A jack synchronous rapid reversing device in box girder erection and construction method thereof

By designing the jack synchronous rapid reversal device in box girder erection, including lifting, transfer and reversal components, the problems of cumbersome and lifting interference in the prior art hydraulic jacks are solved, and the construction efficiency is improved and construction steps are simplified.

CN115627704BActive Publication Date: 2024-11-01CHINA RAILWAY THREE BUREAU GRP LINE BRIDGE ENG CO L +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211362949.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-11-02
Publication Date
2024-11-01
Estimated Expiration
2042-11-02

AI Technical Summary

Technical Problem

The reverse transportation process of hydraulic jacks in the existing box girder installation is complicated, requiring manual transportation and interfering with the lifting operation of the bridge rig, resulting in low construction efficiency and difficult to meet the needs of projects with tight construction periods.

Method used

A jack synchronous rapid reversing device is designed, including lifting components, transfer components and reversing components. The jack is hoisted to the inside of the box girder through the lifting components. The transfer component is transported inside the box girder, and the reversing components are used to pass through the bridge rig. Quickly transport the jack to the designated position to achieve synchronous lifting and via operation.

Benefits of technology

The construction steps are simplified, the construction efficiency is improved, and the jack reverse transportation and the bridge rigging machine's via operation are synchronized, which reduces the construction time and the average jack reverse transportation time per hole of box girder is shortened to 15-20 minutes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115627704B_ABST
    Figure CN115627704B_ABST
Patent Text Reader

Abstract

The present invention discloses a jack synchronous rapid reversing device in box girder erection and a construction method thereof, comprising the following steps: S101, hoisting jacks in the beam body; S102, jack transportation, including synchronous construction operations of the internal transport jacks and the bridge erection machine through the hole; S103, the reversing device extends, so that the reversing assembly is in an extended cantilever beam state; S104, hoisting jacks in place; S105, reversing device recovery: pull back the driving component until the reversing device is restored to the beam erection state. The beneficial effects of the present invention are: meeting the demand for synchronous hydraulic jack hoisting when the bridge erection machine performs the through-hole operation, without interfering with each other in the process, optimizing the beam erection construction steps, improving the beam erection construction efficiency, simplifying the construction process, and solving an average of 15-20mi of jack reversing of box girder holes per hole.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of bridge construction technology, in particular to a jack synchronous rapid reversing device in box girder erection and a construction method thereof. Background Art

[0002] With the rapid development of high-speed railways, large-tonnage box girder prefabrication and erection construction has been widely adopted at home and abroad due to its fast construction speed and high construction quality. Generally, large-tonnage box girders (such as 900-ton box girders) are prefabricated in the beam yard, transported by beam transporters, and erected by 900-ton bridge erection machines. During the beam erection process, 4 hydraulic jacks are used as temporary supports to fine-tune the box girder. Figure 7 As shown, in the existing construction method, the hydraulic jack is generally transported manually when it is transported from the previous pier to the next pier, and the bridge crane crane is used to assist in lifting. It needs to move forward, backward and lift repeatedly, and other operations cannot be performed during the lifting process. It barely meets the requirements for beam erection, but the operation is too cumbersome. For projects with tight schedules, the construction is difficult. Summary of the invention

[0003] The purpose of the present invention is to overcome the shortcomings of the prior art and to provide a jack synchronous rapid reversing device and a construction method for box girder erection, which can meet the demand for synchronous hydraulic jack lifting when the bridge erection machine performs through-hole operation, without interfering with each other in the processes, thereby improving construction efficiency and simplifying the construction process.

[0004] The object of the present invention is achieved through the following technical scheme: a jack synchronous rapid reversing device in box girder erection, which comprises:

[0005] A hoisting assembly is used to hoist the jacks on the piers to the inside of the box beam through the working wells between adjacent box beams when removing the top;

[0006] A transfer assembly, used for transferring the jack hoisted inside the beam body to one end of the box beam to be erected;

[0007] The inverting assembly is used to invert the transported jack to a designated position on the bridge pier.

[0008] The lifting assembly is composed of a mounting component and a first lifting component. The mounting component includes a mounting plate and a lifting plate connected to the mounting plate as a whole. The lifting plate divides the mounting plate into a left wing plate and a right wing plate. A beam gap is also provided between adjacent box girders. During lifting, the left wing plate and the right wing plate are respectively installed on the box girders on both sides of the beam gap. The lifting plate is inserted into the beam gap between adjacent box girders. The fixed end of the first lifting component is installed on the lifting plate. A U-shaped clamp for grabbing a jack is provided on the movable end of the first lifting component. The lifting component realizes the lifting of the jack through the U-shaped clamp.

[0009] The first lifting component is a manual or electric guide chain, and the second lifting component is a manual or electric guide chain. The choice of manual or electric guide chain can be determined according to the site conditions. Since this application uses beam gaps for operation, it is necessary to choose a guide chain for operation.

[0010] The length of the hanging plate is greater than the thickness of the box beam top plate, and the width of the hanging plate is 1-2 mm smaller than the width of the beam seam.

[0011] The transfer assembly is arranged inside the beam body of the box beam.

[0012] The inverted transport component is composed of a moving component and a second lifting component, and the moving component includes a first sleeve, a second sleeve, a beam and a driving component, wherein the first sleeve and the second sleeve are arranged in parallel on the arm at the lower part of the second column of the bridge erection machine, and the first sleeve and the second sleeve are both provided with a slideway for installing the beam, and the beam is slidably installed in the slideway, and the beam passes through the first sleeve and the second sleeve to form a cantilever beam structure with the first sleeve and the second sleeve as double support points, and the driving component is installed at one end of the beam close to the box beam, and the fixed end of the second lifting component is installed on the end of the beam away from the box beam, and the movable end of the second lifting component is provided with a U-shaped clamp for grabbing the jack. The beam is arranged horizontally. When the jack is not synchronously transported, the beam is in a bridge-building state (non-cantilever beam state), that is, the beam is not hoisted by the jack at this time. The specific installation position can be determined according to the size of the bridge-building machine, without affecting the movement of the bridge-building machine. As a preferred embodiment, when the beam is in the bridge-building state, the cantilever end extends 100-300mm from the corresponding sleeve. It should be noted that in order to prevent the beam from moving out of bounds, travel baffles can be set at both ends of the beam to prevent misoperation. At the same time, a moving pair is set between the beam and the sleeve (the first sleeve and the second sleeve) to make the movement of the beam more stable. When the beam moves to the specified position, the beam can be locked, and the locking method is bolt fixing.

[0013] The driving component is a push-pull handle installed on one end of the cantilever beam.

[0014] A construction method for synchronous rapid reversal of jacks in box girder erection comprises the following steps:

[0015] S101. Install the jack inside the beam body: after the mortar of the upper box beam support meets the requirements for top removal (≥20MPa), install the lifting assembly between adjacent box beams, insert the lifting plate into the beam seam, and install the first lifting component on the lifting plate. Use the first lifting component to lift the jack on the pier to the inside of the box beam body.

[0016] S102, jack transfer, including synchronous construction operations of internal transport jacks and bridge erection machine through-hole, wherein the internal transport jacks of the beam body are transferred to one end of the box beam to be erected using a transfer assembly after the jacks arrive inside the beam body, and the bridge erection machine is simultaneously passed through the hole until the hole is in place;

[0017] S103, the reverse transport device extends: after the bridge erection machine passes through the hole and moves into position, the driving component of the reverse transport assembly is pushed 800mm-1000mm, so that the reverse transport assembly is in an extended cantilever beam state;

[0018] S104, hoisting the jack into place: installing the second lifting component on the beam, lifting the second lifting component to the inside of the beam, installing the jack inside the beam on the second lifting component, and continuing to lift the second lifting component through the working well to the outside of the beam until the jack falls to a fixed position;

[0019] S105, recovery of the inverting device: dismantle the second lifting component, and pull back the driving component until the inverting device is restored to the beam-laying state.

[0020] The bridge-erecting machine passing through a hole means that after the bridge-erecting machine has completed erecting the hole, the lifting trolley retreats to the tail of the boom, lifts and retracts column No. 1, lifts the running wheel group of column No. 3 and swings it inwards to the running position, without the running wheel group hanging in the air, starts the motor of the trolley for column No. 3 to move the bridge-erecting machine forward to the next hole position, supports column No. 2, moves column No. 1 longitudinally to the next pier, pads the support, moves the bridge-erecting machine forward to the designed position, and the lifting trolley walks between columns No. 1 and No. 2, lifts and swings column No. 3 outwards. The bridge-erecting machine passes through the hole and moves into place, ready to erect beams.

[0021] The existing construction process is: the traveling crane moves forward - the bridge erecting machine supports the third column - the beam transport vehicle drives in - the small hoisting device added to the traveling crane is used to reverse the jack - the traveling crane is retracted - the bridge erecting machine and the beam transport vehicle simultaneously carry out the beam. The optimized process of this application is: the traveling crane moves forward - the bridge erecting machine supports the third column - the beam transport vehicle drives in - the jack fast reverse device is used to reverse / the bridge erecting machine and the beam transport vehicle simultaneously carry out the beam (concurrently) - the bridge erecting machine erects the beam.

[0022] The beneficial effects of the present invention are as follows: compared with the existing construction technology, the construction method of the present application can simplify the construction steps, so that the jack's reverse operation and the bridge-erecting machine's passing through the hole (beam out) can be carried out simultaneously, meeting the demand for synchronous hydraulic jack lifting when the bridge-erecting machine is performing the beam out operation, without interfering with each other in the process, optimizing the beam erection construction steps, improving the efficiency of beam erection construction, simplifying the construction process, and solving the jack reverse operation of each box beam hole for an average of 15-20 minutes. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 It is a schematic diagram of the process of construction of the present invention;

[0024] Figure 2 It is a structural schematic diagram of the box girder working pit of the present invention;

[0025] Figure 3 It is a schematic diagram of the installation of the hoisting assembly of the present invention;

[0026] Figure 4 For the present invention Figure 3 A partial enlarged schematic diagram of the middle area A;

[0027] Figure 5 It is a front view of the translation vehicle of the present invention;

[0028] Figure 6 It is a side view of the translation vehicle of the present invention;

[0029] Figure 7 It is a schematic diagram of the hoisting method of the jack in the prior art;

[0030] Figure 8 It is a schematic diagram of the position of the through hole of the bridge erecting machine in the present invention;

[0031] Fig. 9 It is a schematic diagram of the position of the bridge erection machine through the hole in the present invention;

[0032] Fig.10 It is a schematic diagram of the hoisting jack after the bridge erection machine in the present invention has passed through the hole;

[0033] Fig.11 It is a schematic diagram of the bridge erection machine in the present invention after the lifting jack is installed.

[0034] In the figure, 1-hoisting assembly, 2-transfer assembly, 3-reverse transportation assembly, 4-bridge pier, 5-jack, 6-box beam, 7-working well, 8-beam joint, 101-installation component, 102-first lifting component, 103-installation plate, 104-hoisting plate, 105-left wing plate, 106-right wing plate, 301-moving assembly, 302-second lifting component, 303-first sleeve, 304-second sleeve, 305-crossbeam, 306-driving component, 307-arm. DETAILED DESCRIPTION

[0035] The technical solution of the present invention is further described in detail below in conjunction with the accompanying drawings, but the protection scope of the present invention is not limited to the following.

[0036] A jack synchronous rapid reversing device for erecting a box girder, comprising:

[0037] The hoisting assembly 1 is used to hoist the jack 5 on the pier 4 to the inside of the box beam 6 through the working well 7 between the adjacent box beams 6 when removing the top;

[0038] A transfer assembly 2, used for transferring the jack 5 hoisted inside the beam body to one end of the box beam to be erected;

[0039] The inverting assembly 3 is used to invert the transported jack 5 to a designated position on the pier 4 .

[0040] Among them, according to the position of the jack 5, as a preference, the jacks can be hoisted simultaneously on both sides of the bridge-building machine, that is, the hoisting assembly 1 and the inverting assembly 3 can be symmetrically arranged on both sides of the bridge-building machine, so that hoisting operations on both sides can be realized simultaneously.

[0041] like Figure 2-Figure 4 As shown, the hoisting assembly 1 is composed of a mounting component 101 and a first lifting component 102, the mounting component 101 includes a mounting plate 103 and a hoisting plate 104 connected to the mounting plate 103 as a whole, the hoisting plate 104 divides the mounting plate 103 into a left wing plate 105 and a right wing plate 106, and a beam gap 8 is also provided between adjacent box beams 6. During hoisting, the left wing plate 105 and the right wing plate 106 are respectively installed on the box beam 6 on both sides of the beam gap 8, and the hoisting plate 104 is inserted into the beam gap 8 between adjacent box beams 6, the fixed end of the first lifting component 102 is installed on the hoisting plate 104, and the movable end of the first lifting component 102 is provided with a U-shaped clamp for grabbing the jack 5, and the lifting component 102 realizes the hoisting of the jack 5 through the U-shaped clamp.

[0042] The first lifting component 102 is a manual or electric guide chain.

[0043] The length of the hanging plate 104 is greater than the thickness of the top plate of the box beam 6 , and the width of the hanging plate 104 is smaller than the width of the beam gap 8 by 1-2 mm.

[0044] like Figure 5As shown, the transfer assembly 2 is arranged inside the beam body of the box beam 6, wherein the transfer assembly 2 is a portable transfer vehicle, and its overall structure is a round steel pipe with a diameter of 200 mm and a thickness of 20 mm, the tire is a rubber-type solid tire with an inner diameter of 320 mm, and the support frame is made of a round steel pipe with a diameter of 100 mm and a thickness of 10 mm. Preferably, a U-shaped fixture for grabbing the jack 5 is provided on the portable transfer vehicle. Alternatively, a bearing platform for carrying the jack 5 is provided on the portable transfer vehicle.

[0045] like Figure 6 As shown, the inverted transport component 3 is composed of a moving component 301 and a second lifting component 302, wherein the moving component 301 includes a first sleeve 303, a second sleeve 304, a crossbeam 305 and a driving component 306, wherein the first sleeve 303 and the second sleeve 304 are arranged in parallel on the arm 307 at the lower part of the second column of the bridge erecting machine (as a preference, the first sleeve 303 and the second sleeve 304 are symmetrically distributed on the arms on both sides of the center line of the bridge erecting machine), and the first sleeve 303 and the second sleeve 304 are both provided with a The slideway for installing the cross beam 305, the cross beam 305 is slidably installed in the slideway, the cross beam 305 passes through the first sleeve 303 and the second sleeve 304 to form a cantilever beam structure with the first sleeve 303 and the second sleeve 304 as double support points, the driving component 306 is installed on one end of the cross beam 305 close to the box beam 6, the fixed end of the second lifting component 302 is installed on the end of the cross beam 305 away from the box beam 6, and the movable end of the second lifting component 302 is provided with a U-shaped clamp for grabbing the jack 5.

[0046] Preferably, the first sleeve 303 and the second sleeve 304 are two groups of 200*200*300mm rectangular square steels, which are integrally welded to the arm of the second column of the bridge-building machine, with the two groups spaced 1400mm apart, serving as load-bearing devices for the crossbeam 305.

[0047] The second lifting component 302 is a manual or electric guide chain.

[0048] The driving component 306 is a push-pull handle installed on one end of the cantilever beam.

[0049] like Figure 1 As shown, a method for synchronous rapid reversal of jacks in box girder erection comprises the following steps:

[0050] S101, hoisting jacks in the beam body: after the mortar of the upper box beam support meets the requirements for top removal, install the hoisting assembly 1 between the adjacent box beams 6, insert the hoisting plate 104 into the beam seam 8, and install the first lifting component 102 on the hoisting plate 104, and hoist the jacks 5 on the pier 4 to the inside of the box beam body through the first lifting component 102;

[0051] S102, jack transfer, including synchronous construction operations of the internal transport jack and the bridge erection machine through the hole, wherein the internal transport jack of the beam is to be transferred to the end of the box beam to be erected using the transfer assembly 2 after the jack 5 reaches the inside of the beam body, and at the same time Figure 8-9 As shown, the bridge erection machine passes through the hole until it is in place after passing through the hole. The bridge erection machine passing through the hole means that the bridge erection machine has completed the hole erection, the lifting trolley retreats to the tail of the machine arm, lifts and retracts the No. 1 column, lifts the No. 3 column and swings the running wheel group inward to the running position, the running wheel group is not suspended in the air, the No. 3 column trolley motor is started, the bridge erection machine moves forward, walks to the next hole position, supports the No. 2 column, and the No. 1 column is longitudinally moved to the next pier, the support is padded, the bridge erection machine moves forward to the designed position, the lifting trolley walks between the No. 1 and No. 2 columns, lifts and swings the No. 3 column outward, the bridge erection machine passes through the hole and moves in place, and prepares to erect beams;

[0052] S103, the reverse transport device extends: after the bridge erection machine passes through the hole and moves into position, the driving component 306800mm-1000mm of the reverse transport component 3 is pushed to make the reverse transport component 3 in an extended cantilever beam state;

[0053] S104, Lifting jack in place: Fig.10 As shown, the second lifting component 302 is installed on the beam 305, the second lifting component 302 is lifted to the inside of the beam body, the jack 5 inside the beam body is installed on the second lifting component 302, and the second lifting component 302 is continued to be lifted through the working well 7 to the outside of the beam body until the jack 5 falls to a fixed position;

[0054] Among them, the crossbeam 305 is made of rectangular square steel of 180*180*3050mm, which serves as the main body of the whole device, plays a telescopic role and serves as the main force-bearing structure. A hook and a driving component 306 (push-pull handle) are arranged on it. The push-pull handle is a Φ16 threaded steel bar with a length of 450mm, and its central axis coincides with the crossbeam 305; the hook is a Φ20 threaded steel bar, which is welded on one side of the protruding end, with an overall length of 600mm and an overall shape of an open rectangular structure, forming the main structure of the lifting jack with the U-shaped clamp and the fall chain.

[0055] S105, recovery of the inverting device: dismantle the second lifting component 302, and pull back the driving component 306 until the inverting device 3 is restored to the beam-laying state.

[0056] like Fig.11 As shown, after the inverting device is restored, the normal beam erection operation is performed. After the beam erection is completed, steps S101-S105 are repeated.

[0057] As described above, a method according to the present invention is described by way of example with reference to the accompanying drawings. However, it should be understood by those skilled in the art that various improvements may be made to the method proposed by the present invention without departing from the content of the present invention, or some of the technical features thereof may be replaced by equivalents, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention. Therefore, the protection scope of the present invention shall be determined by the contents of the attached claims.

Claims

1. A jack synchronous rapid reversing device for box girder erection, characterized in that it include: A lifting assembly (1) is used to lift the jack (5) on the bridge pier (4) to the inside of the box beam (6) through the working well (7) between adjacent box beams (6) when removing the top; A transfer assembly (2) is used to transfer the jack (5) hoisted into the interior of the beam body to one end of the box beam to be erected; A reverse transport component (3) for reversely transporting the transported jack (5) to a designated position on the bridge pier (4); The reverse transport component (3) is composed of a moving component (301) and a second lifting component (302), wherein the moving component (301) comprises a first sleeve (303), a second sleeve (304), a crossbeam (305) and a driving component (306), wherein the first sleeve (303) and the second sleeve (304) are arranged in parallel on a machine arm (307) at the lower part of the second column of the bridge erecting machine, and the first sleeve (303) and the second sleeve (304) are both provided with a slideway for installing the crossbeam (305), and the crossbeam (305) The crossbeam (305) is slidably installed in the slideway, the crossbeam (305) passes through the first sleeve (303) and the second sleeve (304) to form a cantilever beam structure with the first sleeve (303) and the second sleeve (304) as double support points, the driving component (306) is installed at one end of the crossbeam (305) close to the box beam (6), the fixed end of the second lifting component (302) is installed on one end of the crossbeam (305) away from the box beam (6), and the movable end of the second lifting component (302) is provided with a U-shaped clamp for grabbing the jack (5).

2. The jack synchronous rapid reversing device for box girder erection according to claim 1, characterized in that: The hoisting assembly (1) is composed of a mounting component (101) and a first lifting component (102); the mounting component (101) comprises a mounting plate (103) and a hoisting plate (104) connected to the mounting plate (103) as a whole; the hoisting plate (104) separates the mounting plate (103) into a left wing plate (105) and a right wing plate (106); beam gaps (8) are also provided between adjacent box beams (6); and during hoisting, the left wing plate (105) and the right wing plate (107) are respectively mounted on the box beams (6) on both sides of the beam gap (8); the lifting plate (104) is inserted into the beam gap (8) between adjacent box beams (6); the fixed end of the first lifting component (102) is mounted on the lifting plate (104); a U-shaped fixture for grabbing the jack (5) is provided on the movable end of the first lifting component (102); the lifting component (102) realizes the lifting of the jack (5) through the U-shaped fixture.

3. The jack synchronous rapid reversing device for box girder erection according to claim 2, characterized in that: The first lifting component (102) is a manual or electric guide chain.

4. The jack synchronous rapid reversing device for box girder erection according to claim 2, characterized in that: The length of the hanging plate (104) is greater than the thickness of the top plate of the box beam (6), and the width of the hanging plate (104) is 1-2 mm smaller than the width of the beam gap (8).

5. The jack synchronous rapid reversing device for box girder erection according to claim 1, characterized in that: The transfer assembly (2) is arranged inside the beam body of the box beam (6).

6. The jack synchronous rapid reversing device for box girder erection according to claim 1, characterized in that: The second lifting component (302) is a manual or electric guide chain.

7. The jack synchronous rapid reversing device for box girder erection according to claim 1, characterized in that: The driving component (306) is a push-pull handle installed on one end of the cantilever beam.

8. A method for synchronous rapid reversal of jacks in erecting box beams, characterized in that: The following steps are involved: S101, hoisting jacks in the beam body: after the mortar of the upper box beam support meets the requirements for top removal, installing a hoisting assembly (1) between adjacent box beams (6), inserting a hoisting plate (104) into the beam joint (8), and installing a first lifting component (102) on the hoisting plate (104), and hoisting the jacks (5) on the piers (4) into the interior of the box beam body through the first lifting component (102); S102, jack transfer, including synchronous construction operations of internal transport jacks and bridge erection machine through-holes, wherein the internal transport jacks of the beam body are transferred to one end of the box beam to be erected using a transfer assembly (2) after the jacks (5) arrive inside the beam body, and the bridge erection machine is simultaneously passed through the hole until the hole is in place; S103, the reverse transport device is extended: after the bridge erection machine passes through the hole and is in place, the driving component (306) of the reverse transport component (3) is pushed 800mm-1000mm, so that the reverse transport component (3) is in an extended cantilever beam state; S104, hoisting the jack into place: installing the second lifting component (302) on the beam (305), lifting the second lifting component (302) to the inside of the beam, installing the jack (5) inside the beam on the second lifting component (302), and continuing to lift the second lifting component (302) through the working well (7) to the outside of the beam until the jack (5) falls to a fixed position; S105, recovery of the inverting device: dismantling the second lifting component (302), and pulling back the driving component (306) until the inverting device (3) is restored to the beam-laying state.

9. A method for synchronous rapid reversal of jacks in erecting a box beam according to claim 8, characterized in that: The bridge-erecting machine passing through a hole means that after the bridge-erecting machine has completed erecting the hole, the lifting trolley retreats to the tail of the boom, lifts and retracts column No. 1, lifts the running wheel group of column No. 3 and swings it inwards to the running position, without the running wheel group hanging in the air, starts the motor of the trolley for column No. 3 to move the bridge-erecting machine forward to the next hole position, supports column No. 2, moves column No. 1 longitudinally to the next pier, pads the support, moves the bridge-erecting machine forward to the designed position, and the lifting trolley walks between columns No. 1 and No. 2, lifts and swings column No. 3 outwards. The bridge-erecting machine passes through the hole and moves into place, ready to erect beams.