip size corresponding to the service beam. Figure 6 As shown, the satellite coverage area is still as follows Figure 4 The square shown is divided into 12×12 wave positions, each wave position has a radius of 5 km, and it is assumed that the width of the preset parallel strip size is 20 km, that is, every 2 rows of wave positions can be regarded as a parallel strip. Then, Figure 6 As shown, the satellite coverage area is divided into 6 parallel strips, wherein the first row of wave positions and the second row of wave positions are shown with dotted lines, which are the first parallel strip; the second row of wave positions and the second row of wave positions are shown with solid lines, which are the second parallel strip, and so on, for a total of 6 parallel strips. Then, the power control device can set the corresponding transmission power for each parallel strip, and no longer set the corresponding transmission power for each wave position. In this way, the complexity of power control can be reduced, and there is no need to adjust the power when scanning the transmission signal to different positions of the same parallel strip.
[0169] Step S303: determine the transmit power corresponding to each scanning area in at least one scanning area corresponding to the target beam according to the total transmit power of the target beam, and generate a corresponding relationship between the at least one scanning area corresponding to the target beam and the transmit power.
[0170] Specifically, after determining the total transmit power of the target beam and at least one scanning area corresponding to the target beam, the power control device can set the transmit power corresponding to each scanning area respectively. Generally, there are two targets of power control. One is to use the equal landing power spectrum density as the control target, that is, to ensure that the power received by the user terminal in each scanning area is equal and the user experience is consistent. For the scanning area with large power loss during signal transmission, the corresponding transmit power is set to be large, and for the scanning area with small power loss during signal transmission, the corresponding transmit power is set to be small, so as to achieve the control target of equal landing power spectrum density. The other is to use the maximum satellite capacity as the power control target, minimize the power loss during signal transmission, and improve the utilization rate of the transmit power. For the scanning area far away from the satellite, since the power loss during signal transmission is too large, only the minimum communication quality of the user terminal therein is guaranteed, and the corresponding transmit power is set to be small; for the scanning area close to the satellite, since the signal transmission path is relatively short, the scanning angle of the satellite is small, and the corresponding power loss is small, the corresponding transmit power can be set to be large.
[0171] For example, taking the target beam as the signaling beam, since the user terminal in the satellite coverage area can only return its corresponding user terminal information to the satellite when it receives the ephemeris information and other messages sent by the user through the signaling beam, the power control device needs to ensure that the user terminals in the satellite coverage area can receive the signals transmitted by the satellite through the signaling beam, that is, the power control is aimed at equal landing power spectrum density. Therefore, when transmitting signals to an area relatively far from the satellite, the power loss is relatively large due to the relatively long signal transmission path and the large scanning angle of the satellite, so the transmission power to be used should be relatively large; when transmitting signals to an area relatively close to the satellite, the signal transmission path is relatively short and the satellite scanning angle is small, so in order to save transmission power, a relatively small transmission power can be used. In this way, the power control target is to make the receiving power of the user terminal in each scanning area equal. For the scanning area farthest from the satellite, the corresponding transmission power is set to be the largest. As the distance between the scanning area and the satellite decreases, the transmission power corresponding to the scanning area is also reduced accordingly. In other words, the transmission power corresponding to the scanning area is directly proportional to the distance between the scanning area and the satellite. The farther the distance between the scanning area and the satellite and the larger the satellite scanning angle, the greater the power loss in the corresponding transmission process. Therefore, the transmission power corresponding to the scanning area is set to be larger. At this time, the power control device determines the power allocation ratio of each scanning area according to the distance between each scanning area and the satellite and the scanning angle of the satellite corresponding to each scanning area, and then allocates the total transmission power of the target beam to at least one scanning area according to the power allocation ratio of at least one scanning area. The details are as follows.
[0172] As a possible implementation manner, when the satellite coverage area is divided into at least one beam position corresponding to the target beam, determining the transmit power corresponding to each scanning area in at least one scanning area corresponding to the target beam according to the total transmit power of the target beam, and generating a correspondence between at least one scanning area corresponding to the target beam and the transmit power includes:
[0173] Determine the distance between each of the at least one wave position corresponding to the target beam and the satellite, and the scanning angle of the satellite corresponding to each of the at least one wave position corresponding to the target beam;
[0174] According to the distance between each wave position and the satellite, and the scanning angle of the satellite corresponding to each wave position, the path loss and scanning loss corresponding to each wave position are determined;
[0175] Get the terminal gain parameters corresponding to each wave position
[0176] Determine the loss value corresponding to each beam position according to the terminal gain parameter corresponding to each beam position, the path loss corresponding to each beam position, and the scanning loss;
[0177] According to the total transmission power of the target beam and the loss value corresponding to each beam position, the transmission power corresponding to each beam position is determined, and a corresponding relationship between at least one beam position corresponding to the target beam and the transmission power is generated.
[0178] Specifically, when the power control device divides the satellite coverage area into at least one wave position, the power control device needs to determine the distance between each wave position in at least one wave position corresponding to the target beam and the satellite, as well as the scanning angle of the satellite. First, the power control device can first determine the position information of the satellite, and then determine the position information of the center point of each wave position, and then determine the distance between the center point of the wave position and the satellite based on the position information of the satellite and the position information of the center point of the wave position, that is, the distance between the wave position and the satellite; then, determine the angle between the line connecting the satellite and the center point of the wave position and the satellite reference scanning direction, that is, the satellite scanning angle corresponding to the wave position, wherein the reference scanning direction is the direction of the beam when transmitting a signal directly below the satellite, for example, it can be the normal direction of the satellite's transmitting antenna.
[0179] Furthermore, the path loss and scanning loss corresponding to the wave position can be determined. The path loss is the power loss caused by the signal being transmitted to the wave position through the target beam; the scanning loss is the power loss caused by the scanning angle of the target beam deviating from the reference scanning direction when the signal is transmitted to the wave position through the target beam. For example, the path loss Los corresponding to each wave position can be determined according to the following formula (1): 1 , where L is the distance between the wave position and the satellite; the scanning loss Los corresponding to each wave position is determined according to the following formula (2): 2 , where θ is the satellite scanning angle corresponding to the wave position.
[0180] Los 1 =10×log 10 (L 2 ) (1)
[0181] Los 2 = -10×log 10 (cosdθ 2 ) (2)
[0182] Moreover, since the user terminal will amplify the signal according to the terminal gain parameter when receiving the signal, that is, the terminal gain parameter of the user terminal will affect the receiving power of the user terminal, wherein the terminal gain parameter is the power amplification factor. Therefore, when the power control device sets the transmission power corresponding to each wave position, it is also necessary to consider the terminal gain parameter of the user terminal in each wave position. There may be multiple user terminals in each wave position, and the terminal gain parameter of each user terminal may be the same or different. For the convenience of calculation, the power control device can set the terminal gain corresponding to each wave position to the value of the minimum terminal gain parameter, such as 0dBi. Of course, it can also be other values, and this application does not limit this. Therefore, after determining the path loss and scanning loss corresponding to each wave position, the power control device can obtain the preset terminal gain parameter, and regard the terminal gain parameter corresponding to each wave position as the preset terminal gain parameter.
[0183] Then, the power control device can determine the loss value of each wave position in at least one wave position according to the terminal gain parameter, path loss and scanning loss corresponding to each wave position. At this time, the power control device can first obtain the preset reference gain and reference path loss. Among them, the value of the reference gain is set to the maximum terminal gain parameter, for example, it can be 2.5dBi, of course, it can also be other values. The reference path loss is the minimum value of the path loss. Since the distance between the sub-satellite point and the satellite is the shortest in the satellite coverage area, the path loss is the minimum when transmitting a signal to the sub-satellite point. Therefore, the path loss corresponding to the sub-satellite point can be determined as the reference path loss.
[0184] Then, for each wave position, the terminal gain reduction value and path loss increase value corresponding to the wave position are determined according to the preset reference gain and reference path loss, the terminal gain parameter corresponding to the wave position, and the path loss. The terminal gain reduction value corresponding to the wave position is the reduction value of the terminal gain corresponding to the wave position relative to the reference gain, and the path loss increase value corresponding to the wave position is the increase value of the path loss corresponding to the wave position relative to the reference path loss. For example, the terminal gain reduction value corresponding to the wave position is determined according to the following formula (3), where ΔLos G Indicates the terminal gain reduction value, G 0 represents the reference gain, G represents the terminal gain parameter corresponding to the wave position; the path loss increase value ΔLos corresponding to the wave position is determined according to the following formula (4): 1 , Los 1 Indicates the path loss value corresponding to the wave position, Los 0 Represents the baseline path loss value, L 0 Indicates the distance between the sub-satellite point and the satellite.
[0185] ΔLos G =|G 0-G| (3)
[0186] ΔLos 1 =|Los 1 -Los 0 |=|10×log 10 (L 2 )-10×log 10 (L 0 2 )| (4)
[0187] After determining the terminal gain reduction value and path loss increase value corresponding to the wave position, the loss value corresponding to the wave position is determined according to the terminal gain reduction value, path loss increase value and scanning loss corresponding to the wave position according to the following formula (5).
[0188] Los 总 =ΔLos G +ΔLos 1 +|Los 2 | (5)
[0189] After the loss value corresponding to each wave position is determined, the power allocation ratio corresponding to each wave position in at least one wave position is determined according to the ratio between the loss values corresponding to each wave position in at least one wave position, and the transmission power corresponding to each wave position is determined according to the total transmission power of the target beam and the power allocation ratio corresponding to each wave position in at least one wave position. In other words, the larger the loss value corresponding to a wave position, the larger the corresponding power allocation ratio, and the larger the transmission power corresponding to the wave position is determined. Exemplarily, assuming that the total power of the target beam is 24W, the satellite coverage area is divided into 4 wave positions, and the loss values of the 4 wave positions determined are 12, 18, 6, and 12, respectively, then the power allocation ratio corresponding to the 4 wave positions is 2:3:1:2, then it can be determined that the transmission power corresponding to the first wave position is 6W, the transmission power corresponding to the second wave position is 9W, the transmission power corresponding to the third wave position is 3W, and the transmission power corresponding to the second wave position is 6W.
[0190] As a possible implementation manner, when the satellite coverage area is divided into at least one concentric ring corresponding to the target beam position, determining the transmit power corresponding to each scanning area in at least one scanning area corresponding to the target beam according to the total transmit power of the target beam, and generating a correspondence between at least one scanning area corresponding to the target beam and the transmit power includes:
[0191] Determine a distance between each of at least one concentric ring corresponding to the target beam and the satellite, and a satellite scanning angle corresponding to each of at least one concentric ring corresponding to the target beam;
[0192] Determine the path loss and scanning loss corresponding to each concentric ring according to the distance between each concentric ring and the satellite and the satellite scanning angle corresponding to each concentric ring;
[0193] According to the path loss and scanning loss corresponding to each concentric ring, the loss value corresponding to each concentric ring is determined;
[0194] According to the total transmission power of the target beam and the loss value corresponding to each concentric ring, the transmission power corresponding to each concentric ring is determined, and a corresponding relationship between at least one concentric ring corresponding to the target beam and the transmission power is generated.
[0195] Specifically, when the power control device divides the satellite coverage area into at least one concentric ring, the power control device needs to determine the distance between each concentric ring in at least one concentric ring corresponding to the target beam and the satellite, as well as the scanning angle of the satellite. First, the power control device can first determine the position information of the satellite, and then use the center of the concentric ring as the starting point to make a radius in any direction to determine the position information of the intersection of the radius and each concentric ring. Then, for each concentric ring, according to the position information of the satellite and the position information of the intersection of the concentric ring and the radius, determine the distance between the intersection and the satellite, that is, the distance between the concentric ring and the satellite; then, determine the line connecting the satellite and any point on the center line of the concentric ring and the satellite reference scanning direction, and determine the angle between the line and the reference scanning direction as the satellite scanning angle corresponding to the concentric ring, wherein the reference scanning direction is the direction of the beam when transmitting a signal directly below the satellite, for example, it can be the normal direction of the satellite's transmitting antenna.
[0196] Furthermore, the path loss and scanning loss corresponding to the concentric ring can be determined. The path loss is the power loss caused by the signal being transmitted through the target beam to the concentric ring; the scanning loss is the power loss caused by the scanning angle of the target beam deviating from the reference scanning direction when the signal is transmitted through the target beam to the concentric ring. 1 , scanning loss Los 2 The specific calculation formula of can refer to formula (6) and formula (7), where L is the distance between the concentric ring and the satellite, and θ is the satellite scanning angle corresponding to the concentric ring.
[0197] Los 1 =10×log 10 (L 2 ) (6)
[0198] Los 2 = -10×log 10 (cosdθ 2 ) (7)
[0199] Then the power control device can determine the loss value of each concentric ring in at least one concentric ring according to the path loss and scanning loss corresponding to each concentric ring. For example, the power control device can first obtain the preset reference path loss and reference scanning loss. Among them, since the distance between the sub-satellite point and the satellite is the shortest in the satellite coverage area, the path loss is the smallest and the scanning loss is the smallest when transmitting a signal to the sub-satellite point. Therefore, the power control device can determine the path loss corresponding to the sub-satellite point as the reference path loss, and determine the scanning loss corresponding to the sub-satellite point as the reference scanning loss. Then for each concentric ring, according to the preset reference path loss and the path loss corresponding to the concentric ring, the path loss increase value corresponding to the concentric ring is determined; according to the preset reference scanning loss and the scanning loss corresponding to the concentric ring, the scanning loss increase value corresponding to the concentric ring is determined. Among them, the path loss increase value corresponding to the concentric ring is the increase of the path loss corresponding to the concentric ring and the reference path loss, and the scanning loss increase value corresponding to the concentric ring is the increase of the path loss corresponding to the concentric ring relative to the reference scanning loss. Then, the loss value corresponding to the concentric ring is determined according to the path loss increase value and the scanning loss increase value corresponding to the concentric ring. For example, the path loss increase value ΔLos corresponding to the concentric ring is determined according to formula (8): 1 At this time, Los 1 Indicates the path loss value corresponding to the concentric ring, Los 0 Represents the baseline path loss value, L 0 represents the distance between the sub-satellite point and the satellite; the scanning loss increase value corresponding to the concentric ring is determined according to formula (9), where Los 2 Indicates the scanning loss value corresponding to the concentric ring, Los' 0 represents the reference scanning loss value, θ 0 represents the satellite scanning angle corresponding to the sub-satellite point; according to formula (10), the sum of the path loss increase value corresponding to the concentric ring and the scanning loss increase value corresponding to the concentric ring is determined as the loss value corresponding to the concentric ring.
[0200] ΔLos 1 =|Los 1 -Los 0 |=|10×log 10 (L 2 )-10×log 10 (L 0 2 )| (8)
[0201]
[0202] Los 总 =ΔLos 1 +ΔLos 2 (10)
[0203] After the loss value corresponding to each concentric ring is determined, the power allocation ratio corresponding to each concentric ring in at least one concentric ring is determined according to the ratio between the loss values corresponding to each concentric ring in at least one concentric ring, and the transmit power corresponding to each concentric ring is determined according to the total transmit power of the target beam and the power allocation ratio corresponding to each concentric ring in at least one concentric ring. In other words, the larger the loss value corresponding to a certain concentric ring, the larger the corresponding power allocation ratio, and the larger the transmit power corresponding to the determined concentric ring. In this way, it is only necessary to set the corresponding transmit power for each concentric ring, and when the power control device transmits signals to different user terminals in the same concentric ring, the transmit power used is the same, and no adjustment is required, which simplifies the power control process.
[0204] As a possible implementation method, assuming that the target wave position is a service wave position, when the satellite coverage area is divided into at least one concentric ring corresponding to the target wave position, the maximum satellite capacity can also be used as the power control target, that is, to improve the utilization rate of the satellite transmission power and reduce power loss, since when the same transmission power is used to transmit signals to the near-end user terminal and the far-end user terminal respectively, the signal transmission distance when transmitting signals to the far-end user terminal is longer and the satellite scanning angle is larger, the corresponding power loss is also larger, and relatively speaking, the power loss when transmitting signals to the near-end user terminal is smaller, therefore, when transmitting signals to the far-end user terminal, the signal is transmitted at the minimum transmission power that can ensure the basic communication quality of the user terminal, and more transmission power is used for data interaction with the near-end user terminal. That is to say, the closer the scanning area is to the satellite, the higher the corresponding transmission power can be set by the power control device. Based on this, when the target beam is a service beam, assuming that the power control device divides the satellite coverage area into at least one concentric ring corresponding to the service beam, then, determining the transmit power corresponding to each scanning area in at least one scanning area corresponding to the target beam according to the total transmit power of the target beam, and generating the corresponding relationship between at least one scanning area corresponding to the target beam and the transmit power includes:
[0205] Obtain a preset power allocation ratio parameter, and determine the preset power allocation ratio parameter as the power allocation ratio parameter of the outermost concentric ring of at least one concentric ring;
[0206] According to the power allocation ratio parameter of the outermost concentric ring, the power allocation ratio parameter of the concentric rings other than the outermost concentric ring in at least one concentric ring is determined according to a preset rule; the preset rule includes that in at least one concentric ring, the smaller the outer ring radius of the concentric ring, the larger the power allocation ratio parameter;
[0207] According to the total transmit power of the target beam and the power ratio allocation parameter of each concentric ring in at least one concentric ring, the transmit power corresponding to each concentric ring is determined, and a corresponding relationship between at least one concentric ring corresponding to the target beam and the transmit power is generated.
[0208] Specifically, when the power control target is to ensure the maximum satellite capacity, the power control device can determine the satellite scanning angle when the user terminal farthest from the satellite transmits a signal in advance according to the coverage area of the satellite, and set the minimum transmission power that can be used when transmitting a signal at the scanning angle, that is, the preset power allocation ratio parameter, which can be preset according to actual needs, and the present application does not limit this. When setting the transmission power corresponding to at least one concentric ring, the power control device can obtain the preset power allocation ratio parameter. Since the user terminal in the outermost concentric ring is farthest from the satellite, the obtained preset power allocation ratio parameter can be determined as the power allocation ratio parameter of the outermost concentric ring in at least one concentric ring. Then, according to the power allocation ratio parameter of the outermost concentric ring, according to the preset rules, the power allocation ratio parameters of the concentric rings other than the outermost concentric ring in at least one concentric ring are determined. Among them, the preset rules include that in at least one concentric ring, the smaller the outer ring radius of the concentric ring, the larger its power allocation ratio parameter. The preset rules can be set according to actual needs, and the present application does not limit this. After determining the power allocation ratio parameter corresponding to each concentric ring in at least one concentric ring, the transmission power corresponding to each concentric ring can be determined according to the ratio between the total transmission power of the service beam and the power allocation ratio parameter of at least one concentric ring. Exemplarily, assuming that the power control device pre-sets the preset power allocation ratio parameter to 5W, when the target beam is a service beam, the power control device divides the satellite coverage area into 4 concentric rings corresponding to the service beam according to the preset scanning area size corresponding to the service beam, then the power allocation ratio parameter corresponding to the first concentric ring (the outermost concentric ring) is the preset power allocation ratio parameter 5W. Assuming that the satellite scanning angle corresponding to the first concentric ring (the outermost concentric ring) is 40°, for the convenience of calculation, the satellite scanning angle corresponding to each concentric ring is no longer determined according to the position of each concentric ring. The power control device pre-sets the difference between the satellite scanning angles of every two concentric rings to be 5°. Assuming that the preset rule set by the power control device is: the power allocation ratio parameter corresponding to the nth concentric ring is: y n =2*(θ 1 +(n-1)*Δθ)+b
[0209] Among them, y n represents the power allocation ratio parameter of the nth concentric ring, θ 1represents the scanning angle corresponding to the first concentric ring (the outermost concentric ring), Δθ represents the difference between the satellite scanning angles corresponding to two adjacent concentric rings, b is a constant, and n is a positive integer. In this example, since the scanning angle corresponding to the first concentric ring (the outermost concentric ring) is 40 degrees and the corresponding power allocation ratio parameter is 5W, θ 1 is 40°, Δθ is 10°, and according to the power distribution ratio parameter of the first concentric ring: 2*θ 1 +b=5, we can determine that the value of constant b is -75, so we can determine that the ratio of the power allocation ratio parameters among the four concentric rings is 5:15:25:35, that is, 1:3:5:7. Assuming the total transmit power is 80W, then according to the ratio of the power allocation ratio parameters among the four concentric rings 1:3:5:7, we can determine that the transmit powers corresponding to the four concentric rings are 5W, 15W, 25W, and 35W respectively.
[0210] It should be noted that the preset rules in the above example are only examples, and the preset rules can also be set according to actual needs, and this application does not limit this. For example, the power allocation ratio parameters of n concentric rings increase in exponential form, and the power control device sets the power allocation ratio parameter corresponding to the nth concentric ring to be: n =e (θ+(n-1)*Δθ) +b. Among them, θ represents the scanning angle corresponding to the outermost concentric ring, Δθ represents the difference between the satellite scanning angles corresponding to two adjacent concentric rings, b is a constant, and n is a positive integer.
[0211] That is, according to the above method, for the remote concentric ring farthest from the satellite, the corresponding transmission power is determined to be the smallest, and the closer the concentric ring is to the satellite, the corresponding transmission power determined to be increased according to the preset rule. In this way, the power control device can use more transmission power for communication with the near-end user terminal, while ensuring the basic communication quality of the remote user terminal, thereby achieving the power control goal of maximizing the satellite capacity.
[0212] As a possible implementation manner, assuming that the target beam includes a service beam, when the satellite coverage area is divided into at least one parallel strip corresponding to the target wave position, determining the transmit power corresponding to each scanning area in at least one scanning area corresponding to the target beam according to the total transmit power of the target beam, and generating a correspondence between at least one scanning area corresponding to the target beam and the transmit power includes:
[0213] Determine the distance between each strip in at least one parallel strip and the satellite, and the satellite scanning angle corresponding to each strip;
[0214] Determine the path loss and scanning loss corresponding to each strip according to the distance between each strip in at least one parallel strip and the satellite and the satellite scanning angle corresponding to each strip;
[0215] Determine the loss value corresponding to each strip according to the path loss and scanning loss corresponding to each strip;
[0216] According to the total transmit power of the target beam and the loss value corresponding to each stripe, the transmit power of the target beam corresponding to each stripe is determined, and a corresponding relationship between at least one stripe corresponding to the target beam and the transmit power is generated.
[0217] Specifically, assuming that the target beam is a service beam, the power control device can also divide the satellite coverage area into at least one parallel strip corresponding to the service beam according to the preset parallel strip size corresponding to the service beam. The power control device needs to determine the distance between each parallel strip in the at least one parallel strip corresponding to the service beam and the satellite, as well as the scanning angle of the satellite. First, the power control device can first determine the position information of the satellite, and then use the sub-satellite point as the reference point to make a straight line perpendicular to each parallel strip, and determine the position information of the intersection of the straight line and the center line of each parallel strip. For each parallel strip, according to the position information of the satellite and the position information of the intersection of the center line of the parallel strip and the straight line, determine the distance between the intersection and the satellite, that is, the distance between the parallel strip and the satellite, and then determine the connecting line between the intersection and the satellite and the satellite reference scanning direction, and determine the angle between the connecting line and the reference scanning direction as the satellite scanning angle corresponding to the parallel strip, wherein the reference scanning direction is the direction of the beam when transmitting a signal directly below the satellite, for example, it can be the normal direction of the satellite's transmitting antenna.
[0218] Furthermore, the path loss and scanning loss corresponding to the parallel strip can be determined. The path loss is the power loss caused by the signal being transmitted to the parallel strip through the target beam; the scanning loss is the power loss caused by the scanning angle of the target beam deviating from the reference scanning direction when the signal is transmitted to the parallel strip through the target beam. For example, the path loss Los corresponding to each parallel strip can be determined according to the following formula (11): 1 , where L is the distance between the parallel strip and the satellite; the scanning loss Los corresponding to each parallel strip is determined according to the following formula (12): 2 , where θ is the satellite scanning angle corresponding to the parallel strip.
[0219] Los 1 =10×log 10 (L 2 ) (11)
[0220] Los2 = -10×log 10 (cosdθ 2 ) (12)
[0221] Then the power control device can determine the loss value of each parallel strip in at least one parallel strip according to the path loss and scanning loss corresponding to each parallel strip. For example, the power control device can first obtain the preset reference path loss and reference scanning loss. Among them, since the distance between the sub-satellite point and the satellite is the shortest in the satellite coverage area, the path loss and the scanning loss are the smallest when transmitting a signal to the sub-satellite point. Therefore, the power control device can determine the path loss corresponding to the sub-satellite point as the reference path loss, and determine the scanning loss corresponding to the sub-satellite point as the reference scanning loss. Then, for each parallel strip, according to the preset reference path loss and the path loss corresponding to the parallel strip, the path loss increase value corresponding to the parallel strip is determined; according to the preset reference scanning loss and the scanning loss corresponding to the parallel strip, the scanning loss increase value corresponding to the parallel strip is determined. Among them, the path loss increase value corresponding to the parallel strip is the increase value of the path loss corresponding to the parallel strip and the reference path loss, and the scanning loss increase value corresponding to the parallel strip is the increase value of the path loss corresponding to the parallel strip relative to the reference scanning loss. Then, the loss value corresponding to the parallel strip is determined according to the path loss increase value and the scanning loss increase value corresponding to the parallel strip. For example, the path loss increase value ΔLos corresponding to the parallel strip can be determined according to formula (13): 1 , among which, Los 1 Indicates the path loss value corresponding to the parallel strip, Los 0 Represents the baseline path loss value, L 0 represents the distance between the subsatellite point and the satellite; the scanning loss increase value corresponding to the parallel strip is determined according to formula (14), where Los 2 Indicates the scanning loss value corresponding to the parallel strip, Los' 0 represents the reference scanning loss value, θ 0 represents the satellite scanning angle corresponding to the sub-satellite point; then, according to formula (15), the sum of the path loss increase value corresponding to the parallel strip and the scanning loss increase value corresponding to the parallel strip is determined as the loss value corresponding to the parallel strip.
[0222] ΔLos 1 =|Los 1 -Los 0 |=|10×log 10 (L 2 )-10×log 10 (L 0 2 )| (13)
[0223]
[0224] Los 总 =ΔLos 1 +ΔLos 2 (15)
[0225] After the loss value corresponding to each parallel strip is determined, the power allocation ratio corresponding to each parallel strip in at least one parallel strip is determined according to the ratio between the loss values corresponding to each parallel strip in at least one parallel strip, and the transmit power corresponding to each parallel strip is determined according to the total transmit power of the target beam and the power allocation ratio corresponding to each parallel strip in at least one parallel strip. In other words, the larger the loss value corresponding to a parallel strip, the larger the corresponding power allocation ratio, and the larger the transmit power corresponding to the parallel strip determined. In this way, it is only necessary to set the corresponding transmit power for each parallel strip, and when the power control device transmits signals to different user terminals located in the same parallel strip, the transmit power used is the same, and no adjustment is required, which simplifies the power control process.
[0226] As a possible implementation manner, when at least one scanning area corresponding to the target beam includes an area where at least one user terminal is located in the satellite coverage area, determining the transmit power corresponding to each scanning area in the at least one scanning area corresponding to the target beam according to the total transmit power of the target beam, and generating a correspondence between at least one scanning area corresponding to the target beam and the transmit power includes:
[0227] Acquire a user communication parameter corresponding to each user terminal in at least one user terminal;
[0228] Determine, according to the location information of each user terminal in the at least one user terminal, the distance between each user terminal and the satellite, and the satellite scanning angle corresponding to each user terminal;
[0229] Determine the path loss and scanning loss of each user terminal according to the distance between each user terminal and the satellite and the satellite scanning angle corresponding to each user terminal;
[0230] Determine the loss value corresponding to each user terminal according to the user communication parameters, path loss and scanning loss corresponding to each user terminal;
[0231] According to the total transmission power of the target beam and the loss value corresponding to each user terminal, the service beam transmission power corresponding to the area where each user terminal is located is determined, and a corresponding relationship between the area where at least one user terminal corresponding to the service beam is located and the transmission power is generated.
[0232] As a possible implementation manner, the user communication parameter of each user terminal includes a terminal gain parameter or a terminal-specific loss parameter corresponding to each user terminal.
[0233] Specifically, the positions of any two user terminals in the same scanning area may be far apart, and the terminal gain parameters may also be different. If the power control device uses the same transmission power to transmit the same signal to the two user terminals in the same scanning area, the receiving power of the two user terminals may also be different due to the different transmission path distances of the signals, the different satellite scanning angles, and the different terminal gains of the user terminals. Therefore, in order to more accurately allocate the total power of the target beam, the power control device can obtain the area where at least one user terminal is located in the satellite coverage area, and determine the corresponding transmission power of the area where each user terminal is located for the relevant information of each user. Since the terminal gain of the user terminal determines the power amplification factor of the user terminal when receiving the signal, and obstacles in the environment where the user terminal is located may also affect the user terminal's reception of the signal, causing a certain power loss, therefore, when determining the transmission power corresponding to the area where each user terminal is located, the power control device can first obtain the user communication parameters corresponding to each user terminal in at least one user terminal. Among them, the user communication parameters are terminal gain parameter information or terminal-specific loss parameters. When the user communication parameter is a terminal gain parameter, since in step S202, when the location of at least one user terminal in the satellite coverage area is obtained, at least one user terminal in the satellite coverage area will return respective user terminal information to the power control device, and the user terminal information includes the terminal gain parameter information corresponding to the user terminal, therefore, the power control device can obtain the terminal gain parameter information corresponding to each user terminal from the user related information received from at least one user terminal. When the user communication parameter is a terminal specific loss parameter, since in step S202, when the location information of at least one user terminal is obtained, the power control device will send a broadcast message to the satellite coverage area through a signaling multiple, after receiving the broadcast message, at least one user terminal in the satellite coverage area returns respective user terminal related information to the power control device, at least one user terminal can also determine the transmit power and the received power of the user terminal, perform channel measurement and generate a channel measurement result, and the channel measurement result at least includes the terminal specific loss parameter. At least one user terminal will return the channel measurement result to the power control device, and the power control device receives the channel measurement result of at least one user terminal, and the terminal specific loss parameter corresponding to each user terminal in at least one user terminal can be obtained through the channel measurement result of at least one user terminal.Then, the power control device can first determine the location information of the satellite, and for the area where each user terminal is located, determine the distance between each user terminal and the satellite based on the area information of the user terminal and the location information of the satellite; then, determine the angle between the line connecting the satellite and the center point of the area where the user terminal is located and the satellite reference scanning direction, which is the satellite scanning angle corresponding to the user terminal, wherein the reference scanning direction is the direction of the beam when transmitting a signal directly below the satellite, for example, it can be the normal direction of the satellite's transmitting antenna.
[0234] Furthermore, the path loss and scanning loss corresponding to the user terminal can be determined. The path loss is the power loss caused by the signal being transmitted during the transmission process when the signal is transmitted to the area where the user terminal is located through the target beam; the scanning loss is the power loss caused by the scanning angle of the target beam deviating from the reference scanning direction when the signal is transmitted to the area where the user terminal is located through the target beam. For example, the path loss Los corresponding to each user terminal can be determined according to the following formula (16): 1 , where L is the distance between the user terminal and the satellite; the scanning loss Los corresponding to each user terminal is determined according to the following formula (17): 2 , where θ is the satellite scanning angle corresponding to the user terminal.
[0235] Los 1 =10×log 10 (L 2 ) (16)
[0236] Los 2 = -10×log 10 (cosdθ 2 ) (17)
[0237] Then, the power control device can determine the loss value of each user terminal in at least one user terminal according to the user communication parameters, path loss and scanning loss corresponding to each user terminal. At this time, when the user communication parameter is the terminal gain parameter, the power control device can first obtain the preset reference gain and reference path loss. Among them, the value of the reference gain is the maximum terminal gain parameter; the reference path loss is the minimum value of the path loss. Since the distance between the sub-satellite point and the satellite is the shortest in the satellite coverage area, the path loss is the minimum when the signal is transmitted to the sub-satellite point, so the path loss corresponding to the sub-satellite point can be determined as the reference path loss. Then, for each user terminal, according to the preset reference gain and reference path loss, the terminal gain parameter corresponding to the user terminal, and the path loss, determine the terminal gain reduction value and path loss increase value corresponding to the user terminal. Among them, the terminal gain reduction value corresponding to the user terminal is the reduction value of the terminal gain corresponding to the user terminal relative to the reference gain, and the path loss increase value corresponding to the user terminal is the increase value of the path loss corresponding to the user terminal relative to the reference path loss. For example, the terminal gain reduction value corresponding to the user terminal is determined according to the following formula (18), wherein ΔLos G Indicates the terminal gain reduction value, G 0 represents the reference gain, G represents the terminal gain parameter corresponding to the user terminal; the path loss increase value ΔLos corresponding to the user terminal is determined according to the following formula (19): 1 , Los 1 Indicates the path loss value corresponding to the user terminal, Los 0 Represents the baseline path loss value, L 0 Indicates the distance between the sub-satellite point and the satellite.
[0238] ΔLos G =|G 0 -G| (18)
[0239] ΔLos 1 =|Los 1 -Los 0 |=|10×log 10 (L 2 )-10×log 10 (L 0 2 )| (19)
[0240] After determining the terminal gain reduction value and path loss increase value corresponding to the user terminal, the loss value corresponding to the user terminal is determined according to the terminal gain reduction value, path loss increase value and scanning loss corresponding to the user terminal, according to the following formula (20).
[0241] Los 总 =ΔLosG +ΔLos 1 +|Los 2 | (20)
[0242] In addition, when the user communication parameter is a terminal-specific loss parameter, for each user terminal, only the path loss increase value ΔLos corresponding to the user terminal may be determined. 1 And scanning loss Los 2 , there is no need to calculate the terminal gain reduction value corresponding to the user terminal. The specific loss value Los corresponding to the user terminal can be calculated according to the following formula (21): 特 , the path loss increase value ΔLos corresponding to the user terminal 1 And scanning loss Los 2 The sum of the absolute values of is determined as the loss value corresponding to the user terminal.
[0243] Los 总 =Los 特 +ΔLos 1 +|Los 2 | (21)
[0244] After the loss value corresponding to each user terminal is determined, the power allocation ratio corresponding to each user terminal in at least one user terminal is determined according to the ratio between the loss values corresponding to each user terminal in at least one user terminal, and the transmit power corresponding to the area where each user terminal is located is determined according to the total transmit power of the target beam and the power allocation ratio corresponding to each user terminal in at least one user terminal. In other words, the larger the loss value corresponding to a certain user terminal, the larger the corresponding power allocation ratio, and the larger the transmit power corresponding to the area where the user terminal is located.
[0245] In this way, the power control device can take the guarantee of consistent user experience of at least one user terminal in the satellite coverage area as the control target. The farther the scanning area is from the satellite, the higher the corresponding loss value is, and the higher the corresponding transmission power is set. It can also take the maximum satellite capacity as the control target. For the scanning area farthest from the satellite, only the basic communication quality of the user terminal in it is guaranteed, and the corresponding transmission power is set to the lowest. The closer the scanning area is to the satellite, the higher the corresponding transmission power is set. Therefore, the power control method described in this application is relatively more flexible and can meet different control requirements.
[0246] Figure 7 A power control method is provided in an embodiment of the present application. Figure 3It can be seen from the illustrated embodiment that when the power control device pre-sets the correspondence between the scanning area and the transmission power, the corresponding relationship between the scanning area corresponding to the signaling beam and the transmission power, as well as the corresponding relationship between the scanning area corresponding to the service beam and the transmission power, will be set for the target beam being a signaling beam or a service beam. Therefore, when determining to transmit a signal, it is necessary to first determine whether to use a signaling beam or a service beam to transmit a signal. When determining to use a signaling beam to transmit a signal, it is necessary to obtain the correspondence between the scanning area corresponding to the preset signaling beam and the transmission power. When determining to use a service beam to transmit a signal, it is necessary to obtain the correspondence between the scanning area corresponding to the preset service beam and the transmission power. Based on this, if Figure 7 As shown, when the power control device sets the corresponding relationship between the scanning area and the transmission power for the signaling beam and the service beam respectively, the specific power control method is as follows.
[0247] Step S701: Determine the beam to be used.
[0248] The beam to be used includes a signaling beam or a service beam.
[0249] In the embodiment of the present application, when transmitting a signal, it may be transmitted through a signaling beam or through a service beam, and the power control device needs to first determine whether to scan and transmit the signal through a signaling beam or a service beam. The power control device usually periodically broadcasts the satellite's ephemeris information and other signals to at least one user terminal in the satellite coverage area through a signaling beam, so that at least one user terminal reports the user terminal related information after receiving the signal, so that the power control device subsequently provides services to each user terminal according to the user terminal related information. Therefore, when the signal to be transmitted is a signaling signal such as the satellite's ephemeris information, the beam to be used is determined to be a signaling beam; or, the power control device sends the user terminal required data files and other information through a service beam according to the user terminal's needs. At this time, the beam to be used is a service beam. For example, user terminal A needs to transmit a first file to user terminal B, and user terminal A sends a first file transmission request message to the satellite. The power control device in the satellite receives the first file transmission request message, and determines that the target user terminal is user terminal B through the request message. At this time, it is necessary to send the first file to user terminal B through the service beam, so the beam to be used is determined to be a service beam.
[0250] Step S702: Determine the target scanning area.
[0251] Please refer to step S201 for details, which will not be described again here.
[0252] As a possible implementation manner, when the beam to be used is a signaling beam, obtaining at least one scanning area corresponding to the service beam;
[0253] Determining a target scanning area in the at least one scanning area corresponding to the signaling beam according to a preset scanning order of the at least one scanning area corresponding to the signaling beam;
[0254] Alternatively, when the beam to be used is a service beam, determining location information of the target user terminal;
[0255] Acquire at least one scanning area corresponding to the service beam;
[0256] According to the location information of the target user terminal, a scanning area corresponding to the target user terminal is determined in the scanning area corresponding to the beam to be used, and is determined as the target scanning area.
[0257] Specifically, the power control device periodically broadcasts the satellite's ephemeris information and other signaling signals to at least one user terminal in the satellite coverage area through a signaling beam to inform at least one user terminal of the satellite's ephemeris information. The power control device usually pre-sets a preset scanning order for at least one scanning area corresponding to the signaling beam, and then determines the target scanning area in sequence according to the preset scanning order of at least one scanning area corresponding to the signaling beam. For example, it is assumed that the power control device divides the satellite coverage area into 200 wave positions, and determines the scanning area farthest from the sub-satellite point in the scanning area located in the north direction of the sub-satellite point as the first scanning area, and then determines the scanning order of each scanning area in a clockwise scanning order. When it is determined that a signal needs to be transmitted through a signaling beam, the first scanning area is determined as the target scanning area according to the preset scanning order, and the relevant steps of scanning and transmitting signals to the target scanning area are performed. After the scanning is completed, the second scanning area is determined as the target scanning area according to the preset scanning order, and so on. Assume that the power control device divides the satellite coverage area into 6 concentric rings, and sets the innermost concentric ring as the first scanning area in order from the inside to the outside, and sets the north direction of the first concentric ring as the scanning starting point, and scans in a clockwise direction, and so on, setting the scanning order for each concentric ring.
[0258] It should be noted that the above are only some examples of preset scanning orders. The preset scanning order of at least one scanning area corresponding to the signaling beam can be set according to actual needs, and this application does not impose any restrictions on this.
[0259] Since at least one user terminal in the satellite coverage area will report the corresponding user terminal related information when accessing the satellite communication system, for example, the user terminal location information, terminal gain information, etc., the power control device will save the relevant information of at least one user terminal. Therefore, when the beam to be used is a service beam, the power control device can determine the location information of the target user terminal in the saved relevant information of at least one user terminal in the satellite coverage area according to the identification information of the target user terminal. Then, at least one scanning area corresponding to the service beam is obtained, and according to the location information of the target user terminal, the scanning area corresponding to the location of the target user terminal is determined in the at least one scanning area corresponding to the service beam, and it is determined as the target scanning area. For example, user terminal A needs to transmit a first file to user terminal B, and user terminal A sends a first file transmission request message to the satellite, and the request message carries the data information of the first file and the identification information of user terminal B. The power control device on the satellite receives the first file transmission request message, determines the target user terminal as user terminal B through the request message, and determines the location information of user terminal B in the saved relevant information of at least one user terminal in the satellite coverage area according to the identification information of user terminal B. The power control device obtains at least one scanning area corresponding to the service beam, and determines, according to the location information of the user terminal B, a scanning area corresponding to the user terminal B in the at least one scanning area corresponding to the service beam, which is the target scanning area.
[0260] It should be noted that in the above example, other modules of the satellite may also receive the first file transmission request message sent by the user terminal A, and then forward the request message to the power control device, and this application does not impose any restrictions on this.
[0261] Step S703: Obtain the corresponding relationship between the preset scanning area and the transmission power corresponding to the beam to be used.
[0262] Specifically, when the beam to be used is a signaling beam, the corresponding relationship between the preset scanning area and the transmission power corresponding to the signaling beam is obtained; when the beam to be used is a service beam, the corresponding relationship between the preset scanning area and the transmission power corresponding to the service beam is obtained.
[0263] For details, please refer to step S202, which will not be repeated here.
[0264] Step S704: According to the target scanning area, in the correspondence between the preset scanning area corresponding to the beam to be used and the transmit power, determine the target transmit power corresponding to the target scanning area.
[0265] Please refer to step S203 for details, which will not be described again here.
[0266] Step S705: Scan and transmit signals to the target scanning area through the beam to be used according to the target transmission power.
[0267] Please refer to step S204 for details, which will not be described again here.
[0268] For example, it is assumed that the power control device receives a signal sent by user terminal A.
[0269] In this way, the power control device can respectively set the corresponding relationship between the scanning area corresponding to the service beam and the transmission power, and the corresponding relationship between the scanning area corresponding to the signaling beam and the transmission power. When transmitting a signal, the beam to be used and the target scanning area can be determined first, and the corresponding relationship between the scanning area corresponding to the preset beam to be used and the transmission power can be obtained according to the target scanning area. According to the corresponding relationship between the target scanning area and the scanning area corresponding to the beam to be used and the transmission power, the target transmission power can be determined, and the signal can be directly transmitted at the target transmission power, which simplifies the power control process.
[0270] Corresponding to the above embodiment, Figure 8 As shown, the embodiment of the present application also provides a power control device, including:
[0271] The processing unit 801 is used to determine a target scanning area;
[0272] An acquisition unit 802 is used to acquire a correspondence between a preset scanning area and a transmission power;
[0273] The processing unit 801 is further configured to determine, according to the target scanning area, a target transmission power corresponding to the target scanning area in a preset correspondence relationship between the scanning area and the transmission power;
[0274] The processing unit 801 is further configured to scan and transmit signals to a target scanning area according to the target transmission power.
[0275] As a possible implementation, the acquisition unit 802 is further configured to acquire the total transmit power of the target beam; the target beam includes a signaling beam or a service beam;
[0276] As a possible implementation manner, the acquisition unit 802 is further used to acquire a satellite coverage area, and divide the satellite coverage area into at least one scanning area corresponding to the target beam according to a preset scanning area size;
[0277] As a possible implementation method, the processing unit 801 is also used to determine the transmission power corresponding to each scanning area in at least one scanning area corresponding to the target beam according to the total transmission power of the target beam, and generate a corresponding relationship between at least one scanning area corresponding to the target beam and the transmission power.
[0278] As a possible implementation manner, the acquisition unit 802 is specifically configured to divide the satellite coverage area into at least one wave position corresponding to the target beam according to a preset wave position size corresponding to the target beam;
[0279] The processing unit 801 is specifically configured to determine a distance between each of at least one wave position corresponding to the target beam and the satellite, and a scanning angle of the satellite corresponding to each of at least one wave position corresponding to the target beam;
[0280] The processing unit 801 is further used to determine the path loss and scanning loss corresponding to each wave position according to the distance between each wave position and the satellite and the scanning angle of the satellite corresponding to each wave position;
[0281] The acquisition unit 802 is also used to obtain the terminal gain parameter corresponding to each wave position.
[0282] The processing unit 801 is further configured to determine a loss value corresponding to each beam position according to a terminal gain parameter corresponding to each beam position, a path loss corresponding to each beam position, and a scanning loss;
[0283] The processing unit 801 is further used to determine the transmission power corresponding to each beam position according to the total transmission power of the target beam and the loss value corresponding to each beam position, and generate a corresponding relationship between at least one beam position corresponding to the target beam and the transmission power.
[0284] As a possible implementation manner, the acquisition unit 802 is specifically configured to divide the satellite coverage area into at least one concentric ring corresponding to the target beam according to a preset concentric ring size corresponding to the target beam;
[0285] The processing unit 801 is specifically configured to determine a distance between each of at least one concentric ring corresponding to the target beam and the satellite, and a satellite scanning angle corresponding to each of at least one concentric ring corresponding to the target beam;
[0286] The processing unit 801 is further used to determine the path loss and scanning loss corresponding to each concentric ring according to the distance between each concentric ring and the satellite and the satellite scanning angle corresponding to each concentric ring;
[0287] The processing unit 801 is further configured to determine a loss value corresponding to each concentric ring according to the path loss and scanning loss corresponding to each concentric ring;
[0288] The processing unit 801 is further used to determine the transmit power corresponding to each concentric ring according to the total transmit power of the target beam and the loss value corresponding to each concentric ring, and generate a corresponding relationship between at least one concentric ring corresponding to the target beam and the transmit power.
[0289] As a possible implementation manner, the acquisition unit 802 is specifically configured to acquire a location of at least one user terminal within a satellite coverage area when the target beam includes a service beam;
[0290] The processing unit 801 is specifically configured to obtain a user communication parameter corresponding to each user terminal in at least one user terminal;
[0291] The processing unit 801 is further configured to determine, according to the area information of each user terminal in the at least one user terminal, the distance between each user terminal and the satellite, and the satellite scanning angle corresponding to each user terminal;
[0292] The processing unit 801 is further configured to determine the path loss and scanning loss of each user terminal according to the distance between each user terminal and the satellite and the satellite scanning angle corresponding to each user terminal;
[0293] The processing unit 801 is further configured to determine a loss value corresponding to each user terminal according to a user communication parameter, a path loss, and a scanning loss corresponding to each user terminal;
[0294] Processing unit 801 is also used to determine the service beam transmission power corresponding to the area where each user terminal is located based on the total transmission power of the target beam and the loss value corresponding to each user terminal, and generate a corresponding relationship between the area where at least one user terminal corresponding to the service beam is located and the transmission power.
[0295] As a possible implementation manner, the acquisition unit 802 is specifically configured to divide the satellite coverage area into at least one parallel strip corresponding to the target beam according to a preset parallel strip size corresponding to the target beam when the target beam includes the service beam;
[0296] The processing unit 801 is specifically configured to determine a distance between each strip in at least one parallel strip and a satellite, and a satellite scanning angle corresponding to each strip;
[0297] The processing unit 801 is further configured to determine a path loss and a scanning loss corresponding to each strip according to a distance between each strip in at least one parallel strip and the satellite and a satellite scanning angle corresponding to each strip;
[0298] The processing unit 801 is further configured to determine a loss value corresponding to each stripe according to the path loss and scanning loss corresponding to each stripe;
[0299] The processing unit 801 is further configured to determine the target beam transmit power corresponding to each stripe according to the total transmit power of the target beam and the loss value corresponding to each stripe, and generate a corresponding relationship between at least one stripe corresponding to the target beam and the transmit power.
[0300] As a possible implementation manner, the acquisition unit 802 is specifically configured to divide the satellite coverage area into at least one concentric ring corresponding to the target beam according to the size of the concentric ring corresponding to the target beam when the target beam is a service beam;
[0301] The processing unit 801 is specifically configured to obtain a preset power allocation ratio parameter, and determine the preset power allocation ratio parameter as a power allocation ratio parameter of an outermost concentric ring in at least one concentric ring;
[0302] The processing unit 801 is further configured to determine, according to the power allocation ratio parameter of the outermost concentric ring, the power allocation ratio parameter of the concentric rings other than the outermost concentric ring in at least one concentric ring according to a preset rule; the preset rule includes that, in at least one concentric ring, the smaller the outer ring radius of the concentric ring, the larger the power allocation ratio parameter;
[0303] The processing unit 801 is also used to determine the transmission power corresponding to each concentric ring according to the total transmission power of the target beam and the power ratio allocation parameter of each concentric ring in at least one concentric ring, and generate a corresponding relationship between at least one concentric ring corresponding to the target beam and the transmission power.
[0304] As a possible implementation manner, the processing unit 801 is further configured to determine a beam to be used; the beam to be used includes a signaling beam or a service beam;
[0305] The acquisition unit 802 is specifically used to acquire the corresponding relationship between the preset scanning area and the transmission power corresponding to the beam to be used;
[0306] The processing unit 801 is specifically configured to determine, according to the target scanning area, a target transmission power corresponding to the target scanning area in a correspondence relationship between a preset scanning area corresponding to the beam to be used and the transmission power;
[0307] The processing unit 801 is specifically configured to scan and transmit signals to a target scanning area through a beam to be used according to a target transmission power.
[0308] As a possible implementation manner, the processing unit 801 is specifically configured to, when the beam to be used is a signaling beam, obtain at least one scanning area corresponding to the service beam; determine a target scanning area in the at least one scanning area corresponding to the signaling beam according to a preset scanning order of the at least one scanning area corresponding to the signaling beam;
[0309] Alternatively, the processing unit 801 is also used to determine the location information of the target user terminal when the beam to be used is a service beam; obtain at least one scanning area corresponding to the service beam; and determine the scanning area corresponding to the target user terminal in the scanning area corresponding to the service beam according to the location information of the target user terminal, and determine it as the target scanning area.
[0310] Corresponding to the above embodiments, the present application also provides an electronic device. Fig. 9 A schematic diagram of the structure of an electronic device provided in an embodiment of the present invention, the electronic device 900 may include: a processor 901, a memory 902 and a communication unit 903. These components communicate through one or more buses, and those skilled in the art can understand that the structure of the server shown in the figure does not constitute a limitation on the embodiment of the present invention, it can be a bus structure or a star structure, and can also include more or fewer components than shown in the figure, or combine certain components, or arrange the components differently.
[0311] The communication unit 903 is used to establish a communication channel so that the electronic device can communicate with other devices, receive user data sent by other devices or send user data to other devices.
[0312] The processor 901 is the control center of the electronic device. It uses various interfaces and lines to connect various parts of the entire electronic device. It runs or executes software programs and / or modules stored in the memory 902, and calls data stored in the memory to perform various functions of the electronic device and / or process data. The processor can be composed of an integrated circuit (IC), for example, it can be composed of a single packaged IC, or it can be composed of multiple packaged ICs with the same or different functions. For example, the processor 901 can include only a central processing unit (CPU). In an embodiment of the present invention, the CPU can be a single computing core or multiple computing cores.
[0313] The memory 902 is used to store the execution instructions of the processor 901. The memory 902 can be implemented by any type of volatile or non-volatile storage device or a combination thereof, such as static random access memory (SRAM), electrically erasable programmable read-only memory (EEPROM), erasable programmable read-only memory (EPROM), programmable read-only memory (PROM), read-only memory (ROM), magnetic memory, flash memory, magnetic disk or optical disk.
[0314] When the execution instructions in the memory 902 are executed by the processor 901, the electronic device 900 can execute Figure 3 or Figure 7 Some or all of the steps in the illustrated embodiments.
[0315] In a specific implementation, the present invention further provides a computer storage medium, wherein the computer storage medium may store a program, and when the program is executed, the program may include some or all of the steps in each embodiment of the power control method provided by the present invention. The storage medium may be a magnetic disk, an optical disk, a read-only memory (ROM) or a random access memory (RAM), etc.
[0316] Those skilled in the art can clearly understand that the technology in the embodiments of the present invention can be implemented by means of software plus a necessary general hardware platform. Based on this understanding, the technical solution in the embodiments of the present invention is essentially or the part that contributes to the prior art can be embodied in the form of a software product, which can be stored in a storage medium such as ROM / RAM, a disk, an optical disk, etc., and includes a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods described in each embodiment of the present invention or some parts of the embodiments.
[0317] In this specification, the same or similar parts between the various embodiments can be referred to each other. In particular, for the device embodiment and the terminal embodiment, since they are basically similar to the method embodiment, the description is relatively simple, and the relevant parts can be referred to the description in the method embodiment.
Claims
1. A power control method, characterized in that: include: Determine the target scanning area; Obtaining the corresponding relationship between the preset scanning area and the transmission power; According to the target scanning area, in the correspondence relationship between the preset scanning area and the transmission power, determine the target transmission power corresponding to the target scanning area; Scanning and transmitting signals to the target scanning area according to the target transmission power; Before determining the target scanning area, the method further includes: Acquire a total transmit power of a target beam; the target beam includes a signaling beam or a service beam; Acquire a satellite coverage area, and divide the satellite coverage area into at least one scanning area corresponding to the target beam according to a preset scanning area size; According to the total transmission power of the target beam, the transmission power corresponding to each scanning area in at least one scanning area corresponding to the target beam is determined, and a corresponding relationship between the at least one scanning area corresponding to the target beam and the transmission power is generated.
2. The method according to claim 1, characterized in that The preset scanning area size includes: a preset scanning area size corresponding to a signaling beam or a preset scanning area size corresponding to a service beam.
3. The method according to claim 1, characterized in that: The step of dividing the satellite coverage area into at least one scanning area corresponding to the target beam according to the preset scanning area size corresponding to the target beam comprises: According to a preset wave position size corresponding to the target beam, the satellite coverage area is divided into at least one wave position corresponding to the target beam; The determining, according to the total transmit power of the target beam, the transmit power corresponding to each scanning area in at least one scanning area corresponding to the target beam, and generating a corresponding relationship between the at least one scanning area corresponding to the target beam and the transmit power comprises: Determine the distance between each of the at least one wave position corresponding to the target beam and the satellite, and the scanning angle of the satellite corresponding to each of the at least one wave position corresponding to the target beam; Determine the path loss and scanning loss corresponding to each wave position according to the distance between each wave position and the satellite and the scanning angle of the satellite corresponding to each wave position; Obtaining a terminal gain parameter corresponding to each of the wave positions; Determine the loss value corresponding to each beam position according to the terminal gain parameter corresponding to each beam position, the path loss corresponding to each beam position, and the scanning loss; According to the total transmission power of the target beam and the loss value corresponding to each beam position, the transmission power corresponding to each beam position is determined, and a corresponding relationship between at least one beam position corresponding to the target beam and the transmission power is generated.
4. The method according to claim 1, characterized in that: The step of dividing the satellite coverage area into at least one scanning area corresponding to the target beam according to the preset scanning area size corresponding to the target beam comprises: Dividing the satellite coverage area into at least one concentric ring corresponding to the target beam according to a preset concentric ring size corresponding to the target beam; The determining, according to the total transmit power of the target beam, the transmit power corresponding to each scanning area in at least one scanning area corresponding to the target beam, and generating a corresponding relationship between the at least one scanning area corresponding to the target beam and the transmit power comprises: Determine a distance between each of at least one concentric ring corresponding to the target beam and a satellite, and a satellite scanning angle corresponding to each of at least one concentric ring corresponding to the target beam; Determine the path loss and scanning loss corresponding to each concentric ring according to the distance between each concentric ring and the satellite and the satellite scanning angle corresponding to each concentric ring; Determine the loss value corresponding to each concentric ring according to the path loss and scanning loss corresponding to each concentric ring; According to the total transmission power of the target beam and the loss value corresponding to each concentric ring, the transmission power corresponding to each concentric ring is determined, and a corresponding relationship between at least one concentric ring corresponding to the target beam and the transmission power is generated.
5. The method according to claim 1, characterized in that The step of dividing the satellite coverage area into at least one scanning area corresponding to the target beam according to the preset scanning area size corresponding to the target beam comprises: When the target beam includes a service beam, obtaining an area where at least one user terminal within the satellite coverage area is located; The determining, according to the total transmit power of the target beam, the transmit power corresponding to each scanning area in at least one scanning area corresponding to the target beam, and generating a corresponding relationship between the at least one scanning area corresponding to the target beam and the transmit power comprises: Acquire a user communication parameter corresponding to each user terminal in the at least one user terminal; Determine, according to the area information of each user terminal in the at least one user terminal, the distance between each user terminal and the satellite, and the satellite scanning angle corresponding to each user terminal; Determine the path loss and scanning loss of each user terminal according to the distance between each user terminal and the satellite and the satellite scanning angle corresponding to each user terminal; Determine the loss value corresponding to each user terminal according to the user communication parameter, path loss and scanning loss corresponding to each user terminal; According to the total transmission power of the target beam and the loss value corresponding to each user terminal, the service beam transmission power corresponding to the area where each user terminal is located is determined, and a corresponding relationship between the area where at least one user terminal corresponding to the service beam is located and the transmission power is generated.
6. The method according to claim 5, characterized in that The user communication parameters of each user terminal include a terminal gain parameter or a terminal-specific loss parameter corresponding to each user terminal.
7. The method according to claim 1, characterized in that The step of dividing the satellite coverage area into at least one scanning area corresponding to the target beam according to the preset scanning area size corresponding to the target beam comprises: When the target beam includes a service beam, dividing the satellite coverage area into at least one parallel strip corresponding to the target beam according to a preset parallel strip size corresponding to the target beam; The determining, according to the total transmit power of the target beam, the transmit power corresponding to each scanning area in at least one scanning area corresponding to the target beam, and generating a corresponding relationship between the at least one scanning area corresponding to the target beam and the transmit power comprises: Determine the distance between each strip in the at least one parallel strip and the satellite, and the satellite scanning angle corresponding to each strip; Determine the path loss and scanning loss corresponding to each strip according to the distance between each strip in the at least one parallel strip and the satellite, and the satellite scanning angle corresponding to each strip; Determine the loss value corresponding to each strip according to the path loss and scanning loss corresponding to each strip; According to the total transmit power of the target beam and the loss value corresponding to each strip, the transmit power of the target beam corresponding to each strip is determined, and a corresponding relationship between at least one strip corresponding to the target beam and the transmit power is generated.
8. The method according to claim 1, characterized in that The step of dividing the satellite coverage area into at least one scanning area corresponding to the target beam according to the preset scanning area size corresponding to the target beam comprises: When the target beam is a service beam, dividing the satellite coverage area into at least one concentric ring corresponding to the target beam according to the size of the concentric ring corresponding to the target beam; The determining, according to the total transmit power of the target beam, the transmit power corresponding to each scanning area in at least one scanning area corresponding to the target beam, and generating a corresponding relationship between the at least one scanning area corresponding to the target beam and the transmit power comprises: Acquire a preset power allocation ratio parameter, and determine the preset power allocation ratio parameter as the power allocation ratio parameter of the outermost concentric ring of the at least one concentric ring; According to the power allocation ratio parameter of the outermost concentric ring, the power allocation ratio parameter of the concentric rings other than the outermost concentric ring in the at least one concentric ring is determined according to a preset rule; the preset rule includes that among the at least one concentric ring, the smaller the outer ring radius of the concentric ring, the larger the power allocation ratio parameter; According to the total transmission power of the target beam and the power ratio allocation parameter of each concentric ring in the at least one concentric ring, the transmission power corresponding to each concentric ring is determined, and a corresponding relationship between at least one concentric ring corresponding to the target beam and the transmission power is generated.
9. The method according to claim 1, characterized in that: Before obtaining the correspondence between the preset scanning area and the transmission power, the method further includes: Determine a beam to be used; the beam to be used includes a signaling beam or a service beam; The obtaining of the correspondence between the preset scanning area and the transmission power includes: Obtaining a correspondence between a preset scanning area and a transmission power corresponding to the beam to be used; The determining, according to the target scanning area, in the correspondence relationship between the preset scanning area and the transmit power, the target transmit power corresponding to the target scanning area comprises: According to the target scanning area, in the correspondence between the preset scanning area corresponding to the beam to be used and the transmit power, determine the target transmit power corresponding to the target scanning area; The scanning and transmitting signals to the target scanning area according to the target transmission power comprises: According to the target transmission power, a signal is scanned and transmitted toward the target scanning area by using the beam to be used.
10. The method according to claim 9, characterized in that Determining the target scanning area includes: When the beam to be used is a signaling beam, acquiring at least one scanning area corresponding to the signaling beam; Determining a target scanning area in the at least one scanning area corresponding to the signaling beam according to a preset scanning order of the at least one scanning area corresponding to the signaling beam; Alternatively, when the beam to be used is a service beam, determining the location information of the target user terminal; Acquire at least one scanning area corresponding to the service beam; According to the location information of the target user terminal, in the scanning area corresponding to the service beam, a scanning area corresponding to the target user terminal is determined and determined as the target scanning area.
11. A power control device, characterized in that: include: A processing unit, used for determining a target scanning area; An acquisition unit, used to acquire a correspondence between a preset scanning area and a transmission power; The processing unit is further configured to determine, according to the target scanning area, a target transmission power corresponding to the target scanning area in the preset correspondence relationship between the scanning area and the transmission power; The processing unit is further used to scan and transmit signals to the target scanning area according to the target transmission power; The acquisition unit is further used to acquire the total transmission power of the target beam; the target beam includes a signaling beam or a service beam; The acquisition unit is further used to acquire a satellite coverage area, and divide the satellite coverage area into at least one scanning area corresponding to the target beam according to a preset scanning area size; The processing unit is further used to determine the transmission power corresponding to each scanning area in at least one scanning area corresponding to the target beam according to the total transmission power of the target beam, and generate a corresponding relationship between at least one scanning area corresponding to the target beam and the transmission power.
12. An electronic device, characterized in that: include: A processor and a memory, wherein the memory stores a computer program, and when the computer program is executed, the electronic device executes the method according to any one of claims 1 to 10.
13. A storage medium, characterized in that: The storage medium includes a stored program, wherein when the program is executed, the device where the storage medium is located is controlled to execute the method according to any one of claims 1 to 10.
Citation Information
Patent Citations
Method and device for controlling signal radiation, storage medium and electronic equipment
CN111010698A
Signal transmitting and receiving device, electronic device and equipment
CN111934790A
Communication method and device
CN113747365A
Method and apparatus for information transmission, device, and storage medium
CN114026903A
Method and device for controlling device using bluetooth in wireless communication system
US20170099597A1