Business prediction method and device, electronic device and readable storage medium

By dividing the communication network area into grids and four-quadrant diagrams, screening key feature factors and combining them with vector machines and multi-dimensional prediction models, we solve the problems of poor adaptability and large errors in business prediction methods in the existing technology, and achieve more efficient and Accurate 4G and 5G traffic forecasts.

CN115767569BActive Publication Date: 2024-10-15CHINA MOBILE GRP GUANGDONG CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111028675.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-09-02
Publication Date
2024-10-15
Estimated Expiration
2041-09-02

AI Technical Summary

Technical Problem

Existing communication network business prediction methods have a single prediction type and poor adaptability. They fail to effectively consider multiple traffic influencing factors, resulting in large model prediction errors and are unable to meet the complex needs of 4G and 5G communication networks.

Method used

Divide the target area into grid areas and divide it into four quadrants, screen out key feature factors based on the correlation of feature factors in each quadrant area, combine vector machines and multi-dimensional prediction models to predict business volume, and consider multiple scenarios and factors. Improve prediction accuracy and scope of application.

Benefits of technology

Through multi-dimensional forecasting models and key feature factor screening, the accuracy and adaptability of business volume forecasting are significantly improved. It can flexibly adapt to different scenarios, reduce forecasting errors, and improve forecasting efficiency and accuracy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115767569B_ABST
    Figure CN115767569B_ABST
Patent Text Reader

Abstract

The present invention provides a business prediction method and device, an electronic device and a readable storage medium, wherein the method comprises: dividing a target area into different grid areas; dividing a four-quadrant diagram based on the single carrier traffic of 4G and 5G cells in each grid area; based on the correlation of the feature factors in each quadrant area in the four-quadrant diagram, respectively screening out the key feature factors of each quadrant area; inputting the key feature factors of each quadrant area into a vector machine model, and outputting the total business volume prediction result of the target area, wherein the vector machine model is obtained after training based on the key feature factor sample data and the predetermined total business volume label. The present invention fully considers the influence of external factors on the prediction effect; can flexibly adapt to various scenarios, and perform classification prediction according to the scenarios, and has a wider scope of application; using combined prediction, compared with traditional methods, can greatly improve the prediction efficiency and accuracy.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of communications, and in particular to a service prediction method and device, an electronic device, and a readable storage medium. Background Art

[0002] With the continuous development of mobile communication networks, the current communication networks are in the stage of 4G and 5G coexistence. The 4G and 5G communication business volume reflects the current communication network load. The 4G and 5G business forecasts are of great value to the maintenance, planning and construction of mobile communication networks. Timely and accurate business forecasts can effectively help mobile operators optimize and build networks, guide network expansion, and improve network performance and quality.

[0003] The existing prediction schemes have a single prediction type and poor adaptability. For example, the time series prediction method only reflects the periodicity and historical trends of traffic. The linear prediction method has a simple model and fails to consider enough factors affecting traffic. When the influencing factors change, the model prediction error is large. Summary of the invention

[0004] The present invention provides a business prediction method and device, an electronic device and a readable storage medium, which are used to solve the technical defects existing in the prior art.

[0005] The present invention provides a business forecasting method, comprising:

[0006] Divide the target area into different grid areas;

[0007] Based on the single-carrier traffic of 4G and 5G cells in each grid area, a four-quadrant graph is drawn;

[0008] Based on the correlation between the two characteristic factors in each quadrant area of ​​the four-quadrant diagram, the key characteristic factors of each quadrant area are respectively screened out;

[0009] The key feature factors of each quadrant area are input into a vector machine model, and a total business volume prediction result of the target area is output, wherein the vector machine model is obtained after training based on key feature factor sample data and a predetermined total business volume label.

[0010] According to the business forecasting method of the present invention, wherein, after inputting the key feature factors of each quadrant area into a vector machine model and outputting the total business volume forecast result of the target area, the method comprises:

[0011] The total traffic volume prediction result and all characteristic factors in each quadrant area are input into a multidimensional prediction model, and the 4G traffic volume prediction result and 5G traffic volume prediction result of the target area are output; wherein the multidimensional prediction model is obtained after training based on the total traffic volume sample data, characteristic factor sample data and predetermined 4G traffic volume labels and 5G traffic volume labels.

[0012] According to the service prediction method of the present invention, wherein, after inputting the total service volume prediction result and all characteristic factors in each quadrant area into a multidimensional prediction model and outputting the 4G service volume prediction result and the 5G service volume prediction result of the target area, the method comprises:

[0013] Based on the 4G traffic volume prediction result and the 5G traffic volume prediction result of the target area, a 4G traffic growth rate and a 5G traffic growth rate of the target area are obtained;

[0014] Based on the 4G traffic growth rate, 5G traffic growth rate and preset 4G service inflection point conditions and 5G service inflection point conditions in the target area, the 4G service traffic inflection point and 5G service traffic inflection point of the target area are determined.

[0015] According to the service prediction method of the present invention, the four-quadrant diagram is divided based on the single carrier traffic of the 4G and 5G cells in each grid area, including:

[0016] The average value of 4G single-carrier traffic in each grid area is taken as the 4G center point;

[0017] The average value of 5G single-carrier traffic in each grid area is taken as the 5G center point;

[0018] The 4G center point and the 5G center point are combined as the quadrant area division centers to divide the diagram into four quadrants.

[0019] According to the business prediction method of the present invention, the key characteristic factors of each quadrant area are screened out based on the correlation between the two characteristic factors in each quadrant area of ​​the four-quadrant diagram, including:

[0020] The correlation between the two feature factors in each quadrant is calculated, and the feature factors in each quadrant whose correlation between the two feature factors is greater than a preset correlation threshold are selected as key feature factors.

[0021] According to the business prediction method of the present invention, the loss function of the vector machine model training is:

[0022]

[0023] Among them, n represents the number of sample data of key characteristic factors, y 1 i represents the total traffic volume label, y 1 i' represents the output total business volume forecast result.

[0024] The total traffic volume prediction result and all characteristic factors in each quadrant area are input into a multidimensional prediction model, and a 4G traffic volume prediction result and a 5G traffic volume prediction result are output; wherein the multidimensional prediction model is obtained after training based on the total traffic volume sample data, characteristic factor sample data and predetermined 4G traffic volume labels and 5G traffic volume labels.

[0025] According to the business prediction method of the present invention, the loss function of the multi-dimensional prediction model training is:

[0026]

[0027] Among them, n represents the number of characteristic factor sample data, y 2 i represents the 4G traffic label or the 5G traffic label, y 2 i' represents the output 4G traffic volume prediction result or 5G traffic volume prediction result.

[0028] The present invention also provides a business prediction device, comprising:

[0029] A grid area division module is used to divide the target area into different grid areas;

[0030] A four-quadrant diagram division module is used to divide a four-quadrant diagram based on the single carrier traffic of 4G and 5G cells in each grid area;

[0031] A key characteristic factor screening module, used to screen out the key characteristic factors of each quadrant area based on the correlation between the characteristic factors in each quadrant area of ​​the four-quadrant diagram;

[0032] The total business volume prediction module is used to input the key feature factors of each quadrant area into the vector machine model and output the total business volume prediction result of the target area, wherein the vector machine model is obtained after training based on the key feature factor sample data and the predetermined total business volume label.

[0033] The present invention also provides an electronic device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, the steps of any of the above-mentioned business prediction methods are implemented.

[0034] The present invention also provides a non-transitory computer-readable storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the steps of any of the above-mentioned business prediction methods are implemented.

[0035] The present invention divides the target area into different grid areas and divides them into four quadrants. According to the correlation between the characteristic factors in each quadrant, the key characteristic factors of each quadrant are screened out respectively. Compared with the traditional form of using a single factor for prediction, it is more innovative. According to different scenarios, the present invention obtains different effects of different prediction factors on the prediction effect, and fully considers the influence of external factors on the prediction effect. It can flexibly adapt to various scenarios and perform classified prediction according to the scenarios, and has a wider scope of application. The use of combined prediction can greatly improve the prediction efficiency and accuracy compared with traditional methods. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] In order to more clearly illustrate the technical solutions in the present invention or the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0037] Figure 1 It is a flow chart of the business forecasting method provided by the present invention;

[0038] Figure 2 It is a four-quadrant distribution diagram of single carrier traffic in the service prediction method provided by the present invention;

[0039] Figure 3 It is a flow chart of business volume prediction of a multi-dimensional prediction model in the business prediction method provided by the present invention;

[0040] Figure 4 It is a schematic diagram of the inflection points of 4G and 5G service traffic in the service prediction method provided by the present invention;

[0041] Figure 5 It is a structural schematic diagram of the business prediction device provided by the present invention;

[0042] Figure 6 It is a structural schematic diagram of the electronic device provided by the present invention. DETAILED DESCRIPTION

[0043] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the drawings of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0044] Combine the following Figure 1 A business forecasting method of the present invention is described, the method comprising:

[0045] S1, dividing the target area into different grid areas;

[0046] This step mainly divides the target area (which can be a city) into different grid areas according to geographical location. For example, a city can be divided into n networks according to the distance of 500 meters * 500 meters, namely grids A1, A2, A3...An, and the sum of all grid areas is the area of ​​the city. Alternatively, it can also be divided according to the number of sites, location area, administrative type, etc.

[0047] S2. Divide the graph into four quadrants based on the single carrier traffic of 4G and 5G cells in each grid area;

[0048] 4G and 5G cells refer to cells that cover both 4G and 5G networks. Figure 2 As shown, Figure 2 This is a four-quadrant distribution diagram of single-carrier traffic provided by the present invention.

[0049] First, different numbers of 4G and 5G cells are distributed in different grids. The 4G and 5G cell traffic in the corresponding grids are summed up and then divided by the total equivalent carrier number of the corresponding 4G and 5G cells. The calculation method of the equivalent carrier number of various standards and bandwidth cells is shown in Table 1 below:

[0050] Table 1

[0051]

[0052] By calculating with the above formula, we can get the single-carrier traffic of 4G and 5G cells. Then, according to the size of the single-carrier traffic of 4G and 5G cells, we can appropriately divide the area into four quadrants. For example, points A, B, C, and D are divided into the first, second, third, and fourth quadrants respectively.

[0053] S3, based on the correlation between the two characteristic factors in each quadrant area of ​​the four-quadrant diagram, respectively screen out the key characteristic factors of each quadrant area;

[0054] like Figure 2As shown, S201 shows the first quadrant area: key area. The 5G single-carrier traffic in this area is high, and the 4G single-carrier traffic is also high, indicating that the 4G traffic in this area is suppressed, and the 5G traffic is growing. After the 4G users in this area migrate to 5G, the suppressed traffic of the original 4G users is released. Therefore, when predicting the business in this area, the key characteristic factors are: the total number of 4G and 5G users, the single-carrier traffic of 4G and 5G, the utilization rate of 4G and 5G, and the traffic of 4G and 5G.

[0055] As shown in S202, the second quadrant area is the potential area. In this area, the 5G single-carrier traffic is high and the 4G single-carrier traffic is not high, which means that there is no suppression of 4G traffic in this area, and the 5G traffic is growing continuously. After the 4G users in this area migrate to 5G, the traffic of the original 4G users begins to decrease. As the users migrate, the traffic also migrates. When predicting the business in this area, the key characteristic factors are: the number of 5G terminal users, the number of 4G users locked by 5G terminals, the traffic of 4G and 5G single carriers, and the utilization rate of 4G and 5G.

[0056] As shown in S203, the third quadrant area is the problem area. The 5G single-carrier traffic in this area is not high, and the 4G single-carrier traffic is not high either, which means that the 4G traffic in this area is small, and the 5G traffic is also small. The traffic demand of 4G and 5G users in this area is not high. When predicting the service for this area, the characteristic factors focus on: the total number of 4G and 5G users, the 4G and 5G single-carrier traffic, the 4G and 5G utilization rate, and the proportion of terminals turning off 5G.

[0057] As shown in S204, the fourth quadrant area is the observation area. The 5G single-carrier traffic in this area is not high, but the 4G single-carrier traffic is high, indicating that the 4G traffic in this area is suppressed, but the 5G traffic is small. After the 4G users in this area migrate to 5G, the suppressed traffic of the original 4G users is released, but the 5G users may return to the 4G network due to perception problems. When predicting the service for this area, the characteristic factors focus on: 5G users lock 4G traffic, 5G users reverse 4G traffic, 4G, 5G single-carrier traffic, 4G, 5G utilization.

[0058] S4. Input the key feature factors of each quadrant area into a vector machine model, and output the total business volume prediction result of the target area, wherein the vector machine model is obtained after training based on the key feature factor sample data and the predetermined total business volume label.

[0059] Using these key characteristic factors as the input of the support vector machine model, first, filter out the factor data with high correlation with the business volume. Since the units of various factor data are different and the values ​​vary greatly, it is necessary to normalize the data for preprocessing. Different normalization methods will directly affect the prediction results. The following Table 2 shows the comparison data of prediction results with different normalizations:

[0060] Table 2

[0061] Normalization method Squared correlation coefficient % Average relative error% Raw data 84.42 22.43 [0,1] Normalization 99.11 4.89 [-1,1] Normalization 99.36 6.04

[0062] By performing different normalization processing on the data set, the accuracy of the established business volume prediction is different. From the verification results of this embodiment, the prediction effect is best after [0,1] normalization processing. Therefore, this embodiment divides 80% of the data into a training set and 20% of the data into a test set to establish a support vector machine model. And select appropriate kernel functions and parameters, train the sample test set data, and give the optimal model through multiple trainings. The error accuracy is tested through the verification set to verify whether the result has met the error accuracy requirements. If it does not meet the requirements, the kernel function and parameter modification verification will continue. After reaching the error accuracy, the parameter model is used to predict the total business volume. After normalization and feature extraction, the data prediction effect is better. Of course, the prediction effect can be achieved without normalization, but the effect is not as good as after normalization, and the error is relatively large.

[0063] When constructing a support vector machine algorithm model for total business volume forecasting, modeling can be performed based on dimensions such as cells, base stations, grids, and cities, and key feature factors can be automatically adapted as scene classifications change. In addition, since total business volume is affected by many factors, when using the support vector machine model for total business volume forecasting, it is not suitable for predicting changes in total business volume over a long period of time.

[0064] The present invention divides the target area into different grid areas and divides them into four quadrants. According to the correlation between the characteristic factors in each quadrant, the key characteristic factors of each quadrant are screened out respectively. Compared with the traditional form of using a single factor for prediction, it is more innovative. According to different scenarios, the present invention obtains different effects of different prediction factors on the prediction effect, and fully considers the influence of external factors on the prediction effect. It can flexibly adapt to various scenarios and perform classified prediction according to the scenarios, and has a wider scope of application. The use of combined prediction can greatly improve the prediction efficiency and accuracy compared with traditional methods.

[0065] According to the business forecasting method of the present invention, wherein, after inputting the key feature factors of each quadrant area into a vector machine model and outputting the total business volume forecast result of the target area, the method comprises:

[0066] The total traffic volume prediction result and all characteristic factors in each quadrant are input into a multidimensional prediction model, and the 4G traffic volume prediction result and 5G traffic volume prediction result of the target area are output; wherein the multidimensional prediction model is obtained after training based on the total traffic volume sample data, characteristic factor sample data and the predetermined 4G traffic volume label and 5G traffic volume label. 4G and 5G traffic volume refers to 4G and 5G traffic.

[0067] like Figure 3 As shown, Figure 3 The flowchart of the traffic volume prediction of the multidimensional prediction model (which can be a BP neural network) provided by the present invention. This illustration only shows the structure of a multidimensional prediction model, using a three-layer neural grid structure model, with 6 input layer nodes, 4 hidden layer nodes, and 1 output layer node, i.e., the predicted value.

[0068] The flow prediction steps in this embodiment are as follows:

[0069] All kinds of neuron data are normalized and preprocessed. Normalized data can make the influence weights of each feature dimension on the objective function consistent and improve the convergence speed of iterative solution.

[0070] 80% of the preprocessed data is divided into a training set, and 20% of the data is divided into a test set. The test set is mainly used to train the BP neural network model, and the validation set is mainly used to verify whether the trained model meets the accuracy requirements.

[0071] Determine the structure and network parameters of the multi-dimensional prediction model, adopt a three-layer neural grid structure model, and set the input layer nodes to 12, namely: the number of 4G and 5G users, 5G users locking 4G traffic, 5G users reflowing 4G traffic, the number of 5G terminal locking 4G users, 4G and 5G total traffic, total traffic, 4G and 5G single carrier traffic, 4G and 5G utilization. The number of hidden layer nodes is set to 16, and the output layer node is set to 1, that is, the predicted value of 4G and 5G total traffic; use random functions to generate initial weights and thresholds. The main purpose is to reduce the error of the training model and improve the speed and accuracy of model training. The initial weights are between neurons in the layers, and the thresholds are within the neurons.

[0072] Initialize various parameters, mainly the maximum number of training times, error accuracy, learning rate, number of nodes in each layer, and activation function settings of the input layer, hidden layer, and output layer.

[0073] The training set is input into the multidimensional prediction model for model training, and the error between the output result and the expected result is calculated.

[0074] If the error accuracy does not meet the requirements and the number of training times is less than the maximum number of training times, return to the step of initializing various parameters to correct the parameters;

[0075] If the error accuracy meets the requirements, the test set data is used for verification. If the verification error result meets the accuracy requirements, the model can be used for 4G and 5G traffic prediction.

[0076] When constructing a multi-dimensional prediction model to predict 4G and 5G traffic, it is also possible to model separately according to the dimensions of cells, base stations, grids and cities. The weight factors input into the multi-dimensional prediction model can be automatically adapted according to different scene classifications. In addition, since 4G and 5G traffic is also affected by many factors, when using a multi-dimensional prediction model to predict 4G and 5G traffic, it is not suitable to predict the changes in total traffic over a long period of time.

[0077] When modeling in different dimensions, the inputs and outputs are the same, but the dimensions are different.

[0078] For example, the inputs are: total number of 4G and 5G users, 4G and 5G single carrier traffic, 4G and 5G utilization rate, number of 5G terminal users, number of 4G users locked by 5G terminals, percentage of terminals shutting down 5G, 4G traffic locked by 5G users, 4G traffic reversed by 5G users, and total business volume.

[0079] There are two outputs: 4G traffic and 5G traffic.

[0080] However, when modeling a cell, the input is all cell-level data, and the output is cell-level 4G traffic and 5G traffic.

[0081] When modeling a base station: the input is all base station-level data, and the output is base station-level 4G traffic and 5G traffic.

[0082] When modeling a grid, the input is all grid-level data, and the output is grid-level 4G traffic and 5G traffic.

[0083] When modeling cities: the input is all city-level data, and the output is 4G traffic and 5G traffic at the city-level.

[0084] According to the service prediction method of the present invention, wherein, after inputting the total service volume prediction result and all characteristic factors in each quadrant area into a multidimensional prediction model and outputting the 4G service volume prediction result and the 5G service volume prediction result of the target area, the method comprises:

[0085] Based on the 4G traffic volume prediction result and the 5G traffic volume prediction result of the target area, a 4G traffic growth rate and a 5G traffic growth rate of the target area are obtained;

[0086] Based on the 4G traffic growth rate, 5G traffic growth rate and preset 4G service inflection point conditions and 5G service inflection point conditions in the target area, the 4G service traffic inflection point and 5G service traffic inflection point of the target area are determined.

[0087] like Figure 4 As shown, Figure 4 Schematic diagram of 4G and 5G service traffic inflection points provided by the present invention.

[0088] First, calculate the total traffic growth rate, 5G traffic growth rate and 4G traffic growth rate respectively. The traffic growth rate is calculated as follows: (current month traffic - last month traffic) / last month traffic = traffic growth rate;

[0089] The 4G service inflection point condition and the 5G service inflection point condition may be that both of the following conditions are met at the same time:

[0090] The growth rate of 5G traffic has been greater than the growth rate of total traffic and the growth rate of 4G traffic for three consecutive months;

[0091] If the 4G traffic growth rate is negative for three consecutive months and the total traffic growth rate is positive, the first month of negative growth is the turning point.

[0092] According to the prediction results of total traffic and 4G, 5G traffic, total traffic and 4G, 5G traffic will increase over time. When 4G users are converted to 5G users, 5G traffic growth will be faster than 4G traffic growth. During the conversion process, there will be an inflection point of 4G and 5G business traffic. 4G traffic will tend to be flat and gradually decrease, while 5G traffic will begin to gradually increase, as shown at point A in the figure. Point A is the inflection point of 4G and 5G business traffic.

[0093] According to the prediction results of total traffic and 4G and 5G traffic, total traffic and 4G and 5G traffic will increase over time. When 4G users are converted to 5G users, 5G traffic will grow faster than 4G traffic. In the conversion process, there will be an inflection point of 4G and 5G business traffic. 4G traffic tends to be flat and gradually decreases, while 5G traffic begins to gradually increase. This point is the inflection point of 4G and 5G business traffic. When predicting the inflection point of business traffic, predictions can be made in multiple dimensions, such as cell, base station, grid and city. Different dimensions will result in different predicted business traffic inflection points, but the principle of the inflection point position is the same.

[0094] According to the service prediction method of the present invention, the four-quadrant diagram is divided based on the single carrier traffic of the 4G and 5G cells in each grid area, including:

[0095] The average value of 4G single-carrier traffic in each grid area is taken as the 4G center point;

[0096] The average value of 5G single-carrier traffic in each grid area is taken as the 5G center point;

[0097] The 4G center point and the 5G center point are combined as the quadrant area division centers to divide the diagram into four quadrants.

[0098] According to the business prediction method of the present invention, the key characteristic factors of each quadrant area are screened out based on the correlation between the two characteristic factors in each quadrant area of ​​the four-quadrant diagram, including:

[0099] The correlation between the two feature factors in each quadrant is calculated, and the feature factors whose correlation between the two feature factors in each quadrant is greater than a preset correlation threshold are selected as key feature factors. After calculating the correlation between the two feature factors, the feature factors can be arranged according to the correlation, and the factors with high correlation are listed as key feature factors. For example, the factors with correlation greater than the correlation threshold (which can be set to 0.8) can be selected as key feature factors.

[0100] According to the business prediction method of the present invention, the loss function of the vector machine model training is:

[0101]

[0102] Among them, n represents the number of sample data of key characteristic factors, y 1 i represents the total traffic volume label, y 1 i' represents the output total business volume forecast result.

[0103] The total traffic volume prediction result and all characteristic factors in each quadrant area are input into a multidimensional prediction model, and a 4G traffic volume prediction result and a 5G traffic volume prediction result are output; wherein the multidimensional prediction model is obtained after training based on the total traffic volume sample data, characteristic factor sample data and predetermined 4G traffic volume labels and 5G traffic volume labels.

[0104] According to the business prediction method of the present invention, the loss function of the multi-dimensional prediction model training is:

[0105]

[0106] Among them, n represents the number of characteristic factor sample data, y 2 i represents the 4G traffic label or the 5G traffic label, y 2 i' represents the output 4G traffic forecast result or 5G traffic forecast result. 2 i represents the 4G traffic label, and y 2 i' represents the output 4G traffic forecast result; when y 2 i represents the 5G traffic label, and y 2 i' represents the output 5G traffic forecast result.

[0107] See also Figure 5The following describes the service prediction device provided by the present invention. The service prediction device described below and the service prediction method described above can be referred to each other. The service prediction device includes:

[0108] A grid area division module 10 is used to divide the target area into different grid areas;

[0109] The target area (which can be a city) can be divided into different grid areas according to the geographical location. For example, a city can be divided into n networks according to the distance of 500 meters * 500 meters, namely grids A1, A2, A3...An, and the sum of all grid areas is the area of ​​the city. Alternatively, it can be divided according to the number of sites, location area, administrative type, etc.

[0110] A four-quadrant diagram division module 20 is used to divide a four-quadrant diagram based on the single carrier traffic of the 4G and 5G cells in each grid area;

[0111] According to the size of the single-carrier traffic in the 4G and 5G cells, four different quadrants are divided into different areas for distribution, such as Figure 2 Points A, B, C, and D are divided into the first, second, third, and fourth quadrants respectively.

[0112] A key characteristic factor screening module 30 is used to screen out key characteristic factors of each quadrant area based on the correlation between the characteristic factors of each pair in each quadrant area of ​​the four-quadrant diagram;

[0113] like Figure 2 As shown, S201 shows the first quadrant area: key area. The 5G single-carrier traffic in this area is high, and the 4G single-carrier traffic is also high, indicating that the 4G traffic in this area is suppressed, and the 5G traffic is growing. After the 4G users in this area migrate to 5G, the suppressed traffic of the original 4G users is released. Therefore, when predicting the business in this area, the key characteristic factors are: the total number of 4G and 5G users, the single-carrier traffic of 4G and 5G, the utilization rate of 4G and 5G, and the traffic of 4G and 5G.

[0114] As shown in S202, the second quadrant area is the potential area. In this area, the 5G single-carrier traffic is high and the 4G single-carrier traffic is not high, which means that there is no suppression of 4G traffic in this area, and the 5G traffic is growing continuously. After the 4G users in this area migrate to 5G, the traffic of the original 4G users begins to decrease. As the users migrate, the traffic also migrates. When predicting the business in this area, the key characteristic factors are: the number of 5G terminal users, the number of 4G users locked by 5G terminals, the traffic of 4G and 5G single carriers, and the utilization rate of 4G and 5G.

[0115] As shown in S203, the third quadrant area is the problem area. The 5G single-carrier traffic in this area is not high, and the 4G single-carrier traffic is not high either, which means that the 4G traffic in this area is small, and the 5G traffic is also small. The traffic demand of 4G and 5G users in this area is not high. When predicting the service for this area, the characteristic factors focus on: the total number of 4G and 5G users, the 4G and 5G single-carrier traffic, the 4G and 5G utilization rate, and the proportion of terminals turning off 5G.

[0116] As shown in S204, the fourth quadrant area is the observation area. The 5G single-carrier traffic in this area is not high, but the 4G single-carrier traffic is high, indicating that the 4G traffic in this area is suppressed, but the 5G traffic is small. After the 4G users in this area migrate to 5G, the suppressed traffic of the original 4G users is released, but the 5G users may return to the 4G network due to perception problems. When predicting the service for this area, the characteristic factors focus on: 5G users lock 4G traffic, 5G users reverse 4G traffic, 4G, 5G single-carrier traffic, 4G, 5G utilization.

[0117] The total business volume prediction module 40 is used to input the key feature factors of each quadrant area into the vector machine model and output the total business volume prediction result of the target area, wherein the vector machine model is obtained after training based on the key feature factor sample data and the predetermined total business volume label.

[0118] Using these key feature factors as the input of the support vector machine model, first, filter out the factor data with high correlation with the business volume. Since the units of various factor data are different and the numerical values ​​vary greatly, the data needs to be normalized and preprocessed. Different normalization methods will directly affect the prediction results. By performing different normalization processing on the data set, the accuracy of the established business volume prediction is different. From the verification results of this embodiment, the prediction effect after [0,1] normalization processing is the best. Therefore, this embodiment divides 80% of the data into a training set and 20% of the data into a test set to establish a support vector machine model. And select appropriate kernel functions and parameters, train the sample test set data, and give the optimal model through multiple trainings. The error accuracy test is performed on the verification set to verify whether the result has met the error accuracy requirements. If it does not meet the requirements, continue to modify the kernel function and parameters for verification. After reaching the error accuracy, the parameter model is used to predict the total business volume. After normalization and feature extraction, the data prediction effect is better. Of course, the prediction effect can be achieved without normalization, but the effect is not as good as after normalization, and the error is relatively large.

[0119] When constructing a support vector machine algorithm model for total business volume forecasting, modeling can be performed based on dimensions such as cells, base stations, grids, and cities, and key feature factors can be automatically adapted as scene classifications change. In addition, since total business volume is affected by many factors, when using the support vector machine model for total business volume forecasting, it is not suitable for predicting changes in total business volume over a long period of time.

[0120] According to the business prediction device of the present invention, the business prediction device further comprises a multi-dimensional prediction module, and the multi-dimensional prediction module is used to:

[0121] The total traffic volume prediction result and all characteristic factors in each quadrant are input into a multidimensional prediction model, and the 4G traffic volume prediction result and 5G traffic volume prediction result of the target area are output; wherein the multidimensional prediction model is obtained after training based on the total traffic volume sample data, characteristic factor sample data and the predetermined 4G traffic volume label and 5G traffic volume label. 4G and 5G traffic volume refers to 4G and 5G traffic.

[0122] The flow prediction steps in this embodiment are as follows:

[0123] All kinds of neuron data are normalized and preprocessed. Normalized data can make the influence weights of each feature dimension on the objective function consistent and improve the convergence speed of iterative solution.

[0124] 80% of the preprocessed data is divided into a training set, and 20% of the data is divided into a test set. The test set is mainly used to train the BP neural network model, and the validation set is mainly used to verify whether the trained model meets the accuracy requirements.

[0125] Determine the structure and network parameters of the multi-dimensional prediction model, adopt a three-layer neural grid structure model, and set the input layer nodes to 12, namely: the number of 4G and 5G users, 5G users locking 4G traffic, 5G users reflowing 4G traffic, the number of 5G terminal locking 4G users, 4G and 5G total traffic, total traffic, 4G and 5G single carrier traffic, 4G and 5G utilization. The number of hidden layer nodes is set to 16, and the output layer node is set to 1, that is, the predicted value of 4G and 5G total traffic; use random functions to generate initial weights and thresholds. The main purpose is to reduce the error of the training model and improve the speed and accuracy of model training. The initial weights are between neurons in the layers, and the thresholds are within the neurons.

[0126] Initialize various parameters, mainly the maximum number of training times, error accuracy, learning rate, number of nodes in each layer, and activation function settings of the input layer, hidden layer, and output layer.

[0127] The training set is input into the multidimensional prediction model for model training, and the error between the output result and the expected result is calculated.

[0128] If the error accuracy does not meet the requirements and the number of training times is less than the maximum number of training times, return to the step of initializing various parameters to correct the parameters;

[0129] If the error accuracy meets the requirements, the test set data is used for verification. If the verification error result meets the accuracy requirements, the model can be used for 4G and 5G traffic prediction.

[0130] When constructing a multi-dimensional prediction model to predict 4G and 5G traffic, it is also possible to model separately according to the dimensions of cells, base stations, grids and cities. The weight factors input into the multi-dimensional prediction model can be automatically adapted according to different scene classifications. In addition, since 4G and 5G traffic is also affected by many factors, when using a multi-dimensional prediction model to predict 4G and 5G traffic, it is not suitable to predict the changes in total traffic over a long period of time.

[0131] When modeling in different dimensions, the inputs and outputs are the same, but the dimensions are different.

[0132] For example, the inputs are: total number of 4G and 5G users, 4G and 5G single carrier traffic, 4G and 5G utilization rate, number of 5G terminal users, number of 4G users locked by 5G terminals, percentage of terminals shutting down 5G, 4G traffic locked by 5G users, 4G traffic reversed by 5G users, and total business volume.

[0133] There are two outputs: 4G traffic and 5G traffic.

[0134] However, when modeling a cell, the input is all cell-level data, and the output is cell-level 4G traffic and 5G traffic.

[0135] When modeling a base station: the input is all base station-level data, and the output is base station-level 4G traffic and 5G traffic.

[0136] When modeling a grid, the input is all grid-level data, and the output is grid-level 4G traffic and 5G traffic.

[0137] When modeling cities: the input is all city-level data, and the output is 4G traffic and 5G traffic at the city-level.

[0138] According to the business forecasting device of the present invention, the business forecasting device further comprises an inflection point prediction module, and the inflection point prediction module is used to:

[0139] Based on the 4G traffic volume prediction result and the 5G traffic volume prediction result of the target area, a 4G traffic growth rate and a 5G traffic growth rate of the target area are obtained;

[0140] Based on the 4G traffic growth rate, 5G traffic growth rate and preset 4G service inflection point conditions and 5G service inflection point conditions in the target area, the 4G service traffic inflection point and 5G service traffic inflection point of the target area are determined.

[0141] First, calculate the total traffic growth rate, 5G traffic growth rate and 4G traffic growth rate respectively. The traffic growth rate is calculated as follows: (current month traffic - last month traffic) / last month traffic = traffic growth rate;

[0142] The 4G service inflection point condition and the 5G service inflection point condition may be that both of the following conditions are met at the same time:

[0143] The growth rate of 5G traffic has been greater than the growth rate of total traffic and the growth rate of 4G traffic for three consecutive months;

[0144] If the 4G traffic growth rate is negative for three consecutive months and the total traffic growth rate is positive, the first month of negative growth is the turning point.

[0145] According to the prediction results of total traffic and 4G, 5G traffic, total traffic and 4G, 5G traffic will increase over time. When 4G users are converted to 5G users, 5G traffic growth will be faster than 4G traffic growth. During the conversion process, there will be an inflection point of 4G and 5G business traffic. 4G traffic will tend to be flat and gradually decrease, while 5G traffic will begin to gradually increase, as shown at point A in the figure. Point A is the inflection point of 4G and 5G business traffic.

[0146] According to the prediction results of total traffic and 4G and 5G traffic, total traffic and 4G and 5G traffic will increase over time. When 4G users are converted to 5G users, 5G traffic will grow faster than 4G traffic. In the conversion process, there will be an inflection point of 4G and 5G business traffic. 4G traffic tends to be flat and gradually decreases, while 5G traffic begins to gradually increase. This point is the inflection point of 4G and 5G business traffic. When predicting the inflection point of business traffic, predictions can be made in multiple dimensions, such as cell, base station, grid and city. Different dimensions will result in different predicted business traffic inflection points, but the principle of the inflection point position is the same.

[0147] According to the business prediction device of the present invention, the four-quadrant graph division module 20 is specifically used for:

[0148] The average value of 4G single-carrier traffic in each grid area is taken as the 4G center point;

[0149] The average value of 5G single-carrier traffic in each grid area is taken as the 5G center point;

[0150] The 4G center point and the 5G center point are combined as the quadrant area division centers to divide the diagram into four quadrants.

[0151] According to the business forecasting device of the present invention, the key feature factor screening module 30 is specifically used for:

[0152] The correlation between the two feature factors in each quadrant is calculated, and the feature factors whose correlation between the two feature factors in each quadrant is greater than a preset correlation threshold are selected as key feature factors. After calculating the correlation between the two feature factors, the feature factors can be arranged according to the correlation, and the factors with high correlation are listed as key feature factors. For example, the factors with correlation greater than the correlation threshold (which can be set to 0.8) can be selected as key feature factors.

[0153] According to the business prediction device of the present invention, the loss function of the vector machine model training is:

[0154]

[0155] Among them, n represents the number of sample data of key characteristic factors, y 1 i represents the total traffic volume label, y 1 i' represents the output total business volume forecast result.

[0156] The total traffic volume prediction result and all characteristic factors in each quadrant area are input into a multidimensional prediction model, and a 4G traffic volume prediction result and a 5G traffic volume prediction result are output; wherein the multidimensional prediction model is obtained after training based on the total traffic volume sample data, characteristic factor sample data and predetermined 4G traffic volume labels and 5G traffic volume labels.

[0157] According to the business prediction device of the present invention, the loss function of the multi-dimensional prediction model training is:

[0158]

[0159] Among them, n represents the number of characteristic factor sample data, y 2 i represents the 4G traffic label or the 5G traffic label, y 2 i' represents the output 4G traffic forecast result or 5G traffic forecast result. 2 i represents the 4G traffic label, and y 2 i' represents the output 4G traffic forecast result; when y 2 i represents the 5G traffic label, and y 2 i' represents the output 5G traffic forecast result.

[0160] Figure 6An example of a physical structure diagram of an electronic device is shown, and the electronic device may include: a processor 310, a communication interface 320, a memory 330, and a communication bus 340, wherein the processor 310, the communication interface 320, and the memory 330 communicate with each other through the communication bus 340. The processor 310 may call the logic instructions in the memory 330 to execute the service prediction method, and the method includes:

[0161] S1, dividing the target area into different grid areas;

[0162] S2. Divide the graph into four quadrants based on the single carrier traffic of 4G and 5G cells in each grid area;

[0163] S3, based on the correlation between the two characteristic factors in each quadrant area of ​​the four-quadrant diagram, respectively screen out the key characteristic factors of each quadrant area;

[0164] S4. Input the key feature factors of each quadrant area into a vector machine model, and output the total business volume prediction result of the target area, wherein the vector machine model is obtained after training based on the key feature factor sample data and the predetermined total business volume label.

[0165] In addition, the logic instructions in the above-mentioned memory 330 can be implemented in the form of a software functional unit and can be stored in a computer-readable storage medium when it is sold or used as an independent product. Based on such an understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk and other media that can store program codes.

[0166] On the other hand, the present invention further provides a computer program product, the computer program product comprising a computer program stored on a non-transitory computer-readable storage medium, the computer program comprising program instructions, when the program instructions are executed by a computer, the computer can execute the business prediction method provided by the above methods, the method comprising:

[0167] S1, dividing the target area into different grid areas;

[0168] S2. Divide the graph into four quadrants based on the single carrier traffic of 4G and 5G cells in each grid area;

[0169] S3, based on the correlation between the two characteristic factors in each quadrant area of ​​the four-quadrant diagram, respectively screen out the key characteristic factors of each quadrant area;

[0170] S4. Input the key feature factors of each quadrant area into a vector machine model, and output the total business volume prediction result of the target area, wherein the vector machine model is obtained after training based on the key feature factor sample data and the predetermined total business volume label.

[0171] In another aspect, the present invention further provides a non-transitory computer-readable storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the method is implemented to perform the above-mentioned business prediction method, the method comprising:

[0172] S1, dividing the target area into different grid areas;

[0173] S2. Divide the graph into four quadrants based on the single carrier traffic of 4G and 5G cells in each grid area;

[0174] S3, based on the correlation between the two characteristic factors in each quadrant area of ​​the four-quadrant diagram, respectively screen out the key characteristic factors of each quadrant area;

[0175] S4. Input the key feature factors of each quadrant area into a vector machine model, and output the total business volume prediction result of the target area, wherein the vector machine model is obtained after training based on the key feature factor sample data and the predetermined total business volume label.

[0176] The device embodiments described above are merely illustrative, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Ordinary technicians in this field can understand and implement it without paying creative labor.

[0177] Through the description of the above implementation methods, those skilled in the art can clearly understand that each implementation method can be implemented by means of software plus a necessary general hardware platform, and of course, it can also be implemented by hardware. Based on this understanding, the above technical solution is essentially or the part that contributes to the prior art can be embodied in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, a disk, an optical disk, etc., including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods described in each embodiment or some parts of the embodiments.

[0178] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A business forecasting method, characterized in that: include: Divide the target area into different grid areas; Based on the single carrier traffic of 4G and 5G cells in each grid area, a four-quadrant diagram is divided; the 4G and 5G cells refer to cells that cover both 4G and 5G networks, and different numbers of 4G and 5G cells are distributed in different grid areas. The single carrier traffic of 4G and 5G cells in any of the grid areas is obtained by summing the traffic of 4G and 5G cells in the grid area and dividing it by the total equivalent carrier number of the 4G and 5G cells; Based on the correlation between the two characteristic factors in each quadrant area of ​​the four-quadrant diagram, the key characteristic factors of each quadrant area are respectively screened out; Inputting the key characteristic factors of each quadrant area into a vector machine model, and outputting a total business volume prediction result of the target area, wherein the vector machine model is obtained after training based on key characteristic factor sample data and a predetermined total business volume label; The four-quadrant diagram is divided based on the single carrier traffic of the 4G and 5G cells in each grid area, including: The average value of 4G single-carrier traffic in each grid area is taken as the 4G center point; The average value of 5G single-carrier traffic in each grid area is taken as the 5G center point; The 4G center point and the 5G center point are combined as quadrant area division centers to divide a four-quadrant graph; The key characteristic factors of each quadrant area are screened out based on the correlation between the two characteristic factors in each quadrant area of ​​the four-quadrant diagram, including: The correlation between the two feature factors in each quadrant is calculated, and the feature factors in each quadrant whose correlation between the two feature factors is greater than a preset correlation threshold are selected as key feature factors.

2. The business forecasting method according to claim 1, characterized in that: After inputting the key characteristic factors of each quadrant area into the vector machine model and outputting the total business volume prediction result of the target area, the method includes: The total traffic volume prediction result and all characteristic factors in each quadrant area are input into a multidimensional prediction model, and the 4G traffic volume prediction result and 5G traffic volume prediction result of the target area are output; wherein the multidimensional prediction model is obtained after training based on the total traffic volume sample data, characteristic factor sample data and predetermined 4G traffic volume labels and 5G traffic volume labels.

3. The business forecasting method according to claim 2, characterized in that: After inputting the total traffic volume prediction result and all characteristic factors in each quadrant area into a multidimensional prediction model and outputting the 4G traffic volume prediction result and the 5G traffic volume prediction result of the target area, the method includes: Based on the 4G traffic volume prediction result and the 5G traffic volume prediction result of the target area, a 4G traffic growth rate and a 5G traffic growth rate of the target area are obtained; Based on the 4G traffic growth rate, 5G traffic growth rate and preset 4G service inflection point conditions and 5G service inflection point conditions in the target area, the 4G service traffic inflection point and 5G service traffic inflection point of the target area are determined.

4. The business forecasting method according to claim 1, characterized in that: The loss function of the vector machine model training is: ; Among them, n represents the number of sample data of key feature factors, y1i represents the total business volume label, and y1i ’ Indicates the output total business volume forecast result; The total traffic volume prediction result and all characteristic factors in each quadrant area are input into a multidimensional prediction model, and a 4G traffic volume prediction result and a 5G traffic volume prediction result are output; wherein the multidimensional prediction model is obtained after training based on the total traffic volume sample data, characteristic factor sample data and predetermined 4G traffic volume labels and 5G traffic volume labels.

5. The business forecasting method according to claim 2, characterized in that: The loss function of the multidimensional prediction model training is: ; Where n represents the number of characteristic factor sample data, y2i represents the 4G traffic label or the 5G traffic label, and y2i ’ Indicates the output 4G business volume forecast result or 5G business volume forecast result.

6. A business prediction device, characterized in that: include: A grid area division module is used to divide the target area into different grid areas; A four-quadrant diagram division module is used to divide a four-quadrant diagram based on the single-carrier traffic of 4G and 5G cells in each grid area; the 4G and 5G cells refer to cells that cover both 4G and 5G networks, and different numbers of 4G and 5G cells are distributed in different grid areas. The single-carrier traffic of 4G and 5G cells in any of the grid areas is obtained by summing the traffic of 4G and 5G cells in the grid area and dividing it by the total equivalent carrier number of the 4G and 5G cells; A key characteristic factor screening module, used to screen out the key characteristic factors of each quadrant area based on the correlation between the characteristic factors in each quadrant area of ​​the four-quadrant diagram; A total business volume prediction module, used for inputting the key characteristic factors of each quadrant area into a vector machine model, and outputting the total business volume prediction result of the target area, wherein the vector machine model is obtained after training based on the key characteristic factor sample data and the predetermined total business volume label; The four-quadrant diagram division module is used for: The average value of 4G single-carrier traffic in each grid area is taken as the 4G center point; The average value of 5G single-carrier traffic in each grid area is taken as the 5G center point; The 4G center point and the 5G center point are combined as quadrant area division centers to divide a four-quadrant graph; The key characteristic factor screening module is used for: The correlation between the two feature factors in each quadrant is calculated, and the feature factors in each quadrant whose correlation between the two feature factors is greater than a preset correlation threshold are selected as key feature factors.

7. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the program, the steps of the business prediction method according to any one of claims 1 to 5 are implemented.

8. A non-transitory computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the business forecasting method according to any one of claims 1 to 5 are implemented.