Method, device and system for channel access in unlicensed band
By executing different types of channel access methods based on uplink scheduling information in the cellular communication system, the channel access problem in the unauthorized frequency band is solved, and the efficient signal transmission and coexistence capabilities are improved.
Patent Information
- Application Number
- CN202211309103.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Priority Date
- 2016-08-26
- Filing Date
- 2017-07-24
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2037-07-24
AI Technical Summary
In cellular communication systems, communication quality is difficult to ensure when using unlicensed frequency bands and may lead to interference problems of conventional wireless communication devices, and prior art is difficult to develop robust coexistence mechanisms to prevent LTE technology from affecting devices in unlicensed bands.
The user equipment performs different types of channel access methods by receiving uplink scheduling information in a wireless communication system, including performing random backoff after channel sensing or performing channel sensing only, adjusting the competition window size according to the channel state to optimize Uplink transmission.
It realizes efficient signal transmission in unauthorized frequency bands, reduces interference to conventional unauthorized band devices, and improves the coexistence capability of the communication system.
Smart Images

Figure CN115765949B_ABST
Abstract
Description
[0001] This application is a divisional application of a patent application with application number 201780057852.6 (PCT / KR2017 / 007967), which was submitted to the China Patent Office on March 20, 2019, with an international application date of July 24, 2017, and the invention name is “Method, device and system for channel access in unlicensed band”. Technical Field
[0002] The present invention relates to a wireless communication system, and more particularly to a method, device and system for performing channel access in an unlicensed band. Background Art
[0003] In recent years, as mobile services have exploded due to the popularity of smart devices, it has been difficult to handle the increased data usage for providing cellular communication services only through conventional licensed spectrum or LTE licensed frequency bands.
[0004] In this case, a solution to provide cellular communication services using unlicensed (alternatively, unlicensed, unlicensed, or unlicensed) spectrum or LTE unlicensed bands (e.g., 2.4 GHz band, 5 GHz band, etc.) has been designed as a solution to the spectrum shortage problem.
[0005] However, unlike the licensed band in which a communication service provider secures exclusive frequency use rights through a process such as auction, in the unlicensed band, multiple communication facilities can be used simultaneously without restriction when only a predetermined level of adjacent band protection rules are followed. Therefore, when the unlicensed band is used in a cellular communication service, it is difficult to ensure the communication quality at the level provided in the licensed band, and interference problems may occur with common wireless communication devices (e.g., wireless LAN devices) using the unlicensed band.
[0006] Therefore, it is necessary to prioritize research on coexistence schemes for conventional unlicensed band devices and schemes for efficiently sharing radio channels in order to address LTE technology in the unlicensed band. That is, it is necessary to develop a robust coexistence mechanism (RCM) to prevent devices using LTE technology in the unlicensed band from affecting conventional unlicensed band devices. Summary of the invention
[0007] Technical issues
[0008] The present invention has been devoted to providing a method for efficiently transmitting signals in a wireless communication system (particularly, a cellular wireless communication system and its equipment). Further, the present invention has been devoted to providing a method for efficiently transmitting signals in a specific frequency band (e.g., an unlicensed band) and its equipment.
[0009] The technical objectives expected to be achieved in the present invention are not limited to the aforementioned objectives, and other technical objectives not described above will be clearly understood by those skilled in the art from the following disclosure.
[0010] Technical Solution
[0011] The first embodiment of the present invention provides a method for performing uplink transmission in a specific cell by a user equipment in a wireless communication system, comprising: receiving uplink scheduling information; and when the user equipment has stopped uplink transmission during uplink transmission being performed according to the uplink scheduling information, in order to resume uplink transmission, when the channel sensed by the user equipment after the uplink transmission has been stopped is continuously idle, performing a second type of channel access; and performing a first type of channel access when the channel sensed by the user equipment after the uplink transmission has been stopped is not continuously idle, wherein the first type of channel access includes performing random backoff after channel sensing, and the second type of channel access only includes performing channel sensing.
[0012] A second embodiment of the present invention provides a user equipment for use in a wireless communication system, comprising: a wireless communication module; a processor, wherein the processor receives uplink scheduling information, and when the user equipment has stopped uplink transmission during uplink transmission being performed according to the uplink scheduling information, in order to resume uplink transmission, when the channel sensed by the user equipment after the uplink transmission has been stopped is continuously idle, a second type of channel access is performed; and when the channel sensed by the user equipment after the uplink transmission has been stopped is not continuously idle, a first type of channel access is performed, wherein the first type of channel access includes performing random backoff after channel sensing, and the second type of channel access only includes performing channel sensing.
[0013] In the first and second embodiments, the uplink transmission may include transmission over a plurality of subframes, and stopping the uplink transmission by the user equipment during the uplink transmission may include dropping the uplink transmission in subframes except for a last subframe over the plurality of subframes.
[0014] In the first and second embodiments, the wireless communication system may include a wireless communication system based on the 3rd Generation Partnership Project (3GPP), and the first type of channel access may include Category-4 Listen Before Talk (LBT) and the second type of channel access may include Category-2 LBT.
[0015] In the first and second embodiments, the first type of channel access may include performing random backoff using a variable size contention window (CW), and the second type of channel access may include performing channel sensing within a duration of 25 us without random backoff.
[0016] In the first and second embodiments, the specific cell may be an unlicensed cell.
[0017] A third embodiment of the present invention provides a method for performing uplink transmission in multiple carriers by a user equipment in a wireless communication system, comprising: receiving uplink scheduling information indicating a first type of channel access to a carrier of a first group; receiving uplink scheduling information indicating a second type of channel access to a carrier of a second group; performing the first type of channel access only on a specific carrier among the carriers of the first group, and performing the second type of channel access on the remaining carriers; and performing the second type of channel access indicated by the uplink scheduling information for the carriers of the second group, wherein, when the first type of channel access fails in a specific carrier, the uplink transmission is discarded only in the carriers of the first group among the carriers in which the second type of channel access is performed.
[0018] A fourth embodiment of the present invention provides a method for performing uplink transmission in multiple carriers by a user equipment in a wireless communication system, comprising: receiving uplink scheduling information indicating a first type of channel access for carriers of a first group; performing the first type of channel access only on a specific carrier among the carriers of the first group, and performing the second type of channel access on the remaining carriers; and adjusting the contention window size (CWS) for each carrier, wherein reception response information for uplink transmission on a specific carrier sent by performing the first type of channel access is reflected in the CWS adjustment of the user equipment, and reception response information for uplink transmission on the remaining carriers among the carriers of the first group where the first type of channel access is not performed is not reflected in the CWS adjustment in the user equipment.
[0019] Beneficial Effects
[0020] According to an exemplary embodiment of the present invention, a method for efficiently transmitting signals in a wireless communication system (particularly, a cellular wireless communication system and its equipment) is provided. Further, a method for efficiently transmitting signals in a specific frequency band (e.g., an unlicensed band) and its equipment is provided.
[0021] Effects obtained in the present invention are not limited to the aforementioned effects, and other effects not described above will be clearly understood by those skilled in the art from the following disclosure. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] To help understanding of the present invention, the accompanying drawings, which are included as a part of the detailed description, provide embodiments of the present invention and, together with the detailed description, describe the technical problems of the present invention.
[0023] Figure 1Illustrated are physical channels used in a 3rd Generation Partnership Project (3GPP) system and a general signal transmission method using the physical channels.
[0024] Figure 2 An example of a radio frame structure used in a wireless communication system is illustrated.
[0025] Figure 3 An example of a downlink (DL) / uplink (UL) slot structure used in a wireless communication system is illustrated.
[0026] Figure 4 The figure shows the structure of a downlink subframe.
[0027] Figure 5 The figure shows the structure of an uplink subframe.
[0028] Figure 6 It is a schematic diagram used to describe single-carrier communication and multi-carrier communication.
[0029] Figure 7 An example of applying the cross-carrier scheduling technology is shown.
[0030] Figure 8 The figure shows a DL / UL hybrid automatic repeat request (HARQ) process in a single cell case.
[0031] Fig. 9 Figure 1 shows the License Assisted Access (LAA) service environment.
[0032] Fig.10 The figure shows the layout scenario of user equipment and base stations in the LAA service environment.
[0033] Fig.11 A communication scheme operating in an unlicensed band in the prior art is illustrated.
[0034] Fig.12 and 13 The diagram illustrates a listen-before-talk (LBT) process for DL transmission.
[0035] Fig.14 The diagram illustrates DL transmission in the unlicensed band.
[0036] Figures 15 to 17 The diagram illustrates a DL transmission process in an unlicensed band.
[0037] Figures 18 to 22 The figure shows the UL transmission process in the unlicensed band.
[0038] Figures 23 to 27 UL multi-carrier transmission according to the present invention is illustrated.
[0039] Figures 28 to 29is a diagram for explaining a method of recovering transmission when some transmissions are dropped during multi-subframe transmission.
[0040] Fig.30 Configurations of a user equipment and a base station according to an exemplary embodiment of the present invention are illustrated. DETAILED DESCRIPTION
[0041] By considering the functions in the present invention, the terms used in this specification try to adopt the common terms widely used at present, but the terms can be changed according to the intentions, habits, and emergence of new technologies of the technicians in this field. Further, in certain cases, there are terms arbitrarily selected by the applicant, and in this case, their meanings will be described in the corresponding description part of the present invention. Therefore, the present invention is intended to show that the terms used in this specification should be analyzed, and the analysis is not only based on the name of the term, but also based on the substantive meaning of the term and the content throughout the present specification.
[0042] Throughout this specification and the claims that follow, when an element is described as being "coupled" to another element, the element may be "directly coupled" to the other element or "electrically coupled" to the other element through a third element. Further, unless expressly described to the contrary, the word "include" and variations (such as, "comprises" or "comprising") will be understood to mean the inclusion of the stated elements but not the exclusion of any other elements. Moreover, in some exemplary embodiments, it may be appropriate to replace the limitation with "greater than" or "less than", such as, "equal to or greater than" or "equal to or less than" based on a particular threshold, respectively.
[0043] The following technologies, such as code division multiple access (CDMA), frequency division multiple access (FDMA), time division multiple access (TDMA), orthogonal frequency division multiple access (OFDMA), single carrier FDMA (SC-FDMA), etc., can be used in various wireless access systems. CDMA can be implemented by radio technology such as Universal Terrestrial Radio Access (UTRA) or CDMA 2000. TDMA can be implemented by radio technology such as Global System for Mobile Communications (GSM) / General Packet Radio Service (GPRS) / Enhanced Data Rates for GSM Evolution (EDGE). OFDMA can be implemented by radio technology such as IEEE 802.11 (Wi-Fi), IEEE 802.16 (WiMAX), IEEE 802-20, Evolved UTRA (E-UTRA), etc. UTRA is part of Universal Mobile Telecommunications System (UMTS). The 3rd Generation Partnership Project (3GPP) Long Term Evolution (LTE) is a part of Evolved UMTS (E-UMTS) using Evolved UMTS Terrestrial Radio Access (E-UTRA), and Advanced LTE (A) is an evolved version of 3GPP LTE. 3GPP LTE / LTE-A is mainly described for clarity of description, but the technical spirit of the present invention is not limited thereto.
[0044] Figure 1 The figure illustrates physical channels used in the 3GPP system and a general signal transmission method using the physical channels. The user equipment receives information from the base station through the downlink (DL), and the user equipment transmits information to the base station through the uplink (UL). The information transmitted / received between the base station and the user equipment includes data and various control information, and various physical channels exist according to the type / purpose of the information transmitted / received between the base station and the user equipment.
[0045] When the power of the user equipment is turned on or the user equipment enters a cell in a new way, the user equipment performs an initial cell search operation including synchronization with the base station, etc. (S301). To this end, the user equipment receives a primary synchronization channel (P-SCH) and a secondary synchronization channel (S-SCH) from the base station to synchronize with the base station and obtain information including a cell ID, etc. Thereafter, the user equipment receives a physical broadcast channel from the base station to obtain intra-cell broadcast information. The user equipment receives a downlink reference signal (DL RS) in the initial cell search step to verify the downlink channel state.
[0046] The user equipment that has completed the initial cell search receives a physical downlink control channel (PDCCH) and a physical downlink shared channel (PDSCH) according to information loaded on the PDCCH to obtain more detailed system information (S302).
[0047] When there is no radio resource for initial access to the base station or signal transmission, the user equipment may perform a random access procedure (RACH procedure) for the base station (S303 to S306). To this end, the user equipment may transmit a preamble through a physical random access channel (PRACH) (S303) and receive a response message to the preamble through a PDCCH and a PDSCH corresponding thereto (S304). In the case of a contention-based RACH, a contention resolution procedure may also be performed.
[0048] Thereafter, the user equipment may receive PDCCH / PDSCH (S307) and transmit a physical uplink shared channel (PUSCH) / physical uplink control channel (PUCCH) (S308) as a general process. The user equipment receives downlink control information (DCI) through PDCCH. DCI includes control information (such as resource allocation information) for the user equipment, and the format varies according to the purpose of use. The control information transmitted by the user equipment to the base station is designated as uplink control information (UCI). UCI includes acknowledgement / negative acknowledgement (ACK / NACK), channel quality indicator (CQI), precoding matrix index (PMI), rank indicator (RI), etc. UCI can be transmitted through PUSCH and / or PUCCH.
[0049] Figure 2 An example of a radio frame structure used in a wireless communication system is illustrated. Figure 2 (a) illustrates a frame structure for frequency division duplex (FDD), and Figure 2 (b) illustrates a frame structure for time division duplex (TDD).
[0050] Reference Figure 2 , the frame structure may have a length of 10 ms (307200 Ts) and may be composed of 10 subframes (SFs). Ts represents a sampling time and is expressed as Ts=1 / (2048*15kHz). Each subframe may have a length of 1 ms and may be composed of 2 time slots. Each time slot has a length of 0.5 ms. The time used to transmit one subframe is defined as a transmission time interval (TTI). Time resources may be distinguished by a radio frame number / index, a subframe number / index #0 to #9, and a time slot number / index #0 to #19.
[0051] The radio frame can be configured in different ways according to the duplex mode. In FDD mode, downlink transmission and uplink transmission are distinguished by frequency, and the radio frame includes only one of the downlink subframe and uplink subframe for a specific frequency band. In TDD mode, downlink transmission and uplink transmission are distinguished by time, and the radio frame includes both of the downlink subframe and uplink subframe for a specific frequency band.
[0052] Figure 3 The figure shows the structure of the downlink / uplink time slot.
[0053] Reference Figure 3 , a time slot includes multiple orthogonal frequency division multiplexing (OFDM) symbols in the time domain and multiple resource blocks (RBs) in the frequency domain. OFDM symbol also means one symbol period. According to the multiple access scheme, OFDM symbol can be called OFDMA symbol, single carrier frequency division multiple access (SC-FDMA) symbol, etc. The number of OFDM symbols included in a time slot can be variously modified according to the length of the cyclic prefix (CP). For example, in the case of standard CP, one time slot includes 7 OFDM symbols, and in the case of extended CP, one time slot includes 6 OFDM symbols. RB is defined as N in the time domain. DL / UL symb (e.g., 7) consecutive OFDM symbols and N in the frequency domain RB sc (For example, 12) consecutive subcarriers. A resource consisting of one OFDM symbol and one subcarrier is called a resource element (RE) or tone. One RB consists of N DL / UL symb *N RB sc Resource elements.
[0054] The resources of the time slot can be represented by N DL / UL RB *N RB sc subcarriers and N DL / UL symb OFDM symbols form a resource grid. Each RE in the resource grid is uniquely defined by a pair of indexes (k, 1) at each time sequence. K represents a 0 to N in frequency domain. DL / UL RB *N RB sc -1 for a given index, and 1 for a given index in the time domain from 0 to N DL / UL symb -1 given index. Here, N DL RB represents the number of resource blocks (RBs) in a downlink time slot, and NUL RB N represents the number of RBs in a UL slot. DL RB and N UL RB Depends on the DL transmission bandwidth and UL transmission bandwidth respectively. DL symb represents the number of symbols in the downlink time slot, and N UL symb N represents the number of symbols in the UL slot. RB sc Indicates the number of subcarriers that make up one RB. A resource grid is set for each antenna port.
[0055] Figure 4 The figure shows the structure of a downlink subframe.
[0056] Reference Figure 4 , a subframe can be composed of 14 OFDM symbols. According to the subframe setting, the first 1 to 3 (alternatively, 2 to 4) OFDM symbols are used as the control region, and the remaining 13 to 11 (alternatively, 12 to 10) OFDM symbols are used as the data region. R1 to R4 represent reference signals for antenna ports 0 to 3. The control channels allocated to the control region include the Physical Control Format Indicator Channel (PCFICH), the Physical Hybrid ARQ Indicator Channel (PHICH), the Physical Downlink Control Channel (PDCCH), etc. The data channels allocated to the data region include PDSCH, etc. When the enhanced PDCCH (EPDCCH) is set, PDSCH and EPDCCH are multiplexed in the data region by frequency division multiplexing (FDM).
[0057] The PDCCH as a physical downlink control channel is allocated to the first n OFDM symbols of a subframe, and n is represented by PCFICH as an integer of 1 (alternatively, 2) or more. The PDCCH announces information associated with resource allocation of a paging channel (PCH) and a downlink shared channel (DL-SCH) as transmission channels, uplink scheduling permissions, HARQ information, etc. to each user equipment or user equipment group. The data (i.e., transport blocks) of the PCH and DL-SCH are transmitted through the PDSCH. In addition to specific control information or specific service data, each of the base station and the user equipment generally transmits and receives data through the PDSCH.
[0058] Information indicating to which user equipment (one or more user equipment) data of the PDSCH is transmitted, information indicating how the user equipment receives the PDSCH data and decodes the PDSCH data, etc., is transmitted, and the information is included in the PDCCH / EPDCCH. For example, it is assumed that the PDCCH / EPDCCH is CRC-masked using a radio network temporary identifier (RNTI) called "A" and information about data transmitted by using a radio resource (e.g., frequency position) called "B" and a DCI format called "C" (i.e., transmission format information (e.g., transport block size, modulation scheme, coding information, etc.) is transmitted through a specific subframe). In this case, the user equipment in the cell monitors the PDCCH / EPDCCH by using its RNTI information, and when one or more user equipments with the "A" RNTI are provided, the user equipment receives the PDCCH / EPDCCH, and receives the PDSCH represented by "B" and "C" through the information about the received PDCCH / EPDCCH.
[0059] Figure 5 The figure shows the structure of an uplink subframe.
[0060] Reference Figure 5 , a subframe can be divided into a control region and a data region in the frequency domain. PUCCH is allocated to the control region and carries UCI. PUSCH is allocated to the data region and carries user data.
[0061] The following control information may be transmitted using the PUCCH.
[0062] - Scheduling Request (SR): Information for requesting UL-SCH resources. The SR is transmitted by using an On-Off Keying (OOK) scheme.
[0063] -HARQ-ACK: A response to the PDCCH and / or a response to a downlink data packet (e.g., a codeword) on the PDSCH. A codeword is a coding format for a transport block. HARQ-ACK indicates whether the PDCCH and PDSCH were successfully received. The HARQ-ACK response includes a positive ACK (simply, ACK), a negative ACK (NACK), a discontinuous transmission (DTX), or NACK / DTX. DTX indicates that the user equipment loses the PDCCH (alternatively, a semi-persistent scheduling (SPS) PDSCH) and NACK / DTX refers to the case of NACK or DTX. HARQ-ACK is used in combination with HARQ-ACK / NACK and ACK / NACK.
[0064] - Channel State Information (CSI): Feedback information about downlink channels. Feedback information related to Multiple Input Multiple Output (MIMO) includes RI and PMI.
[0065] Table 1 shows the relationship between the PUCCH format and the UCI.
[0066] [Table 1]
[0067]
[0068] Hereinafter, carrier aggregation will be described. Carrier aggregation means a method in which a wireless communication system uses multiple frequency blocks as one larger logical frequency band in order to use a wider frequency band. When the entire system band is extended by carrier aggregation, the frequency band used to communicate with each user equipment is defined by a component carrier (CC) unit.
[0069] Figure 6 It is a schematic diagram used to describe single-carrier communication and multi-carrier communication. Figure 6 (a) illustrates a subframe structure of a single carrier, and Figure 6 (b) illustrates a subframe structure of a multi-carrier of carrier aggregation.
[0070] Reference Figure 6 (a), in a single carrier system, a base station and a user equipment perform data communication through one DL band and one UL band corresponding thereto. The DL / UL band is divided into a plurality of orthogonal subcarriers, and each band operates at one carrier frequency. In FDD, the DL and UL bands operate at different carrier frequencies, respectively, and in TDD, the DL and UL bands operate at the same carrier frequency. The carrier frequency refers to the center frequency of the frequency band.
[0071] Reference Figure 6 (b) Carrier aggregation is distinguished from an OFDM system that performs DL / UL communication in a baseband divided into a plurality of subcarriers by using one carrier frequency, because carrier aggregation performs DL / UL communication by using a plurality of carrier frequencies. Figure 6 (b) Three 20MHz CCs are clustered in each of the UL and DL to support a 60MHz bandwidth. CCs can be adjacent to each other or not in the frequency domain. For convenience, Figure 6(b) illustrates a case where the bandwidth of the UL CC and the bandwidth of the DL CC are the same and symmetrical to each other, but the bandwidth of the corresponding CC can be determined independently. Further, asymmetric carrier aggregation in which the number of UL CCs and the number of DL CCs are different from each other is also available. (Multiple) DL / UL CCs are independently allocated / configured for each user equipment, and (multiple) DL / UL CCs allocated / configured for the user equipment are designated as (multiple) serving UL / DL CCs of the corresponding user equipment.
[0072] The base station may start some or all of the service CCs of the user equipment or disable some CCs. When the base station allocates (multiple) CCs to the user equipment, if the CC allocation to the user equipment is completely reconfigured or if the user equipment is not switched, at least one specific CC in the (multiple) CCs configured for the corresponding user equipment is not disabled. The specific CC that is always started is called the primary CC (PCC), and the CC that the base station can start / disable arbitrarily is called the secondary CC (SCC). The PCC and SCC can be distinguished based on control information. For example, specific control information can be set to be sent / received only through a specific CC, and the specific CC can be called the PCC, and the remaining (multiple) CCs can be called (multiple) SCCs. PUCCH is transmitted only on the PCC.
[0073] In 3GPP, the concept of cells is used to manage radio resources. A cell is defined as a combination of DL resources and UL resources, that is, a combination of DL CCs and UL CCs. A cell can be configured only by DL resources or a combination of DL resources and DL resources. When carrier aggregation is supported, system information can be used to indicate the link between the carrier frequency of DL resources (alternatively, DL CCs) and the carrier frequency of UL resources (alternatively, UL CCs). For example, a system information block type 2 (SIB2) link can be used to indicate the combination of DL resources and UL resources. The carrier frequency refers to the center frequency of each cell or CC. The cell corresponding to the PCC is called the primary cell (PCell), and the cell corresponding to the SCC is called the secondary cell (SCell). The carrier corresponding to the PCell is the DL PCC in the downlink, and the carrier corresponding to the PCell is the UL PCC in the uplink. Similarly, the carrier corresponding to the SCell is the DL SCC in the downlink, and the carrier corresponding to the SCell is the UL SCC in the uplink. Depending on the user equipment capability, (multiple) service cells can be composed of a PCell and 0 or more SCells. For a user equipment in RRC_CONNECTED state but without any configuration of carrier aggregation or not supporting carrier aggregation, there is only one serving cell consisting of only PCell.
[0074] Figure 7 The diagram illustrates an example of applying cross-carrier scheduling. When cross-carrier scheduling is configured, a control channel transmitted through a first CC can schedule a data channel transmitted through a first CC or a second CC by using a carrier indicator field (CIF). The CIF is included in the DCI. In other words, a scheduling cell is configured, and a DL grant / UL grant transmitted in the PDCCH area of the scheduling cell is scheduled in the PDSCH / PUSCH of the scheduled cell. That is, the search space of multiple component carriers exists in the PDCCH area of the scheduling cell. A PCell can basically be a scheduling cell, and a specific SCell can be designated as a scheduling cell by an upper layer.
[0075] exist Figure 7 In this paper, it is assumed that three DL CCs are aggregated. In this article, DL component carrier #0 is assumed to be DL PCC (alternatively, PCell), and DL component carrier #1 and DL component carrier #2 are assumed to be DL SCC (alternatively, SCell). Further, it is assumed that the DL PCC is set to monitor the PDCCH of the CC. When CIF is disabled, according to the LTE PDCCH rules (non-cross-carrier scheduling and self-carrier scheduling), the corresponding DL CC can transmit only the PDCCH that schedules its PDSCH without CIF. On the contrary, when CIF is enabled by UL-specific (alternatively, UL group-specific or cell-specific) upper layer signaling, a specific CC (e.g., DL PCC) can transmit the PDCCH that schedules the PDSCH of DL CC A and the PDCCH that schedules the PDSCH of another CC by using CIF (cross-carrier scheduling). On the contrary, in another DL CC, PDCCH is not transmitted.
[0076] Figure 8 The figure shows the DL / UL HARQ process in a single cell case. Figure 8 (a) illustrates the DL HARQ process, and Figure 8 (b) illustrates the UL HARQ process. In the case of the DL HARQ process, ACK / NACK (A / N) for (i) PDSCH scheduled by PDCCH, (ii) PDSCH without corresponding PDCCH (i.e., SPS PDSCH), and (iii) PDCCH indicating SPS release is fed back. In the case of the UL HARQ process, ACK / NACK (A / N) for (i) PUSCH scheduled by PDCCH and (ii) PUSCH without corresponding PDCCH (i.e., SPS PUSCH) is fed back. PDCCH includes EPDCCH.
[0077] Reference Figure 8(a), the user equipment receives a PDCCH (alternatively, an EPDCCH) in a subframe #nk (S802) and receives a PDSCH indicated by the PDCCH in the same subframe (S804). The PDCCH transmits scheduling information (i.e., DL grant), and the PDSCH transmits one or more (e.g., two) transport blocks (TBs) (alternatively, code words (CWs)) according to a transmission mode. Thereafter, the user equipment may transmit an ACK / NACK for the PDSCH (i.e., transport block) in a subframe #n (S806). ACK / NACK 1 bit may be transmitted in response to a single transport block, and ACK / NACK 2 bits may be transmitted in response to two transport blocks. ACK / NACK is basically transmitted through the PUCCH, but when the PUSCH is transmitted in the subframe #n, ACK / NACK may be transmitted through the PUSCH. K represents the time interval between a DL subframe and a UL subframe. In FDD, k=4, and in TDD, k may be given by a downlink association setup index (DASI). ACK / NACK refers to HARQ-ACK. HARQ-ACK responses include ACK, NACK, DTX, and NACK / DTX.
[0078] refer to Figure 8 (b), the user equipment receives the PDCCH (alternatively, the EPDCCH) in subframe #n-k1 (S812), and transmits the PUSCH indicated by the PDCCH in subframe #n (S814). The PDCCH transmits scheduling information (i.e., UL grant), and the PUSCH transmits one or more (e.g., two) transport blocks (TBs) (alternatively, code words (CWs)) according to the transmission mode. Thereafter, the user equipment receives reception response information for the PUSCH (i.e., transport block) in subframe #n+k2 through the PHICH or the UL grant (S816). The UL grant includes a new data indicator (NDI) for each TB. In addition, depending on the switch, the NDI indicates new data transmission or indicates retransmission of a TB of a previous PUSCH. For example, if the NDI is switched relative to the NDI value of the previous UL grant, the NDI indicates new data transmission, otherwise the NDI indicates retransmission of a TB of a previous PUSCH. k1 / k2 indicates the time interval between a DL subframe and a UL subframe. In FDD, k1=k2=4, and in TDD, k1 / k2 depends on the TDD UL-DL configuration.
[0079] When multiple cells are configured for a user equipment, ACK / NACK information may be transmitted by using PUCCH format 3 or a channel selection scheme based on PUCCH format 1b.
[0080] An ACK / NACK payload of PUCCH format 3 is configured for each cell, and then the ACK / NACK payload of PUCCH format 3 is cascaded according to the cell index order. Regardless of the actual data transmission in each cell, the ACK / NACK payload is configured for all cells configured to the user equipment. Each bit in the ACK / NACK payload indicates the HARQ-ACK feedback of the corresponding transport block (alternatively, codeword). The HARQ / ACK feedback indicates ACK or NACK, and DTX is processed as NACK. NACK and DTX have the same HARQ-ACK feedback value. If necessary, the base station can distinguish NACK from DTX by using information about the control channel that the base station is to transmit to the user equipment.
[0081] When two cells are aggregated, a channel selection scheme based on PUCCH format 1b may be set for transmitting ACK / NACK. In the channel selection scheme based on PUCCH format 1b, ACK / NACK responses to multiple transport blocks (alternatively, codewords) are identified by a combination of a PUCCH resource index and a bit value.
[0082] Table 2 shows the mapping between HARQ-ACK (j) and transport blocks (TB) of each cell in the channel selection scheme based on PUCCH format 1b. When A = 2 to 4, Tables 3 to 5 show the mapping of ACK, NACK, DTX, and NACK / DTX, respectively. The user equipment selects a PUCCH resource corresponding to the HARQ-ACK set from A PUCCH resources, and transmits a 2-bit value corresponding to the HARQ-ACK set by using the selected PUCCH resource. DTX is transmitted one by one and is transmitted as NACK / DTX. When transmitting NACK / DTX, if necessary, the base station can distinguish between NACK and DTX by using information about the control channel that the base station is to transmit to the user equipment.
[0083] [Table 2]
[0084]
[0085] [Table 3]
[0086]
[0087] [Table 4]
[0088]
[0089] [Table 5]
[0090]
[0091] Example: CWS Adjustment Scheme for Random Backoff in Unlicensed Bands
[0092] Fig. 9 Figure 1 shows the License Assisted Access (LAA) service environment.
[0093] Reference Fig. 9 , a service environment can be provided to users, in which the LTE technology (11) in the conventional authorized band and LTE unlicensed (LTE-U) or LAA as the LTE technology (12) in the unlicensed band, which have been actively discussed, can be connected to each other. For example, the LTE technology (11) in the authorized band and the LTE technology (12) in the unlicensed band in the LAA environment can be integrated by using technologies (such as carrier aggregation, etc.), which can help expand network capacity. Further, in an asymmetric service structure in which the amount of downlink data is greater than the amount of uplink data, LAA can provide optimized LTE services according to various requirements or environments. For convenience, the LTE technology in the authorized (alternatively, authorized or allowed) band is referred to as LTE authorized (LTE-L), and the LTE technology in the unlicensed (alternatively, unauthorized, unlicensed, not necessarily authorized) band is referred to as LTE unlicensed (LTE-U) or LAA.
[0094] Fig.10 The diagram shows the layout scenarios of user equipment and base stations in the LAA service environment. The frequency band targeted by the LAA service environment has a short wireless communication reach distance due to its high frequency characteristics. Taking this into account, the layout scenarios of user equipment and base stations in an environment where conventional LTE-L services and LAA services coexist can be an overlapping model and a co-location model.
[0095] In the overlapping model, the macro base station can perform wireless communication with X UE and X'UE in the macro area (32) by using a licensed carrier, and connect with multiple remote radio heads (RRH) through the X2 interface. Each RRH can perform wireless communication with X UE or X'UE in a predetermined area (31) by using an unlicensed carrier. The frequency bands of the macro base station and the RRH are different from each other and do not interfere with each other, but data needs to be quickly exchanged between the macro base station and the RRH through the X2 interface so that the LAA service can be used as an auxiliary downlink channel for the LTE-L service through carrier aggregation.
[0096] In the co-location model, the pico / femto base station can perform wireless communication with the Y UE by using a licensed carrier and an unlicensed carrier. However, the pico / femto base station may be limited in downlink transmission using the LTE-L service and the LAA service. The coverage (33) of the LTE-L service and the coverage (34) of the LAA service may be different depending on the frequency band, transmission power, etc.
[0097] When LTE communication is performed in an unlicensed band, a conventional device (e.g., a wireless LAN (Wi-Fi) device) performing communication in the corresponding unlicensed band may not demodulate LTE-U messages or data, and determine the LTE-U message or data as a type of energy for performing interference avoidance operations through energy detection technology. That is, when the energy corresponding to the LTE-U message or data is less than -62dBm or a specific energy detection (ED) threshold, the wireless LAN device may perform communication by ignoring the corresponding message or data. Therefore, the user equipment performing LTE communication in the unlicensed band may be frequently interfered with by the wireless LAN device.
[0098] Therefore, it is necessary to allocate or reserve a specific frequency band within a specific time in order to effectively implement LTE-U technology / services. However, since peripheral devices that perform communication through unlicensed bands attempt to access based on energy detection technology, there is a problem that it is difficult to perform efficient LTE-U services. Therefore, it is necessary to give priority to the research on coexistence schemes for conventional unlicensed band devices and schemes for efficiently sharing radio channels in order to solve LTE-U technology. That is, it is necessary to develop a robust coexistence mechanism in which LTE-U devices do not affect conventional unlicensed band devices.
[0099] Fig.11 A communication scheme (eg, wireless LAN) operating in an unlicensed band in the prior art is illustrated. Since most devices operating in an unlicensed band operate based on listen-before-talk (LBT), a clear channel assessment (CCA) technique of sensing a channel before data transmission is performed.
[0100] Reference Fig.11 , a wireless LAN device (e.g., an AP or a STA) checks whether a channel is busy by performing carrier sensing before transmitting data. When a radio signal of a predetermined strength or greater is sensed in a channel transmitting data, the corresponding channel is determined to be busy, and the wireless LAN device delays access to the corresponding channel. This process is called idle channel assessment, and the signal level used to determine whether a signal is sensed is called a CCA threshold. At the same time, when no radio signal is sensed in the corresponding channel or a radio signal with a strength less than the CCA threshold is sensed, the channel is determined to be idle.
[0101] When it is determined that the channel is idle, the terminal with data to be transmitted performs a backoff process after a delay period (e.g., arbitration interframe space (AIFS), PCF IFS (PIFS), etc.). The delay period refers to the minimum time that the terminal needs to wait after the channel is idle. The backoff process allows the terminal to further standby within a predetermined time after the delay period. For example, while the channel is in an idle state, the terminal stands by while reducing the slot time for the slot time corresponding to the random number allocated to the terminal in the contention window (CW), and the terminal that completely runs out of the slot time can attempt to access the corresponding channel.
[0102] When the terminal successfully accesses the channel, the terminal can transmit data through the channel. When data is successfully transmitted, the CW size (CWS) is reset to the initial value (CWmin). On the contrary, when data is not successfully transmitted, the CWS is doubled. Therefore, the terminal is assigned a new random number in a range twice as large as the previous random number range to perform a backoff process in the next CW. In a wireless LAN, only ACK is defined as receiving response information to data transmission. Therefore, when ACK is received for data transmission, CWS is reset to the initial value, and when no feedback information is received for data transmission, CWS is doubled.
[0103] As mentioned above, since most communications in the unlicensed band in the prior art operate based on LBT, LTE also considers LBT in LAA to coexist with conventional devices. Specifically, in LTE, the channel access methods on the unlicensed band can be divided into the following 4 categories according to the presence / application scheme of LBT.
[0104] Category 1 (cat-1): No LBT
[0105] -The LBT process performed by the Tx entity is not performed.
[0106] Category 2 (cat-2): LBT without random backoff
[0107] - Determine the time interval (e.g., 25us) that the Tx entity needs to sense the channel in an idle state before performing a transmission on the channel. No random backoff is performed. This may be referred to as Type 2 channel access.
[0108] Category 3 (cat-3): LBT with random backoff of fixed-size CW
[0109] -LBT method that performs random backoff by using a fixed-size CW. The Tx entity has a random number N in the CW, and the CW size is defined by a minimum / maximum value. The CW size is fixed. The random number N is used to determine the time interval that the Tx entity needs to sense the channel in an idle state before performing a transmission on the channel.
[0110] Category 4 (cat-4): LBT with random backoff of CWs of variable size
[0111] -LBT method that performs random backoff by using a variable-sized CW. The Tx entity has a random number N in the CW, and the CW size is defined by the minimum / maximum value of N. The Tx entity can change the CW size when the random number N is generated. The random number N is used to determine the time interval that needs to sense the channel in an idle state before the Tx entity performs transmission on the channel. This can be called Type 1 channel access.
[0112] Fig.12 and Fig.13 The figure shows the DL transmission process based on Class 4 LBT. Class 4 LBT can be used to ensure fair channel access using Wi-Fi. Fig.12 and Fig.13 , the LBT process includes initial CCA (ICCA) and extended CCA (ECCA). In ICCA, random backoff is not performed, and in ECCA, random backoff is performed by using CW of variable size. ICCA is applicable to the case where the channel is idle when signal transmission is required, and ECCA is applicable to the case where the channel is busy when signal transmission is required or DL transmission has just been performed. Although the following description is based on DL transmission, it is also applicable to UL transmission. In the case of UL transmission, the user equipment is replaced by the base station in the following description.
[0113] Reference Fig.12 , the downlink transmission process based on Category 4 LBT, i.e., Type 1 channel access may be performed as follows.
[0114] Initial CCA
[0115] - S1202: The base station verifies that the channel is idle.
[0116] - S1204: The base station verifies whether signal transmission is required. When signal transmission is not required, the process returns to S1202, and when signal transmission is required, the process continues to S1206.
[0117] -S1206: The base station verifies that the channel is in the ICCA delay period (B CCA) is idle within the ICCA delay period. The ICCA delay period is configurable. As an implementation example, the ICCA delay period may be composed of an interval of 16 μs and n consecutive CCA slots. In this article, n may be a positive integer, and a CCA slot interval may be 9 μs. Depending on the QoS level, the number of CCA slots may be configured in different ways. The ICCA delay period may be set to an appropriate value by considering the delay period of Wi-Fi (e.g., DIFS or AIFS). For example, the ICCA delay period may be 34 μs. When the channel is idle within the ICCA delay period, the base station may perform a signal transmission process (S1208). When it is determined that the channel is busy during the ICCA delay period, the process proceeds to S1212 (ECCA).
[0118] - S1208: The base station may perform a signal transmission process. When signal transmission is not performed, the process proceeds to S1202 (ICCA), and when signal transmission is performed, the process proceeds to S1210. Even in the case where the backoff count N reaches 0 in S1218 and S1208 is performed, when signal transmission is not performed, the process proceeds to S1202 (ICCA), and when signal transmission is performed, the process proceeds to S1210.
[0119] - S1210: When additional signal transmission is not required, the process proceeds to S1202 (ICCA), and when additional signal transmission is required, the process proceeds to S1212 (ECCA).
[0120] Extended CCA
[0121] -S1212: The base station generates a random number N in the CW. N is used as a count during the backoff process, and N is generated from [0, q-1]. The CW may consist of q ECCA slots, and the ECCA slot size may be 9 μs or 10 μs. In S1214, the CW size (CWS) may be defined as q and may be variable. Thereafter, the base station proceeds to S1216.
[0122] -S1214: The base station may update the CWS. The CWS q may be updated to a value between X and Y. The X and Y values are configurable parameters. The CWS update / adjustment may be performed whenever N is generated (dynamic backoff), and may be performed semi-statically within a predetermined time interval (semi-static backoff). The CWS may be updated / adjusted based on an exponential backoff or a binary backoff. That is, the CWS may be updated / adjusted in the form of a square of 2 or a multiple of 2. In conjunction with PDSCH transmission, the CWS may be updated / adjusted based on feedback / reporting from the user equipment (e.g., HARQ ACK / NACK) or may be updated / adjusted based on base station sensing.
[0123] -S1216: The base station verifies that the channel is in the ECCA delay period ( DeCCA ). The ECCA delay period is configurable. As an implementation example, the ECCA delay period may consist of an interval of 16 μs and n consecutive CCA slots. In this article, n may be a positive integer, and a CCA slot interval may be 9 μs. Depending on the QoS level, the number of CCA slots may be configured in different ways. The ECCA delay period may be set to an appropriate value by considering the delay period of Wi-Fi (e.g., DIFS or AIFS). For example, the ECCA delay period may be 34 μs. When the channel is idle within the ECCA delay period, the base station proceeds to S1218. When it is determined that the channel is busy during the ECCA delay period, the base station repeats S1216.
[0124] - S1218: The base station verifies whether N is 0. When N is 0, the base station may perform the signal transmission process (S1208). In this case, (N=0), the base station may not perform transmission immediately, and perform a CCA check within at least one time slot to continue the ECCA process. When N is not 0 (i.e., N>0), the process continues to S1220.
[0125] - S1220: The base station senses the channel during one ECCA time slot interval (T). The ECCA time slot size may be 9 μs or 10 μs, and the actual sensing time may be at least 4 μs.
[0126] - S1222: When it is determined that the channel is idle, the process proceeds to S1224. When it is determined that the channel is busy, the process returns to S1216. That is, an ECCA delay period is applied again after the channel is idle, and N is not counted during the ECCA delay period.
[0127] -S1224: N minus 1 (ECCA count down)
[0128] Fig.13 Generally speaking Fig.12 The transmission process is the same / similar to that of Fig.12 Therefore, you can refer to Fig.12 to describe the problem in detail.
[0129] - S1302: The base station verifies whether signal transmission is required. When signal transmission is not required, S1302 is repeated, and when signal transmission is required, the process proceeds to S1304.
[0130] - S1304: The base station verifies whether the time slot is idle. When the time slot is idle, the process continues to S1306, and when the time slot is busy, the process continues to S1312 (ECCA). The time slot can be Fig.12 Corresponding to the CCA time slot in.
[0131] - S1306: The base station verifies whether the channel is idle within the delay period (D). D can be Fig.12 When the channel is idle during the delay period, the base station may perform a signal transmission process (S1308). When it is determined that the channel is busy during the delay period, the process proceeds to S1304.
[0132] - S1308: If necessary, the base station may perform a signal transmission process.
[0133] - S1310: When signal transmission is not performed, the process proceeds to S1302 (ICCA), and when signal transmission is performed, the process proceeds to S1312 (ECCA). Even in the case where the backoff count N reaches 0 in S1318 and S1308 is performed, when signal transmission is not performed, the process proceeds to S1302 (ICCA), and when signal transmission is performed, the process proceeds to S1312 (ECCA).
[0134] Extended CCA
[0135] - S1312: The base station generates a random number N in the CW. N is used as a count during the backoff process, and N is generated from [0, q-1]. In S1314, the CW size (CWS) may be defined as q and may be variable. Thereafter, the base station proceeds to S1316.
[0136] -S1314: The base station may update the CWS. The CWS q may be updated to a value between X and Y. The X and Y values are configurable parameters. The CWS update / adjustment may be performed whenever N is generated (dynamic backoff), and may be performed semi-statically within a predetermined time interval (semi-static backoff). The CWS may be updated / adjusted based on an exponential backoff or a binary backoff. That is, the CWS may be updated / adjusted in the form of a square of 2 or a multiple of 2. In conjunction with PDSCH transmission, the CWS may be updated / adjusted based on feedback / reports from the user equipment (e.g., HARQ ACK / NACK) or may be updated / adjusted based on base station sensing.
[0137] - S1316: The base station verifies whether the channel is idle within the delay period (D). D can be Fig.12The D in S1306 and the D in S1316 may be the same. When the channel is idle during the delay period, the base station proceeds to S1318. When it is determined that the channel is busy during the delay period, the base station repeats S1316.
[0138] - S1318: The base station verifies whether N is 0. When N is 0, the base station may perform a signal transmission process (S1308). In this case, (N=0), the base station may not perform transmission immediately, and perform a CCA check during at least one time slot to continue the ECCA process. When N is not 0 (i.e., N>0), the process continues to S1320.
[0139] - S1320: The base station selects one of an operation of N minus 1 and an operation of not decreasing N (self-delay). The self-delay operation may be performed according to the implementation / selection of the base station, and in the self-delay the base station does not perform energy detection sensing and does not even perform ECCA countdown.
[0140] - S1322: The base station may select one of not performing an operation of energy detection sensing and an energy detection operation. When energy detection sensing is not performed, the process proceeds to S1324. When the energy detection operation is performed, if the energy level is equal to or less than the energy detection threshold (i.e., idle), the process proceeds to S1324. If the energy level is greater than the energy detection threshold (i.e., busy), the process returns to S1316. That is, a delay period is applied again after the channel is idle, and N is not calculated during the delay period.
[0141] -S1324: The process continues to enter S1318.
[0142] LBT scheme for uplink transmission
[0143] As a method for performing LBT used by a terminal in the transmission of uplink traffic corresponding to an uplink grant, an LBT scheme performed when sending an uplink grant can be performed, or when the uplink traffic is sent within the maximum channel occupancy time (MCOT) ensured when sending the uplink grant, a single interval LBT such as 16us, 25us, 34us or 43us (hereinafter referred to as type 2 channel access) can be performed, thereby achieving fast channel access for uplink data transmission.
[0144] Alternatively, as a method for performing LBT used by a terminal in the transmission of an uplink service corresponding to an uplink grant, an LBT scheme performed when an uplink grant is sent may be performed, or cat-4 LBT (hereinafter, may be referred to as type 1 channel access) may be performed when an uplink service is sent outside of the MCOT ensured when an uplink grant is sent.
[0145] Alternatively, the base station may signal the terminal whether to perform type 2 channel access capable of fast channel access, or type 1 channel access in which random backoff is performed as LBT of the uplink service. For example, the base station may notify the terminal of type 1 channel access or type 2 channel access through an uplink grant. In this case, type 1 channel access means Cat-4 LBT, and type 2 channel access means Cat-2 LBT or 25us LBT.
[0146] CWS adjustment for DL transmission
[0147] Fig.14 The figure shows an example of a base station performing DL transmission in an unlicensed band. The base station can aggregate one or more cells in the licensed band (for convenience, LTE-L cells or LAA cells) and one or more cells in the unlicensed band (for convenience, LTE-U cells). Fig.14 In the present invention, it is assumed that one LTE-L cell and one LTE-U cell are aggregated to communicate with a user equipment. The LTE-L cell may be a PCell, and the LTE-U cell may be an SCell. In the LTE-L cell, the base station may use only frequency resources and perform operations according to LTE in the prior art. Therefore, all radio frames may be composed of a regular subframe (rSF) having a length of 1 ms (see Figure 2 ), and DL transmission (eg, PDCCH and PDSCH) may be performed in each subframe (see Figure 1 ). Meanwhile, in the LTE-U cell, DL transmission is performed based on LBT for coexistence with conventional devices (e.g., Wi-Fi devices). Furthermore, it is necessary to allocate or reserve a specific frequency band within a specific time in order to effectively implement LTE-U technology / services. Therefore, in the LTE-U cell, DL transmission may be performed through a set of one or more consecutive subframes (DL transmission bursts) after LBT. Depending on the LBT situation, the DL transmission burst may start with a regular subframe (rSF) or a partial subframe (pSF). The pSF may be part of a subframe and may include the second time slot of the subframe. Further, the DL transmission burst may end with an rSF or a pSF.
[0148] Hereinafter, a method for adaptively adjusting the CWS of channel access in an unlicensed band will be described. The CWS may be adjusted based on user equipment (UE) feedback, and the UE feedback for CWS adjustment may include a HARQ-ACK response and CQI / PMI / RI. More specifically, a method for adaptively controlling the CWS based on the HARQ-ACK response will be described. The HARQ-ACK response includes ACK, NACK, and DTX.
[0149] For reference, such as Fig.11 As described, even in Wi-Fi, CWS is adjusted based on ACK. When ACK is fed back, CWS is reset to the minimum value (CWmin), and when ACK is not fed back, CWS increases. However, since Wi-Fi is a peer-to-peer (1:1) system and a cellular system (e.g., LTE) is a multiple access system, the Wi-Fi method cannot be efficiently applied, and a CWS adjustment method considering multiple access is required.
[0150] First, terms are defined as follows.
[0151] -HARQ-ACK feedback value set (HARQ-ACK feedback set): This set refers to (multiple) HARQ-ACK feedback values used to update / adjust the CWS. The HARQ-ACK feedback set corresponds to (multiple) HARQ-ACK feedback values that are decoded and available when determining the CWS. The HARQ-ACK feedback set includes (multiple) HARQ-ACK feedback values for one or more DL (channel) transmissions (e.g., PDSCH) on an unlicensed band (e.g., LTE-U cell). The HARQ-ACK feedback set may include (multiple) HARQ-ACK feedback values for DL (channel) transmissions (e.g., PDSCH), for example, multiple HARQ-ACK feedback values fed back from multiple user equipments. The HARQ-ACK feedback value may represent reception response information of a transport block or PDSCH, and may represent ACK, NACK, DTX, and NACK / DTX. Depending on the context, the HARQ-ACK feedback value may be mixed with HARQ-ACK value / bit / response / information, etc.
[0152] - Reference window: The reference window refers to the time interval for performing DL transmission (e.g., PDSCH) corresponding to the HARQ / ACK feedback set in an unlicensed band (e.g., LTE-U cell). The reference window may be defined in units of SF. The reference window will be described / proposed in more detail below.
[0153] In LTE, according to the HARQ-ACK feedback scheme or PUCCH format, the HARQ-ACK value can represent only ACK and NACK, or further represent DTX. For example, when PUCCH format 3 is configured as the HARQ-ACK feedback method, the HARQ-ACK value can represent only ACK and NACK. In contrast, when the channel selection scheme using PUCCH format 1b is configured as the HARQ-ACK feedback method, the HARQ-ACK value can represent ACK, NACK, DTX, and NACK / DTX.
[0154] Therefore, the cases where only ACK and NACK are considered as the HARQ-ACK response and the case where DTX is further configured as the HARQ-ACK response are described separately. The basic problems are common to each other.
[0155] Case 1: Consider only ACK and NACK as HARQ-ACK responses
[0156] The following method can be regarded as a method for adjusting the CWS based on the HARQ-ACK feedback set. Options 1 to 3 and alternatives 1 to 3 can be combined.
[0157] - Option 1: If all the HARQ-ACK feedback values in the reference window are determined to be NACK, the CWS is increased, and if not (i.e., if there is at least one ACK), the CWS can be reset to the minimum value.
[0158] - Option 2: If at least one of the HARQ-ACK feedback values in the reference window is determined to be NACK, the CWS is increased, and if not (i.e., if all values are ACK), the CWS can be reset to the minimum value.
[0159] - Option 3: If NACK is determined to be at least Z% (0 < Z < 100) among the HARQ-ACK feedback values in the reference window, the CWS is increased, and if not, the CWS can be reset to the minimum value. As an example, Z can be 50 or 80. That is, if the ratio of NACK in the HARQ-ACK feedback (hereinafter referred to as Y%) is equal to or greater than the reference value, the CWS is increased, and when the ratio of NACK is less than the reference value, the CWS can be reset to the minimum value. Depending on the unit, the reference value can be 0 < reference value < 1 or 0% < reference value < 100%. Similarly, if ACK is determined to be less than P% (X = 100 - Z) of the values in the reference window of the HARQ-ACK feedback, the CWS is increased, and if not, the CWS can be reset to the minimum value. As an example, P can be 20 or 50.
[0160] When CWS increases, CWS may double, increase exponentially between a minimum value CW_min and a maximum value CW_max, or increase to a maximum value.
[0161] In addition, when at least one of the following conditions is met, CWS may be reset to CW_min.
[0162] - Alternative 1: Maximum CWS (CW_max) is used for the case of K consecutive ECCAs. In this paper, K is fixed to one of 1, 2, and 3 or can be selected by the base station within {1, ..., 8}.
[0163] - Alternative 2: There is no situation where DL transmission is performed by the base station for at least a period of T. T is a predetermined value or a configurable value.
[0164] -Alternative 3: Case of using maximum HARQ retransmissions in K consecutive ECCAs. In this article, K is fixed to one of 1, 2, and 3 or can be selected by the base station within {1, ..., 8}.
[0165] The reference window may be: (1) a single subframe in the last DL transmission burst (ie, the latest DL transmission burst on the unlicensed band), (2) multiple (eg, two) subframes, or (3) all subframes in which HARQ-ACK feedback is available.
[0166] In this document, (1) a single subframe may be the first or last subframe of the last DL transmission burst. A single subframe may be a regular subframe rSF or a partial subframe pSF. However, in a partial subframe, the number of user equipment that can be served by the base station is limited. Therefore, when the first or last subframe of the last DL transmission burst is a partial subframe, the base station can efficiently adjust the CWS according to channel conflicts or interference by defining a HARQ-ACK feedback set based on the HARQ-ACK feedback value of (multiple) user equipments corresponding to the regular subframe. For example, when the first or last subframe of the last DL transmission burst is a partial subframe, the reference window may be multiple subframes.
[0167] Herein, (2) multiple subframes may be the first multiple subframes or the last multiple subframes in the last DL transmission burst. For example, when the number of multiple subframes is 2, the multiple subframes may be the first two subframes of the last DL transmission burst, that is, (the first subframe) a partial subframe or a regular subframe, and (the second subframe) a regular subframe. Further, the multiple subframes may be the last two subframes, that is, (the first subframe) a regular subframe, and (the second subframe) a partial subframe or a regular subframe.
[0168] Case 2-1: DTX is also considered as a HARQ-ACK response
[0169] Hereinafter, a method for adjusting CWS by treating ACK, NACK, and DTX as HARQ-ACK responses transmitted from a user equipment will be described. In self-carrier scheduling, that is, in the case where DL transmission (e.g., PDSCH) of a carrier in an unlicensed band is performed through a control channel (e.g., (E)PDCCH) transmitted on the same unlicensed band carrier, the HARQ feedback that can be transmitted by the user equipment regarding the DL transmission of the unlicensed band may include ACK, NACK, DTX, and NACK / DTX. In this article, since DTX corresponds to a situation where DL transmission is unsuccessful due to a hidden node in an unlicensed band carrier, etc., DTX can be used together with NACK to perform CWS adjustment. Further, DTX is one of the methods, that is, even if the base station transmits a control channel (e.g., (E)PDCCH) including scheduling information to the user equipment, the user equipment notifies the base station of the situation that the user equipment may not decode the corresponding control channel. DTX can be determined only by the HARQ-ACK feedback value or by considering the HARQ-ACK feedback value and the actual scheduling situation. For convenience, a self-carrier scheduling operation is assumed.
[0170] The following method can be considered as a method of adjusting CWS based on a HARQ-ACK feedback set. Methods A-1 to A-4 and methods B-1 to B-3 can be combined.
[0171] -Method A-1: In the case where all HARQ-ACK feedback values in the reference window are NACK, all HARQ-ACK feedback values are determined to be DTX, or all HARQ-ACK feedback values are NACK / DTX, the CWS increases, and if this is not the case (i.e., if there is at least one ACK), the CWS may be reset to a minimum value.
[0172] - Method A-2: If at least one of the HARQ-ACK feedback values of the reference window is determined to be NACK, DTX, or NACK / DTX, the CWS increases, and if not (ie, if all values are ACK), the CWS may be reset to a minimum value.
[0173] - Method A-3: If NACK or DTX is determined to be at least Z% (0 < Z < 100) in the HARQ-ACK feedback value of the reference window, then the CWS is increased, and if not, the CWS can be reset to the minimum value. As an example, Z can be 50 or 80. In this context, at least Z% of NACK or DTX means increasing either NACK or DTX (i.e., the sum of NACK, DTX, and NACK / DTX) to become at least Z%. That is, NACK / DTX and DTX can be regarded as the same as NACK. Therefore, if the ratio of NACK or DTX in the HARQ-ACK feedback (hereinafter referred to as Y%) is equal to or greater than the reference value, the CWS is increased, and when the ratio of NACK or DTX is less than the reference value, the CWS can be reset to the minimum value. Depending on the unit, the reference value can be 0 < reference value < 1 or 0% < reference value < 100%. Similarly, if ACK is determined to be less than P% (X = 100 - Z) in the HARQ-ACK feedback value of the reference window, the CWS is increased, and if not, the CWS can be reset to the minimum value. As an example, P can be 20 or 50.
[0174] - Method A-4: In the case where all HARQ-ACK feedback values in the reference window are determined to be DTX, considering that all control channels PDCCH / EPDCCH are not received by the user equipment or the decoding of PDCCH and EPDCCH is unsuccessful due to interference from other nodes, the base station increases the CWS, and if not (i.e., when not all HARQ-ACK feedback values are determined to be DTX), the CWS can be adjusted according to Method A-1 to A-3.
[0175] When the CWS is increased, the CWS can be doubled, increased exponentially between the minimum value CW_min and the maximum value CW_max, or increased to the maximum value.
[0176] In addition, when at least one of the following conditions is met, the CWS can be reset to CW_min.
[0177] - Method B-1: The maximum value CWS (CW_max) is used for the case of K consecutive ECCAs. In this context, K is fixed as one of 1, 2, and 3 or K can be selected by the base station within {1,..., 8}.
[0178] - Method B-2: There is no case where DL transmission is performed by the base station within at least T time periods. T is a predetermined value or a configurable value.
[0179] - Method B-3: The case of using the maximum HARQ retransmission within K consecutive ECCAs. In this article, K is fixed to one of 1, 2, and 3 or can be selected by the base station within {1, ..., 8}.
[0180] The reference window may be: (1) a single subframe in the last DL transmission burst (i.e., the latest DL transmission burst in the unlicensed band), (2) multiple (e.g., two) subframes, or (3) all subframes in which HARQ-ACK feedback is available. For details, refer to the content described in Case 1.
[0181] Case 2-2: DTX is also considered as a HARQ-ACK response
[0182] Hereinafter, another example of a method for adjusting CWS by treating ACK, NACK, and DTX as HARQ-ACK responses transmitted from a user equipment will be described. In self-carrier scheduling, that is, in the case where DL transmission (e.g., PDSCH) of a carrier in an unlicensed band is performed through a control channel (e.g., (E)PDCCH) transmitted on the same unlicensed band carrier, the HARQ feedback that can be transmitted by the user equipment for DL transmission in the unlicensed band may include ACK, NACK, DTX, and NACK / DTX. In this article, since DTX corresponds to a situation where DL transmission is unsuccessful due to a hidden node in an unlicensed band carrier, etc., DTX can be used together with NACK to perform CWS adjustment. Further, the DTX disclosed herein is one of the methods, that is, even if the base station transmits a control channel (e.g., (E)PDCCH) including scheduling information to the user equipment, the user equipment notifies the base station of the situation where the user equipment does not decode the corresponding control channel. DTX can be determined only by the HARQ-ACK feedback value or by considering the HARQ-ACK feedback value and the actual scheduling situation. For convenience, a self-carrier scheduling operation is assumed.
[0183] The following method can be considered as a method of adjusting CWS based on the HARQ-ACK feedback set. Methods C-1 and C-2 and methods D-1 to D-3 can be combined.
[0184] -Method C-1: In the case where DTX exists in the HARQ-ACK feedback value of the reference window, according to method A-3, when Y% is calculated as HARQ-ACK feedback based on NACK or DTX, a weight can be applied to DTX. In the case where the base station can distinguish between NACK and DTX, and in the case where the user equipment also feeds back DTX even if the base station transmits PDSCH related to the control channel PDCCH / EPDCCH, the base station can know that the corresponding user equipment does not accept the control channel PDCCH / EPDCCH. In this case, the base station can identify the probability of interference or hidden nodes, etc. occurring in the corresponding channel. Therefore, when DTX is received from the user equipment, the base station can calculate Y% by applying the weight to DTX so as to more actively solve the problem generated by interference or hidden nodes on the channel. Further, when NACK / DTX is included in the HARQ-ACK feedback value within the reference window, the base station can regard NACK / DTX as NACK. In contrast, when the user equipment feeds back NACK / DTX to the base station, it makes sense for the user equipment to inform the base station that the HARQ-ACK feedback value can be DTX. Therefore, when NACK / DTX is fed back from the user equipment, the base station can calculate Y% by applying the weight to NACK / DTX in the HARQ-ACK feedback set. The values considered as HARQ-ACK feedback may be ACK, NACK, NACK / DTX, and DTX. As described herein, Y% for adjusting CWS may be calculated by considering different weights for NACK, NACK / DTX, and DTX in addition to ACK.
[0185] Formula 1 represents an example of method C-1. This method can be similarly represented by another formula and is not limited to the following formula.
[0186] [Formula 1]
[0187] Y%={W_A*Pr(A)+W_B*Pr(B)+W_C*Pr(C)}*100,
[0188] In this text, Pr(A) represents the probability of NACK in the reference window, that is, Pr(A) = the number of NACKs / the total number of available HARQ-ACK feedbacks in the reference window. In this text, Pr(B) represents the probability of NACK / DTX in the reference window, that is, Pr(B) = the number of NACK / DTXs / the total number of available HARQ-ACK feedbacks in the reference window. In this text, Pr(C) represents the probability of DTX in the reference window, that is, Pr(C) = the number of DTXs / the total number of available HARQ-ACK feedbacks in the reference window. W_A refers to the weight of NACK, W_B refers to the weight of NACK / DTX, and W_C refers to the weight of DTX.
[0189] First, W_A = W_B = W_C is the case where NACK, NACK / DTX, and DTX are calculated using the same weights in the HARQ-ACK feedback set when calculating Y%. W_A < W_B = W_C is the case where NACK / DTX and DTX are calculated using weights larger than the weight of NACK, and NACK / DTX and DTX are calculated using the same weights in the HARQ-ACK feedback set when calculating Y%. W_A = W_B < W_C is the case where NACK and NACK / DTX are calculated using the same weights, and DTX is calculated using a larger weight in the HARQ-ACK feedback set when calculating Y%. W_A < W_B = W_C is the case where NACK / DTX is calculated using a weight larger than NACK, and DTX is calculated using a weight larger than NACK / DTX in the HARQ-ACK feedback set when calculating Y%.
[0190] - When the calculated Y% is at least Z%, the CWS is increased, and if not, the CWS can be reset to the minimum value. In this text, Z% is a reference value that can be set in the base station (e.g., 0 < Z < 100). For example, Z can be 50 or 80.
[0191] - Method C-2: When there is at least one DTX feedback in the reference window, the CWS can be increased. This method is a method that overrides Option-3 or Method A-3. If not (i.e., no DTX), the CWS can be adjusted according to Option-3 or Method A-3. Since DTX indicates that the user equipment does not receive the control channel PDCCH / EPDCCH on the unlicensed band due to interference or hidden nodes in the same channel, the base station can increase the CWS as a method to solve the problem.
[0192] When the CWS is increased, the CWS can be doubled, increased exponentially between the minimum CW_min and the maximum CW_max, or increased to the maximum value.
[0193] In addition, when at least one of the following conditions is met, CWS may be reset to CW_min.
[0194] - Method D-1: Maximum CWS (CW_max) is used for the case of K consecutive ECCAs. In this paper, K is fixed to one of 1, 2, and 3 or can be selected by the base station within {1, ..., 8}.
[0195] - Method D-2: There is no situation where DL transmission is performed by the base station for at least a period of T. T is a predetermined value or a settable value.
[0196] - Method D-3: Case of using maximum HARQ retransmission in K consecutive ECCAs. In this article, K is fixed to one of 1, 2, and 3 or can be selected by the base station within {1, ..., 8}.
[0197] The reference window may be: (1) a single subframe in the last DL transmission burst (i.e., the latest DL transmission burst in the unlicensed band), (2) multiple (e.g., two) subframes, or (3) all subframes in which HARQ-ACK feedback is available. For details, refer to the content described in Case 1.
[0198] Depending on whether the scheduling cell is an LTE-L cell or an LTE-U cell in cross-carrier scheduling, cases 2-1 and 2-2 may be applied in different ways as described below.
[0199] - In the case where DL transmission transmitted in an unlicensed carrier is cross-carrier scheduled from different unlicensed bands (i.e., unlicensed carrier, unlicensed band cell, and LTE-U cell), CWS can be adjusted by using the same method as self-carrier scheduling. The reason is that since the control channel (e.g., PDCCH / EPDCCH) is transmitted in the unlicensed carrier, the determination of the base station based on (multiple) HARQ-ACK responses (ACK, NACK, DTX, and NACK / DTX) can be performed in the same manner as in the case of self-carrier scheduling.
[0200] -In the case where the DL transmission transmitted in the unlicensed carrier is cross-carrier scheduled from the licensed band (i.e., the licensed carrier, the licensed band cell, and the LTE-L cell), the PDCCH / EPDCCH as the control channel for scheduling the DL transmission is transmitted in the licensed band. In this case, since DTX feedback is used to determine the decoding situation of the user equipment for the control channel transmitted on the licensed band, it cannot help to adaptively adjust the CWS for channel access in the unlicensed band. Therefore, in cross-carrier scheduling from the licensed band, the method of adjusting the CWS considering DTX is set to not be used, and the CWS can be adjusted by only considering ACK and NACK as (multiple) HARQ-ACK responses to DL transmissions (e.g., PDSCH) on the unlicensed band. Alternatively, the CWS can be adjusted by only considering ACK, NACK, and NACK / DTX as (multiple) HARQ-ACK responses to DL transmissions (e.g., PDSCH) on the unlicensed band. For example, DTX as a HARQ-ARQ response due to cross-carrier scheduling from the authorized band can be excluded in the process of applying cases 1, 2-1, and 2-2. Specifically, in Option 3 and Method A-3, DTX of HARQ-ARQ due to cross-carrier scheduling from the authorized band can be excluded when calculating Z%. That is, in the HARQ-ACK feedback set, only ACK and NACK are selected to calculate Z%, or only ACK, NACK, and NACK / DTX are selected to calculate Z. In addition, the following two methods can be used for the base station to calculate Z% excluding DTX in Option 3 and Method A-3.
[0201] - First, when determining Z%, DTX indicating a failure to receive a control channel at the user equipment for control channel transmission on the granted cell is not included in the entire HARQ-ACK value and is not included in the ratio of NACK.
[0202] - Second, in determining Z%, DTX indicating a failure to receive a control channel at the user equipment for control channel transmission on the granted cell is included in the entire HARQ-ACK value but is not included in the ratio of NACK.
[0203] -As described above, if a DL transmission sent on an unlicensed carrier is cross-carrier scheduled from a licensed band (i.e., a licensed carrier, a licensed band cell, and a LTE-L cell), DTX as a HARQ-ACK response for cross-carrier scheduling from the licensed band can be excluded from the process of applying cases 1, 2-1, and 2-2. Specifically, when calculating Z% in Option 3 and Method A-3, DTX as a HARQ-ACK response for cross-carrier scheduling from the licensed band can be excluded. In addition, the following two methods can be used for the base station to exclude DTX in Option 3 and Method A-3 to calculate Z%.
[0204] - First, when determining Z%, DTX indicating a failure to receive a control channel at the user equipment for control channel transmission on the granted cell is not included in the entire HARQ-ACK value, and is not included in the ratio of NACK.
[0205] - Second, DTX indicating a failure to receive a control channel at the user equipment for control channel transmission on the granted cell is included in the entire HARQ-ACK value but is not included in the ratio of NACK.
[0206] However, when HARQ-ACK feedback is performed using a channel selection scheme based on PUCCH format 1b (i.e., PUCCH format 1b with channel selection), the base station can determine the HARQ-ACK response according to no transmission even if the user equipment does not perform transmission. Specifically, the base station can determine the HARQ-ACK response corresponding to no transmission based on the HARQ-ACK response values of Tables 3 to 5 defined for A=2 to 4. For example, when A=2, if the user equipment does not perform transmission, the base station can determine that the HARQ-ACK response corresponding to no transmission is [HARQ-ACK(0), HARQ-ACK(1)]=[DTX, NACK / DTX] based on Table 3.
[0207] -If a DL transmission sent on an unlicensed carrier is cross-carrier scheduled from a licensed band (i.e., a licensed carrier, a licensed band cell, and an LTE-L cell), and the user equipment is configured to send a HARQ-ACK response using a channel selection scheme based on PUCCH format 1b in cases other than (i) no transmission from the user equipment and (ii) the base station fails to detect a HARQ-ACK response, then when calculating Z% to adjust CWS, the NACK / DTX state and any state that is a HARQ-ACK response may be considered as NACK. That is, if there is clearly a HARQ-ACK response, the NACK / DTX state and any state may be considered as NACK when calculating Z%. On the other hand, in the case where (i) there is no transmission from the user equipment or (ii) the base station fails to detect a HARQ-ACK response, the HARQ-ACK response determined by the base station as DTX may be excluded when calculating Z%. In this case, as a method of configuring DTX to be excluded when calculating Z%, the following two methods are possible.
[0208] - First, because the corresponding DTX may not reflect the channel status of the non-licensed cell, DTX is not included in the entire HARQ-ACK value and is not included in the ratio of NACK when determining Z%.
[0209] - Second, the corresponding DTX is included in the entire HARQ-ACK value but not included in the ratio of NACK.
[0210] Different from this, in the absence of a transmission from the user equipment, or (ii) when the base station fails to detect the HARQ response, the HARQ-ACK response determined by the base station as NACK / DTX when calculating Z% can be considered as NACK. This can be a method for allowing the base station to perform CWS adjustment by assuming the possibility of NACK for DL transmission on an unlicensed carrier. Different from this, in the absence of a transmission from the user equipment, or (ii) when the base station fails to detect the HARQ-ACK response, the HARQ-ACK response determined by the base station as NACK / DTX when calculating Z% is considered as DTX rather than NACK so that NACK / DTX is not included in Z%. Therefore, the NACK / DTX state can be ignored. Specifically, because it may be uncertain whether (i) and (ii) are caused by an error in the PDCCH / EPDCCH transmission in the authorized carrier or by the situation where the base station does not perform PUCCH detection, because the channel state of the channel for sending PUCCH on the authorized carrier is not a good state, and at the same time, the NACK sent by the user equipment for the PDSCH sent through the unlicensed carrier is sent through the PUCCH on the authorized carrier. Therefore, when calculating Z%, the corresponding NACK / DTX state can be regarded as DTX, so that it can not be regarded as NACK when calculating Z%. That is, the NACK / DTX state can be ignored so as not to be included in Z%. Here, the following two methods can be used for the base station to ignore NACK / DTX and determine Z% without including NACK / DTX.
[0211] -First, because DTX indicating failure to receive a control channel at a user equipment for control channel transmission on a licensed cell may not reflect the channel state of an unlicensed cell, it is possible to configure NACK / DTX not to be included in the entire HARQ-ACK value and not to be included in the ratio of NACK when determining Z%.
[0212] -Second, because DTX indicating a failure to receive a control channel at a user equipment for control channel transmission on a licensed cell may not reflect the channel status of an unlicensed cell, NACK / DTX may be configured to be included in the entire HARQ-ACK value but not in the ratio of NACK.
[0213] At the same time, when a part of the HARQ-ACK is determined to be DTX and another part of the HARQ-ACK is determined to be NACK / DTX in the process of detecting HARQ-ACK for no transmission, DTX as a part of the HARQ-ACK can be reflected in the calculation of Z% equivalent to NACK / DTX. For example, if NACK / DTX is regarded as NACK to be reflected in Z%, DTX can also be determined as NACK to be reflected in Z% of NACK. On the other hand, if NACK / DTX is not reflected in Z%, DTX can be regarded as DTX not reflected in Z%. Here, the following two methods can be used to set the base station to not reflect DTX when determining Z%.
[0214] - First, since DTX indicating a failure to receive a control channel at a user equipment for control channel transmission on a licensed cell does not reflect a channel state of an unlicensed cell, DTX is not included in the entire HARQ-ACK value and is not included in the ratio of NACK when determining Z%.
[0215] - Second, DTX indicating a failure to receive a control channel at the user equipment for control channel transmission on the granted cell is included in the entire HARQ-ACK value but is not included in the ratio of NACK.
[0216] Figures 15 to 17 The diagram illustrates the signal transmission process. Fig.15 illustrates a method for adjusting the CWS according to scenario 1, and Fig.16 and Fig.17 The reference window used to generate the HARQ-ACK feedback set is shown. Cases 2-1 and 2-2 can be performed similarly.
[0217] Reference Fig.15, the base station may transmit the nth DL transmission burst in an unlicensed band (e.g., an LTE-U cell) (S1502), and thereafter, when an additional DL transmission is required, transmit the (n + 1)th DL transmission burst based on ECCA (S1512). Specifically, when the channel in the unlicensed band is idle during the ECCA delay period, the base station also performs a random backoff in the CW (S1510). The base station may generate a random number N in the CW (e.g., [0, q - 1]) (S1508) and perform the backoff as long as the time slot corresponds to the random number N (S1510). Here, the CWS is adaptively changed based on the HARQ-ACK feedback value from the user equipment (S1506). The HARQ-ACK feedback value for adjusting the CWS includes the HARQ-ACK feedback value of the latest DL transmission burst (the nth DL transmission burst). The HARQ-ACK feedback value for adjusting the CWS includes the HARQ-ACK feedback value of the DL transmission on the reference window in the DL transmission burst (S1504).
[0218] When applying Scenario 1, the CWS may be adjusted as follows based on the HARQ-ACK feedback value. Scenarios 2-1 and 2-2 may be applied similarly.
[0219] - Option 1: When all HARQ-ACK feedback values of the reference window are NACK, the CWS is increased, and if not, the CWS is reset to the minimum value.
[0220] - Option 2: When at least one of the HARQ-ACK feedback values of the reference window is NACK, the CWS is increased, and if not, the CWS is reset to the minimum value.
[0221] - Option 3: When the NACK among the HARQ-ACK feedback values of the reference window is at least Z% (0 < Z < 100), the CWS is increased, and when the NACK is not at least Z%, the CWS is reset to the minimum value.
[0222] When the CWS is increased, the CWS may be doubled, increased exponentially between the minimum value (CW_min) and the maximum value (CW_max), or increased to the maximum value.
[0223] Referring to Fig.16 and Fig.17 , the reference window may be composed of the starting subframe ( Fig.16 ) and the last subframe ( Fig.17). When the reference window is located at the start position of the DL transmission burst, the reference window may be composed of (i) a normal subframe and (ii) a partial subframe and a normal subframe. Further, when the reference window is located at the end position of the DL transmission burst, the reference window may be composed of (i) a normal subframe and (ii) a normal subframe and a sub-subframe.
[0224] This method assumes that the HARQ-ACK response sent from the user equipment is sent through the PUCCH or PUSCH on the PCell of the licensed band.
[0225] Next, when the user equipment is configured to send ACK, NACK, NACK / DTX and DTX values on an unlicensed carrier through UL on an unlicensed carrier as a HARQ-ACK response for a PDSCH sent through DL, a method for performing CW size update / adjustment on transmission in a base station will be described.
[0226] A case where HARQ-ACK for PDSCH transmitted through DL on LAA SCell is transmitted only through UL on an unlicensed carrier or LAA SCell will be described.
[0227] -In method 100, in the case where the HARQ-ACK for PDSCH sent via DL on an unlicensed carrier or LAA SCell is only sent via UL on an unlicensed carrier or LAA SCell, if at least one ACK is fed back as the HARQ-ACK sent via UL on the LAA SCell, the base station may reset the CW size for DL PDSCH transmission on the LAA SCell, otherwise the CW size may be increased (e.g., doubled). That is, when the base station successfully decodes the PUCCH or PUSCH including the HARQ-ACK sent from the user equipment on the LAA SCell and detects at least one ACK for the PDSCH sent from the base station from the user equipment, the base station may reset the CW size. In this case, the base station determines that the channel of the medium between the base station and the user equipment is idle to reset each CWp (e.g., p={1,2,3,4}) that can be reset according to different settings of the channel access priority to CWmin. In addition, when the user equipment sends feedback using NACK because the user equipment fails to decode the PDSCH and the base station detects or determines NACK, NACK / DTX or DTX, the base station can double the CW. Alternatively, even in the case where NACK, NACK / DTX or DTX is detected at the base station, this may occur due to the transmission of PUCCH or PUSCH including HARQ-ACK sent from the user equipment on an unlicensed carrier, and the base station can double the CW. In this case, the base station can determine that the channel of the medium between the base station and the user equipment is busy, and can double the CWp set according to different types of channel access priority (e.g., p = {1, 2, 3, 4}). In addition, if the LBT repetition using the CW_max value is set to K times (e.g., K = {1, ..., 8}) after doubling the CW size, the CWp can be set to the CW_min value. The value K can be specified by the base station as a value of {1, ..., 8}.
[0228] When the number of unlicensed carriers increases, it may not be possible to send the HARQ-ACK value only through the UL on a specific single unlicensed carrier. In this case, the HARQ-ACK transmission can be performed through the UL in groups, in which the transmission of the HARQ-ACK response is possible and set by the RRC. At the same time, when there are not many DL PDSCH transmissions on the unlicensed carrier, the HARQ-ACK response can be sent only through the UL on a single LAA SCell. When HARQ-ACK transmission is performed through the UL of the group unit, the unlicensed carrier (e.g., LAA SCell index) on which the transmission of HARQ-ACK depends on the channel availability based on the channel access within the group can be configured to change dynamically in units of subframes, or can be configured as a single semi-static unlicensed carrier (e.g., LAA SCell). The base station that receives feedback about HARQ-ACK on a group basis can update / adjust the CWp and group_index (group index) of the DL PDSCH to be sent to the user equipment by managing the CWp and group_index based on the group. Based on the feedback of HARQ-ACK of DL PDSCH on LAA SCELLs configured into groups, the CW size can be reset or doubled.
[0229] A case in which the HARQ-ACK feedback of the PDSCH sent on the unlicensed carrier or LAA SCell is divided into the HARQ-ACK feedback sent through the PUCCH or PUSCH on the licensed carrier and the HARQ-ACK feedback sent through the PUCCH or PUSCH on the unlicensed carrier will be described.
[0230] -In method 110, HARQ-ACK feedback for PDSCH sent on an unlicensed carrier or LAA SCell is divided into HARQ-ACK feedback sent through PUCCH or PUSCH on a licensed carrier and HARQ-ACK feedback sent through PUCCH or PUSCH on an unlicensed carrier. In this case, based on Z% of NACK (e.g., 80 or 50, which can be a natural value set by the base station), if the feedback determined to be NACK is Z% or greater, the CW is doubled according to the CW size update / adjustment of the HARQ-ACK feedback sent through UL on the licensed carrier, otherwise the CW size update / adjustment resets the CW size. When HARQ-ACK feedback is sent on the authorized carrier in the HARQ-ACK feedback of the PDSCH sent on the LAA cell, the CW size of the LAA SCell used to send the PDSCH corresponding to the HARQ-ACK sent on the authorized carrier can be adjusted / updated using methods A-1, A-2, A-3, A-4, B-1, B-2, B-3 and combinations thereof. If the LBT repetition using the CW_max value is set to K times (e.g., K = {1, ..., 8}) after doubling the CW size, CWp can be set to the CW_min value. The value K can be specified by the base station as a value of {1, ..., 8}.
[0231] In the case of CW size update / adjustment based on HARQ-ACK feedback sent via UL on an unlicensed carrier, the group of HARQ-ACKs corresponding to the PDSCH sent via DL on the LAA SCell is sent only via UL on the unlicensed carrier, or the LAA SCell may be limited to the LAA SCell that sends the PDSCH corresponding to the HARQ-ACK sent on the unlicensed carrier. Therefore, the same method as in method 100 can be applied to perform CW size update / adjustment on the PDSCH sent on the LAA SCell. If the LBT repetition using the CW_max value is set to K times (e.g., K = {1, ..., 8}) after doubling the CW size, CWp can be set to the CW_min value. The value K can be specified by the base station as a value of {1, ..., 8}.
[0232] Unlike the method of updating / adjusting the CW size according to whether the cell that independently sends HARQ-ACK is an unlicensed cell (e.g., LAA SCell) or an authorized cell, a method of managing the CW size of the LBT for DL PDSCH transmission on an unlicensed carrier or LAA SCell may also be considered by referring to the HARQ-ACK feedback on the authorized carrier and the HARQ-ACK feedback on the unlicensed carrier. When the conditions of methods 100 and 110, which are a hybrid method of methods 100 and 110, that is, the case where the ACK detection as a feedback value sent by UL on the unlicensed carrier is performed by the base station (i.e., condition -110) and the case where the feedback regarded as NACK is not equal to or greater than Z% (i.e., condition -110), are both met, the CW size can be reset. However, when both conditions are not met, the CW size may be doubled. Alternatively, because condition -100 takes into account UL transmission on the unlicensed carrier, it is determined that the channel state of the unlicensed carrier can be better reflected, so that the CW size can be reset or doubled depending on whether condition -100 is met. Different from this, condition-110 designed to better reflect the channel status of all UEs is considered to better reflect the channel status of the unlicensed carrier in all UEs, so that a method of resetting or doubling the CW size according to whether condition-110 is satisfied can be considered. If the LBT repetition using the CW_max value is set to K times (e.g., K={1, ..., 8}) after doubling the CW size, CWp can be set to the CW_min value. The value K can be specified by the base station as a value in {1, ..., 8}.
[0233] In the existing LTE system up to Release 13, if simultaneous transmission of PUSCH and PUCCH is set in the user equipment, simultaneous transmission of PUSCH and PUCCH can be performed in the same carrier or different carriers. However, if simultaneous transmission of PUSCH and PUCCH is not configured in the user equipment, transmission of UCI such as HARQ-ACK and CSI is performed on PUCCH in the case where PUSCH transmission is not scheduled in the corresponding subframe, and in the case where PUSCH transmission is scheduled in the corresponding subframe, transmission of UCI such as HARQ-ACK and CSI sent through PUCCH is piggybacked to PUSCH. This also applies to different carriers when carrier aggregation is performed.
[0234] In this case, when performing carrier aggregation, in the case where the aggregated carrier consists of different licensed carriers and unlicensed carriers, it is assumed that a group of cells on which transmission of PUCCH is possible is composed of licensed carriers and unlicensed carriers. In this case, if simultaneous transmission of PUSCH and PUCCH is configured in the user equipment, HARQ-ACK and CSI as user equipment feedback for DL transmission sent on the licensed carrier may be sent through the PUCCH on the licensed carrier, but HARQ-ACK may not be sent through the scheduled PUSCH on the unlicensed carrier, and CSI (e.g., periodic CSI or non-periodic CSI) may be sent to the scheduled PUSCH on the unlicensed carrier. In addition, if HARQ-ACK and CSI as user equipment feedback for DL transmission sent on the unlicensed carrier are sent through the PUCCH on the licensed carrier, or if the PUSCH on the unlicensed carrier is scheduled, transmission through the corresponding PUSCH is possible.
[0235] However, if simultaneous transmission of PUSCH and PUCCH is not configured in the user equipment, HARQ-ACK and CSI may be sent through the PUCCH on the licensed carrier as feedback from the user equipment for DL transmission sent from the licensed carrier, but HARQ-ACK may not be sent through the scheduled PUSCH on the unlicensed carrier, and CSI (e.g., periodic CSI or non-periodic CSI) may be sent through the scheduled PUSCH on the unlicensed carrier. According to the method used in the existing LTE system, if PUSCH is not scheduled in the corresponding subframe, HARQ-ACK and CSI are sent through the PUCCH on the licensed carrier as user equipment feedback for DL transmission on the licensed carrier and the unlicensed carrier, and if PUSCH is scheduled in the corresponding subframe on the licensed carrier or on the unlicensed carrier, HARQ-ACK and CSI are only sent by utilizing the scheduled PUSCH on the licensed carrier or on the unlicensed carrier as user equipment feedback for DL transmission on the licensed carrier and the unlicensed carrier. However, since the HARQ-ACK as feedback from the user equipment for DL transmission sent on the licensed carrier is configured not to be sent on the unlicensed carrier, if the PUSCH is scheduled on the unlicensed carrier, the HARQ-ACK response as feedback from the user equipment for DL transmission sent on the licensed carrier may not be sent through the predetermined PUSCH of the unlicensed carrier. Therefore, the following options may be considered to solve the corresponding situation.
[0236] - Option 1. In case that the configuration of carrier aggregation (CA) consists of a licensed carrier and an unlicensed carrier, as a group of cells on which transmission of PUCCH is possible, it consists of a licensed carrier and an unlicensed carrier, and if simultaneous transmission of PUSCH and PUCCH is not configured in the user equipment, then in a subframe in which transmission of PUCCH can be performed, the user equipment does not expect transmission of PUSCH to be scheduled on the unlicensed carrier from the user equipment, and the user equipment only assumes transmission of PUCCH, so that HARQ-ACK and CSI as user equipment feedback for DL transmission on the licensed carrier and the unlicensed carrier are sent through PUCCH on the licensed carrier.
[0237] - Option 2. In the case where the configuration of CA consists of a licensed carrier and an unlicensed carrier, as a group of cells on which PUCCH can be transmitted, it consists of a licensed carrier and an unlicensed carrier, and if simultaneous transmission of PUSCH and PUCCH is not configured in the user equipment, then for the subframe in which PUCCH transmission can be performed, as feedback for a user equipment performing DL transmission on the licensed carrier to be sent by the user equipment, only when the HARQ-ACK response is the subframe to be sent, the user equipment does not expect the PUSCH transmission to be scheduled on the unlicensed carrier from the base station. In addition, the user equipment only assumes the transmission of PUCCH, so that the HARQ-ACK and CSI as feedback for the user equipment performing DL transmission on the licensed carrier and the unlicensed carrier are sent through the PUCCH on the licensed carrier. Because the HARQ-ACK response for the DL transmission on the licensed carrier alone may not be sent to the PUSCH on the unlicensed carrier, the CSI can be sent to the PUSCH on the unlicensed carrier. Therefore, this method can be applied only when the UCI type to be carried is the HARQ-ACK response for the DL transmission on the licensed carrier.
[0238] -Option 3. In the case where CA consists of licensed carriers and unlicensed carriers, as a group of cells on which PUCCH can be transmitted, and simultaneous transmission of PUSCH and PUCCH is not configured in the user equipment, for a subframe where PUCCH transmission is possible, if PUSCH transmission from the base station is scheduled on the unlicensed carrier, the user equipment configures HARQ-ACK and CSI as user equipment feedback for DL transmission on the licensed carrier and on the unlicensed carrier to be sent through PUSCH on the unlicensed carrier by using a conventional UCI piggybacking method.
[0239] - Option 4. In the case where CA consists of licensed carriers and unlicensed carriers, as a group of cells on which PUCCH can be transmitted, and simultaneous transmission of PUSCH and PUCCH is not configured in the user equipment, for a subframe where PUCCH transmission is possible, if PUSCH transmission is scheduled on the unlicensed carrier from the base station, the user equipment discards the scheduled PUSCH on the unlicensed carrier, and by assuming transmission only through PUCCH, the user equipment configures HARQ-ACK and CSI as user equipment feedback for DL transmission on the licensed carrier and on the unlicensed carrier to be sent through PUCCH on the licensed carrier.
[0240] - Option 5. In the case where CA consists of a licensed carrier and an unlicensed carrier, as a group of cells on which PUCCH can be transmitted, and simultaneous transmission of PUSCH and PUCCH is not configured in the user equipment, for a subframe where PUCCH transmission is possible, if PUSCH transmission is scheduled on an unlicensed carrier from a base station, the user equipment discards the scheduled PUSCH only when the subframe is a HARQ-ACK response as a user equipment feedback for DL transmission on the licensed carrier to be transmitted by the user equipment. In addition, by assuming that transmission is performed only through PUCCH, the user equipment configures HARQ-ACK and CSI as user equipment feedback for DL transmission on the licensed carrier and on the unlicensed carrier transmitted by PUCCH on the licensed carrier. Because the HARQ-ACK response only to DL transmission on the licensed carrier may not be transmitted on the unlicensed carrier through PUSCH, the CSI may be transmitted through PUSCH on the unlicensed carrier. Therefore, only when the UCI type to be carried is a HARQ-ACK response to DL transmission on the licensed carrier, the scheduled PUSCH can be discarded on the unlicensed carrier by applying the corresponding method.
[0241] <Exclusion method for calculating NACK rate for PUSCH transmission drop when adjusting CWS>
[0242] In options 4 to 5, the base station may schedule PUSCH, but the user equipment may drop PUSCH. If CWS adjustment is used based on PUSCH reception of the base station at the UL LBT, in the case of options 4 to 5, because the base station can identify PUSCH drop from the user equipment according to the combination of configuration information, for PUSCH drop of the user equipment, during CWS adjustment, the corresponding PUSCH drop may not indicate conflict handling or interference conditions on the unlicensed carrier. Therefore, the dropped PUSCH may be configured not to be used for calculating the NACK ratio for CWS adjustment or not to be used for calculating the Z% of NACK for DL CWS adjustment.
[0243] The representation of the unlicensed carrier in the present disclosure may be the same as the representation of the LAA SCell.
[0244] CWS adjustment for UL transmission
[0245] A method for adjusting the CWS of the UL LBT of the user equipment will be described.
[0246] When the base station manages a user equipment-specific CWS for each user equipment, or each user equipment enables the base station to identify the CWS of each user equipment, the base station can update / adjust the CWS of each user equipment based on the UL transmission sent from the user equipment. At the same time, in the case of power limitation of the user equipment, the PUSCH transmission can be discarded on the unlicensed carrier depending on the priority of the channel of the licensed carrier and the channel of the unlicensed carrier. However, because it may be difficult for the base station to identify the power limitation state of the user equipment, it may not be recognized whether the channel discarded by the user equipment is sent due to power limitation. The base station expects the user equipment to send the scheduled channel and expects to perform UL reception at the corresponding reception timing. Therefore, when the UL transmission is discarded in the user equipment, the base station can determine the reception response for the UL transmission as NACK and use NACK as information for updating the CWS of the device. However, due to the power limitation state of the user equipment, the discarded UL transmission may not be useful information for determining whether the channel of the medium between the user equipment and the base station is busy or idle. Therefore, when the base station performs CWS update / adjustment for each user equipment, it can be considered to perform CWS update / adjustment based on whether the base station receives the PUSCH sent by the user equipment. For example, when the user equipment transmits a PUSCH and the base station successfully decodes the PUSCH, the base station may reset the CWS of the corresponding user equipment to a minimum value (i.e., CWmin) by determining that the response to the PUSCH transmission is ACK. In this case, the user equipment determines that the channel between the user equipment and the base station is idle, so that the user equipment may reset each CWp (e.g., p={1,2,3,4}), which may be set to a minimum value (i.e., (CWmin, p)) differently according to the channel access priority category. At the same time, when the base station fails to decode the corresponding PUSCH, the base station may double the CWS of the corresponding user equipment by determining that the response to the PUSCH transmission is NACK. In this case, the user equipment determines that the channel between the user equipment and the base station is busy, so that the user equipment may double the CWp that may be set differently according to the channel access priority category (e.g., p={1,2,3,4}). In addition, if the base station performs energy detection for PUSCH transmission by detecting the UL DM-RS, or if the PUSCH is scheduled using the SRS, energy detection of the SRS may be performed to determine whether to send the PUSCH.
[0247] When the base station manages the CWS of each user equipment according to the PUSCH decoding result, the base station can use the new data indicator (NDI) included in the UL grant to enable each user equipment to perform CWS update / adjustment. NDI is a 1-bit information indicating the initial transmission / retransmission of PUSCH based on whether it is switched based on the NDI value of the previous UL grant. For example, if the NDI value of the current UL grant is equal to the NDI value of the previous UL grant, the current UL grant indicates the retransmission of PUSCH (ie, the decoding of the previous PUSCH failed). In addition, if the NDI value of the current UL grant is switched differently from the previous value, the current UL grant indicates the initial transmission of PUSCH (ie, the decoding of the previous PUSCH is successful). Specifically, when the NDI on the UL grant received from the base station in the nth subframe is switched, so that the transmission of the PUSCH scheduled to the corresponding user equipment in the (n+4)th subframe indicates new data, when the UL grant is received, the CWp of the corresponding user equipment can be reset, that is, the current CWp can be set to the CW_min,p value. Unlike this, when the NDI received on the UL grant received from the base station in the nth subframe does not indicate new data (i.e., when the NDI in the (n-4)th UL subframe is not switched to indicate retransmission of the PUSCH), it can perform LBT for transmission of the PUSCH in the (n+4)th subframe by doubling the current CWS (when receiving the UL grant). In addition, if the LBT repetition using the CW_max value is set to K times (e.g., K={1, ..., 8}) by retransmission, CWp can be set to the CW_min value. The value K can be specified by the base station as one of {1, ..., 8}.
[0248] Next, when the base station manages only the CWS for base station transmission without information about the CWS of the user equipment and each user equipment manages its own CWS, each user equipment can perform CWS update / adjustment using the new data indicator (NDI) information included in the UL grant sent from the base station. For example, when the NDI on the UL grant received from the base station in the nth subframe is switched so that the transmission of the PUSCH scheduled to the corresponding user equipment in the (n+4)th subframe indicates new data, the CWp of the corresponding user equipment can be reset when the UL grant is received, that is, the current CWp can be set to the CW_min,p value. In contrast, when the NDI received on the UL grant received from the base station in the nth subframe does not indicate new data (that is, when the NDI in the (n-4)th UL subframe is not switched to indicate retransmission of the PUSCH), it can perform LBT for transmitting the PUSCH in the (n+4)th subframe by doubling the current CWS (when receiving the UL grant). In addition, if LBT using the CW_max value is repeated K times (eg, K={1, ..., 8}) by retransmission, CWp may be set to the CW_min value. The value K may be specified by the base station as one of {1, ..., 8}.
[0249] If the user equipment adjusts the CWS according to the switching of the NDI included in the UL grant, it may be considered to update / adjust the CWS depending on whether the UL transmission on the reference subframe has been successfully decoded to quickly adjust the CWS according to the UL channel state. Here, the reference subframe may be defined as follows.
[0250] - The reference subframe is defined as the start transmission subframe in which the latest UL transmission burst using the Cat-4 LBT procedure is expected, and it refers to the subframe in which the transmission of UL DMRS or SRS from the user equipment is detected by the base station and the PUSCH is decoded.
[0251] - The reference subframe may be defined as the start transmission subframe of the nearest UL transmission burst, where the Cat-4 LBT procedure is expected to be used.
[0252] -The reference subframe may be defined as the first subframe of a reference scheduling burst in which the base station successfully decodes at least one transport block on the LAA SCell. The reference scheduling burst refers to the UL subframe that was most recently continuously scheduled for the corresponding user equipment. The reference scheduling burst is the UL subframe in which UL transmission is expected to be initiated after Cat-4 LBT, and refers to the UL subframe in which transmission is expected to be completed at least four subframes ago instead of the subframe in which CWS adjustment transmission information (e.g., NDI) is sent.
[0253] - The reference subframe may be defined as the (starting) subframe of the most recent UL transmission burst successfully transmitted by the user equipment.
[0254] - After the user equipment implements Cat-4, the reference subframe may be defined as the (starting) subframe of the most recent UL transmission burst that was successfully transmitted.
[0255] The CWS may be reset by the user equipment when the base station successfully decodes a reference subframe (e.g., PUSCH). In addition, the CWS may be increased by the user equipment when the base station does not successfully decode a reference subframe (e.g., PUSCH). When a CWS is defined for each channel access priority category, the CWSp may be reset or increased to the CWSp value of the next higher allowed level for each channel access priority category. p is the channel access priority category (e.g., p = {1, 2, 3, 4}).
[0256] When the PUSCH carries multiple transport blocks (TBs) in a reference subframe (i.e., UL SU-MIMO) and at least one TB in the reference subframe is successfully decoded, the CWS for each channel access priority category is successfully decoded, and otherwise, the CWS can be increased to the CWS value of the next higher allowed level for each channel access priority. The transmission success / failure of the user equipment relative to the reference subframe can be determined by referring to the NDI value sent by the base station in the UL grant. The NDI is set by each TB. Therefore, if the NDI of at least one TB in the TBs for the reference subframe is switched, the CWS can be reset for each channel access priority category, otherwise (i.e., there is no switched NDI), for each channel access priority category, the CWS can be increased to the CWS value of the next higher allowed level. In other words, if any NDI is switched in a subsequent UL grant after the reference subframe and is associated with the reference subframe (e.g., only one of the two NDIs is switched), the CWS can be reset to the minimum value, and if there is no switched NDI, the CWS can be increased. Whether the UL grant is associated with the reference subframe of the previous UL transmission burst (or uplink transmission (e.g., PUSCH)) can be determined based on whether the HARQ process ID of the reference subframe is the same as the HARQ process ID of the subframe scheduled by the UL grant. Because asynchronous HARQ can be applied to UL transmissions on LAA SCells, whether the UL grant is associated with the reference subframe of the previous UL transmission burst can be determined based on whether the HARQ process ID in the UL grant is the same as the HARQ of the process ID used to schedule the reference subframe. At the same time, when the LBT repetition using the CW_max value is set to K times (e.g., K = {1, ..., 8}) by retransmission, the CWp of the repeated channel access priority can be set to the CW_min value only. The value K can be specified by the base station as a value in {1, ..., 8}.
[0257] At the same time, the base station may signal or indicate to the user equipment the position of a reference subframe within a reference scheduling burst that the user equipment may use to update the CWS. For example, when information indicating cat-4 LBT is implicitly or explicitly signaled to the user equipment via a UL grant as a type of LBT to be performed by the user equipment in UL transmission, information about the position of the reference subframe may be included in the corresponding UL grant. Even if the reference subframe is not detected in the base station, the base station may send information about the position of the reference subframe to the user equipment.
[0258] For example, the number of bits may be determined based on the number of subframes scheduled for multi-subframes to notify the position of the reference subframe in the reference scheduled burst through a bitmap. As another example, the position of the reference subframe may be indicated, including the absence of detection of the reference subframe through a bitmap, regardless of the number of subframes scheduled for multi-subframes (e.g., 0000: no reference subframe, 1000: first subframe, 0100: second subframe, 0010: third subframe, 0001: fourth subframe). Different from this, assuming that the maximum number of subframes that can be scheduled for multi-subframes is four, the position of the reference subframe may be specified by two bits. As another example, five states (e.g., no reference subframe, 1st subframe, 2nd subframe, 3rd subframe, and 4th subframe) may be signaled through three bits, including a case where no reference subframe is detected.
[0259] When the user equipment receives the position of the reference subframe from the base station, the user equipment may perform UL transmission (e.g., PUSCH) in a subframe (e.g., the first UL subframe of four consecutive UL subframes) before the reference subframe in the reference scheduling burst (e.g., the second UL subframe of four consecutive UL subframes). In this case, the base station may not receive the UL transmission in the reference subframe even if the user equipment has transmitted earlier. Therefore, the user equipment may determine that a conflict has occurred in the base station reception for UL transmission, and the user equipment may increase the CWS (e.g., twice) for each channel access priority category (or LBT priority category).
[0260] When the user equipment receives the position of the reference subframe from the base station, the user equipment may perform UL transmission (e.g., PUSCH) in a subframe (e.g., the third UL subframe of four consecutive UL subframes) after the reference subframe in the reference scheduling burst (e.g., the second UL subframe of four consecutive UL subframes). In this case, the user equipment may maintain the CWS for each channel access priority category (or LBT priority category) without changing it. That is, the base station considers that the UL transmission is received in the reference subframe, although the user equipment sends it later, and the CWS may be maintained by considering that it has nothing to do with the conflict in the base station reception for the UL transmission.
[0261] When the user equipment receives the position of the reference subframe from the base station, the user equipment may perform UL transmission (e.g., PUSCH) in the same subframe (e.g., the first UL subframe of four consecutive UL subframes) in the reference scheduling burst. In this case, because the user equipment performs UL transmission in the reference subframe and the base station successfully decodes at least one transport block for UL transmission of the reference subframe, the user equipment may determine that the base station successfully receives the UL transmission. Therefore, the user equipment may reset the CWS for each channel access priority category (or LBT priority category) to a minimum value.
[0262] Meanwhile, if the user equipment is configured to reset the CWS based on the NDI for the reference subframe or increase it to the next higher allowed level in cat-4 LBT, since asynchronous HARQ is applied to the UL transmission in the LAA SCell, not synchronous HARQ, it is not ensured that a UL grant that can refer to the retransmission (e.g., PUSCH) for the UL transmission sent in subframe n is sent in subframe (n+4). Therefore, when no UL grant is received in subframe (n+4), ambiguity arises as to whether the user equipment should reset the CWS or increase it to the next level to use the CWS for cat-4 LBT. To address this issue, if the NDI of at least one TB based on the most recently received UL grant NDI is switched, the user equipment resets the CWS for each channel access priority category to CW_min, and otherwise increases the CWS to the CWS value of the next higher allowed level for each channel access priority category. In addition, when LBT repetition using the CW_max value is set to K times (e.g., K={1, ..., 8}) by retransmission, CWp of the repeated channel access priority may be set to CW_min only. The value K may be specified by the base station as one of {1, ..., 8}.
[0263] Therefore, as described above, the base station may not distinguish the following three cases where the user equipment fails to transmit the PUSCH. Therefore, a method of classifying the following three cases according to corresponding methods and a method for adjusting the CWS will be described.
[0264] - First, the case where PUSCH cannot be transmitted due to failure to receive UL grant,
[0265] - Second, the case where LBT fails before PUSCH transmission and PUSCH may not be sent
[0266] - Third, the case where LBT succeeds before PUSCH transmission but PUSCH may not be sent (e.g., UL power limitation case)
[0267] First, as an example of a method for distinguishing between the first and second cases, if the LAA SCell is configured to receive cross-carrier scheduling from a cell of a licensed carrier, the (E)PDCCH and PDSCH including a UL grant for signal transmission of a UL PUSCH on the LAA SCell may be transmitted simultaneously in the downlink. In this case, when the base station detects explicit HARQ-ACK feedback (including receiving "ACK, NACK" or "ACK, NACK, NACK / DTX" or at least ACK or NACK) as feedback on the PDSCH instead of a licensed carrier or a transmission on an unlicensed carrier, because it can be seen that the (E)PDCCH scheduling of the PDSCH is considered successful in the user equipment, the base station can determine that the user equipment has successfully received the UL grant. Therefore, in the first case, that is, because the UL grant is not received, the PUSCH may not be sent, and the PUSCH may be excluded from the event to adjust the CWS (e.g., CWS increase) for performing UL LBT for the next PUSCH transmission. When a PDCCH including a UL grant (E) is transmitted from a cell of a licensed carrier, the base station may exclude adjusting the CWS of uplink transmission of the user equipment because the first case may not be conducive to notifying the state of channel conflict for transmitting UL PUSCH on LAASCELL. That is, when the base station may not receive (or detect) PUSCH at the transmission timing of PUSCH determined by receiving UL grant, the base station may determine that PUSCH is not transmitted due to a failure of PUSCH LBT and increase the CWS of the corresponding user equipment (e.g., twice).
[0268] The above content can be applied equally to the case where the unlicensed carrier or LAA SCell is configured for self-carrier scheduling. When the (E)PDCCH and PDSCH including the UL grant for the transmission of the UL PUSCH on the LAA SCell are simultaneously transmitted on the downlink on the LAA SCell, as feedback to the PDSCH, the base station can detect explicit HARQ-ACK feedback that is not a no-transmission situation on the licensed carrier or the unlicensed carrier (including "ACK, NACK" or "ACK, NACK, NACK / DTX" or at least one of ACK or NACK is detected). In this case, it can be seen that the reception of the (E)PDCCH for scheduling the PDSCH is successful in the user equipment. In addition, the base station can determine that the user equipment has successfully received the UL grant. Therefore, in the first case, that is, when the PUSCH may not be sent because the UL grant is not received on the unlicensed carrier, the adjustment (e.g., CWS increase) of the CWS for performing UL LBT for the next PUSCH transmission can be excluded from the event. That is, when the base station may not receive (or detect) PUSCH at the transmission timing of PUSCH determined by receiving UL grant, the base station may determine that PUSCH LBT is not sent due to failure of PUSCH and increase the CWS of the corresponding user equipment (e.g., twice).
[0269] Next, an implicit signaling method and an explicit signaling method will be described as methods by which the base station can distinguish between the second and third cases.
[0270] First, as an implicit signaling method, when CA is configured for a power limitation situation of a user equipment, the PUSCH on an unlicensed carrier may be discarded according to transmission priority based on the channel type and channel content in different carriers. The transmission priority may follow the standard up to the priority defined in the existing 3GPP version-13 (e.g., PRACH>PUCCH>PUSCH with UCI>PUSCH>Periodic SRS). Therefore, when a channel with a higher priority than the PUSCH on the unlicensed carrier (e.g., PRACH, PUCCH, or PUSCH with UCI) is detected in another carrier at the transmission timing of the PUSCH according to the UL grant transmission, the base station may regard the PUSCH on the unlicensed carrier as discarded due to the power limitation state of the user equipment. In this case, the PUSCH that is not received on the unlicensed carrier may be excluded from the event to adjust the CWS (e.g., CWS increase) for performing UL LBT to transmit the next PUSCH. That is, although the LBT for PUSCH has been successful (i.e., the channel is idle), even if PUSCH is not received (or detected) in the base station at the transmission timing of PUSCH according to the UL grant, the base station may not double or increase the CWS of the corresponding user equipment (i.e., maintain the CWS), because the PUSCH may not be sent due to the power limitation state of the user equipment.
[0271] In addition, the above-mentioned implicit signaling method can be configured differently in the case where the user equipment receives cross-carrier scheduling of PUSCH and in the case where the user equipment receives self-carrier scheduling of PUSCH. In the case of self-carrier scheduling, when it is determined that the UL grant has been successfully received, the channel state can be considered / considered to be idle at the PUSCH transmission timing on the unlicensed carrier. That is, although the PUSCH LBT is successful, considering that the PUSCH cannot be sent due to the power limitation state of the user equipment (i.e., the third case), even if the PUSCH is not received (or detected) at the base station at the transmission timing of the PUSCH according to the UL grant, the CWS of the corresponding user equipment may not be doubled or increased from the previous CWS (i.e., the CWS is maintained).
[0272] In the case of cross-carrier scheduling, successful UL grant reception on the licensed carrier may not be considered as a method for determining the channel state at the PUSCH timing on the unlicensed carrier. In this case, because it is difficult for the base station to determine the second case and the third case, the base station arbitrarily determines whether it is the second case or the third case to apply the CWS adjustment method. Alternatively, in order to configure to obtain more channel opportunities, even if scheduled by a UL grant from a licensed carrier, in the case where PUSCH is not received, a method of configuring the CWS to double or increase from the previous value may be considered.
[0273] Next, as an explicit signaling method, information about a PUSCH LBT failure on the LAA SCELL or information about whether the PUSCH on the LAA SCell is lost due to power limitation may be included in the PUCCH / PUSCH of the authorized PCell or the PUCCH / PUSCH of the authorized SCell and transmitted. Alternatively, information about a PUSCH LBT failure on another LAA SCell or information about whether the PUSCH on the LAA SCell is discarded due to power limitation may be included in the PUSCH of the LAA SCell that is set to be transmittable after LBT is successful and transmitted.
[0274] Fig.18 The diagram illustrates the signal transmission process.
[0275] refer to Fig.18, after receiving a UL grant (e.g., UG#1) from the base station, the user equipment may send an nth UL transmission burst (e.g., UTB#1) (S1802). UTB#1 includes one or more, preferably two or more consecutively scheduled UL subframes, and a PUSCH may be sent for each UL subframe. UTB#1 may be sent in an unlicensed band (e.g., LTE-U cell) and may be sent based on a Cat-4 LBT procedure (i.e., type 1 channel access). The base station may then send a UL grant (e.g., UG#2) to the user equipment (S1804). UG#2 includes scheduling information for the (n+1)th UL transmission burst (e.g., UTB#2), and UTB#2 includes one or more consecutively scheduled UL subframes. UG#2 includes PUSCH scheduling information for each UL subframe in UTB#2, and each PUSCH scheduling information includes an NDI for each TB. The user equipment may send UTB#2 according to UG#2 (S1812). UTB#2 may also be transmitted in an unlicensed band (e.g., an LTE-U cell) and may be transmitted based on a Cat-4 LBT procedure. Specifically, if the channel of the unlicensed band is in an idle state during the ECCA delay period, the user equipment also performs a random backoff within the CWS (S1810). The user equipment generates a random number N (e.g., [0, q-1]) equal to or less than the CWS (S1808), and performs a backoff using the number of time slots corresponding to the random number N (S1810). In this case, the size of the CW (i.e., CWS) is adaptively changed based on the NDI value of UG#2 (S1806). The NDI value for adjusting the CWS may be related to the UL transmission (i.e., PUSCH) on the reference subframe (i.e., UTB#1) in the most recent UL transmission burst. Specifically, when at least one NDI is switched relative to the TB transmitted on the reference subframe in UTB#1, the CWS is reset to the minimum value, otherwise the CWS may be increased. For example, if multiple (e.g., two) TBs are sent on a reference subframe, and at least one NDI is switched in a UL grant associated with the reference subframe after the reference subframe (e.g., only one of the two NDIs is switched), the CWS can be reset to a minimum value. Because asynchronous HARQ is applied to UL transmission in the LAA SCell, in the UL transmission, the HARQ process ID can be used to confirm whether the UL grant is associated with the reference subframe of the previous UL transmission burst. For example, when a UL grant with a scheduled HARQ process ID for a reference subframe is received after the reference subframe (or when the HARQ process ID of the reference subframe and the HARQ process ID of the subframe scheduled by the UL grant are the same), and when at least one NDI value in the UL grant is switched, the CWS can be reset to a minimum value.On the other hand, if no UL grant associated with the reference subframe is received, or a UL grant associated with the reference subframe is received but NDI is not switched on all TBs, the CWS may be increased. When the CWS increases, the CWS may be exponentially doubled or increased between a minimum value (ie, CW_min) and a maximum value (ie, CW_max) or increased to a maximum value.
[0276] The above method based on multi-subframe scheduling can be similarly applied to the case of single subframe scheduling.
[0277] Next, a signaling method for adjusting LBT parameters of a CWS when UL LBT of UL PUSCH transmission is performed by a user equipment will be described.
[0278] When the base station notifies the user equipment of the UL LBT parameters, because it may be difficult for the base station to identify the channel access priority category of the service sent by the user equipment, notifying the user equipment of each channel access priority category of the CWS may be a large signaling overhead. In addition, when each channel access priority category follows the channel access priority category used in the DL (DL channel access priority category), as shown in Table 6, the range of allowed CWp sizes is large, which can increase the relevant signaling overhead.
[0279] [Table 6]
[0280]
[0281] In addition, Table 7 can be used as LBT parameters for UL channel access priority category.
[0282] [Table 7]
[0283]
[0284] Note 1: The maximum channel occupancy time (MCOT) of 6 ms may be increased to 8 ms by inserting one or more gaps, and the minimum duration of the pause due to a gap shall be 100 us. The maximum duration length including the gap before shall be 6 ms. The gap duration is not included in the channel occupancy time.
[0285] Note 2: The MCOT for LBT priority categories 3 and 4 can be as high as 10ms if it is ensured that there is no other technology (e.g., Wi-Fi) on the same carrier, otherwise, the MCOT for LBT priority categories 3 and 4 is as specified in Note 1.
[0286] Therefore, in order to inform the base station of the CW size in the LBT parameters that can be notified to the user equipment, a method for reducing the signaling overhead and a method for adjusting the CWS according to the signaling overhead will be described.
[0287] First, because the base station notifies the user equipment of the common value of CWS regardless of the channel access priority category, the user equipment receiving the common value can perform LBT for performing a backoff operation using the CWS corresponding to the common value according to the common value of the channel access priority to be sent. In other words, the base station determines that the CWS is doubled or increased based on the reception of the PUSCH sent from the user equipment, and notifies the user equipment of the common value with parameters for LBT regardless of the channel access priority category. The user equipment receiving the common value sets the CWS according to the common value of the LBT of the PUSCH to be sent to perform LBT, and sends the PUSCH according to the success of the LBT. In the case of receiving the common value through UL permission, when the common value is 0, the LBT can be performed using the minimum value of the CW size of the channel access priority of the PUSCH to be sent, and when the common value is 1, the LBT can be performed by setting the minimum value of the CW size to the next level value. Because a common value is applied according to the size of the CWp allowed in each channel access priority, such as in DL, when the maximum CWmax,p value in the channel access priority category is repeatedly set to K times, the CWp value can be set to the CWmin,p value in the channel access priority category. Here, K can be selected by the base station from {1, 2, ..., 8}. K can be indicated to the user equipment via RRC signaling.
[0288] When DL channel access priority category 4 is used, 6 is indicated as a common value of CWS, and in the case where the next PUSCH transmission is expected for transmission with channel access priority category 1, considering that the maximum CWS is repeated 6 times, according to the condition that if the base station repeats the setting to K times, the CWp value in the channel access priority category should be set to the CWmin,p value, and the CWS for the PUSCH of the corresponding channel access priority category can be determined. Such a method can be considered, in which when K is configured to 6, CWp can be set to the minimum value CWS, and if K is configured to 4, it is configured to the CWp maximum value, and because the common value is greater than the set value K, CWp is configured to the minimum value CWS.
[0289] In addition, as another method, since the levels of the allowed CWp sizes for UL PUSCH transmission are configured to be the same number of levels (e.g., one of {2, 3, 4, ..., 8 steps}) for each channel access priority class. Additionally, regardless of the channel access priority, the base station notifies the user equipment of the common value of the CWS. Then, the user equipment that receives the common value can perform LBT with backoff using the CWS corresponding to the common value according to the channel access priority class to be transmitted. This can be a method in which the increase or reset of the CWS relative to the adjustment of the CWS for each channel access priority class is controlled to be the same by the common value and the signaling overhead for CWS indication is reduced. In other words, in the case of receiving the common value of the condition for increasing the CWS of each channel access priority class, the CWS is increased to the next higher allowed value regardless of the channel access priority class to be transmitted from the user equipment. Additionally, even in the case of receiving the common value of the reset condition in the CWS reset or when the reset condition is satisfied by repeating K times, the corresponding CWS of each channel access priority class is reset regardless of the channel access priority class. This can be considered a method for reducing the signaling overhead of the CWS in the LBT parameters transmitted in the UL grant. As an example below, when the channel access priority used in the DL is based on the following method, a method for setting the levels of the allowed CWp sizes to two levels can be used. In the corresponding case, the signaling overhead for indicating the common value of the CWS is sufficient for one bit.
[0290] [Table 8]
[0291] Channel access priority class (p) <![CDATA[Allowed CW p Size]]> 1 {3,7} 2 {7,15} 3 {15,31} 4 {31,63}
[0292] If modified to a more general allowed CWp size representation, it can be as follows.
[0293] [Table 9]
[0294] Channel access priority class (p) <![CDATA[Permitted CW p Size]]> 1 {A,B} 2 {C,D} 3 {E,F} 4 {G,H}
[0295] Here, the values of B, C, D, E, F, G, and H can be set to values that satisfy the condition A < B = < C < D = < E < F = < G < H, and the values of B, D, F, and H can be set to the maximum CW size values of the corresponding channel access priority classes. For example, when the maximum allowed CW size uses the value used in the DL, each of B, D, F, and H can have a value of {7, 15, 31, 63, 127, 255, 511, 1023}.
[0296] As another example, if the UL transmission is configured to use a smaller CW size than the DL transmission. For example, when the maximum allowed CW size is configured as {3, 4, 5, 6} or {3, 4, 5, 6, 7}, even with the maximum CWS defined by one of the values in {3, 4, 5, 6} or one of the values in {3, 4, 5, 6, 7}, for each channel access priority class, the allowed CWp size level for UL PUSCH transmission can be set to the same level.
[0297] Table 10 is an example, and a method for setting the allowed CWp size level to two levels can be used.
[0298] [Table 10]
[0299] Channel access priority class (p) <![CDATA[Allowed CW p Size]]> 1,2 {A,B} 3,4 {C,D}
[0300] Here, the values of B, C, and D can be set to values that satisfy the condition A < B = < C < D, and the values of B and D can be set to the maximum CW size values of the corresponding channel access priority classes. For example, if the maximum allowed CW size is configured as {3, 4, 5, 6} or {3, 4, 5, 6, 7}, then each of B and D can be set to one of {3, 4, 5, 6} or one of {3, 4, 5, 6, 7} as the maximum allowed CW size.
[0301] See Fig. 9 , the values of B, C, D, E, F, G, and H can be set to values that satisfy the condition A < B = < C < D = < E < F = < G < H, and the values of B, D, F, and H can be set to the maximum CW size values of the corresponding channel access priorities. For example, if the maximum allowed CW size is configured as {3, 4, 5, 6} or {3, 4, 5, 6, 7}, then each of B, D, F, and H can be set to one of {3, 4, 5, 6} or one of {3, 4, 5, 6, 7} as the maximum allowed CW size.
[0302] When the base station performs scheduling on the user equipment, as Figure 19 to Figure 20As shown in , and a reference subframe for updating CWS by a user equipment is configured. In this case, the user equipment performs UL LBT for the reference subframe according to the scheduling information sent from the base station in the UL grant. Then, when the LBT is successful, the user equipment performs UL transmission in the UL reference subframe. However, even if the user equipment performs UL transmission, a situation may occur in which the base station fails to detect the UL transmission due to channel interference conditions of the unlicensed band used by the LAA SCell. In this case, due to a transmission failure at the user equipment, or because the user equipment misses the UL grant from the user equipment, the base station may not be able to accurately identify whether the UL transmission of the scheduled UL subframe fails to perform transmission, or whether the base station cannot detect due to channel interference in the corresponding subframe. In particular, if the base station does not detect the reference subframe despite the reference subframe being sent from the user equipment, the CWS should be increased, but if the base station and the user equipment determine the reference subframe differently from each other, the CWS may be reset even if it is a condition for increasing the CWS. Alternatively, the opposite may occur. Therefore, a method for configuring a base station and a user equipment to identify whether a reference subframe of a UL transmission burst received at the base station is the same as a reference subframe sent by the user equipment when determining a CWS for UL LBT performed by the user equipment by solving a mismatch problem of a reference subframe between a base station and a user equipment for adjusting a CWS and being set to have the same understanding between the base station and the user equipment will be described.
[0303] When it is assumed that the reference subframe is the starting transmission subframe of a UL transmission burst sent from a user equipment by performing cat-4 LBT, the following description is a method for indicating the starting transmission subframe of a UL transmission burst in a user equipment and a method for configuring a base station to identify whether the first subframe of a UL transmission burst received by the base station is the first subframe sent by the user equipment.
[0304] Fig.21 1 is a diagram showing the structure of a UL radio frame, a UL subframe, and a UL time slot in LTE. In LTE, a cyclic shift index of a sequence of a reference signal (e.g., UL DMRS) within a UL subframe is determined by a function of a value set by a cyclic shift index of UL DMRS in a UL grant and RRC signaling sent from a base station to a user equipment and a time slot index. The cyclic shift value determined by RRC signaling during a specific time interval is the same, and because the cyclic shift index value determined by the UL grant is constant within a subframe, the cyclic shift value of the UL DMRS in the subframe can be determined to be a different value depending on the time slot index.
[0305] As a method P) which is different from the method of using a cyclic shift index of a UL DM-RS sequence transmitted in a UL subframe transmitted at the first in a UL transmission burst transmitted after the UL LBT based on a time slot used in the conventional method, a method of transmitting a UL DM-RS sequence using the following methods P-1 to P-3 may be considered. Therefore, when the base station performs up to two UL DMRS detections when performing PUSCH detection for each subframe of a UL transmission burst scheduled by the base station, the base station determines whether each subframe of the received UL transmission burst is the first successfully transmitted subframe, or whether there is a first successfully transmitted subframe before the corresponding subframe is transmitted.
[0306] As method P-1 of an embodiment, unlike the conventional method, the user equipment switches the cyclic shift index of the UL DM-RS sequence sent in the first transmitted UL subframe in the UL transmission burst to the index cyclic shift of the UL DM-RS sent in each time slot of the UL subframe sent at the first transmission, that is, switches the first time slot index and the second time slot index, so that the user equipment sends the UL subframe including the UL DM-RS by setting the cyclic shift of the UL DM-RS sequence sent in the first time slot based on the second time slot index and setting the cyclic shift of the DMRS sequence sent in the second time slot based on the first time slot index.
[0307] Because when the user equipment sends a UL subframe to the base station, the user equipment notifies the user equipment whether the corresponding UL subframe is the first UL subframe of the UL transmission burst scheduled from the base station by indicating that the cyclic shift index of the UL DM-RS switches between time slots, this can be used as a method for preventing mismatch between the user equipment and the base station for the starting transmission UL subframe.
[0308] For consecutive UL subframes of a UL transmission burst scheduled by the base station, the base station performs two detections based on the UL DM-RS generated by two different schemes (i.e., switching or not switching of the UL DM-RS cyclic shift between time slots) until the UL subframe is detected by PUSCH. Then, when the UL PUSCH is detected by the switched UL DM-RS, the transmission of the corresponding subframe can be determined as the UL subframe when the UL transmission burst is started from the user equipment. In this case, depending on the success of PUSCH decoding in the starting UL subframe, the base station can signal the user equipment to reset the CWS or increase the CWS by the next higher allowed value through signaling (e.g., UL grant, common control channel, common PDCCH). In contrast, if a UL PUSCH is detected by a non-switched UL DM-RS at the base station, the base station determines that the transmission of the corresponding subframe is not the transmission of the first UL subframe of the UL transmission burst from the user equipment and the first UL subframe of the UL transmission burst in the user equipment is sent from the user equipment, but due to interference conditions of the channel, the first UL subframe may not be detected at the base station, so that the base station may signal the user equipment via signaling (e.g., UL grant, common control channel, common PDCCH) to increase the CWS to the next higher allowed value.
[0309] Method P-2) A method of setting the cyclic shift index of the UL DM-RS sequence in the first slot and the cyclic shift index of the UL DM-RS sequence in the second slot according to the same slot index is considered. There may be a method of setting the cyclic shift index of the UL DM-RS sequence to be the same based on the index of the first slot of the UL subframe to be transmitted, and there may be a method of setting the same cyclic shift index of the UL DM-RS sequence based on the index of the second slot.
[0310] Since the user equipment notifies whether the UL subframe is the starting UL subframe of the UL transmission burst scheduled from the base station when the user equipment transmits the UL subframe to the base station by the cyclic shift index indicating switching of the UL DM between time slots, this can be used as a method of preventing mismatching of the user equipment and the base station for starting transmission of the UL subframe.
[0311] For consecutive UL subframes of a UL transmission burst scheduled by the base station, the base station performs two detections based on the UL DM-RS generated by two different schemes (i.e., based on the same slot index for the UL DMRS cyclic shift value between slots or based on each slot index of the UL DM-RS cyclic shift value) until PUSCH detection of the UL subframe. Then, when the UL PUSCH is detected by the UL DM-RS generated by the value of the same slot index of the UL DM-RS cyclic shift value between slots, the transmission of the corresponding subframe can be determined as the UL subframe when the UL transmission burst is started from the user equipment. In this case, depending on the success of PUSCH decoding in the starting UL subframe, the base station can signal the user equipment to reset the CWS or increase the CWS by the next higher allowed value through signaling (e.g., UL grant, common control channel, common PDCCH). In contrast, if a UL PUSCH is detected in the base station through a UL DM-RS generated by a value set based on a time slot index, the base station determines that transmission of the corresponding subframe is not transmission of the first UL subframe of a UL transmission from the user equipment and sends the first UL subframe of a UL transmission burst in the user equipment from the user equipment, but due to interference conditions of the channel, the first UL subframe may not be detected at the base station, so that the base station may signal the user equipment through signaling (e.g., UL grant, common control channel, common PDCCH) to increase the CWS to the next higher allowed value.
[0312] Method P-3) A method for transmitting a predefined cyclic shift index of a UL DM-RS sequence based on a predefined index of a cyclic shift of the UL DM-RS set in advance for a base station and a user equipment by applying the UL DM-RS of a UL subframe to be first transmitted by a user equipment may be considered.
[0313] Method Q) As a method different from the method of using a cyclic shift index of a sequence of UL DM-RS transmitted in a UL subframe excluding the UL subframe first transmitted in a UL transmission burst transmitted after UL LBT based on a time slot index conventionally used, by using the following methods Q-1 to Q-3 to generate a UL DM-RS sequence for transmission, it is possible to distinguish between the start transmission and non-start transmission of a UL transmission burst at a base station.
[0314] As a method for setting a cyclic shift index of a UL DM-RS sequence sent to a UL subframe excluding a first UL subframe sent in a UL transmission burst, Q-1) which is different from a conventional method, a user equipment switches the cyclic shift index of the UL DMRS sent in each time slot between time slots, that is, switches the first time slot index and the second time slot index, so that the user equipment sends a UL subframe including a UL DMRS by setting the cyclic shift of the DMRS sequence of the UL DMRS sent in the first time slot based on the second time slot index and setting the cyclic shift of the DMRS sequence of the UL DMRS sent in the second time slot based on the first time slot index.
[0315] Method Q-2) In a UL subframe other than the first UL subframe transmitted in a UL transmission burst, a method of setting the cyclic shift index of the UL DMRS sequence in the first slot and the cyclic shift index of the UL DMRS sequence in the second slot by the user equipment according to the same slot index may be considered. There may be a method of setting the cyclic shift index of the UL DMRS sequence to be the same based on the index of the first slot of the UL subframe to be transmitted, and there may be a method of setting the same cyclic shift index of the UL DMRS sequence based on the index of the second slot.
[0316] Method Q-3) A method for sending a cyclic shift index of a predefined UL DMRS sequence based on a predefined index of the cyclic shift of the UL DMRS previously set for the base station and the user equipment by applying the UL DMRS of the UL subframe first sent by the user equipment in a UL subframe other than the first UL subframe sent in a UL transmission burst may be considered.
[0317] Fig. 22 The method for determining the CWS in the subframe in which Cat-4 should be performed for UL transmission is illustrated. Specifically, it illustrates the case where each UL scheduled subframe of the latest UL transmission burst has a gap between consecutive subframes and is scheduled by each UL grant (i.e., Fig. 20 (a)), a case where scheduling is performed through gaps between consecutive UL subframes scheduled by multi-subframe scheduling from one DL subframe (ie, Fig. 20 (b)), and the case where scheduling is performed using the gap between UL subframes scheduled with multiple UL grants from one DL subframe (ie, Fig. 20 (c)). In these cases, due to the gaps between UL subframes, each UL subframe performing each cat-4 LBT can be regarded as a UL transmission burst. Fig. 20 As shown in , if there is a gap between scheduled UL subframes, when determining the CWS of cat-4 for performing the next UL transmission, the most recent UL transmission burst performing cat-4 as a reference subframe may be Fig. 20 (a), 20 (b) and 20 (c) in which the A subframe (e.g., UL SF #(n+4+k)), B subframe (e.g., UL SF #(n+5+k)), or C subframe (e.g., UL SF #(n+6+k)). Here, because the subframe of each cat-4 in which the last transmission has been performed can be the subframe of the latest UL burst, in this case, even if it is the UL subframe that starts first in the scheduled subframe due to the success of LBT in the previous cat-4 LBT, by notifying the starting subframe of the UL burst using methods P-1, P-2, P-3 and methods Q-1, Q-2 and Q-3 in the corresponding subframe, it is difficult to solve the reference subframe mismatch problem for adjusting the CWS for the next UL transmission between the base station and the user equipment. In this case, detecting the UL DMRS and PUSCH twice in the base station may only increase the detection complexity of the base station. Therefore, in the case where the base station configures the user equipment to perform scheduling with a UL gap, the base station signals to the user equipment a method of not performing modified transmission of the UL DMRS sequence in the user equipment, that is, methods P-1, P-2, P-3 and methods Q-1, Q-2 and Q-3 can be considered. As a signaling method, for example, a common control channel or a common PDCCH can be indicated by a UL grant. Fig.19 As shown in , in the case where the base station performs scheduling of UL transmission bursts without gaps, the base station can configure the user equipment to use methods P-1, P-2 and P-3 and methods Q-1, Q-2 and Q-3 to solve the mismatch between the base station and the user equipment for the reference subframe. In addition, as Fig. 20 As shown in , in the case where the base station schedules UL transmission bursts using gaps, the base station can signal to the user equipment not to perform methods P-1, P-2 and P-3 and methods Q-1, Q-2 and Q-3 to reduce the number of blind detections at the base station.
[0318] Embodiment 1: Channel access for uplink multi-carrier transmission
[0319] When multiple LAA SCells are configured, the following channel access method is used as a method for a base station to access a channel for downlink multi-carrier transmission.
[0320] -Multi-carrier channel access type A (ie, type A): With respect to each set of combinations of carriers through which the base station intends to perform transmission on the LAA SCell (ie, carrier set), a single carrier channel access procedure using cat-4 LBT can be performed independently for each carrier. Thereafter, according to the determination of the base station, a self-delay time that does not reduce the backoff counter is used in a specific carrier so that the transmission time point is matched between multiple carriers.
[0321] -Multi-carrier channel access type B (i.e., type B): Similar to the scheme used in Wi-Fi, one of the carriers to be transmitted by the base station (c_j) is randomly selected or the carrier (c_j) is selected without changing for at least one second, and channel access using cat-4 LBT is performed on the carrier (c_j). When channel access on the carrier (c_j) is successful, channel detection is performed on other carriers (c_i) (i≠j) for at least T_mc=25us just before the transmission time of the carrier on which the channel access is successful. In this case, when the channel is idle within T_mc, the base station performs multi-carrier transmission including other carriers.
[0322] In the scheme for transmitting multiple carriers through the downlink, the base station performs channel access basically by assuming cat-4LBT with backoff through the carrier through which it intends to transmit a signal. However, in the case of channel access type B, cat-4LBT can be performed in a specific carrier determined by the base station, and simultaneous transmission with the carrier in which cat-4LBT is performed can be performed on other carriers through channel sensing at 25us intervals. If cat-4LBT fails in the specific carrier determined by the base station, transmission is not performed on all multiple carriers regardless of the sensing results in the other carriers.
[0323] However, in the case where the user equipment performs an uplink transmission to the base station, the base station notifies the user equipment of the type of LBT that should be performed by the user equipment through a UL grant. The LBT type may be, for example, (i) cat-4 LBT, i.e., type 1 channel access, or (ii) cat-2 LBT (e.g., LBT based only on 25us CCA), which performs channel sensing for only a single interval, i.e., type 2 channel access. Therefore, according to the LBT type indication of the base station, there may be a case where the LBT type in all carriers where the user equipment performs uplink transmission (e.g., PUSCH) is not cat-4 LBT. That is, cat-4 LBT may be indicated on some carriers, and cat-2 LBT may be indicated on another carrier among the carriers through which the base station intends the user equipment to perform transmission.
[0324] Hereinafter, a channel access method for a user equipment to send multiple carriers and an uplink transmission method thereof will be described. In the present specification, sending a carrier means sending a signal (e.g., PUSCH) through a carrier or on a carrier. In addition, unless otherwise specified, a carrier means a carrier (i.e., an unlicensed carrier) operating in an unlicensed band (e.g., LAA SCell). In addition, multi-carrier transmission in the present specification refers to a signal transmission operation when multiple carriers are scheduled simultaneously on an LAA SCell. In actual signal transmission, according to the channel access method, signals may be sent only on some of the carriers constituting the multiple carriers, and signal transmission on some other carriers may be discarded.
[0325] Fig.23 The diagram shows that the user equipment performs UL transmission on multiple carriers in the case where the base station independently indicates different UL LBT types to each carrier via a UL grant. It is assumed that self-carrier scheduling is performed.
[0326] First, it is possible to consider a reuse type B scheme in the downlink for multi-carrier channel access for an uplink multi-carrier access scheme. In this case, when the base station has multiple carriers that indicate cat-4LBT to the user equipment through UL grant, and there are multiple carriers in which the user equipment is instructed to perform cat-4LBT based on the UL grant received from the base station, the user equipment needs to select one of the carriers indicating cat-4LBT. A scheme in which cat-4LBT is performed only on one carrier is applied, and transmission on the remaining carriers is allowed only by sensing Tmc (e.g., 25μs) in the type B scheme. The following method can be used as a method for selecting one of the carriers on which the user equipment should perform cat-4LBT.
[0327] First, through base station signaling, the user equipment can select one of the carriers to perform cat-4LBT. In this regard, the base station can define the carriers on which cat-4LBT should be performed and allocate the carriers to the user equipment (via a UL grant for the carrier). However, in this case, if the user equipment misses the corresponding UL grant, the user equipment cannot perform channel access for multi-carrier transmission. Therefore, the base station can specify the priority value of the carrier on which cat-4LBT should be performed and send the value to the user equipment with a signal. Specifically, the base station can indicate the priority value of the corresponding carrier to the user equipment via a UL grant indicating (each) cat-4LBT (hereinafter referred to as a cat-4LBT UL grant). Therefore, the user equipment recognizes the value indicated as the priority by the base station and first performs cat-4LBT on the carrier with the highest priority. If cat-4LBT is successful, the user equipment senses within Tmc (e.g., 25us) on other carriers before transmission, and can perform UL transmission (e.g., PUSCH) on multiple carriers simultaneously when the channel is busy. Therefore, even if the user equipment misses a UL grant of a carrier that the base station sets as the highest priority, the user equipment can perform cat-4 LBT for UL transmission according to the next higher priority value.
[0328] A method for selecting one of the carriers signaled between a base station and a user equipment on which cat-4 LBT should be performed by the user equipment according to a predefined rule is as follows.
[0329] 1) A carrier with the smallest (carrier / cell) index among carriers indicating cat-4 LBT may be selected. That is, the user equipment performs cat-4 LBT only on the carrier with the smallest index among the carriers receiving the cat-4 LBT UL grant. In addition, the user equipment may sense at least Tmc on the remaining carriers just before transmission, and perform UL transmission when the channel is idle. The present invention is also applicable to a situation where the user equipment misses a UL grant by selecting a carrier based on a received UL grant of the user equipment. In this specification, a cat-x LBT UL grant refers to a UL grant indicating cat-x LBT (e.g., x=2,4).
[0330] 2) A carrier having the largest CWS (i.e., maximum CWS) among carriers in which cat-4 LBT is indicated may be selected. That is, the user equipment performs cat-4 LBT only on the carrier having the largest CWS among carriers in which cat-4 LBT UL grant is received. In addition, the user equipment may sense at least Tmc on the remaining carriers just before transmission, and perform UL transmission when the channel is idle. Therefore, coexistence with Wi-Fi may be ensured as much as possible. In addition, the present invention is also applicable to a case where the user equipment misses a UL grant by selecting a carrier based on a received UL grant of the user equipment.
[0331] 3) A carrier having the smallest CWS (i.e., minimum CWS) among the carriers indicating cat-4LBT may be selected. That is, the user equipment performs cat-4LBT only on the carrier having the smallest CWS among the carriers receiving the cat-4LBT UL grant. In addition, the user equipment may sense at least Tmc on the remaining carriers just before transmission, and perform UL transmission when the channel is idle. Therefore, it is possible to ensure UL transmission on the LAA SCell to the greatest extent, which performs scheduling-based channel access different from Wi-Fi while allowing coexistence with Wi-Fi. In addition, the present invention is also applicable to a case where the user equipment misses the UL grant by selecting a carrier based on the UL grant received by the user equipment.
[0332] 4) A carrier having a maximum random backoff counter (i.e., a maximum backoff counter) among carriers indicating cat-4LBT may be selected. That is, the user equipment performs cat-4LBT only for a carrier having a maximum random backoff counter among carriers receiving a cat-4LBT UL grant. In addition, the user equipment may sense at least Tmc on the remaining carriers just before transmission, and perform UL transmission when the channel is idle. Therefore, coexistence with Wi-Fi may be ensured as much as possible. In addition, the present invention is also applicable to a case where the user equipment misses a UL grant by selecting a carrier based on a received UL grant of the user equipment.
[0333] 5) A carrier having a minimum random backoff counter (i.e., a minimum backoff counter) among carriers indicating cat-4LBT may be selected. That is, the user equipment performs cat-4LBT only for the carrier having the minimum random backoff counter among carriers receiving the cat-4LBT UL grant. In addition, the user equipment may sense at least Tmc on the remaining carriers just before transmission, and perform UL transmission when the channel is idle. Therefore, it is possible to ensure UL transmission on the LAA SCell to the greatest extent, which performs scheduling-based channel access different from Wi-Fi while allowing coexistence with Wi-Fi. In addition, the present invention is also applicable to a situation where the user equipment misses the UL grant by selecting a carrier based on the UL grant received by the user equipment.
[0334] Fig.24 The diagram illustrates an uplink multi-carrier transmission operation when LBT fails in a cat-4 LBT carrier when the base station indicates different UL LBT types for each carrier individually via a UL grant. It is assumed that self-carrier scheduling is performed.
[0335] refer to Fig.24 , even when UL LBT fails in a carrier performing cat-4LBT, when UL LBT succeeds in a carrier performing cat-2LBT, multi-carrier transmission can be performed using only the carrier performing cat-2LBT. In the case of multi-carrier channel access type B in the downlink, if cat-4LBT fails in a specific carrier designated by the base station at the time of channel access of multiple carriers, LBT is not performed in another carrier. In addition, even if LBT in other carriers is performed in advance, multi-carrier transmission excluding the carrier performing cat-4LBT is not available regardless of the channel detection result. However, in the case of the uplink, the UL LBT type (or UL channel access type) of each carrier is indicated by a UL grant sent from the base station. In this case, LBT failure may occur depending on interference conditions or channel conditions in the carrier performing cat-4LBT, such as Figure 23-24 As shown in . However, in the case of indicating a carrier to perform cat-2LBT from the base station, uplink transmission can be performed on the corresponding carrier depending on whether cat-2LBT is successful. Therefore, regardless of the success or failure of cat-4LBT, uplink transmission can be performed by allowing channel access in the carrier indicating cat-2LBT according to the success of LBT. That is, channel access of the carrier indicating cat-4LBT and channel access of the carrier indicating cat-2LBT are managed independently. Therefore, the success or failure of cat-4LBT only affects the channel access / multi-carrier transmission of the carrier indicating cat-4LBT, and does not affect the channel access / multi-carrier transmission of the carrier indicating cat-2LBT. On the other hand, the success or failure of cat-2LBT only affects the carrier that actually performs cat-2LBT, and does not affect other carriers.
[0336] Fig.24 The diagram shows a case where a single subframe is scheduled by one UL grant. However, even when multiple subframes are scheduled by one UL grant, Fig.25 As shown in , the UL channel access according to the present invention can also be applied in the same manner. In addition, the UL channel access according to the present invention can be similarly applied to the case where multiple subframes are scheduled by UL grants sent from different downlink subframes, such as Fig.26Moreover, the UL channel access according to the present invention can be similarly applied to the case where each UL scheduled subframe of a UL transmission burst is scheduled by a UL grant of a DL subframe, such as Fig. 27 middle.
[0337] Fig.25 The diagram shows that a user equipment performs UL transmission on multiple carriers in a case where a base station independently indicates different UL LBT types for each carrier for multiple subframes via UL grant. It is assumed that self-carrier scheduling is performed.
[0338] Fig.26 The figure shows that the user equipment performs UL transmission on multiple carriers when the base station schedules multiple subframes through UL grant. Specifically, Fig.26 A case is shown indicating that the UL LBT type may be the same or different for each carrier and different UL subframes, while a UL grant from a different downlink subframe is transmitted for each of a plurality of subframes. It is assumed that self-carrier scheduling is performed.
[0339] refer to Fig.26 , the number of multiple carriers that can be successfully transmitted according to the UL transmission time and the LBT performed before the transmission time of each subframe can be changed for each subframe. In the case where cat-4 LBT is performed in a subframe of a carrier set to perform cat-4 LBT, if the channel access type set to a multi-carrier executable by the user equipment is signaled as type B, LBT in other carriers except the carrier performing cat-4 LBT can be sensed within Tmc=25us (i.e., Tmc is sensed just before the LBT completion time in the carrier performing cat-4 LBT) to perform UL transmission in multiple carriers.
[0340] Fig. 27 The figure shows that the user equipment performs UL transmission on LAAScells on multiple carriers when the base station schedules multiple subframes through UL grant. Specifically, Fig. 27 A case is shown indicating that the UL LBT type may be the same or different for each carrier and different UL subframes, while a UL grant is transmitted from the same downlink subframe or different downlink subframes for each of a plurality of subframes. It is assumed that self-carrier scheduling is performed.
[0341] refer to Fig. 27 , Example and Fig.26The embodiment described in is the same as that described in, except that multiple subframes are scheduled by one UL grant. That is, the number of multi-carriers that can be transmitted according to the success of LBT performed before each subframe transmission time and the UL transmission time can be changed for each subframe. In the case where cat-4 LBT is performed in a subframe of a carrier set to perform cat-4 LBT, if the channel access type of the multi-carrier set to be executable by the user equipment is signaled as type B, LBT in other carriers except the carrier in which cat-4 LBT is performed can be sensed within Tmc=25us (i.e., Tmc is sensed immediately before the LBT completion time in the carrier in which cat-4 LBT is performed) to perform UL transmission in multiple carriers.
[0342] Since the user equipment performs UL transmission in subframe units, the user equipment can perform UL transmission in a carrier capable of transmission at each UL transmission time (eg, subframe) regardless of whether scheduling indicated by a UL grant is single-subframe scheduling or multi-subframe scheduling.
[0343] Figures 24 to 27 Self-carrier scheduling is exemplified, but the present invention can be similarly applied to the case of indicating UL permission to schedule cat-4LBT / cat-2LBT from PCell across carriers using licensed bands or cross-carrier scheduling from LAA SCell using unlicensed bands. Therefore, cat-4LBT or cat-2LBT can be indicated to the user equipment through self-carrier scheduling, or cat-4LBT or cat-2LBT can be indicated to the user equipment through cross-carrier scheduling. The UL scheduling method is set to one of self-carrier scheduling or cross-carrier scheduling for each carrier, and the present invention can be applied to the case where different scheduling methods are applied to each carrier.
[0344] Despite Figure 25 to Figure 27 An LBT gap for performing LBT between consecutive subframes is not specified and described in the present invention, but the present invention can be applied to both cases where an LBT gap exists or does not exist between subframes.
[0345] Embodiment 2: CWS adjustment for uplink multi-carrier transmission
[0346] As a channel access method for downlink multi-carrier transmission when a plurality of LAA Scells are configured, there are Type A and Type B explained in the first embodiment.
[0347] Type A has two schemes as CWS adjustment methods. The first scheme (i.e., Type A1) manages the CWS in each carrier and independently extracts the BO counter for each carrier according to the scheme used in single carrier channel access. The second scheme (i.e., Type A2) manages the CWS in each carrier in the same manner as for single carrier channel access, but sets a common BO counter for multi-carrier transmission. The BO counter selected from the largest CWS (i.e., Maximum CWp) among the CWS of each carrier is set as the common BO counter.
[0348] Type B also has two schemes as CWS adjustment methods. In the first scheme (i.e., type B1), the carrier set (hereinafter referred to as set C) used for multi-carrier transmission has a single CWS (hereinafter referred to as CWS set C). Based on the HARQ-ACK feedback corresponding to the PDSCH transmission in the reference subframe sent in all carriers of set C, if the HARQ-ACK value determined as NACK is at least 80% or more, the CWS set C is increased, otherwise it is reset to the minimum value. The second scheme (i.e., type B2) manages the CWS in each carrier according to the scheme used in single-carrier channel access, but the BO counter of the carrier (c_j) performing cat-4LBT for multi-carrier transmission using multiple carriers Type B scheme is set to the BO counter selected from the largest CWS (i.e., maximum CWp) in the CWS of each carrier. In the type B method, Cat-2 LBT (i.e., Tmc = 25us) occurs in a carrier (c_i) (i≠j) other than the carrier (c_j), but DL transmission always regards cat-4 as the basic LBT. Therefore, even if cat-2 LBT is performed on the carrier (c_i) while the CWS in each carrier is managed according to type B2, the result of DL transmission in the carrier is reflected in the corresponding CWS.
[0349] Meanwhile, unlike the conventional method, the following method can be considered as a CWS adjustment method in a downlink multi-carrier type B transmission method. The base station performs cat-2 LBT (i.e., Tmc=25us) in a carrier (c_i) (i≠j) other than a carrier (c_j) set to perform cat-4 LBT. In this case, even if the base station always regards cat-4 as the basic LBT in DL transmission, unlike the conventional B2 class scheme, a CWS update for increasing or resetting the CWS may not be performed according to a transmission from the base station with respect to a carrier that does not perform cat-4 LBT. Therefore, when the CWS is managed in each carrier in type B2 of the type B method and cat-2 LBT is performed in the carrier (c_i), the result of the DL transmission in the carrier can be prevented from being reflected in the corresponding CWS. That is, in the case of managing the CWS of each carrier in the type B method, the result of the DL transmission in the carrier that performs cat-2 LBT is not reflected in the CWS of the corresponding carrier. In this case, only the result of the DL transmission in the carrier in which cat-4 LBT is performed can be reflected in the CWS of the corresponding carrier. On the other hand, in the case of uplink transmission, the base station notifies the user equipment of the type of LBT to be performed by the user equipment through a UL grant when scheduling PUSCH transmission. The LBT type may be, for example, (i) Cat-4 LBT (or type 1 channel access), or (ii) Cat-2 LBT that performs only single-interval sensing (e.g., LBT based on 25us CCA, or type 2 channel access). The user equipment performs LBT and sends PUSCH according to the indicated LBT type. Therefore, according to the LBT type indication of the base station, there may be a situation where the LBT type in all carriers where the user equipment performs uplink transmission (e.g., PUSCH) is not cat-4 LBT. That is, cat-4 LBT may be indicated for some carriers, while cat-2 LBT may be indicated for other carriers in the carriers where the base station intends for the user equipment to perform transmission. Therefore, in the channel access method for uplink multi-carrier transmission, a CWS adjustment method different from the downlink that only assumes cat-4 LBT is required. Hereinafter, an uplink CWS adjustment method in a base station and a user equipment for UL transmission in case of UL transmission (eg, PUSCH) on multiple carriers will be described.
[0350] Unlike the downlink multi-carrier transmission method, in the uplink transmission in which the user equipment performs transmission, cat-4 LBT or cat-2 LBT can be dynamically indicated to each carrier at a single subframe level or a plurality of subframe levels by UL grant. Therefore, the user equipment can be configured to manage the CWS of each carrier for uplink multi-carrier transmission. The user equipment can manage the CWS of each carrier according to the LBT type indicated by the UL grant for each carrier, regardless of whether cat-4 LBT or cat-2 LBT is performed for PUSCH transmission on each carrier. Therefore, if necessary, if simultaneous transmission on multiple carriers is required at the terminal, when the base station requests the user equipment to perform simultaneous transmission on multiple carriers, or until the time point when simultaneous transmission can start within the interval allowing LBT, the terminal is allowed to have a self-delay time for each carrier for PUSCH transmission on multiple carriers.
[0351] As a method for setting a carrier that is allowed to have a self-delay time, multi-carrier transmission can be performed by having a self-delay time on all carriers in which multi-carrier transmission is intended, regardless of the LBT type (e.g., cat-2LBT, cat-4). Therefore, when channel sensing in a carrier that performs cat-4LBT ends after a channel sensing period in a carrier that performs cat-2LBT, a self-delay time can be set for the carrier that performs cat-2LBT so that multi-carrier transmission can be achieved.
[0352] As another method, the self-delay time may be set only in the carrier that indicates cat-4 LBT, but if it is possible to send on all carriers at the time of transmission, multi-carrier transmission can be performed regardless of the cat-2 LBT / cat-4 LBT setting. Since the LBT interval in the carrier that indicates the execution of cat-2 LBT is presumably shorter than the LBT interval in the carrier that indicates the execution of cat-4 LBT, multi-carrier transmission can be performed by setting the self-delay time only in the carrier that is instructed to execute cat-4 LBT.
[0353] As yet another method, the self-delay time may be set only in the carrier indicating cat-4 LBT to perform multi-carrier transmission consisting only of carriers carrying cat-4. Since the LBT interval in the carrier indicating the execution of cat-2 LBT is presumably shorter than the LBT interval in the carrier indicating the execution of cat-4 LBT, multi-carrier transmission can be performed by setting the self-delay time only in the carrier indicating the execution of cat-4 LBT. In addition, when the channels of one or more carriers performing cat-4 LBT are not idle, multi-carrier transmission may be enabled at the transmission possible time of the carrier indicating cat-2 LBT.
[0354] Meanwhile, as a method of adjusting CWS in downlink multi-carrier transmission to perform cat-4LBT, a common random backoff (BO) counter can be selected from the CWS of the carrier with the largest CWS in the CWS set managed by each carrier to apply the corresponding BO counter to all carriers in which multi-carrier transmission is expected. However, unlike the downlink in which cat-4LBT is always performed, since cat-2LBT or cat-4LBT can be performed on each carrier in the uplink, a CWS adjustment method for a carrier indicating cat-2LBT may be further considered.
[0355] First, when a method such as type-A2 for downlink multi-carrier transmission is applied to the uplink, ambiguity may arise as to whether the carrier set for selecting the maximum CWS includes a CWS managed separately in a carrier scheduled to perform cat-2LBT. In order to solve this problem, the following two methods can be considered. The first method is to select the maximum CWS among the CWSs of all carriers scheduled for UL transmission on multiple carriers and extract a common BO counter N therefrom. Because cat-4LBT / cat-2LBT is dynamically set by a UL grant for each carrier and is configured to manage the CWS of each carrier, even if the LBT type of a specific carrier is indicated as cat-2LBT, it is possible to extract a common backoff counter in consideration of the CWS of multiple carriers in which multi-carrier transmission is expected. The second method is to select the maximum CWS among the CWSs of the carrier indicated to perform cat-4LBT among the carriers scheduled for UL transmission on multiple carriers and extract a common BO counter N therefrom. Even if the CWS is managed in each carrier, only the CWS of the carrier performing cat-4LBT at the current time may be considered. Therefore, by eliminating the possibility of unnecessarily performing more backoff when the CWS of a carrier performing cat-2 LBT is greater than the CWS of a carrier performing cat-4 LBT, the possibility of acquiring a channel when uplink multi-carrier transmission is required can be increased.
[0356] As another method, when a method such as type-B2 for downlink multi-carrier transmission is applied to the uplink, ambiguity may arise as to whether the carrier set for selecting the maximum CWS includes the CWS managed individually in the carrier scheduled to perform cat-2LBT. The following two methods can be considered. The first method is to select the maximum CWS among the CWSs of all carriers scheduled for UL transmission on multiple carriers and extract therefrom a common BO counter N of a representative carrier for performing cat-4LBT. Because cat-4LBT / cat-2LBT is dynamically set by the UL grant for each carrier and it is configured to manage the CWS of each carrier, even if the LBT type of a specific carrier is indicated as cat-2LBT, considering the CWS of all carriers of the expected multi-carrier transmission, the BO counter of the representative carrier in which cat-4LBT is performed can be extracted. The second method is to select the maximum CWS among the CWSs of the carrier indicated to perform cat-4LBT among the carriers scheduled for UL transmission on multiple carriers, and extract therefrom a common BO counter N of the representative carrier for performing cat-4LBT. Even if the CWS is managed in each carrier, only the CWS of the carrier performing cat-4LBT at the current time can be considered. Therefore, by eliminating the possibility of unnecessarily performing more backoff when the CWS of the carrier performing cat-2LBT is greater than the CWS of the carrier performing cat-4LBT, the possibility of acquiring a channel when uplink multi-carrier transmission is required can be increased.
[0357] In the case where the type B scheme for the downlink is applied to uplink multi-carrier transmission (i.e., cat-4LBT is applied only to the representative carrier, and even if cat-4LBT or cat-2LBT is signaled to other carriers than the representative carrier among the carriers in which multi-carrier transmission is expected via UL grant, the user equipment performs channel sensing through T_mc (e.g., 25us) CCA before the transmission time of the carrier in which the representative carrier has successfully performed channel access, when determining the CWS for the next UL transmission, whether the CWS should be adjusted by considering / reflecting the previous UL transmission on the corresponding carrier (e.g., UL transmission in which cat-4LBT or cat-2LBT is signaled on the corresponding carrier) The solution. The process of adjusting the CWS can refer to Fig.18 and its description.
[0358] As a method, when the user equipment performs uplink multi-carrier transmission, regardless of which LBT type is signaled from the base station or which LBT type is performed for each carrier, the user equipment may perform CWS adjustment for the next UL transmission of each carrier by determining ACK, NACK, or DTX based on detection of the base station for UL transmission of the corresponding carrier. When a single CWS is managed for multiple carriers, CWS adjustment may be performed by determining ACK, NACK, or DTX for UL transmission in a reference subframe of all carriers in which UL transmission is performed. A method for the user equipment to determine ACK, NACK, or DTX for the corresponding UL transmission and adjust the CWS may be determined based on a value of NDI transmitted by a UL grant, such as Fig.18 Described in .
[0359] As another method, by determining ACK, NACK, or DTX based on detection of UL transmission of the corresponding carrier by the base station only for UL transmission of the carrier in which cat-4 LBT is signaled as the type of the user equipment, the user equipment may perform CWS adjustment for the next UL transmission. The method for the user equipment to determine ACK, NACK, or DTX for the corresponding UL transmission and adjust the CWS may be based on the following. Fig.18 Because the carrier configured to perform cat-4 LBT is set by the base station through the CWS adjustment of the expected user equipment, the user equipment can perform CWS adjustment even if it has performed channel sensing of Tmc=25us through type-B and participated in multi-carrier transmission. Therefore, for the UL transmission of each carrier, the user equipment can perform CWS adjustment based on the LBT type sent with the signal, regardless of the LBT type actually performed. That is, the user equipment can perform CWS adjustment by determining the ACK, NACK or DTX for UL transmission in the reference subframe of the carrier that signals cat-4 LBT. The method for the user equipment to determine the ACK, NACK or DTX for the corresponding UL transmission and adjust the CWS can be based on the following. Fig.18 The value of NDI sent by the UL Grant is determined as described in .
[0360] As yet another method, by determining ACK, NACK, or DTX based on detection of UL transmission of a corresponding carrier by the base station only for UL transmission in which cat-4 LBT is signaled as the LBT type of the user equipment and in which cat-4 LBT is performed, the user equipment may perform CWS adjustment for the next UL transmission. The method for the user equipment to determine ACK, NACK, or DTX for the corresponding UL transmission and adjust the CWS may be based on the following. Fig.18The CWS adjustment is determined by the value of the NDI sent by the UL grant described in . Considering that the CWS adjustment does not refer to the carrier in which cat-2 LBT is performed in single-carrier transmission, it may be difficult to obtain a channel for transmitting multiple carriers according to the CWS adjustment method compared to the user equipment sending LAA UL without multi-carrier transmission. Therefore, the CWS adjustment can be configured not to be performed for the UL transmission of the carrier in which cat-4 LBT has not been actually performed, even if it has participated in multi-carrier transmission.
[0361] Next, an operation of the user equipment after LBT failure of the previous subframe when multi-subframe scheduling is performed in a single carrier will be described.
[0362] - If there is an LBT gap or a CCA gap for performing LBT between consecutive subframes scheduled for multiple subframes
[0363] When the LBT type is specified as cat-4LBT in a UL grant for multi-subframe scheduling, or when the LBT type is specified as cat-4LBT in a UL grant for scheduling each subframe in multi-subframes, if the LBT of the previous subframe has failed, it is configured to obtain a new BO counter for transmission to the next UL subframe and follow the uplink channel access procedure.
[0364] When the LBT type is specified as cat-4LBT in the UL grant for multi-subframe scheduling, or when the LBT type is specified as cat-4LBT in the UL grant for each subframe in scheduling multi-subframes, if the LBT of the previous subframe fails, the previous BO counter is configured to recover and follow the uplink channel access procedure.
[0365] - If there is no LBT gap or CCA gap for performing LBT between consecutive subframes scheduled for multi-subframes,
[0366] When the LBT type is specified as cat-4LBT in a UL grant for multi-subframe scheduling, or when the LBT type is specified as cat-4LBT in a UL grant for each subframe in scheduling multi-subframes, the BO counter is configured to recover after a failure of LBT in the previous subframe and follow the uplink channel access procedure.
[0367] Next, the operation of the user equipment after the LBT of the previous subframe has failed when multi-subframe scheduling is performed on multiple carriers will be described. If multi-subframe scheduling is scheduled so that there is no gap between subframes in at least one carrier, uplink transmission may not always be possible in other carriers where LBT has failed due to continuous transmission in the carrier. In order to solve this problem, when the user equipment is scheduled for multiple carriers and undergoes multi-subframe scheduling so that there is no gap between subframes for a specific carrier, the user equipment can be configured to give arbitrary gaps within the multi-subframes of the corresponding carrier. Therefore, another carrier where the previous LBT failed and the carrier that succeeded in the current LBT can perform multi-carrier transmission at the same time.
[0368] Embodiment 3: Channel access for uplink multi-subframe transmission
[0369] When scheduling the transmission of consecutive subframes on the LAA SCell, the user equipment may discard some subframes of the consecutive subframes for some reasons. Here, discarding subframes means stopping / discarding UL transmission (e.g., PUSCH) in the subframe. That is, it is possible to pause / stop UL transmission in consecutive subframes before completion. For example, if the user equipment is in a power-limited situation, UL transmission may be discarded in some subframes according to the power scaling rules. Therefore, contrary to the intention of the base station, UL transmission may be performed in non-continuous subframes.
[0370] Hereinafter, a channel access procedure will be described when UL transmission in non-continuous subframes is performed due to the dropping of some subframes when the transmission of continuous subframes is scheduled. For ease of understanding, the present invention exemplifies a power limitation case of a user equipment as a case of dropping subframes. However, the present invention can be applied to a channel access procedure in the case of scheduling continuous subframes but performing UL transmission in non-continuous subframes without limitation.
[0371] For reference, according to section 5.1.1.1 of 3GPP TS 36.213v13.2.0, the following rules are used in the power scaling operation of the user equipment in the power limitation scenario of the user equipment: If the secondary cell group (SCG) is not configured and the total transmission power exceeds the power allowed limit value of the user equipment, the user equipment allocates the transmission power by prioritizing the transmission of PUCCH or by prioritizing the transmission of PUSCH including UCI, and equally allocates the remaining transmission power to the PUSCH transmitted on the remaining scheduled carriers. The transmission power of the user equipment is determined subframe by subframe.
[0372] In the case of LAA SCell, the base station can allocate consecutive subframes (hereinafter, referred to as UL bursts) to the user equipment, and the user equipment performs one of cat-4 LBT and cat-2 LBT according to the LBT type signaled immediately before the transmission of the UL burst, and sends the corresponding UL burst when the LBT is successful. Here, if the UL burst is scheduled without a gap between subframes and the LBT is successful at the beginning of the UL transmission burst, the transmission of the UL transmission burst can be performed without additional LBT. However, when the user equipment is in a power-limited state, specific subframes of the LAA SCell may be discarded due to the UL transmission of the authorized cell according to the power scaling operation. For this reason, gaps may appear in the UL burst.
[0373] Fig.28 The figure shows a situation where a subframe is dropped on the LAA SCell.
[0374] refer to Fig.28 , four consecutive UL subframes are scheduled on the LAA SCell. However, in the power limited state of the user equipment, priority is given to the power of the UL SF#(n+1) of the authorized cell, and the UL subframes in the UL SF#(n+1) of the LAA SCell may be abandoned. In this case, the user equipment may intend to perform data transmission on consecutive UL subframes after the UL LBT on the LAA SCell is successful. However, there is ambiguity as to whether to perform transmission on UL#(n+2) and ULSF#(n+3) without LBT, ambiguity as to the type of LBT on which it should be performed, and ambiguity as to which LBT parameters should be used if cat-4 LBT is to be performed. Therefore, the present invention provides a solution to the following situation.
[0375] First, a case will be described in which cat-2 LBT is configured to be performed at the beginning of a UL transmission burst for UL transmission on an LAA Scell.
[0376] -If only 25us LBT is performed just before SF#(n+2) transmission on LAA SCell and LBT succeeds (i.e., if the channel is continuously idle or if the channel is continuously idle and 25us LBT succeeds), UL data transmission can be performed in UL SF#(n+2) and UL SF#(n+3). If 25us LBT fails, the following two methods can be considered.
[0377] As a first method, if 25us LBT is performed continuously and LBT is successful, transmission can be performed in UL SF#(n+3). In this case, if 25us LBT is successful in UL SF#(n+2), UL transmission starts after the LBT success time, but the CP of the next symbol, that is, SF#(n+3) may be extended to occupy a portion of UL SF#(n+2) after LBT success.
[0378] As a second method, in order to transmit UL data in UL SF #(n+3), cat-4 LBT may be performed from UL SF #(n+2). In this case, cat-4 LBT may be performed by setting LBT parameters based on LBT priority category 1 having the highest priority among the priority categories.
[0379] · As another method, the base station may specify the LBT priority category and the LBT type indication via the UL grant, and the user equipment may perform cat-4 LBT by setting the LBT parameters based on the specified LBT priority category. However, because the UL transmission burst is configured to perform cat-2 LBT when the initial signaling is received from the base station, even if cat-4 LBT is performed to transmit the remaining subframes, the corresponding cat-4 LBT may not be reflected in the CWS adjustment. Alternatively, the cat-4 LBT in SF#(n+2) performed by the user equipment may be applied / reflected in the CWS adjustment when the cat-4 LBT UL scheduling is received after the next 4 ms (for example, SF#(n+2) is set as the reference subframe).
[0380] Next, a description will be given of a case where cat-4 LBT is configured to be performed at the beginning of a UL transmission burst for UL transmission on an LAA Scell.
[0381] - As an embodiment, if cat-4LBT is completed before SF#(n+2) transmission on LAA SCell by setting cat-4LBT to be performed from SF#(n+1) on LAA SCell, UL data transmission scheduled in UL SF#(n+2) and UL SF#(n+3) may be performed. If cat-4LBT is not completed before SF#(n+2) transmission on LAA SCell, cat-4LBT may continue until SF#(n+3) transmission on LAA SCell. A random backoff counter for cat-4LBT may be continuously used.
[0382] -As another embodiment, if 25us LBT is performed just before SF#(n+2) transmission on LAA SCell and cat-2 LBT succeeds (i.e., if the channel is continuously idle or if the channel is continuously idle and 25us LBT succeeds), UL data transmission can be performed in UL SF#(n+2) and UL SF#(n+3). Here, if 25us LBT fails, the following two methods can be considered.
[0383] As a first method, if 25us LBT is performed continuously and LBT is successful, transmission can be performed in UL SF#(n+3). In this case, if 25us LBT is successful in UL SF#(n+2), UL transmission starts after the LBT success time, but the CP of the next symbol, that is, SF#(n+3), can be extended to occupy a part of UL SF#(n+2) after LBT is successful.
[0384] As a second method, in order to transmit UL data in UL SF #(n+3), cat-4 LBT may be performed from UL SF #(n+2). In this case, cat-4 LBT may be performed by setting LBT parameters based on LBT priority 1 having the highest priority among the priority categories.
[0385] · As another method, the base station may specify the LBT priority category and the LBT type indication via the UL grant, and the user equipment may perform cat-4 LBT by setting the LBT parameters based on the specified LBT priority category. In this regard, since the UL transmission burst is configured to perform cat-4 LBT when the initial signaling is received from the base station, even if cat-4 LBT is performed to transmit the remaining subframes, the corresponding cat-4 LBT may not be reflected in the CWS adjustment. In this regard, since the UL transmission burst is configured to perform cat-4 LBT when the initial signaling is received from the base station, the transmission start time of the UL transmission (e.g., Fig.28 In the embodiment of the present invention, the UL SF #n in the UE is regarded as a reference subframe to perform CWS adjustment. In addition, from the viewpoint of segmenting a single UL transmission burst and performing different cat-4 LBT, each UL transmission burst can be regarded as a different UL burst. Therefore, when a cat-4 LBT UL scheduling is received after the next 4 ms (e.g., SF #(n+2) or SF #(n+3)) is set as a reference subframe, the cat-4 LBT in SF #(n+2) or SF #(n+3) performed by the user equipment can be applied / reflected in the CWS adjustment.
[0386] Alternatively, the following operation may be considered, regardless of whether it is configured to perform cat-4 LBT or cat-2 LBT at the beginning of a UL transmission burst for UL transmission on the LAA SCell. Specifically, if a specific subframe is not transmitted (i.e., UL transmission is stopped) in the continuous UL subframe scheduling of a specific LAA SCell (e.g., due to power limitation between the authorized carrier and the LAA SCell), then (starting from the time point when the UL transmission is stopped) a continuous 25us LBT may be performed for transmission of the following UL subframes, and a later UL subframe is transmitted if the channel is idle (e.g., Fig.28 In addition, when the channel is not idle when performing continuous 25us LBT (from the time point when UL transmission stops), the user equipment can perform cat-4 LBT and send a later subframe (for example, Fig.28 Here, the LBT parameters used in cat-4 LBT may be configured taking into account the LBT priority indicated by the UL grant. In addition, the UL grant refers to the UL grant that schedules the UL subframe being transmitted. Depending on the scheduling scheme, the UL grant may be a UL grant that schedules multiple subframes, or may be a UL grant that schedules each subframe in the multiple subframes individually.
[0387] Here, performing continuous 25us LBT is to check whether the channel is continuously idle. Considering that LBT should be performed during UL transmission, the above method can be summarized as follows.
[0388] If a specific subframe is not transmitted in the consecutive UL subframe scheduling of the LAA SCell (i.e., UL transmission is stopped / suspended during the consecutive UL subframe transmission),
[0389] - If the channel is continuously idle from the time point when UL transmission stops (until the LBT point of the UL subframe), the user equipment may perform 25us LBT (i.e., cat-2 LBT) for the next subframe (i.e., the remaining UL subframe) for transmission,
[0390] -If the channel is not continuously idle from the time point when UL transmission stops (until the LBT point of the UL subframe), the user equipment may perform cat-4 LBT for transmission of the next subframe (i.e., the remaining UL subframes). Cat-4 LBT may be performed considering the LBT priority indicated in the UL grant.
[0391] If LBT succeeds according to the above process, the user equipment can resume transmission of the following UL subframes (i.e., the remaining UL subframes). On the other hand, if LBT fails, since the channel is not idle, the user equipment can additionally perform cat-4 LBT for transmission of subsequent UL subframes (e.g., Fig.28 UL SF#(n+3) in.
[0392] On the other hand, in the case of multi-carrier transmission with multiple LAA SCells, for UL transmission,
[0393] (UL Multi-Carrier (MC) LBT Type 1) Perform independent LBT to transmit a UL subframe for each LAA SCell corresponding to the LAA SCell, and perform UL transmission through the LAA SCell carrier on which LBT succeeded, or
[0394] Regarding a subframe in which cat-4 LBT is performed among one or more LAA SCell carriers, cat-4 LBT is performed (UL MC LBT type 2) on a specific carrier (hereinafter, referred to as a designated carrier), and UL multi-carrier transmission through multiple carriers is performed when a channel is detected to be idle by performing 25us LBT just before transmission on other carriers used for subframe transmission. One carrier uniformly randomly selected from the carriers scheduled to perform cat-4 LBT is used as the designated carrier.
[0395] UL MC LBT type 2 can be performed within a specific carrier set. For example, if a UL grant is received in a carrier set having the same start time in a subframe and scheduled using cat-4LBT, if cat-4LBT in a specific carrier in the carrier set has been successfully completed, the user equipment can perform 25us LBT just before transmission on other carriers in the carrier set. The corresponding carrier set can be set in consideration of the regulations of each country. For example, in Europe, considering the channelization of 5GHz, part / whole carriers of the corresponding channel binding can be set to one carrier set. In addition, a UL subframe in which a cat-2LBT UL grant is configured can be sent by independently performing 25us LBT without participating in MC LBT in the corresponding carrier set. In addition, even if cat-4LBT of a designated carrier among the subframes configured with cat-4LBT fails, UL transmission of the UL grant carrier with cat-2LBT that has been received can be performed independently.
[0396] In addition, when transmitting through multiple LAA SCell carriers, the MCOT set in a specific carrier can be shared by multiple carriers as follows. In addition, the corresponding MCOT can be configured to start from the channel occupancy in the carrier performing cat-4 LBT.
[0397] - A base station initiating DL transmission based on Type B multi-carrier LBT of obtaining MCOT can share channel occupancy with user equipment on all carriers that have completed Type B LBT.
[0398] -After the operator performing cat-4LBT completes cat-4LBT, DL transmission can be used to start channel occupation,
[0399] On the other hand, when it is configured to perform cat-4 LBT as the LBT type at the start time of the UL transmission burst for UL transmission on the LAA SCell, the following two methods can be considered.
[0400] - As a method, if cat-4LBT is completed before transmission of SF#(n+2) on the LAA SCell by setting cat-4LBT to be performed from SF#(n+1) on the LAA SCell, UL data transmission scheduled in UL SF#(n+2) and UL SF#(n+3) may be performed. If cat-4LBT is not completed before transmission of SF#(n+2) on the LAA SCell, cat-4LBT may be performed until transmission of SF#(n+3) on the LAA SCell.
[0401] -As another method, if 25us LBT is performed just before SF#(n+2) transmission on LAA SCell and cat-2 LBT succeeds, UL data transmission can be performed in UL SF#(n+2) and UL SF#(n+3). Here, if 25us LBT fails, the following two methods can be considered.
[0402] As a first method, if 25us LBT is performed continuously and LBT is successful, transmission can be performed in UL SF#(n+3). In this case, if 25us LBT is successful in UL SF#(n+2), UL transmission is configured to start after the LBT success time but the CP of the next symbol, that is, SF#(n+3) can be extended to occupy a part of UL SF#(n+2) after LBT success.
[0403] During the transmission of (continuous) UL subframes in LAA SCell carriers to be transmitted by multiple carriers, together with the implementation of power scaling operation for transmission of the licensed carrier in a power limited state, a specific subframe may not be transmitted. When the transmission of subframes (e.g., UL SF #(n+1)) of multiple LAA SCell carriers becomes impossible due to the transmission of the licensed carrier, such as Fig.29As shown in , it is necessary to perform the additional LBT as described above for transmission of the latter subframe (e.g., UL SF#(n+2)) of the LAA SCell carrier. However, there are various LBT procedures for multi-carrier transmission (e.g., UL MC LBT type 1 or UL MC LBT type 2), and the LBT procedure for UL subframe transmission should be determined after discarding the subframe for transmission according to each MC LBT procedure.
[0404] - In case independent UL LBT is performed for each LAA SCell carrier (e.g., UL MC LBT type 1), later UL subframe transmissions may be performed through additional LBT in the UL subframe where the transmission is dropped as follows.
[0405] ·As in UL MC LBT Type 1, LAA SCell LBT (e.g., cat-4 or 25us LBT) may be implemented independently for each carrier. In this case, if UL transmission is not performed in UL SF #(n+1) for each LAA SCell carrier, 25us LBT may be performed for UL SF #(n+2) transmission, and UL transmission may be performed in carriers where the channel is not idle. In carriers where the channel is not idle, additional cat-4 LBT may be performed (in this case, the LBT priority category defined in the UL grant is considered or the above priority category is selected), and if the channel is idle UL transmission is possible in the later UL subframe.
[0406] Even if LAA SCell LBT is implemented independently for each carrier as in UL MC LBT Type 1, if a subframe to be discarded occurs as in UL SF #(n+1), 25us LBT may be performed independently of each carrier. In this regard, if a carrier whose channel is not idle occurs, a specific carrier may be selected and cat-4 LBT may be performed on the selected carrier. In addition, only 25us LBT may be performed on other carriers (including the remaining carriers whose channels are not idle), and whether to perform later UL subframe transmission may be determined for each carrier.
[0407] In a subframe configured to perform 25us LBT by UL grant according to the above process, by performing only 25us LBT without the cat-4 LBT process, UL transmission can be performed in a later subframe (e.g., ULSF#(n+2)) after discarding the subframe in which transmission is performed. In addition, when cat-4 LBT is performed only on a specific carrier and 25us LBT is performed on other carriers, it is possible to participate in simultaneous transmission on a subframe configured with 25us LBT by UL grant.
[0408] -In the case of UL multi-carrier transmission schemes, such as UL MC LBT type 2, cat-4 LBT is performed based on a specific designated carrier in the LAA SCell, and 25us LBT is performed on other carriers for which a cat-4 LBT UL grant is received for subframe transmission, the following method can be regarded as an additional LBT scheme for UL subframe transmission before the UL subframe in which the transmission is abandoned (e.g., UL SF#(n+1)).
[0409] In case a cat-4 LBT UL grant UL subframe is received as in UL MC LBT type 2, if a UL subframe of transmission is discarded before completion, a 25us LBT is performed for each carrier for subsequent UL subframe transmission, and subsequent UL subframe transmission is possible in a carrier where the channel is idle. For carriers where the channel is not idle, an additional cat-4 LBT is performed, and UL subframe transmission is possible if the channel is idle.
[0410] In the case where a cat-4 LBT UL grant UL subframe is received as in UL MC LBT type 2, if a UL subframe in which transmission is discarded occurs before completion, a designated carrier may be additionally set (or a previously defined designated carrier may be reused) for later UL subframe transmission. Then, LBT similar to UL MC LBT type 2 is performed by performing 25us LBT on other carriers and performing cat-4 LBT on the designated carrier, and then whether to perform transmission may be determined for each carrier in a later UL subframe after the UL subframe in which transmission is discarded. In this regard, 25us LBT may be performed before setting a designated carrier for cat-4 LBT, and adding a designated carrier may be performed on a carrier whose channel is not idle at this time.
[0411] In the case where a cat-4 LBT UL grant UL subframe is received as in UL MC LBT type 2, if a UL subframe in which transmission is discarded occurs before completion, only 25us LBT can be performed for the subsequent UL subframe transmission. That is, it is also possible to transmit the subsequent UL subframe only on a carrier where the channel is idle for 25us, and to perform transmission by checking only 25us just before the transmission of the immediately following UL subframe (e.g., UL SF#(n+2)).
[0412] When additional cat-4 LBT or 25us LBT is performed as described above, it can be performed on a carrier to which cat-4 LBT is assigned by UL grant. Meanwhile, in the case of a UL subframe in which 25us LBT is configured by UL grant, if additional LBT is performed due to transmission discard, subsequent UL subframe transmission may be performed in consideration of the success of independent 25us LBT. However, in order to perform simultaneous MC transmission by a user equipment, an operation similar to that of a subframe in which cat-4 LBT UL grant is configured is performed by participating in an additional cat-4 LBT or 25us LBT.
[0413] For UL subframe transmission after the subframe in which transmission is discarded, in the case of carrier transmission in which 25us LBT (including cat-4LBT) is successful for the additional LBT scheme proposed above, it is possible to send a signal for channel reservation by extending the CP by copying the signal sent from the OFDM symbol with CP extension.
[0414] Fig.30 The configuration of a user equipment and a base station according to an exemplary embodiment of the present invention is illustrated. In the present invention, the user equipment can be implemented by various types of wireless communication devices or computing devices that ensure portability and mobility. The user equipment (UE) can be referred to as a terminal, a station (STA), a mobile user (MS), etc. In the present invention, the base station can control and manage cells corresponding to the service area (e.g., macro cells, femto cells, micro cells, etc.), and perform functions including signal transmission, channel designation, channel monitoring, self-diagnosis, relaying, etc. The base station can be referred to as an evolved node B (eNB), an access point (AP), etc.
[0415] Reference Fig.30 , the user equipment 100 may include a processor 110 , a communication module 120 , a memory 130 , a user interface unit 140 , and a display unit 150 .
[0416] The processor 110 may execute various commands or programs according to the present invention and process data in the user equipment 100. Further, the processor 110 may control all operations of the corresponding units of the user equipment 100 and control data transmission / reception between these units. For example, the processor 110 may perform DL / UL transmission / reception in an LTE-U cell in an LAA environment. In detail, the processor 110 may perform the aforementioned various operations, such as DL / UL transmission / reception, verification of HARQ-ACK feedback sets, CWS adjustment, etc.
[0417] The communication module 120 may be an integrated module for performing mobile communication by using a mobile communication network and performing wireless LAN access by using a wireless LAN. To this end, the communication module 120 may include a plurality of network interface cards, such as cellular communication interface cards 121 and 122 and an internal or external type wireless LAN interface card 123. Fig.30 In the embodiment, the communication module 120 is shown as an integrated module, but may be configured according to a circuit or different Fig.30 The corresponding network interface card is set independently according to the purpose.
[0418] The cellular communication interface card 121 sends / receives a radio signal to / from at least one of the base station 200, the external device, and the server by using a mobile communication network, and provides a cellular communication service at a first frequency band based on a command of the processor 110. The cellular communication interface card 121 may include at least one NIC module using an LTE licensed frequency band. The cellular communication interface card 122 sends / receives a radio signal to / from at least one of the base station 200, the external device, and the server by using a mobile communication network, and provides a cellular communication service at a second frequency band based on a command of the processor 110. The cellular communication interface card 122 may include at least one NIC module using an LTE unlicensed frequency band. For example, the LTE unlicensed frequency band may be a band of 2.4 GHz or 5 GHz.
[0419] The wireless LAN interface card 123 transmits / receives a radio signal to / from at least one of the base station 200, an external device, and a server through a wireless LAN access, and provides a wireless LAN service at a second frequency band based on a command of the processor 110. The wireless LAN interface card 123 may include at least one NIC module using a wireless LAN frequency band. For example, the wireless LAN frequency band may be an unlicensed radio band, such as a 2.4 GHz or 5 GHz band.
[0420] The memory 130 stores a control program and various result data used in the user equipment 100. The control program may include a program required for the user equipment 100 to perform wireless communication with at least one of the base station 200, the external device, and the server. The user interface 140 includes various types of input / output devices provided in the user equipment 100. The display unit 150 outputs various images on a display screen.
[0421] Further, the base station 200 according to the exemplary embodiment of the present invention may include a processor 210 , a communication module 220 , and a memory 230 .
[0422] The processor 210 may execute various commands or programs according to the present invention and process data in the base station 200. Further, the processor 210 may control all operations of the corresponding units of the base station 200 and control data transmission / reception between these units. For example, the processor 210 may perform DL / UL transmission / reception based on LBT in an LAA environment. Specifically, the processor 210 may perform the aforementioned various operations, such as DL / UL transmission / reception, verification of HARQ-ACK feedback sets, CWS adjustment, etc.
[0423] The communication module 220 may be an integrated module for performing mobile communication by using a mobile communication network and performing wireless LAN access by using a wireless LAN, such as the communication module 120 of the user device 100. To this end, the communication module 120 may include a plurality of network interface cards, such as cellular communication interface cards 221 and 222 and an internal or external type wireless LAN interface card 223. Fig.25 In the embodiment, the communication module 220 is shown as an integrated module, but may be configured according to a circuit or different Fig.25 The corresponding network interface card is set independently according to the purpose.
[0424] The cellular communication interface card 221 sends / receives a radio signal to / from at least one of the user equipment 100, the external device, and the server by using a mobile communication network, and provides a cellular communication service at a first frequency band based on a command of the processor 210. The cellular communication interface card 221 may include at least one NIC module using an LTE licensed frequency band. The cellular communication interface card 222 sends / receives a radio signal to / from at least one of the user equipment 100, the external device, and the server by using a mobile communication network, and provides a cellular communication service at a second frequency band based on a command of the processor 210. The cellular communication interface card 222 may include at least one NIC module using an LTE unlicensed frequency band. The LTE unlicensed frequency band may be a band of 2.4 GHz or 5 GHz.
[0425] The wireless LAN interface card 223 sends / receives a radio signal to / from at least one of the user equipment 100, an external device, and a server through a wireless LAN access, and provides a wireless LAN service at a second frequency band based on a command of the processor 210. The wireless LAN interface card 223 may include at least one NIC module using a wireless LAN frequency band. For example, the wireless LAN frequency band may be an unlicensed radio band, such as a 2.4 GHz or 5 GHz band.
[0426] exist Fig.25In the figure, the blocks of the user equipment and the base station are logically divided and the elements of the device are illustrated. Depending on the design of the device, the elements of the device can be installed as one chip or multiple chips. Further, some components of the user equipment 100 (that is, the user interface 140 and the display unit 150) can be selectively set in the user equipment 100. Further, some components of the base station 200 (that is, the wireless LAN interface 223, etc.) can be selectively set in the base station 200. If necessary, the user interface 140 and the display unit 150 can also be set in the base station 200.
[0427] The method and system of the present invention are described in conjunction with specific embodiments, but some or all of the components and operations of the present invention may be implemented by using a computer system with a general hardware architecture.
[0428] The description of the present invention is used for illustration, and those skilled in the art will appreciate that the present invention can be easily modified into other detailed forms without changing the technical spirit or essential features of the present invention. Therefore, the aforementioned exemplary embodiments are illustrative in all respects, rather than restrictive. For example, each component described as a single type can be implemented as a distributed component, and similarly, the components described as distributed components can also be implemented in a combined form.
[0429] The scope of the present invention is indicated by the claims to be described below rather than the detailed description, but the scope of the present invention should be interpreted as the meaning and scope of the claims and all changes or modifications from equivalents thereof are within the scope of the present invention.
[0430] Industrial Applicability
[0431] The present invention can be used in various communication devices used in a wireless communication system (for example, a station or access point using unlicensed band communication, a station or base station using cellular communication, etc.).
Claims
1. A method for performing uplink transmission in an unlicensed frequency band by a user equipment in a wireless communication system, the method comprising: receiving uplink scheduling information; and performing channel access to resume the uplink transmission when the user equipment has stopped transmission during uplink transmission being performed in the unlicensed frequency band according to the uplink scheduling information, wherein a first type of channel access is performed when a channel sensed by the user equipment after the transmission has been stopped is not continuously idle, and a second type of channel access is performed when a channel sensed by the user equipment after the transmission has been stopped is continuously idle, wherein the first type of channel access includes performing a random backoff after first channel sensing, and the second type of channel access includes only performing a second channel sensing without the random backoff, The sensing interval of the second channel sensing is one of 16us, 25us, 34us or 43us.
2. The method according to claim 1, in, The uplink transmission comprises transmission over a plurality of subframes, and Wherein, stopping the transmission by the user equipment during the uplink transmission comprises stopping the transmission in a subframe other than a last subframe among the plurality of subframes.
3. The method according to claim 1, in, The wireless communication system includes a wireless communication system based on the 3rd Generation Partnership Project 3GPP, and The first type of channel access includes type-4 listen before talk LBT, and the second type of channel access includes type-2 LBT.
4. The method according to claim 1, in, The first type of channel access includes performing the random backoff using a variable size contention window CW, and The second type of channel access includes performing the second channel sensing within a duration of 25 us without the random backoff.
5. A user equipment used in a wireless communication system, the user equipment comprising: Wireless communication module; and processor, Wherein, the processor is configured to: receiving uplink scheduling information, and When the user equipment has stopped transmission during uplink transmission being performed according to the uplink scheduling information in an unlicensed frequency band, performing channel access to resume the uplink transmission, wherein a first type of channel access is performed when a channel sensed by the user equipment after the transmission has been stopped is not continuously idle, and a second type of channel access is performed when a channel sensed by the user equipment after the transmission has been stopped is continuously idle, wherein the first type of channel access includes performing a random backoff after first channel sensing, and the second type of channel access includes only performing a second channel sensing without the random backoff, The sensing interval of the second channel sensing is one of 16us, 25us, 34us or 43us.
6. The user equipment according to claim 5, in, The uplink transmission comprises transmission over a plurality of subframes, and Wherein, stopping the transmission by the user equipment during the uplink transmission comprises stopping the transmission in a subframe other than a last subframe among the plurality of subframes.
7. The user equipment according to claim 5, in, The wireless communication system includes a wireless communication system based on the 3rd Generation Partnership Project 3GPP, and Among them, the first type of channel access includes category-4 listen before talk LBT and the second type of channel access includes category-2 LBT.
8. The user equipment according to claim 5, in, The first type of channel access includes performing the random backoff using a variable size contention window CW, and The second type of channel access includes performing the second channel sensing within a duration of 25 us without the random backoff.
