A speed collaborative control method for mining and transportation equipment based on CNN-LSTM neural network
Through the method based on CNN-LSTM neural network, the problem of low cooperative working efficiency of shearers and scrapers is solved, more efficient speed collaborative control is achieved, adapting to changes in coal mine environment, and reducing energy consumption and failure rate.
Patent Information
- Application Number
- CN202211239379.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-10-11
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2042-10-11
AI Technical Summary
In existing coal mining technology, the cooperative working efficiency of shearers and scrapers is low, resulting in high energy consumption and high failure rates. Moreover, existing algorithms have deviations in speed prediction and lack of load correlation, which affects control accuracy.
A collaborative speed control method for mining and transportation equipment based on CNN-LSTM neural network is adopted. By collecting and normalizing raw data, using CNN to extract features and combining it with LSTM for training, a prediction model for shearers and scrapers is established, and the loss function is optimized. To improve collaborative control accuracy and efficiency.
It improves the collaborative working efficiency and control accuracy between the shearer and the scraper, can better adapt to changes in the working surface environment and equipment, reduces energy consumption, and reduces the failure rate.
Smart Images

Figure CN115657475B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of coal mining, and in particular to a method for coordinated speed control of mining and transportation equipment based on a CNN-LSTM neural network. Background Art
[0002] In order to realize unmanned working face in existing coal mining areas, it is necessary to intelligently connect the electromechanical equipment of the fully mechanized working face. Coal mining machine and scraper are the two core equipment of fully mechanized working face. Overload, shutdown and other failures during their operation will seriously affect the efficiency of coal mining.
[0003] When the coal mining machine and the scraper are running at the same time, the working face characteristics, equipment structural parameters and speed coordination between the two machines will affect the efficiency of coal mining, and the speed coordination between them is an important factor in reducing energy consumption, improving mining efficiency and reducing failure rate;
[0004] Specifically, the essence of the collaborative working process of the coal shearer and the scraper is the mutual coordination of production and transportation on the continuous production line. The coal mining volume of the coal shearer determines the coal carrying capacity of the scraper. The overload problem of the scraper during transportation is largely due to the low efficiency of the collaborative work between the coal shearer and the scraper. Under the condition of a certain coal mining height, the traction speed of the coal shearer determines its coal mining volume. Since the coal shearer reciprocates on the working face and the scraper circulates and unloads at the head end, the running direction and position of the coal shearer and the unloading speed of the scraper, i.e., the chain speed, have an important influence on the coal carrying capacity of the scraper. That is, when the speed of the coal shearer is too large, the coal mining volume increases, which increases the coal carrying capacity of the scraper (which is prone to overload), and when the speed of the coal shearer is too small, the coal mining volume decreases, and the scraper consumes a lot of ineffective power during operation.
[0005] The speeds of some existing coal mining machines and scrapers need to be controlled to match the speeds while keeping the working face bottom plate flat. When predicting the speed, on the one hand, the use of a single algorithm makes the prediction results prone to deviations. On the other hand, the actual working face environment is complex, and there is a lack of load correlation between the coal mining machines and scrapers, resulting in low collaborative control accuracy. Summary of the invention
[0006] The purpose of the present invention is to provide a method for coordinated control of the speed of mining and transportation equipment based on a CNN-LSTM neural network, so as to realize coordinated control of the speeds of a coal mining machine and a scraper, improve the coordinated working efficiency and control accuracy therebetween, and better adapt to the environment and equipment changes of a fully mechanized mining face.
[0007] To achieve the above purpose, this paper provides a method for coordinated speed control of mining and transportation equipment based on CNN-LSTM neural network, which specifically includes the following steps:
[0008] Step 1: Collecting the original operation data of underground coal mining machines and scrapers;
[0009] Step 2: normalize the original data of the coal mining machine and the scraper in step 1 and divide them into a training set, a validation set and a test set respectively;
[0010] Step 3: Input the corresponding divided training set into the CNN-LSTM neural network model. The input data is first extracted by the upper CNN neural network and then transferred to the lower LSTM neural network for training. After passing through the fully connected layer and the output layer, the results of the coal mining machine prediction model and the scraper prediction model are output;
[0011] Step 4: When the maximum number of training rounds is not reached, the total loss function loss1 of the coal mining machine prediction model, the total loss function loss2 of the scraper prediction model, and the total loss function Loss of the synergistic relationship between the coal mining machine prediction speed and the scraper prediction speed are established at the same time;
[0012] Calculate the corresponding loss values of the coal mining machine and the scraper and update the parameters, and optimize the updated parameters through the optimization algorithm to make them converge quickly; then re-input the converged parameters into the LSTM layer in step 3 for training again, and re-output the results of the coal mining machine prediction model and the scraper prediction model;
[0013] And loop until the maximum number of training rounds is reached;
[0014] Step 5: When the maximum number of training rounds is reached, stop the training and output the corresponding coal mining machine prediction model and scraper prediction model under the condition of the minimum total loss value Loss on the validation set;
[0015] Step 6: Input the test set in step 2 into the prediction model trained in step 5, output the predicted speed of the coal mining machine and the predicted speed of the scraper, and calculate the evaluation index of the CNN-LSTM prediction model.
[0016] Furthermore, the total loss function Loss of the collaborative relationship is calculated as follows:
[0017] Loss = A·loss1+B·loss2+C·G
[0018] Among them, loss1 is the total loss function of the coal mining machine prediction model, loss2 is the total loss function of the scraper prediction model, and G is the load stability function;
[0019] A, B, and C are proportional coefficients of the corresponding functions, (A+B+C)=1 and are all greater than 0.
[0020] Furthermore, the total loss function loss1 of the coal mining machine prediction model is calculated as follows:
[0021] loss1=a·L δ (v c ,v ci )+b·f1+c·h
[0022] Wherein, a, b, c are proportional coefficients of the corresponding functions, (a+b+c)=1 and are all greater than 0;
[0023] L δ (v c ,v ci ) is the prediction model loss function of the coal mining machine, and the calculation formula is:
[0024]
[0025] Among them, v c is the actual speed of the coal mining machine at the same time, v ci is the ith value of the predicted speed of the coal mining machine in each round, and δ is a hyperparameter;
[0026] f1 is the speed stability function of the coal mining machine, and the calculation formula is:
[0027]
[0028] in, is the average value of the predicted speed of the shearer in each round, and m is the total number of rounds in the shearer;
[0029] h is the inverse function of the total coal drop of the coal mining machine L1 in the predicted time period t, and its calculation formula is:
[0030] h=1 / Max(L1)
[0031]
[0032] Among them, H is the memory cutting height of the coal mining machine within the time range of t, B is the memory cutting depth of the coal mining machine drum within the time range of t, ρ is the density of coal, k1 is the capacity correction coefficient of the coal mining machine, and v c(i+1) The i+1th value predicted for the shearer speed in each round.
[0033] Furthermore, the total loss function loss2 of the scraper prediction model is calculated as follows:
[0034] loss2=d·L δ (v g ,v gi )+e·f2
[0035] Among them, L δ (v g ,v gi) is the prediction model loss function of the scraper, and f2 is the speed stability function of the scraper;
[0036] d and e are proportional coefficients of the corresponding functions, (d+e)=1 and both are greater than 0;
[0037] The loss function L of the prediction model of the scraper δ (v g ,v gi ), calculation formula:
[0038]
[0039] Among them, v g is the actual speed of the scraper at the same time, v gi is the i-th value of the scraper speed prediction for each round, and δ is a hyperparameter;
[0040] f2 is the speed stability function of the scraper, and its calculation formula is:
[0041]
[0042] in, The average value of the predicted speed for each round of the scraper.
[0043] Furthermore, the calculation formula of the load stabilization function G is as follows:
[0044]
[0045] Among them, ΔL i The new load change for the i-th value in each round, It is the average value of all newly added load changes;
[0046] ΔL i The calculation formula is:
[0047] ΔL i =L1-L2
[0048] L2 is the load of the scraper conveyor in the predicted time period t, and the calculation formula is:
[0049]
[0050] Among them, S0 is the average coal passing area of the scraper, k2 is the transportation capacity correction coefficient of the scraper, and v g(i+1) The i+1th value predicted for each round of scraper speed.
[0051] Furthermore, in step 2, before the original data is divided, it is subjected to noise elimination processing.
[0052] Furthermore, the original data is normalized using Min-Max normalization, and the calculation formula is as follows:
[0053]
[0054] In the formula, min and max are the minimum and maximum values of the same type of collected data.
[0055] The first 70% of the normalized original data is divided into the training set, 10% of the data is divided into the validation set, and the last 20% of the data is divided into the test set.
[0056] Furthermore, the speed of the coal mining machine is predicted to have 10 values in each round, and the speed of the scraper is predicted to have 10 values in each round.
[0057] Compared with the prior art, this method for coordinated control of the speed of mining and transportation equipment based on the CNN-LSTM neural network improves the loss function in the CNN-LSTM neural network model, coordinates the total loss function of the coal mining machine prediction model, the total loss function of the scraper prediction model, and the load stabilization function to obtain the total loss function between their coordinated relationships. Compared with a single LSTM neural network and a CNN neural network, this method not only achieves coordinated control of the speed of mining and transportation equipment and improves the accuracy of coordinated control of the speed of coal mining machines and scrapers, but also greatly improves the coordinated work efficiency of coal mining machines and scrapers, and better adapts to the environment and equipment changes of the comprehensive mining working face. BRIEF DESCRIPTION OF THE DRAWINGS
[0058] Figure 1 It is a flow chart of the overall mining and transportation equipment speed coordinated control method of the present invention;
[0059] Figure 2 It is the CNN-LSTM neural network calculation flow chart of the present invention;
[0060] Figure 3 It is a comparison diagram of an embodiment of the coal mining machine traction prediction speed value and its actual value according to the present invention;
[0061] The dotted line represents the actual value of the shearer traction speed; the solid line represents the predicted value of the shearer traction speed;
[0062] Figure 4 It is a comparison diagram of an embodiment of the predicted speed value of the scraper conveying of the present invention and its actual value;
[0063] Among them: the dotted line represents: the actual value of the scraper conveyor traction speed; the solid line represents: the predicted value of the scraper conveyor traction speed. DETAILED DESCRIPTION
[0064] The present invention will be further described below in conjunction with the accompanying drawings.
[0065] like Figure 1 As shown, the speed collaborative control method of mining and transportation equipment based on CNN-LSTM neural network specifically includes the following steps:
[0066] Step 1: Collecting the original operation data of underground coal mining machines and scrapers;
[0067] Specifically, the original operation data of the coal mining machine and the scraper can be the cutting depth, cutting height, and traction speed of the coal mining machine drum, the average coal passing area and transportation speed of the scraper, etc.
[0068] For example, sensors are installed on coal mining machines and scrapers. The sensors can collect the original operation data such as the position, traction speed, traction current, traction transformer temperature, cutting current, cutting temperature, scraper transportation speed, transportation current, motor temperature, working face inclination, etc. of the coal mining machines and scrapers. For example, the position sensor locates the position of the coal mining machine and scraper, the temperature sensor measures the traction transformer temperature and cutting temperature, and the speed sensor measures the transportation speed and traction speed of the scraper.
[0069] Table 1 The data used in the prediction model of coal mining machine and scraper machine are as follows:
[0070]
[0071] Step 2: normalize the original data of the coal mining machine and the scraper in step 1 and divide them into a training set, a validation set and a test set respectively;
[0072] Time series data grows with time, that is, the raw data of coal mining machines and scrapers are collected and recorded in the calculation table before and after the time to form a data set, and then the data set is divided. The divided data needs to meet the continuity in time. The first 70% of the data in the order of raw data collection can be divided into a training set, 10% of the data is a validation set, and the last 20% of the data is a test set;
[0073] Furthermore, before dividing the data set, it can be subjected to a de-differentiation process;
[0074] Specifically, the dynamic floating range of the variables of the raw data collected by various sensors must be consistent with the actual field data. In the actual collection process, the collected data often have null values and abnormal values due to data transmission, errors, working environment, etc. Therefore, the raw data needs to be processed before it is divided. This processing method mainly deletes missing values, replaces abnormal values with average values, or treats them as missing values for deletion.
[0075] Normalization of raw data is to linearly scale the data to the interval [0, 1];
[0076] Example 1
[0077] The original operation data of the coal mining machine and the scraper are collected. For example, the data in Table 1 contains null values and abnormal values, among which the missing values need to be deleted. The abnormal values can be replaced by the average value or regarded as missing values for deletion. That is, the sequence number 2 and the sequence number 3 need to be processed to remove the abnormality;
[0078] Table 1 The original data collected from the operation of the coal mining machine
[0079] Serial number inclination Traction speed Coal machine location ... Traction temperature Traction current 1 -3.77 6.9 15940 ... 58 75 2 -3.83 6.9 15913 ... 3 -3.32 7 15890 ... 58 73 4 -3.46 7.5 15853 ... 58 75 5 -3.85 6.9 15831 ... 58 77 6 -0.8 23 4047 61 64 ... ... ... ... ... ... n -3.55 7 15814 ... 58 78
[0080] Among them, the traction temperature and traction current in sequence number 2 have missing values, and the traction speed and coal machine position in sequence number 6 have abnormal values, which can be removed;
[0081] In addition, the original data can be normalized by Min-Max standardization, and the calculation formula is as follows:
[0082]
[0083] In the formula, min and max are the minimum and maximum values of the same type of collected data. For example, in each column of data in Table 1, x is the value in each column of data, and x' is the normalized data value of x. This standardization linearly scales the input data to the interval [0,1], which is suitable for situations where the data is relatively concentrated and does not conform to the normal distribution.
[0084] The first 70% of the normalized original data is divided into the training set, 10% of the data is the validation set, and the last 20% of the data is the test set;
[0085] Step 3: Input the corresponding divided training set into the CNN-LSTM neural network model. The input data is first extracted by the upper CNN neural network and then transferred to the lower LSTM neural network for training. After passing through the fully connected layer and the output layer, the results of the coal mining machine prediction model and the scraper prediction model are output;
[0086] Specifically: Figure 2 As shown in the figure, the CNN-LSTM neural network consists of 1 layer of 1D-CNN and 2 layers of LSTM. The convolution kernel size used in the convolution layer is 1×3, the convolution step is 1, and the pooling layer adopts the average pooling method, which can be effectively used to predict and retain historical information, so tanh is used as the activation function.
[0087] Other parameters are set as epoch = 50, learning rate = 0.005, hidden size = 64, weight decay = 1e-4, timestep = 10, and batchsize = 50.
[0088] Based on the working face environment data and the historical data of the coal shearer and scraper, the speed changes of the coal shearer and scraper in a certain period of time in the future are predicted. The data set of the first 200 time points is used to predict the speed of the coal shearer and scraper at the next 10 time points. The interval between each time point is 2 seconds, that is, the sampling frequency is 1 / 2.
[0089] Step 4: When the maximum number of training rounds is not reached, the total loss function loss1 of the coal mining machine prediction model, the total loss function loss2 of the scraper prediction model, and the total loss function Loss of the synergistic relationship between the coal mining machine prediction speed and the scraper prediction speed are established at the same time;
[0090] Calculate the corresponding loss values of coal mining machines and scrapers and update the parameters. Use the Adma optimization algorithm to optimize the updated parameters to make them converge quickly.
[0091] Then, the converged parameters are re-input into the LSTM layer in step 3 for training again, and the results of the coal mining machine prediction model and the scraper prediction model are re-output, and the cycle is repeated until the maximum number of training rounds is reached;
[0092] Specific description: The Adam optimization algorithm is an adaptive learning rate method that combines Momentum and RMSprop. It has low memory requirements and is suitable for large data sets and high-dimensional spaces. The Adam algorithm contains 4 hyperparameters. Random search is used to optimize the hyperparameters and select appropriate hyperparameters.
[0093] After each round is completed, the total loss value of the synergistic relationship between the current coal mining machine and scraper conveyor model is calculated, and the updated parameters are optimized through the Adma algorithm so that the model can converge quickly.
[0094] Furthermore, the total loss function Loss of the collaborative relationship is calculated as follows:
[0095] Loss = A·loss1+B·loss2+C·G
[0096] Among them, A, B, and C are proportional coefficients, indicating the proportion of different functions in the total loss function, and (A+B+C)=1 and are all greater than 0. Their values can be allocated according to site requirements.
[0097] loss1 is the total loss function of the coal mining machine prediction model, loss2 is the total loss function of the scraper prediction model, and G is the load stabilization function.
[0098] Exemplarily, the total loss function loss1 of the coal mining machine prediction model is calculated as follows:
[0099] loss1=a·Lδ (v c ,v ci )+b·f1+c·h
[0100] Among them, a, b, and c are the proportional coefficients of the corresponding functions, indicating their proportion in the coal mining machine speed prediction model, (a+b+c)=1 and are all greater than 0. The distribution of the proportions can be selected according to the actual requirements of the working face site.
[0101] L δ (v c ,v ci ) is the prediction model loss function of the coal mining machine, f1 is the speed stability function of the coal mining machine, and h is the inverse function of the total coal falling amount L1 of the coal mining machine in the prediction time period t;
[0102] Furthermore, L δ (v c ,v ci ) is the Huber loss function as the prediction model loss function of the coal mining machine, and its calculation formula is
[0103]
[0104] Among them, v c is the actual speed of the coal mining machine at the same time, v ci is the i-th value of the coal mining machine speed prediction in each round. For example, 10 values can be predicted in each round. δ is a hyperparameter whose value can be 1. The best value can be obtained by Time Series Split cross validation. Substitute the corresponding parameters into the calculation to obtain L δ (v c ,v ci ) is a loss value of the coal mining machine speed prediction model. For example, when 10 values are predicted in each round, L δ (v c ,v ci ) uses the average of 10 loss values;
[0105] Specifically, Huber Loss is a parameterized loss function for regression problems, which effectively overcomes the shortcomings of square loss and absolute loss. It not only makes the loss function have a continuous derivative, but also utilizes the characteristic that the MSE gradient decreases with the error to obtain a more accurate minimum value.
[0106] f1 is the speed stability function of the coal mining machine, and its calculation formula is:
[0107]
[0108] in, is the average value of the speed prediction of the coal mining machine in each round. For example, when each round of prediction is 10 values, is the average of the speed predictions of 10 shearers in each round; m is the total number of rounds in the shearer;
[0109] Specifically, the size of f1 indicates the change in the speed of the coal mining machine during the prediction period. In this case, it is necessary to set a speed constraint on the traction speed of the coal mining machine. The maximum traction speed of the coal mining machine and the minimum traction speed to ensure production efficiency are used as constraints. The traction speed should meet the following conditions:
[0110] v cmin <v c <v cmax
[0111] h is the inverse function of the total coal drop of the shearer L1 in the forecast time period t. When calculating, the total coal drop of the shearer L1 needs to be as high as possible in the forecast time period t, that is, Max(L1). Therefore, the calculation formula of h is:
[0112] h=1 / Max(L1)
[0113]
[0114] Among them, H is the memory cutting height of the coal mining machine within the time range of t, B is the memory cutting depth of the coal mining machine drum within the time range of t, ρ is the density of coal, k1 is the capacity correction coefficient of the coal mining machine, and v c(i+1) is the i+1th value of the speed prediction of each round of coal mining machine, t can be set to 2 seconds, and the coal mining volume of the coal mining machine at the prediction time point can be obtained by substituting the order of the coal mining machine prediction time points into the calculation;
[0115] From the constraints of f1, we can see that there are certain limits on the size of L, and the coal mining volume is usually required to be as large as possible, while the loss function needs to seek the minimum value;
[0116] Exemplarily, the total loss function loss2 of the scraper prediction model is calculated as follows:
[0117] loss2=d·L δ (v g ,v gi )+e·f2
[0118] Among them, L δ (v g ,v gi ) is the prediction model loss function of the scraper, and f2 is the speed stability function of the scraper;
[0119] d and e are the proportional coefficients of the corresponding functions, indicating their proportion in the scraper prediction model, (d+e)=1 and both are greater than 0. The distribution of the proportion can be selected according to the actual requirements of the working surface site;
[0120] L δ (v g ,v gi ) is the Huber loss function as the scraper prediction model loss function, and its calculation formula is:
[0121]
[0122] Among them, v g is the actual speed of the scraper at the same time, v gi is the i-th value of the speed prediction of the scraper in each round. For example, 10 values are predicted for each round of the coal mining machine. δ is a hyperparameter whose value can be 1. The best value can be obtained by Time Series Split cross validation. Substitute the corresponding parameters into the calculation to obtain L δ (v g ,v gi ) is a loss value of the scraper speed prediction model. For example, when 10 values are predicted per round, L δ (v g ,v gi ) uses the average of 10 loss values;
[0123] Similarly, the Huber Loss used by the scraper is consistent with that of the coal mining machine, which can make the loss function have a continuous derivative and a higher precision value;
[0124] f2 is the speed stability function of the scraper, and its calculation formula is:
[0125]
[0126] in, is the average value of the scraper speed prediction for each round. For example, when each round of prediction is 10 values, is the average of 10 shearer speed predictions for each round;
[0127] The size of f2 indicates the change of scraper speed during the prediction period. If the scraper speed is constrained by the rated speed and the minimum speed to ensure the normal operation of the scraper, the traction speed should meet the following requirements:
[0128] v gmin <v g <v gmax
[0129] Furthermore, G is a load stabilization function, and the calculation formula is as follows:
[0130]
[0131] Among them, ΔL iThe new load change for the i-th value in each round, It is the average value of all newly added load changes;
[0132] ΔL i The calculation formula is:
[0133] ΔL i =L1-L2
[0134] L2 is the load of the scraper conveyor in the predicted time period t, and the calculation formula is:
[0135]
[0136] Among them, S0 is the average coal passing area of the scraper, k2 is the transportation capacity correction coefficient of the scraper, and v g(i+1) The i+1th value predicted for each round of scraper speed;
[0137] Step 5: When the maximum number of training rounds is reached, stop training, and output the corresponding coal mining machine prediction model and scraper prediction model under the condition of the minimum total loss value on the validation set;
[0138] Step 6: Input the test set in step 2 into the prediction model trained in step 5, output the predicted speed of the coal mining machine and the predicted speed of the scraper, and calculate the evaluation index of the CNN-LSTM prediction model.
[0139] Specifically, the test set normalized by the Min-Max standard is input into the CNN-LSTM neural network model trained in step 6. The predicted speed of the coal mining machine and the predicted speed of the scraper are predicted based on the input data. The predicted value can be compared with the true value, such as Figure 3 , Figure 4 As shown, a comparison diagram of an embodiment of a coal mining machine traction predicted speed value and its actual value, and a comparison diagram of an embodiment of a scraper conveyance predicted speed value and its actual value, the x-axis is the predicted time point, and the y-axis is the speed value;
[0140] The root mean square error (RMSE), mean absolute error (MAE) and goodness of fit (R2) can be used as evaluation indicators of the CNN-LSTM prediction model. That is, R2 represents the goodness of fit, and the closer it is to 1, the better the effect. MAE and RMSE represent the mean absolute error and root mean square error, and the closer they are to 0, the better the effect.
[0141] This method of coordinated speed control of mining and transportation equipment based on CNN-LSTM neural network can ensure the prediction accuracy. A defined loss function is added to control the coordinated working relationship between the coal mining machine and the scraper, which greatly improves the efficiency of the coordinated work of the two machines.
[0142] In the description of the present invention, it should be understood that the terms "center", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
Claims
1. A method for coordinated speed control of mining and transportation equipment based on CNN-LSTM neural network, characterized in that: The specific steps include: Step 1: Collecting the original operation data of underground coal mining machines and scrapers; Step 2: normalize the original data of the coal mining machine and the scraper in step 1 and divide them into a training set, a validation set and a test set respectively; Step 3: Input the corresponding divided training set into the CNN-LSTM neural network model. The input data is first extracted by the upper CNN neural network and then transferred to the lower LSTM neural network for training. After passing through the fully connected layer and the output layer, the results of the coal mining machine prediction model and the scraper prediction model are output; Step 4: When the maximum number of training rounds is not reached, the total loss function loss1 of the coal mining machine prediction model, the total loss function loss2 of the scraper prediction model, and the total loss function Loss of the synergistic relationship between the coal mining machine prediction speed and the scraper prediction speed are established at the same time; Calculate the corresponding loss values of the coal mining machine and the scraper and update the parameters, and optimize the updated parameters through the optimization algorithm to make them converge quickly; then re-input the converged parameters into the LSTM layer in step 3 for training again, and re-output the results of the coal mining machine prediction model and the scraper prediction model; And loop it until the maximum number of training rounds is reached; Step 5: When the maximum number of training rounds is reached, stop the training and output the corresponding coal mining machine prediction model and scraper prediction model under the condition of the minimum total loss value Loss on the validation set; Step 6: Input the test set in step 2 into the prediction model trained in step 5, output the predicted speed of the coal mining machine and the predicted speed of the scraper, and calculate the evaluation index of the CNN-LSTM prediction model.
2. According to claim 1, a method for coordinated control of mining and transportation equipment speed based on CNN-LSTM neural network is characterized in that: The total loss function Loss of the collaborative relationship is calculated as follows: Loss = A·loss1+B·loss2+C·G Among them, loss1 is the total loss function of the coal mining machine prediction model, loss2 is the total loss function of the scraper prediction model, and G is the load stability function; A, B, and C are proportional coefficients of the corresponding functions, (A+B+C)=1 and are all greater than 0.
3. The method for coordinated speed control of mining and transportation equipment based on CNN-LSTM neural network according to claim 2 is characterized in that: The total loss function loss1 of the coal mining machine prediction model is calculated as follows: loss1=a·L δ (v c ,v ci )+b·f1+c·h Wherein, a, b, c are proportional coefficients of the corresponding functions, (a+b+c)=1 and are all greater than 0; L δ (v c ,v ci ) is the prediction model loss function of the coal mining machine, and the calculation formula is: Among them, v c is the actual speed of the coal mining machine at the same time, v ci is the ith value of the predicted speed of the coal mining machine in each round, and δ is a hyperparameter; f1 is the speed stability function of the coal mining machine, and the calculation formula is: in, is the average value of the predicted speed of the shearer in each round, and m is the total number of rounds in the shearer; h is the inverse function of the total coal drop of the coal mining machine L1 in the predicted time period t, and its calculation formula is: h=1 / Max(L1) Among them, H is the memory cutting height of the coal mining machine within the time range of t, B is the memory cutting depth of the coal mining machine drum within the time range of t, ρ is the density of coal, k1 is the capacity correction coefficient of the coal mining machine, and v c(i+1) The i+1th value predicted for the shearer speed in each round.
4. The method for coordinated speed control of mining and transportation equipment based on CNN-LSTM neural network according to claim 3 is characterized in that: The total loss function loss2 of the scraper prediction model is calculated as follows: loss2=d·L δ (in g ,v gi )+e·f2 Among them, L δ (v g ,v gi ) is the prediction model loss function of the scraper, and f2 is the speed stability function of the scraper; d and e are proportional coefficients of the corresponding functions, (d+e)=1 and both are greater than 0; The loss function L of the prediction model of the scraper δ (v g ,v gi ), calculation formula: Among them, v g is the actual speed of the scraper at the same time, v gi is the i-th value of the scraper speed prediction for each round, and δ is a hyperparameter; f2 is the speed stability function of the scraper, and its calculation formula is: in, The average value of the predicted speed for each round of the scraper.
5. The method for coordinated speed control of mining and transportation equipment based on CNN-LSTM neural network according to claim 4 is characterized in that: The calculation formula of the load stabilization function G is as follows: Among them, ΔL i The new load change for the i-th value in each round, It is the average value of all newly added load changes; ΔL i The calculation formula is: ΔL i =L1-L2 L2 is the load of the scraper conveyor in the predicted time period t, and the calculation formula is: Among them, S0 is the average coal passing area of the scraper, k2 is the transportation capacity correction coefficient of the scraper, and v g(i+1) The i+1th value predicted for each round of scraper speed.
6. A method for coordinated speed control of mining and transportation equipment based on a CNN-LSTM neural network according to any one of claims 1 to 5, characterized in that: In step 2, before the original data is divided, it is subjected to de-noising processing.
7. A method for coordinated speed control of mining and transportation equipment based on a CNN-LSTM neural network according to any one of claims 1 to 5, characterized in that: The original data normalization method adopts Min-Max normalization, and its calculation formula is as follows: In the formula, min and max are the minimum and maximum values of the same type of collected data. The first 70% of the normalized original data is divided into the training set, 10% of the data is divided into the validation set, and the last 20% of the data is divided into the test set.
8. The method for coordinated speed control of mining and transportation equipment based on CNN-LSTM neural network according to claim 4 is characterized in that: The speed of the coal mining machine is predicted to have 10 values for each round, and the speed of the scraper is predicted to have 10 values for each round.
Citation Information
Patent Citations
CNN and LSTM fused neural network-based air PM2.5 concentration prediction method
CN108009674A
CNN-LSTM-Attention-based combined heat and power generation boiler load prediction method
CN113837464A
