A method for optimizing the design of pipe diameter for gas pre-extraction working face

By designing and calculating the gas drainage branch pipes in sections, the gas drainage volume and pipe diameter of each section area are solved, which solves the problem of unreasonable pipe diameter design in the gas drainage system in the existing technology, reduces the cost and improves efficiency. Extraction effect.

CN115795909BActive Publication Date: 2024-10-01CHINA COAL TECH & ENG GRP CHONGQING RES INST CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211631344.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-12-19
Publication Date
2024-10-01
Estimated Expiration
2042-12-19

AI Technical Summary

Technical Problem

In the existing gas drainage system, the pipe diameter design of the drainage branch pipes in the pre-drainage working face is not reasonable enough, resulting in high investment costs and poor drainage effects, especially the unreasonable selection of pipe diameters in local working face areas.

Method used

By designing the drainage branch pipes in the pre-drainage working face in sections, the gas drainage volume and pipe diameter of each section are calculated, and the inner diameter of each section of the drainage branch pipe is calculated using a formula to optimize the design of the drainage pipeline.

Benefits of technology

It achieves a more accurate division of the drainage pipe service area, reduces economic costs, improves the drainage effect, and optimizes the design of the gas drainage system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115795909B_ABST
    Figure CN115795909B_ABST
Patent Text Reader

Abstract

The present invention relates to a method for optimizing the design of the diameter of a gas pre-extraction working face extraction pipeline, and belongs to the field of gas extraction. The design method comprises the following steps: S1: when designing the diameter of the extraction branch pipe of the coal seam gas pre-extraction working face, the working face is designed in sections to determine the number of sections N; S2: according to the number of sections N of the extraction branch pipe, the length of the working face served by each section of the gas extraction branch pipe is determined; S3: according to the designed working face parameters and the measured basic parameters of the coal seam gas of the working face, the pure amount of gas to be extracted from each section of the pre-extraction working face and the amount of mixed gas to be extracted by the pipeline under the standard state are calculated; S4: according to the calculation formula of the gas extraction pipeline, the diameter of each section of the extraction branch pipe is calculated respectively. The present invention can more accurately divide the working face area served by the extraction pipe, optimize the problems of high economic cost and poor extraction effect caused by the selection of too large extraction pipelines, and thus provide support in the optimization design of the extraction system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of gas extraction and relates to a method for optimizing the diameter of a gas pre-extraction pipeline in a working face. Background Art

[0002] Coal seam gas, as the "number one killer" of coal mines, has induced a large number of coal mine safety accidents, seriously threatening the lives and property of coal miners and restricting the healthy development of the coal industry. Gas extraction is an effective measure to solve the prevention and utilization of coal mine gas disasters in my country, and the design of the gas extraction system is becoming more and more important in the gas extraction process. At present, the gas extraction system using the ground pump station is mainly composed of gas extraction pumps, gas extraction pipelines and supporting auxiliary equipment, and the investment cost of the extraction pipeline accounts for about 30% of the total investment of the extraction system. At present, the gas extraction pipeline is designed according to the "Gas Extraction Engineering Design Standard". When designing the diameter of the extraction branch pipe of the pre-extraction working face, the extraction pipe diameter is calculated according to the gas extraction volume of the entire pre-extraction working face. This is not the most reasonable diameter choice for the local working face area, which will not only affect the extraction effect, but also cause the investment cost to be too high because the diameter design is too large. Summary of the invention

[0003] In view of this, the purpose of the present invention is to provide a method for optimizing the diameter of gas pre-extraction pipelines in a gas pre-extraction working face, based on segmented design of the pre-extraction working face extraction pipes, and optimizing and calculating the most reasonable pipeline diameters for each section of the working face.

[0004] In order to achieve the above object, the present invention provides the following technical solutions:

[0005] The method comprises the following steps:

[0006] S1: When designing the diameter of the extraction branch pipe for the coal seam gas pre-extraction working face, the working face is designed in sections and the number of sections N is determined;

[0007] S2: According to the number of sections N of the gas extraction branch pipe, determine the length of the working face served by each gas extraction branch pipe;

[0008] S3: According to the designed working face parameters and the measured basic parameters of coal seam gas in the working face, calculate the pure amount of gas to be extracted in each pre-extraction working face and the amount of mixed gas to be extracted in the pipeline under standard conditions;

[0009] S4: According to the calculation formula of gas extraction pipeline, calculate the diameter of each extraction branch pipe separately.

[0010] Optionally, S1 is specifically: the number of segments N is divided according to the length of the pre-extraction working face. Generally, when the length of the working face is within 1 km, N is 2-3; when the length of the working face is greater than 1 km, N is 4-5.

[0011] Optionally, S2 is specifically: numbering the divided working face areas from 1 to N along the gas extraction direction, dividing the length of each divided working face area equally according to the number of segments, and the length of each working face area l = L1 / N, where L1 is the pre-extraction working face length.

[0012] Optionally, S3 is specifically: the following formula is used to calculate the gas extraction quantity Q of the working face area numbered 1 to N: 1n :

[0013]

[0014] Where K n , L 2n , M, γ, W 0n , W1, and t are the gas extraction imbalance coefficient of the working face area, working face width, average coal seam thickness, coal density, original gas content, pre-extraction standard gas content, and pre-extraction time.

[0015] Calculate the value Q based on the pure amount of gas extraction 1n , calculate the amount of mixed gas Q that needs to be extracted from the pipeline under standard conditions 2n :

[0016] Q 2n =Q 1n / c

[0017] Where Q 2n There should be a surplus coefficient of 1.2 to 1.8; c is the designed gas extraction concentration in the extraction pipe.

[0018] Optionally, S4 is specifically: according to the pure amount of gas extraction in each section of the working face, the calculated value Q 1n , calculate the mixed gas quantity Q under standard conditions in each pipeline section 2n , and then calculate the inner diameter of each section of the extraction pipeline as the basis for selecting the optimized extraction pipeline diameter:

[0019]

[0020] Where V is the economic flow rate, which can be 5m / s~12m / s.

[0021] The beneficial effects of the present invention are:

[0022] The method for optimizing the design of the diameter of the gas pre-extraction working face extraction pipeline provided by the present invention can, based on the segmented design of the extraction pipe of the pre-extraction working face, more accurately divide the working face area served by the extraction pipe, obtain the amount of gas that needs to be extracted by each section of the extraction pipe, calculate the reasonable diameter of each section of the extraction pipe of the working face, optimize the selection of too large extraction pipelines to solve the problems of high economic cost and poor extraction effect, thereby providing support for the optimized design of the extraction system.

[0023] Other advantages, objectives and features of the present invention will be described in the following description to some extent, and to some extent, will be obvious to those skilled in the art based on the following examination and study, or can be taught from the practice of the present invention. The objectives and other advantages of the present invention can be realized and obtained through the following description. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] In order to make the purpose, technical solutions and advantages of the present invention more clear, the present invention will be described in detail below in conjunction with the accompanying drawings, wherein:

[0025] Figure 1 It is a schematic diagram of the steps of the present invention. DETAILED DESCRIPTION

[0026] The following describes the embodiments of the present invention by specific examples, and those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. The present invention can also be implemented or applied through other different specific embodiments, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present invention. It should be noted that the illustrations provided in the following embodiments only illustrate the basic concept of the present invention in a schematic manner, and the following embodiments and the features in the embodiments can be combined with each other without conflict.

[0027] Among them, the drawings are only used for illustrative explanations, and they only represent schematic diagrams rather than actual pictures, and should not be understood as limitations on the present invention. In order to better illustrate the embodiments of the present invention, some parts of the drawings may be omitted, enlarged or reduced, and do not represent the size of actual products. For those skilled in the art, it is understandable that some well-known structures and their descriptions in the drawings may be omitted.

[0028] The same or similar numbers in the drawings of the embodiments of the present invention correspond to the same or similar parts; in the description of the present invention, it should be understood that if the terms "upper", "lower", "left", "right", "front", "rear", etc. indicate the orientation or position relationship, they are based on the orientation or position relationship shown in the drawings, which is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation. Therefore, the terms describing the position relationship in the drawings are only used for illustrative purposes and cannot be understood as limiting the present invention. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to specific circumstances.

[0029] See also Figure 1 , is a method for optimizing the diameter of gas pre-extraction pipelines in a gas pre-extraction working face, the method comprising the following steps:

[0030] S1: When designing the diameter of the extraction branch pipe for the coal seam gas pre-extraction working face, the working face is designed in sections and the number of sections N is determined;

[0031] S2: According to the number of sections N of the gas extraction branch pipe, determine the length of the working face served by each gas extraction branch pipe;

[0032] S3: According to the designed working face parameters and the measured basic parameters of coal seam gas in the working face, calculate the pure amount of gas to be extracted in each pre-extraction working face and the amount of mixed gas to be extracted in the pipeline under standard conditions;

[0033] S4: According to the calculation formula of gas extraction pipeline, calculate the diameter of each extraction branch pipe separately.

[0034] Optionally, S1 is specifically: the number of segments N is divided according to the length of the pre-extraction working face. Generally, when the length of the working face is within 1 km, N is 2-3; when the length of the working face is greater than 1 km, N is 4-5.

[0035] Optionally, S2 is specifically: numbering the divided working face areas from 1 to N along the gas extraction direction, dividing the length of each divided working face area equally according to the number of segments, and the length of each working face area l = L1 / N, where L1 is the pre-extraction working face length.

[0036] Optionally, S3 is specifically: the following formula is used to calculate the gas extraction quantity Q of the working face area numbered 1 to N: 1n :

[0037]

[0038] Where K n , L 2n , M, γ, W 0n, W1, and t are the gas extraction imbalance coefficient of the working face area, working face width, average coal seam thickness, coal density, original gas content, pre-extraction standard gas content, and pre-extraction time.

[0039] Calculate the value Q based on the pure amount of gas extraction 1n , calculate the amount of mixed gas Q that needs to be extracted from the pipeline under standard conditions 2n :

[0040] Q 2n =Q 1n / c

[0041] Where Q 2n There should be a surplus coefficient of 1.2 to 1.8; c is the designed gas extraction concentration in the extraction pipe.

[0042] Optionally, S4 is specifically: according to the pure amount of gas extraction in each section of the working face, the calculated value Q 1n , calculate the mixed gas quantity Q under standard conditions in each pipeline section 2n , and then calculate the inner diameter of each section of the extraction pipeline as the basis for selecting the optimized extraction pipeline diameter:

[0043]

[0044] Where V is the economic flow rate, which can be 5m / s~12m / s.

[0045] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the purpose and scope of the technical solution, which should be included in the scope of the claims of the present invention.

Claims

1. A method for optimizing the diameter of gas pre-extraction pipelines in a gas pre-extraction working face, characterized in that: The following steps are involved: S1: When designing the diameter of the extraction branch pipe of the coal seam gas pre-extraction working face, the working face is designed in sections to determine the number of sections N of the extraction branch pipe. The number of sections N is divided according to the length of the pre-extraction working face; S2: According to the number of sections N of the gas extraction branch pipe, determine the length of the working face served by each gas extraction branch pipe; S3: According to the designed working face parameters and the measured basic parameters of coal seam gas in the working face, calculate the pure amount of gas to be extracted in each pre-extraction working face and the amount of mixed gas to be extracted in the pipeline under standard conditions; The following formula is used to calculate the gas extraction quantity Q in the working face area numbered 1 to N: 1n : Where K n , L 2n , M, γ, W 0n , W1, and t are the gas extraction imbalance coefficient of the divided working face area, the working face width, the average coal seam thickness, the density of coal, the original gas content, the pre-extraction gas content that meets the standard, and the pre-extraction time; Calculate the value Q based on the pure amount of gas extraction 1n , calculate the amount of mixed gas Q that needs to be extracted from the pipeline under standard conditions 2n : Q 2n =Q 1n / c Where Q 2n There should be a surplus coefficient of 1.2 to 1.8; c is the designed gas extraction concentration in the extraction pipe; S4: According to the calculation formula of gas extraction pipeline, calculate the diameter of each extraction branch pipe respectively; according to the pure calculation value Q of gas extraction in each section of the working face 1n , calculate the mixed gas quantity Q under standard conditions in each pipeline section 2n , and then calculate the inner diameter of each section of the extraction pipeline as the basis for selecting the optimized extraction pipeline diameter: Where V is the economic flow rate.

2. The method for optimizing the diameter of gas pre-extraction pipelines in a gas pre-extraction working face according to claim 1 is characterized in that: When the working face length is less than 1 km, N is 2 to 3; when the working face length is greater than 1 km, N is 4 to 5.

3. The method for optimizing the diameter of gas pre-extraction pipelines in a gas pre-extraction working face according to claim 1 is characterized in that: S2 is specifically: the divided working face areas are numbered from 1 to N along the gas extraction direction, and the length of each divided working face area is equally divided according to the number of segments. The length of each working face area is l = L1 / N, where L1 is the length of the pre-extraction working face.

4. The method for optimizing the diameter of gas pre-extraction pipelines in a gas pre-extraction working face according to claim 1 is characterized in that: The economic flow velocity V can be 5m / s~12m / s.